Measuring head and electromagnetic flowmeter
By setting a guide and an outer cone between the signal electrodes of the electromagnetic flowmeter, the problem of insufficient flow velocity was solved, and higher accuracy of flow velocity measurement and induced electromotive force was achieved.
Patent Information
- Application Number
- CN202522680373.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-16
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2035-12-16
AI Technical Summary
Existing electromagnetic flowmeters have a slow fluid velocity between the signal electrodes, resulting in insufficient accuracy in measuring flow velocity.
A flow guide is installed between the signal electrodes. The flow guide extends in a third direction, and the cross-sectional area gradually decreases from the middle to both ends. An outer conical surface is provided on the side of the signal electrode away from the support to reduce the cross-sectional area and resistance of the fluid and guide the fluid to flow smoothly.
The increased flow velocity between the signal electrodes makes the measurement of induced electromotive force more accurate, thus improving the flow velocity measurement accuracy of the electromagnetic flowmeter.
Smart Images

Figure CN224984879U_ABST
Abstract
Description
Technical Field
[0001] This application belongs to the field of flow meter technology, specifically relating to a measuring head and an electromagnetic flow meter. Background Technology
[0002] Fluid flowing in a magnetic field generates an induced electromotive force (EMF), and the fluid velocity is positively correlated with this EMF. Electromagnetic flow meters typically use two signal electrodes to detect the induced EMF generated by the fluid flowing in the magnetic field, and the fluid velocity can be calculated from this EMF. However, the fluid velocity is slower in the section between the two signal electrodes, and the accuracy of flow velocity measurement by electromagnetic flow meters needs improvement. Utility Model Content
[0003] The purpose of this application is to provide a measuring head and an electromagnetic flowmeter to improve the accuracy of the electromagnetic flowmeter in measuring flow velocity.
[0004] To achieve the above objectives, an embodiment of the first aspect of this application provides a measuring head, comprising: a support member; two signal electrodes connected to one end of the support member along a first direction, the two signal electrodes being spaced apart along a second direction, the second direction being perpendicular to the first direction; and a flow guide member connected to the end of the support member where the two signal electrodes are located, the flow guide member being positioned between the two signal electrodes.
[0005] In some embodiments, the guide extends along a third direction, which is perpendicular to the first and second directions; in the third direction, the two ends of the guide are located on both sides of the two signal electrodes; the cross-sectional area of the guide gradually decreases from the middle to both ends along the third direction; along the first direction from the support to the end of the guide away from the support, the size of any cross-section of the guide gradually decreases in the second direction.
[0006] In some embodiments, the guide member has two opposing arcuate surfaces at both ends along the second direction.
[0007] In some embodiments, the signal electrode has an outer conical surface whose axis extends along a first direction; in the first direction, the diameter of the outer conical surface gradually decreases from one end near the support to one end away from the support.
[0008] In some embodiments, a portion of the flow guide is located on the side of the signal electrode away from the support along a first direction.
[0009] An embodiment of the second aspect of this application also provides an electromagnetic flowmeter, including a flowmeter body and a measuring head according to any one of the embodiments of the first aspect, a support member connected to the flowmeter body, and a signal electrode electrically connected to the flowmeter body.
[0010] In some embodiments, the electromagnetic flowmeter is an insertion type electromagnetic flowmeter, and the flowmeter body includes: a measuring device electrically connected to a signal electrode; a connecting rod assembly including a first connecting rod and a second connecting rod, the first connecting rod and the second connecting rod being coaxial and extending along a first direction; the first connecting rod connecting to the measuring device, and the two ends of the second connecting rod along the first direction respectively connecting the first connecting rod and a support member; a support tube extending along the first direction, the support tube being sleeved on the first connecting rod, and the support tube being used to connect the device to be measured; a measuring head being used to insert into the device to be measured; and a pressure ring connected inside the support tube and sleeved on the first connecting rod; the inner diameter of the pressure ring being larger than the diameter of the first connecting rod and smaller than the diameter of the second connecting rod.
[0011] In some embodiments, an annular flange is provided on the inner wall of the support tube; the flow meter body also includes a first sealing ring and an annular fixing member, the first sealing ring being located inside the support tube and sleeved on the first connecting rod; the annular flange, the first sealing ring, the pressure ring and the annular fixing member are arranged sequentially along a first direction, and the annular fixing member is located on the side of the pressure ring away from the second connecting rod along the first direction; the annular fixing member is sleeved on the first connecting rod and threadedly connected to the support tube, and the annular fixing member and the annular flange clamp the pressure ring and the first sealing ring so that the first sealing ring seals the gap between the first connecting rod and the support tube.
[0012] In some embodiments, the second connecting rod is provided with a first mounting hole extending in a first direction, and the flow meter body also includes a magnetic core and a connecting wire assembly disposed in the first mounting hole, the connecting wire assembly electrically connecting the signal electrode to the measuring device; the first mounting hole is filled with sealant; and / or, the electromagnetic flow meter also includes a pressure detection unit, the pressure detection unit is connected to the support tube, and the pressure detection unit is used to measure the pressure in the support tube.
[0013] In some embodiments, the flow meter body further includes a directional indicator and a fixing component, the directional indicator being connected to the measuring device; the fixing component being detachably connected to the directional indicator and the support tube, respectively.
