Mountaineering machine

By designing movable handrail components and linkages on the mountaineering machine to simulate the movement of trekking poles, the problem of existing mountaineering machines being unable to assist leg power generation is solved, achieving a more realistic assistance and balance effect.

CN223818114UActive Publication Date: 2026-01-23SUNSHINE DISTRIBUTOR CO
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202423307217.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-12-31
Publication Date
2026-01-23
Estimated Expiration
2034-12-31

AI Technical Summary

Technical Problem

The fixed handrails of existing mountaineering machines cannot effectively assist leg power generation and cannot simulate the assistance effect of using trekking poles during real mountaineering.

Method used

Design a climbing machine that uses a handrail assembly that moves along the pedals and follows the foot pedals. The handrail assembly connects the pedals and the main frame with a linkage group, simulating the movement of a trekking pole. It includes a lower linkage and a front linkage. The handrail body is connected to the main frame, and buffer blocks and positioning holes are provided to adjust the slope.

Benefits of technology

The handrail assembly simulates the support effect of trekking poles during foot movement, providing assistance and maintaining body balance. The buffer block protects the main frame and pedals, and the positioning holes adjust the slope, making it closer to the real mountaineering experience.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223818114U_ABST
    Figure CN223818114U_ABST
Patent Text Reader

Abstract

The utility model provides a mountaineering machine which comprises a supporting frame, a pulley block and a pedal, the pulley block and the pedal are installed on the supporting frame, the supporting frame comprises a front support and a main frame, the front support is connected with the main frame, the pulley block is installed on the main frame, two parallel guide rails are arranged on the main frame, and the two parallel guide rails are connected with the front support. The two guide rails are respectively provided with one pedal, the pedals are installed on the guide rails in a sliding mode, the two pedals are connected with the pulley blocks respectively, and the sides, away from each other, of the two pedals are respectively and movably connected with one handrail assembly used for simulating power assisting of an alpenstock. The armrest assembly is movably connected to the pedal, and the armrest assembly can serve as an alpenstock and move along with movement of the pedal, so that the situation that the alpenstock is used for mountaineering during mountaineering is simulated, and the situation is closer to the real mountaineering situation.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to mountain climbing machine technical field, especially a mountain climbing machine. BACKGROUND

[0002] Mountain climbing is a good aerobic exercise, but outdoor exercise is influenced by geographical position and natural weather condition more, such as meeting rain and snow, strong wind and so on bad weather, mountain climbing is not very convenient, along with the use of fitness equipment increasingly widely, the market has appeared mountain climbing machine that can simulate foot movement when mountain climbing. The existing mountain climbing machine fixed handrail, such as the patent document shown in the announcement number CN221579602U, cannot effectively assist leg power, simulates the situation of using mountain climbing pole force when real mountain climbing. SUMMARY

[0003] To solve the above problem, the utility model aims at providing a mountain climbing machine.

[0004] The utility model adopts the following method to realize: a mountain climbing machine, including support frame, pulley block and pedal, pulley block and pedal are installed on support frame, support frame includes front support and main frame, front support is connected on main frame, main frame is installed pulley block, main frame is equipped with two parallel guide rails, one is installed on two guide rails respectively Pedal, pedal is slidably installed on guide rail, two pedals are connected with pulley block respectively, two pedals are respectively movably connected with one handrail assembly on the side away from each other, for simulating mountain climbing pole force.

[0005] Preferably, the handrail assembly includes a handrail body and a connecting rod group, the connecting rod group is connected between the handrail body and the pedal, and the handrail body is connected between the main frame or the front support.

[0006] Preferably, the connecting rod group includes a lower connecting rod and a front connecting rod, the front connecting rod is connected between the handrail body and the main frame, and the lower connecting rod is connected between the handrail body and the pedal.

[0007] Preferably, one end of the front connecting rod is hinged to the bottom of the handrail body and the front side of the main frame, one end of the lower connecting rod is fixedly connected to the bottom of the handrail body, and the other end of the lower connecting rod is hinged to the pedal.

[0008] Preferably, the lower connecting rod is provided with a first bending angle outwardly bent at a position close to the pedal, and the lower connecting rod is provided with a second bending angle inwardly bent at a position close to the handrail body.

[0009] Preferably, the middle part of the handrail body has a third bending angle outwardly bent, and the top of the handrail body has a fourth bending angle inwardly bent; the handrail body and the lower connecting rod are integrated.

