Graphical User Interface (1) of Laboratory Pure Water Treatment System for Electronic Devices

CN309405270SActive Publication Date: 2025-07-25XIAMEN RSJ WATER PURIFICATION TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202430600225.5
Authority / Receiving Office
CN · China
Patent Type
Designs(China)
Current Assignee / Owner
Filing Date
2024-09-20
Publication Date
2025-07-25
Estimated Expiration
2039-09-20

Smart Images

  • Figure 000001_ABST
    Figure 000001_ABST
Patent Text Reader

Abstract

1. Name of the design product: Graphical User Interface (1) for Laboratory Pure Water Treatment System for Electronic Devices. 2. Use of the design product: For an electronic device. 3. Design key points of the design product: Lies in the graphical user interface. 4. Picture or photo that best shows the design key points: The front view of Design 1. 5. The six views of the hardware device are existing designs, and other views are omitted. 6. Design 1 is designated as the basic design. 7. Use of the graphical user interface: For the treatment of laboratory pure water. 8. Area of the graphical user interface in the product: The screen of the electronic device. 9. Human-computer interaction method of the graphical user interface: For Design 1, the main view is the initial interface. Enter the authorization code and click "Activate" to enter the Design 1 interface change state diagram 1. Click "Start using" in the Design 1 interface change state diagram 1 to enter the Design 1 interface change state diagram 2, and automatically connect to the device. After successful connection, enter the Design 1 interface change state diagram 3. Click "System disinfection" in the Design 1 interface change state diagram 3 to enter the Design 1 interface change state diagram 4; For Design 2, the main view is the initial interface. Enter the authorization code and click "Activate" to enter the Design 2 interface change state diagram 1. Click "Start using" in the Design 2 interface change state diagram 1 to enter the Design 2 interface change state diagram 2, and automatically connect to the device. After successful connection, enter the Design 2 interface change state diagram 3. Click "Quantitative water intake calibration" in the Design 2 interface change state diagram 3 to enter the Design 2 interface change state diagram 4; For Design 3, the main view is the initial interface. Enter the authorization code and click "Activate" to enter the Design 3 interface change state diagram 1. Click "Start using" in the Design 3 interface change state diagram 1 to enter the Design 3 interface change state diagram 2, and automatically connect to the device. After successful connection, enter the Design 3 interface change state diagram 3. Click "Consumable inspection / maintenance" in the Design 3 interface change state diagram 3 to enter the Design 3 interface change state diagram 4; For Design 4, the main view is the initial interface. Enter the authorization code and click "Activate" to enter the Design 4 interface change state diagram 1. Click "Start using" in the Design 4 interface change state diagram 1 to enter the Design 4 interface change state diagram 2, and automatically connect to the device. After successful connection, enter the Design 4 interface change state diagram 3. Click "Device switching" in the Design 4 interface change state diagram 3 to enter the Design 4 interface change state diagram 4; For Design 5, the main view is the initial interface. Enter the authorization code and click "Activate" to enter the Design 5 interface change state diagram 1. Click "Start using" in the Design 5 interface change state diagram 1 to enter the Design 5 interface change state diagram 2, and automatically connect to the device. After successful connection, enter the Design 5 interface change state diagram 3. Click "Device information" in the Design 5 interface change state diagram 3 to enter the Design 5 interface change state diagram 4; For Design 6, the main view is the initial interface. Enter the authorization code and click "Activate" to enter the Design 6 interface change state diagram 1. Click "Start using" in the Design 6 interface change state diagram 1 to enter the Design 6 interface change state diagram 2, and automatically connect to the device. After successful connection, enter the Design 6 interface change state diagram 3. Click "Operation information" in the Design 6 interface change state diagram 3 to enter the Design 6 interface change state diagram 4; For Design 7, the main view is the initial interface. Enter the authorization code and click "Activate" to enter the Design 7 interface change state diagram 1. Click "Start using" in the Design 7 interface change state diagram 1 to enter the Design 7 interface change state diagram 2, and automatically connect to the device. After successful connection, enter the Design 7 interface change state diagram 3. Click "Alarm information" in the Design 7 interface change state diagram 3 to enter the Design 7 interface change state diagram 4. Click "View the third row" in the Design 7 interface change state diagram 4 to enter the Design 7 interface change state diagram 5;The front view of Design 8 is the initial interface. Enter the authorization code and click "Activate" to enter the state change diagram 1 of Design 8. Click "Start Using" in the state change diagram 1 of Design 8 to enter the state change diagram 2 of Design 8, and automatically connect to the device. After successful connection, enter the state change diagram 3 of Design 8. Click "Device Control" in the state change diagram 3 of Design 8 to enter the state change diagram 4 of Design 8. Click "RO Water Intake Control" in the state change diagram 4 of Design 8 to enter the state change diagram 5 of Design 8.;
Need to check novelty before this filing date? Find Prior Art