[0014] The beneficial effects of the measuring head and electromagnetic flowmeter provided in this application are as follows: By placing a flow guide between the two signal electrodes, the cross-sectional area of the fluid flowing between them is reduced, thereby increasing the fluid velocity between the two signal electrodes. This makes the fluid velocity between the signal electrodes closer to the velocity value without the measuring head, resulting in more accurate measurement of the induced electromotive force by the signal electrodes. This application improves the accuracy of the electromagnetic flowmeter in measuring flow velocity. Attached Figure Description
[0015] To more clearly illustrate the technical solutions in the embodiments of this application, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0016] Figure 1 Schematic diagram of the structure of the measuring head provided in some embodiments of this application Figure 1 ; Figure 2 Schematic diagram of the structure of the measuring head provided in some embodiments of this application Figure 2 ; Figure 3 A schematic diagram of the flow velocity of the fluid cross-section at the location of the measuring head with the flow guide removed in a pipe, provided for some embodiments of this application; Figure 4 for Figure 3 A schematic diagram of the flow velocity at the center of the fluid cross-section; Figure 5 A schematic diagram of fluid velocity in a pipe with a measuring head provided for some embodiments of this application; Figure 6 A schematic diagram of the flow velocity of a fluid cross-section at the location of a measuring head with a flow guide in a pipe, provided for some embodiments of this application; Figure 7 A schematic diagram illustrating the connection between an electromagnetic flowmeter and a device under test, provided in some embodiments of this application; Figure 8 Cross-sectional view of an electromagnetic flowmeter provided in some embodiments of this application Figure 1 ; Figure 9 for Figure 8 Enlarged view of part A in the middle; Figure 10 An exploded view of the support tube, sealing assembly, locking element, and locking nut provided in some embodiments of this application; Figure 11 Cross-sectional view of an electromagnetic flowmeter provided in some embodiments of this application Figure 2 ; Figure 12 for Figure 11 A magnified view of part B in the middle.
[0017] The following are the labeling elements in the figure: 1000. Electromagnetic flowmeter; 100. Flow meter body; 10. Measuring device; 20. Connecting rod assembly; 21. First connecting rod; 211. Second mounting hole; 22. Second connecting rod; 221. First mounting hole; 30. Support tube; 31. Annular flange; 32. Positioning flange; 40. Sealing assembly; 41. Pressure ring; 42. First sealing ring; 43. First support ring; 44. Second support ring; 45. Second sealing ring; 46. Third sealing ring; 47. Annular fastener; 471. Inner conical surface; 50. Locking component; 51. Angled surface; 60. Locking nut; 61. Nut body; 62. Supporting flange; 70. Directional sign; 80. Fixing component; 81. Fixing ring; 82. Support plate; 83. Third connecting rod; 84. First nut; 85. Second nut; 90. Magnetic core; 200. Measuring head; 201. Support component; 202. Signal electrode; 2021. Outer conical surface; 203. Flow guide; 2031. Arc-shaped surface; 204. Point; 300. Pressure detection unit; 2000, short pipe; 3000, ball valve; 4000, Device to be tested. Detailed Implementation
[0018] To make the technical problems, technical solutions, and beneficial effects to be solved by this application clearer, the following detailed description is provided in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and are not intended to limit the scope of this application.
[0019] It should be noted that when a component is referred to as being "fixed to" or "set on" another component, it can be directly on or indirectly on that other component. When a component is referred to as being "connected to" another component, it can be directly connected to or indirectly connected to that other component.
[0020] It should be understood that the terms "length", "width", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this application.
[0021] Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of this application, "multiple" means two or more, unless otherwise explicitly specified.
[0022] An embodiment of the first aspect of this application provides a measuring head capable of detecting the induced electromotive force of a fluid in an electromagnetic flowmeter.
[0023] Please refer to Figure 1 The measuring head 200 includes a support member 201, two signal electrodes 202, and a flow guide 203. The two signal electrodes 202 are connected to one end of the support member 201 along a first direction Z, and are spaced apart along a second direction X, which is perpendicular to the first direction Z. The flow guide 203 is connected to the end of the support member 201 where the two signal electrodes 202 are located, and is situated between the two signal electrodes 202.
[0024] The support 201 can support the signal electrode 202 and the flow guide 203.
[0025] When in use, the measuring head 200 needs to be placed in the fluid. The signal electrode 202 is a conductor. The two signal electrodes 202 are set at intervals and can detect the induced electromotive force generated when the fluid between the two signal electrodes 202 flows in the magnetic field.
[0026] The flow guide 203 is connected to one end of the support member 201 where two signal electrodes 202 are provided, that is, the flow guide 203 and the signal electrodes 202 are located at the same end of the support member 201 along the first direction Z.
[0027] When the measuring head 200 is placed in a pipe or bend to measure flow rate, the fluid flow direction is perpendicular to the spacing direction of the two signal electrodes 202. The flow guide 203 is located between the two signal electrodes 202, meaning it is situated in the gap between them. This reduces the space available for fluid flow between the two signal electrodes 202, resulting in a smaller cross-sectional area and a higher flow velocity. The cross-sectional area of the fluid refers to the section perpendicular to its own flow direction.
[0028] The beneficial effects of this application embodiment are as follows: by providing a flow guide 203 between the two signal electrodes 202, the cross-sectional area of the fluid that can flow between the signal electrodes 202 is reduced, which increases the flow velocity of the fluid between the two signal electrodes 202, making the flow velocity between the signal electrodes 202 closer to the flow velocity value when the measuring head 200 is not provided, and the induced electromotive force measured by the signal electrodes 202 is more accurate. This application embodiment can improve the accuracy of the electromagnetic flowmeter in measuring flow velocity.
[0029] In some embodiments, please refer to Figure 1 and Figure 2 The flow guide 203 extends along a third direction Y, which is perpendicular to the first direction Z and the second direction X. Along the third direction Y, the two ends of the flow guide 203 are located on opposite sides of the two signal electrodes 202. The cross-sectional area of the flow guide 203 gradually decreases from the middle to both ends along the third direction Y. Along the first direction Z from the support 201 to the end of the flow guide 203 away from the support 201, the size of any cross-section of the flow guide 203 gradually decreases along the second direction X.
[0030] The third direction Y is the length direction of the guide member 203. In the third direction Y, the two ends of the guide member 203 are located on opposite sides of the two signal electrodes 202, meaning the two signal electrodes 202 are positioned between the two ends of the guide member 203 in the third direction Y. When the measuring head 200 is placed in the fluid, the fluid flows along the third direction Y; that is, the fluid first flows through one end of the guide member 203 along the third direction Y, and then flows between the two signal electrodes 202.
[0031] The cross-section of the flow guide 203 is perpendicular to the third direction Y. The area of the cross-section of the flow guide 203 gradually decreases from the middle to both ends along the third direction Y. Therefore, when the fluid impacts any end of the flow guide 203 along the third direction Y, the contact area between the fluid and the flow guide 203 is small, the resistance of the flow guide 203 to the fluid is small, the fluid flows faster when passing between the two signal electrodes 202, the fluid velocity between the signal electrodes 202 is closer to the velocity value when the measuring head 200 is not set, and the induced electromotive force measured by the signal electrodes 202 is more accurate.
