Construction hanging basket

By introducing movable adjustment components and counterweight frames into the construction scaffold, and using the lever principle of the crossbeam to adjust the position of the counterweight, the stability and safety problems of traditional scaffolds under load changes are solved, and the balance and adaptability of the scaffold under different loads are achieved.

CN224106846UActive Publication Date: 2026-04-10CHINA CONSTR SECOND ENG BUREAU LTD
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-04-28
Publication Date
2026-04-10

AI Technical Summary

Technical Problem

Traditional suspended platforms lack a dynamic counterweight adjustment mechanism, making it impossible to adjust the counterweight according to the actual load. This can easily lead to overload and instability during transport, posing serious safety hazards.

Method used

A construction suspended platform was designed, in which the position of the counterweight frame and counterweight is adjusted by movable adjustment components, and the crossbeam is used as a lever to balance the torque, so as to adapt to different levels of suspended platform load.

Benefits of technology

It achieves stability and flexibility of the suspended platform under different load conditions, improves construction safety and adaptability, and enhances the load-bearing capacity and bending resistance of the suspended platform.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224106846U_ABST
    Figure CN224106846U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building construction auxiliary tools, in particular to a construction hanging basket which comprises a main support, a hanging basket body, a movable adjusting piece and a counterweight frame. The main support comprises a strut and a beam, the beam is provided with a first end and a second end, the other end of the strut is supported on the beam, and the fulcrum is located between the first end and the second end. One end of the movable adjusting part is inserted into the second end part, and the position of the movable adjusting part on the cross beam can be adjusted in the extending direction of the cross beam; the counter weight frame is connected with the other end of the movable adjusting piece, and the position of the other end of the movable adjusting piece on the counter weight frame is adjustable. In the application, by adjusting the position of the movable adjusting piece in the extending direction of the cross beam, the counter weight frame and the counter weight can be driven to move in the extending direction of the cross beam, so that the counter weight is close to or far away from a supporting point of the supporting column to the cross beam, and the effect of increasing or shortening the length of the counter weight side lever is achieved; and the construction hanging basket can adapt to hanging basket loads of different magnitudes.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present application relates to the technical field of construction auxiliary tools, in particular to a construction basket. BACKGROUND

[0002] In the field of building construction, the basket as an important aerial work equipment is widely used in the scene of external wall construction, curtain wall installation, external wall cleaning, etc. The basket is usually composed of a suspension mechanism, a lifting mechanism, a safety lock, a steel wire rope and a basket body, which can effectively improve the construction efficiency and protect the safety of construction personnel.

[0003] With the rapid development of the construction industry, the complexity and diversity of construction projects are increasing, and the basket needs to adapt to different construction environments and operation requirements. In the actual construction process, the basket not only needs to carry construction personnel, but also needs to carry various construction materials and equipment, which makes the load condition of the basket complex and changeable. Due to the difference in demand of different construction projects and the change in the number of construction personnel, the load borne by the basket often fluctuates greatly. When the load carried by the basket increases, the traditional basket device cannot adjust the counterweight according to the actual load condition due to the lack of dynamic counterweight adjustment mechanism, which easily leads to problems such as overload and unstable body during the carrying process of the basket, thereby causing serious safety hazards. CONTENT OF THE UTILITY MODEL

[0004] The purpose of the present application is to provide a construction basket which can adjust the counterweight setting and adapt to different magnitudes of basket load.

[0005] In order to achieve the above-mentioned purpose, the utility model provides a construction basket, which comprises:

[0006] A main support, the main support comprises a support column and a crossbeam, the crossbeam has a first end and a second end, one end of the support column is fixedly arranged, the other end of the support column is supported on the crossbeam and the fulcrum is located between the first end and the second end;

[0007] A basket, the basket is connected with the first end;

[0008] A movable adjusting part, one end of the movable adjusting part is inserted on the second end, the position of the movable adjusting part on the crossbeam can be adjusted along the extension direction of the crossbeam;

[0009] A counterweight frame, the counterweight frame is provided with a counterweight, the other end of the movable adjusting part is connected with the counterweight frame, and the position of the other end of the movable adjusting part on the counterweight frame is adjustable.

