Building engineering hole filling device
By introducing volume detection and drying functions into the hole-filling device for building engineering, the problems of improper material filling and low drying efficiency have been solved, achieving the effects of precise filling and rapid drying.
Patent Information
- Application Number
- CN202520149925.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-22
- Publication Date
- 2026-01-06
- Estimated Expiration
- 2035-01-22
AI Technical Summary
Existing hole-filling devices for construction projects cannot accurately determine the volume of the hole, leading to improper material filling and low drying efficiency.
An injection assembly and a drying assembly were designed. The injection assembly detects the cavity volume using a volume detection device and accurately fills the material, while the drying assembly accelerates the drying of the material using heating strips and fan blades.
It achieves precise filling and rapid drying of materials, avoiding the problem of too much or too little material, and improving the efficiency of hole filling.
Smart Images

Figure CN223767215U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to a hole repairing device technical field, especially a kind of building engineering hole repairing device. BACKGROUND
[0002] Building engineering hole repairing device is a kind of equipment or tool specially used for plugging or repairing hole in building engineering. Its design principle and function are mainly to conveniently and efficiently solve various hole problems in building. When building engineering hole repairing device is carried out hole repairing on the hole on wall, the volume of the hole is unknown, so it is easy to cause material filling too much or cause material too little to be insufficient for hole repairing, and after material hole repairing, it relies on natural drying, needs longer time, and drying efficiency is low.
[0003] Chinese patent discloses a kind of building engineering hole repairing device (authorized announcement number CN212478130U), and the patent technology mainly has left plate and right plate, left plate and right plate are semicircular, left plate top is cut into the upper plate of inwardly inclined, left plate bottom is cut into the lower plate of outwardly inclined.
[0004] However, there are still deficiencies for the patent, building engineering hole repairing device is carried out hole repairing on the hole on wall, the volume of the hole is unknown, so it is easy to cause material filling too much or cause material too little to be insufficient for hole repairing, and after material hole repairing, it relies on natural drying, needs longer time, and drying efficiency is low. Therefore, building engineering hole repairing device is provided by the person skilled in the art to solve the problems proposed in the above background art. CONTENT OF UTILITY MODEL
[0005] 1. Technical solution
[0006] To solve the above technical problems, the utility model is realized by the following technical solutions:
[0007] The utility model is a kind of building engineering hole repairing device, including,
[0008] Injection assembly, including mounting plate, fixed in mounting plate's injection pipe, fixed in injection pipe's pressure disc, set up in the side of injection pipe's holding groove, install in the volume detection device of mounting plate one side rear end;
[0009] Moving assembly is set up on injection assembly;
[0010] The moving assembly includes long plate fixed on the other side of mounting plate, long slot is set up in the front end of long plate, connecting block is inserted into long slot, bracket is fixed in the front end of connecting block, push disc is fixed on one side of bracket;
[0011] And;
[0012] Drying assembly is set up on injection assembly;
[0013] The drying assembly comprises a circular ring fixed to the front end of one side of the mounting plate, two through holes opened on one side of the circular ring, an air inlet hole opened on the inner wall of the through hole two, a circular box fixed to one side of the circular ring, a threaded groove opened on one side of the circular box, a through hole one opened on one side of the inner wall of the threaded groove, a heating strip mounted on the inner wall of the through hole one, a threaded disc screwedly connected in the threaded groove, a fan blade rotationally connected on one side of the threaded disc, a gas guide pipe fixed to one side of the circular box, and a gas guide hole one opened on one side of the gas guide pipe.
[0014] Further, the other side of the mounting plate is fixed with a handle one at both front and rear ends, and a control switch box is fixed on the other side of the mounting plate, and a display screen and a button are sequentially embedded and mounted on one side of the control switch box from top to bottom.
[0015] Specifically, the handle one facilitates the overall device to be held, and facilitates the hole on the wall to be patched, and the control switch box is electrically connected with the motor one, the motor two and the heating strip respectively, so that the control switch box can control the start and stop of the motor one, the motor two and the heating strip.
[0016] Further, the mounting plate is provided with a mounting hole on one side, and the injection tube penetrates through the mounting hole, and the outer wall of the injection tube is fixed with the inner wall of the mounting hole.
[0017] Specifically, the mounting hole facilitates the penetration and fixation of the injection tube.
