A prefabricated low-energy green building construction structure
By employing a design that distributes loads through multiple sets of support points and an interference fit with the buffer layer in prefabricated low-energy buildings, the problems of load concentration and structural deformation in the connection between the support slab and the base are solved, thereby improving the stability and seismic performance of the structure.
Patent Information
- Application Number
- CN202522474132.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-21
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2035-11-21
AI Technical Summary
In the existing construction structure of prefabricated low-energy buildings, the connection between the supporting slab and the supporting base lacks dual limiting and load distribution design, which leads to the concentration of load at local nodes, making the structure prone to deformation and component damage, and the impact load during the assembly process is relatively large.
The design adopts multiple sets of support points to distribute the load. Through the multi-point auxiliary support of the support base and the layer plate, combined with the interference fit of the buffer pad and the limiting inner column, multiple sets of evenly distributed vertical support points are formed. The buffer pad ring absorbs the assembly impact and vibration, limits the radial sway of the limiting inner column, and improves the seismic performance of the connection node.
This effectively avoids localized stress concentration, ensures the long-term structural stability and seismic performance of the supporting slab, and reduces construction energy consumption and component damage risks.
Smart Images

Figure CN224955235U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of green building construction technology, specifically to a prefabricated low-energy green building construction structure. Background Technology
[0002] As the construction industry transforms towards "green, low-carbon, and industrialized construction," prefabricated low-energy green buildings have become the mainstream direction for sustainable building development due to their core advantages such as factory prefabrication, rapid on-site assembly, less construction waste, and low energy loss. These buildings significantly shorten construction cycles and reduce on-site labor intensity through industrialized component production and standardized assembly. Simultaneously, by combining integrated insulation and joint sealing technologies, they achieve a significant reduction in building energy consumption, aligning with current green building development needs.
[0003] However, existing prefabricated low-energy building construction structures still have some shortcomings in practical applications: the connection between the supporting slab and the supporting base is mostly a single snap-fit or bolt-fixed structure, lacking dual limiting and load distribution design; the single connection method easily leads to load concentration at local nodes, which can easily cause structural deformation under long-term use. The vertical connection nodes between the slab and the base are mostly rigid contacts, and the impact load during assembly is large, which can easily cause component damage. Utility Model Content
[0004] To address the above problems, the purpose of this utility model is to provide a prefabricated low-energy green building construction structure that solves the problems of lacking dual limiting and load distribution design, single connection method easily leading to load concentration at local nodes, structural deformation under long-term use, and the vertical connection nodes between the layer plate and the base being mostly rigid contacts, resulting in large impact loads during assembly and easy damage to components. The horizontal section of the base folded plate is attached to the bottom of the supporting layer plate, and the protective pad buffers the contact pressure, forming multi-point auxiliary support. By dispersing the load of the supporting layer plate through multiple sets of support points, local stress concentration is avoided, and the structural stability of the supporting layer plate is ensured for long-term use.
[0005] To achieve the above objectives, the present invention adopts the following technical solution: a prefabricated low-energy green building construction structure, comprising a support component, a docking component, and a shelf component. The support component includes a support base and an assembly frame. The docking component includes a docking sleeve. The shelf component includes a support shelf, a docking column, and a limiting inner column. The support base is a factory-prefabricated reinforced concrete component with symmetrically formed base slots on its upper inner side. The inner wall of the support base is integrally formed with a base folding plate. The support base has... The inner side of the base slot has a through mounting hole. One end of the support base is welded and fixed with an assembly slide rail. The inner side of the assembly slide rail has an assembly groove extending along the length direction. The docking sleeve is a prefabricated steel sleeve, fixed to a preset installation position at the top of the inner wall of the support base. The inner side of the docking sleeve is provided with an interference fit limit tube. The inner wall of the limit tube away from the docking sleeve is connected to a bottom column with an interference fit. The support plate is a prefabricated thermal insulation composite plate, and the lower end is integrally formed and connected with a plate clip.
