Protective fence for building construction

By using modularly designed guardrails with connecting pieces, hinges, and hooks, the problems of guardrail damage during disassembly and structural inflexibility are solved, enabling convenient disassembly and partial opening of the guardrails and improving the efficiency of secondary use.

CN223880907UActive Publication Date: 2026-02-06苏朝升
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202520337455.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-02-28
Publication Date
2026-02-06
Estimated Expiration
2035-02-28

AI Technical Summary

Technical Problem

Existing construction safety railings are easily damaged during dismantling and reuse, and their overall structure is inflexible and lacks local openness, which affects their effectiveness in reuse.

Method used

The modular design utilizes connecting pieces, hinges, hooks, and cards to allow for the detachable and rotatable connection of the modular protective panels, enabling partial opening. Combined with the frame structure, this enhances the flexibility and convenience of the guardrail.

Benefits of technology

It improves the ease of disassembly of guardrails, reduces damage, enhances the local openness and flexibility of guardrails, and facilitates flexible use on construction sites.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223880907U_ABST
    Figure CN223880907U_ABST
Patent Text Reader

Abstract

The utility model discloses a protective fence for building construction, which comprises a first frame, and is characterized in that a module protective plate I is embedded in the first frame, a second frame is arranged above the first frame, a connecting piece is arranged between the first frame and the second frame, and the module protective plate I is embedded in the first frame. A second module protection plate is installed in the second frame in an embedded mode, and reserved grooves are fixedly formed in the four corners of the back face of the first module protection plate. The first frame and the second frame are vertically installed through the connecting pieces, on one hand, the protection height of the protective fence is increased, on the other hand, the frames can be disassembled conveniently by disassembling the connecting pieces, and therefore when the protective fence on the construction site is disassembled for secondary use, damage to the protective fence is reduced, and the construction efficiency is improved. The module protection plates are installed through the hook seats and the clamping pieces, and the clamping pieces are rotationally connected with the fixing seats, so that the clamping pieces are lapped on the hook seats or separated from the hook seats, and rotary opening and closing of the module protection plates are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to the construction protection relevant technical field, concretely is a protective fence for building construction. BACKGROUND

[0002] In the building construction process, there are many unsafe conditions in the construction site, in order to avoid causing construction safety accidents, therefore, the protection device of the construction site is a very important thing, can nip in the bud, also can reduce the danger to the minimum, in order to improve the safety of the construction site, the demand of construction protection device is also more and more big, for this, a protective fence for building construction is proposed.

[0003] The prior art patent authorization announcement no. CN221194568U discloses a protective fence for building construction, which comprises a protective fence base, four wheels are fixedly connected to the lower surface of the protective fence base, a protective fence body is fixedly connected to the upper surface of the protective fence base, a ground pegging device is arranged on the protective fence base, the ground pegging device comprises a short sleeve and a long sleeve, the short sleeve and the long sleeve are located in the protective fence base, the two ends of the short sleeve and the long sleeve extend out of the outer surface of the protective fence base, the lower end of the two inclined pegs is a sharp tip, which can make the angle between the short sleeve and the long sleeve be 45 degrees, so that the two inclined pegs can not be easily pulled out after being inserted into the ground, thereby improving the anti-toppling performance of the protective fence body and the installation efficiency of the protective fence, and the protective fence body is prevented from being lifted by the reaction force when the inclined pegs are vertically inserted into the ground.

[0004] The existing building construction protective fence has a structure of a whole piece combined together, and is arranged around the construction site, which plays a role of interception and enclosure, but the whole piece arrangement causes the decline of the secondary recycling and secondary utilization effect of the protective fence, when the protective fence is removed, the whole piece structure lacks detachable nodes, which is not convenient for disassembly and storage, so that the protective fence is inevitably damaged during removal, thereby causing damage to the protective fence during the next use, in addition, the assembled protective fence is fixed by screws at four corners, and after fixing, the protective fence does not have local openness, and the overall flexibility is reduced.

[0005] Therefore, it is necessary to provide a protective fence for building construction. UTILITY MODEL CONTENTS

[0006] The utility model aims at providing a protective fence for building construction to solve the problems in the above background technology.

[0007] In order to achieve the above object, the utility model provides the following technical scheme: A protective fence for building construction, it is characterized in that: the inside of first frame is embedded with module guard board no.

[0008] As an embodiment of the utility model, the outer shape structure of the corner piece is a T-shaped structure, and screw holes are formed on the surface of the corner piece.

