A roadbed for mitigating uneven road settlement
By employing a multi-layered reinforcement and fill structure in the roadbed, combined with an integrated pile network design of geotextile, geocells, and construction waste particles, a vertical and horizontal drainage system is formed, which solves the problem of uneven settlement of the roadbed and improves the bearing capacity and stability of the roadbed.
Patent Information
- Application Number
- CN202521857736.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-08-29
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2035-08-29
AI Technical Summary
In existing technologies, rigid foundations cannot effectively release the additional stress caused by uneven settlement of the foundation, leading to problems such as cracking of beam-column joints and leakage of walls. Furthermore, traditional crushed stone piles are insufficient in resisting uneven settlement.
The roadbed structure adopts alternating layers of reinforcement and fill. Reinforcement piles penetrate the roadbed and are fixedly connected to the reinforcement layers. Geotextile, geocells and construction waste particles are used to form an integral pile network structure. The geogrid cylinder works in conjunction with the fill layer, and drainage holes and intercepting channels are combined to form a vertical and horizontal drainage system.
It effectively controls uneven settlement, improves the bearing capacity and stability of the roadbed, prevents fine particles from entering the interlayer, promotes the smooth drainage of water, enhances the overall anti-settlement capacity of the roadbed, and makes up for the shortcomings of traditional crushed stone piles.
Smart Images

Figure CN224981990U_ABST
Abstract
Description
Technical Field
[0001] This utility model belongs to the field of roadbed reinforcement technology, and in particular relates to a roadbed for mitigating uneven road settlement. Background Technology
[0002] In the field of civil engineering, the stability of the foundation directly determines the overall safety and durability of the road superstructure. However, uneven foundation settlement, as a common engineering problem, has long been one of the core challenges plaguing engineering construction. It can not only lead to cracking and functional failure of the pavement structure, but may even cause major safety accidents, resulting in huge economic losses and social impacts.
[0003] In existing technologies, rigid foundations are typically used in an attempt to resist settlement deformation by enhancing structural stiffness. However, when uneven settlement occurs in the foundation, rigid structures cannot effectively release additional stress, which can easily lead to problems such as cracking at beam-column joints and wall leakage. Utility Model Content
[0004] Based on the above analysis, the present invention aims to provide a roadbed for mitigating uneven road settlement, thereby solving the problem of uneven or significant uneven settlement of roadbeds in the technology.
[0005] This utility model provides a roadbed for mitigating uneven road settlement, including reinforcing piles, multiple reinforcing layers, and multiple fill layers;
[0006] Multiple layers of reinforcement and multiple layers of fill are stacked alternately, and the reinforcement piles penetrate through the multiple layers of reinforcement and multiple layers of fill and are fixedly connected to the reinforcement layers;
[0007] The reinforcement layer includes a first geotextile, construction waste particles, geocells, and a second geotextile. The first geotextile, geocells, and second geotextile are stacked sequentially, and the construction waste particles fill the cavities of the geocells.
[0008] Furthermore, the reinforcing pile includes a geotextile inner cylinder, a geogrid cylinder, and a geotextile outer cylinder, which are sequentially fitted and bonded together from the inside out, with the geotextile inner cylinder filled with crushed stone.
[0009] Furthermore, drainage holes are provided on the side walls of the geocell chamber.
[0010] Furthermore, the diameter of the drainage hole is 0.3cm to 0.5cm, and construction waste particles are filled into the drainage hole.
[0011] Furthermore, there are multiple drainage holes.
[0012] Furthermore, there are three drainage holes, arranged in a triangular pattern.
[0013] Furthermore, drainage ditches are constructed on the slopes of the roadbed and below the reinforcement layer.
[0014] Furthermore, both the fill layer and the reinforcement layer consist of three layers.
[0015] Furthermore, the fill layers are the first fill layer, the second fill layer, and the third fill layer;
[0016] The reinforcement layers are the first reinforcement layer, the second reinforcement layer, and the third reinforcement layer.
[0017] Furthermore, the first fill layer, the first reinforcement layer, the second fill layer, the second reinforcement layer, the third fill layer, and the third reinforcement layer are stacked sequentially from top to bottom.
[0018] Compared with the prior art, the present invention can achieve at least one of the following beneficial effects:
[0019] A) The roadbed provided by this utility model for mitigating uneven road settlement has reinforcing piles that penetrate the entire vertical direction of the roadbed and are fixedly connected to the reinforcing layer, forming an integral and stable pile network structure inside the roadbed. This can effectively improve the roadbed's ability to resist uneven settlement, achieve effective control of uneven settlement, and thus improve the roadbed's bearing capacity and stability.
