Hoisting device for a chimney tower drum

By using a hoisting device with an arc-shaped base plate connected to the top of the tower, combined with anti-sway components, the problems of extended construction period and increased costs caused by welding lugs were solved, achieving efficient and safe tower hoisting.

CN224954209UActive Publication Date: 2026-11-10ANHUI CHIZHOU JIUHUA POWER GENERATION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522721721.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-23
Publication Date
2026-11-10
Estimated Expiration
2035-12-23

AI Technical Summary

Technical Problem

The existing technology of welding lifting lugs to the outside of the tower leads to problems such as extended construction period and increased production costs.

Method used

The hoisting device, which includes a main sling, a balance beam, and a base, is connected to the tower via an arc-shaped base plate. Combined with anti-sway components, it achieves efficient hoisting without the need for welding lugs.

Benefits of technology

This shortened the construction period, avoided the impact of later cutting of the lifting lugs on the appearance quality of the components, and ensured the safety and stability of the hoisting process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224954209U_ABST
    Figure CN224954209U_ABST
Patent Text Reader

Abstract

This utility model discloses a hoisting device for chimney towers, including a main sling connected to a hook, with a balance beam connected to both ends of the main sling. A base is connected to each end of the balance beam via a secondary sling. The base includes a pair of connecting steel plates, with an arc-shaped base plate positioned between them. The arc-shaped base plate is located at the bottom of the connecting steel plates and is fixedly connected to them. Several screw holes are formed on the arc-shaped base plate, and fixing bolts for connecting to the tower are inserted into these holes. This utility model solves the problem in the prior art where welding lifting lugs to the outside of the tower leads to extended construction time and increased production costs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model belongs to the field of hoisting equipment technology, specifically relating to a hoisting device for chimney towers. Background Technology

[0002] During power plant renovation, temporary chimneys serve as transitional flue gas exhaust devices during the renovation of the main chimney. Temporary chimneys are generally newly built and switched during unit shutdown and maintenance. Since the unit shutdown and maintenance period is generally short, temporary chimney sites are usually selected at steel structure plants to process and prefabricate tower sections, which are then transported to the power plant for sectional hoisting and assembly. In order to carry out hoisting efficiently and safely, traditional steel chimney hoisting requires welding lifting lugs to the outside of the tower. This method, on the one hand, increases the construction preparation period and makes it difficult to shorten the construction period; on the other hand, welding lifting lugs increases material and labor costs, and the subsequent removal of the lugs will affect the appearance quality of the components. Utility Model Content

[0003] The purpose of this invention is to provide a hoisting device for chimney towers, which solves the problem of prolonged construction period and increased production costs caused by welding lifting lugs to the outside of the tower in the prior art.

[0004] The technical solution adopted by this utility model is a hoisting device for chimney towers, including a main sling connected to a hook, a balance beam connected to both ends of the main sling, and a base connected to both ends of the balance beam via a secondary sling. The base includes a pair of connecting steel plates, with an arc-shaped base plate in the middle of the pair of connecting steel plates. The arc-shaped base plate is located at the bottom of the connecting steel plates and is fixedly connected to the connecting steel plates. Several screw holes are opened on the arc-shaped base plate, and fixing bolts for connecting to the tower are inserted into the screw holes.

[0005] The present invention is further characterized in that, The connection point between the main sling and the hook is subject to different load directions, forming an angle with an angle less than °.

[0006] The two ends of the balance beam are provided with connecting grooves along the axial direction, and connecting plates are provided in the connecting grooves and are fixedly connected to the balance beam. The upper part of the connecting plate has a first connecting hole for connecting to the main sling; the lower part has a second connecting hole for connecting to the secondary sling.

[0007] The connecting plate has at least two second connecting holes, and the corresponding second connecting holes on the two connecting plates are set in a mirror image.

[0008] The balance beam is also equipped with reinforcing plates and end plates at both ends. The reinforcing plates are fitted on the outside of the balance beam, and the connecting plate is located between the reinforcing plates and the end plates.

[0009] The curvature of the arc-shaped base plate is the same as that of the top of the tower, and the connecting steel plate is curved, with the curvature of the curve being consistent with that of the arc-shaped base plate.

[0010] A connecting pin is provided on the top of the connecting steel plate. The connecting pin passes through a pair of connecting steel plates and is movably connected to the connecting steel plates. One end of the secondary sling is connected to the connecting pin, and the other end is connected to the second connecting hole.

[0011] The balance beam is equipped with an anti-sway component, which includes a mounting base and a guy rope. The mounting base is located on the balance beam, and one end of the guy rope is connected to the mounting base while the other end is free.

