Suspension shoe, climbing unit and method for erecting a building

EP4453350A1Active Publication Date: 2024-10-30DOKA GMBH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
EP2022854461
Authority / Receiving Office
EP · EP
Patent Type
Applications
Current Assignee / Owner
Priority Date
2021-12-22
Filing Date
2022-12-22
Publication Date
2024-10-30
Estimated Expiration
2042-12-22

Smart Images

  • Figure 1.1
    Figure 1.1
Patent Text Reader

Abstract

The invention relates to a suspension shoe (11, 30, 44) for use in a climbing unit (6) having a first climbing component which is in particular a climbing rail (7), and a second climbing component which is in particular a climbing carriage (9) movable along the climbing rail (7), the suspension shoe comprising: an anchor (12) for anchoring in a concreting portion (5; 5A, 5B) of a building (3), and a suspension part (16) connected to the anchor (12), wherein the suspension part (16) has a first mount (17) for releasably mounting the first climbing component of the climbing unit (6), in particular the climbing rail (7), and a second mount (18) for releasably mounting the second climbing component of the climbing unit (6), in particular the climbing carriage (9).
Need to check novelty before this filing date? Find Prior Art

Description

[0001] Suspension shoe, climbing unit, and method for erecting a structure. The invention relates to a suspension shoe for use in a climbing unit with a first climbing component, which is in particular a climbing rail, and with a second climbing component, which is in particular a climbing carriage displaceable along the climbing rail, comprising: an anchor for anchoring in a concreting section of a structure, and a suspension part connected to the anchor. The invention further relates to a climbing unit for arrangement on a structure, comprising: a first suspension shoe for anchoring in a concreting section of the structure, a climbing rail, and a climbing carriage. The invention further relates to a climbing device, comprising: two climbing units arranged next to one another at a horizontal distance. The invention further relates to a climbing system, comprising: a climbing unit, a structure with a concreting section,The anchor of the suspension shoe is anchored within the concreting section of the structure. Finally, the invention relates to a method for erecting a structure from superimposed concreting sections. From EP 3440 283 B1, it is known to use a different type of self-climbing unit in the construction of building cores. The self-climbing unit is equipped with a working platform and can be moved independently of a crane from a lower, completed concrete wall section to another concrete wall section above it. For such a climbing process, lifting cylinders are used, which are supported on climbing brackets, each of which is releasably anchored in anchor points of a lower concrete wall section. The working platform and the concrete formwork elements are attached to working brackets, which are anchored to the concrete component above the climbing brackets. For fastening the working and climbing brackets in the concreting sections,Anchor bolts are used, which are inserted into the respective concreting section. EP 3440 283 B1 addresses the problem that the concrete wall anchors must be arranged at predetermined positions, but can collide with the reinforcing steel to be embedded there. Therefore, the reinforcing steel must be partially guided around the anchor points. This can, however, lead to a structural weakening of the concrete body. The number of anchor points in the concrete should be kept as low as possible. To achieve this goal, EP 3440 283 B1 proposes a design with climbing brackets and working brackets. The climbing brackets have first anchor receptacles in a first concreting section, and the working brackets have second anchor receptacles in a second concreting section, which match their pattern with regard to their relative positions. In this way, after the working brackets have been anchored in anchor holes at third anchor points, the climbing brackets can beof a third concrete wall section by a return stroke of the climbing cylinders to the second anchor points of the second concrete wall section and anchored in the anchor holes of the second anchor points of the second concrete wall section that have become free in the meantime. This allows the number of anchor holes to be halved. A disadvantage of this state of the art, however, is that the self-climbing unit requires three concreting sections for anchoring to the concrete body for each climbing process (anchoring the climbing bracket in the first concreting section - climbing the working bracket with the work platform from the second to the third concreting section - anchoring the working bracket in the third concreting section - pulling the climbing bracket from the first to the second concreting section). This requires a very complex and high design of the self-climbing unit. Another disadvantage is that the state of the art does not provide working and climbing brackets with receiving openings for theConcrete wall anchors are used. However, this leads to unfavorable tensile loads at the anchoring points. Furthermore, the state of the art is only designed for the construction of a building core, with the self-climbing unit being supported between opposing wall sections. For this purpose, two support columns are connected at their upper ends via a support frame with cross beams. For use on the exterior of a building, without support between opposing wall sections, this state of the art would be ill-suited. Furthermore, suspension shoes for climbing formwork are known in the state of the art. A single climbing component, in particular a climbing rail, is suspended from these suspension shoes. A working platform can be mounted on the climbing rail. To climb to the next floor, cylinder-piston drives can be used, which are supported on the structure or on the suspension shoe attached to it. The lifting isstepwise, i.e., with short forward and backward movements of the cylinder-piston drive. Examples of this are shown in EP 1899 549 B1 and WO 2008 / 061922 A1. Accordingly, the object of the invention is to alleviate or eliminate at least some of the disadvantages of the prior art. This object is achieved with a suspension shoe according to claim 1, a climbing unit according to claim 8, a climbing device according to claim 22, and a method according to claim 26. Preferred embodiments are specified in the dependent claims. The invention provides a suspension shoe, in which the suspension part has a first holder for releasably holding the first climbing component of the climbing unit, in particular the climbing rail, and a second holder for releasably holding the second climbing component of the climbing unit, in particular the climbing carriage. With the first and second holders, the suspension shoe has two fastening points, atwhich, depending on the application and phase of the climbing process, can be used to suspend either one of the first and second climbing components or both the first and second