[0010] In the optional embodiment, in the vertical direction, the height H of the first end of the crossbeam is greater than the height M of the second end on the crossbeam.

[0011] In an optional embodiment, the activity adjusting member comprises a rod body and a groove body, one end of the rod body is inserted on the second end portion, the other end of the rod body is fixedly connected with the groove body, and the groove body is detachably mounted on the counterweight frame.

[0012] In an optional embodiment, the counterweight frame comprises a fitting rod and a mounting frame body provided with counterweights, the fitting rod is fixedly connected with the mounting frame body, and the fitting rod is provided with first fitting holes, the number of the first fitting holes is at least two.

[0013] The groove body is provided with second fitting holes, the number of the second fitting holes is at least one, different second fitting holes on the groove body are switchingly fitted with the first fitting holes to adjust the position of the groove body on the fitting rod, and the second fitting holes and the first fitting holes coinciding with the second fitting holes are provided with first locking bolts to lock the groove body and the fitting rod.

[0014] In an optional embodiment, the counterweight frame further comprises a limiting column, the limiting column is fixedly mounted on the mounting frame body, and the limiting column is used for limiting the counterweights on the mounting frame body.

[0015] In an optional embodiment, the rod body is provided with first locking holes, the second end portion is provided with second locking holes, when the first locking holes and the second locking holes coincide, a second locking bolt is inserted into the first locking holes and the second locking holes to lock the rod body and the second end portion;

[0016] The first locking holes are arranged in multiple along the extension direction of the rod body, and / or the second locking holes are arranged in multiple along the extension direction of the second end portion.

[0017] In an optional embodiment, further comprising:

[0018] A stand column, one end of the stand column is fixedly arranged on the cross beam;

[0019] A connecting rope, one end of the connecting rope is connected with the second end portion, the other end of the connecting rope is connected with the first end portion, and the other end of the stand column is supported at a position between the two ends of the connecting rope to tension the connecting rope into a broken line shape.

[0020] In an optional embodiment, the support column comprises:

[0021] A support plate body, the support plate body is fixedly arranged;

[0022] A support column is fixedly connected to one end of the support plate body, and the other end of the support column is connected to the cross beam.

[0023] In an optional embodiment, the cross beam comprises a first beam body and a second beam body, and the first beam body and the second beam body are in telescopic cooperation.

[0024] The first end is located on one end of the first beam body away from the second beam body, and the second end is located on one end of the second beam body away from the first beam body.

[0025] In an optional embodiment, the construction basket further comprises:

[0026] A steel cable is arranged at the first end and the other end of the steel cable is arranged on the basket.

[0027] In the present application, by adjusting the position of the movable adjusting member along the extension direction of the cross beam, the counterweight frame and the counterweight can be moved along the extension direction of the cross beam, so that the counterweight is close to or away from the support point of the support column to the cross beam, thereby increasing or shortening the length of the lever on the side of the counterweight. This setting makes the construction basket adapt to different loads of the construction basket. For example, when the construction basket needs to carry heavy building materials, the counterweight is adjusted to be away from the support point of the support column, thereby increasing the length of the lever on the side of the counterweight, so as to balance the moment of force at both ends of the cross beam and ensure the stability of the construction basket. Conversely, when the construction basket has a light load, the counterweight is adjusted to be close to the support point of the support column, thereby shortening the length of the lever on the side of the counterweight and improving the flexibility and adaptability of the construction basket.

