Intercepting device for municipal engineering pipeline construction
By simplifying the structure of the municipal engineering pipeline construction interception device, which combines screws, conical heads, and pins, the convenience and safety issues of interception devices in municipal drainage pipeline maintenance are solved, reducing costs and improving ease of operation.
Patent Information
- Application Number
- CN202520573924.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-30
- Publication Date
- 2025-12-26
- Estimated Expiration
- 2035-03-30
AI Technical Summary
The lack of easily disassembled and reassembled interception devices during the maintenance of existing municipal drainage pipelines poses safety hazards to workers in the event of sudden floods. Furthermore, the existing devices are complex in structure and costly.
The municipal engineering pipeline construction interception device with a simplified structure includes a first support and a second support. It can be quickly fixed in pipes of different diameters through the combination of screws, conical heads and pins. The rubber layer and arc handle improve the convenience and safety of operation.
It enables rapid fixing in pipes of different diameters, reduces production costs, improves operational convenience and safety, is applicable to various pipe diameters, and simplifies structural design.
Smart Images

Figure CN223725796U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to municipal engineering pipeline construction field, concretely is a kind of municipal engineering pipeline construction interception device. BACKGROUND
[0002] Municipal engineering refers to the civil engineering, pipeline, equipment installation engineering of city road, public transport, water supply, drainage, gas, heat, garden, environmental sanitation, sewage treatment, garbage disposal, flood control, underground public facilities and auxiliary facilities.Among them, in drainage engineering, some drainage pipelines need workers to enter the pipeline for maintenance, and these pipelines are usually large in diameter, up to 1.2 meters.When workers are working in the pipeline, they may encounter unexpected situations, such as unexpected water inflow, and sometimes the water inflow is very large, so workers may be washed away without preparation, which poses a great safety hazard.
[0003] In existing drainage pipelines, the points that need to be repaired due to faults occur occasionally, so it is impossible to set a device to intercept workers at each repair point.Therefore, there is an urgent need for an interception device that can be quickly disassembled and assembled by workers on site.Chinese Utility Model Patent No.202421484725.8 discloses an interception protection device, which comprises an interception frame, a support rod installed on the interception frame, the support rod is arranged towards the inner wall of the well chamber, and the length of the support rod is adjustable relative to the inner wall of the well chamber to assemble the interception frame in the well chamber of different diameters.
[0004] The above-mentioned interception protection device adjusts the length of the support rod to assemble the interception frame in the well chamber of different diameters, and the support rod is adjustable in length to be completely assembled with the inner wall of the well chamber, so as to be clamped on the inner wall of the well chamber, effectively intercepting the workers who are about to be washed into the downstream pipeline, thereby greatly ensuring the safety of the workers.However, it uses a variety of components such as support rod, spring, pivot, limiting rod and interception rod, which has a complex structure and is not conducive to cost reduction. SUMMARY
[0005] In view of the deficiencies of the prior art, the utility model provides a municipal engineering pipeline construction interception device, which can simplify the structure, reduce the cost, and support and fix the pipeline of different diameters, intercept the maintenance personnel, and effectively solve the problems raised in the background art.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical scheme: a municipal engineering pipeline construction interception device, comprising a vertical first support member, the first support member comprises a screw sleeve with an upper opening, a screw rod is threadedly connected in the screw sleeve, a first conical head is fixedly arranged at the top of the screw rod, and a second conical head is fixedly arranged on the bottom surface of the screw sleeve;
[0007] The upper end side of the screw sleeve of the first support is provided with a vertical fixing plate, a through hole is arranged on the fixing plate, a second support is transversely and slidingly arranged in the through hole, and the structure of the second support is same as that of the first support.
[0008] As a preferred technical scheme, the screw rod on the lower side of the first conical head is provided with a transverse first perforation, and a first pin shaft is slidingly arranged in the first perforation.
[0009] As a preferred technical scheme, the first pin shaft comprises a transverse plug rod, and a cylindrical limiting block is fixedly arranged at one end of the plug rod.