climbing components simultaneously. The first and second climbing components can be moved relative to each other in the climbing or vertical direction when the climbing unit is moved. The first and second brackets are arranged at a distance from each other. If the suspension shoe has a single anchor for anchoring in the concrete, the number of anchor points in the concrete can be reduced accordingly. A significant advantage over the prior art is that two fastening points are created per anchor. Thus, the suspension shoe only requires a single anchor point in the concrete. In a preferred embodiment, the first and second brackets are used for the optional suspension of the climbing rail and the climbing carriage. For example, the climbing rail can be attached first toThe climbing carriage is suspended from the first bracket of the suspension shoe before climbing up and being suspended from the second bracket of the same suspension shoe. With the suspension shoe according to the invention, two independent fastening or suspension points are created by the first and second brackets. The suspension shoe according to the invention (or a plurality of such suspension shoes) can be part of a climbing unit during the cyclical construction of the structure from concrete sections. It is advantageous that when moving from one concrete section to the next, no more than two concrete sections arranged one above the other are required for anchoring in the concrete. Unlike the prior art, it is not mandatory to temporarily suspend the climbing unit from a third concrete section when climbing up to the next story. For the purposes of this disclosure, location and direction references such as "horizontal," "vertical," "one above the other," refer to"side by side" refers to the intended use of the suspension shoe, the climbing unit, and the climbing device in the assembled state on a structure with a vertical concreting section. Depending on the design, the suspension shoe, the climbing unit, and the climbing device can also be used to create concreting sections inclined to the vertical, in which case the location and direction information must be transferred accordingly. In a first climbing position, i.e., when climbing from one to the next concreting section, the first climbing component, in particular the climbing rail, can be fixed in its respective height relative to the suspension shoe by being suspended from the first bracket of the suspension shoe. Thus, in this design, the first climbing component, in particular the climbing rail, is secured in the first climbing position not only against downward movement, but also against upward movement. The load of the climbing unit is transferred via the firstClimbing component is introduced into the suspension shoe and diverted from the suspension shoe into the concreting section of the structure. In the first climbing position, the second climbing component, in particular the climbing carriage, can be released from the second bracket of the suspension shoe in order to enable the second climbing component to climb upwards by displacement relative to the first climbing component. In a second climbing position, the second climbing component, in particular the climbing carriage, can be fixed in its respective height position relative to the suspension shoe and thus to the structure by being suspended from the second bracket of the suspension shoe. Thus, in this embodiment, the first second climbing component, in particular the climbing carriage, is secured not only against downward movement but also against upward movement in the second climbing position. The load of the climbing unit is introduced into the suspension shoe via the second climbing component andSuspension shoe into the concreting section of the structure. In the second climbing position, the first climbing component, in particular the climbing rail, can be released from the first holder of the suspension shoe in order to enable the first climbing component to climb upwards by displacement relative to the second climbing component. Furthermore, in a holding position, the first climbing component can be fastened to the first holder and the second climbing component to the second holder. When used as climbing formwork, the holding position can be a concreting position during the concreting of a concreting section. In a preferred embodiment, the first holder has a first holding opening for the passage of a first holding bolt and / or the second holder has a second holding opening for the passage of a second holding bolt. As a result, the suspension of the first and second climbing components can be carried out quickly andreliably provided and released. In the mounted state on the structure, the first and / or the second retaining bolt preferably extends substantially perpendicular to the main plane of the suspension part, in particular substantially perpendicular to a base plate of the suspension part. Relative to a neutral position of the suspension part, the first and / or the second retaining bolt therefore preferably extends substantially perpendicular to the outer side of the concreting section facing the suspension part. A plug bolt or a screw bolt with a thread can be provided as the first and / or second retaining bolt. In order to arrange the fastening points for the suspension of the climbing components in an easily accessible manner, the first and the second bracket are preferably provided substantially at the same height on both sides of the anchor. To achieve load or tolerance compensation, it is advantageous if the suspension part can be tilted with the anchor, in particular about a horizontal axis.is connected. The maximum tilt angle relative to a substantially vertical starting position of the suspension part is preferably at least 5° in both tilting directions, i.e. at least + / - 5° relative to the substantially vertical starting position of the suspension part. In a preferred embodiment, the anchor has a ball element and the suspension part a ball socket, wherein the ball element of the anchor is arranged tiltably in the ball socket of the suspension part. This embodiment has the advantage that an effective force transmission is achieved by reducing the tensile forces. The suspension part can be held directly by the (wall) anchor via the ball joint formed by the ball socket and the ball element. In the mounted state on the building, the suspension part is spaced from the outer side of the concreting section facing the suspension part in order to release the tiltability of the suspension part relative to the anchor. Since the suspension part, unlikeAs the ball socket is not supported on the concrete, as is the case with the state of the art, the tensile forces of the anchor can be significantly reduced. This allows the weight of the suspension shoe to be significantly reduced. This design is particularly advantageous when two such suspension shoes are used in pairs, which can in particular be arranged next to each other at essentially the same height in order to guide the first climbing component, in particular the climbing rail, between the two