Building settlement observation point device

By fixing sleeves and stainless steel settlement observation nails to the building walls, along with protective shells and polycarbonate top covers, the problems of data error and insufficient protection in existing technologies are solved, achieving high-precision settlement observation and long-term use.

CN223882988UActive Publication Date: 2026-02-06FUZHOU RONGJIAN ENG INSPECTION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520422994.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-03-12
Publication Date
2026-02-06
Estimated Expiration
2035-03-12

AI Technical Summary

Technical Problem

Existing building settlement monitoring devices have spherical ends to the settlement monitoring nails, making it difficult for inspectors to keep the invar ruler or barcode ruler absolutely stable, resulting in data errors. Furthermore, they lack protection and are easily affected by external objects, impacting their long-term use.

Method used

The device uses components such as sleeves, settlement observation nails, and protective shells, and is fixed to the wall with anchoring adhesive. The settlement observation nails are connected horizontally and equipped with stainless steel sleeves and protective shells. It is also equipped with a polycarbonate top cover and protective door to ensure the stability and protection of the device.

Benefits of technology

It improved data accuracy, reduced operational difficulty, protected the settlement observation nails, prevented external contact, and ensured the long-term use of the observation points.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223882988U_ABST
    Figure CN223882988U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of constructional engineering detection, and discloses a building settlement observation point device which is arranged on a wall, a sleeve is fixedly installed on the inner wall of the wall, and the wall and the sleeve are connected through embedded steel bar glue. According to the building settlement observation point device, the sleeve, the settlement observation nail, the protective shell and other components are arranged, firstly, a hole with the diameter and depth similar to those of the sleeve is drilled in a wall through an electric drill, then the sleeve is fixed to the wall through embedded steel bar glue, and after the sleeve is stabilized, the settlement observation nail is connected with the sleeve; the horizontal plane of the settlement observation nail faces upwards and is kept horizontal, after the settlement observation nail is firm, settlement observation can be conducted on the settlement point only by placing the leveling rod on the horizontal plane of the settlement observation nail, the two clamping plates move relatively by rotating the threaded rod, the leveling rod can be clamped, the leveling rod is clamped in the initial installation process, and the settlement point can be observed. And the levelness of the settlement observation nail can be conveniently adjusted.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The application relates to the technical field of building engineering detection, in particular to a building settlement observation point device. BACKGROUND

[0002] In the whole life cycle of a building, settlement deformation observation of the building is an important method for determining the safety of the building. A settlement observation point on the market is usually processed into a spherical protrusion. A 2m-long indium scale or bar code scale is erected on the end of the settlement observation nail by a detection personnel, so as to realize settlement observation.

[0003] However, in the existing building settlement observation point device, since the end of the settlement observation nail is a spherical surface, the detection personnel cannot keep the indium scale or bar code scale absolutely stable, data errors are caused, and the safety of the whole building is affected. Meanwhile, the settlement observation point device will accompany the whole life cycle of the building. The device needs to be protected more solidly. CONTENT OF THE UTILITY MODEL

[0004] In view of the defects of the prior art, the application provides a building settlement observation point device, which has the advantages of being capable of observing the horizontal plane of the settlement observation nail, reducing the operation difficulty, improving the data accuracy, and protecting the settlement observation nail. The application solves the problems that the detection personnel cannot keep the indium scale or bar code scale absolutely stable, data errors are caused, and the settlement observation point is not protected, the settlement point is easily touched by non-detection factors, and the long-term use of the observation point is affected.

[0005] To achieve the above-mentioned purpose, the application provides the following technical scheme: a building settlement observation point device is arranged on a wall body. An inner wall of the wall body is fixedly provided with a sleeve. The wall body and the sleeve are connected by means of a plant glue. An inner wall of the sleeve is threadedly connected with a settlement observation nail. One side of the settlement observation nail faces upward. A front surface of the wall body is provided with a protective shell. An outer surface of the protective shell is fixedly connected with a mounting strip. An inner wall of the mounting strip is fixedly provided with fixed bolts arranged at equal distances. The back surface of the mounting strip and the front surface of the wall body are fixedly connected by means of the fixed bolts.