[0032] Along the first direction Z from the support 201 to the end of the guide 203 away from the support 201, the size of any cross section of the guide 203 perpendicular to the third direction Y gradually decreases in the second direction X. Therefore, the end face area of the guide 203 connected to the support 201 is larger, and the connection between the guide 203 and the support 201 is more stable. Moreover, the end face area of the guide 203 away from the support 201 along the first direction Z is smaller, the friction between the fluid and the end face of the guide 203 away from the support 201 along the first direction Z is smaller, the flow velocity of the fluid flowing through the guide 203 is faster, the fluid velocity between the signal electrodes 202 is closer to the flow velocity value when the measuring head 200 is not set, and the induced electromotive force measured by the signal electrodes 202 is more accurate.
[0033] In some embodiments, please refer to Figure 1 and Figure 2 The guide member 203 has two opposing arc-shaped surfaces 2031 at both ends along the second direction X.
[0034] The two arc-shaped surfaces 2031 are the end faces of the flow guide 203 approaching the two signal electrodes 202 along the second direction X. When the fluid flows between the two signal electrodes 202, it flows between the arc-shaped surface 2031 and the signal electrodes 202. The arc-shaped surface 2031 can guide the fluid to flow smoothly, reduce the generation of eddies and turbulence, and make the induced electromotive force measured by the signal electrodes 202 more accurate.
[0035] In some embodiments, please refer to Figure 1 and Figure 2 The signal electrode 202 has an outer conical surface 2021 whose axis extends along a first direction Z; in the first direction Z, the diameter of the outer conical surface 2021 gradually decreases from the end near the support member 201 to the end away from the support member 201.
[0036] The outer conical surface 2021 is the outer surface of the signal electrode 202. The outer conical surface 2021 extends along the first direction Z, that is, the axis of the outer conical surface 2021 extends along the first direction Z. In the first direction Z, the diameter of the outer conical surface 2021 gradually decreases from the end closer to the support member 201 to the end farther away from the support member 201. That is, the end of the signal electrode 202 with a larger diameter is connected to the support member 201.
[0037] The beneficial effects of this embodiment are as follows: The outer surface of the signal electrode 202 is configured as an outer conical surface 2021, which guides the fluid to flow smoothly, reduces the generation of eddies and turbulence, and makes the induced electromotive force measured by the signal electrode 202 more accurate. In the first direction Z, the diameter of the outer conical surface 2021 gradually decreases from the end closer to the support member 201 to the end farther from the support member 201. Therefore, the end of the signal electrode 202 with the larger diameter connects to the support member 201, resulting in a larger end face area where the signal electrode 202 connects to the support member 201, and a more stable connection between the signal electrode 202 and the support member 201.
[0038] In some embodiments, please refer to Figure 1 and Figure 2 A portion of the flow guide 203 is located on the side of the signal electrode 202 away from the support 201 along the first direction Z, that is, the signal electrode 202 is located between a portion of the flow guide 203 and the support 201 along the first direction Z.
[0039] When the measuring head 200 is used, it is usually inserted into the device under test 4000 along the first direction Z. The end of the signal electrode 202 away from the support member 201 along the first direction Z is prone to touching the device under test 4000. The signal electrode 202 is located between the partial guide member 203 and the support member 201 along the first direction Z. When the measuring head 200 is inserted into the device under test 4000 along the first direction Z, the partial guide member 203 located on the side of the signal electrode 202 away from the support member 201 along the first direction Z can make contact with the device under test 4000 in advance, preventing the end of the signal electrode 202 away from the support member 201 along the first direction Z from touching the device under test 4000 and causing damage.
[0040] In some embodiments, please refer to Figure 1 and Figure 2 In the third direction Y, the two end faces of the guide member 203 along the first direction Z and the two ends of the whole of the two arc surfaces 2031 intersect at two points 204 on the support member 201 respectively, and the two ends of the guide member 203 along the third direction Y have less resistance to the fluid.
[0041] Optionally, both points 204 are located on the edge line of the plane connecting the support 201 and the guide 203.
[0042] In some embodiments, please refer to Figure 1 and Figure 2 The two signal electrodes 202 and the flow guide 203 are symmetrically arranged about a plane passing through the center of the flow guide 203 and perpendicular to the second direction X, so that the fluid flow velocity between the flow guide 203 and the two signal electrodes 202 is more consistent.
[0043] In some embodiments, please refer to Figure 1 and Figure 2The cross-section with the largest area of the guide element 203 is located on the same plane as the axis of the two outer conical surfaces 2021. The gap between the guide element 203 and the signal electrode 202 is small, and the fluid flow velocity between the guide element 203 and the signal electrode 202 is fast.
[0044] In some embodiments, please refer to Figure 1 and Figure 2 The support component 201 and the flow guide component 203 are integrally molded. Both are made of polymer compounds, possessing stable chemical properties and unlikely to contaminate the fluid. Optionally, the support component 201 and the flow guide component 203 can be made of plastic for easier processing.
[0045] In some embodiments, please refer to Figure 1 and Figure 2 The measuring head 200 includes a support 201, two signal electrodes 202, and a flow guide 203. The two signal electrodes 202 are connected to one end of the support 201 along a first direction Z, and are spaced apart along a second direction X, which is perpendicular to the first direction Z. Each signal electrode 202 has an outer conical surface 2021 whose axis extends along the first direction Z; in the first direction Z, the diameter of the outer conical surface 2021 gradually decreases from the end near the support 201 to the end away from the support 201.
[0046] A flow guide 203 is connected to one end of the support 201 where two signal electrodes 202 are located, and the flow guide 203 is situated between the two signal electrodes 202. The flow guide 203 extends along a third direction Y, which is perpendicular to the first direction Z and the second direction X. Along the third direction Y, the two ends of the flow guide 203 are located on opposite sides of the two signal electrodes 202. The cross-sectional area of the flow guide 203 gradually decreases from the middle to both ends along the third direction Y. Along the first direction Z from the support 201 to the end of the flow guide 203 away from the support 201, the dimension of any cross-section of the flow guide 203 gradually decreases along the second direction X.
