Trolley switch characteristic test adapter

By integrating energy storage, interlocking, and switching functions into a transfer device, the problems of low efficiency and insufficient safety of trolley switch testing equipment are solved, simplifying the operation process and reducing the risk of misoperation, thus ensuring the stable operation of the power system.

CN224958073UActive Publication Date: 2026-11-10INNER MONGOLIA POWER (GRP) CO LTD XUEJIAWAN POWER SUPPLY BUREAU
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522273529.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-10-28
Publication Date
2026-11-10
Estimated Expiration
2035-10-28

AI Technical Summary

Technical Problem

Existing mechanical characteristic testing equipment for trolley switches is inefficient and lacks safety. Furthermore, the complex design of the interlocking device leads to cumbersome operation procedures, high error rates, and significant risks, affecting the stable operation of the power system.

Method used

Design a trolley switch characteristic test transfer device that integrates energy storage, interlocking and opening/closing functions, simplifies the wiring process, and achieves automatic interlocking and unlocking using a changeover switch and indicator branch, reducing the intensity of manual operation, and allowing the status to be observed through indicator lights.

Benefits of technology

It improves testing efficiency, reduces equipment carrying capacity and on-site setup time, reduces the risk of misoperation, and ensures the safe and stable operation of the power system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224958073U_ABST
    Figure CN224958073U_ABST
Patent Text Reader

Abstract

This utility model discloses a switching characteristic test adapter for a trolley. The input terminal of the rectifier is connected to an external power supply, and the output terminal of the rectifier is electrically connected to a switching circuit, a test circuit, and an operating circuit, respectively. The switching circuit, test circuit, and operating circuit are arranged in parallel. The test circuit includes a normally open contact of a first contactor KM1, a coil of a time relay KT, a lockout control branch, and an energy storage control branch. One end of the normally open contact of the first contactor KM1 is connected to the output terminal of the rectifier, and the other end of the normally open contact of the first contactor KM1 is connected to the lockout control branch and the energy storage control branch through the coil of the time relay KT, respectively. The lockout control branch includes lockout circuit terminals a1-a2 and a lockout indicator light HL3 arranged in series. The energy storage control branch includes an energized delay disconnect contact of the time relay KT, energy storage circuit terminals b1-b2, and an energy storage indicator light HL4 arranged in series.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of power technology, specifically to a trolley switch characteristic test adapter. Background Technology

[0002] In the field of substation maintenance and testing within the power industry, trolley switches in substations and similar environments are crucial equipment for ensuring the stable operation of the power system. Their mechanical characteristics directly determine the reliability and accuracy of switch operation. Therefore, regularly conducting mechanical characteristic tests and maintenance on trolley switches is one of the core aspects of substation maintenance. With the development of power systems towards higher voltage, larger capacity, and greater intelligence, more stringent requirements are being placed on the efficiency, safety, and standardization of trolley switch testing and maintenance.

[0003] During the mechanical characteristic testing and maintenance of the trolley switch, the existing technical solutions have obvious defects and are no longer able to meet the needs of actual maintenance work, mainly in the following two aspects: On the one hand, the mechanical characteristic test of the trolley switch is inefficient and lacks safety. The output signal of conventional mechanical characteristic test instruments is a pulsed current, which can only meet the basic characteristic testing requirements, but does not integrate energy storage devices and interlocking devices. This design flaw requires additional external energy storage devices and interlocking control circuits during testing, which not only increases the amount of equipment carried and the on-site setup time, but also makes the secondary wiring process extremely cumbersome. Due to the complex layout of the secondary circuit of the trolley switch and the dense arrangement of multiple circuits, the additional external wiring operations are very likely to cause problems such as misconnection and accidental contact with other operating circuits. At best, it will lead to the distortion of test data and the need to repeat the test; at worst, it may trigger protection malfunction, abnormal equipment tripping, or even cause electric shock to personnel or damage to equipment, seriously threatening the safe and stable operation of the substation, significantly prolonging the working time of a single test and maintenance, and reducing the overall maintenance efficiency.