[0006] Through the above scheme, in order to solve the problem that the detection personnel is difficult to keep the indium ruler or the bar code ruler absolutely stable, in order to avoid data error, first, the position of the settlement observation point arranged on the wall is drilled with a drill, and the hole diameter and depth are almost the same as the sleeve, then the sleeve is connected with the hole on the surface of the wall through the anchoring glue, after the sleeve is stable, the settlement observation nail is rotated into the sleeve and connected through the thread, then the position of the settlement observation nail is adjusted, one side of which is upward and horizontal, finally, the protective shell is installed on the wall through the connection between the installation bar, the fixing bolt and the wall, after the settlement observation nail is firm, the level ruler is placed on the horizontal surface of the settlement observation nail through the opening above the protective shell, and the settlement of the settlement point can be observed, and the protective shell protects the settlement observation point, avoids the settlement observation nail from being touched by external objects, and guarantees the long-term use of the observation point.

[0007] Further, the material of the sleeve is stainless steel, and the material of the settlement observation nail is stainless steel.

[0008] Through the above scheme, the sleeve is made of 304 stainless steel, which has the advantages of good high temperature resistance and strong corrosion resistance, can guarantee long-term use, and the material of the settlement observation nail is also selected as 304 stainless steel, so that the whole detection device can also be used for a long time without external contact.

[0009] Further, the upper surface of the protective shell is provided with a top cover, and the material of the top cover is polycarbonate.

[0010] Through the above scheme, the top cover is arranged on the upper surface of the protective shell, and the opening above the protective shell can be wrapped, the components in the protective shell can be protected, the material of the top cover is selected as polycarbonate, which has excellent impact resistance and high strength, can withstand a large external force without being easily broken, is made into a transparent state, and is convenient for observing the internal structure.

[0011] Further, the front surface of the protective shell is provided with a protective door, and the front surface of the protective door is fixedly connected with a door handle.

[0012] Through the above scheme, the protective door is arranged on the front surface of the protective shell, and the protective door is also made of polycarbonate material, which can protect the front surface of the protective shell and is convenient for observing the internal situation, the door handle is installed on the front surface of the protective door, and the protective door is convenient for opening and closing the protective shell through the door handle.

[0013] Further, two hinges are fixedly installed on the right side surface of the protective door, and the left side surface of each hinge is fixedly installed on the right side surface of the protective shell.

[0014] Through the above scheme, two hinges are installed on the right side surface of the protective door, and the hinges are connected with the protective shell, and the protective door can be limited on the front surface of the protective shell through the hinges, and the protective door is convenient to open and close.

[0015] Further, the inner side wall of the protective shell is fixedly connected with a guide rod, and the material of the protective shell is stainless steel.

[0016] Through the above scheme, the guide rod is fixed on the inner side wall of the protective shell, and the guide rod is placed transversely, so that the left and right ends of the guide rod are connected with the inner side wall of the protective shell, realizing the positioning and installation effect of the guide rod.

[0017] Further, the outer surface of the guide rod is slidably connected with two clamping plates, and each clamping plate is rotatably connected with a threaded rod on the side away from each other.

[0018] Through the above scheme, the clamping plates are arranged on the outer surface of the guide rod and are slidably connected, so that the clamping plates are limited and can slide on the surface of the guide rod.

[0019] Further, the outer surface of each threaded rod is threadedly connected with a threaded block, and the outer surface of each threaded block is fixedly connected with the inner wall of the protective shell.

[0020] Through the above scheme, the threaded blocks are arranged on the surface of the threaded rods and are connected with the threaded rods, and are threadedly connected, and then the outer surface of the threaded blocks is connected with the inner wall of the protective shell and is fixedly connected.