[0006] The beneficial effects of this utility model are as follows: the connecting sleeve corresponds to the connecting column at the bottom of the supporting plate, forming multiple sets of evenly distributed vertical support points. The load of the supporting plate is dispersed through multiple sets of support points, avoiding local stress concentration and ensuring the structural stability of the supporting plate for long-term use. The limiting inner column is inserted into the bottom column and forms an interference fit with the buffer pad ring. The buffer pad ring absorbs the assembly impact and vibration during use, avoiding rigid collision between the limiting inner column and the bottom column. At the same time, the radial sway of the limiting inner column is limited by elastic constraint, improving the seismic performance of the connection node.
[0007] To protect the cushioning layer from contact pressure and form multiple auxiliary supports, the load-bearing stability of the support layer is further improved: As a further improvement to the above technical solution: the two ends of the support base are symmetrically welded with mounting base plates, the bottom of the mounting base plates is coplanar with the bottom of the support base, and a transverse reinforcing rod is welded between adjacent mounting base plates. The front cross-section of the base folded plate is L-shaped, and its vertical section is welded and fixed to the inner wall of the support base. The top inner side of the horizontal section away from the inner wall of the support base is provided with folded plate grooves at equal intervals, and a rectangular environmentally friendly rubber protective pad layer is bonded and fixed in the folded plate groove.
[0008] The beneficial effects of this improvement are as follows: the support base is hoisted to the predetermined construction position, ensuring that the installation base plate is aligned with the pre-embedded steel plate in the foundation. Expansion bolts are used to lock and fix the installation base plate and the pre-embedded steel plate. The reinforcing rods are used to distribute the vertical load of the support base and improve the stability of the connection with the ground. The base folded plate enhances the bending strength at the corner of the support base through the L-shaped structure. When the support plate is connected to the support base, the horizontal section of the base folded plate fits against the bottom of the support plate. The protective pad buffers the contact pressure and forms multi-point auxiliary support, further improving the load-bearing stability of the support plate.
[0009] To ensure the assembly clip slides along the assembly groove to the preset limit block, the rounded chamfer reduces sliding jamming: As a further improvement to the above technical solution: two identical assembly slide rails are welded parallel to one end of the support base; an assembly frame is welded and fixed to the end of the support base away from the assembly slide rails; an assembly clip is integrally formed on the inner wall of the assembly frame; the cross-sectional dimensions of the assembly slide groove are clearance-fitted with the cross-sectional dimensions of the assembly clip; the two sides of the assembly clip away from the bottom of the assembly frame are treated with R3 arc chamfers; the side walls of the assembly slide rails are provided with preset threaded holes; and an integrally formed limiting block is provided on the inner wall of the assembly frame.
[0010] The beneficial effects of this improvement are as follows: When multiple sets of support bases need to be spliced, the assembly slide rail of the next support base is aligned with the assembly frame entrance of the previous support base, and the next support base is pushed horizontally so that the assembly clip slides along the assembly slide groove to the preset limit block. The arc chamfer reduces sliding jamming. Stainless steel bolts are used to penetrate the side wall of the assembly frame and lock it with the preset threaded hole of the assembly slide rail, so as to realize the rapid assembly and fixing of adjacent support bases. The gap at the splice is filled with sealant to improve airtightness.
[0011] To avoid localized stress concentration and ensure the structural stability of the supporting slab during long-term use: As a further improvement to the above technical solution: the connecting sleeve is fixed to the top of the inner wall of the support base by pre-embedded bolts and is arranged at equal intervals along the length of the support base. The bottom of the limiting tube is coplanar with the bottom of the bottom column, and the bottom of the limiting tube is welded and fixed to the inner wall of the support base.
[0012] The beneficial effects of this improvement are as follows: Before the support slab is connected to the support base, the installation position of the connecting sleeve is confirmed to be accurate and without deviation. After the support slab is positioned, the connecting sleeve corresponds to the connecting column at the bottom of the support slab, forming multiple sets of evenly distributed vertical support points. The load of the support slab is distributed through multiple sets of support points, avoiding local stress concentration and ensuring the structural stability of the support slab for long-term use. At the same time, the prefabricated connecting sleeve reduces the on-site pouring process and reduces construction energy consumption.
[0013] To absorb assembly impacts and vibrations during use, and to prevent rigid collisions between the inner retaining column and the bottom column: As a further improvement to the above technical solution: the outer diameter of the bottom column is the same as the outer diameter of the limiting inner column, and a buffer pad ring is bonded and fixed to the inner wall of the bottom column. The buffer pad ring is a cylindrical, highly elastic, environmentally friendly rubber column.