[0010] Preferably, the middle part of the front connecting rod has an outwardly pointed bending angle, and the two sides of the front part of the main frame are provided with hinge points and are hinged with the front connecting rod.

[0011] Preferably, the lower surface of the side of the guide rail away from the front support is provided with a buffer block, the pedal is provided with a U-shaped connecting block, the connecting block is arranged on the guide rail, a plurality of rollers are arranged in the connecting block, the guide rail is clamped between the plurality of rollers, and the lower connecting rod is hinged with the connecting block.

[0012] Preferably, a plurality of positioning holes are arranged on the front support in a longitudinal array, the front end of the main frame is provided with a connecting portion, a bolt is arranged on the connecting portion and penetrates one of the positioning holes, and the two guide rails are provided with support rods at the ends away from the front support.

[0013] Preferably, the pulley block comprises two pulleys arranged on the front part of the main frame, and a steel wire rope arranged on the pulleys, and the two ends of the steel wire rope are connected with one of the pedals.

[0014] Preferably, the top of the front support is provided with an electronic watch.

[0015] The mountain climbing machine has the following technical effects: 1. The handrail assembly is movably connected on the pedal, can act as a mountain climbing stick, and moves along with the pedal to simulate the situation of using a mountain climbing stick to climb a mountain, which is closer to the real situation of mountain climbing. 2. The connecting rod set connects the pedal and the main frame, and the handrail body moves along with the pedal, so that the handrail body is as close as possible to the movement form of the mountain climbing stick in the real situation of mountain climbing. 3. The connecting rod set comprises a lower connecting rod and a front connecting rod, the handrail body is connected with the front connecting rod between the handrail body and the main frame, and the handrail body is connected with the lower connecting rod between the handrail body and the pedal; the handrail body is connected through the lower connecting rod and the front connecting rod, so that the handrail body can simulate the movement track of the mountain climbing stick supporting the body movement in the actual mountain climbing. 4. The handrail body, the lower connecting rod and the front connecting rod have bending angles and bending angles, which can ensure the connection with the pedal and the main frame, provide enough space for human activities, and facilitate the user to hold the handrail body. 5. The buffer block plays a buffering and limiting role to protect the main frame and the pedal. 6. A plurality of positioning holes are arranged to adjust the connection between the bolt on the main frame and different positioning holes according to the situation of the user, so as to adjust the climbing slope. BRIEF DESCRIPTION OF DRAWINGS

[0016] Figure 1 is a structure schematic view of the first perspective of the mountain climbing machine.

[0017] Figure 2is a second perspective view of the structure of a mountain climbing machine of the utility model.

[0018] Figure 3 is a third perspective view of the structure of a mountain climbing machine of the utility model.

[0019] Figure 4 is a partial enlarged view of the structure of a mountain climbing machine of the utility model.

[0020] Explanation of reference numerals: 1, pedal; 11, connecting block; 12, roller; 2, front support; 21, positioning hole; 3, main frame; 31, guide rail; 311, buffer block; 32, bolt; 33, support rod; 4, handrail assembly; 41, handrail body; 411, third corner; 412, fourth corner; 42, lower connecting rod; 421, first corner; 422, second corner; 43, front connecting rod; 431, bending angle; 5, electronic watch; 6, pulley; 7, steel wire rope. DETAILED DESCRIPTION

[0021] The utility model will be further explained in connection with the drawings and specific embodiments.

[0022] Please refer to Figures 1 to 4 A mountain climbing machine comprises a support frame, a pulley set and a pedal 1, the pulley set and the pedal 1 are installed on the support frame, the support frame comprises a front support 2 and a main frame 3, the main frame 3 is connected to the front support 2, the pulley set is installed on the main frame 3, two parallel guide rails 31 are arranged on the main frame 3, one pedal 1 is installed on each of the two guide rails 31, the pedal 1 is slidably installed on the guide rail 31, the two pedals 1 are connected to the pulley set respectively, each pedal 1 is movably connected to a handrail assembly 4 on the side away from the other pedal 1, so as to simulate the power of a mountain climbing pole. The handrail assembly 4 can act as a mountain climbing pole and move along with the pedal, so as to simulate the situation of using a mountain climbing pole to climb a mountain, which is closer to the real situation of mountain climbing.