suspension shoes. Since the ball socket is freely rotatable, tolerance compensation of the anchorages of the two suspension shoes in the concrete can be achieved. The two ball sockets can be precisely aligned with each other so that the climbing components have a common axis of rotation, whereby the two concrete anchorages receive essentially the same load. In this way, a type of balance beam can be realized. For the secure suspension of the climbing components, it is advantageous if the suspension part has ain particular, a receiving groove extending in a horizontal direction for receiving a first engagement bar on the first climbing component and / or a second engagement bar on the second climbing component. With regard to a stable yet lightweight design, the suspension part preferably has a base plate in which the receiving groove and / or the ball socket are preferably recessed. For example, the base plate can be designed as a milled part. The base plate preferably has a recess for the receiving groove and / or the ball socket. Preferably, the suspension part with the base plate, in the mounted state on the structure, is spaced from the outer side of the concreting section facing the suspension part in order to reduce the tensile forces of the anchor and thus enable a particularly weight-saving design. Relative to the neutral position, the main plane of the base plate, in the mounted state on the structure, preferably extends substantiallyparallel to the flat outer side of the concreting section. The climbing unit according to the invention for arrangement on a building comprises at least: a first suspension shoe for anchoring to a concreting section of the building, a climbing rail, a climbing carriage, wherein the first suspension shoe is designed according to one of the embodiments described above, wherein in a first climbing position of the climbing unit, a holding device on the climbing carriage is connected to the second holder of the first suspension shoe and a fastening device on the climbing rail is released from the first holder of the first suspension shoe, so that the climbing rail is displaceable along the first suspension shoe, wherein in a second climbing position, the fastening device on the climbing rail is connected to the first holder of the first suspension shoe and the holding device on the climbing carriage is released from the second holder of the first suspension shoe, so that theClimbing carriage is movable along the climbing rail. Thus, a climbing console and a working console as in the prior art can be dispensed with. Instead, a suspension shoe with a suspension part is provided, on which in one phase of the climbing process when moving to the next storey, the climbing carriage, but not the climbing rail, can be suspended, and in a second phase, the climbing rail, but not the climbing carriage, can be suspended from the suspension shoe. In one embodiment, in particular for climbing on an outer side of the building, i.e., when climbing facades, the holding device is arranged at the upper end of the climbing rail. In another embodiment, in particular for climbing between opposite wall sections of a shaft, the holding device can be arranged at a central longitudinal section, between the opposite ends. In a holding position, in particular a concreting position, theThe holding device on the climbing carriage is connected to the second holder of the first suspension shoe, and the fastening device on the climbing rail is connected to the first holder of the first suspension shoe. For a quick and stable connection, the fastening device connected to the climbing rail preferably has a fastening opening for arranging the first holding bolt and / or the holding device connected to the climbing carriage has a suspension opening for arranging the second holding bolt. The suspension opening of the holding device and the second holding opening of the suspension shoe can be arranged in alignment, with the second holding bolt passing through the suspension opening and the second holding opening for the connection. Accordingly, the fastening opening of the fastening device and the first holding opening of the suspension shoe can be arranged in alignment, with the first holding bolt passing through the fastening opening and the first holding opening for the connection.For stable and secure suspension, the fastening device on the climbing rail has a first engagement strip and / or the holding device on the climbing carriage has a second engagement strip, each for a preferably substantially precise arrangement in the receiving groove of the first suspension shoe. If the suspension part is arranged tiltably on the anchor, the engagement of the first or second engagement strip in the receiving groove of the first suspension shoe can also prevent undesired rotation of the suspension part about the longitudinal axis of the anchor. In a preferred embodiment, a second suspension shoe, which is designed according to one of the embodiments of the suspension shoe described above, is provided for anchoring to the same concreting section. In the first climbing position, the holding device on the climbing carriage is connected to the second holder of the first and second suspension shoes, wherein the fastening device on theClimbing rail is detached from the second holder of the first and second suspension shoe. This allows the climbing rail to be moved along the first and second suspension shoe. In the second climbing position, the fastening device on the climbing rail is connected to the first holder of the first and second suspension shoe, wherein the holding device on the climbing carriage is detached from the second holder of the first and second suspension shoe. This allows the climbing carriage to be moved along the climbing rail. In order to fix the climbing rail and the climbing carriage in their respective height position depending on the phase of the climbing process or to enable climbing upwards, the first and second suspension shoes are preferably arranged substantially at the same height on both sides of the climbing rail. In this embodiment, the first and second suspension shoes are located adjacent to the opposite long sides of the climbing rail.In the second climbing position, the climbing rail can be guided upwards relative to the climbing carriage between the first and second suspension shoes. Preferably, the first holders of the first and second suspension shoes are located on the side of the climbing rail relative to the vertical plane through the longitudinal axis of the anchor, and the second holders of the first and second suspension shoes are located on the side facing away from the climbing rail, again relative to the vertical plane through the longitudinal axis of the anchor. This allows for the creation of structurally simple suspensions for the climbing rail and the climbing carriage. In a preferred embodiment, the climbing carriage has a holding fork with two fork elements on either side of the climbing rail, wherein the two fork elements, in particular at their free ends, each carry a holding element, in particular a