[0014] The beneficial effects of this improvement are as follows: During the factory prefabrication stage, after the limiting tube and the bottom column are assembled with an interference fit, the whole assembly is installed inside the docking sleeve. When the supporting layer is assembled, the limiting inner column is inserted into the bottom column and forms an interference fit with the buffer pad ring. The buffer pad ring absorbs the assembly impact and vibration during use, avoiding rigid collision between the limiting inner column and the bottom column. At the same time, the radial sway of the limiting inner column is limited by elastic constraints, thereby improving the seismic performance of the connection node.
[0015] To ensure that the two sets of shelf clips are vertically guided into the base grooves until the bottom of the supporting shelf is fully in contact with the pre-set sealing gasket at the top of the supporting base: As a further improvement to the above technical solution: the planar dimensions of the supporting layer plate match the bearing surface dimensions of the supporting base. The lower end of the supporting layer plate is integrally formed with two sets of layer plate clips. Each set of layer plate clips has two clips. The two sets of layer plate clips are symmetrically distributed along the center line of the supporting layer plate. The two ends of the layer plate clips away from the bottom of the supporting layer plate are treated with R3 arc chamfering. Threaded holes are opened at the corresponding mounting hole positions of the layer plate clips.
[0016] The beneficial effects of this improvement are as follows: The support shelf is hoisted to the top of the support base using hoisting equipment, aligned with the position of the shelf clips and the base slots, and the support shelf is slowly lowered so that the two sets of shelf clips are vertically guided and inserted into the base slots until the bottom of the support shelf is completely in contact with the pre-set sealing gasket at the top of the support base. The stainless steel fastening bolts are then passed through the mounting holes and locked with the threaded holes of the shelf clips, achieving a detachable and fixed connection between the support shelf and the support base. The sealing gasket and the sealant at the bolt connection work together to improve the airtightness of the joint and reduce energy loss.
[0017] To achieve double fixation with the shelf clips and base slots, and to improve the stability of the connection between the supporting shelf and the supporting base: As a further improvement to the above technical solution: the bottom of the support plate is integrally connected to the docking sleeve position with a docking column. The outer diameter of the docking column is clearance-fitted with the inner diameter of the docking sleeve. The docking column is a solid high-strength steel column and is prefabricated integrally with the support plate in the factory. The inner side of the support plate is provided with a countersunk hole, and the opening of the countersunk hole is equipped with a sealing cap.
[0018] The beneficial effects of this improvement are as follows: When the support shelf is hoisted and positioned, the center axis of the docking column and the docking sleeve are aligned simultaneously. During the lowering of the support shelf, the docking column is vertically inserted along the inner wall of the docking sleeve. Through prefabrication, the two fit tightly together to form a vertical limit. The cooperation between the docking column and the docking sleeve, together with the shelf clips and base grooves, forms a double fixation, which improves the connection stability between the support shelf and the support base. The countersunk hole is used for the assembly and fixation of the upper components. After assembly, the sealing cover is put on to reduce heat loss through the hole, which meets the low energy consumption design requirements.
[0019] In order to generate an elastic reaction force after compression of the buffer ring, an axial preload is formed on the limiting inner column: As a further improvement to the above technical solution: the end of the docking column away from the supporting plate is integrally formed and connected to a limiting inner column, and the outer diameter of the limiting inner column is clearance-fitted with the inner diameter of the limiting tube.
[0020] The beneficial effects of this improvement are as follows: When the docking column is inserted into the docking sleeve, the limiting inner column simultaneously enters the inner side of the limiting tube and slides along the inner wall of the limiting tube. As the supporting plate continues to be lowered, the limiting inner column gradually approaches the buffer pad ring inside the bottom column. When the bottom of the supporting plate is in contact with the top sealing gasket of the supporting base, the end of the limiting inner column away from the docking column is completely in contact with the top of the buffer pad ring, and the buffer pad ring is compressed to the preset compression amount. The compressed buffer pad ring generates an elastic reaction force, which forms an axial pre-tightening on the limiting inner column, further restricting the vertical displacement of the structure. At the same time, it absorbs vibration energy through elastic deformation, improving the seismic performance and durability of the joint.