[0004] On the other hand, the structural design of the trolley's opening and closing locking device has inherent shortcomings. In practical applications, the locking electromagnet of the trolley switch is usually embedded inside the switch cabinet panel and is in a normally closed working state by default. This normally closed state directly creates a forced lock on the locking mechanism and the closing circuit, requiring personnel to disassemble the switch cabinet panel to access the locking electromagnet before testing and maintenance, and then release the lock using temporary wiring or special tools. This process is complex and time-consuming. Furthermore, the embedded installation significantly increases the difficulty of monitoring the status of the locking electromagnet and troubleshooting faults. If the locking electromagnet experiences jamming, coil burnout, or other faults, a large number of panel components must be removed for repair, further extending equipment downtime and affecting the reliability of the power supply system. Utility Model Content

[0005] The purpose of this invention is to provide a transfer device for testing the switching characteristics of a trolley.

[0006] This utility model is implemented by the following technical solution: a trolley switch characteristic test adapter, which includes a rectifier, a conversion circuit, a test circuit, and an operation circuit; The input terminal of the rectifier is connected to an external power supply, and the output terminal of the rectifier is electrically connected to the conversion circuit, the test circuit, and the operation circuit, respectively. The conversion circuit, the test circuit, and the operation circuit are connected in parallel. The test circuit includes a normally open contact of a first contactor KM1, a coil of a time relay KT, a lockout control branch, and an energy storage control branch. One end of the normally open contact of the first contactor KM1 is connected to the output terminal of the rectifier, and the other end of the normally open contact of the first contactor KM1 is connected to the lockout control branch and the energy storage control branch respectively through the coil of the time relay KT. The interlocking control branch includes interlocking circuit terminals a1-a2 and interlocking indicator light HL3 connected in series. The energy storage control branch includes the energizing delay disconnection contact of time relay KT, energy storage circuit terminals b1-b2 and energy storage indicator light HL4 connected in series.

[0007] Furthermore, the output terminal of the rectifier is connected to a switching characteristic tester via a power supply plug.

[0008] Furthermore, the switching circuit includes a changeover switch SA, an operation position indicator branch, and a test position indicator branch. One end of the changeover switch SA is connected to the output terminal of the rectifier, and the other end of the changeover switch SA is in active contact with the contacts of the operation position indicator branch and the test position indicator branch, respectively. The operation position indicator branch and the test position indicator branch are arranged in parallel. The operation position indicator branch includes the coil of the first contactor KM1, the normally closed contact of the second contactor KM2, and the test position indicator light HL1, which are arranged in series. The test position indicator branch includes the coil of the second contactor KM2, the normally closed contact of the first contactor KM1, and the operation position indicator light HL2, which are arranged in series.

[0009] Furthermore, the operating circuit includes a normally open contact of a second contactor KM2, a closing control branch, and a opening control branch. One end of the normally open contact of the second contactor KM2 is connected to the output terminal of the rectifier, and the other end of the normally open contact of the second contactor KM2 is connected to the closing control branch and the opening control branch, respectively. The closing control branch and the opening control branch are arranged in parallel. The closing control branch includes a closing button SB1, closing circuit terminals c1-c2, and a closing indicator light HL5 arranged in series. The opening control branch includes an opening button SB2, opening circuit terminals d1-d2, and an opening indicator light HL6 arranged in series.

[0010] The advantages of this invention are as follows: The device integrates energy storage, interlocking, and opening / closing tests into a single unit housed in a housing, making it easy to carry. It is also convenient for use in trolley switch characteristic tests, reducing the amount of equipment carried and the time required for on-site setup, simplifying the wiring process, and lowering the error rate. In the test circuit, the use of a changeover switch, operating position indicator branch, and test position indicator branch enables automatic interlocking and unlocking, reducing the labor intensity of manual operation and lowering the risk. The indicator lights facilitate observation of the interlocking and unlocking status and the integrity of the test components. Attached Figure Description