[0010] As a preferred technical scheme, the screw sleeve on the upper side of the second conical head is transversely provided with a second perforation, and a second pin shaft is slidingly arranged in the second perforation, and the structure of the second pin shaft is same as that of the first pin shaft.
[0011] As a preferred technical scheme, the length of the screw rod is greater than the length of the screw sleeve.
[0012] As a preferred technical scheme, the screw sleeve is a stainless steel screw sleeve, and the screw rod is a stainless steel screw rod.
[0013] As a preferred technical scheme, the plug rod of the first pin shaft is provided with a rubber layer on the outer surface, and the rubber layer is in damping sliding fit with the first perforation.
[0014] As a preferred technical scheme, the plug rod of the second pin shaft is provided with a rubber layer on the outer surface, and the rubber layer is in damping sliding fit with the second perforation.
[0015] As a preferred technical scheme, rubber bolts for limiting the screw rod are respectively screwed inward on one side of the upper end of the screw sleeve.
[0016] As a preferred technical scheme, the screw sleeve side of the first support and the screw sleeve side of the second support are respectively fixedly provided with arc-shaped handles.
[0017] Compared with the prior art, the utility model provides a municipal engineering pipeline construction interception device, has the following beneficial effects:
[0018] 1.The utility model discloses a first support piece includes the screw bush of upper opening, be provided with the screw rod in the screw bush, the top of screw rod is fixed with first conical head, and the bottom surface of screw bush is fixed with second conical head, and the upper end side of screw bush of first support piece is equipped with vertical fixed plate, and is equipped with through -hole in the fixed plate, and the second support piece is horizontally slidably arranged in the through -hole, and the structure of second support piece is same with the structure of first support piece, when using, first support piece and second support piece are respectively taken into the overhaul point in pipeline, first support piece is placed vertically first, makes second conical head resist the bottom surface in pipeline, then rotates screw rod and makes screw rod stretch out, and then makes the first conical head of top resist the top surface in pipeline, makes first support piece vertical support fixed, then the second support piece is horizontally passed through the through -hole on the fixed plate, then makes second conical head resist the left surface in pipeline to left, and then rotates screw rod and makes first conical head resist the right surface in pipeline, makes second support piece horizontal support fixed, and the whole can play the blocking interception effect to the overhaul personnel, and the pointed head structure is not easy to slip, and the whole simplifies the structure, and is favorable for reducing production cost.
[0019] 2.The utility model discloses a first conical head downside screw rod is equipped with the first perforation of horizontal, and the first pin shaft is slidably arranged in the first perforation, and the first pin shaft includes the stick of horizontal, and the stick one end is fixed with the cylindrical limit block, and the screw bush of second conical head upside is equipped with the second perforation of horizontal, and the second pin shaft is slidably arranged in the second perforation, and the structure of second pin shaft is same with the structure of first pin shaft, when using, first pin shaft and second pin shaft are convenient for staff to hold and rotate screw rod or screw bush, and can disassemble the device without spanner.
[0020] 3.The utility model discloses a screw bush upper end one side still twists inwards respectively rubber bolt of the screw rod limit, when using, after first support piece and second support piece adjust position, can twist inwards rubber bolt, makes rubber bolt inner end resist screw rod, avoids the failure of supporting caused by loosening.
[0021] 4.The utility model discloses a first support piece and second support piece's screw bush side is respectively fixed with arc handle, when using, arc handle is convenient for staff to grasp when in distress, in addition, after first support piece and second support piece dismount, make screw rod retract as far as possible in screw bush, arc handle is convenient for staff to carry, is convenient for carrying and carrying. ACCURACY
[0022] The drawings described herein are used to provide further understanding of the utility model and constitute a part of this application:
[0023] Figure 1 It is the three -dimensional structure schematic diagram of embodiment 1 of the utility model;
[0024] Figure 2 It is Figure 1 The enlarged structure schematic diagram of first support piece in it
[0025] Figure 3 is a use state diagram for embodiment 1;
[0026] Figure 4 is a three-dimensional structure schematic view of embodiment 2 of the utility model;
[0027] Figure 5 is a three-dimensional structure schematic view of embodiment 3 of the utility model.
