A steel structure derrick

By designing a pre-assembled connection of frame units for steel structure derricks, the problems of low construction efficiency and inconvenient transportation of traditional derricks were solved, thereby improving construction efficiency and reducing transportation costs.

CN224981089UActive Publication Date: 2026-11-17DONGNAN ELEVATOR
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522325186.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-03
Publication Date
2026-11-17
Estimated Expiration
2035-11-03

AI Technical Summary

Technical Problem

Traditional steel structure elevator shafts have low construction efficiency, high labor costs, and the finished elevator shafts are large in volume, making transportation inconvenient and increasing costs.

Method used

Design a steel structure derrick, including frame units, with the first and second frame components connected by a second crossbar to achieve pre-assembly, reduce transportation space, and facilitate loading and handling.

Benefits of technology

It improved construction efficiency, reduced transportation space, and lowered transportation costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224981089U_ABST
    Figure CN224981089U_ABST
Patent Text Reader

Abstract

This utility model relates to a steel structure derrick, comprising frame units, several frame units vertically stacked to form the derrick; each frame unit includes a first frame assembly, a second frame assembly, and a first crossbar, with a second crossbar provided on the side of the first frame assembly, the second crossbar being perpendicular to the plane of the first frame assembly; during transportation, the second frame assembly is connected to the first frame assembly via the second crossbar; after installation, the second frame assembly is connected to the first frame assembly via the first and second crossbars. The connection between the first and second frame assemblies via the second crossbar achieves pre-assembly of the derrick, improving on-site construction efficiency; it also reduces the space occupied during transportation, facilitating loading, transportation, and handling, and saving transportation costs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of elevator technology, and in particular to a steel structure hoist. Background Technology

[0002] Traditional steel elevator shaft frames are constructed by workers using bolts to connect crossbars and columns, based on materials delivered to the site and the shaft frame construction drawings. However, this method is inefficient and labor-intensive. Therefore, currently, multiple prefabricated elevator shaft frames are typically transported to the fabrication site for assembly and installation.

[0003] However, the finished elevator shaft is quite large in volume and occupies a relatively large space during transportation, making it inconvenient to load, transport, and move, which increases transportation costs and affects work efficiency.

[0004] Based on the above-mentioned technical problems, this application proposes a steel structure derrick. Utility Model Content

[0005] The purpose of this utility model is to provide a steel structure derrick to solve the technical problems mentioned in the background art. This purpose is achieved through the following technical solution: A steel structure derrick includes frame units, and several frame units are vertically stacked to form a derrick. Each frame unit includes a first frame assembly, a second frame assembly, and a first crossbar. Both the first and second frame assemblies are rectangular frames. A second crossbar is provided on the side of the first frame assembly, and the second crossbar is perpendicular to the plane on which the first frame assembly is located. During transportation, the second frame assembly is connected to the first frame assembly through the second crossbar. After installation, the second frame assembly is connected to the first frame assembly through the first and second crossbars.

[0006] Furthermore, the first frame component includes a first column and a first beam, the first column and the first beam forming a rectangular frame.

[0007] Furthermore, the second frame component includes a second column and a second beam, the second column and the second beam forming a rectangular frame.

[0008] Furthermore, during transport, the first crossbar is installed at an angle between the first frame assembly and the second frame assembly.

[0009] Furthermore, a reinforcing component is provided between the first frame component and the second crossbar.

[0010] Furthermore, connecting plates are provided at the bottom of the lowest frame unit and at the top of the highest frame unit.

[0011] Furthermore, the second horizontal bar is shorter than the length of the first horizontal bar.

[0012] The technical solutions provided in this application have at least the following technical effects or advantages: The connection between the first and second frame components is achieved by using the second crossbar, which not only enables the pre-assembly of the derrick and improves the efficiency of on-site construction, but also reduces the space occupied during transportation, facilitates loading, transportation and handling, and saves transportation costs. Attached Figure Description

[0013] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0014] Figure 1 This is a schematic diagram of the first frame structure of an embodiment of this application; Figure 2 This is a schematic diagram of the second frame structure of an embodiment of this application; Figure 3 This is a schematic diagram of the derrick transportation status according to an embodiment of this application; Figure 4 This is a schematic diagram showing the connections between the framework units in an embodiment of this application; Figure 5 This is a schematic diagram of the derrick installation state according to an embodiment of this application; Figure 6 This is a schematic diagram showing the connection between the first and second horizontal bars in an embodiment of this application.

[0015] Reference numerals: 1. First frame assembly; 11. First column; 12. First crossbeam; 13. First connecting beam; 2. Second frame assembly; 21. Second column; 22. Second crossbeam; 23. Second connecting beam; 3. First crossbar; 4. Second crossbar; 5. Reinforcing assembly; 51. Reinforcing rod; 52. Reinforcing plate; 6. Connecting plate; 7. Connecting piece; 8. Connecting block. Detailed Implementation

[0016] To further illustrate the technical means and effects adopted by this utility model in order to achieve the intended utility model purpose, the following detailed description of the specific implementation methods, structure, features and effects of this utility model is provided in conjunction with the accompanying drawings and preferred embodiments.

