A kind of advance reinforcement device for shield crossing boulder stratum construction

By setting up guide tunnels and pipe roof reinforcement structures during shield tunneling, and using suspended pipes and tension pipes to provide lifting and pulling forces, the settlement and displacement problems caused by unreinforced boulders during shield tunneling were solved, thus achieving stability and safety in construction.

CN224955753UActive Publication Date: 2026-11-10CHINA RAILWAY WUJU GROUP ELECTRIC WORKS ENG CORP +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202522665743.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-16
Publication Date
2026-11-10
Estimated Expiration
2035-12-16

Smart Images

  • Figure CN224955753U_ABST
    Figure CN224955753U_ABST
Patent Text Reader

Abstract

The utility model relates to tunnel construction reinforcing technical field, concretely discloses a kind of advance reinforcing device of shield crossing boulder stratum construction, including two pilot holes being arranged in geologic stratum, two pilot holes are located the two sides of pre-excavation tunnel and the direction of pilot hole is identical with pre-excavation tunnel, pipe shed reinforcing structure is set between two pilot holes, and multiple hanger pipes are punched into downwards in geologic stratum top, and hanger pipe lower end is connected together with pipe shed reinforcing structure.The utility model has the beneficial effect: hanger pipe provides lifting force to pipe shed reinforcing structure, which can prevent the overall downward settlement of pipe shed reinforcing structure. By pulling pipe, an upward pulling force is provided to the reinforcing block. This can prevent the reinforcing block from shifting, and further prevent the overall downward settlement of the pipe shed reinforcing structure.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of tunnel construction reinforcement technology, and in particular to an advanced reinforcement device for shield tunneling through boulder strata. Background Technology

[0002] In the construction of major infrastructure projects such as subway tunnels, deep foundation pits for high-rise buildings, underground utility tunnels, and pile foundation engineering in dense urban clusters such as large metropolitan areas and coastal economic zones, accurately identifying underground obstacles, especially "isolated boulders," is a crucial prerequisite for ensuring project safety, controlling construction risks, and saving costs. Isolated boulders refer to giant, irregularly distributed, spherical weathered cores remaining in weathered rock layers, possessing extremely high strength and significantly different physical and mechanical properties from the surrounding soil. The presence of isolated boulders has a significant impact on tunnel boring machine (TBM) construction, easily leading to ground settlement and equipment damage, thereby affecting the construction schedule.

[0003] Currently, isolated boulders are typically removed through methods such as manual excavation of bored piles, ground drilling and blasting for pretreatment, or by using an in-tunnel hydraulic rock splitter during shield tunneling. The former is suitable for situations with good ground conditions and no other buildings; the latter is suitable for situations with a stable tunnel face and good geological conditions. However, in actual construction, situations often arise where the shield tunnel passes under existing buildings and has a cluster of isolated boulders suspended above the tunnel section. If the cluster of isolated boulders is not effectively reinforced, the boulders can easily fall during shield tunneling due to unloading in front of and above the tunnel face, causing the machine to jam, and in severe cases, even leading to ground subsidence accidents.

[0004] To address this, CN201920161287.4 discloses a construction structure for reinforcing isolated boulders in a shield tunnel section. This structure includes a guide tunnel parallel to the shield tunnel and a pipe roof support structure positioned below the isolated boulders on the shield tunnel's top surface. The guide tunnel is located on the side of the shield tunnel or between two shield tunnels, and is partially or entirely higher than the top surface of the shield tunnel. The pipe roof support structure is constructed from the side of the guide tunnel towards the top of the shield tunnel, with a distance of 1-1.5 meters from the top surface of the shield tunnel. By supporting the tunnel with an integral pipe roof at the top, the impact of isolated boulders on shield tunneling is effectively avoided. However, the pipe roof formed by this construction structure lacks additional fixing measures. During shield tunneling, the entire pipe roof structure may experience overall settlement or displacement. When the overall pipe roof settles or shifts, the isolated boulders reinforced by the pipe roof are also prone to settlement or displacement, potentially affecting normal shield tunneling operations. Utility Model Content

[0005] The purpose of this invention is to address the shortcomings of existing technologies by proposing an advanced reinforcement device for shield tunneling through boulder strata.

[0006] To achieve the above objectives, the present invention adopts the following technical solution: An advanced reinforcement device for shield tunneling through boulders includes two pilot tunnels located on both sides of a pre-excavated tunnel, with the direction of the pilot tunnels aligned with the pre-excavated tunnel. A pipe roof reinforcement structure is installed between the two pilot tunnels. Multiple suspended pipes are driven downward from the top of the geological layer, with the lower ends of the suspended pipes connected to the pipe roof reinforcement structure.