holding plate, of the holding device, which in the first climbing position, in particular above thesecond retaining bolt, are connected to the second brackets of the first and second suspension shoes. Due to the retaining fork, the two retaining elements of the retaining device can be reversibly and detachably connected to the second brackets of the first and second suspension shoes on both sides of the climbing rail. Preferably, a vertical center plane of the retaining fork between the two fork elements contains the longitudinal axis of the anchor of the suspension shoe. In order to achieve reliable guidance when climbing upwards, the climbing carriage, in a preferred embodiment, has a guide shoe for guidance along the climbing rail, in particular for gripping a climbing profile of the climbing rail. Preferably, a horizontal center axis of the guide shoe extends substantially along a vertical center plane of the climbing rail perpendicular to the adjacent concreting section of the structure. If the climbing carriage has the retaining fork, the horizontal center axis of theGuide shoe substantially centrally between the two fork elements. This allows a particularly favorable load transfer between anchoring points arranged one above the other to be achieved. For suspending the climbing rail in the second climbing position, the fastening device in a preferred embodiment has a fastening plate with a bearing section and two fastening sections on either side of the bearing section, wherein the bearing section is connected to the climbing rail, preferably via a bearing pin, and the fastening sections are connected, preferably via the two first retaining bolts, to the first holders of the first and second suspension shoe in the second climbing position. The climbing carriage preferably has a pivot axis about which the holding fork can be pivoted. This pivot axis is preferably arranged substantially in line with the longitudinal axis of the bearing pin, which enables pivoting of thefastening plate. Thus, the holding fork can be pivoted together with the fastening plate on the climbing rail, for example, to compensate for anchoring points in the concrete of the first and second suspension shoes that are not exactly horizontally arranged. This achieves a uniform load transfer in the anchoring points in the concrete. Preferably, the longitudinal axis of the bearing pin extends along the vertical center plane of the guide shoe. In a preferred embodiment, a support part for support on the outside of the building, in particular at the lower end of the climbing rail, is connected to the climbing rail. In a preferred embodiment, in particular for an embodiment when climbing on the outside of the building, a climbing scaffold is provided with the climbing carriage. In this embodiment, the climbing scaffold can have a preferably vertical column element, which preferably extends substantially parallel andpreferably extends at a horizontal distance perpendicular to the vertical outside of the structure to the climbing rail. This design is particularly suitable for climbing on the outside of the structure. In addition, the climbing scaffold preferably has a support element for support on the outside of the structure. The support element is preferably arranged on a horizontal beam. The horizontal beam is preferably attached to the lower end of the column element. In a preferred embodiment, the climbing scaffold has a guide element for guidance along the climbing rail, wherein the guide element is preferably arranged below the guide shoe. The guide element can engage around a flange of a climbing profile of the climbing rail. Furthermore, it is advantageous if the guide element is connected to the column element of the climbing scaffold via a support element. For climbing up into the next concreting section, it is advantageous if the climbing unit has aSelf-climbing drive, in particular with a cylinder-piston drive, for displacing the climbing carriage relative to the climbing rail and vice versa. The self-climbing drive is designed to transmit power between the climbing rail and the climbing carriage, so that actuation of the self-climbing drive in the first climbing position moves the climbing rail upwards, in particular by a single stroke of the cylinder-piston drive, i.e. by extending or retracting the piston once, and a further actuation of the self-climbing drive in the second climbing position moves the climbing carriage upwards, by a single stroke of the cylinder-piston drive. Preferably, the longitudinal axis of the cylinder-piston drive is arranged substantially vertically in order to enable a maximum stroke. In a preferred embodiment, in particular for climbing on the outside of the structure, a boom is provided which extends from the climbing rail,in particular from the lower end of the climbing rail, to the rear, i.e. away from the adjacent concreting section of the structure. In a preferred embodiment, the self-climbing drive, in particular the first longitudinal end of the cylinder-piston drive, is connected to the boom. In a preferred embodiment, in particular for climbing on the outside of the structure, the climbing scaffold has the column element to which the self-climbing drive is connected. With this design, the power of the self-climbing drive can be effectively transferred to the climbing scaffold in order to allow the climbing scaffold to climb upwards. In an alternative embodiment, a crane for raising the climbing unit is provided instead of the self-climbing drive. In a preferred embodiment, the climbing scaffold has a further column element, wherein a strut framework is preferably provided between the column element and the further column element.Preferably, the further column element extends, in use, at a horizontal distance perpendicular to the vertical outer side of the structure behind the column element. For the purposes of this disclosure, "front" means closer to the structure and "rear" means facing away from the structure. It is particularly preferred if the climbing rail, the column element, and the further column element are arranged along a vertical plane perpendicular to the outer side of the structure. In this embodiment, the climbing unit is designed as a substantially two-dimensional climbing disc. This embodiment is particularly suitable for use as part of a climbing device described in more detail below, having a plurality of climbing units arranged at a horizontal distance in a direction parallel to the outer side of the structure. Preferably, the climbing unit has at least one further climbing shoe, in particular a pair of further climbing shoes arranged next to one another, above the first suspension shoe (andoptionally the second suspension shoe), in particular on an overlying concreting section. The climbing device according to the invention comprises at least two climbing units, which are designed according to one of the embodiments of the climbing unit described above, wherein the two climbing units are arranged next to one another at a horizontal distance on the same concreting section. The climbing device preferably