Warm air conditioner pipeline conveying and connecting device for architectural design

By installing shielding and installation mechanisms on HVAC ducts, the problems of loosening, collapse, and leakage at duct connections are solved, achieving stable connections and shielding protection, and ensuring the normal operation of the air conditioning system and heat delivery.

CN224093973UActive Publication Date: 2026-04-07YANYI CONSTR GRP CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-05-29
Publication Date
2026-04-07

AI Technical Summary

Technical Problem

HVAC pipe connections are prone to loosening, collapse, and leakage, affecting normal operation and work efficiency.

Method used

The first and second pipelines are equipped with a shielding mechanism, including a cover and a mounting mechanism. Through the combination of mounting frame, mounting plate, connecting rod, gear and screw, the pipeline is stably connected and shielded.

Benefits of technology

This effectively prevents loosening, collapse, and leakage at pipe connections, ensuring the normal operation of air conditioning pipes and the effective delivery of heat.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224093973U_ABST
    Figure CN224093973U_ABST
Patent Text Reader

Abstract

The utility model discloses a warm air conditioner pipeline conveying and connecting device for architectural design, which belongs to the technical field of air conditioner pipelines and comprises a first pipeline and a second pipeline, a first protective cover and a second protective cover are respectively provided with a placement frame, and placement plates are slidably connected into the placement frames. A second lead screw is rotationally connected to the interior of the placement frame, a second gear is fixedly connected to the second lead screw, a connecting rod is rotationally connected to the placement frame, and a first gear is fixedly connected to the connecting rod; the first pipeline, the second pipeline, the placement plate, the connecting rod, the first gear, the second gear and the second lead screw are arranged, the first gear and the second gear are driven to rotate through the connecting rod, then the second lead screw is driven to rotate, and then the placement plate is driven until the placement plate is adjusted to a proper position; and the joint of the first pipeline and the second pipeline can be conveniently supported and fixed, so that the condition that the joint of the air conditioner pipeline is loosened and collapsed is avoided, and normal operation of the air conditioner pipeline is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model belongs to the field of air conditioning duct technology, specifically relating to a heating and air conditioning duct connection device for building design. Background Technology

[0002] A heating and ventilation air conditioning system is an air conditioning device that provides heating, ventilation, and air conditioning functions. The installation and connection of heating and ventilation ducts is a crucial aspect of building design.

[0003] A heating, ventilation and air conditioning pipe connection device with patent number CN217030331U has a reasonable structural design, is easy to install, does not require external tools, can effectively complete the positioning connection between two pipes, is simple to operate, convenient to maintain, and has good practicality.

[0004] However, in actual operation, the connection of the HVAC pipe in this utility model is a stress concentration point. During use, the air conditioning pipe itself is also prone to vibration due to the noise and vibration of the outdoor unit. This can lead to loosening and collapse of the pipe connection, affecting the normal operation of the pipe. Furthermore, once a leak occurs at the connection of the HVAC pipe, the transmitted heat will be rapidly lost, causing a sharp decline in work efficiency. Utility Model Content

[0005] The purpose of this utility model is to provide a heating and air conditioning pipe connection device for building design, so as to solve the problems mentioned in the background art.

[0006] To achieve the above objectives, this utility model provides the following technical solution: a heating and air conditioning pipe connection device for building design, comprising a first pipe and a second pipe, wherein the first pipe and the second pipe are provided with a shielding mechanism, the shielding mechanism comprising a first cover and a second cover, the first pipe being provided with a first cover and the second pipe being provided with a second cover, the first cover and the second cover being provided with a placement mechanism, the placement mechanism comprising a placement frame, the first cover and the second cover being respectively provided with a placement frame, a placement plate being slidably connected inside the placement frame, a second lead screw being rotatably connected inside the placement frame, the second lead screw being threadedly connected inside the placement plate, a second gear being fixedly connected to the second lead screw, a connecting rod being rotatably connected to the placement frame, and a first gear being fixedly connected to the connecting rod, the first gear meshing with the second gear.

