An acrylate distillation column
By employing a dual-sealing structure and a thermal energy circulation system in the acrylate distillation column, the problems of material leakage and high energy consumption were solved, achieving efficient sealing and energy recovery, and improving the operational stability and energy utilization rate of the distillation column.
Patent Information
- Application Number
- CN202522445177.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-18
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2035-11-18
AI Technical Summary
Existing acrylate distillation columns suffer from leakage when transporting easily leakable materials due to wear of sealing surfaces, media penetration, or pressure fluctuations, and also have high energy consumption.
The system employs a double-sealed plug ring and a sealing ring groove for interlocking, combined with a tight fit design between the inclined groove and the inclined ring, forming a double physical sealing structure. Through a thermal energy coupling circulation system, energy recovery and utilization are achieved using the top feed preheater, condenser, and waste heat power generation device.
It significantly reduces the risk of material leakage, improves sealing performance, reduces energy consumption, increases distillation efficiency and product purity, and enables the effective utilization of waste heat resources.
Smart Images

Figure CN224949647U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to an acrylate distillation column, specifically an acrylate distillation column, and belongs to the field of distillation column technology. Background Technology
[0002] Acrylic ester distillation column is the core equipment for separating and purifying mixtures in the production process of acrylic esters. It utilizes the boiling point difference between acrylic esters (such as methyl methacrylate, ethyl methacrylate, etc.) and unreacted monomers, byproducts, solvents and other components in the raw materials. The distillation operation allows the gas and liquid phases in the column to fully contact, transfer mass and heat in the trays or packing layer. The volatile component (target acrylic ester) in the gas phase is gradually enriched and then condensed at the top of the column to obtain a high-purity product.
[0003] The existing connection between the feed pipe and the material conveying pipe of the acrylate distillation column is equipped with a sealing structure, which mostly adopts basic forms such as single-layer gasket sealing or direct thread connection. It has not been specifically optimized for the physicochemical properties of acrylate materials, resulting in insufficient sealing surface fit accuracy and weak resistance to media erosion. When conveying such easily leaking materials, material leakage is very likely to occur due to sealing surface wear, media penetration or pressure fluctuations. Therefore, a new technical solution needs to be designed to solve this problem. Utility Model Content
[0004] The purpose of this invention is to provide an acrylate distillation tower to solve the above-mentioned problems, thereby addressing the issue in the prior art where material leakage is easily caused by wear of the sealing surface, media penetration, or pressure fluctuations when conveying easily leakable materials.
[0005] This utility model is achieved through the following technical solution: an acrylate distillation column.
[0006] The system includes a distillation column, with an installation plate fixedly connected to its outer side. A top feed preheater is fixedly connected to the top of the installation plate, and a heating medium receiving pipe is fixedly connected to one side of the top feed preheater. The heating medium receiving pipe is connected to the distillation column. A condenser is fixedly connected to the top of the installation plate, and a heating medium discharge pipe is fixedly connected to one side of the condenser. The heating medium discharge pipe is connected to the top feed preheater, forming a circulation loop for the heating medium. This allows the low-temperature heating medium discharged from the top feed preheater to enter the condenser to recover waste heat, thereby improving energy utilization and reducing energy consumption.
[0007] Preferably, a heating medium discharge pipe is fixedly connected to one side of the condenser. The heating medium discharge pipe is connected to the top feed preheater of the tower to form a circulation loop of the heating medium, so that the low-temperature heating medium discharged from the top feed preheater of the tower enters the condenser to recover waste heat, thereby improving energy utilization and reducing energy consumption.
[0008] Preferably, a condensate reflux pipe is fixedly connected to the other side of the condenser, and the condensate reflux pipe is connected to the distillation column. A preheating pipe is fixedly connected to the top of the feed preheater at the top of the column, and the preheating pipe is connected to the distillation column. The condensate reflux pipe realizes the reflux of the vapor phase condensed at the top of the distillation column, ensuring the distillation separation effect. The preheating pipe transports the preheated feed to the distillation column, reducing temperature fluctuations in the column and improving distillation efficiency.