[0021] In summary, the beneficial effects of this case are as follows: the compressed buffer ring generates an elastic reaction force, which forms an axial preload on the inner column of the limiting structure, further restricting the vertical displacement of the structure. At the same time, it absorbs vibration energy through elastic deformation, improving the seismic performance and durability of the joint. The load of the supporting plate is distributed through multiple sets of support points, avoiding local stress concentration and ensuring the structural stability of the supporting plate for long-term use. The buffer ring absorbs assembly impact and vibration during use, avoiding rigid collision between the inner column of the limiting structure and the bottom column. At the same time, the radial sway of the inner column of the limiting structure is restricted through elastic constraint, improving the seismic performance of the connection joint.
[0022] The parts of the device not covered herein are the same as or can be implemented using existing technologies. Attached Figure Description
[0023] Figure 1 This is a schematic diagram of the main structure of this utility model.
[0024] Figure 2 for Figure 1 A magnified structural diagram of point A in the middle.
[0025] Figure 3 This is a structural schematic diagram of the assembly frame of this utility model.
[0026] Figure 4 This is a schematic diagram of the structure of the support base of this utility model.
[0027] Figure 5 for Figure 4 A magnified structural diagram at point B in the middle.
[0028] Figure 6This is a cross-sectional view of the connecting sleeve of this utility model.
[0029] Figure 7 This is a schematic diagram of the structure of the support layer of this utility model.
[0030] In the diagram: 1. Support assembly; 11. Support base; 12. Base slot; 13. Base folded plate; 131. Folded plate groove; 132. Protective pad; 14. Mounting hole; 15. Mounting base plate; 151. Reinforcing rod; 16. Assembled slide rail; 17. Assembled slide groove; 18. Assembly frame; 181. Limiting block; 19. Assembled clip; 2. Connecting assembly; 21. Connecting sleeve; 22. Limiting tube; 23. Bottom column; 24. Buffer pad ring; 3. Shelf assembly; 31. Supporting shelf; 32. Shelf clip; 33. Connecting column; 34. Limiting inner column; 35. Countersunk hole; 351. Sealing cover. Detailed Implementation
[0031] To enable those skilled in the art to better understand the technical solution of this utility model, the present utility model will be described in detail below with reference to the accompanying drawings. The description in this part is only exemplary and explanatory, and should not be used to limit the scope of protection of this utility model in any way.
[0032] like Figure 1-7 As shown, a prefabricated low-energy green building construction structure includes a support component 1, a docking component 2, and a shelf assembly 3. The support component 1 includes a support base 11 and an assembly frame 18. The docking component 2 includes a docking sleeve 21. The shelf assembly 3 includes a support shelf 31, a docking column 33, and a limiting inner column 34. The support base 11 is a factory-prefabricated reinforced concrete component with symmetrically formed base slots 12 on its upper inner side. The inner wall of the support base 11 is integrally formed with a base folding plate 13. The inner side of the support base 11 corresponds to the base slot 12. The support base 11 has a through mounting hole 14. One end of the support base 11 is welded and fixed with an assembly slide rail 16. The inner side of the assembly slide rail 16 has an assembly slide groove 17 extending along the length direction. The docking sleeve 21 is a prefabricated steel sleeve, which is fixed to a preset installation position on the top of the inner wall of the support base 11. The inner side of the docking sleeve 21 is provided with an interference fit limit tube 22. The inner wall of the limit tube 22 away from the docking sleeve 21 is connected with an interference fit bottom column 23. The support layer 31 is a prefabricated thermal insulation composite layer, and the lower end is integrally formed and connected with a layer plate clip 32.
[0033] The support base 11 has mounting base plates 15 symmetrically welded to both ends. The bottom of the mounting base plates 15 is coplanar with the bottom of the support base 11. A transverse reinforcing rod 151 is welded between adjacent mounting base plates 15. The front cross-section of the base folding plate 13 is L-shaped. Its vertical section is welded and fixed to the inner wall of the support base 11. The horizontal section has folding plate grooves 131 evenly spaced on the top inner side of the end away from the inner wall of the support base 11. A rectangular environmentally friendly rubber protective pad 132 is bonded and fixed in the folding plate groove 131. The support base 11 is then hoisted to the predetermined construction position. To ensure alignment between the mounting base plate 15 and the pre-embedded steel plate in the foundation, expansion bolts are used to lock and fix the mounting base plate 15 to the pre-embedded steel plate. The reinforcing rod 151 is used to distribute the vertical load of the support base 11 and improve the stability of the connection with the ground. The base folded plate 13 enhances the bending strength at the corner of the support base 11 through the L-shaped structure. When the support plate 31 is connected to the support base 11, the horizontal section of the base folded plate 13 fits against the bottom of the support plate 31. The protective pad 132 buffers the contact pressure and forms multi-point auxiliary support, further improving the load-bearing stability of the support plate 31.
