Lightweight high-strength prefabricated assembled ribbed bridge abutment
By using the design of lightweight, high-strength prefabricated ribbed bridge abutments and connecting them with high-strength adhesive and bolts, the problems of complex construction, long cycle and high cost of traditional bridge abutments are solved, and the construction of bridge abutments is achieved quickly and efficiently and with high-quality structural connections.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- FUZHOU UNIV
- Filing Date
- 2025-07-02
- Publication Date
- 2026-07-10
AI Technical Summary
Traditional precast bridge abutments suffer from problems such as limited use of bolt connections, complex construction, long construction period, high cost, environmental pollution, and difficulty in guaranteeing quality.
The bridge abutment is a lightweight, high-strength prefabricated ribbed abutment, which includes a bottom support platform, ribs, abutment cap shell, back wall and I-beam connectors. It is fixed by high-strength adhesive bonding and bolt connection. The prefabricated components in the factory are simply assembled on site.
It shortened the construction period, improved construction quality and efficiency, reduced labor and material costs, reduced environmental pollution, and enhanced structural stability and connection reliability.
Smart Images

Figure CN224478380U_ABST