[0047] In some embodiments, please refer to Figures 3 to 6 Flow simulation tests were performed on the measuring head 200. Figures 3 to 6 These are all flow simulation test diagrams. Figures 3 to 6 The colors in the diagram represent flow velocities. The flow velocities corresponding to each color increase sequentially from green to yellow, orange, and red. The flow velocity at the center of the pipe, where no measuring head is installed (200 units), corresponds to the orange color.
[0048] Please refer to Figures 3 to 5The signal electrode 202 is placed in the center of the pipe, and a flow simulation test is performed on the measuring head 200 with the guide 203 removed. The flow velocity of a large portion of the fluid between the two signal electrodes 202 is the flow velocity corresponding to yellow. The flow velocity of a large portion of the fluid between the two signal electrodes 202 is significantly lower than the normal flow velocity in the pipe without the measuring head 200.
[0049] Please refer to Figure 5 and Figure 6 By placing the signal electrode 202 at the center of the pipe and performing flow simulation tests on the measuring head 200 with the flow guide 203, the flow velocity of the fluid between the two signal electrodes 202 was basically the velocity corresponding to the orange color. The flow velocity between the two signal electrodes 202 was closer to the normal flow velocity in the pipe without the measuring head 200. The test results show that the measuring head 200 with the flow guide 203 in this embodiment can increase the flow velocity between the two signal electrodes 202, making the flow velocity between the signal electrodes 202 closer to the flow velocity value without the measuring head 200, thus improving the accuracy of the electromagnetic flowmeter 1000 in measuring flow velocity.
[0050] An embodiment of the second aspect of this application also provides an electromagnetic flowmeter 1000, please refer to... Figures 1 to 7 The electromagnetic flowmeter 1000 includes a flowmeter body 100 and a measuring head 200 in any of the first aspect embodiments. A support member 201 is connected to the flowmeter body 100, and a signal electrode 202 is electrically connected to the flowmeter body 100.
[0051] The electromagnetic flowmeter 1000 is used to measure the flow rate of fluids. Optionally, the electromagnetic flowmeter 1000 can be an insertion type electromagnetic flowmeter, a flange type electromagnetic flowmeter, etc.
[0052] The signal electrode 202 is electrically connected to the flowmeter body 100, so that the signal electrode 202 can transmit the detected induced electromotive force to the flowmeter body 100. The flowmeter body 100 can generate a magnetic field and calculate the flow velocity of the fluid based on the electromotive force.
[0053] When measuring fluid flow rate, the measuring head 200 is placed in the fluid, and the flow meter body 100 generates a magnetic field. When the fluid passes through the magnetic field, an induced electromotive force is generated. The signal electrode 202 transmits the detected electromotive force signal to the flow meter body 100, and the flow meter body 100 calculates the fluid velocity based on the electromotive force.
[0054] The beneficial effects of the embodiments of this application are as follows: the electromagnetic flowmeter 1000 includes the measuring head 200 of any one of the first aspect embodiments, which can increase the flow rate of the fluid between the two signal electrodes 202, making the flow rate of the fluid between the signal electrodes 202 closer to the flow rate value when the measuring head 200 is not set, and the induced electromotive force measured by the signal electrodes 202 is more accurate. Therefore, the fluid flow rate measured by the electromagnetic flowmeter 1000 is more accurate, and the electromagnetic flowmeter 1000 has all the effects of the measuring head 200 in the first aspect embodiment.
[0055] In some embodiments, please refer to Figures 7 to 10 The electromagnetic flowmeter 1000 is an insertion type electromagnetic flowmeter. The flowmeter body 100 includes a measuring device 10, a connecting rod assembly 20, a support tube 30, and a pressure ring 41. The measuring device 10 is electrically connected to the signal electrode 202. The connecting rod assembly 20 includes a first connecting rod 21 and a second connecting rod 22, which are coaxial and extend along a first direction Z. The first connecting rod 21 connects to the measuring device 10, and the two ends of the second connecting rod 22 along the first direction Z are respectively connected to the first connecting rod 21 and the support member 201. The support tube 30 extends along the first direction Z and is sleeved on the first connecting rod 21. The support tube 30 is used to connect the device to be measured 4000; the measuring head 200 is used to insert into the device to be measured 4000. The pressure ring 41 is connected inside the support tube 30 and sleeved on the first connecting rod 21; the inner diameter of the pressure ring 41 is larger than the diameter of the first connecting rod 21 and smaller than the diameter of the second connecting rod 22.
[0056] The measuring device 10 can convert the electromotive force signal transmitted by the signal electrode 202 into the flow rate of the fluid.
[0057] The first connecting rod 21 connects to the measuring device 10, and the second connecting rod 22 connects the first connecting rod 21 and the support member 201 at its two ends along the first direction Z, respectively. That is, the measuring device 10 is connected to the support member 201 via the first connecting rod 21 and the second connecting rod 22. Optionally, the second connecting rod 22 can be connected to the end of the support member 201 away from the signal electrode 202 along the first direction Z. The second connecting rod 22 has a smaller impact on the fluid at the signal electrode 202.
[0058] The support tube 30 is used to connect the device under test 4000. When the electromagnetic flowmeter 1000 is installed, the device under test 4000 has a connection hole. After one end of the support tube 30 along the first direction Z is connected to the device under test 4000, the support tube 30 communicates with the interior of the device under test 4000 through the connection hole. Optionally, the device under test 4000 can be a pipe, a water tank, etc. For example, when the device under test 4000 is a metal pipe, the support tube 30 can be welded to the metal pipe, resulting in a firm connection and good sealing effect. Optionally, when the device under test 4000 is a plastic pipe, the support tube 30 can also be fixed to the plastic pipe using clamps.
[0059] When installing the electromagnetic flowmeter 1000, the measuring head 200 passes through the support tube 30 and is inserted into the device under test 4000 through the connection hole. The measuring head 200 comes into contact with the fluid in the device under test 4000 and can detect the induced electromotive force of the fluid.