[0017] like Figure 1-6 The steel structure derrick shown includes two frame units, which are vertically stacked to form the derrick. Each frame unit includes a first frame assembly 1, a second frame assembly 2, and a first crossbar 3. Both the first frame assembly 1 and the second frame assembly 2 are rectangular frames spliced ​​together from steel sections.

[0018] like Figure 1 As shown, the first frame assembly 1 includes first columns 11 and first crossbeams 12. Two first columns 11 and two first crossbeams 12 are bolted together to form a rectangular frame. A first connecting beam 13 is also installed between the two first crossbeams 12. The first connecting beam 13 can be used to install elevator accessories and enhance the structural strength of the first frame assembly 1. Six second crossbars 4 are bolted to the right side of the first frame assembly 1. The second crossbars 4 are perpendicular to the plane of the first frame assembly 1. A reinforcing assembly 5 is installed between the first frame assembly 1 and the second crossbars 4. The reinforcing assembly 5 includes reinforcing rods 51 and reinforcing plates 52. The reinforcing rods 51 are vertically installed between the free ends of the two second crossbars 4, and the reinforcing plates 52 are installed between the second crossbars 4 and the first frame assembly 1 to enhance the stability of the second crossbars 4.

[0019] like Figure 2 As shown, the second frame assembly 2 includes second columns 21 and second crossbeams 22. The two second columns 21 and the two second crossbeams 22 are bolted together to form a rectangular frame. A second connecting beam 23 is installed between the two second crossbeams 22. The second connecting beam 23 can be used to install elevator accessories and enhance the structural strength of the second frame assembly 2.

[0020] like Figures 3-4 As shown, the two frame units are connected by connecting pieces 7. Connecting plates 6 are fixed to the four corners of the bottom of the bottom frame unit and the four corners of the top of the top frame unit. The connecting plates 6 are connected to the bottom and top of the elevator shaft by expansion bolts to fix the shaft frame.

[0021] like Figure 3 As shown, the second crossbar 4 is shorter than the length of the first crossbar 4. During transportation, the second frame assembly 2 is connected to the first frame assembly 1 via the second crossbar 4, and the first crossbar 3 is installed obliquely between the sides of the first frame assembly 1 and the second frame assembly 2. The connection between the first frame assembly 1 and the second frame assembly 2 via the second crossbar 4 allows for pre-assembly of the steel structure derrick, improving on-site construction efficiency; it also reduces the size of the derrick, facilitating its handling and transportation.

[0022] like Figure 5 , Figure 6 As shown, during installation, the second frame assembly 2 is first separated from the first frame assembly 1. The first frame assembly 1 and the second frame assembly 2 are then hoisted into the elevator shaft, and the first horizontal bar 3 and the second horizontal bar 4 are connected via connecting block 8, thus connecting the second frame assembly 2 to the first frame assembly 1 through the first horizontal bar 3 and the second horizontal bar 4. Finally, after adjusting the verticality and distance from the wall, it is fixed with expansion bolts. If there is sufficient space on site, it can also be assembled outside and then hoisted into the elevator shaft as a whole for adjustment and fixation.

[0023] The technical solutions provided in this application have at least the following technical effects or advantages: The connection between the first and second frame components is achieved by using the second crossbar, which not only enables the pre-assembly of the derrick and improves the efficiency of on-site construction, but also reduces the space occupied during transportation, facilitates loading, transportation and handling, and saves transportation costs.

[0024] The above description is merely a preferred embodiment of the present utility model and is not intended to limit the present utility model in any way. Although the present utility model has been disclosed above with reference to a preferred embodiment, it is not intended to limit the present utility model. Any person skilled in the art can make some modifications or alterations to the above-disclosed technical content to create equivalent embodiments without departing from the scope of the present utility model. Any simple modifications, equivalent changes and alterations made to the above embodiments based on the technical essence of the present utility model without departing from the scope of the present utility model shall still fall within the scope of the present utility model.

Claims

1. A steel structure derrick characterized by, The device includes frame units, and several frame units are vertically stacked to form a derrick. Each frame unit includes a first frame assembly, a second frame assembly, and a first crossbar. Both the first frame assembly and the second frame assembly are rectangular frames. A second crossbar is provided on the side of the first frame assembly, and the second crossbar is perpendicular to the plane on which the first frame assembly is located. During transportation, the second frame assembly is connected to the first frame assembly through the second crossbar. After installation, the second frame assembly is connected to the first frame assembly through the first crossbar and the second crossbar.

2. The steel structure derrick according to claim 1, characterized in that, The first frame component includes a first column and a first beam, the first column and the first beam forming a rectangular frame.

3. A steel structure derrick according to claim 1, characterized in that, The second frame component includes a second column and a second beam, the second column and the second beam forming a rectangular frame.

4. A steel structure derrick according to claim 1, characterized in that, During transport, the first crossbar is installed at an angle between the first frame assembly and the second frame assembly.

5. A steel structure derrick according to claim 1, characterized in that, A reinforcing component is provided between the first frame component and the second crossbar.

6. A steel structure derrick according to claim 1, characterized in that, A connecting plate is provided at the bottom of the lowest frame unit and at the top of the highest frame unit.

7. A steel structure derrick according to claim 1, characterized in that, The second horizontal bar is shorter than the length of the first horizontal bar.