[0012] There are at least two sets of anti-sway components, and the anti-sway components are mirrored with the axial symmetry point of the balance beam as the center point.

[0013] The beneficial effects of this utility model are: (1) The present invention is used for the hoisting device of chimney tower. It is connected to the tower by the arc-shaped base plate in the base combined with high-strength bolts. There is no need to add lifting lugs on the outside of the tower separately, which shortens the construction cycle and avoids the problem of the lifting lugs affecting the appearance quality of the components after cutting. The curvature of the curved base plate is the same as that of the tower, which can increase the tightness of the connection between the base and the tower support and avoid the risk of loosening during hoisting.

[0014] (2) The hoisting device for chimney towers of this utility model sets connecting plates at both ends of the balance beam so that the angle between the main sling and the hook connection position is an acute angle. The balance beam can effectively bear the horizontal load generated by the horizontal angle of the main sling, ensuring the force balance between each point.

[0015] (3) The hoisting device for chimney towers of this utility model has anti-sway components mirrored on the balance beam. When the tower deflects due to wind or other circumstances after hoisting, workers can pull the guy ropes to adjust the rotation of the tower, prevent the tower from hitting other obstacles and better align the installation position. Attached Figure Description

[0016] Figure 1 This utility model relates to a hoisting device for chimney towers; Figure 2 This is a schematic diagram of the structure of the base used in the chimney tower of this utility model; Figure 3 This is a schematic diagram of the structure of the arc-shaped bottom plate used in the chimney tower of this utility model; Figure 4 This is a schematic diagram of the structure of the steel plate used in the chimney tower of this utility model.

[0017] Figure 5This is a schematic diagram of the structure of the balance beam used in the chimney tower of this utility model; Figure 6 This is a utility model Figure 5 Enlarged structural diagram at point A; Figure 7 This is a schematic diagram of the structure of the connecting plate used in the chimney tower of this utility model; In the diagram, 1. Main sling, 2. Balance beam, 3. Connecting plate, 4. Reinforcing plate, 5. End plate, 6. Secondary sling, 7. Base, 8. Arc-shaped base plate, 9. Connecting steel plate, 10. Connecting pin, 11. Fixing bolt, 12. First connecting hole, 13. Second connecting hole, 14. Screw hole, 15. Connecting groove, 16. Anti-sway assembly, 17. Mounting base, 18. Guy rope. Detailed Implementation

[0018] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0019] Example 1 This utility model relates to a hoisting device for chimney towers, such as... Figure 1 As shown, the core components form a complete hoisting structure according to the force transmission path: the top of the device is equipped with a main sling 1 that is directly connected to the crane hook. The two ends of the main sling 1 are stably connected to the balance beam 2, and the balance beam 2 achieves uniform distribution of the hoisting load. The two ends of the balance beam 2 are respectively connected to the base 7 through secondary slings 6. The secondary slings 6 smoothly transmit the load transmitted by the balance beam 2 to the base 7, and finally the base 7 forms a firm connection with the chimney tower, forming a complete force link of "hook-main sling 1-balance beam 2-secondary sling 6-base 7-tower".

[0020] like Figure 2 As shown, the base 7 adopts a combination structure of "double steel plate + arc-shaped base plate", specifically including a pair of parallel connecting steel plates 9, and an arc-shaped base plate 8 is assembled in the middle of the pair of connecting steel plates 9. The arc-shaped base plate 8 is located at the bottom of the connecting steel plates 9 and is fixedly connected to the connecting steel plates 9 to form an integrated structure, ensuring the overall load-bearing strength of the base 7. like Figure 3As shown, the arc-shaped base plate 8 has several evenly spaced screw holes 14, each with a fixing bolt 11 for connecting to the chimney tower. The fixing bolt 11, in conjunction with the connection structure at the top of the tower, allows for quick assembly and disassembly of the base 7 and the tower. Furthermore, the arc of the arc-shaped base plate 8 perfectly matches the arc of the top of the chimney tower, maximizing its fit to the tower surface. This improves the connection stability between the base 7 and the tower and eliminates the need for welding the lifting lugs and subsequent cutting processes.

[0021] Example 2 The present invention is used for a hoisting device for chimney towers, including a main sling 1 connected to a hook, a balance beam 2 connected to both ends of the main sling 1, and a base 7 connected to both ends of the balance beam 2 by a secondary sling 6. The base 7 includes a pair of connecting steel plates 9, with an arc-shaped base plate 8 in the middle of the pair of connecting steel plates 9. The arc of the arc-shaped base plate 8 is the same as the arc of the top of the tower. The arc-shaped base plate 8 is located at the bottom of the connecting steel plates 9 and is fixedly connected to the connecting steel plates 9. Several screw holes 14 are opened on the arc-shaped base plate 8, and fixing bolts 11 connected to the tower are inserted into the screw holes 14.