[0018] Further, a threaded hole is opened on one side of the connecting block, a circular hole one is opened on one side of the long plate, the motor one is fixed on one side of the long plate, a transmission shaft of the motor one extends into the circular hole one, a threaded rod is fixed on one side of the transmission shaft of the motor one, and the threaded rod penetrates through the threaded hole and is screwedly connected.
[0019] Specifically, the transmission shaft of the motor one fixes the threaded rod, which provides power for the rotation of the threaded rod, so that the bracket and the push disc can be moved as needed, and the patching material in the holding groove can be filled into the hole.
[0020] Further, a circular hole two is opened on the other side of the threaded disc, the motor two is fixed on the other side of the threaded disc, a transmission shaft of the motor two extends into the circular hole two, and the fan blade is fixed on one side of the transmission shaft of the motor two.
[0021] Specifically, the transmission shaft of the motor two fixes the fan blade, which provides power for the rotation of the fan blade, so that the filled material can be blown, and the drying efficiency of the material is improved.
[0022] Further, a handle two is fixed on both front and rear ends of the other side of the threaded disc, and a plurality of gas guide holes two are opened on the other side of the threaded disc.
[0023] Specifically, the handle two is convenient for mounting and dismounting the threaded disc, and the air guide hole two is convenient for blowing the heated air to the filled material.
[0024] 2. Beneficial effects
[0025] Compared with the prior art, the utility model has the advantages that:
[0026] The utility model discloses a movable assembly is added on the injection assembly, when needing to fill the hole on the wall, the hole volume is detected to detect the hole volume on the wall, and then a proper amount of material is guided into the containing groove, a motor is started, the threaded rod rotates, the push plate moves, and the material in the containing groove is injected into the hole, the hole volume on the wall can be detected, too much filling or insufficient filling material is prevented, and filling and hole filling are facilitated.
[0027] Meanwhile, a drying assembly is additionally arranged, after the hole on the wall is filled, the air guide pipe is aligned with the hole, a heating strip is started, a second motor is started, the fan blade rotates, the air outside the wall is sucked into the through hole one, the heating strip heats the sucked air, and then the heated air is blown to the hole filling material, and the drying efficiency of the hole filling material is improved.
[0028] Of course, implementing any product of the utility model does not necessarily need to achieve all the advantages mentioned above. BRIEF DESCRIPTION OF DRAWINGS
[0029] In order to more clearly illustrate the technical scheme of the embodiments of the utility model, the following will briefly introduce the drawings needed to be used in the embodiment description, and obviously, the drawings in the following description are only some embodiments of the utility model, and for those skilled in the art, other drawings can also be obtained according to these drawings without paying creative labor.
[0030] Figure 1 It is the front view of the utility model;
[0031] Figure 2 It is the injection assembly plan view of the utility model;
[0032] Figure 3 It is the movable assembly sectional view of the utility model;
[0033] Figure 4 It is the air guide pipe sectional view of the utility model;
[0034] Figure 5 It is the round box sectional view of the utility model.
[0035] In the drawings, the component list represented by each sign is as follows:
[0036] 100, injection assembly; 110, handle one; 120, mounting plate; 121, mounting hole; 130, injection tube; 131, containing groove; 140, pressure plate; 150, volume detection device; 160, control switch box; 200, moving assembly; 210, support; 220, push plate; 230, connecting block; 231, threaded hole; 240, long plate; 241, round hole one; 242, long groove; 250, threaded rod; 260, motor one; 300, drying assembly; 310, air guide pipe; 311, air guide hole one; 320, threaded disc; 321, round hole two; 322, air guide hole two; 330, motor two; 340, handle two; 350, heating strip; 360, fan blade; 370, round box; 371, threaded groove; 372, through hole one; 380, circular ring; 381, through hole two; 382, air inlet hole. DETAILED DESCRIPTION
[0037] In order to make the above-mentioned purpose, features and advantages of the present application more apparent, specific embodiments of the present application will be described in detail below with reference to the accompanying drawings.
[0038] In the following description, many specific details are set forth in order to provide a thorough understanding of the present application. However, the present application can be practiced in a variety of ways beyond the specific details set forth herein without departing from the scope of the present application. It can be apparent to one skilled in the art that the present application can be practiced without the specific details set forth in the following description.