comprises at least one working platform. The working platform preferably comprises individual platform supports, which can extend horizontally parallel to the outside of the structure. A working platform covering can be arranged on the platform supports. In one embodiment, in particular for climbing on the outside of the structure, the working platform is connected to the climbing scaffolds having the climbing carriages. In this embodiment, the working platform is arranged together with the climbing scaffolds at the level of the next concreting section.implemented. In a further embodiment, particularly for climbing within a shaft, the working platform is connected to the climbing rails of the climbing units, so that the working platform is relocated together with the climbing rails to the level of the next concreting section. In a preferred application of the climbing device, a formwork, in particular a wall formwork, is provided. The formwork has at least one formwork element, in particular a wall formwork element, which is movable between a shuttering and a striking position, in particular at least in a horizontal direction perpendicular to the outside of the building. In one embodiment, particularly for climbing on the outside of the building, the formwork is supported from below on a scaffold part of the climbing scaffold and / or suspended from above from a cantilever part of the climbing scaffold. In a further embodiment, particularly for climbing within a shaft,a transmission connected to the climbing rail, wherein the formwork is suspended from the transmission. The climbing system according to the invention comprises at least: a climbing unit in one of the embodiments described above, a structure with a first concreting section, wherein the anchor of the first suspension shoe is anchored within the first concreting section of the structure. Preferably, the climbing system comprises a climbing device with several climbing units in one of the embodiments described above, wherein the anchors of the first suspension shoes of the climbing units are each anchored within the same concreting section of the structure. Preferably, the climbing system comprises at least one further suspension shoe, in one of the embodiments described above, which is anchored to a second concreting section above the first concreting section. After completion of the climbing process, the first suspension shoes (or parts of the firstSuspension shoes) can be recovered and used in the construction of a concreting section located higher up. In the method according to the invention for erecting a structure from superimposed concreting sections, at least the following steps are carried out, preferably in the specified order: i. Providing a climbing unit in one of the embodiments described above, ii. Anchoring the first suspension shoe to a first concreting section of the structure, iii. Arranging the climbing unit in the first climbing position on the first suspension shoe, wherein the holding device on the climbing carriage is connected to the second holder of the first suspension shoe and the fastening device on the climbing rail is detached from the first holder of the first suspension shoe, iv. Anchoring another suspension shoe to a second concreting section, v. Moving the climbing rail along the first suspension shoe, vi. Arranging the climbing unitin the second climbing position on the further suspension shoe, wherein the fastening device on the climbing rail is connected to the first holder of the further suspension shoe and the holding device on the climbing carriage is released from the second holder of the first suspension shoe, vii. Moving the climbing carriage upwards along the climbing rail. The method preferably also comprises the step: viii. Arranging the climbing unit in a holding position on the further suspension shoe, wherein the holding device on the climbing carriage is connected to the second holder of the further suspension shoe and the fastening device on the climbing rail is connected to the first holder of the further suspension shoe. If the method is applied to a climbing formwork, the method can be expanded to include additional steps. In this embodiment, the following steps can also be carried out, in particular in a holding position of the climbing unit: ix. Arranginga formwork, in particular a wall formwork, in a shuttering position, x. concreting the third concreting section, xi. arranging the formwork in a stripping position, wherein the formwork is preferably moved in a horizontal direction perpendicular to the second concreting section away from the second concreting section. The stripping position is designed to enable the displacement of the climbing rail into a fourth concreting section (i.e. into a position overlapping with the third concreting section). Depending on the number of storeys, the preceding steps can be repeated as often as desired. In a preferred embodiment, the displacement of the climbing rail along the first suspension shoe, i.e. step v. above, and / or the displacement of the climbing carriage along the climbing rail, i.e. step vii. above, in particular by the height of the first or second concreting section, is each carried out by a single stroke (i.e. by a single extension or a singleRetraction) of a cylinder-piston drive of a self-climbing drive. In a first embodiment, the method is carried out while climbing along an outer side of the structure using a climbing device with multiple climbing units, wherein the climbing scaffolds and the climbing rails of the climbing units are each displaced substantially parallel and at the same height. In a second embodiment, the method is carried out while climbing between opposite wall sections of a shaft of the structure. The present disclosure also relates to a self-climbing device, in particular a self-climbing formwork, as follows. Self-climbing device, in particular a self-climbing formwork, comprising: a suspension shoe for anchoring to a concreting section of a structure, a climbing rail for guidance along the suspension shoe, a climbing scaffold with a climbing carriage that is displaceable along the climbing rail,a self-climbing drive, which acts between the climbing rail and the climbing scaffold. In this embodiment, the suspension shoe can be designed according to one of the embodiments described above. However, a different design of the suspension shoe can also be provided, in particular with only one attachment point for the climbing rail or the climbing scaffold. The climbing rail, the climbing scaffold, the self-climbing drive, and optionally other components of the self-climbing device can be designed as in the embodiments of the climbing device described above. Facade climbing formwork with climbing rails, which are guided on climbing shoes on the facade, are known in the prior art. However, the climbing drive is supported on the structure or suspension shoe and must be activated in short strokes. On the other hand, the prior art according to EP 3440 283 B1 is not suitable for climbing on the exterior of the building.The self-climbing device in the above embodiment