Rapid insertion component for building external wall insulation board

By designing a quick-install component for building exterior wall insulation panels, using long rods and hooks to hold the steel mesh, and combining it with adjustable movable rods, the problem of deformation and misalignment of the insulation panels during concrete pouring was solved, achieving a stable connection and efficient installation.

CN224016542UActive Publication Date: 2026-03-20ZHEJIANG YUSEN BUILDING MATERIALS TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-04-02
Publication Date
2026-03-20

AI Technical Summary

Technical Problem

In existing building construction, insulation boards are prone to deformation and misalignment during concrete pouring due to settlement of the insert components, which affects their performance.

Method used

A quick-install component for building exterior wall insulation panels is designed. A long rod passes through the insulation panel, and hooks are used to hook the horizontal bars of the steel mesh. Combined with the adjustment of the movable rod and the sleeve, a stable connection is achieved, preventing the component from falling during concrete pouring.

Benefits of technology

It improves the convenience and stability of insulation board installation, avoids deformation and misalignment of insulation board during concrete pouring, and enhances adaptability and connection stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224016542U_ABST
    Figure CN224016542U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of insulation board installation, in particular to a building external wall insulation board rapid inserting component which comprises a long rod, a first board body and a second board body are sleeved on the two sides of the outer wall of the long rod respectively, a shell is fixed on one side wall of the first board body, a notch is formed in the middle of the top of the shell, and clamping blocks are fixed on the two sides of the top of the shell. The outer end of the long rod penetrates through the shell and is fixedly connected with a drag hook, the other end of the long rod is hinged to a sleeve through a spherical hinge, the outer end of the sleeve is connected with a movable rod, and a hook groove is formed in the outer wall of the movable rod. The long rod penetrates through the heat preservation plate, then the first plate body and the second plate body are arranged on the two sides of the heat preservation plate, and therefore the pull hooks can hook transverse bars on a reinforcing mesh to enable the transverse bars to be arranged in the two clamping blocks, rapid connection with the reinforcing mesh can be achieved, and convenience of installation operation is improved.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to thermal insulation board installation technical field, concretely is a kind of building external thermal insulation board quick plug-in component. BACKGROUND

[0002] Building insulation board is the special building material for building external thermal insulation, aims to provide the function of thermal insulation, heat insulation and energy saving.

[0003] In the process of existing building construction, there are many installation methods of insulation board, one of which is to avoid the damage of insulation board exposed to the outside world by pouring insulation board in concrete. Before pouring insulation board in concrete, insulation board and steel mesh need to be connected in advance. When installing and connecting, corresponding plug-in components need to be used. The existing plug-in components need to pass through the insulation board by using the component, then the end of the component is clamped on the steel mesh, and the other end of the component is placed in the concrete pouring area, so that the component is placed in the concrete after the concrete solidifies. However, the actual installation of insulation board will cause the component to sink downward during the concrete pouring process, and then the insulation board will be deformed and misaligned, which will affect the later use effect. Therefore, we propose a kind of building external thermal insulation board quick plug-in component. UTILITY MODEL CONTENTS

[0004] The utility model aims at providing a kind of building external thermal insulation board quick plug-in component, solve the problem proposed in background art.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical scheme: a kind of building external thermal insulation board quick plug-in component, including long pole, the outer wall both sides of long pole are respectively equipped with first plate body and second plate body;

[0006] The side wall of the first plate body is fixed with a shell, the top middle part of the shell is provided with a notch, the top both sides of the shell are fixed with a clamping block, the outer end of the long pole penetrates the shell and is fixedly connected with a drag hook, the other end of the long pole is hinged with a sleeve pipe through a ball hinge, the outer end of the sleeve pipe is connected with a movable rod, the outer wall of the movable rod is provided with a hook groove.

[0007] By adopting the above technical solution, firstly, the first plate is fitted onto the long rod, and then the long rod is passed through the insulation board, so that the first plate is attached to one side wall of the insulation board. Then, the second plate is fitted onto the long rod, and the long rod is pulled so that the hook catches the horizontal bars of the steel mesh, so that the horizontal bars of the steel mesh can be locked in the locking block. Then, the second plate is attached to the other side wall of the insulation board. Then, by utilizing the mobility of the ball hinge, the movable rod and the sleeve are adjusted to align with the steel bars, and hooked onto the steel bars using the hook groove. Thus, by positioning both ends of the long rod, it is possible to prevent the long rod from sagging due to the concrete during pouring, which helps to prevent the insulation board from deforming or misaligning due to the influence of the long rod.

[0008] In a preferred embodiment of this utility model, one end of the movable rod is fixedly connected to an insert rod, the insert rod is inserted into the inner cavity of the sleeve, the inner end of the insert rod is fixedly connected to a spring, and the outer end of the spring is fixedly connected to the inner cavity end face of the sleeve.