[0007] Furthermore, the pipe roof reinforcement structure includes multiple parallel reinforcement pipes, each guide hole is equipped with a reinforcement block, the reinforcement block has a cavity, and both ends of the reinforcement pipe are fixed to the corresponding reinforcement block and connected to the cavity.

[0008] Furthermore, two sets of pull tubes are driven downwards from the top of the geological layer, and the lower ends of the two sets of pull tubes are fixedly connected to the corresponding reinforcement blocks.

[0009] Furthermore, a groove is provided at the top of the geological layer, and concrete is poured into the groove to form a concrete anti-settlement slab. The upper end of each pull pipe and the hanging pipe is fixed together with the concrete anti-settlement slab.

[0010] Furthermore, each pull pipe and hanging pipe is equipped with multiple crossbars at its upper end, which are located inside the concrete anti-settlement slab.

[0011] Furthermore, both sets of pull tubes are set at an angle, with the included angle between the two sets of pull tubes being between 45° and 90°.

[0012] The advantages of this utility model are as follows: The advanced reinforcement device for shield tunneling through boulders provided by this utility model provides lifting force to the pipe roof reinforcement structure through the lifting pipe, thus preventing the overall pipe roof reinforcement structure from settling downwards. The pulling pipe provides upward pulling force to the reinforcement block. This prevents the reinforcement block from shifting, thereby further preventing the overall pipe roof reinforcement structure from settling downwards. Attached Figure Description

[0013] Figure 1 This is a schematic diagram of the basic structure of an advanced reinforcement device for shield tunneling through boulders, provided by this utility model. Figure 2 This is a schematic diagram of the basic structure of the hanging pipe; Figure 3 This is a basic structural diagram of the pipe roof reinforcement structure. Detailed Implementation

[0014] To enable those skilled in the art to better understand the present application, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present application, and not all embodiments. Based on the embodiments in the present application, all other embodiments obtained by those of ordinary skill in the art without creative effort should fall within the scope of protection of the present application.

[0015] It should be noted that the terms "first," "second," etc., in the specification, claims, and accompanying drawings of this application are used to distinguish similar objects and are not necessarily used to describe a specific order or sequence. It should be understood that such data can be interchanged where appropriate for the embodiments of this application described herein. Furthermore, the terms "comprising" and "having," and any variations thereof, are intended to cover non-exclusive inclusion; for example, a process, method, system, product, or apparatus that comprises a series of steps or units is not necessarily limited to those steps or units explicitly listed, but may include other steps or units not explicitly listed or inherent to such processes, methods, products, or apparatus.

[0016] In this application, the terms "upper," "lower," "left," "right," "front," "rear," "top," "bottom," "inner," "outer," "middle," "vertical," "horizontal," "lateral," and "longitudinal" indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. These terms are primarily for the purpose of better describing this application and its embodiments, and are not intended to limit the indicated device, element, or component to having a specific orientation, or to be constructed and operated in a specific orientation.

[0017] Furthermore, in addition to indicating location or positional relationship, some of the aforementioned terms may also have other meanings. For example, the term "above" may also be used in some cases to indicate a certain dependency or connection relationship. Those skilled in the art can understand the specific meaning of these terms in this application based on the specific circumstances.

[0018] Furthermore, the terms "installation," "setup," "equipped with," "connection," "linking," and "socketing" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral structure; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium, or an internal connection between two devices, components, or parts. Those skilled in the art can understand the specific meaning of these terms in this application based on the specific circumstances.

[0019] It should be noted that, unless otherwise specified, the embodiments and features described in this application can be combined with each other. This application will now be described in detail with reference to the accompanying drawings and embodiments.

[0020] like Figures 1-3 As shown in this embodiment, an advanced reinforcement device for shield tunneling through boulders includes two guide tunnels 1 located within a geological layer 100. The two guide tunnels 1 are situated on opposite sides of a pre-excavated tunnel 200, with their directions aligned with the tunnel 200. A pipe roof reinforcement structure is installed between the two guide tunnels 1. The height of the guide tunnels 1 must be higher than the height of the pre-excavated tunnel 200, allowing the pipe roof reinforcement structure to be positioned at the top of the tunnel 200. The pipe roof reinforcement structure includes multiple parallel reinforcement pipes 2, extending from one guide tunnel 1 to the other. Each guide tunnel 1 contains a reinforcement block 5 fixed to its bottom. Each reinforcement block 5 has a cavity. Both ends of the reinforcement pipe 2 are fixed to the corresponding reinforcement block 5 and connected to the cavity. Concrete grout is added to the cavity, allowing it to enter the reinforcement pipe 2 and slowly diffuse into the surrounding geological layer 100. The principle of pipe roof reinforcement is prior art and will not be elaborated further here. In this embodiment, by setting reinforcement blocks 5 at both ends of the pipe roof to limit the pipe roof, it is possible to effectively prevent the pipe roof from shifting to the surrounding area.