combines the advantages of known facade climbing systems with an efficient self-climbing drive, with which the climbing scaffold and the climbing rail can be quickly and easily moved into the next concreting section, in particular by a single stroke of a cylinder-piston drive. The invention is explained in more detail below using a preferred exemplary embodiment. Fig. 1 shows a diagrammatic view of a climbing formwork according to the invention during the erection of a building from individual concreting sections arranged one above the other. Figs. 2 to 4 show side views of the climbing formwork in different phases of the climbing process. Fig. 5 shows a front view of a suspension shoe according to the invention with its own fastening points for a climbing carriage and a climbing rail of the climbing formwork. Fig. 6 shows a side view of the suspension shoe, with aAnchor and a tiltable suspension part with the attachment points for the climbing carriage and the climbing rail can be seen. Fig. 7 shows the suspension shoe to which the climbing carriage (partially visible) was detachably attached. Fig. 8 shows a detailed view of a climbing unit of the climbing formwork, with a first and a second suspension shoe arranged on opposite sides of the climbing rail. Fig. 9 shows a view corresponding to Fig. 7 in a non-tilted neutral position of the suspension part. Fig. 10 shows a diagrammatic view of a detail of the climbing unit in a position in which both the climbing rail and the climbing carriage are fixed relative to the first and second suspension shoes. Fig. 11 shows a further embodiment of the climbing formwork between opposite wall sections of a shaft. Figs. 12 to 14 show the climbing process of the climbing formwork of Fig. 11 within the shaft.Fig. 1 to 4 show a climbing system 1 which is formed from a climbing device 2 and a building 3 (only partially visible). The climbing device 2 is temporarily connected to the building 3 during the construction of the building 3. Shown is an embodiment of the climbing device 2 for climbing on a facade, i.e. on the outside, of the building 3. In the embodiment shown, the climbing device 2 is designed as a climbing formwork, on which a formwork 4, here a wall formwork, is arranged. With the aid of the climbing formwork, individual concreting sections 5 are produced in successive concreting processes, which are arranged vertically one above the other. In an alternative application, the climbing device 2 has a protective shield for securing an edge area of ​​a storey of the building 3. The climbing device 2 has (at least) two identical climbing units 6, which are essentiallyof the same height at a horizontal distance parallel to the vertical outer side of the structure 3 (cf. Fig. 1). The climbing units 6 each have an elongated climbing rail 7, which extends over more than the height of a concreting section 5, here over more than the total height of two equally high concreting sections 5. In addition, the climbing units 6 each have a climbing carriage 9, which in the embodiment of Figs. 1 to 10 is designed as a scaffold carriage of a climbing scaffold 8. The climbing scaffold 8 is moved as a unit when climbing up along the climbing rail 7. The climbing device 2 also has at least one working platform 10, which in the embodiment of Figs. 1 to 10 is carried by the climbing scaffolds 8 of the climbing units 6. The working platform has horizontal platform supports 10A, on which a working platform deck 58 is arranged. For load transfer into the structure 3, each climbing unit 6 has at least one firstSuspension shoe 11, which is anchored in the concrete of the structure 3. As can be seen in detail in Fig. 5 to 9, the suspension shoe 11 has a wall anchor in the form of an anchor 12 for anchoring in the respective concreting section 5. The anchor 12 has a locking part, also referred to as a locking anchor 13, a suspension cone 14 and a ball stud 15. The locking anchor 13 can remain in the concrete of the structure 3; the suspension cone 14 and the ball stud 15 connected to the locking anchor 13, for example by screwing, can be retrieved after climbing up and used for an overlying concreting section 5. When the suspension shoe 11 is assembled, the anchor part 15 protrudes rearward from the outside of the structure 3. A suspension part 16 is arranged on the anchor part 15, from which the climbing rail 7 or the climbing carriage 9 can be suspended. In the embodiment shown, the suspension part 16 has a first holder 17 for reversibly detachableHolding the climbing rail 7 and a second holder 18 for reversibly releasably holding the climbing carriage 9 of the climbing frame 8. The first holder 17 has a first holding opening 19 for the passage of a first holding bolt 20 (see Fig. 8). Accordingly, the second holder 18 has a second holding opening 21 for the passage of a second holding bolt 22 (see Fig. 8). The first 17 and the second holder 18 are located, in relation to the mounted state of use on the structure 3, essentially at the same height, ie essentially at the same vertical position, on opposite sides with respect to a vertical plane (corresponding to the section line VI-VI in Fig. 5) through a longitudinal axis 23 (cf. Fig. 6) of the anchor 12. In the embodiment shown, the centers of the first 19 and the second holding opening 21 are arranged essentially at the same horizontal distance from the vertical plane through the longitudinal axis 23 of the anchor 12. In the embodiment shown, theThe suspension part 16 is mounted on the anchor 12 so as to be tiltable (at least) about a tilting axis running horizontally parallel to the outside of the adjacent concreting section 5. For this purpose, the anchor 12 has a ball element 24 and the suspension part 16 has a ball socket 25. The ball element 24 is arranged within the ball socket 25 such that the suspension part 16 can be tilted relative to the anchor 12. Furthermore, the ball socket 25 is elongated in the vertical direction (cf. Fig. 5), so that the suspension part 16 is displaceable in the vertical direction relative to the anchor 12 to facilitate assembly. In the embodiment shown, the suspension part 16 also has a receiving groove 26 which extends in an upper region of the suspension part 16 on the front side facing the climbing rail 7 in a horizontal direction parallel to the outside of the adjacent concreting section 5. This receiving groove 26 enables the positive reception of afirst engagement bar 27 on the climbing rail 7 and a second engagement bar 28 on the climbing carriage 9 (cf. Fig. 8). In the example shown, the suspension part 16 has a base plate 29 in which the receiving groove 26 and the ball socket 25 are formed as recesses, in particular as milled recesses. As can be seen from Fig. 8 and Fig. 10, each climbing unit 6 in the embodiment shown has a second suspension shoe 30 which is identical to the first suspension shoe 11. The first 11 and the second suspension shoe 30 are arranged essentially at the same height on both sides of the climbing rail 7 on the same concreting section 5. In the embodiment shown, the climbing carriage 9 has a holding fork 31 with