[0023] Please refer to Figures 1 to 4 Preferably, the handrail assembly 4 comprises a handrail body 41 and a connecting rod set, the connecting rod set is connected between the handrail body 41 and the pedal 1, and the handrail body 41 and the main frame 3 or the front support 2. The connecting rod set connects the pedal and the main frame 3, so that the handrail body 41 moves along with the pedal, which is as close as possible to the movement of a mountain climbing pole in real mountain climbing.

[0024] Please refer to Figures 1 to 4, preferably, the linkage group comprises a lower linkage 42 and a front linkage 43, the front linkage 43 is connected between the handrail body 41 and the main frame 3, and the lower linkage 42 is connected between the handrail body 41 and the pedal 1. One end of the front linkage 43 is hinged to the bottom of the handrail body 41 and the front side of the main frame 3, and the other end of the lower linkage 42 is hinged to the pedal 1. The linkage group has a lower linkage 42 and a front linkage 43, the handrail body 41 is connected with the main frame 3 through the front linkage 43, and the handrail body 41 is connected with the pedal 1 through the lower linkage 42; the handrail body 41 is connected through the lower linkage 42 and the front linkage 43, so that the handrail body 41 can simulate the movement track of the trekking pole supporting the body during actual mountain climbing during the movement of the pedal.

[0025] Please refer to Figures 1 to 4 , preferably, the lower linkage 42 is provided with a first bending corner 421 outwardly bent near the pedal 1, and the lower linkage 42 is provided with a second bending corner 422 inwardly bent near the handrail body 41. The setting of the bending corner ensures that the pedal and the main frame 3 are connected while leaving enough space for human activities, so that the handrail can be expanded outwardly.

[0026] Please refer to Figures 1 to 4 , preferably, the middle part of the handrail body 41 has a third bending corner 411 outwardly bent, and the top part of the handrail body 41 has a fourth bending corner 412 inwardly bent; the handrail body 41 and the lower linkage 42 are integrated. The setting of the bending corner ensures that the pedal and the main frame 3 are connected while leaving enough space for human activities, so that the handrail can be expanded outwardly.

[0027] Please refer to Figures 1 to 4 , preferably, the middle part of the front linkage 43 has a bending corner 431 with a sharp corner outwardly bent, and the front part of the main frame 3 is provided with a hinge point hinged with the front linkage 43. The setting of the bending corner ensures that the pedal and the main frame 3 are connected while leaving enough space for human activities, so that the handrail can be expanded outwardly.

[0028] Please refer to Figures 1 to 4 , preferably, the lower surface of the guide rail 31 away from the front support 2 is provided with a buffer block 311; the pedal 1 is provided with a U-shaped connecting block 11, the connecting block 11 is arranged on the guide rail 31, a plurality of rollers 12 are arranged in the connecting block 11, and the guide rail 31 is clamped between the plurality of rollers 12; the lower linkage 42 is hinged with the connecting block 11. The buffer block 311 plays a role of buffering and limiting to protect the main frame 3 and the pedal 1.

[0029] Please refer to Figures 1 to 4, preferably, the front support 2 is provided with a plurality of positioning holes 21 in longitudinal array, the front end of the main frame 3 is provided with a connecting portion, a bolt 32 is arranged in penetrating mode on the connecting portion, and the bolt 32 penetrates one of the positioning holes 21; the two guide rails 31 are provided with support rods 33 at the ends away from the front support 2. The plurality of positioning holes 21 facilitate adjustment of the bolt 32 on the main frame 3 in connection with different positioning holes 21 according to the actual situation, so as to adjust the climbing gradient.

[0030] Please refer to Figures 1 to 4 , preferably, the top of the front support 2 is provided with an electronic watch 5.

[0031] Please refer to Figures 1 to 4 , preferably, the pulley block comprises two pulleys 6 arranged on the front portion of the main frame 3, and a steel wire rope 7 penetrating the pulleys 6, and the two ends of the steel wire rope 7 are connected with one of the pedals 1. The force of one pedal 1 provides resistance for the movement of the other pedal 1.