[0028] Other features and advantages of the present application will be described in detail in the following specific embodiments. BRIEF DESCRIPTION OF DRAWINGS

[0029] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the following will briefly introduce the drawings needed in the embodiments. It should be understood that the following drawings only show some embodiments of the present application, and therefore should not be regarded as a limitation on the scope. For those skilled in the art, other related drawings can also be obtained without creative labor.

[0030] Figure 1 A structure diagram of one embodiment of a construction basket according to an embodiment of the present application is shown from one perspective;

[0031] Figure 2 A structure diagram of a support column of one embodiment of a construction basket according to an embodiment of the present application is shown from two perspectives;

[0032] Figure 3A three-view structural schematic diagram of a support column of one of the embodiments of the construction basket provided in the embodiments of the present application;

[0033] Figure 4 A three-view structural schematic diagram of a movable adjusting member and a counterweight frame of one of the embodiments of the construction basket provided in the embodiments of the present application.

[0034] Icon:

[0035] 100 - main support; 110 - support column; 112 - support plate body; 114 - support column body; 120 - cross beam; 122 - first beam body; 124 - second beam body; 130 - first end portion; 140 - second end portion; 150 - second locking hole;

[0036] 200 - movable adjusting member; 210 - rod body portion; 212 - first locking hole; 220 - groove body portion; 222 - second matching hole;

[0037] 300 - counterweight frame; 310 - matching rod; 312 - first matching hole; 320 - mounting frame body; 330 - counterweight; 340 - limiting column body;

[0038] 400 - stand column; 410 - connecting cable;

[0039] 500 - basket; 550 - steel cable. DETAILED DESCRIPTION

[0040] In order to make the purpose, technical solutions and advantages of the embodiments of the present application clearer, the technical solutions in the embodiments of the present application will be described clearly and completely below in combination with the drawings in the embodiments of the present application. Obviously, the described embodiments are some embodiments of the present application, not all embodiments of the present application. The components of the embodiments of the present application described and shown in the drawings can be arranged and designed in various different configurations.

[0041] In the description of the present application, it should be noted that the positions or location relationships indicated by the terms “inner”, “outer” and the like are based on the positions or location relationships shown in the drawings, or the positions or location relationships in which the products of the present application are usually placed, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore cannot be understood as a limitation on the present application. In addition, the terms “first”, “second” and the like are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.

[0042] In the description of the present application, it is also necessary to explain that, unless otherwise explicitly specified and limited, the terms "set", "connected" should be understood broadly, for example, it can be fixedly connected, or detachably connected, or integrally connected; it can be directly connected, or indirectly connected through an intermediate medium, or the internal communication of two elements. For those skilled in the art, the specific meaning of the above terms in the present application can be understood according to the specific circumstances.

[0043] As shown in Figure 1 , the embodiment of the present application provides a construction basket, which comprises a main support 100, a basket 500, a movable adjusting piece 200 and a counterweight frame 300.

[0044] As shown in Figure 1 , the main support 100 comprises a support column 110 and a cross beam 120. The cross beam 120 has a first end 130 and a second end 140. Exemplarily, the first end 130 is located at one end of the cross beam 120, and the second end 140 is located at the other end of the cross beam 120.

[0045] One end of the support column 110 is fixedly arranged, and the other end of the support column 110 is supported on the cross beam 120 with a support point between the first end 130 and the second end 140. Exemplarily, as shown in Figure 1 , one end of the support column 110 is fixed on the building by means of chemical screws, set screws, clamping or welding. The support column 110 supports the cross beam 120 away from the building.

[0046] As shown in Figure 1 , the basket 500 is connected with the first end 130, so that the basket 500 is installed on the main support 100.

[0047] As shown in Figure 1 , one end of the movable adjusting piece 200 is inserted into the second end 140, and the position of the movable adjusting piece 200 on the cross beam 120 can be adjusted along the extension direction of the cross beam 120.

[0048] As shown in Figure 1 , the counterweight frame 300 is provided with a counterweight 330, and the other end of the movable adjusting piece 200 is connected with the counterweight frame 300. The position of the other end of the movable adjusting piece 200 on the counterweight frame 300 is adjustable.