[0011] To more clearly illustrate the technical solutions in the embodiments of this utility model or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0012] Figure 1 This is a schematic diagram of the structure of the utility model; In the diagram: 1. Rectifier; 2. Switching circuit; 3. Test circuit; 4. Operation circuit; 5. External power supply; 6. Time relay KT; 7. Lockout control branch; 8. Energy storage control branch; 9. Operation position indicator branch; 10. Test position indicator branch; 11. Closing control branch; 12. Opening control branch; 13. Second contactor KM2; 14. First contactor KM1; 15. Closing button SB1; 16. Opening button SB2; 17. Lockout circuit terminals a1-a2; 18. Energy storage circuit terminals b1-b2; 19. Closing circuit terminals c1-c2; 10. Opening circuit terminals d1-d2; 11. Test position indicator HL1; 12. Operation position indicator HL2; 13. Lockout indicator HL3; 14. Energy storage indicator HL4; 15. Closing indicator HL5; 16. Opening indicator HL6; 8. Switch characteristic tester; 9. Changeover switch SA. Detailed Implementation

[0013] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0014] like Figure 1 As shown, the trolley switch characteristic test adapter includes a rectifier 1, a switching circuit 2, a test circuit 3, and an operating circuit 4. The input terminal of rectifier 1 is connected to the external power supply 5, and the output terminal of rectifier 1 is electrically connected to the conversion circuit 2, the test circuit 3 and the operation circuit 4 respectively. The conversion circuit 2, the test circuit 3 and the operation circuit 4 are connected in parallel. The test circuit 3 includes the normally open contact of the first contactor KM1, the coil of the time relay KT, the interlocking control branch 6, and the energy storage control branch 7. One end of the normally open contact of the first contactor KM1 is connected to the output terminal of the rectifier 1, and the other end of the normally open contact of the first contactor KM1 is connected to the interlocking control branch 6 and the energy storage control branch 7 respectively through the coil of the time relay KT. The interlocking control branch 6 includes interlocking circuit terminals a1-a2 and interlocking indicator light HL3, which are connected in series. The energy storage control branch 7 includes the energizing delay disconnection contact of the time relay KT, energy storage circuit terminals b1-b2 and energy storage indicator light HL4, which are connected in series.

[0015] The output terminal of rectifier 1 is connected to a switch characteristic tester 8 via a power supply plug.

[0016] The switching circuit 2 includes a changeover switch SA, an operation position indicator branch 9, and a test position indicator branch 10. One end of the changeover switch SA is connected to the output terminal of the rectifier 1, and the other end of the changeover switch SA is in active contact with the contacts of the operation position indicator branch 9 and the test position indicator branch 10, respectively. The operation position indicator branch 9 and the test position indicator branch 10 are connected in parallel. The operation position indicator branch 9 includes the coil of the first contactor KM1, the normally closed contact of the second contactor KM2, and the test position indicator light HL1, which are connected in series. The test position indicator branch 10 includes the coil of the second contactor KM2, the normally closed contact of the first contactor KM1, and the operation position indicator light HL2, which are connected in series.

[0017] The operating circuit 4 includes a normally open contact of the second contactor KM2, a closing control branch 11, and a opening control branch 12. One end of the normally open contact of the second contactor KM2 is connected to the output terminal of the rectifier 1, and the other end of the normally open contact of the second contactor KM2 is connected to the closing control branch 11 and the opening control branch 12 respectively. The closing control branch 11 and the opening control branch 12 are arranged in parallel. The closing control branch 11 includes a closing button SB1, closing circuit terminals c1-c2, and a closing indicator light HL5 arranged in series. The opening control branch 12 includes an opening button SB2, opening circuit terminals d1-d2, and an opening indicator light HL6 arranged in series.

[0018] This device integrates energy storage, interlocking, and opening / closing tests into one unit, reducing the amount of equipment carried and the time required for on-site setup, simplifying the wiring process, and lowering the error rate. In test circuit 3, the automatic interlocking and unlocking are achieved by using a changeover switch, operation position indicator branch 9, and test position indicator branch 10, reducing the labor intensity of manual operation and lowering the risk. Under the influence of the indicator lights, it is easy to observe the interlocking and unlocking status and whether the test components are intact.

[0019] The specific operation process of this embodiment is as follows: The rectifier 1 is connected to an external AC power source and converted into DC power to power the conversion circuit 2, the test circuit 3, and the operation circuit 4.