[0007] In a preferred embodiment, the first pipe and the second pipe are provided with a connecting mechanism, the connecting mechanism including a flange, one end of the first pipe and the second pipe are respectively provided with a flange, the two flanges are connected by bolts, and the bolts are threaded with nuts.

[0008] In a preferred embodiment, a locking block is fixedly connected to the first protective cover, and the locking block engages with the second protective cover.

[0009] In a preferred embodiment, the first and second protective covers are provided with a positioning mechanism, which includes a fixing block. A set of fixing blocks is provided on the first and second protective covers respectively, and a positioning rod is slidably connected inside the fixing block.

[0010] In a preferred embodiment, a first lead screw is rotatably connected to the fixing block. The first lead screw is threaded inside the positioning rod, and one end of the first lead screw extends to the outside of the fixing block and is connected to a rotating block.

[0011] In a preferred embodiment, each group of the fixing blocks is provided with a plurality of blocks, and the end of the positioning rod is arc-shaped.

[0012] In a preferred embodiment, one end of the connecting rod extends outside the mounting frame, and a turntable is mounted on the connecting rod.

[0013] In a preferred embodiment, a limiting rod is fixedly connected inside the mounting frame, and the mounting plate is slidably connected to the limiting rod.

[0014] Compared with the prior art, the beneficial effects of this utility model are:

[0015] This utility model, by setting up a first pipe, a second pipe, a mounting frame, a mounting plate, a turntable, a connecting rod, a first gear, a second gear, and a second lead screw, allows for the following operation: First, the connection between the first and second pipes can be positioned appropriately. Then, depending on the actual situation, the turntable drives the connecting rod to rotate, which in turn drives the first gear to rotate, which in turn drives the second gear to rotate, and subsequently drives the second lead screw to rotate. The second lead screw then drives the mounting plate to move within the mounting frame until it is adjusted to a suitable position. This allows the mounting plate to provide support and fixation for the connection between the first and second pipes, thus facilitating better support of the air conditioning pipe connection and preventing loosening or collapse, ensuring the normal operation of the air conditioning pipe.

[0016] This utility model, by setting up a first protective cover, a second protective cover, a locking block, a fixing block, a rotating block, a first lead screw, and a positioning rod, allows the first protective cover on the first pipe to be engaged with the second protective cover on the second pipe before laying the air conditioning duct. The first and second protective covers provide some shielding and protection at the connection between the first and second pipes. Furthermore, the rotating block drives the first lead screw, causing the positioning rod to move inside the fixing block until it contacts the surface of either the first or second pipe, further limiting and fixing the first and second protective covers. This facilitates shielding and protection at the air conditioning duct connection, preventing rapid heat loss in case of leakage, temporarily ensuring operational efficiency, and serving as an emergency measure. Attached Figure Description

[0017] Figure 1 This is a schematic diagram of the overall structure of this utility model;

[0018] Figure 2 This is a schematic diagram of the first pipe, the shielding mechanism, and the positioning mechanism of the present utility model.

[0019] Figure 3 This is a schematic diagram of the first pipe, the second pipe, and the connecting mechanism of the present utility model.

[0020] Figure 4 This is a schematic diagram of the first pipe, the first protective cover, and the positioning mechanism of the present utility model.

[0021] Figure 5 This is a schematic diagram of the installation mechanism of the present utility model.

[0022] Figure 6 This is an enlarged schematic diagram of part A of the structure of this utility model.

[0023] In the diagram: 1. First pipe; 2. Second pipe; 3. Connecting mechanism; 301. Flange; 302. Bolt; 303. Nut; 4. Protective mechanism; 401. First protective cover; 402. Second protective cover; 403. Locking block; 5. Positioning mechanism; 501. Fixing block; 502. Rotating block; 503. First lead screw; 504. Positioning rod; 6. Installation mechanism; 601. Installation frame; 602. Installation plate; 603. Turntable; 604. Connecting rod; 605. First gear; 606. Second gear; 607. Second lead screw; 608. Limiting rod. Detailed Implementation

[0024] The present invention will be further described below with reference to the embodiments.