two fork elements 32 on both sides of the climbing rail 7. The two fork elements 32 each carry a holding element 33, here a vertical holding plate, of a holding device 34 at their free ends. The holding elements 33 have suspension openings 35(see Fig. 9) for connection to the second holding openings 21 of the second brackets 18 by arranging the second holding bolts 22. In addition, the holding elements 33 each have a second engagement strip 28 for a substantially precise arrangement in the receiving groove 26 of the first 11 or the second suspension shoe 30. In the embodiment shown, the climbing carriage 9 also has a guide shoe 9A for gripping around and sliding along a rear flange 36 of a climbing profile 37 of the climbing rail 7. The climbing carriage 9 and thus the entire climbing frame 8 are guided during climbing by means of the guide shoe 9A. In the embodiment shown, a fastening device 38 can be reversibly detachably connected to the climbing rail 7 (see Fig. 8). The fastening device 38 has a fastening plate 39 with a bearing section 40 and two fastening sections 41 on either side of the bearing section 40. The bearing section 40 is connected via a bearing journal 42 to theClimbing rail 7. The fastening sections 41 each have a fastening opening 43 for connection to the first holding openings 19 of the first brackets 17 of the first 11 and second suspension shoe 30, respectively, by arranging the first retaining bolts 20. In the embodiment shown, the fastening plate 39 also has the first engagement strip 27 for a substantially precise arrangement in the receiving groove 26 of the first 11 and the second suspension shoe 30. Figs. 2 to 4 illustrate the sequence of climbing the climbing device 2. This sequence can be repeated as often as required depending on the height of the structure 3 to be erected. According to Fig. 2, the first 11 and the second suspension shoe 30 are anchored adjacent to the upper end of the climbing rail 7 at a first concreting section 5A, whereby in the example shown, two lower concreting sections 5 have already been produced below the first concreting section 5A. The formwork 4 is locatedis in the formwork or concreting position, with which a second concreting section 5B is created directly above the first concreting section 5a. The climbing unit 6 (and correspondingly the further climbing unit 6 arranged in parallel) is arranged in the holding position, in which the holding device 34 on the climbing carriage 9 is connected to the second holder 18 of the first 11 and the second suspension shoe 30, and the fastening device 38 on the climbing rail 9 is connected to the first holder 17 of the first 11 and the second suspension shoe 30. The climbing rail 7 is arranged completely below the lower end of the second concreting section 5B. According to Fig. 3, the formwork 4 is retracted into the striking position. The fastening device 38 connected to the climbing rail 7 is released from the first holder 17 of the first 11 and the second suspension shoe 30. In this position, the climbing rail 7 can be moved along the first 11 and secondSuspension shoe 30 can be moved upwards to the upper end of the second concreting section 5B. During the ascent of the climbing rail 7, the climbing scaffold 8 is held by the first 11 and second suspension shoe 30. At the upper end of the second concreting section 5B, a pair of further suspension shoes 44 is arranged, which are designed and arranged correspondingly to the first 11 and second suspension shoe 30. The fastening device 38 at the upper end of the climbing rail 7 is connected to the first brackets 17 of the further pair of suspension shoes 44 on the second concreting section 5B. The climbing rail 7 of the other climbing unit 6 is pulled upwards simultaneously and in parallel and is also held by a pair of further suspension shoes 44. According to Fig. 4, the holding device 34 on the climbing carriage 9 was first released from the second bracket 18 of the first 11 and the second suspension shoe 30. The climbing scaffold 8 can then be moved over theClimbing carriage 9 can be moved upwards along the climbing rail 7 until the formwork 4 is positioned at the height of the third concreting section (to be completed). The holding elements 33 of the holding device 34 on the climbing carriage 9 are then connected to the second brackets 18 of the further suspension shoes 44 on the second concreting section 5B. Finally, the formwork 4 can be brought into the shuttering or concreting position shown in Fig. 4 in order to produce the third concreting section (not yet present in the illustration of Fig. 4) above the second concreting section 5B. In the embodiment shown, a support part 45 is provided for support on the outside of the structure (cf. e.g. Fig. 2). The support part 45 slides on the outside of the structure 3 as the climbing rail 7 climbs upwards. In the embodiment shown, the support part 45 is attached to the lower end of the climbing rail 7. In the embodiment shown, a cantilever 46 is also provided at the lower end of theClimbing rail mounted (see, for example, Fig. 2). The boom 46 extends horizontally to the rear, i.e., away from the outside of the structure 3. Depending on the design, the climbing device 2 can be climbed up using a crane (not shown) or with a self-climbing drive 47 (as shown). In the design shown, the self-climbing drive 47 has, for example, a hydraulic cylinder-piston drive 48 for displacing the climbing scaffold relative to the climbing rail (and vice versa) (see, for example, Fig. 2). In the design shown, the climbing scaffold 8 has a vertically aligned column element 49 (when using the climbing unit 6 on a structure 3 consisting of vertical concreting sections 5), which extends parallel to the climbing rail 7. In addition, the climbing scaffold 6 has a support element for support on the outside of the structure. The support element is provided at the front end of a horizontal beam 61, whichis mounted at the lower end of the column element 49. The cylinder-piston drive 48 is connected at one longitudinal end to the rear end of the boom 46 and at the other longitudinal end to the column element 49. In the retracted state, the cylinder-piston drive is arranged essentially completely within the column element 49 (cf. Fig. 3 and Fig. 4). In the embodiment shown, the climbing scaffold 8 has a support element 56 for support on the outside of the structure 3. The support element 56 is provided at the front end of a horizontal beam 57 at the lower end of the column element 49. In the embodiment shown, the climbing carriage 9 is connected to the column element 49 via a further boom 50 (cf. e.g. Fig. 2). In addition, the climbing scaffold 8 has a guide element 51, in particular a further guide shoe, for guidance along the rear flange 36 of the climbing rail 7 below the guide shoe of the climbing carriage 8. The guide element 51engages around the rear flange 36 of the climbing rail 7 in order to slide along the climbing rail 7 when climbing up the climbing scaffold 8. The guide element 51 is connected to the column element 49 of the climbing scaffold 8 via a support element 