Concrete pouring formwork

By replacing timber with a fixing component made of steel pipes and concrete, the problems of easy deformation and breakage of timber are solved, and the high load-bearing capacity and long service life of concrete pouring formwork are achieved, making it suitable for the construction of complex structures.

CN223907851UActive Publication Date: 2026-02-13CHENGDU NO 2 CONSTRUETION COMPDNY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520125432.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-01-20
Publication Date
2026-02-13
Estimated Expiration
2035-01-20

AI Technical Summary

Technical Problem

The wooden beams used in traditional wall and column casting formwork are prone to deformation, breakage, and damage, affecting the quality and efficiency of concrete casting.

Method used

The traditional timber structure is replaced by a steel pipe and concrete-filled vertical and horizontal fixing components, combined with tie rods and bolts for tension fixing, which improves the load-bearing capacity and corrosion resistance of the formwork.

Benefits of technology

It enhances the structural strength and stability of the template, extends its service life, reduces reliance on wood, improves construction efficiency and safety, and is suitable for the construction of large-scale complex structures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223907851U_ABST
    Figure CN223907851U_ABST
Patent Text Reader

Abstract

The utility model discloses a concrete pouring formwork which comprises a wood plate, a concrete pouring formwork body and a concrete pouring formwork body. The vertical fixing assembly is arranged on the outer side of the wood board, the vertical fixing assembly comprises vertical pipes which are arranged at intervals in the horizontal direction, and first through holes are formed in the vertical pipes; the horizontal fixing assembly is arranged on the outer side of the vertical fixing assembly, the horizontal fixing assembly comprises horizontal pipes arranged at intervals in the vertical direction, and second through holes are formed in the horizontal pipes; the opposite-pulling fixing assembly comprises a screw rod and a bolt, and the screw rod penetrates through the first through hole, the second through hole and the wood plate and then is fixed through the bolt; wherein the vertical pipe and the horizontal pipe comprise steel pipes and concrete filled in the steel pipes. The pipe body of the steel pipe-concrete structure adopted by the formwork can provide higher bearing capacity, impact resistance and longer service life, and dependence on wood resources is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to the technical field of wall column pouring form, concretely relates to concrete pouring form. BACKGROUND

[0002] The traditional wall column pouring form is composed of wood board and wood frame by screw rod and bolt opposite pulling fixation, in the use process, the wood frame is easy to deform, break and damage, and further influence concrete pouring quality and pouring efficiency. UTILITY MODEL CONTENT

[0003] The utility model discloses a concrete pouring form, and solves the technical problem that the wood frame is easy to deform, break and damage in the prior art.

[0004] In order to realize the above-mentioned purpose, the utility model provides a concrete pouring form, and the technical scheme is as follows:

[0005] The concrete pouring form comprises a wood board, a vertical fixing assembly and a horizontal fixing assembly, wherein the wood board encloses a pouring area; the vertical fixing assembly is arranged on the outer side of the wood board and comprises vertically arranged vertical pipes with first through holes; the horizontal fixing assembly is arranged on the outer side of the vertical fixing assembly and comprises horizontally arranged horizontal pipes with second through holes; the opposite pulling fixation assembly comprises a screw rod and a bolt, and the screw rod passes through the first through holes, the second through holes and the wood board and is fixed by the bolt; and the vertical pipes and the horizontal pipes comprise steel pipes and concrete filled in the steel pipes.

[0006] Compared with the wooden shuttering, the vertical pipe and the horizontal pipe of the utility model comprise a steel pipe and concrete filled in the steel pipe, firstly, the steel pipe provides good compression resistance and tensile resistance, and the concrete can effectively resist impact and deformation, therefore, the pipe body of the steel pipe-concrete structure has higher bearing capacity and structural stability than the wooden shuttering, can bear greater concrete pouring pressure, can effectively prevent deformation of the formwork in the pouring process, and ensures accuracy of the pouring shape. Secondly, the steel pipe can adopt hot galvanizing, anti-corrosion coating or stainless steel material, can resist weather changes (such as high temperature, low temperature, humidity, etc.), especially has strong corrosion resistance in humid or severe environment, has long service life, and can be recycled; the wooden shuttering is greatly affected by environmental humidity and temperature change, is prone to damp, rot or be eroded by pests, and can need frequent replacement and maintenance in long-term use. It can be seen that the pipe body of the steel pipe-concrete structure of the formwork of the utility model has obvious advantages in structural strength, stability, service life, construction efficiency, safety and environmental protection compared with the wooden shuttering, especially in large-scale and complex structure construction, the steel pipe-concrete formwork can provide higher bearing capacity, impact resistance and longer service life, reduces dependence on wood resources, and meets the environmental protection demand of the modern building industry.