[0021] Compared with the prior art, the technical scheme of the present application has the following beneficial effects:

[0022] The building settlement observation point device is characterized in that: the sleeve, the settlement observation nail, the protective shell and other components are arranged; a hole with a diameter and a depth similar to those of the sleeve is drilled on the wall body by using an electric drill; the sleeve is fixed to the wall body through the anchoring glue; the settlement observation nail is connected to the sleeve after the sleeve is stable; the horizontal plane of the settlement observation nail faces upward and is kept horizontal; after being stable, the leveling rod is placed on the horizontal plane of the settlement observation nail, so that the settlement of the settlement point is observed; the leveling rod is clamped by rotating the threaded rod to relatively move the two clamping plates; the leveling rod is clamped during initial installation, so that the horizontal degree of the settlement observation nail can be adjusted. BRIEF DESCRIPTION OF DRAWINGS

[0023] Figure 1 It is a whole three-dimensional structural diagram of the application;

[0024] Figure 2 It is a whole front view structural diagram of the application;

[0025] Figure 3 It is a structural diagram of the connection relationship between the protective shell and the mounting strip of the application;

[0026] Figure 4 It is a structural diagram of the connection relationship between the protective shell and the top cover of the application;

[0027] Figure 5 It is a structural diagram of the connection relationship between the clamping plate and the threaded rod of the application.

[0028] In the drawings:

[0029] 1, wall body; 2, sleeve; 3, settlement observation nail; 4, protective shell; 5, mounting strip; 6, fixing bolt; 7, top cover; 8, protective door; 9, door handle; 10, hinge; 11, guide rod; 12, clamping plate; 13, threaded rod; 14, threaded block. DETAILED DESCRIPTION

[0030] The technical solutions in the embodiments of the application will be clearly and completely described below with reference to the drawings in the embodiments of the application. Obviously, the described embodiments are only part of the embodiments of the application, rather than all the embodiments of the application. Based on the embodiments in the application, all other embodiments obtained by those skilled in the art without creative work fall within the protection scope of the application.

[0031] Please refer to Figure 3 , Figure 4 and Figure 5The building settlement observation point device in the embodiment is arranged on the wall body 1, the inner wall of the wall body 1 is fixedly provided with the sleeve 2, the wall body 1 and the sleeve 2 are connected by means of the anchoring adhesive, the inner wall of the sleeve 2 is threadedly connected with the settlement observation nail 3, one side of the settlement observation nail 3 faces upward, the front surface of the wall body 1 is provided with the protective shell 4, the outer surface of the protective shell 4 is fixedly connected with the mounting strip 5, the inner wall of the mounting strip 5 is fixedly provided with the fixed bolts 6 arranged at equal distances, and the back surface of the mounting strip 5 is fixedly connected with the front surface of the wall body 1 through the fixed bolts 6.

[0032] Please refer to Figure 4 and Figure 5 The material of the sleeve 2 is stainless steel, the material of the settlement observation nail 3 is stainless steel, the sleeve 2 is made of stainless steel, the sleeve 2 made of 304 stainless steel has the advantages of good high-temperature resistance and strong corrosion resistance, can ensure long-term use, and the material of the settlement observation nail 3 is also selected to be 304 stainless steel, so that the whole detection device can also be used for a long time without external contact.

[0033] Please refer to Figure 1 and Figure 4 The upper surface of the protective shell 4 is provided with the top cover 7, the material of the top cover 7 is polycarbonate, the top cover 7 is arranged on the upper surface of the protective shell 4, and can wrap the opening above the protective shell 4, so as to protect the components inside the protective shell 4, the material of the top cover 7 is selected to be polycarbonate, which has excellent impact resistance and high strength, can withstand a large external force without being easily broken, is made into a transparent state, and is convenient for observing the internal structure.