[0039] Secondly, the present application is described in detail in combination with the schematic diagram. In the detailed description of the embodiments of the present application, the cross-sectional view of the device structure is partially enlarged without the general proportion for the convenience of description, and the schematic diagram is only an example, which should not limit the scope of protection of the present application. In addition, the three-dimensional spatial dimensions of length, width and depth should be included in the actual manufacture.
[0040] In order to make the purpose, technical scheme and advantages of the present application more clear, the embodiments of the present application will be described in further detail below in combination with the drawings.
[0041] Embodiment 1
[0042] Please refer to Figures 1-3 The present embodiment is a kind of building engineering hole filling device, including,
[0043] Injection assembly 100, including mounting plate 120, injection tube 130 fixed to mounting plate 120, pressure plate 140 fixed to injection tube 130, containing groove 131 opened on one side of injection tube 130, volume detection device 150 installed on the rear end of one side of mounting plate 120;
[0044] Moving assembly 200 is arranged on injection assembly 100;
[0045] The moving assembly 200 comprises a long plate 240 fixed to the other side of the mounting plate 120, a long slot 242 formed in the front end of the long plate 240, a connecting block 230 inserted into the long slot 242, a bracket 210 fixed to the front end of the connecting block 230, and a push plate 220 fixed to one side of the bracket 210;
[0046] A handle 110 is fixed to each of the front and rear ends of the other side of the mounting plate 120, and a control switch box 160 is fixed to the other side of the mounting plate 120, wherein a display screen and buttons are sequentially embedded and installed on one side of the control switch box 160 from top to bottom;
[0047] A mounting hole 121 is formed in one side of the mounting plate 120, and the injection tube 130 penetrates through the mounting hole 121, and the outer wall of the injection tube 130 is fixed to the inner wall of the mounting hole 121;
[0048] A threaded hole 231 is formed in one side of the connecting block 230, a round hole 241 is formed in one side of the long plate 240, a motor 260 is fixed to one side of the long plate 240, a transmission shaft of the motor 260 extends into the round hole 241, a threaded rod 250 is fixed to one side of the transmission shaft of the motor 260, and the threaded rod 250 penetrates through the threaded hole 231 and is threadedly connected;
[0049] The moving assembly 200 is used;
[0050] When it is necessary to repair a hole in a wall, the volume detection device 150 is used to detect the volume of the hole in the wall, and after the volume is detected, an appropriate amount of hole repairing material is introduced into the containing groove 131, the control switch box 160 is operated to start the motor 260, the threaded rod 250 is rotated, and the connecting block 230, the bracket 210 and the push plate 220 can be moved as needed, the push plate 220 pushes the material in the containing groove 131 out of the injection tube and into the hole, and the volume of the hole in the wall can be detected to prevent overfilling or insufficient filling, thereby facilitating hole repairing.
[0051] Embodiment 2
[0052] Please refer to Figures 4-5 and;
[0053] The drying assembly 300 is arranged on the injection assembly 100;
[0054] The drying assembly 300 comprises a circular ring 380 fixed to the front end of one side of the mounting plate 120, a through hole two 381 formed in one side of the circular ring 380, an air inlet hole 382 formed in the inner wall of the through hole two 381, a circular box 370 fixed to one side of the circular ring 380, a threaded groove 371 formed in one side of the circular box 370, a through hole one 372 formed in one side of the inner wall of the threaded groove 371, a heating strip 350 mounted on the inner wall of the through hole one 372, a threaded disc 320 screwed into the threaded groove 371, a fan blade 360 rotationally connected to one side of the threaded disc 320, a gas guide pipe 310 fixed to one side of the circular box 370, and a gas guide hole one 311 formed in one side of the gas guide pipe 310.
[0055] A circular hole two 321 is formed in the other side of the threaded disc 320, a motor two 330 is fixed to the other side of the threaded disc 320, a transmission shaft of the motor two 330 extends into the circular hole two 321, and the fan blade 360 is fixed to one side of the transmission shaft of the motor two 330.
[0056] A handle two 340 is fixed to each of the front and rear ends of the other side of the threaded disc 320, and a plurality of gas guide holes two 322 are formed in the other side of the threaded disc 320.
[0057] The use of the drying assembly 300 is performed.