[0020] Test site: In the switching circuit 2, when the switching switch SA is switched to contact the test position indicator branch 10, the coil of the first contactor KM1 is energized and the test position indicator light HL1 lights up. In test circuit 3, the locking circuit terminals a1-a2 are connected to the locking circuit (locking electromagnet) of the trolley switch, and the energy storage circuit terminals b1-b2 are connected to the energy storage circuit (energy storage motor, limit switch) of the trolley switch. The normally open contact of the first contactor KM1 closes, and the coil of the time relay KT is energized. The energy storage motor of the trolley switch is powered by the energy storage control branch 7 to meet the locking operation requirements of the locking electromagnet. The trigger time of the time relay KT is set according to the energy storage status of the energy storage motor. When the set time is reached, the energy storage circuit of the trolley switch is automatically disconnected to effectively protect the energy storage motor. When the corresponding locking control branch 6 is energized, the locking indicator HL3 lights up, and when the energy storage control branch 7 is energized, the energy storage indicator HL4 lights up.

[0021] Operation bit: In the changeover switch, when the changeover switch SA is switched to contact the operation position indicator branch 9, the coil of the second contactor KM2 is energized and the operation position indicator light HL2 lights up; In operating circuit 4, the normally open contact of the second contactor KM2 closes, connecting the closing circuit terminals c1-c2 to the closing circuit (closing coil) of the trolley switch, and the opening circuit terminals d1-d2 to the opening circuit (opening coil) of the trolley switch. The switch characteristic tester 8 is then connected to the output terminal of the rectifier 1. When performing the closing test, press the closing button SB1, and the closing indicator light HL5 will light up. Connect the measuring line of the switch characteristic tester 8 to the closing circuit to measure different performance values. During the tripping test, press the tripping button SB2, and the tripping indicator HL6 will light up. Connect the measuring line of the switch characteristic tester 8 to the tripping circuit to measure different performance values.

[0022] The above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present utility model should be included within the protection scope of the present utility model.

Claims

1. A trolley switch characteristic test adapter, characterized in that, It includes a rectifier, a conversion circuit, a test circuit, and an operating circuit; The input terminal of the rectifier is connected to an external power supply, and the output terminal of the rectifier is electrically connected to the conversion circuit, the test circuit, and the operation circuit, respectively. The conversion circuit, the test circuit, and the operation circuit are connected in parallel. The test circuit includes a normally open contact of a first contactor KM1, a coil of a time relay KT, a lockout control branch, and an energy storage control branch. One end of the normally open contact of the first contactor KM1 is connected to the output terminal of the rectifier, and the other end of the normally open contact of the first contactor KM1 is connected to the lockout control branch and the energy storage control branch respectively through the coil of the time relay KT. The interlocking control branch includes interlocking circuit terminals a1-a2 and interlocking indicator light HL3 connected in series. The energy storage control branch includes the energizing delay disconnection contact of time relay KT, energy storage circuit terminals b1-b2 and energy storage indicator light HL4 connected in series.

2. The trolley switch characteristic test adapter according to claim 1, characterized in that, The output terminal of the rectifier is connected to a switching characteristic tester via a power supply plug.

3. The trolley switch characteristic test adapter according to claim 2, characterized in that, The switching circuit includes a changeover switch SA, an operation position indicator branch, and a test position indicator branch. One end of the changeover switch SA is connected to the output terminal of the rectifier, and the other end of the changeover switch SA is in active contact with the contacts of the operation position indicator branch and the test position indicator branch, respectively. The operation position indicator branch and the test position indicator branch are arranged in parallel. The operation position indicator branch includes the coil of the first contactor KM1, the normally closed contact of the second contactor KM2, and the test position indicator light HL1, which are arranged in series. The test position indicator branch includes the coil of the second contactor KM2, the normally closed contact of the first contactor KM1, and the operation position indicator light HL2, which are arranged in series.

4. The trolley switch characteristic test adapter according to claim 3, characterized in that, The operating circuit includes a normally open contact of a second contactor KM2, a closing control branch, and a opening control branch. One end of the normally open contact of the second contactor KM2 is connected to the output terminal of the rectifier, and the other end of the normally open contact of the second contactor KM2 is connected to the closing control branch and the opening control branch, respectively. The closing control branch and the opening control branch are arranged in parallel. The closing control branch includes a closing button SB1, closing circuit terminals c1-c2, and a closing indicator light HL5 arranged in series. The opening control branch includes an opening button SB2, opening circuit terminals d1-d2, and an opening indicator light HL6 arranged in series.