[0007] As a further improvement of the above concrete pouring formwork: the steel pipe is a square steel pipe. Thus, the price is cheap, it is easy to obtain, and it is convenient to use.

[0008] As a further improvement of the above concrete pouring formwork: the square steel pipe has a cross-sectional side length of 30-50mm. Thus, the filled concrete amount is appropriate, the construction and carrying cost caused by excessive self-weight of the pipe body is not increased, and the bearing capacity and impact resistance caused by excessive small self-weight cannot be ensured.

[0009] As a further improvement of the above concrete pouring formwork: the arrangement spacing of the vertical pipe is 50-150mm. Thus, the formwork self-weight is adapted, and the supporting effect is good.

[0010] As a further improvement of the above concrete pouring formwork: the arrangement spacing of the horizontal pipe is 200-400mm. Thus, the formwork self-weight is adapted, and the supporting effect is good.

[0011] As a further improvement of the above concrete pouring formwork: the concrete filled in the steel pipe is C20 fine stone concrete. The C20 fine stone concrete refers to concrete with a strength of C20 and a maximum particle size of coarse aggregate of not more than 15mm, and thus the obtained pipe body has higher impact resistance.

[0012] As a further improvement of the above concrete pouring formwork: the vertical pipe and the horizontal pipe are spliced by the short section and the sleeve. Thus, according to the pouring volume of the wall column, the pipe body of the corresponding size can be assembled for use, the resource utilization rate is improved, and the material cost is reduced; the splicing through the sleeve is not only convenient to operate, but also has high strength, high bearing capacity and high impact resistance.

[0013] As a further improvement of the above concrete pouring formwork: the length of the sleeve is 30-60 mm. Thus, the operation is convenient, and the strength of the connection is high.

[0014] The embodiments of the application provided in the specification are further described below in conjunction with the drawings and specific embodiments. Additional aspects and advantages of the embodiments of the application provided in the specification will be partially given in the following description, partially become obvious from the following description, or be understood by the practice of the embodiments of the application provided in the specification. BRIEF DESCRIPTION OF DRAWINGS

[0015] The drawings constituting part of the embodiments of the application provided in the specification serve to aid the understanding of the embodiments of the application provided in the specification, and the content provided in the drawings and its related description in the embodiments of the application provided in the specification can be used to explain the embodiments of the application provided in the specification, but do not constitute improper limitation on the embodiments of the application provided in the specification. In the drawings:

[0016] Figure 1 It is a side view of the concrete pouring formwork of the embodiment 1 of the utility model.

[0017] Figure 2 It is a sectional view of the concrete pouring formwork of the embodiment 1 of the utility model.

[0018] Figure 3 It is a structural schematic view of the vertical pipe or the horizontal pipe in the concrete pouring formwork of the embodiment 1 of the utility model.

[0019] Figure 4 It is a structural schematic view of the vertical pipe or the horizontal pipe in the concrete pouring formwork of the embodiment 2 of the utility model.

[0020] The related marks in the above drawings are:

[0021] 100-wood board, 200-vertical pipe, 210-first through hole, 300-horizontal pipe, 310-second through hole, 400-screw rod, 510-steel pipe, 520-concrete, 600-sleeve. DETAILED DESCRIPTION

[0022] The embodiments of the present application provided by the present application will be described in detail below with reference to the drawings. A person of ordinary skill in the art can implement the embodiments of the present application provided by the present application based on the description. Before the embodiments of the present application provided by the present application are described in detail with reference to the drawings, it should be particularly pointed out that:

[0023] The technical solutions and technical features provided in each part of the embodiments of the present application provided by the present application, including the following description, can be combined with each other without conflict.

[0024] In addition, the embodiments of the present application provided by the present application involved in the following description are generally only a part of the embodiments of the present application provided by the present application rather than all the embodiments, and therefore, all other embodiments obtained by a person of ordinary skill in the art based on the embodiments of the present application provided by the present application without creative labor should belong to the protection scope of the embodiments of the present application provided by the present application.

[0025] Regarding the terms and units in the embodiments of the present application provided by the present application: the terms "comprise", "contain", "have" and any variants thereof in the description and claims of the embodiments of the present application provided by the present application and related parts are intended to cover non-exclusive inclusion. In addition, other related terms and units in the embodiments of the present application provided by the present application can be reasonably interpreted based on the related content of the embodiments of the present application provided by the present application.