[0009] As an embodiment of the utility model, the adjacent module guard boards are connected through the hinge to form a rotating structure, and the module guard boards are equally distributed along the first frame.

[0010] As an embodiment of the utility model, the card and the fixed seat are connected through rotation, and the card and the hook seat are matched with each other.

[0011] As an embodiment of the utility model, the bottom of the first frame is integrally connected with a bottom foot, and the outside of the bottom foot is sleeved with a hollow sleeve.

[0012] As an embodiment of the utility model, screw holes are formed on the surface of the hollow sleeve, and a fixed foot is fixedly connected to the bottom of the hollow sleeve.

[0013] Compared with the prior art, the utility model has the beneficial effects that:

[0014] 1. The first frame and the second frame are vertically installed through the connecting piece, which increases the protection height of the protective fence, and the frame can be disassembled by removing the connecting piece, so that the protective fence can be removed without being damaged, and the damage of the protective fence can be reduced in secondary use.

[0015] 2、Meanwhile, the back of the module protection plate is provided with a reserved groove, and the connection between the module protection plates is realized by the reserved groove and the corner piece embedded in the reserved groove. The first group of module protection plates and the second group of module protection plates are connected through a hinge, and the second group of module protection plates and the third module protection plate are installed through a hook base and a card. The card and the fixed seat are rotationally connected, so that the card is clamped on the hook base or separated from the hook base. In cooperation with the hinge connection, the rotation of the module protection plate is realized. Due to the setting of the frame, the frame cooperates with the module protection plate to set the protective fence into a unit plate. By opening one of the module protection plates, the local opening of the protective fence is realized, the inside and outside of the protective fence are connected, the communication with the external personnel of the construction site is facilitated, and the flexibility of the protective fence is improved. BRIEF DESCRIPTION OF DRAWINGS

[0016] Figure 1 It is a front view structural schematic diagram of the utility model;

[0017] Figure 2 It is a back view structural schematic diagram of the utility model;

[0018] Figure 3 It is a back view structural schematic diagram of the utility model; Figure 2 It is an enlarged structural schematic diagram of the middle B of the utility model;

[0019] Figure 4 It is an enlarged structural schematic diagram of the middle A of the utility model; Figure 1 It is an enlarged structural schematic diagram of the middle A of the utility model.

[0020] In the drawing: 1, first frame; 2, module protection plate one; 3, second frame; 4, module protection plate two; 5, connecting piece; 6, reserved groove; 7, corner piece; 8, screw hole; 9, fixed seat; 10, card; 11, hook base; 12, bottom foot; 13, hollow sleeve; 14, screw hole; 15, fixed foot base; 16, hinge. DETAILED DESCRIPTION

[0021] The technical scheme in the embodiments of the utility model will be described clearly and completely below in combination with the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor fall within the protection scope of the utility model.

[0022] Please refer to Figures 1-4The utility model provides a technical scheme: a protective fence for building construction, including first frame 1, the inside of first frame 1 is embedded and is installed with module guard board no. 2, the top of first frame 1 is installed with second frame 3, and the connecting piece 5 is arranged between first frame 1 and second frame 3, and the inside of second frame 3 is embedded and is installed with module guard board no. 4, and the bottom of first frame 1 is integratively connected with bottom foot 12, and the outside of bottom foot 12 is equipped with hollow sleeve 13, and the surface of hollow sleeve 13 is fixed and is equipped with screw hole 14, and the bottom of hollow sleeve 13 is fixedly connected with fixed foot stand 15,

[0023] Specifically, the bottom of the first frame 1 is fixedly provided with the bottom foot 12, the bottom foot 12 is sleeved with the hollow sleeve 13 on the fixed foot stand 15, and the bottom foot 12 and the fixed foot stand 15 are fastened and connected by using screws. The protective fence is installed and placed by using the fixed foot stand 15, and finally the fixed foot stand 15 is fixed to the ground by using ground nails.

[0024] The back of the module guard board no. 2 is fixedly provided with a reserved slot 6 at four corners, the inside of the reserved slot 6 is embedded with a corner piece 7, a hinge 16 is rotatably installed between adjacent module guard boards no. 2, a fixed seat 9 is fixedly provided on the left side of the module guard board no. 2 away from the hinge 16, a card 10 is rotatably installed on the surface of the fixed seat 9, a hook seat 11 is fixedly installed on the left side of the fixed seat 9, the corner piece 7 has a "T" shaped structure, and a screw hole 8 is formed on the surface of the corner piece 7.