[0060] During the installation of the electromagnetic flowmeter 1000, the measuring head 200 needs to be positioned correctly before the first connecting rod 21 is fixed to the support pipe 30. During the adjustment of the measuring head 200, the first connecting rod 21 can move relative to the support pipe 30. During pressurized installation of the electromagnetic flowmeter 1000, the high-pressure fluid can easily push the measuring head 200 towards the end of the support pipe 30 away from the device under test 4000. The inner diameter of the pressure ring 41 is larger than the diameter of the first connecting rod 21. During pressurized installation of the electromagnetic flowmeter 1000, the fluid can flow out of the support pipe 30 through the gap between the pressure ring 41 and the first connecting rod 21, reducing the force exerted by the fluid on the first connecting rod 21 and simplifying the adjustment of the measuring head 200's position.
[0061] If the inner diameter of the pressure ring 41 is smaller than the diameter of the second connecting rod 22, the pressure ring 41 can prevent the second connecting rod 22 from moving along the first direction Z. During the pressurized installation of the electromagnetic flowmeter 1000, the pressure ring 41 can prevent the second connecting rod 22 from moving out of the end of the support tube 30 away from the device under test 4000, thereby preventing the measuring head 200 and the first connecting rod 21 connected to the second connecting rod 22 from moving out of the end of the support tube 30 away from the device under test 4000.
[0062] In some embodiments, please refer to Figures 7 to 10 The inner wall of the support tube 30 is provided with an annular flange 31; the flow meter body 100 also includes a first sealing ring 42 and an annular fixing member 47. The first sealing ring 42 is located inside the support tube 30 and sleeved on the first connecting rod 21. The annular flange 31, the first sealing ring 42, the pressure ring 41 and the annular fixing member 47 are arranged in sequence along the first direction Z. The annular fixing member 47 is located on the side of the pressure ring 41 away from the second connecting rod 22 along the first direction Z.
[0063] The annular fastener 47 is sleeved on the first connecting rod 21 and threadedly connected to the support tube 30. The annular fastener 47 and the annular flange 31 clamp the pressure ring 41 and the first sealing ring 42 so that the first sealing ring 42 seals the gap between the first connecting rod 21 and the support tube 30.
[0064] The first sealing ring 42 is located inside the support tube 30 and sleeved on the first connecting rod 21, that is, the first sealing ring 42 is located in the gap between the support tube 30 and the first connecting rod 21.
[0065] Define the two ends of the support tube 30 along the first direction Z as the first end and the second end, respectively, and the first end is used to connect the device under test 4000. Then, the second connecting rod 22 is located on the side of the pressure ring 41 away from the second end along the first direction Z. The annular fixing member 47 is located on the side of the pressure ring 41 away from the second connecting rod 22 along the first direction Z, that is, the annular fixing member 47 is located on the side of the pressure ring 41 closer to the second end along the first direction Z.
[0066] The annular flange 31, the first sealing ring 42, the pressure ring 41, and the annular fixing member 47 are arranged sequentially along the first direction Z, that is, the first sealing ring 42 and the pressure ring 41 are located between the annular flange 31 and the annular fixing member 47 along the first direction Z. The annular fixing member 47 and the annular flange 31 clamp the pressure ring 41 and the first sealing ring 42. In other words, the annular fixing member 47 and the annular flange 31 clamp the pressure ring 41 and the first sealing ring 42 along the first direction Z, causing the first sealing ring 42 to deform. The size of the first sealing ring 42 in the first direction Z becomes smaller; in the radial direction perpendicular to the first direction Z, the size of the first sealing ring 42 becomes larger and abuts against the inner surface of the support tube 30 and the outer surface of the first connecting rod 21, respectively. The first sealing ring 42 seals the gap between the first connecting rod 21 and the support tube 30.
[0067] Optionally, only a pressure ring 41 and a first sealing ring 42 may be provided between the annular fixing member 47 and the annular flange 31, with the first sealing ring 42 directly abutting against the annular flange 31, thus sealing the area between the first sealing ring 42 and the annular flange 31. Optionally, other components may also be provided between the first sealing ring 42 and the annular flange 31, with the annular fixing member 47 and the annular flange 31 clamping the pressure ring 41, the first sealing ring 42, and other components as a whole.
[0068] The annular fixing member 47 is sleeved on the first connecting rod 21 and threadedly connected to the support pipe 30. That is, the annular fixing member 47 is connected to the support pipe 30, and after rotating the annular fixing member 47, it can move along the first direction Z. When the electromagnetic flowmeter 1000 is installed under pressure, the annular fixing member 47 can be rotated to create a gap between it and the pressure ring 41. At this time, the first sealing ring 42 does not seal the gap between the support pipe 30 and the first connecting rod 21. During the installation of the electromagnetic flowmeter 1000 under pressure, fluid can flow out of the support pipe 30 through the first sealing ring 42. Furthermore, the annular fixing member 47 can prevent the pressure ring 41 from moving, preventing the pressure ring 41 from being pushed out of the support pipe 30 by the fluid.
[0069] After adjusting the position of the measuring head 200, the annular fixing member 47 can be rotated and brought closer to the annular flange 31. The annular fixing member 47 and the annular flange 31 clamp the pressure ring 41 and the first sealing ring 42, so that the first sealing ring 42 seals the gap between the first connecting rod 21 and the support pipe 30. Optionally, the annular fixing member 47 can be a pipe with external threads.
[0070] The beneficial effects of this embodiment are as follows: The annular fixing member 47 is threadedly connected to the support tube 30, and the annular fixing member 47 is positioned on the side of the pressure ring 41 away from the second connecting rod 22 along the first direction Z. During the pressurized installation of the electromagnetic flowmeter 1000, the annular fixing member 47 can prevent the pressure ring 41 from being pushed out of the support tube 30 by the fluid, thereby preventing the second connecting rod 22 from moving out of the end of the support tube 30 away from the device under test 4000. After adjusting the position of the measuring head 200, the annular fixing member 47 can be rotated, causing the annular fixing member 47 and the annular flange 31 to clamp the pressure ring 41 and the first sealing ring 42, deforming the first sealing ring 42 and sealing the gap between the first connecting rod 21 and the support tube 30.