[0022] Furthermore, the connecting steel plate 9 is curved as a whole, such as... Figure 4 As shown, its curvature is strictly consistent with the curvature of the curved base plate 8. This design allows the inner wall of the connecting steel plate 9 to fit seamlessly with the outer wall of the curved base plate 8, forming a continuous and stable connection structure when the two are fixed together. This avoids localized loose connections or weak points due to curvature mismatch, thereby ensuring the overall structural integrity and load-bearing strength of the base 7. It also ensures that the load during hoisting is smoothly transferred to the curved base plate 8 through the connecting steel plate 9, and then evenly transmitted to the tower, improving the operational safety of the entire hoisting device.

[0023] Example 3 The present invention is used for a hoisting device for chimney towers, including a main sling 1 connected to a hook, a balance beam 2 connected to both ends of the main sling 1, and a base 7 connected to both ends of the balance beam 2 by a secondary sling 6. The base 7 includes a pair of connecting steel plates 9, with an arc-shaped base plate 8 positioned between them. The arc of the arc-shaped base plate 8 is the same as the arc of the top of the tower. The arc-shaped base plate 8 is located at the bottom of the connecting steel plates 9 and is fixedly connected to them. The connecting steel plates 9 are curved, and their curvature matches that of the arc-shaped base plate 8. Several screw holes 14 are provided on the arc-shaped base plate 8, and fixing bolts 11 for connecting to the tower are inserted into the screw holes 14.

[0024] When hoisting is required, the fixing bolts 11 are passed through the arc-shaped base plate 8 and the top of the tower to complete the fixed connection between the base and the tower. Then, the tower can be hoisted by raising the hook.

[0025] Furthermore, a connecting pin 10 is provided on the top of the connecting steel plate 9 of the base 7. The connecting pin 10 passes through the parallel connecting steel plates 9 in a horizontal direction and is movably connected to the connecting steel plates 9. This movable connection design allows the connecting pin 10 to rotate flexibly within the mounting holes of the connecting steel plate 9, which can accommodate the fine-tuning of the angle of the secondary sling 6 due to tower posture adjustments or force changes during hoisting, avoiding stress concentration caused by rigid connections, and ensuring the load-bearing safety and service life of the connection parts.

[0026] The secondary sling 6 is a key component for transferring the load between the base 7 and the upper structure. One end of it is stably connected to the connecting pin 10 and can be fixed by shackles or snap-fit ​​to ensure a firm and secure connection. The other end is connected to the balance beam 2. Through the connection of the two ends of the secondary sling 6, a complete load transfer link can be formed: "base 7 → connecting pin 10 → secondary sling 6 → connecting plate 3 → balance beam 2". This smoothly transfers the weight of the tower to the balance beam 2, and then to the hook via the main sling 1, further ensuring the stability and safety of the entire hoisting process.

[0027] Example 4 Based on Embodiment 3 above, this embodiment of the present invention provides connecting grooves 15 along the axial direction at both ends of the balance beam 2 of the chimney tower hoisting device, as shown below. Figure 5 , Figure 6 As shown, the dimensions of the connecting groove 15 are adapted to the shape of the connecting plate 3, providing a precise installation and positioning space for the connecting plate 3. The connecting plate 3 is embedded in the connecting groove 15 and forms an integrated structure with the balance beam 2 by means of fixed connection. This embedded fixed connection design can prevent the connecting plate 3 from shifting or falling off due to the impact of the hoisting load, significantly improve the load-bearing strength of the connection between the balance beam 2 and the connecting plate 3, and ensure stable load transmission.

[0028] like Figure 7 As shown, the connecting plate 3 has two types of connecting holes with different functions: the upper part has a first connecting hole 12, which is specifically used to connect with the main sling 1. It can be quickly assembled by connecting parts such as shackles. The tension of the main sling 1 is transferred to the balance beam 2 through the first connecting hole 12; the lower part has a second connecting hole 13, which is used to connect with the secondary sling 6, forming a load transmission path of "main sling 1-connecting plate 3-secondary sling 6", realizing the orderly transmission of lifting force between different components.