[0049] In use, the operator takes the cross beam 120 as a lever, adjusts the position of the counterweight frame 300 and the counterweight 330 along the direction of the cross beam 120 by adjusting the position of the movable adjusting piece 200 along the direction of the cross beam 120 after determining the maximum load of the basket 500, and then fixes and installs the counterweight frame 300 on the building.

[0050] For example, the counterweight frame 300 is equipped with a counterweight 330. The counterweight frame 300 is mounted on the second end 140 of the crossbeam 120 by means of a movable adjustment member 200, and the basket 500 is mounted on the first end 130 of the crossbeam 120. Therefore, the counterweight frame 300 and the basket 500 are located at the two ends of the crossbeam 120, and the position of the support column 110 supporting the crossbeam 120 constitutes a fulcrum. The crossbeam 120 serves as a lever to support the counterweight frame 300 and the basket 500.

[0051] During use, the counterweight frame 300 uses the counterweight 330 to balance the load borne by the suspended platform 500 on the first end 130 of the crossbeam 120. By adjusting the position of the movable adjusting member 200 along the extension direction of the crossbeam 120, the counterweight frame 300 and the counterweight 330 can be moved along the extension direction of the crossbeam 120, allowing the counterweight 330 to move closer to or further away from the support point of the support column 110 on the crossbeam 120. When the crossbeam 120 acts as a lever, this achieves the effect of increasing or decreasing the lever length on the side of the counterweight 330, thereby allowing the construction suspended platform to adapt to different load levels of the suspended platform 500, significantly improving the adaptability of the construction suspended platform.

[0052] For example, when the suspended platform 500 needs to bear heavy building materials, the movable adjustment component 200 can be adjusted to move the counterweight 330 away from the support point of the support column 110, increasing the lever length on the side of the counterweight 330. This balances the torque at both ends of the crossbeam 120, ensuring that the suspended platform 500 stably bears the heavy load. Conversely, when the suspended platform 500 is lightly loaded, the counterweight 330 can be adjusted to be closer to the support point of the support column 110, shortening the lever length on the side of the counterweight 330, thus improving the flexibility and adaptability of the construction suspended platform.

[0053] And, as Figure 1 As shown, when implementing the construction scaffold provided in this application, the building height at the support column 110 may be different from the building height at the counterweight frame 300. The other end of the movable adjustment component 200 is adjustable on the counterweight frame 300, which makes it easier to install the counterweight frame 300 on the building, increases the adaptability of the counterweight frame 300 to different building heights, and improves the application range of the construction scaffold.

[0054] like Figure 1 As shown, in one embodiment, in the vertical direction, the height H of the first end 130 of the crossbeam 120 is greater than the height M of the second end 140 of the crossbeam 120, causing the first end 130 of the crossbeam 120 to tilt towards the second end 140. Under the action of gravity, the suspended platform 500 generates a component force pressure on the crossbeam 120 along the extension direction of the crossbeam 120, reducing the vertical component force of the suspended platform 500 on the crossbeam 120, improving the bending resistance of the crossbeam 120, and thus improving the load-bearing capacity of the crossbeam 120.

[0055] To realize the position adjustment of the movable adjustment member 200 on the counterweight frame 300, as shown in Figure 1 and Figure 4 In an embodiment, the movable adjustment member 200 includes a rod body 210 and a groove body 220.

[0056] One end of the rod body 210 is inserted into the second end 140, and the other end of the rod body 210 is fixedly connected with the groove body 220. The groove body 220 is detachably mounted on the counterweight frame 300, and the groove body 220 can be adjusted in position on the counterweight frame 300.

[0057] For example, the rod body 210 and the groove body 220 are fixedly connected by welding, bolting, clamping, or one-piece forming.