[0009] By adopting the above technical solution, when the movable rod is pulled and attached to the steel bar, the spring can be stretched by the insert rod to achieve lateral adjustment of the position of the movable rod, thereby adapting to the position of the steel bar within a certain range and improving adaptability.

[0010] In a preferred embodiment of the present invention, a through hole is provided at the middle of the outer walls of the first plate and the second plate. The inner diameter of the through hole is larger than the outer diameter of the long rod, and the long rod passes through the through hole.

[0011] By adopting the above technical solution, wear from the external threads can be avoided when the first plate and the second plate are fitted onto the long rod.

[0012] In a preferred embodiment of this utility model, the width of the notch is greater than the outer diameter of the hook.

[0013] By adopting the above technical solution, it is ensured that the hook can enter the gap without obstruction.

[0014] In a preferred embodiment of this utility model, positioning rods are fixed on all four sides of one side wall of the first plate.

[0015] By adopting the above technical solution, when the first plate is installed on the outer wall of the insulation board, the positioning rod can be inserted into the insulation board to ensure the stability of the first plate after installation.

[0016] In a preferred embodiment of this utility model, a nut is fixed to one side wall of the second plate, and an external thread is provided on one side of the outer wall of the long rod.

[0017] By adopting the technical scheme, after the second plate body is attached to the thermal insulation board, the nut and the external thread are engaged, so that the first plate body and the second plate body are locked, and stability is improved.

[0018] Compared with the prior art, the utility model has the advantages that:

[0019] The building outer wall thermal insulation board quick plug-in component has the advantages that: the long rod is penetrated through the thermal insulation board, and then the first plate body and the second plate body are arranged on both sides of the thermal insulation board, so that the horizontal ribs on the steel mesh are hooked by the hooks of the draw hooks and arranged in the two clamping blocks, thereby realizing quick connection with the steel mesh and improving the convenience of installation operation.

[0020] The movable rod of the sleeve pipe can be stretched, so that the hook groove on the outer wall of the movable rod can be hung on the steel bar, thereby making the connection stable and high, so that compared with the direct arrangement in the pouring area in the prior art, the situation that the long rod is lowered due to the pouring of concrete and the thermal insulation board is deformed and misaligned is avoided, and the movable rod and the sleeve pipe can be adjusted in angle, thereby improving the adaptability and the position of hooking the steel bar. BRIEF DESCRIPTION OF DRAWINGS

[0021] Other features, objects and advantages of the utility model will become more apparent through reading the detailed description of the non-limiting embodiments with reference to the following drawings:

[0022] Figure 1 FIG. 1 is a first overall structure schematic diagram of the building outer wall thermal insulation board quick plug-in component of the utility model;

[0023] Figure 2 FIG. 2 is a second overall structure schematic diagram of the building outer wall thermal insulation board quick plug-in component of the utility model;

[0024] Figure 3 FIG. 3 is a sleeve pipe and movable rod connection structure schematic diagram of the building outer wall thermal insulation board quick plug-in component of the utility model.

[0025] In the drawings:

[0026] 1, first plate body; 11, shell; 12, clamping block; 13, notch; 14, positioning rod;

[0027] 2, second plate body; 21, nut;

[0028] 3, long rod; 31, external thread; 32, draw hook;

[0029] 4, movable rod; 41, hook groove; 42, plug rod; 43, spring; 44, sleeve pipe; 45, ball hinge. DETAILED DESCRIPTION

[0030] Please refer toFigures 1-3 The utility model provides a technical scheme: a building outer wall insulation board quick plug -in component, including long lever 3, the both sides of the outer wall of long lever 3 are respectively equipped with first plate body 1 and second plate body 2,

[0031] The side wall of first plate body 1 is fixed with shell 11, the top middle part of shell 11 is equipped with gap 13, the both sides of the top of shell 11 are fixed with clamping block 12, the outer end of long lever 3 is passed through shell 11 and is fixedly connected with drag hook 32, the other end of long lever 3 is hinged with sleeve pipe 44 through ball hinge 45, the outer end of sleeve pipe 44 is connected with movable rod 4, and the outer wall of movable rod 4 is equipped with hook groove 41.

[0032] In actual use, first plate body 1 is sleeved on long lever 3 first, then long lever 3 is passed through the insulation board, so that first plate body 1 is attached to one side wall of the insulation board, then second plate body 2 is sleeved on long lever 3, and long lever 3 is pulled so that drag hook 32 hooks the steel mesh horizontal muscle, so that the steel mesh horizontal muscle can be clamped in clamping block 12, then second plate body 2 is attached to the other side wall of the insulation board, and the activity of ball hinge 45 is used to align the activity adjustment of movable rod 4 and sleeve pipe 44 to the steel bar, and movable rod 4 is hung on the steel bar by using hook groove 41, so that the both ends of long lever 3 are positioned, and the long lever 3 can be prevented from falling down when pouring concrete, and the deformation and misplacement of the insulation board caused by the influence of long lever 3 can be avoided.