[0034] Two identical assembly slide rails 16 are welded parallel to one end of the support base 11. An assembly frame 18 is welded and fixed to the end of the support base 11 away from the assembly slide rails 16. An assembly clip 19 is integrally formed and connected to the inner wall of the assembly frame 18. The cross-sectional dimensions of the assembly slide groove 17 are clearance-fitted with the cross-sectional dimensions of the assembly clip 19. The two sides of the assembly clip 19 away from the bottom of the assembly frame 18 are treated with R3 arc chamfers. The side walls of the assembly slide rails 16 are provided with pre-set threaded holes. An integrally formed... The limiting block 181; when multiple sets of support bases 11 need to be spliced, the assembly slide rail 16 of the next support base 11 is aligned with the entrance of the assembly frame 18 of the previous support base 11, and the next support base 11 is pushed in the horizontal direction, so that the assembly clip 19 slides along the assembly slide groove 17 to the preset limiting block 181. The arc chamfer reduces sliding jamming. Stainless steel bolts are used to penetrate the side wall of the assembly frame 18 and lock it with the preset threaded hole of the assembly slide rail 16, so as to realize the rapid assembly and fixing of adjacent support bases 11. The gap at the splice is filled with sealant to improve air tightness.
[0035] The connecting sleeve 21 is fixed to the top of the inner wall of the support base 11 by pre-embedded bolts and is evenly spaced along the length of the support base 11. The bottom of the limiting tube 22 is coplanar with the bottom of the bottom column 23, and the bottom of the limiting tube 22 is welded to the inner wall of the support base 11. Before the support plate 31 is connected to the support base 11, it is confirmed that the installation position of the connecting sleeve 21 is accurate and without deviation. After the support plate 31 is positioned, the connecting sleeve 21 corresponds to the connecting column 33 at the bottom of the support plate 31, forming multiple sets of evenly distributed vertical support points. The load of the support plate 31 is distributed through multiple sets of support points to avoid local stress concentration and ensure the structural stability of the support plate 31 for long-term use. At the same time, the prefabrication of the connecting sleeve 21 reduces the on-site pouring process and reduces construction energy consumption.
[0036] The outer diameter of the bottom column 23 is the same as the outer diameter of the limiting inner column 34. A buffer ring 24 is bonded and fixed to the inner wall of the bottom column 23. The buffer ring 24 is a cylindrical, highly elastic, environmentally friendly rubber column. During the factory prefabrication stage, the limiting tube 22 and the bottom column 23 are assembled with an interference fit and then installed as a whole inside the docking sleeve 21. When the supporting plate 31 is assembled, the limiting inner column 34 is inserted into the bottom column 23 and forms an interference fit with the buffer ring 24. The buffer ring 24 absorbs the assembly impact and vibration during use, avoiding rigid collision between the limiting inner column 34 and the bottom column 23. At the same time, the radial sway of the limiting inner column 34 is limited by elastic constraint, improving the seismic performance of the connection node.
[0037] The planar dimensions of the supporting layer 31 match the bearing surface dimensions of the supporting base 11. Two sets of layer clips 32 are integrally formed and connected to the lower end of the supporting layer 31. Each set of layer clips 32 has two clips, and the two sets of layer clips 32 are symmetrically distributed along the centerline of the supporting layer 31. The ends of the layer clips 32 away from the bottom of the supporting layer 31 are chamfered with an R3 arc. Threaded holes are provided on the layer clips 32 corresponding to the mounting holes 14. The supporting layer 31 is hoisted to the supporting base 11 using hoisting equipment. 1. Directly above, align the shelf clips 32 with the base slots 12, and slowly lower the support shelf 31 so that the two sets of shelf clips 32 are vertically guided into the base slots 12 until the bottom of the support shelf 31 is completely in contact with the pre-set sealing gasket at the top of the support base 11. Pass the stainless steel fastening bolts through the mounting holes 14 and lock them with the threaded holes of the shelf clips 32 to achieve a detachable and fixed connection between the support shelf 31 and the support base 11. The sealing gasket and the sealant at the bolt connection work together to improve the airtightness of the joint and reduce energy loss.