[0058] During construction, the load weight of the building materials placed on the basket 500 will change constantly. When the load weight increases, the position of the rod body 210 on the counterweight frame 300 is adjusted, so that the counterweight frame 300 moves away from the fulcrum of the cross beam 120, thereby increasing the moment generated by the counterweight on the cross beam 120 to balance the moment generated by the load on the cross beam 120, ensuring the balance and stability of the cross beam 120. For example, when the basket 500 is loaded with heavy building materials, the counterweight frame 300 is moved outward through the rod body 210, so that the entire system can withstand greater loads without tilting.

[0059] Different construction scenarios require different balancing of the basket 500. In some special working conditions, such as uneven ground or buildings, by adjusting the relative position of the groove body 220 and the counterweight frame 300, the counterweight frame 300 can be installed to the ground or the building while ensuring that the angle of the cross beam 120 relative to the horizontal direction remains unchanged, thereby improving the adaptability and stability of the construction basket.

[0060] To realize the detachable connection of the counterweight frame 300 and the movable adjustment member 200, as shown in Figure 1 and Figure 4 In an embodiment, the counterweight frame 300 includes a fitting rod 310 and a mounting frame body 320 provided with a counterweight 330. The fitting rod 310 is fixedly connected with the mounting frame body 320, for example, by welding, clamping, bolting, or one-piece forming.

[0061] As shown in Figure 4 The fitting rod 310 is provided with a first fitting hole 312, and the number of the first fitting hole 312 is at least two.

[0062] As shown in Figure 4 The groove body 220 is provided with a second fitting hole 222, and the number of the second fitting hole 222 is at least one. The axis of the first fitting hole 312 is parallel to the axis of the second fitting hole 222.

[0063] The different second matching holes 222 on the groove body 220 are switched to match the first matching holes 312 to adjust the position of the groove body 220 on the matching rod 310. The first locking bolt is inserted into the second matching hole 222 and the first matching hole 312 coinciding with the second matching hole 222 to lock the groove body 220 and the matching rod 310.

[0064] Exemplarily, two first matching holes 312 are provided, one second matching hole 222 is provided, and the second matching hole 222 coincides with one of the first matching holes 312. The first locking bolt is inserted into the second matching hole 222 and the first matching hole 312 coinciding with the second matching hole 222 to lock the groove body 220 and the matching rod 310. When it is necessary to adjust the relative position of the groove body 220 and the matching rod 310, the first locking bolt is pulled out of the first matching hole 312 and the second matching hole 222, and the groove body 220 and the matching rod 310 are unlocked, so that the relative position of the groove body 220 and the matching rod 310 can be adjusted. After adjustment, the first locking bolt is inserted to lock.

[0065] Of course, it should be understood that the first matching holes 312 and the second matching holes 222 can also be provided in other numbers, for example, four first matching holes 312 are provided, and one second matching hole 222 is provided; for another example, four first matching holes 312 are provided, and two second matching holes 222 are provided.

[0066] As shown in Figure 1 and Figure 4 , in one embodiment, the counterweight frame 300 further comprises a limiting column 340 fixedly installed on the mounting frame body 320, and the limiting column 340 is used to limit the counterweight 330 on the mounting frame body 320.

[0067] Exemplarily, as shown in Figure 1 , the counterweight 330 is provided with a through hole matched with the limiting column 340, and the outer wall of the limiting column 340 abuts against the inner wall of the through hole on the counterweight 330. In another embodiment, the outer wall of the limiting column 340 abuts against the outer wall of the counterweight 330 to limit the displacement of the counterweight 330.

[0068] To realize the detachable connection of the rod body 210 and the cross beam 120, as shown in Figure 1 and Figure 4 , in one embodiment, the rod body 210 is provided with a first locking hole 212, and the second end portion 140 is provided with a second locking hole 150. When the first locking hole 212 and the second locking hole 150 coincide, a second locking bolt is inserted into the first locking hole 212 and the second locking hole 150 to lock the rod body 210 and the second end portion 140.