[0033] Further, the side wall of second plate body 2 is fixed with nut 21, and the outer wall of long lever 3 is equipped with external thread 31 on one side, after second plate body 2 is attached to the insulation board, nut 21 and external thread 31 are engaged, so that first plate body 1 and second plate body 2 are locked, and the stability is improved.

[0034] Still further, the side wall of first plate body 1 is fixed with positioning rod 14 on four sides, when first plate body 1 is installed on the outer wall of the insulation board, positioning rod 14 can be inserted into the insulation board, so that the stability of first plate body 1 after installation is ensured.

[0035] It is worth mentioning that the width of gap 13 is greater than the outer diameter of drag hook 32, so that drag hook 32 can enter gap 13 without being blocked.

[0036] It should be noted that the outer wall of first plate body 1 and second plate body 2 is equipped with through hole in the middle, the inner diameter of through hole is greater than the outer diameter of long lever 3, and long lever 3 is passed through through hole, so that first plate body 1 and second plate body 2 can be prevented from being abraded by external thread 31 when they are sleeved on long lever 3.

[0037] As Figure 1 And 2As shown in Figure 3, one end of the movable rod 4 is fixedly connected to an insert rod 42, which is inserted into the inner cavity of the sleeve 44. The inner end of the insert rod 42 is fixedly connected to a spring 43, and the outer end of the spring 43 is fixedly connected to the inner cavity end face of the sleeve 44. Thus, when the movable rod 4 is pulled and hung on the reinforcing bar, the insert rod 42 can be used to stretch the spring 43, thereby achieving lateral adjustment of the position of the movable rod 4. This allows it to adapt to the position of the reinforcing bar within a certain range, improving its adaptability.

[0038] The implementation principle of the quick-installation component for building exterior wall insulation board of this application is as follows: First, the first plate 1 is fitted onto the long rod 3, and then the long rod 3 is passed through the insulation board so that the first plate 1 is attached to one side wall of the insulation board. Then, the second plate 2 is fitted onto the long rod 3, and the long rod 3 is pulled so that the hook 32 hooks the horizontal bar of the steel mesh, so that the horizontal bar of the steel mesh can be locked in the locking block 12. Then, the second plate 2 is attached to the other side wall of the insulation board. Then, the mobility of the ball hinge 45 is used to adjust the movement of the movable rod 4 and the sleeve 44 to align with the steel bar. At the same time, when the movable rod 4 is pulled and hooked onto the steel bar, the spring 43 can be stretched by the insertion rod 42 to achieve the lateral adjustment of the position of the movable rod 4. It can be hooked onto the steel bar by using the hook groove 41. Thus, the long rod 3 is positioned at both ends, which can prevent the long rod 3 from falling due to the concrete during concrete pouring, and thus help to prevent the insulation board from being deformed and misaligned due to the influence of the long rod 3.

[0039] Furthermore, in this document, relational terms such as "first" and "second" are used merely to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such process, method, article, or apparatus.

[0040] Although specific embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to the specific embodiments without departing from the principles and spirit of the present invention, the scope of which is defined by the appended claims and their equivalents.

Claims

1. A quick-installation component for building exterior wall insulation panels, comprising a long rod (3), characterized in that: The outer walls of the long rod (3) are respectively fitted with a first plate (1) and a second plate (2); A housing (11) is fixed to one side wall of the first plate (1). A notch (13) is provided in the middle of the top of the housing (11). A locking block (12) is fixed on both sides of the top of the housing (11). The outer end of the long rod (3) passes through the housing (11) and is fixedly connected to a hook (32). The other end of the long rod (3) is hinged to a sleeve (44) through a ball joint (45). The outer end of the sleeve (44) is connected to a movable rod (4). A hook groove (41) is provided on the outer wall of the movable rod (4).

2. The quick-installation component for building exterior wall insulation panels according to claim 1, characterized in that: One end of the movable rod (4) is fixedly connected to a plug rod (42), which is inserted into the inner cavity of the sleeve (44). The inner end of the plug rod (42) is fixedly connected to a spring (43), and the outer end of the spring (43) is fixedly connected to the inner cavity end face of the sleeve (44).

3. The quick-installation component for building exterior wall insulation panels according to claim 1, characterized in that: A through hole is provided in the middle of the outer wall of the first plate (1) and the second plate (2). The inner diameter of the through hole is larger than the outer diameter of the long rod (3). The long rod (3) passes through the through hole.

4. The quick-installation component for building exterior wall insulation panels according to claim 1, characterized in that: The width of the notch (13) is greater than the outer diameter of the hook (32).

5. A quick-install component for building exterior wall insulation panels according to claim 1, characterized in that: Positioning rods (14) are fixed on all four sides of one side wall of the first plate (1).

6. A quick-installation component for building exterior wall insulation panels according to claim 1, characterized in that: A nut (21) is fixed to one side wall of the second plate (2), and an external thread (31) is provided on one side of the outer wall of the long rod (3).