[0009] Preferably, a waste heat power generation device is provided on one side of the distillation column, and a connecting pipe is fixedly connected to one side of the waste heat power generation device. The connecting pipe is connected to the distillation column, and a power supply line is fixedly connected to the top of the waste heat power generation device. The power supply line is connected to the distillation column. The connecting pipe recovers the waste heat generated during the operation of the distillation column, converts it into electrical energy through the waste heat power generation device, and then provides power support for the distillation column through the power supply line, thereby realizing energy recovery and utilization and reducing dependence on external power supply.
[0010] Preferably, a feed pipe is fixedly connected to the outside of the preheating pipe, and two sealing ring grooves are opened at one end of the feed pipe. The double sealing ring grooves provide an installation base for the subsequent sealing structure. Compared with the single sealing groove, the sealing contact area can be increased, providing structural protection against leakage.
[0011] Preferably, the inner side of the feed pipe is integrally formed with a beveled ring, and a docking groove is provided on one side of the beveled ring. The beveled ring facilitates a close fit and guidance with the conveying pipe, and the docking groove provides a positioning reference for the docking structure, thereby improving the docking accuracy between the feed pipe and the conveying pipe.
[0012] Preferably, a conveying pipe is connected to one side of the feed pipe via a flange, and two sealing rings are fixedly connected to one end of the conveying pipe. The sealing rings extend to the inside of the sealing ring groove. The flange connection enables the feed pipe and the conveying pipe to be detachably fixed. The insertion and engagement of the sealing rings and the sealing ring groove form a double sealing structure, which significantly improves the sealing performance at the connection and reduces the risk of material leakage.
[0013] Preferably, one end of the conveying pipe is provided with an inclined groove, which fits into the inclined ring. A docking ring is fixedly connected to one side of the inclined groove, and the docking ring is inserted into the docking groove. The fit design of the inclined groove and the inclined ring increases the contact area at the connection and improves the structural stability. The insertion of the docking ring and the docking groove further enhances the positioning effect, avoids displacement after connection, and ensures the smoothness of material conveying.
[0014] This invention provides an acrylate distillation column, which has the following beneficial effects: 1. This acrylate distillation column, through the feed pipe sealing mechanism, forms a double physical sealing barrier by the insertion and cooperation of double sealing rings and double sealing ring grooves. Combined with the tight fit design of the inclined groove and inclined ring, it greatly increases the sealing contact area, effectively preventing the leakage of low-viscosity, easily permeable materials such as acrylate, and avoiding raw material waste and safety and environmental risks.
[0015] 2. This acrylate distillation column utilizes a thermal energy coupling circulation mechanism. The top feed preheater preheats the feed using the heat energy output from the distillation column. The cooled heating medium then enters the condenser through the heating medium discharge pipe to recover waste heat, avoiding waste caused by direct heat discharge, significantly improving energy utilization and reducing overall energy consumption. The preheated feed enters the distillation column through the preheating pipe, reducing the temperature difference between the feed and the column, reducing temperature fluctuations within the column, ensuring stable distillation separation conditions, and improving the purity and distillation efficiency of the target product. The waste heat power generation device recovers redundant waste heat generated during the operation of the distillation column through connecting pipelines, converts it into electricity, and then provides power to the distillation column itself via a power supply line, realizing the resource utilization of waste heat. Attached Figure Description
[0016] Figure 1 This is a front-view three-dimensional structural diagram of the present invention; Figure 2 This is a side view of the three-dimensional structure of the present invention; Figure 3 This is a cross-sectional view of the feed pipe sealing mechanism of this utility model; Figure 4 This is a cross-sectional view of the feed pipe sealing mechanism of this utility model after separation; [Explanation of Key Component Symbols] 1. Distillation column; 2. Mounting plate; 201. Tower top feed preheater; 202. Heating medium receiving pipe; 203. Condenser; 204. Heating medium discharge pipe; 205. Condensate return pipe; 206. Preheating pipe; 3. Waste heat power generation device; 301. Connecting pipes; 302. Power supply line; 4. Feed pipe; 401. Sealing ring groove; 402. Beveled ring; 403. Butt joint groove; 5. Conveying pipe; 501. Sealing ring; 502. Inclined groove; 503. Connecting ring. Detailed Implementation
[0017] This utility model provides an acrylate distillation column.