[0029] Meanwhile, at least two second connecting holes 13 are provided on the connecting plate 3, and when a connecting plate 3 is installed at each end of the balance beam 2, the corresponding second connecting holes 13 on the two connecting plates 3 are mirror images of each other. This multi-hole mirror design allows for flexible selection of the connection points of the secondary slings 6 according to the weight and size of the chimney tower, adapting to the hoisting requirements under different working conditions; on the other hand, it ensures that the tension of the secondary slings 6 on both ends of the balance beam 2 is symmetrically distributed, preventing the balance beam 2 from tilting or bending due to uneven force, and further ensuring the operational stability of the entire hoisting device.

[0030] Example 5 Based on Embodiment 4 above, in this embodiment, in addition to the connecting plate 3, the two ends of the balance beam 2 of this utility model are also equipped with a reinforcing plate 4 and an end plate 5. The three are arranged in a specific position to form a stable end bearing structure. The reinforcing plate 4 is assembled on the outside of the balance beam 2 by a sleeve method and is fixed to the outer wall surface of the end of the balance beam 2. Its function is to enhance the structural strength of the end of the balance beam 2. Since the end of the balance beam 2 needs to bear the tension of the main sling 1 and the load of the secondary sling 6 at the same time, the reinforcing plate 4 can effectively disperse the concentrated stress in this part, resist the deformation of the end of the balance beam 2 caused by the load impact during the hoisting process, and avoid the problem of structural weakness.

[0031] End plate 5 is fixedly installed on the end face of the balance beam 2, arranged opposite to the reinforcing plate 4; while the connecting plate 3, which was previously embedded in the connecting groove 15 of the balance beam 2, is located precisely between the reinforcing plate 4 and the end plate 5, forming a clamping structure of "reinforcing plate 4-connecting plate 3-end plate 5". This positional design has a dual function: on the one hand, the reinforcing plate 4 and the end plate 5 can provide lateral restraint for the connecting plate 3, preventing lateral displacement of the connecting plate 3 due to force fluctuations during hoisting, ensuring that the connecting plate 3 is always in the preset connection position, and ensuring the stability of the connection between the main sling 1, the secondary sling 6 and the connecting plate 3; on the other hand, the reinforcing plate 4 can provide additional support for the connecting plate 3, preventing the connecting plate 3 from undergoing local deformation or loosening due to bearing the load alone, further improving the overall load-bearing reliability of the end of the balance beam 2.

[0032] Example 6 The present invention provides a hoisting device for chimney towers, which includes a main sling 1 connected to a hook, a balance beam 2 connected to both ends of the main sling 1, and a base 7 connected to both ends of the balance beam 2 via a secondary sling 6. The base 7 includes a pair of connecting steel plates 9, with an arc-shaped base plate 8 in the middle of the pair of connecting steel plates 9. The arc of the arc-shaped base plate 8 is the same as the arc of the top of the tower. The arc-shaped base plate 8 is located at the bottom of the connecting steel plates 9 and is fixedly connected to the connecting steel plates 9. Several screw holes 14 are opened on the arc-shaped base plate 8, and fixing bolts 11 connected to the tower are inserted into the screw holes 14.

[0033] In use, the upper end of the main sling 1 is connected to the crane hook, and the lower end of the main sling 1 is connected to the first connecting hole 12 on the top of the balance beam end connecting plate 3 using a shackle. The top of the secondary sling 6 is connected to the second connecting hole 13 on the bottom of the balance beam end connecting plate 3 using a shackle, and the bottom of the secondary sling 6 is connected to the lifting base 7 via a connecting pin 10. The lifting base 7 is connected to the top flange of the tower using high-strength fixing bolts 11. This achieves load transfer from the tower to the crane hook.

[0034] Furthermore, in this utility model, the upper end of the main sling 1 is directly connected to the crane hook. Since the two ends of the main sling 1 are respectively connected to the balance beam 2, during the hoisting process, the main sling 1 will bear the lifting force of the hook at one end and transmit the load to the balance beam 2 at the other end due to the different directions of the load transmitted at the two ends. An angle will naturally be formed at the connection position with the hook, and the angle is strictly controlled within the range of less than 90°.

[0035] The included angle design plays a crucial role: on the one hand, an included angle of less than 90° can prevent the main sling 1 from generating excessive horizontal force, thus preventing the horizontal load from acting directly on the chimney tower and causing radial deformation; on the other hand, a smaller included angle allows the tension of the main sling 1 to be transferred more rationally to the balance beam 2, which, together with the balance beam 2, bears the function of the horizontal force, ensuring the force balance between the hook, the main sling 1, and the balance beam 2, avoiding stress concentration at the connection points due to excessive horizontal force, and further improving the load transfer stability and operational safety of the entire hoisting device.