[0038] The bottom of the supporting plate 31 is integrally connected to the docking sleeve 21 with a docking column 33. The outer diameter of the docking column 33 is clearance-fitted with the inner diameter of the docking sleeve 21. The docking column 33 is a solid high-strength steel column, prefabricated and integrally formed with the supporting plate 31 in the factory. A countersunk hole 35 is opened on the inner side of the supporting plate 31, and the opening of the countersunk hole 35 is equipped with a sealing cap 351. When the supporting plate 31 is hoisted and positioned, the center axis of the docking column 33 and the docking sleeve 21 are simultaneously aligned. During the lowering of the support plate 31, the docking column 33 is vertically inserted along the inner wall of the docking sleeve 21. Through prefabrication, the two fit tightly together to form a vertical limit. The cooperation between the docking column 33 and the docking sleeve 21, together with the connection of the plate clip 32 and the base slot 12, forms a double fixation, which improves the connection stability between the support plate 31 and the support base 11. The countersunk hole 35 is used for the assembly and fixation of the upper components. After the assembly is completed, the sealing cover 351 is covered to reduce heat loss through the hole, which meets the low energy consumption design requirements.
[0039] The end of the docking column 33 away from the supporting plate 31 is integrally connected to the limiting inner column 34. The outer diameter of the limiting inner column 34 is clearance-fitted with the inner diameter of the limiting tube 22. When the docking column 33 is inserted into the docking sleeve 21, the limiting inner column 34 simultaneously enters the inner side of the limiting tube 22 and slides along the inner wall of the limiting tube 22. As the supporting plate 31 continues to descend, the limiting inner column 34 gradually approaches the buffer pad ring 24 inside the bottom column 23. When the bottom of the supporting plate 31 is in contact with the top sealing gasket of the supporting base 11, the end of the limiting inner column 34 away from the docking column 33 is completely in contact with the top of the buffer pad ring 24, and the buffer pad ring 24 is compressed to a preset compression amount. The compressed buffer pad ring 24 generates an elastic reaction force, which forms an axial pre-tightening on the limiting inner column 34, further restricting the vertical displacement of the structure. At the same time, it absorbs vibration energy through elastic deformation, improving the seismic performance and durability of the node.
[0040] The working principle of this utility model is as follows: During the factory prefabrication stage, the limiting tube 22 and the bottom column 23 are assembled with an interference fit and then installed as a whole inside the connecting sleeve 21. In use, the support base 11 is hoisted to the predetermined construction position, ensuring that the mounting base plate 15 is aligned with the foundation embedded steel plate. The mounting base plate 15 is locked and fixed to the embedded steel plate by expansion bolts. The reinforcing rod 151 is used to distribute the vertical load of the support base 11 and improve the connection stability with the ground. The base folding plate 13 enhances the bending strength at the corner of the support base 11 through the L-shaped structure. When the support layer plate 31 is connected to the support base 11, the horizontal section of the base folding plate 13 is attached to the bottom of the support layer plate 31. The protective pad 132 buffers the contact pressure and forms multi-point auxiliary support, further improving the support layer. To ensure the load-bearing stability of plate 31, before connecting the support plate 31 to the support base 11, confirm that the installation position of the connecting sleeve 21 is accurate and without deviation. Use hoisting equipment to lift the support plate 31 directly above the support base 11, align the position of the plate clip 32 with the base slot 12, and slowly lower the support plate 31 so that the two sets of plate clips 32 are vertically guided into the base slot 12 until the bottom of the support plate 31 is completely in contact with the pre-set sealing gasket at the top of the support base 11. Pass the stainless steel fastening bolts through the mounting holes 14 and lock them into the threaded holes of the plate clips 32 to achieve a detachable and fixed connection between the support plate 31 and the support base 11. The sealing gasket and the sealant at the bolt connection work together to improve the airtightness of