[0058] When it is necessary to repair a hole in a wall, after filling the hole with a hole repairing material, the gas guide pipe 310 is aligned with the center of the hole, the control switch box 160 is operated, the heating strip 350 is started, the motor two 330 is started, the fan blade 360 is rotated, the external air is sucked into the through hole one 372, the heating strip 350 can heat the sucked air, and then the hot air is blown to the hole repairing material, so that the hole repairing material can be quickly dried.
[0059] In the description of the present application, it should be further pointed out that, unless otherwise explicitly specified and limited, the terms "setting", "mounting", "connecting", "connecting" should be understood broadly, for example, it can be fixedly connected, or it can be detachably connected, or integrally connected, it can be mechanically connected, or it can be electrically connected, it can be directly connected, or indirectly connected through an intermediate medium, or it can be the communication between two elements. For ordinary skilled in the art, the specific meaning of the above terms in the present application can be understood according to the specific circumstances.
[0060] Finally, it should be noted that: the above only for the preferred embodiments of the present application, and is not intended to limit the present application, although the foregoing embodiments of the present application has been described in detail, for the skilled in the art, it still can be modified, or for the equivalent replacement of part of the technical features of the technical solutions recorded in the foregoing embodiments. Any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present application, shall be included within the scope of the present application.
Claims
1. A construction patching device, characterized by: The injection assembly (100) comprises a mounting plate (120), an injection tube (130) fixed to the mounting plate (120), a pressing plate (140) fixed to the injection tube (130), a containing groove (131) formed in one side of the injection tube (130), and a volume detection device (150) mounted at the rear end of one side of the mounting plate (120). The moving assembly (200) is arranged on the injection assembly (100). The moving assembly (200) comprises a long plate (240) fixed to the other side of the mounting plate (120), a long groove (242) formed in the front end of the long plate (240), a connecting block (230) inserted into the long groove (242), a support (210) fixed to the front end of the connecting block (230), and a pushing plate (220) fixed to one side of the support (210). The drying assembly (300) is arranged on the injection assembly (100). The drying assembly (300) comprises a circular ring (380) fixed to the front end of one side of the mounting plate (120), a through hole two (381) formed in one side of the circular ring (380), an air inlet hole (382) formed in the inner wall of the through hole two (381), a circular box (370) fixed to one side of the circular ring (380), a threaded groove (371) formed in one side of the circular box (370), a through hole one (372) formed in one side of the inner wall of the threaded groove (371), a heating strip (350) mounted on the inner wall of the through hole one (372), a threaded disc (320) screw-connected in the threaded groove (371), a fan blade (360) rotationally connected to one side of the threaded disc (320), an air guide pipe (310) fixed to one side of the circular box (370), and an air guide hole one (311) formed in one side of the air guide pipe (310). The other side of the mounting plate (120) is fixed with a handle one (110) at the front and rear ends, and the other side of the mounting plate (120) is fixed with a control switch box (160), which is sequentially embedded with a display screen and buttons from top to bottom. The mounting plate (120) is provided with a mounting hole (121) on one side, the injection tube (130) penetrates through the mounting hole (121), and the outer wall of the injection tube (130) is fixed to the inner wall of the mounting hole (121).
2. A building hole filler as claimed in claim 1 wherein: The connecting block (230) is provided with a threaded hole (231) on one side, the long plate (240) is provided with a circular hole one (241) on one side, the long plate (240) is fixed with a motor one (260) on one side, a transmission shaft of the motor one (260) extends into the circular hole one (241), a threaded rod (250) is fixed to the transmission shaft of the motor one (260) on one side, and the threaded rod (250) penetrates through the threaded hole (231) and is screw-connected.
3. A building hole filler as claimed in claim 2, wherein: The other side of the threaded disc (320) is provided with a circular hole two (321), the threaded disc (320) is fixed with a motor two (330) on the other side, a transmission shaft of the motor two (330) extends into the circular hole two (321), and the fan blade (360) is fixed to the transmission shaft of the motor two (330) on one side.
4. A construction patching device according to claim 1, wherein: 5. A construction patching device according to claim 1, wherein: 6. A building hole filler as claimed in claim 5 wherein: The thread disc (320) is fixed with two handles (340) at the front and back ends of the other side, and a plurality of air guiding holes (322) are formed on the other side of the thread disc (320).
Citation Information
Patent Citations
Hole filling device for constructional engineering
CN212478130U