[0069] Multiple first locking holes 212 are provided along the extension direction of the rod body 210. For example, two, three, four, or five first locking holes 212 are provided.

[0070] For example, multiple second locking holes 150 are provided along the extending direction of the second end 140. For example, two, three, four, or five second locking holes 150 are provided.

[0071] like Figure 1 As shown, in one embodiment, the construction scaffold also includes a column 400 and a connecting cable 410.

[0072] One end of the column 400 is fixedly mounted on the crossbeam 120, and the fixing method is, for example, welding, bolting, snap-fitting or riveting.

[0073] like Figure 1 As shown, one end of the connecting cable 410 is connected to the second end 140, and the other end of the connecting cable 410 is connected to the first end 130. The other end of the column 400 is supported at the part between the two ends of the connecting cable 410 so that the connecting cable 410 is tensioned into a zigzag shape.

[0074] The connecting cable 410 increases the bending strength of the crossbeam 120 and improves the load-bearing capacity of the construction scaffold.

[0075] For example, one connecting cable 410 is provided, but in another embodiment, two connecting cables 410 are provided to further increase the bending resistance of the beam 120.

[0076] For example, the connection positions of the two ends of the connecting cable 410 on the crossbeam 120 are adjustable. For instance, a first connector is provided on the crossbeam 120 along the extending direction, a second connector is provided on one end of the connecting cable 410, and a third connector is provided on the other end of the connecting cable 410. The second connector is connected to the first connector, and the third connector is connected to the first connector. The second connector and the third connector are connected at different positions on the first connector.

[0077] For example, a pulley is provided on one end of the column 400 that supports the connecting cable 410, and the pulley slides in cooperation with the connecting cable 410.

[0078] like Figures 1 to 3 As shown, in one embodiment, the support column 110 includes a support plate 112 and a support column 114.

[0079] The support plate 112 is fixedly installed. For example, the support plate 112 is fixedly installed on the ground or on a building, and the fixing method is, for example, bolt connection or welding.

[0080] One end of the support column 114 is fixedly connected to the support plate body 112, and the other end of the support column 114 is connected to the cross beam 120. Exemplarily, the support column 114 and the support plate body 112 are fixedly connected by welding or one-piece forming.

[0081] The other end of the support column 114 is connected to the cross beam 120 by, for example, clamping, bolting or welding.

[0082] As shown in Figure 2 and Figure 3 , the support column 114 is vertically arranged on the support plate body 112.

[0083] As shown in Figure 1 , in one embodiment, the cross beam 120 includes a first beam body 122 and a second beam body 124, and the first beam body 122 and the second beam body 124 are telescopically connected.

[0084] The first end portion 130 is located on one end of the first beam body 122 away from the second beam body 124, and the second end portion 140 is located on one end of the second beam body 124 away from the first beam body 122.

[0085] Exemplarily, the first beam body 122 and the second beam body 124 are telescopically connected, so that the length of the cross beam 120 can be telescopically adjusted, thereby improving the adaptability of the construction basket.

[0086] Exemplarily, the support column 114 is supported on the first beam body 122. In another embodiment, the support column 114 is supported on the second beam body 124.

[0087] Exemplarily, bolt holes are provided on the first beam body 122 and the second beam body 124, and locking is achieved by inserting bolts into the bolt holes.

[0088] As shown in Figure 1 , in one embodiment, the construction basket further includes a steel cable 550, one end of the steel cable 550 is arranged on the first end portion 130, and the other end of the steel cable 550 is arranged on the basket 500, and the basket 500 is connected to the first end portion 130 by the steel cable 550.

[0089] It should be noted that the features in the embodiments of the present application can be combined with each other without conflict.

[0090] The above only describes the preferred embodiments of the present application and is not intended to limit the present application. Those skilled in the art can make various modifications and changes to the present application. Any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present application shall be included in the protection scope of the present application.