[0025] The following embodiments are used to illustrate the present invention, but should not be used to limit the scope of protection of the present invention. The conditions in the embodiments can be further adjusted according to specific conditions, and simple improvements to the method of the present invention under the premise of the concept of the present invention are all within the scope of protection claimed by the present invention.

[0026] Please see Figure 1-6 This utility model provides a heating and air conditioning duct connection device for building design, including a first duct 1 and a second duct 2. The first duct 1 and the second duct 2 are provided with a shielding mechanism 4, which includes a first cover 401 and a second cover 402. The first duct 1 is provided with a first cover 401, and the second duct 2 is provided with a second cover 402. The first cover 401 and the second cover 402 are provided with a placement mechanism 6, which includes a placement frame 601. The first cover 401 and the second cover 402 are each provided with a placement frame 601. A placement plate 602 is slidably connected inside the placement frame 601. A second lead screw 607 is rotatably connected inside the placement frame 601. The second lead screw 607 is threaded to the inside of the placement plate 602. A second gear 606 is fixedly connected to the second lead screw 607. A connecting rod 604 is rotatably connected to the placement frame 601. A first gear 605 is fixedly connected to the connecting rod 604. The first gear 605 meshes with the second gear 606.

[0027] Specifically, such as Figure 3 As shown, the first pipe 1 and the second pipe 2 are provided with a connecting mechanism 3. The connecting mechanism 3 includes a flange 301. One end of the first pipe 1 and the second pipe 2 are respectively provided with a flange 301. The two flanges 301 are connected by bolts 302, and the bolts 302 are threaded with nuts 303. In use, the first pipe 1 and the second pipe 2 can be easily connected by the two flanges 301, bolts 302 and nuts 303.

[0028] Specifically, such as Figure 2 As shown, a locking block 403 is fixedly connected to the first protective cover 401. The locking block 403 engages with the second protective cover 402. The locking block 403 facilitates the engagement and connection between the first protective cover 401 and the second protective cover 402.

[0029] Specifically, such as Figure 2 , Figure 4 and Figure 6As shown, the first protective cover 401 and the second protective cover 402 are provided with a positioning mechanism 5. The positioning mechanism 5 includes a fixing block 501. The first protective cover 401 and the second protective cover 402 are respectively provided with a set of fixing blocks 501. A positioning rod 504 is slidably connected inside the fixing block 501. A first lead screw 503 is rotatably connected to the fixing block 501. The first lead screw 503 is threaded to the inside of the positioning rod 504, and one end of the first lead screw 503 extends to the outside of the fixing block 501 and is connected to a rotating block 502. Each set of fixing blocks 501 is provided with several of them. The end of the positioning rod 504 is arc-shaped. In use, the corresponding rotating block 502 is rotated, and the rotating block 502 drives the first lead screw 503 to rotate, thereby driving the positioning rod 504 to move inside the fixing block 501 until the corresponding positioning rod 504 abuts against the surface of the first pipe 1 or the second pipe 2, further limiting and fixing the first protective cover 401 and the second protective cover 402.

[0030] Specifically, such as Figure 1 and Figure 5 As shown, one end of the connecting rod 604 extends to the outside of the mounting frame 601, and a turntable 603 is mounted on the connecting rod 604. The turntable 603 facilitates manual operation of the connecting rod 604.

[0031] Specifically, such as Figure 5 As shown, a limiting rod 608 is fixedly connected inside the mounting frame 601, and the mounting plate 602 is slidably connected to the limiting rod 608. The limiting rod 608 serves to limit and guide the mounting plate 602.

[0032] The working principle and usage process of this utility model are as follows: Before laying the air conditioning pipes, the first protective cover 401 on the first pipe 1 can be engaged with the second protective cover 402 on the second pipe 2 by the locking block 403. The first protective cover 401 and the second protective cover 402 can provide some shielding and protection for the connection between the first pipe 1 and the second pipe 2. Furthermore, the corresponding rotating block 502 can be rotated, which drives the first lead screw 503 to rotate, thereby driving the positioning rod 504 to move inside the fixing block 501 until the corresponding positioning rod 504 abuts against the surface of the first pipe 1 or the second pipe 2, further limiting and fixing the first protective cover 401 and the second protective cover 402. This facilitates some shielding and protection for the connection of the air conditioning pipes, preventing the heat from being quickly released after a leak occurs at the pipe connection, temporarily ensuring the working effect and playing an emergency role.