[0071] In some embodiments, please refer to Figures 7 to 10 The flowmeter body 100 also includes a first support ring 43, a second support ring 44, a second sealing ring 45, and a third sealing ring 46. The second support ring 44 is sleeved on the first connecting rod 21 and located inside the support tube 30. The inner diameter of the second support ring 44 is larger than the diameter of the first connecting rod 21. The first support ring 43 and the pressure ring 41 are located on both sides of the first sealing ring 42 along the first direction Z, respectively, and the first support ring 43 and the pressure ring 41 clamp the first sealing ring 42. The annular fixing member 47, the pressure ring 41, the first sealing ring 42, the first support ring 43, the second support ring 44, the second sealing ring 45, and the third sealing ring 46 together form the sealing assembly 40 in the flowmeter body 100.
[0072] The second support ring 44 is disposed between the annular flange 31 and the first support ring 43 along the first direction Z. The second sealing ring 45 is sleeved on the second support ring 44, sealing the gap between the second support ring 44 and the support tube 30. The third sealing ring 46 is sleeved on the first connecting rod 21 and located inside the second support ring 44, sealing the gap between the first connecting rod 21 and the second support ring 44.
[0073] During the pressurized installation of the electromagnetic flowmeter 1000, when adjusting the position of the measuring head 200, the annular fixing member 47 is rotated to create a gap between the annular fixing member 47 and the pressure ring 41. The fluid flows out of the support pipe 30 through the gap between the first connecting rod 21 and the second support ring 44, the gap between the first support ring 43 and the first connecting rod 21, and the gap between the pressure ring 41 and the first connecting rod 21, reducing the force of the fluid on the measuring head 200. When fixing the position of the measuring head 200, the annular fixing member 47 is rotated to hold the pressure ring 41, the first sealing ring 42, the first support ring 43, and the second support ring 44 against the annular flange 31. The first support ring 43 pushes the third sealing ring 46 to move into the gap between the second support ring 44 and the first connecting rod 21, and the third sealing ring 46 seals the gap between the first connecting rod 21 and the second support ring 44. The pressure ring 41 and the first support ring 43 clamp the first sealing ring 42, and the first sealing ring 42 seals the gap between the first connecting rod 21 and the support tube 30. By setting multiple sealing structures at different positions to seal the gap between the support tube 30 and the first connecting rod 21, the sealing effect can be improved.
[0074] In some embodiments, the pressure ring 41 is composed of two semi-circular rings that are not connected. When removing the pressure ring 41, it is not necessary to remove the first connecting rod 21 from the support tube 30; the two semi-circular rings can be directly removed from the support tube 30.
[0075] In some embodiments, the first support ring 43 and the pressure ring 41 are symmetrically arranged about a plane perpendicular to the first direction. The inner diameter of the first support ring 43 is larger than the diameter of the first connecting rod 21 and smaller than the diameter of the second connecting rod 22. When the electromagnetic flowmeter 1000 is installed under pressure, the first support ring 43 can prevent the second connecting rod 22 from moving out of the support tube 30, reducing the collision between the second connecting rod 22 and the first sealing ring 42.
[0076] In some embodiments, please refer to Figure 11 and Figure 12 The second connecting rod 22 is provided with a first mounting hole 221 extending along the first direction Z. The flow meter body 100 also includes a magnetic core 90 and a connecting wire assembly disposed in the first mounting hole 221. The connecting wire assembly electrically connects the signal electrode 202 to the measuring device 10. The first mounting hole 221 is filled with sealant.
[0077] The magnetic core 90 and the connecting wire assembly are disposed in the first mounting hole 221, so the second connecting rod 22 can protect the magnetic core 90 and the connecting wire assembly. The second connecting rod 22 is connected to the measuring head 200. Since the magnetic core 90 is disposed in the first mounting hole 221, the magnetic core 90 is close to the measuring head 200. When the measuring head 200 is placed in the fluid, the magnetic field generated by the magnetic core 90 can cover the fluid around the measuring head 200, and the induced electromotive force generated by the fluid can be detected by the signal electrode 202. Optionally, the magnetic core 90 can be an electromagnet, which facilitates control of the magnetic strength. Optionally, the magnetic core 90 can also be a permanent magnet.
[0078] The connecting wire assembly electrically connects the signal electrode 202 to the measuring device 10. The signal electrode 202 can transmit the detected electromotive force signal to the measuring device 10 through the connecting wire assembly. The connecting wire assembly includes wires that are respectively connected to the two signal electrodes 202, and the signal electrodes 202 are electrically connected to the measuring device 10 through the wires.
[0079] The connecting wire assembly in the first mounting hole 221 passes through the second connecting rod 22 and is electrically connected to the signal electrode 202. The second connecting rod 22 has a hole for the connecting wire assembly to pass through. Fluid may enter the connecting wire assembly through the hole. Sealant fills the first mounting hole 221 to prevent fluid from entering the first mounting hole 221, achieving an IP68 waterproof rating. Furthermore, the sealant bonds the magnetic core 90, the connecting wire assembly, and the second connecting rod 22 together.
[0080] The beneficial effects of this embodiment are as follows: by placing the magnetic core 90 and the connecting wire assembly within the first mounting hole 221 in the second connecting rod 22, the second connecting rod 22 can protect the magnetic core 90 and the connecting wire assembly. Furthermore, the magnetic field generated by the magnetic core 90 can cover the fluid surrounding the measuring head 200, allowing the signal electrode 202 to stably detect the induced electromotive force generated by the fluid. Filling the first mounting hole 221 with sealant prevents fluid from entering the first mounting hole 221 and affecting the magnetic core 90 and the connecting wire assembly. The sealant also bonds the magnetic core 90, the connecting wire assembly, and the second connecting rod 22 together, making the magnetic core 90 and the connecting wire assembly more stable. The sealant also supports the second connecting rod 22, increasing its strength.
[0081] In some embodiments, please refer to Figure 11 and Figure 12 The first mounting hole 221 passes through the second connecting rod 22. The support member 201 is threaded onto the wall of the first mounting hole 221. A sealing ring is provided between the support member 201 and the second connecting rod 22 to prevent fluid from entering the first mounting hole 221.