[0026] Embodiment 1

[0027] Figure 1 A side view of the concrete pouring form of the present embodiment. Figure 2 A sectional view of the concrete pouring form of the present embodiment. Figure 3 A structural schematic view of the vertical pipe or horizontal pipe in the concrete pouring form of the present embodiment.

[0028] As Figures 1-3The concrete pouring formwork shown includes a wooden board 100, a vertical fixing component, a horizontal fixing component, and a tie rod fixing component. The wooden board 100 encloses the area to be poured. The vertical fixing component is located outside the wooden board 100 and includes vertical tubes 200 arranged at intervals in the horizontal direction, each vertical tube 200 having a first through hole 210. The horizontal fixing component is located outside the vertical fixing component and includes horizontal tubes 300 arranged at intervals in the vertical direction, each horizontal tube 300 having a second through hole 310. The tie rod fixing component includes a screw 400 and a bolt. The screw 400 passes through the first through hole 210, the second through hole 310, and the wooden board 100 and is then fixed by the bolt. The vertical tubes 200 and horizontal tubes 300 each include steel pipes 510 and C20 fine aggregate concrete filled within the steel pipes 510.

[0029] The steel pipe 510 is a square steel pipe, and the side length of the cross-section of the square steel pipe is 30-50mm.

[0030] The vertical tubes 200 are spaced 50–150 mm apart. The horizontal tubes 300 are spaced 200–400 mm apart.

[0031] The manufacturing process of the vertical pipe 200 and the horizontal pipe 300 is as follows: Drill holes in the steel pipe 510; install PVC rubber pipes in the holes after drilling; then fill the steel pipe 510 with C20 fine stone concrete and compact it; then cure until the C20 fine stone concrete has initially set, and then remove the PVC rubber sleeve from the steel pipe 510; continue curing until final setting, thus obtaining the vertical pipe 200 and the horizontal pipe 300.

[0032] Example 2

[0033] Figure 4 This is a schematic diagram of the vertical or horizontal pipe in the concrete pouring formwork of this embodiment.

[0034] Compared with Example 1, the concrete pouring formwork in this example differs in that: Figure 4 As shown, the vertical pipe 200 and the horizontal pipe 300 are assembled from short sections and sleeves 600, and the length of the sleeves 600 is 30-60mm.

[0035] The embodiments of the invention provided in this specification have been described above. Those skilled in the art will be able to implement the embodiments of the invention provided in this specification based on these descriptions. All other preferred embodiments and implementations obtained by those skilled in the art based on the above description of the embodiments of the invention provided in this specification without inventive effort should fall within the protection scope of the embodiments of the invention provided in this specification.

Claims

1. A concrete formwork, characterised in that: The utility model relates to a kind of concrete pouring formwork, including: Wood board (100), the wood board (100) surrounds the area to be cast region; Vertical fixed component, the vertical fixed component is set to wood board (100) outside, the vertical fixed component includes the vertical pipe (200) being arranged at interval along horizontal direction, first through-hole (210) is equipped on the vertical pipe (200); Horizontal fixed component, the horizontal fixed component is equipped with vertical fixed component outside, the horizontal fixed component includes the horizontal pipe (300) being arranged at interval along vertical direction, second through-hole (310) is equipped on the horizontal pipe (300); Pulling fixed component, the pulling fixed component includes screw rod (400) and bolt, screw rod (400) passes through first through-hole (210), second through-hole (310), wood board (100) after using bolt fixed; Wherein, the vertical pipe (200) and horizontal pipe (300) include steel pipe (510) and the concrete (520) filled in steel pipe (510).

2. The concrete formwork of claim 1, wherein: The steel pipe (510) is square steel pipe.

3. The concrete formwork of claim 2, wherein: The side length of the cross section of the square steel pipe is 30-50mm.

4. The concrete formwork of claim 1, wherein: The arrangement interval of the vertical pipe (200) is 50-150mm.

5. The concrete formwork of claim 1, wherein: The arrangement interval of the horizontal pipe (300) is 200-400mm.

6. The concrete formwork of claim 1, wherein: The concrete (520) filled in steel pipe (510) is C20 fine stone concrete.

7. The concrete formwork of claim 1, wherein: The vertical pipe (200) and horizontal pipe (300) are spliced by short section and sleeve (600).

8. The concrete formwork of claim 7, wherein: The length of the sleeve (600) is 30-60mm.