the joint and reduce energy loss. When hoisting and positioning the support plate 31... Simultaneously aligning the central axis of the docking column 33 and the docking sleeve 21, during the lowering of the support plate 31, the docking column 33 is vertically inserted along the inner wall of the docking sleeve 21. Through prefabrication, the two fit tightly together, forming a vertical limit. The cooperation between the docking column 33 and the docking sleeve 21, together with the connection of the plate retaining strip 32 and the base retaining groove 12, forms a double fixation, improving the connection stability between the support plate 31 and the support base 11. The countersunk hole 35 is used for the assembly and fixation of the upper components. After assembly, the sealing cover 351 is covered to reduce heat loss through the holes, meeting the low energy consumption design requirements. When the support plate 31 is positioned, the docking sleeve 21 corresponds to the docking column 33 at the bottom of the support plate 31, forming multiple sets of evenly distributed vertical support points. Multiple sets of support points disperse the load of the support slab 31, avoiding local stress concentration and ensuring the structural stability of the support slab 31 for long-term use. Simultaneously, the prefabricated connecting sleeve 21 reduces on-site pouring procedures and lowers construction energy consumption. During assembly of the support slab 31, the limiting inner column 34 is inserted into the bottom column 23, forming an interference fit with the buffer ring 24. The buffer ring 24 absorbs assembly impact and vibration during use, preventing rigid collisions between the limiting inner column 34 and the bottom column 23. At the same time, elastic constraints limit the radial sway of the limiting inner column 34, improving the seismic performance of the connection node. Simultaneously, as the connecting column 33 is inserted into the connecting sleeve 21, the limiting inner column 34 simultaneously enters the inner side of the limiting tube 22, sliding along the inner wall of the limiting tube 22. As the support slab 31 continues to descend...As the inner column 34 gradually approaches the buffer ring 24 inside the bottom column 23, when the bottom of the support plate 31 is in contact with the top sealing gasket of the support base 11, the end of the inner column 34 away from the connecting column 33 is completely in contact with the top of the buffer ring 24, and the buffer ring 24 is compressed to a preset compression amount. The compressed buffer ring 24 generates an elastic reaction force, forming an axial pre-tightening on the inner column 34, further restricting the vertical displacement of the structure. At the same time, it absorbs vibration energy through elastic deformation, improving the seismic performance and durability of the joint. When multiple support bases 11 need to be assembled, the assembly slide rail 16 of the subsequent support base 11 is aligned with the entrance of the assembly frame 18 of the preceding support base 11. The subsequent support base 11 is pushed horizontally, causing the assembly locking strip 19 to slide along the assembly slide groove 17 to the preset limit block 181. The rounded chamfer reduces sliding jamming. Stainless steel bolts are used to penetrate the side wall of the assembly frame 18 and lock it to the preset threaded holes of the assembly slide rail 16, achieving rapid assembly and fixing of adjacent support bases 11. The gaps at the splicing points are filled with sealant to improve airtightness.
[0041] It should be noted that, in this document, the terms “comprising,” “including,” or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such process, method, article, or apparatus.
[0042] This article uses specific examples to illustrate the principles and implementation methods of this utility model. The above examples are only for the purpose of helping to understand the method and core ideas of this utility model. The above description is only a preferred embodiment of this utility model. It should be noted that due to the limitations of textual expression, there are objectively infinite specific structures. For those skilled in the art, several improvements, modifications, or changes can be made without departing from the principles of this utility model, and the above technical features can also be combined in an appropriate manner. These improvements, modifications, changes, or combinations, or the direct application of the concept and technical solution of the utility model to other occasions without modification, should all be considered within the protection scope of this utility model.