[0082] In some embodiments, please refer to Figure 11 and Figure 12The first connecting rod 21 also has a second mounting hole 211, which extends through the first connecting rod 21 along the first direction Z. The first connecting rod 21 and the second connecting rod 22 are threaded together. A sealing ring is provided between the first connecting rod 21 and the second connecting rod 22 to prevent fluid from entering the first mounting hole 221 and the second mounting hole 211. The measuring device 10 is connected to the end of the first connecting rod 21 away from the second connecting rod 22 along the first direction Z. The connecting wire assembly passes through the first mounting hole 221 and the second mounting hole 211 and is connected to the measuring device 10. The first connecting rod 21 and the second connecting rod 22 can isolate the connecting wire assembly from the external environment of the electromagnetic flowmeter 1000, so that the signal electrode 202 is stably electrically connected to the measuring device 10.
[0083] In some embodiments, a welded structure connects the first connecting rod 21 and the second connecting rod 22, making the connection between the first connecting rod 21 and the second connecting rod 22 more robust.
[0084] In some embodiments, the diameter of the first connecting rod 21 is 22 mm, which is relatively small. When the first connecting rod 21 is inserted into the pipe, a smaller diameter connection hole can be made on the pipe to reduce damage to older pipes.
[0085] In some embodiments, please refer to Figure 7 and Figure 11 The electromagnetic flowmeter 1000 also includes a pressure detection unit 300, which is connected to the support pipe 30 and is used to measure the pressure inside the support pipe 30.
[0086] Optionally, the pressure detection unit 300 can be a pressure sensor, capable of accurately measuring pressure and easily reading pressure values. Alternatively, the pressure detection unit 300 can also be a pressure gauge, offering a more stable structure.
[0087] When the electromagnetic flowmeter 1000 measures the device under test 4000, the support tube 30 is connected to the inside of the device under test 4000. The pressure detection unit 300 detects the fluid pressure inside the support tube 30, which is also the fluid pressure inside the device under test 4000, facilitating the monitoring of fluid pressure.
[0088] Optionally, when the electromagnetic flowmeter 1000 includes a first sealing ring 42, the pressure detection unit 300 is connected to the support tube 30 between the first sealing ring 42 and the second connecting rod 22.
[0089] In some embodiments, the electromagnetic flowmeter 1000 further includes an alarm, which is electrically connected to the pressure detection unit 300. When the pressure detection unit 300 detects that the fluid pressure exceeds a set value, the alarm will sound an alarm.
[0090] In some embodiments, please refer to Figure 7 , Figure 11 and Figure 12 The second connecting rod 22 is provided with a first mounting hole 221 extending along the first direction Z. The flowmeter body 100 also includes a magnetic core 90 and a connecting wire assembly disposed in the first mounting hole 221. The connecting wire assembly electrically connects the signal electrode 202 to the measuring device 10. The first mounting hole 221 is filled with sealant. The electromagnetic flowmeter 1000 also includes a pressure detection unit 300, which is connected to the support tube 30 and is used to measure the pressure inside the support tube 30.
[0091] In some embodiments, please refer to Figures 8 to 11 The flow meter body 100 also includes a directional indicator 70 and a fixing component 80. The directional indicator 70 is connected to the measuring device 10; the fixing component 80 is detachably connected to the directional indicator 70 and the support tube 30 respectively.
[0092] The directional marker 70 is connected to the measuring device 10, meaning the directional marker 70 is connected to the first connecting rod 21, the second connecting rod 22, and the measuring head 200 via the measuring device 10. The relative position of the directional marker 70 and the signal electrode 202 is fixed, and the directional marker 70 indicates the arrangement direction of the two signal electrodes 202. Optionally, the directional marker 70 extends along the third direction Y. When the electromagnetic flowmeter 1000 is fixed to the pipeline, the length direction of the directional marker 70 is adjusted to be consistent with the length direction of the pipeline, then the arrangement direction of the two signal electrodes 202 is perpendicular to the length direction of the pipeline.
[0093] The fixing component 80 is detachably connected to both the direction mark 70 and the support tube 30. Specifically, the fixing component 80 is detachably connected to both the direction mark 70 and the support tube 30. When adjusting the position of the measuring head 200, the fixing component 80 can be removed from the direction mark 70, allowing the measuring head 200 to move relative to the support tube 30. When fixing the measuring head 200, the fixing component 80 can be connected to both the direction mark 70 and the support tube 30, thus securing the direction mark 70, the measuring device 10, the first connecting rod 21, the second connecting rod 22, the measuring head 200, and the support tube 30.
[0094] Optionally, the fixing component 80 can be connected to the direction mark 70 and the support tube 30 respectively via clips. Optionally, the fixing component 80 can also be threaded to the direction mark 70 and the support tube 30 respectively.
[0095] The beneficial effects of this embodiment are as follows: the directional marker 70 is connected to the measuring head 200 via the measuring device 10, the first connecting rod 21, and the second connecting rod 22. Adjusting the direction of the directional marker 70 allows for adjustment of the arrangement direction of the two signal electrodes 202. When the electromagnetic flowmeter 1000 is installed in different test devices 4000 of the same type, adjusting the direction of the directional marker 70 relative to the test device 4000 makes the arrangement direction of the two signal electrodes 202 more consistent with that of the test device 4000. The fixing component 80 is detachably connected to the directional marker 70 and the support tube 30, respectively. When the fixing component 80 is removed from the directional marker 70, it facilitates adjustment of the positions of the directional marker 70 and the measuring head 200. After connecting the fixing component 80 to the directional marker 70 and the support tube 30, the directional marker 70, the measuring device 10, the first connecting rod 21, the second connecting rod 22, the measuring head 200, and the support tube 30 are fixed, ensuring the stability of the electromagnetic flowmeter 1000.
[0096] In some embodiments, please refer to Figures 8 to 11 The outer wall of the support tube 30 is provided with a positioning flange 32; the fixing assembly 80 includes a fixing ring 81, a support plate 82 and a third connecting rod 83. The support plate 82 is provided with a through hole, and the support tube 30 is inserted into the through hole. The fixing ring 81 is threadedly connected to the support tube 30, and the fixing ring 81 holds the support plate 82 against the positioning flange 32.
[0097] In some embodiments, please refer to Figures 8 to 11 The third connecting rod 83 is a screw rod, and the fixing assembly 80 also includes two first nuts 84 and two second nuts 85 that are screwed to the screw rod respectively. The two first nuts 84 clamp and fix the direction mark 70, and the two second nuts 85 clamp and fix the support plate 82.