[0018] Example 1, please refer to Figure 1 , Figure 2 , Figure 3 and Figure 4 The distillation column 1 is included. An installation plate 2 is fixedly connected to the outside of the distillation column 1. A top feed preheater 201 is fixedly connected to the top of the installation plate 2. A heating medium receiving pipe 202 is fixedly connected to one side of the top feed preheater 201. The heating medium receiving pipe 202 is connected to the distillation column 1. A condenser 203 is fixedly connected to the top of the installation plate 2.
[0019] Please refer to it again. Figure 1 and Figure 2 A heating medium discharge pipe 204 is fixedly connected to one side of the condenser 203, and the heating medium discharge pipe 204 is connected to the top feed preheater 201. A condensate return pipe 205 is fixedly connected to the other side of the condenser 203, and the condensate return pipe 205 is connected to the distillation column 1. A preheating pipe 206 is fixedly connected to the top of the top feed preheater 201, and the preheating pipe 206 is connected to the distillation column 1. A waste heat power generation device 3 is installed on one side of the distillation column 1. A connecting pipe 301 is fixedly connected to one side of the waste heat power generation device 3, and the connecting pipe 301 is connected to the distillation column 1. A power supply line 302 is fixedly connected to the top of the waste heat power generation device 3, and the power supply line 302 is connected to the distillation column 1.
[0020] The sealing mechanism of the feed pipe 4 achieves reliable sealing through multiple structural combinations: the two sealing rings 501 at the end of the conveying pipe 5 are precisely inserted into the two sealing ring grooves 401 of the feed pipe 4 to form a radial double seal. At the same time, the inclined groove 502 of the conveying pipe 5 is tightly fitted with the inclined ring 402 of the feed pipe 4, forming an axial pressure seal under the action of flange fastening force. With the insertion and positioning of the docking ring 503 and the docking groove 403, the concentricity of the connection between the two is ensured, avoiding misalignment that could lead to seal failure. The multiple structures work together to block the material leakage path and achieve a high-efficiency seal at the connection between the feed pipe 4 and the conveying pipe 5.
[0021] Example 2, please refer to again. Figure 1 , Figure 2 , Figure 3 and Figure 4 A feed pipe 4 is fixedly connected to the outside of the preheating pipe 206. Two sealing ring grooves 401 are opened at one end of the feed pipe 4. An inclined ring 402 is integrally formed on the inside of the feed pipe 4. A docking groove 403 is opened on one side of the inclined ring 402. A conveying pipe 5 is connected to one side of the feed pipe 4 through a flange. Two sealing inserts 501 are fixedly connected to one end of the conveying pipe 5. The sealing inserts 501 extend to the inside of the sealing ring groove 401. An inclined groove 502 is opened at one end of the conveying pipe 5. The inclined groove 502 fits with the inclined ring 402. A docking ring 503 is fixedly connected to one side of the inclined groove 502. The docking ring 503 is inserted into the docking groove 403.
[0022] The thermal energy coupling circulation mechanism forms a cascade energy utilization system through pipeline connection: the high-temperature heating medium generated by the distillation column 1 enters the top feed preheater 201 through the heating medium receiving pipe 202. After the material is preheated, the low-temperature medium enters the condenser 203 through the heating medium discharge pipe 204 to participate in the top gas phase condensation. The condenser 203 sends the condensate back to the distillation column 1 through the condensate return pipe 205 to maintain the gas-liquid balance. At the same time, the redundant waste heat of the distillation column 1 is sent to the waste heat power generation device 3 through the connecting pipe 301 to be converted into electrical energy, and then fed back to the distillation column 1 through the power supply line 302 to realize the recycling of thermal energy and energy-saving operation.