[0025] Specifically, the back structures of the module guard board no. 2 and the module guard board no. 4 are the same, the reserved slots 6 are arranged at four corner positions, and the corner pieces 7 are embeddedly arranged in the reserved slots 6. The corner pieces 7 having a "T" structure are used to splice the upper and lower module guard boards together, and the corner pieces 7 and the module guard boards are fixed by using screws.

[0026] The adjacent module guard boards no. 2 are connected in a rotating structure by the hinge 16, and a plurality of module guard boards no. 2 are equidistantly distributed along the first frame 1. The card 10 and the fixed seat 9 are connected in a rotating manner, and the card 10 and the hook seat 11 are matched with each other.

[0027] Specifically, the embedded structure between the frame and the module guard board is used to install the module guard board into the inside of the frame. A plurality of module guard boards are arranged on the frame. The first module guard board and the second module guard board are connected by using the hinge 16. The second module guard board and the third module guard board are connected by using the hook seat 11 and the card 10. The hook seat 11 is fixed on the third module guard board, the fixed seat 9 is fixed on the second module guard board, the card 10 is rotated to realize the connection and disconnection between the card 10 and the hook seat 11, the hinge 16 on the other side of the second module guard board is rotated, and then the second module guard board is opened to realize the local opening of the protective fence.

[0028] Working principle: when using the utility model, the first frame 1 and the module protection plate 1 between the embedded structure, the module protection plate 1 installs into the inside of first frame 1, same second frame 3 and module protection plate two 4 embedded installation, second, use the reserved slot 6 of module protection plate back four corners, the corner piece 7 embedded installation into the reserved slot 6, the corner piece 7 of " T " structure, the module protection plate of upper and lower splicing is together, then uses screw to fix the corner piece 7 and module protection plate, but, when using screw, only need to fix the corner piece 7 of not setting hinge 16 side can, like this avoids the rotation of hinge 16, again, the first module protection plate and the second module protection plate between using hinge 16 are connected, the second module protection plate and the third module protection plate between using hook seat 11 and card 10 are connected, using the rotation between card 10 and fixed seat 9, after card 10 is separated from hook seat 11, using the rotation of hinge 16, the second module protection plate is rotated and opened, realizes the partial opening of protective fence, improves the use flexibility of protective fence.

[0029] Although the embodiments of the utility model have been shown and described, it can be understood by those skilled in the art that various changes, modifications, replacements and variations can be made to these embodiments without departing from the principles and spirits of the utility model, and the scope of the utility model is defined by the appended claims and their equivalents.

Claims

1. A construction fence comprising a first frame (1), characterized in that: The inside of the first frame (1) is embeddedly installed with a module protection plate one (2), the upper portion of the first frame (1) is installed with a second frame (3), a connecting piece (5) is arranged between the first frame (1) and the second frame (3), and the inside of the second frame (3) is embeddedly installed with a module protection plate two (4), the back of the module protection plate one (2) is fixedly provided with a reserved slot (6) at four corners, the inside of the reserved slot (6) is embeddedly provided with a corner piece (7), a hinge (16) is rotatably installed between adjacent module protection plate ones (2), a fixed seat (9) is fixedly arranged on the left side of the module protection plate one (2) away from the hinge (16), a card (10) is rotatably installed on the surface of the fixed seat (9), and a hook seat (11) is fixedly installed on the left side of the fixed seat (9).

2. The construction fence according to claim 1, wherein: The outer shape structure of the corner piece (7) is a "T" type structure, and screw holes (8) are formed in the surface of the corner piece (7).

3. The construction fence according to claim 1, wherein: Adjacent module protection plate ones (2) are rotatably connected through the hinges (16), and the module protection plate ones (2) are equidistantly distributed along the first frame (1).

4. The construction fence according to claim 1, wherein: The card (10) and the fixed seat (9) are rotatably connected, and the card (10) and the hook seat (11) are matched with each other.

5. The construction fence according to claim 1, wherein: The bottom of the first frame (1) is integrally connected with a bottom foot (12), and the outer side of the bottom foot (12) is sleeved with a hollow sleeve (13).

6. A construction fence according to claim 5, wherein: Screw holes (14) are fixedly formed in the surface of the hollow sleeve (13), and a fixed foot seat (15) is fixedly connected to the bottom of the hollow sleeve (13).

Citation Information

Patent Citations

  • Protective fence for building construction

    CN221194568U