[0033] In actual operation, the connection between the first pipe 1 and the second pipe 2 can be placed in a suitable position first. Then, according to the actual situation, the turntable 603 is rotated. The rotation of the turntable 603 drives the connecting rod 604 to rotate, which in turn drives the first gear 605 to rotate, which in turn drives the second gear 606 to rotate, which in turn drives the second lead screw 607 to rotate. Through the second lead screw 607, the mounting plate 602 is driven to move inside the mounting frame 601 until the mounting plate 602 is adjusted to a suitable position. This allows the mounting plate 602 to provide support and fixation for the connection between the first pipe 1 and the second pipe 2, thereby facilitating better support of the air conditioning pipe connection and preventing loosening or collapse of the air conditioning pipe connection, ensuring the normal operation of the air conditioning pipe.

[0034] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the present invention, the scope of which is defined by the appended claims and their equivalents.

Claims

1. A heating and air conditioning duct connection device for building design, comprising a first duct (1) and a second duct (2), characterized in that: The first pipe (1) and the second pipe (2) are provided with a shielding mechanism (4), the shielding mechanism (4) includes a first shield (401) and a second shield (402). The first pipe (1) is provided with a first shield (401), and the second pipe (2) is provided with a second shield (402). The first shield (401) and the second shield (402) are provided with a mounting mechanism (6), the mounting mechanism (6) includes a mounting frame (601), and the first shield (401) and the second shield (402) are respectively provided with a mounting frame (601). 601), a mounting plate (602) is slidably connected inside the mounting frame (601), a second lead screw (607) is rotatably connected inside the mounting frame (601), the second lead screw (607) is threaded to the inside of the mounting plate (602), a second gear (606) is fixedly connected to the second lead screw (607), a connecting rod (604) is rotatably connected to the mounting frame (601), a first gear (605) is fixedly connected to the connecting rod (604), and the first gear (605) meshes with the second gear (606).

2. The heating and air conditioning duct connection device for building design according to claim 1, characterized in that: The first pipe (1) and the second pipe (2) are provided with a connecting mechanism (3). The connecting mechanism (3) includes a flange (301). One end of the first pipe (1) and the second pipe (2) are respectively provided with a flange (301). The two flanges (301) are connected by bolts (302), and a nut (303) is threaded on the bolt (302).

3. The heating and air conditioning duct connection device for building design according to claim 1, characterized in that: A locking block (403) is fixedly connected to the first protective cover (401), and the locking block (403) engages with the second protective cover (402).

4. A heating and air conditioning duct connection device for building design according to claim 1, characterized in that: The first protective cover (401) and the second protective cover (402) are provided with a positioning mechanism (5). The positioning mechanism (5) includes a fixing block (501). The first protective cover (401) and the second protective cover (402) are respectively provided with a set of fixing blocks (501). The fixing block (501) is slidably connected to a positioning rod (504).

5. A heating and air conditioning duct connection device for building design according to claim 4, characterized in that: A first lead screw (503) is rotatably connected to the fixed block (501). The first lead screw (503) is threaded to the inside of the positioning rod (504), and one end of the first lead screw (503) extends to the outside of the fixed block (501) and is connected to a rotating block (502).

6. A heating and air conditioning duct connection device for building design according to claim 5, characterized in that: Each group of fixed blocks (501) is provided with a plurality of blocks, and the end of the positioning rod (504) is arc-shaped.

7. A heating and air conditioning duct connection device for building design according to claim 1, characterized in that: One end of the connecting rod (604) extends to the outside of the mounting frame (601), and a turntable (603) is mounted on the connecting rod (604).

8. A heating and air conditioning duct connection device for building design according to claim 1, characterized in that: The mounting frame (601) is internally fixedly connected to a limiting rod (608), and the mounting plate (602) is slidably connected to the limiting rod (608).

Citation Information

Patent Citations

  • Heating ventilation air conditioner pipeline connecting device

    CN217030331U