[0028] Indicated in the figure: 1. first support; 11. screw sleeve; 111. second perforation; 12. screw rod; 121. first perforation; 13. first conical head; 14. second conical head; 2. fixed plate; 21. through hole; 3. second support; 4. first pin shaft; 41. plug; 42. limit block; 5. second pin shaft; 6. pipeline; 7. rubber bolt; 8. arc handle. DETAILED DESCRIPTION
[0029] The technical solutions in the embodiments of the utility model will be clearly and completely described below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of protection of the utility model. Embodiment 1
[0030] As Figures 1 to 3 shown, a municipal engineering pipeline construction interception device, including vertical first support 1, first support 1 includes the screw sleeve 11 of upper opening, the screw sleeve 11 is screw threaded with screw rod 12, the top of screw rod 12 is fixedly provided with first conical head 13, the bottom surface of screw sleeve 11 is fixedly provided with second conical head 14. The upper end side of screw sleeve 11 of first support 1 is provided with vertical fixed plate 2, the center position of fixed plate 2 is provided with through hole 21, the second support 3 is slidably arranged in through hole 21 in the transverse direction, and the structure of the second support 3 is same with the structure of the first support 1 (the difference is that the side of the screw sleeve 11 of the second support 3 is not provided with the fixed plate 2).
[0031] The screw rod 12 below the first conical head 13 is provided with the first perforation 121 in the transverse direction, and the first pin shaft 4 is slidably arranged in the first perforation 121.
[0032] The first pin shaft 4 includes the plug 41 in the transverse direction, and the cylindrical limit block 42 is fixedly arranged at one end of the plug 41.
[0033] The screw sleeve 11 above the second conical head 14 is provided with the second perforation 111 in the transverse direction, and the second pin shaft 5 is slidably arranged in the second perforation 111, and the structure of the second pin shaft 5 is same with the structure of the first pin shaft 4.
[0034] The length of screw 12 is greater than the length of screw sleeve 11.
[0035] Screw insert 11 is a stainless steel screw insert, and screw 12 is a stainless steel screw.
[0036] The outer surface of the first pin 4 is provided with a rubber layer (not shown in the figure), and the rubber layer is in damping sliding fit with the first through hole 121.
[0037] The outer surface of the insert of the second pin 5 is provided with a rubber layer (not shown in the figure), and the rubber layer is in damping sliding fit with the second through hole 111.
[0038] In use, the first support 1 and the second support 3 are respectively brought into the maintenance point inside the pipeline. First, the first support 1 is placed vertically so that the second conical head 14 abuts against the inner bottom surface of the pipeline 6. Then, the screw 12 is rotated to extend the screw 12, so that the first conical head 13 at the top abuts against the inner top surface of the pipeline 6, thus vertically supporting and fixing the first support 1. Then, the second support 3 is passed horizontally through the through hole 21 on the fixing plate 2, so that the second conical head 14 of the second support 3 abuts against the left side of the pipeline 6. Then, the screw 12 is tightened so that the first conical head 13 abuts against the right side of the pipeline 6, thus horizontally supporting and fixing the second support 3. The whole device can block and intercept maintenance personnel. The pointed (conical head) structure is not easy to slip, and the overall structure is simplified, which helps to reduce production costs. The first pin 4 and the second pin 5 make it convenient for workers to hold and tighten the screw 12 or the screw sleeve 11, allowing the device to be disassembled and assembled without a wrench. Example 2
[0039] like Figure 4 As shown, rubber bolts 7 that limit the movement of the screw rod 12 are also screwed inward on one side of the upper end of the screw sleeve 11.