Claims

1. A construction basket, characterized in that, The utility model relates to a kind of main support (100), including support (110) and crossbeam (120), the crossbeam (120) has first end (130) and second end (140), one end of the support (110) is fixedly arranged, the other end of the support (110) is supported on the crossbeam (120) and fulcrum is located between the first end (130) and the second end (140);Hanging basket (500) is connected with the first end (130);Movable adjusting part (200), one end of the movable adjusting part (200) is inserted on the second end (140), the position of the movable adjusting part (200) on the crossbeam (120) can be adjusted along the extension direction of the crossbeam (120);Counterweight frame (300) is connected with the other end of the movable adjusting part (200), the position of the other end of the movable adjusting part (200) on the counterweight frame (300) is adjustable, and the counterweight frame (300) is provided with counterweight (330). In vertical direction, the height H of the first end (130) of the crossbeam (120) is greater than the height M of the second end (140) on the crossbeam (120). The movable adjusting part (200) includes rod body part (210) and groove body part (220), one end of the rod body part (210) is inserted on the second end (140), the other end of the rod body part (210) is fixedly connected with the groove body part (220), and the groove body part (220) is detachably mounted on the counterweight frame (300). The counterweight frame (300) includes matching rod (310) and mounting frame body (320) provided with counterweight (330), the matching rod (310) is fixedly connected with the mounting frame body (320), the matching rod (310) is provided with first matching hole (312), and the number of the first matching hole (312) is at least two; The groove body part (220) is provided with second matching hole (222), the number of the second matching hole (222) is at least one, different second matching holes (222) on the groove body part (220) are switched with the first matching hole (312) to adjust the position of the groove body part (220) on the matching rod (310), the second matching hole (222) and the first matching hole (312) coinciding with the second matching hole (222) are provided with first locking bolt, so that the groove body part (220) and the matching rod (310) are locked.

2. The construction basket of claim 1, wherein, The counterweight frame (300) further includes limiting column (340), the limiting column (340) is fixedly installed on the mounting frame body (320), and the limiting column (340) is used for limiting counterweight (330) on the mounting frame body (320).

3. The construction basket of claim 1, wherein, ​ 4. The construction basket of claim 3, wherein, ​ ​ 5. The construction basket of claim 4, wherein, ​ 6. The construction basket of claim 3, wherein, A first locking hole (212) is arranged on the rod body (210), a second locking hole (150) is arranged on the second end portion (140), and when the first locking hole (212) and the second locking hole (150) coincide, a second locking bolt is inserted into the first locking hole (212) and the second locking hole (150) to lock the rod body (210) and the second end portion (140); The first locking hole (212) is arranged in multiple along the extension direction of the rod body (210), and / or the second locking hole (150) is arranged in multiple along the extension direction of the second end portion (140).

7. The construction basket of claim 1, wherein, Further comprising: A stand (400) is fixedly arranged at one end of the cross beam (120); A connecting cable (410) is connected at one end to the second end portion (140) and at the other end to the first end portion (130), and the other end of the stand (400) is supported at a position between the two ends of the connecting cable (410) to tension the connecting cable (410) into a broken line shape.

8. The construction basket of claim 1, wherein, The support column (110) comprises: A support plate body (112) is fixedly arranged; A support column body (114) is fixedly connected at one end to the support plate body (112) and at the other end to the cross beam (120).

9. The construction basket of claim 1, wherein, The cross beam (120) comprises a first beam body (122) and a second beam body (124), and the first beam body (122) and the second beam body (124) are telescopic. The first end portion (130) is located at one end of the first beam body (122) away from the second beam body (124), and the second end portion (140) is located at one end of the second beam body (124) away from the first beam body (122).

10. The construction basket of claim 1, wherein, Further comprising: A steel cable (550) is arranged at one end on the first end portion (130) and at the other end on the hanging basket (500).