[0034] Please refer to Figure 1 , Figure 2 and Figure 3 The front surface of the protective shell 4 is provided with the protective door 8, the front surface of the protective door 8 is fixedly connected with the door handle 9, the protective door 8 is arranged on the front surface of the protective shell 4, and the protective door 8 is also made of polycarbonate material, which can protect the front surface of the protective shell 4 and is convenient for observing the internal condition, the door handle 9 is arranged on the front surface of the protective door 8, and the protective shell 4 is convenient for opening and closing through the door handle 9 and the protective door 8.

[0035] Please refer to Figure 1 and Figure 4 Two hinges 10 are fixedly arranged on the right side surface of the protective door 8, and the left side surface of each hinge 10 is fixedly arranged on the right side surface of the protective shell 4, two hinges 10 are arranged on the right side surface of the protective door 8, and the hinges 10 are connected with the protective shell 4, the protective door 8 can be limited on the front surface of the protective shell 4 through the hinges 10, and the protective door 8 is convenient for opening and closing.

[0036] Please refer to Figure 5The inner side wall of the protective shell 4 is fixedly connected with a guide rod 11, the material of the protective shell 4 is stainless steel, the guide rod 11 is fixed on the inner side wall of the protective shell 4, the guide rod 11 is transversely placed, the left and right ends of the guide rod 11 are connected with the inner side wall of the protective shell 4, the positioning and installation effect of the guide rod 11 is realized, the protective shell 4 is made of 304 stainless steel, has the advantages of good high temperature resistance and strong corrosion resistance, can ensure long-term use and protect the internal settlement observation nail 3.

[0037] Please refer to Figure 5 The outer surface of the guide rod 11 is slidably connected with two clamping plates 12, one side of each clamping plate 12 away from each other is rotatably connected with a threaded rod 13, the clamping plate 12 is arranged on the outer surface of the guide rod 11, and is arranged in a sliding connection, the clamping plate 12 is limited, so that the clamping plate 12 can slide on the surface of the guide rod 11, the threaded rod 13 is installed on the side of the corresponding clamping plate 12 away from each other, and is rotatably connected therebetween, when the threaded rod 13 rotates, the clamping plate 12 will not rotate with it.

[0038] Please refer to Figure 4 And Figure 5 The outer surface of each threaded rod 13 is threadedly connected with a threaded block 14, the outer surface of each threaded block 14 is fixedly connected with the inner wall of the protective shell 4, the threaded block 14 is arranged on the surface of the threaded rod 13 and connected with the threaded rod 13, arranged in a threaded connection, and then the outer surface of the threaded block 14 is connected with the inner wall of the protective shell 4, arranged in a fixed connection, the threaded rod 13 can be moved by rotating the threaded rod 13, and then the clamping plate 12 can be moved, the level rod can be clamped by the mutual movement of the two clamping plates 12, the level rod is placed and clamped after the protective shell 4 is installed, which is convenient for adjusting the levelness of the settlement observation nail 3.

[0039] The building settlement observation point device in the embodiment is provided with a sleeve 2, a settlement observation nail 3, a protective shell 4 and other components, a hole with a diameter and depth similar to that of the sleeve 2 is first drilled on the wall body 1 by using a drill, then the sleeve 2 is fixed to the wall body 1 through the anchoring glue, after the sleeve 2 is stable, the settlement observation nail 3 is connected with the sleeve 2, the horizontal plane of the settlement observation nail 3 faces upward and remains horizontal, after being firm, the level rod is placed on the horizontal plane of the settlement observation nail 3, and the settlement of the settlement point can be observed, the level rod can be clamped by rotating the threaded rod 13 to relatively move the two clamping plates 12, the level rod is clamped during initial installation, which is convenient for adjusting the levelness of the settlement observation nail 3.

[0040] It should be noted that the observation part of the settlement observation nail 3 is a square block, and the upper, lower, left and right sides are flat surfaces, and during installation, only one of the flat surfaces needs to be parallel.