[0036] Furthermore, this utility model also provides an anti-sway component 16 on the balance beam 2, which can effectively deal with the tower deflection problem caused by changes in the external environment or load after hoisting, and ensure stable hoisting and precise docking of the tower.

[0037] The anti-sway component 16 includes a mounting base 17 and a guy rope 18. The mounting base 17 is set on the balance beam 2. The guy rope 18 is made of high-strength flexible rope, such as steel wire rope or wear-resistant synthetic fiber rope. One end is firmly connected to the mounting base 17 through a detachable connector, which facilitates disassembly and storage before and after hoisting. The other end remains free, which is convenient for workers to operate flexibly on the ground or operating platform.

[0038] At least two sets of anti-sway components 16 are provided, and the anti-sway components 16 are mirror-image positioned with the axial symmetry point of the balance beam 2 as the center point. This ensures that the adjustment force is applied evenly to the balance beam 2 and the tower, avoiding tilting of the balance beam or secondary deflection of the tower caused by unilateral adjustment, making the attitude correction process more stable and controllable.

[0039] When the tower deflects due to wind or other conditions after hoisting, the anti-sway component 16 allows workers to pull the guy ropes 18 to adjust the tower's rotation, preventing it from hitting other obstacles and ensuring better alignment with the installation position.

[0040] Finally, it should be noted that in this document, relational terms such as "first" and "second" are used only to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Without further limitations, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes said element.

[0041] The various embodiments in this specification are described in a progressive manner, with each embodiment focusing on the differences from other embodiments. The same or similar parts between the various embodiments can be referred to each other.

[0042] The above description of the disclosed embodiments enables those skilled in the art to make or use this application. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of this application. Therefore, this application is not to be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A hoisting device for chimney towers, characterized in that, It includes a main sling (1) connected to a hook, with a balance beam (2) connected to both ends of the main sling (1), and a base (7) connected to both ends of the balance beam (2) via a secondary sling (6); The base (7) includes a pair of connecting steel plates (9), and an arc-shaped base plate (8) is provided in the middle of the pair of connecting steel plates (9). The arc-shaped base plate (8) is located at the bottom of the connecting steel plates (9) and is fixedly connected to the connecting steel plates (9). Several screw holes (14) are opened on the arc-shaped base plate (8), and fixing bolts (11) connected to the tower are passed through the screw holes (14).

2. The hoisting device for chimney towers according to claim 1, characterized in that, The connection point between the main sling (1) and the hook is subject to different load directions, forming an angle with the hook, and the angle is less than 90°.

3. The hoisting device for chimney towers according to claim 1, characterized in that, The balance beam (2) has connecting grooves (15) along the axial direction at both ends, and connecting plates (3) are provided in the connecting grooves (15), and the connecting plates (3) are fixedly connected to the balance beam (2). The upper part of the connecting plate (3) is provided with a first connecting hole (12) for connecting to the main sling (1); the lower part is provided with a second connecting hole (13) for connecting to the secondary sling (5).

4. The hoisting device for chimney towers according to claim 3, characterized in that, The connecting plate (3) has at least two second connecting holes (12), and the corresponding second connecting holes (12) on the two connecting plates (3) are mirror images of each other.

5. The hoisting device for chimney towers according to claim 1, characterized in that, The balance beam (2) is also provided with a reinforcing plate (4) and an end plate (5) at both ends. The reinforcing plate (4) is sleeved on the outside of the balance beam (2), and the connecting plate (3) is located between the reinforcing plate (4) and the end plate (5).

6. The hoisting device for chimney towers according to claim 4, characterized in that, The arc of the arc-shaped base plate (8) is the same as the arc of the top of the tower, and the connecting steel plate (9) is curved, with the curvature of the curved plate (8) being consistent with the arc of the arc-shaped base plate (8).

7. The hoisting device for chimney towers according to claim 6, characterized in that, The top of the connecting steel plate (9) is provided with a connecting pin (10), which passes through a pair of connecting steel plates (9) and is movably connected to the connecting steel plates (9); one end of the secondary sling (6) is connected to the connecting pin (10), and the other end is connected to the second connecting hole (13).

8. The hoisting device for chimney towers according to claim 1, characterized in that, The balance beam (2) is provided with an anti-sway component (16), which includes a mounting base (17) and a guy rope (18). The mounting base (17) is located on the balance beam (2), and one end of the guy rope (18) is connected to the mounting base (17), while the other end is free.

9. The hoisting device for chimney towers according to claim 7, characterized in that, The anti-sway assembly (16) consists of at least two sets, and the anti-sway assembly (16) is mirrored with the axial symmetry point of the balance beam (2) as the center point.