[0020] B) The roadbed provided by this utility model for mitigating uneven road settlement uses geocells instead of conventional geogrids. At the same time, the geocells are filled with construction waste particles with structural strength, which can ensure that the reinforcement layer has sufficient mechanical strength. Meanwhile, the first geotextile, the geocells and the second geotextile form a sandwich structure, which can prevent fine particles from entering the three-dimensional honeycomb grid cells and ensure that there are sufficient gaps between the construction waste particles, thereby promoting the smooth drainage of water in the roadbed.
[0021] C) The roadbed provided by this utility model for mitigating uneven road settlement consists of a geotextile inner cylinder, a geogrid cylinder, and a geotextile outer cylinder bonded sequentially from the inside out. This composite structure provides multiple technical benefits, including "filtration, drainage, air permeability, and protection." By forming a vertically oriented cylindrical geogrid (i.e., a geogrid cylinder) as the outer structure of the reinforcing pile, the synergistic effect of the geogrid cylinder and the fill layer effectively constrains the overall lateral deformation of the reinforcing pile, thereby improving the bearing capacity of the roadbed and compensating for the shortcomings of traditional crushed stone piles.
[0022] In this invention, the above-described technical solutions can be combined with each other to achieve more preferred combinations. Other features and advantages of this invention will be set forth in the following description, and some advantages will become apparent from the description or be learned by practicing the invention. The objectives and other advantages of this invention can be realized and obtained from the description and accompanying drawings, which are particularly pointed out. Attached Figure Description
[0023] The accompanying drawings are for illustrative purposes only and are not intended to limit the scope of the invention. Throughout the drawings, the same reference numerals denote the same parts.
[0024] Figure 1 A schematic diagram of the roadbed structure for mitigating uneven road settlement provided in an embodiment of this utility model;
[0025] Figure 2 A top view of a roadbed reinforcement pile for mitigating uneven road settlement, provided in an embodiment of this utility model;
[0026] Figure 3 This is a schematic diagram of the structure of the reinforcement layer in the roadbed for mitigating uneven road settlement, provided by an embodiment of the present invention.
[0027] Figure label:
[0028] 1-Reinforcing pile; 11-Geotextile inner cylinder; 12-Geogrid cylinder; 13-Geotextile outer cylinder; 14-Crushed stone; 2-Reinforcing layer; 21-First geotextile; 22-Construction waste particles; 23-Geocell; 24-Second geotextile; 3-Backfill layer; 4-Intercepting trench. Detailed Implementation
[0029] The preferred embodiments of the present invention will now be described in detail with reference to the accompanying drawings, which constitute a part of the present invention and are used together with the embodiments of the present invention to illustrate the principles of the present invention, but are not intended to limit the scope of the present invention.
[0030] This utility model embodiment provides a roadbed for mitigating uneven road settlement, see [link to relevant documentation]. Figure 1 It includes a reinforcing pile 1, multiple reinforcing layers 2 and multiple fill layers 3, with the multiple reinforcing layers 2 and multiple fill layers 3 stacked alternately. The reinforcing pile 1 penetrates the multiple reinforcing layers 2 and multiple fill layers 3 and is fixedly connected to the reinforcing layer 2.
[0031] Among them, see Figure 2 The reinforcement layer 2 includes a first geotextile 21, construction waste particles 22, geocells 23 and a second geotextile 24. The first geotextile 21, geocells 23 and the second geotextile 24 are stacked in sequence, and the construction waste particles 22 are filled in the cavities of the geocells 23.
[0032] Compared with the prior art, the roadbed provided by this utility model embodiment for mitigating uneven road settlement has, on the one hand, a reinforcing pile 1 that penetrates the entire roadbed vertically, and the reinforcing pile 1 is fixedly connected to the reinforcing layer 2, thereby forming an integral and stable pile network structure inside the roadbed, effectively improving the roadbed's ability to resist uneven settlement, achieving effective control of uneven settlement, and thus improving the roadbed's bearing capacity and stability.
[0033] On the other hand, geocells 23 are used to replace conventional geogrids. At the same time, construction waste particles 22 with structural strength are filled in the geocells 23 to ensure that the reinforcement layer 2 has sufficient mechanical strength. Meanwhile, the first geotextile 21, geocells 23 and the second geotextile 24 form a sandwich structure, which can prevent fine particles from entering the geocells 23 and ensure that there are sufficient gaps between the construction waste particles 22, thereby promoting the smooth drainage of water in the subgrade.
[0034] Taking into account the overall structure of the roadbed and the degree of control over uneven settlement, for example, the number of the above-mentioned fill layer 3 and reinforcement layer 2 are both three layers, namely, the first fill layer, the second fill layer, the third fill layer, the first reinforcement layer, the second reinforcement layer and the third reinforcement layer from top to bottom. The first fill layer, the first reinforcement layer, the second fill layer, the second reinforcement layer, the third fill layer and the third reinforcement layer are stacked sequentially from top to bottom.