[0021] In a preferred embodiment of this utility model, to prevent the pipe roof reinforcement structure from settling downwards, multiple hanging pipes 4 are driven downwards from the top of the geological layer 100, with the lower ends of the hanging pipes 4 connected to the pipe roof reinforcement structure. The hanging pipes 4 provide a lifting force to the pipe roof reinforcement structure, thus preventing the overall downward settlement of the pipe roof reinforcement structure. For details, see... Figure 2 As shown, before installing the reinforcing pipe 2, the hanging pipe 4 is driven in first. The lower end of the hanging pipe 4 has an opening 41, and the reinforcing pipe 2 passes through the corresponding opening 41. In this way, when grouting is performed on the reinforcing pipe 2, grouting is performed on the hanging pipe 4 at the same time, so that the reinforcing pipe 2 and the hanging pipe 4 form a whole. This can prevent the pipe roof reinforcement structure from settling downwards.

[0022] To further prevent the overall downward settlement of the pipe roof reinforcement structure, two sets of tension pipes 3 are driven downwards from the top of the geological layer 100. The lower ends of the two sets of tension pipes 3 are fixedly connected to the corresponding reinforcement blocks 5. Both sets of tension pipes 3 are inclined, with the included angle between the two sets of tension pipes 3 being between 45° and 90°. The tension pipes 3 provide an upward pulling force to the reinforcement blocks 5. This prevents the reinforcement blocks 5 from shifting, thereby further preventing the overall downward settlement of the pipe roof reinforcement structure.

[0023] In this embodiment, a groove is provided at the top of the geological layer 100, and concrete is poured into the groove to form a concrete anti-settlement slab 6. The upper ends of each pull pipe 3 and hanging pipe 4 are fixed together with the concrete anti-settlement slab 6. Each pull pipe 3 and hanging pipe 4 has multiple crossbars 9 at its upper end, which are located inside the concrete anti-settlement slab 6. The concrete anti-settlement slab 6 has a large surface area and is not prone to settlement. The pull pipes 3 and hanging pipes 4 are fixed together with the concrete anti-settlement slab 6, which can also prevent the overall pipe roof reinforcement structure from settling downwards to a certain extent.

Claims

1. An advanced reinforcement device for shield tunneling through boulder strata, characterized in that: It includes two pilot tunnels (1) set in the geological layer (100), the two pilot tunnels (1) are located on both sides of the pre-excavated tunnel (200) and the direction of the pilot tunnels (1) is consistent with that of the pre-excavated tunnel (200). A pipe roof reinforcement structure is set between the two pilot tunnels (1), and multiple hanging pipes (4) are driven downward from the top of the geological layer (100). The lower end of the hanging pipes (4) is connected to the pipe roof reinforcement structure.

2. The advanced reinforcement device for shield tunneling through boulder strata according to claim 1, characterized in that: The pipe shed reinforcement structure includes multiple parallel reinforcement pipes (2), each guide hole (1) is provided with a reinforcement block (5), the reinforcement block (5) is provided with a cavity, and the two ends of the reinforcement pipe (2) are fixed to the corresponding reinforcement block (5) and connected to the cavity.

3. The advanced reinforcement device for shield tunneling through boulders as described in claim 2, characterized in that: Two sets of pipes (3) are driven downward from the top of the geological layer (100), and the lower ends of the two sets of pipes (3) are fixedly connected to the corresponding reinforcement blocks (5).

4. The advanced reinforcement device for shield tunneling through boulders as described in claim 3, characterized in that: The top of the geological layer (100) is provided with a groove, and concrete is poured in the groove to form a concrete anti-sinking plate (6). The upper ends of each of the pull pipes (3) and the hanging pipes (4) are fixed together with the concrete anti-sinking plate (6).

5. The advanced reinforcement device for shield tunneling through boulders as described in claim 4, characterized in that: Each of the aforementioned pull tubes (3) and hanging tubes (4) has multiple crossbars (9) at its upper end, and the crossbars (9) are located inside the concrete anti-sinking slab (6).

6. The advanced reinforcement device for shield tunneling through boulders as described in claim 3, characterized in that: Both sets of pull tubes (3) are set at an angle, and the included angle between the two sets of pull tubes (3) is between 45° and 90°.

Citation Information

Patent Citations

  • Construction structure for reinforcing suspended boulder group on shield interval

    CN209444332U