[0032] The utility model has the following working principle:

[0033] When starting to move, the two feet are stepped on the pedals 1, the pedals 1 move up and down through the pulley block, the hands hold the corresponding side of the handrail body 41 respectively, the handrail body 41 is connected with the pedal 1 through the corresponding side of the lower connecting rod 42 and is connected with the main frame 3 through the corresponding side of the front connecting rod 43; one foot moves downward along the guide rail 31 (the handrail body 41 on the same side is driven to move downward and swing backward through the lower connecting rod 42 and the front connecting rod 43, so that the movement of the simulated alpenstock relative to the human body is realized); the pedal 1 on the other side is pulled upward along the guide rail 31 by the steel wire rope 7, and the handrail body 41 on the same side is pulled upward and swings backward; the handrail can provide power assistance and keep the body balanced when the mountain climbing machine is used.

[0034] It should be pointed out that, in the description of the present application, it should be pointed out that, unless otherwise specified and limited, the terms "mounting", "connecting" and "connecting" should be understood in a broad sense, which can be mechanical connection or electrical connection, or the communication between two elements, or direct connection, "up", "down", "left", "right" and the like are only used to indicate the relative position relationship, and when the absolute position of the described object changes, the relative position relationship may change.

[0035] Secondly: the utility model discloses the embodiment of the drawing, only relate to the structure involved in the embodiment of the present disclosure, other structures can refer to the usual design, in the case of no conflict, the same embodiment and different embodiments of the utility model can be combined with each other.

[0036] Finally, the above only is the preferred embodiment of the present application, the protection scope of the present application is not limited to the above-mentioned examples, all technical solutions under the idea of the present application belong to the protection scope of the present application.

[0037] It should be noted that for those skilled in the art, without departing from the principles of the present application, some improvements and refinements, these improvements and refinements should also be considered as the protection scope of the present application.

Claims

1. A mountain climber comprising a support frame, a pulley block and a pedal, said pulley block and said pedal being mounted on said support frame, characterized in that: The support frame comprises a front support and a main frame, the main frame is connected to the front support, the pulley set is installed on the main frame, two parallel guide rails are arranged on the main frame, and one pedal is installed on each of the two guide rails, the pedal is slidingly installed on the guide rail, the two pedals are connected to the pulley set respectively, and one handrail assembly is movably connected to the side away from each other of the two pedals respectively.

2. The machine of claim 1 wherein: The handrail assembly comprises a handrail body and a connecting rod set, the connecting rod set is connected between the handrail body and the pedal, and the handrail body is connected between the main frame and the front support.

3. A mountain climber according to claim 2, wherein: The connecting rod set comprises a lower connecting rod and a front connecting rod, the front connecting rod is connected between the handrail body and the main frame, and the lower connecting rod is connected between the handrail body and the pedal.

4. The machine of claim 3 wherein: One end of the front connecting rod is hingedly connected to the front side of the main frame, and one end of the lower connecting rod is fixedly connected to the bottom of the handrail body.

5. A mountain climber according to claim 4, wherein: The lower connecting rod is provided with a first bending corner outwardly bent at a position close to the pedal, and is provided with a second bending corner inwardly bent at a position close to the handrail body.

6. The machine of claim 4 wherein: The middle part of the handrail body is provided with a third bending corner outwardly bent, and the top of the handrail body is provided with a fourth bending corner inwardly bent; and the handrail body and the lower connecting rod are integrated.

7. The mountain climber of claim 4, wherein: The middle part of the front connecting rod is provided with a bending corner with a sharp corner outwardly bent, and the two sides of the front part of the main frame are provided with hinge points hingedly connected to the front connecting rod.

8. The mountain climber of claim 3, wherein: The lower surface of the side away from the front support of the guide rail is provided with a buffer block, the pedal is provided with a U-shaped connecting block, the connecting block is arranged on the guide rail, a plurality of rollers are arranged in the connecting block, and the guide rail is clamped between the plurality of rollers; and the lower connecting rod is hingedly connected to the connecting block.

9. The mountain climber of claim 1, wherein: A plurality of positioning holes are longitudinally arranged on the front support, the front end of the main frame is provided with a connecting portion, a bolt is arranged on the connecting portion, and the bolt penetrates one of the positioning holes; and the ends away from the front support of the two guide rails are provided with support rods.

10. The mountain climber of claim 1, wherein: The pulley set comprises two pulleys arranged on the front part of the main frame and a steel wire rope penetrating the pulleys, and the two ends of the steel wire rope are connected to the pedals respectively.

Citation Information

Patent Citations

  • Arc-shaped track mountaineering machine

    CN221579602U