[0035] To enable interconnected vertical and horizontal drainage, see [link / reference]. Figure 2 The aforementioned reinforcing pile 1 includes a geotextile inner cylinder 11, a geogrid cylinder 12, and a geotextile outer cylinder 13, which are sequentially fitted and bonded together from the inside out. The geotextile inner cylinder 11 is filled with crushed stone 14.
[0036] In this way, the geotextile inner cylinder 11, geogrid cylinder 12 and geotextile outer cylinder 13, which are bonded from the inside to the outside, are used in combination and have comprehensive performance of "filtration-drainage-breathing-protection". By forming the geogrid into a cylinder along the vertical direction (i.e. geogrid cylinder 12) as the outer structure of the reinforcing pile 1, the geogrid cylinder 12 and the fill layer 3 work together to effectively constrain the overall lateral deformation of the reinforcing pile 1, thereby improving the bearing capacity of the roadbed and making up for the shortcomings of traditional crushed stone piles.
[0037] It should be noted that in order to form lateral drainage within the roadbed, drainage holes are opened on the grid sidewalls of geocell 23, and the number of drainage holes is multiple.
[0038] For example, there are three drainage holes arranged in a triangle to reduce the impact of the drainage holes on the structural strength of the geocell 23. Construction waste particles 22 are filled into the drainage holes, so that the construction waste particles 22 between the multiple chambers of the geocell 23 are connected into a whole.
[0039] For example, the diameter of the drainage hole is 0.3cm to 0.5cm, and the construction waste particles 22 are filled in the drainage hole, so that the construction waste particles 22 between the multiple chambers of the geocell 23 are connected into a whole.
[0040] In order to facilitate the timely drainage of water in the roadbed, a water interception trough 4 is opened on the slope of the roadbed and below the reinforcement layer 2. In this way, the installation of the reinforcement pile 1, the reinforcement layer 2 and the water interception trough 4 can form a complete vertical and horizontal drainage structure, which can facilitate the timely and smooth drainage of rainwater in the roadbed to the outside of the roadbed, avoid the erosion of the roadbed by rainwater, and further reduce the uneven settlement of the roadbed.
[0041] The above description is only a preferred embodiment of the present utility model, but the protection scope of the present utility model is not limited thereto. Any changes or substitutions that can be easily conceived by those skilled in the art within the technical scope disclosed in the present utility model should be included within the protection scope of the present utility model.
Claims
1. A roadbed for mitigating uneven settlement of a road, characterized by, This includes reinforcing piles, multiple reinforcing layers, and multiple fill layers; Multiple layers of reinforcement and multiple layers of fill are stacked alternately, and the reinforcement piles penetrate through the multiple layers of reinforcement and multiple layers of fill and are fixedly connected to the reinforcement layers; The reinforcement layer includes a first geotextile, construction waste particles, geocells, and a second geotextile, which are stacked sequentially, with the construction waste particles filling the cavities of the geocells. The reinforcing pile includes a geotextile inner cylinder, a geogrid cylinder, and a geotextile outer cylinder, which are sequentially nested and bonded together from the inside out, and the geotextile inner cylinder is filled with crushed stone.
2. The roadbed for mitigating uneven road settlement according to claim 1, characterized in that, Drainage holes are provided on the side walls of the geocell.
3. The roadbed for mitigating uneven road settlement according to claim 2, characterized in that, The drainage hole has a diameter of 0.3cm to 0.5cm, and the construction waste particles are filled into the drainage hole.
4. The roadbed for mitigating uneven road settlement according to claim 2, characterized in that, The number of drainage holes is multiple.
5. The roadbed for mitigating uneven road settlement according to claim 4, characterized in that, The number of drainage holes is three, and the three drainage holes are arranged in a triangle.
6. The roadbed for mitigating uneven road settlement according to claim 1, characterized in that, Water interception channels are opened on the slopes of the roadbed and below the reinforcement layer.
7. The roadbed for mitigating uneven road settlement according to claim 1, characterized in that, The number of fill layers and reinforcement layers is three.
8. The roadbed for mitigating uneven road settlement according to claim 7, characterized in that, The fill layers are the first fill layer, the second fill layer, and the third fill layer; The reinforcement layers are a first reinforcement layer, a second reinforcement layer, and a third reinforcement layer.
9. The roadbed for mitigating uneven road settlement according to claim 8, characterized in that, The first fill layer, the first reinforcement layer, the second fill layer, the second reinforcement layer, the third fill layer, and the third reinforcement layer are stacked sequentially from top to bottom.