[0023] Working Principle: Distillation column 1, as the core separation equipment, has an outer mounting plate 2 that integrates and fixes the top feed preheater 201 and condenser 203, forming a compact layout. The material to be processed is conveyed to the feed pipe 4 via the conveying pipe 5. The sealing ring 501 of the conveying pipe 5 and the sealing ring groove 401 of the feed pipe 4 are inserted to form a double radial seal. The inclined groove 502 and the inclined ring 402 fit together to form an axial pressure seal. The docking ring 503 and the docking groove 403 are precisely positioned, and with the flange tightening, leakage-free material conveying is achieved. Subsequently, the material enters the top feed preheater 201 through the preheating pipe 206. The high-temperature heating medium generated by distillation column 1 is heated by the heating medium... The feed preheater 201 at the top of the column is entered through the receiving pipe 202 to preheat the material. After preheating, the low-temperature heating medium enters the condenser 203 through the heating medium discharge pipe 204 to participate in the condensation process of the vapor phase at the top of the distillation column 1. The condensed liquid is returned to the distillation column 1 through the condensate return pipe 205 to maintain the gas-liquid balance in the column and ensure the distillation separation effect. At the same time, the redundant waste heat generated during the operation of the distillation column 1 is transported to the waste heat power generation device 3 through the connecting pipe 301. After being converted into electrical energy, it is fed back to the distillation column 1 through the power supply line 302 to provide power support for its operation. Finally, the integrated operation of efficient sealed material transportation, distillation separation and heat energy recycling is realized.
[0024] The foregoing has shown and described the basic principles, main features, and advantages of this utility model. Those skilled in the art should understand that this utility model is not limited to the above embodiments. The embodiments and descriptions in the specification are merely illustrative of the principles of this utility model. Various changes and modifications can be made to this utility model without departing from its spirit and scope, and all such changes and modifications fall within the scope of the claims. The scope of protection of this utility model is defined by the appended claims and their equivalents.
Claims
1. An acrylate distillation column, comprising a distillation column (1), characterized in that: An installation plate (2) is fixedly connected to the outside of the distillation column (1), and a column top feed preheater (201) is fixedly connected to the top of the installation plate (2). A heating medium receiving pipe (202) is fixedly connected to one side of the top feed preheater (201), and the heating medium receiving pipe (202) is connected to the distillation column (1). A condenser (203) is fixedly connected to the top of the mounting plate (2).
2. An acrylate distillation column according to claim 1, characterized in that: A heating medium discharge pipe (204) is fixedly connected to one side of the condenser (203), and the heating medium discharge pipe (204) is connected to the top feed preheater (201).
3. An acrylate distillation column according to claim 2, characterized in that: A condensate reflux pipe (205) is fixedly connected to the other side of the condenser (203). The condensate reflux pipe (205) is connected to the distillation column (1). A preheating pipe (206) is fixedly connected to the top of the feed preheater (201) at the top of the column. The preheating pipe (206) is connected to the distillation column (1).
4. An acrylate distillation column according to claim 3, characterized in that: A waste heat power generation device (3) is provided on one side of the distillation column (1). A connecting pipe (301) is fixedly connected to one side of the waste heat power generation device (3). The connecting pipe (301) is connected to the distillation column (1). A power supply line (302) is fixedly connected to the top of the waste heat power generation device (3). The power supply line (302) is connected to the distillation column (1).
5. An acrylate distillation column according to claim 4, characterized in that: The preheating pipe (206) is fixedly connected to the outside of the feed pipe (4), and two sealing ring grooves (401) are opened at one end of the feed pipe (4).
6. An acrylate distillation column according to claim 5, characterized in that: The feed pipe (4) has an integrally formed inclined ring (402) on its inner side, and a docking groove (403) is provided on one side of the inclined ring (402).
7. An acrylate distillation column according to claim 6, characterized in that: One side of the feed pipe (4) is connected to a conveying pipe (5) via a flange. One end of the conveying pipe (5) is fixedly connected to two sealing rings (501), which extend to the inside of the sealing ring groove (401).
8. An acrylate distillation column according to claim 7, characterized in that: One end of the conveying pipe (5) is provided with a sloping groove (502), the sloping groove (502) is in contact with the sloping ring (402), and a docking ring (503) is fixedly connected to one side of the sloping groove (502), the docking ring (503) is inserted into the docking groove (403).