[0098] In some embodiments, please refer to Figures 8 to 10The annular fixing member 47 is a pipe coaxial with the support pipe 30. The end of the annular fixing member 47 away from the support pipe 30 along the first direction Z is provided with an inner conical surface 471. In the first direction Z, the diameter of the inner conical surface 471 gradually increases from the end near the support pipe 30 to the end away from the support pipe 30. The flowmeter body 100 also includes a locking nut 60 and a locking member 50. The orthographic projection of the locking member 50 on the projection plane perpendicular to the first direction Z is a semi-circle. The two locking members 50 clamp the first connecting rod 21 radially. The locking member 50 has an inclined surface 51 that fits with the inner conical surface 471. The two inclined surfaces 51 on the two locking members 50 form a conical surface that fits with the inner conical surface 471. A locking nut 60 is fitted onto the first connecting rod 21. The locking nut 60 includes a nut body 61 and a retaining flange 62. The nut body 61 is threadedly connected to the end of the annular fixing member 47 away from the support tube 30 along the first direction Z. The retaining flange 62 is connected to the end of the nut body 61 away from the support tube 30 along the first direction Z. The retaining flange 62 is located at the end of the locking member 50 away from the support tube 30 along the first direction Z. The retaining flange 62 holds the locking member 50 towards the support tube 30 along the first direction Z, so that the locking member 50 abuts against the inner conical surface 471 of the annular fixing member 47, and the locking member 50 is fixed to the annular fixing member 47. The annular fixing member 47 exerts a radial force on the locking member 50 along the inner conical surface 471, so that the two locking members 50 clamp and fix the first connecting rod 21.
[0099] In some embodiments, please refer to Figures 7 to 10 The device under test (DUT) 4000 is equipped with a short pipe 2000 and a ball valve 3000. The two ends of the short pipe 2000 along its length are connected to the ball valve 3000 and the DUT 4000, respectively. When installing the electromagnetic flowmeter 1000, the measuring head 200 is inserted into the DUT 4000 by passing it sequentially through the ball valve 3000 and the short pipe 2000. One end of the support pipe 30 along the first direction Z is connected to the end of the ball valve 3000 furthest from the short pipe 2000. After removing the electromagnetic flowmeter 1000 from the DUT 4000, the ball valve 3000 can be closed, allowing the fluid to flow stably within the DUT 4000.
[0100] The above description is merely a preferred embodiment of this application and is not intended to limit this application. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of this application should be included within the protection scope of this application.
Claims
1. A measuring head, characterized in that, include: Support components; Two signal electrodes are connected to one end of the support member along a first direction, and the two signal electrodes are spaced apart along a second direction, which is perpendicular to the first direction; A flow guide is connected to one end of the support member where the two signal electrodes are located, and the flow guide is located between the two signal electrodes.
2. The measuring head as described in claim 1, characterized in that, The flow guide extends along a third direction, which is perpendicular to the first and second directions; in the third direction, the two ends of the flow guide are respectively located on both sides of the two signal electrodes; the cross-sectional area of the flow guide gradually decreases from the middle to both ends along the third direction; along the first direction from the support to the end of the flow guide away from the support, the size of any cross-section of the flow guide gradually decreases in the second direction.
3. The measuring head as described in claim 2, characterized in that, The guide member has two opposing arc-shaped surfaces at both ends along the second direction.
4. The measuring head as described in claim 1, characterized in that, The signal electrode has an outer conical surface whose axis extends along the first direction; in the first direction, the diameter of the outer conical surface gradually decreases from one end near the support to one end away from the support.
5. The measuring head as described in any one of claims 1-4, characterized in that, A portion of the flow guide is located on the side of the signal electrode away from the support along the first direction.
6. An electromagnetic flowmeter, characterized in that, The device includes a flow meter body and a measuring head as described in any one of claims 1-5, wherein the support is connected to the flow meter body and the signal electrode is electrically connected to the flow meter body.
7. The electromagnetic flowmeter as described in claim 6, characterized in that, The electromagnetic flowmeter is an insertion type electromagnetic flowmeter, and the main body of the flowmeter includes: The measuring device is electrically connected to the signal electrode; A connecting rod assembly includes a first connecting rod and a second connecting rod, the first connecting rod and the second connecting rod being coaxial and extending along a first direction; the first connecting rod is connected to the measuring device, and the two ends of the second connecting rod along the first direction are respectively connected to the first connecting rod and the support member; A support tube extends along the first direction and is sleeved on the first connecting rod. The support tube is used to connect the device to be tested. A pressure ring is connected inside the support tube and sleeved on the first connecting rod; the inner diameter of the pressure ring is larger than the diameter of the first connecting rod and smaller than the diameter of the second connecting rod.
8. The electromagnetic flowmeter as described in claim 7, characterized in that, An annular flange is provided on the inner wall of the support tube; the flow meter body also includes a first sealing ring and an annular fixing member, the first sealing ring is located inside the support tube and sleeved on the first connecting rod; the annular flange, the first sealing ring, the pressure ring and the annular fixing member are arranged sequentially along the first direction, and the annular fixing member is located on the side of the pressure ring away from the second connecting rod along the first direction; The annular fastener is sleeved on the first connecting rod and threadedly connected to the support pipe. The annular fastener and the annular flange clamp the pressure ring and the first sealing ring so that the first sealing ring seals the gap between the first connecting rod and the support pipe.
9. The electromagnetic flowmeter as described in claim 7, characterized in that, The second connecting rod is provided with a first mounting hole extending along the first direction. The flowmeter body also includes a magnetic core and a connecting wire assembly disposed in the first mounting hole. The connecting wire assembly electrically connects the signal electrode to the measuring device. The first mounting hole is filled with sealant. And / or, The electromagnetic flowmeter also includes a pressure detection unit, which is connected to the support pipe and is used to measure the pressure inside the support pipe.
10. The electromagnetic flowmeter as described in claim 7, characterized in that, The flow meter body also includes a directional indicator and a fixing component. The directional indicator is connected to the measuring device. The fixing component is detachably connected to the directional indicator and the support tube, respectively.