Claims
1. A prefabricated low-energy green building construction structure, comprising a support component (1), a docking component (2), and a shelf assembly (3), wherein the support component (1) includes a support base (11) and an assembly frame (18), the docking component (2) includes a docking sleeve (21), and the shelf assembly (3) includes a supporting shelf (31), a docking column (33), and a limiting inner column (34), characterized in that: The support base (11) is a factory prefabricated reinforced concrete component, the upper inner side is symmetrically provided with a base clamping groove (12), the inner wall of the support base (11) is integrally formed and connected with a base folding plate (13), the inner side of the support base (11) corresponding to the base clamping groove (12) is provided with an upper and lower through installation hole (14), one end of the support base (11) is welded and fixed with an assembly sliding rail (16), the inner side of the assembly sliding rail (16) is provided with an assembly sliding groove (17) extending along the length direction, the butt joint sleeve pipe (21) is a prefabricated steel sleeve pipe, is fixed to the inner wall top of the support base (11) in a preset installation position, the inner side of the butt joint sleeve pipe (21) is provided with a limiting pipe (22) in interference fit, the inner wall of the limiting pipe (22) away from one end of the butt joint sleeve pipe (21) is connected with a bottom layer column (23) in interference fit, and the support layer plate (31) is a prefabricated thermal insulation composite layer plate, and the lower end is integrally connected with a layer plate clamping strip (32).
2. The assembled low-energy green building construction structure according to claim 1, characterized in that: The both ends of the support base (11) are symmetrically welded with installation bottom plates (15), the bottom of the installation bottom plate (15) is coplanar with the bottom of the support base (11), and transverse reinforcing rods (151) are welded between the adjacent installation bottom plates (15), the front view cross section of the base folding plate (13) is L-shaped, the vertical section is welded and fixed with the inner wall of the support base (11), the top inner side of the horizontal section away from the inner wall of the support base (11) is provided with folding plate grooves (131) at equal intervals, and the folding plate grooves (131) are bonded and fixed with protective pad layers (132) of rectangular environment-friendly rubber material.
3. The assembled low-energy green building construction structure according to claim 1, characterized in that: The one end of the support base (11) is parallelly welded with two assembly sliding rails (16) of the same size, the end of the support base (11) away from the assembly sliding rail (16) is welded and fixed with an assembly frame (18), the inner wall of the assembly frame (18) is integrally connected with an assembly clamping strip (19), the cross section size of the assembly sliding groove (17) is clearance fit with the cross section size of the assembly clamping strip (19), the two sides of the assembly clamping strip (19) away from the bottom of the assembly frame (18) are R3 arc chamfered, the side wall of the assembly sliding rail (16) is provided with a preset threaded hole, and the inner wall of the assembly frame (18) is provided with an integrally formed limiting block (181).
4. The assembled low-energy green building construction structure according to claim 1, characterized in that: The butt joint sleeve pipe (21) is fixed to the top of the inner wall of the support base (11) through a pre-buried bolt, is arranged at equal intervals along the length direction of the support base (11), the bottom of the limiting pipe (22) is coplanar with the bottom of the bottom layer column (23), and the bottom of the limiting pipe (22) is welded and fixed with the inner wall of the support base (11).
5. The prefabricated low-energy green building construction structure according to claim 1, characterized in that: The outer diameter of the bottom layer column (23) is the same as that of the limiting inner column (34), the inner wall of the bottom layer column (23) is bonded and fixed with a buffer pad ring (24), and the buffer pad ring (24) is a cylindrical high-elasticity environment-friendly rubber column.
6. The prefabricated low-energy green building construction structure according to claim 1, characterized in that: The planar dimensions of the support plate (31) match the bearing surface dimensions of the support base (11). The lower end of the support plate (31) is integrally formed with two sets of plate clips (32). Each set of plate clips (32) has two clips. The two sets of plate clips (32) are symmetrically distributed along the center line of the support plate (31). The two ends of the plate clips (32) away from the bottom of the support plate (31) are treated with R3 arc chamfers. The plate clips (32) are provided with threaded holes corresponding to the mounting holes (14).
7. The prefabricated low-energy green building construction structure according to claim 1, characterized in that: The bottom of the support plate (31) is integrally connected to the docking sleeve (21) with a docking column (33). The outer diameter of the docking column (33) is clearance-fitted with the inner diameter of the docking sleeve (21). The docking column (33) is a solid high-strength steel column and is prefabricated in the factory with the support plate (31). The inner side of the support plate (31) is provided with a countersunk hole (35), and the opening of the countersunk hole (35) is equipped with a sealing cap (351).
8. The prefabricated low-energy green building construction structure according to claim 1, characterized in that: The end of the docking column (33) away from the supporting plate (31) is integrally formed and connected to the limiting inner column (34), and the outer diameter of the limiting inner column (34) is clearance-fitted with the inner diameter of the limiting tube (22).