[0040] In use, after adjusting the positions of the first support 1 and the second support 3, the rubber bolt 7 can be screwed inward so that the inner end of the rubber bolt 7 abuts against the screw rod 12, preventing loosening and support failure. The rubber bolt 7 also protects the threads of the screw rod 12. Example 3
[0041] like Figure 5 As shown, the screw sleeves 11 of the first support member 1 and the second support member 3 are respectively fixed with arc-shaped handles 8.
[0042] When in use, the curved handle 8 makes it easy for staff to grip in case of danger. In addition, after the first support 1 and the second support 3 are disassembled, the screw 12 is retracted into the screw sleeve 11 as much as possible. The curved handle 8 makes it easy for staff to carry, and facilitates handling and carrying.
[0043] The components used in the utility model are all general standard components or components known by those skilled in the art, and the structure and principle thereof are well known to those skilled in the art.
[0044] It should be noted that, in this paper, the terms "first", "second", "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inner", "outer" and the like indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, and are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between the entities or operations. Moreover, the terms "include", "contain" or any other variant thereof are intended to cover non-exclusive inclusion, so that the process, method, article or device including a series of elements not only includes those elements, but also includes other elements not explicitly listed or inherent to such process, method, article or device.
[0045] The structure, proportion, size and the like shown in the drawings of the present specification are only used to cooperate with the content disclosed in the specification, so as to be understood and read by those skilled in the art, and are not used to limit the implementation conditions of the utility model. Any modification of structure, change of proportion relationship or adjustment of size, without affecting the effects and purposes that can be achieved by the utility model, should still fall within the scope of the technical content disclosed by the utility model.
[0046] Although the embodiments of the utility model have been shown and described, it can be understood by those skilled in the art that various changes, modifications, replacements and variations can be made to these embodiments without departing from the principles and spirits of the utility model, and the scope of the utility model is defined by the appended claims and their equivalents.
Claims
1. A municipal engineering pipeline construction interception device, characterized in that: The first support includes a vertical first support member, which includes a threaded sleeve with an upper opening. A screw is threadedly connected to the threaded sleeve, and a first conical head is fixedly provided on the top of the screw. A second conical head is fixedly provided on the bottom surface of the threaded sleeve. The upper end of the screw sleeve of the first support member is provided with a vertical fixing plate. The fixing plate is provided with a through hole, and a second support member is slidably inserted through the through hole. The structure of the second support member is the same as that of the first support member.
2. The municipal engineering pipeline construction interception device according to claim 1, characterized in that: The screw on the lower side of the first conical head is provided with a first transverse through hole, and a first pin is slidably inserted in the first through hole.
3. A municipal engineering pipeline construction interception device according to claim 2, characterized in that: The first pin includes a transverse insert rod, and a cylindrical limiting block is fixed at one end of the insert rod.
4. A municipal engineering pipeline construction interception device according to claim 2, characterized in that: The second conical head has a second through hole on the upper side of the threaded sleeve, and a second pin is slidably inserted in the second through hole. The structure of the second pin is the same as that of the first pin.
5. A municipal engineering pipeline construction interception device according to claim 1, characterized in that: The length of the screw is greater than the length of the sleeve.
6. A municipal engineering pipeline construction interception device according to claim 1, characterized in that: The threaded sleeve is a stainless steel threaded sleeve, and the screw is a stainless steel screw.
7. A municipal engineering pipeline construction interception device according to claim 2, characterized in that: The outer surface of the first pin is provided with a rubber layer, which slides in conjunction with the first perforation damping.
8. A municipal engineering pipeline construction interception device according to claim 4, characterized in that: The outer surface of the insert of the second pin is provided with a rubber layer, which slides in conjunction with the second perforation damping.
9. A municipal engineering pipeline construction interception device according to claim 1, characterized in that: The upper end of the sleeve is also screwed inward with rubber bolts to limit the position of the screw.
10. A municipal engineering pipeline construction interception device according to claim 1, characterized in that: The first and second support members are respectively provided with arc-shaped handles fixed on the sides of the threaded sleeves.