[0041] The working principle of the above embodiment is as follows:

[0042] First, the position where the settlement observation point needs to be arranged on the wall body 1 is drilled with a hole with a diameter and depth similar to those of the sleeve 2, and then the sleeve 2 is connected to the hole through the anchoring glue, and after the sleeve 2 is stable, the settlement observation nail 3 is rotated into the sleeve 2 and connected through the thread, and then the position of the settlement observation nail 3 is adjusted so that one side faces upward and is kept horizontal, and finally the protective shell 4 is installed on the wall body 1 through the connection between the installation strip 5, the fixing bolt 6 and the wall body 1, and then the leveling rod is placed on the surface of the settlement observation nail 3, the two clamping plates 12 are moved relative to each other by rotating the threaded rod 13, and then the leveling rod is clamped vertically so that the surface of the settlement observation nail 3 can be horizontal, and after the installation is completed, when observation is needed, the top cover 7 is removed, the protective door 8 is opened, the leveling rod is placed on the horizontal surface of the settlement observation nail 3 through the opening above the protective shell 4, and the settlement of the settlement point can be observed, and the protective shell 4 protects the settlement observation point from being touched by external objects, ensuring the long-term use of the observation point.

[0043] It should be noted that, in the present text, relational terms such as first and second and the like can only be used to distinguish one entity or action from another entity or action, without necessarily requiring or implying that there is any such actual relationship or order between these entities or actions. Moreover, the terms "comprises", "comprising", or any other variant thereof are intended to cover non-exclusive inclusions, so that a process, method, article, or apparatus that includes a list of elements does not only include those elements, but also includes other elements not explicitly listed, or further includes elements inherent in such a process, method, article, or apparatus. Without more limitations, the element defined by the statement "comprises a" does not exclude the presence of additional identical elements in the process, method, article, or apparatus that includes the element.

[0044] Although the embodiments of the present application have been shown and described, it will be understood by those of ordinary skill in the art that various changes, modifications, substitutions and alterations can be made to the embodiments without departing from the principles and spirit of the present application, and the scope of the present application is defined by the appended claims and their equivalents.

Claims

1. A building settlement observation point device provided in a wall (1), characterized by: The inner wall of the wall body (1) is fixedly installed with a sleeve (2), the wall body (1) and the sleeve (2) are connected by means of planting glue, the inner wall of the sleeve (2) is threadedly connected with a settlement observation nail (3), one side of the settlement observation nail (3) faces upward, the front surface of the wall body (1) is provided with a protective shell (4), the outer surface of the protective shell (4) is fixedly connected with a mounting strip (5), the inner wall of the mounting strip (5) is fixedly installed with equidistantly arranged fixing bolts (6), the back surface of the mounting strip (5) and the front surface of the wall body (1) are fixedly connected through the fixing bolts (6).

2. The building settlement observation point device according to claim 1, characterized by: The sleeve (2) is made of stainless steel, and the settlement observation nail (3) is made of stainless steel.

3. The building settlement observation point device according to claim 1, characterized by: The upper surface of the protective shell (4) is provided with a top cover (7), and the top cover (7) is made of polycarbonate.

4. The building settlement observation point device according to claim 1, characterized by: The front surface of the protective shell (4) is provided with a protective door (8), and the front surface of the protective door (8) is fixedly connected with a door handle (9).

5. The building settlement observation point device according to claim 4, characterized by: The right side surface of the protective door (8) is fixedly installed with two hinges (10), and the left side surface of each hinge (10) is fixedly installed with the right side surface of the protective shell (4).

6. The building settlement observation point device according to claim 1, characterized by: The inner side wall of the protective shell (4) is fixedly connected with a guide rod (11), and the protective shell (4) is made of stainless steel.

7. The building settlement observation point device according to claim 6, characterized by: The outer surface of the guide rod (11) is slidably connected with two clamping plates (12), and the outer surface of each clamping plate (12) is rotatably connected with a threaded rod (13) away from each other.

8. The building settlement observation point device according to claim 7, characterized by: The outer surface of each threaded rod (13) is threadedly connected with a threaded block (14), and the outer surface of each threaded block (14) is fixedly connected with the inner wall of the protective shell (4).