52. In the exemplary embodiment shown, the climbing scaffold 8 has a further column element 53 which is arranged essentially parallel to the column element 49 and at a horizontal distance perpendicular to the outside of the structure. The further column element 53 is connected to the column element 49 via a strut framework 54 (cf. e.g. Fig. 2). In the exemplary embodiment shown, the climbing scaffold 8 has a cantilever part 55 at the upper ends of the column element 49 and the further column element 53, from which the formwork 4 is suspended. The following method for erecting the structure 3 from concreting sections 5 arranged one above the other can be carried out: i. Providing the climbing device 2, ii. Anchoring the first11 and the second suspension shoe 30 of the climbing units 6 essentially at the same height on the first concreting section 5A of the structure 3, iii. Arranging the climbing units 6 each in the holding position on the first 11 and the second suspension shoes 30, wherein the holding devices 34 on the climbing carriages 9 of the climbing units 6 are each connected to the second holders 18 of the first 11 and second suspension shoes 30 and the fastening devices 38 on the climbing rails 7 are each connected to the first holders 17 of the first 11 and second suspension shoes 30, iv. Arranging the formwork 4 in the shuttering or concreting position, v. Concreting the second concreting section 5B directly above the first concreting section 5A, vi. Arranging the formwork 4 in the striking position behind the rear end of the climbing rail 7, vii. Anchoring two further suspension shoes 44 per climbing unit 6 each at the upper end of the second concreting section 5B substantiallyat the same height and releasing the fastening devices 38 on the climbing rails 7 from the first brackets 17 of the first 11 and second suspension shoes 30, viii. Moving the climbing rails 7 by actuating the self-climbing drives 47 along the first 11 and second suspension shoes 30 until the upper ends of the climbing rails 7 reach the upper end of the second concreting section 5B, ix. Connecting the fastening devices 38 on the climbing rails 7 to the first brackets 17 of the further suspension shoes 44, x. Detaching the holding devices 34 on the climbing carriages 9 from the second brackets 18 of the first 11 and second suspension shoes 30, xi. Moving the climbing scaffolds 8 by means of the climbing carriages 9 by actuating the self-climbing drive 47 upwards along the climbing rails 7 until the formwork 4 is arranged at the level of the third concreting section to be produced in the next concreting process. Fig. 11 to 14 show an embodiment of theClimbing device 2, which is designed for climbing between opposite wall sections 59 of a shaft. For this purpose, two climbing units 6 are arranged on the opposite wall sections 59. In Figs. 12 to 14, only one half of this arrangement is shown in side view. In this embodiment, a transmission 60, a so-called gantry, can be provided, which connects the upper ends of the climbing rails 7 to each other. In the embodiment of Figs. 11 to 14, the climbing rail 7 is column-shaped. The climbing carriage 9, as in the embodiment of Figs. 1 to 10, is displaceable along the climbing rail 7. For this purpose, the climbing carriage 9 has the guide shoe 9A, which encompasses a section of the climbing rail 7. The holding device 34 is mounted on the front of the climbing carriage 9, with which the climbing carriage 9, as in the embodiment of Figs. 1 to 10, is attached to the secondBracket 18 of the first 11 and second suspension shoe 30 can be suspended. The first 11 and the second suspension shoe 30 of each climbing unit 6 are designed according to Figs. 1 to 10. In addition, the fastening device 38 is mounted on a central longitudinal section of the climbing rail 7, with which the climbing rail 7, also as in the embodiment of Figs. 1 to 10, can be suspended from the first bracket 17 of the first 11 and second suspension shoe 30. In contrast to the previous embodiment, the working platform 10 is connected to the climbing rail 7, so that the working platform 10, and also the transmission 60 with the formwork 4 suspended therefrom, are relocated together with the climbing rail 7 to the level of the next concreting section. The self-climbing drive 47 has the previously described cylinder-piston drive 48, which acts between the climbing carriage 9 and the climbing rail 7 in order to, depending on the phase of theClimbing process, the climbing rail 7 or the climbing carriage 9 is to be brought to the height of the next concreting section. According to Fig. 12, the first 11 and the second suspension shoe 30 are each anchored to the first concreting section 5A, wherein in the example shown, two lower concreting sections 5 have already been produced below the first concreting section 5A. The formwork 4 is in the shuttering or concreting position, with which the second concreting section 5B is produced directly above the first concreting section 5a. The climbing units 6 on the opposite wall sections 59 of the shaft, i.e. spaced apart from one another in the horizontal direction perpendicular to the wall planes, are each arranged in the holding position, in which the holding device 34 on the climbing carriage 9 is connected to the second holder 18 of the first 11 and the second suspension shoe 30 and the fastening device 38 on the climbing rail 9 is connected to the first holder 17 of thefirst 11 and second suspension shoe 30. The climbing rail 7 extends beyond the upper end of the second concreting section 5B, with the formwork 4 suspended from the transfer device 60. According to Fig. 13, the fastening device 38 connected to the climbing rail 7 is released from the first holder 17 of the first 11 and the second suspension shoe 30. In this position, the climbing rail 7, together with the working platform 10, the transfer device 60 and the formwork 4, can be moved upwards along the first 11 and second suspension shoe 30 beyond the upper end of the third concreting section (to be completed next). The climbing rail 7 is climbed upwards by a single stroke of the self-climbing drive 47 (i.e., not step by step with multiple forward and backward movements of the piston). During the ascent of the climbing rail 7, the climbing carriage 9 is held by the first 11 and second suspension shoe 30. At the upperAt the end of the second concreting section 5b, a pair of additional suspension shoes 44 is arranged, which are designed and arranged correspondingly to the first 11 and second suspension shoes 30. The fastening device 38 on the central longitudinal section of the climbing rail 7 is connected to the first brackets 17 of the further pair of suspension shoes 44 on the second concreting section 5b. The climbing rail 7 of the climbing unit 6 on the opposite wall section 59 is simultaneously and parallel pulled upwards and held by a pair of additional suspension shoes 44 on the opposite wall section 59. According to Fig. 14, the holding device 34 on the climbing carriage 9 was first released from the second bracket 18 of the first 11 and the second suspension shoe 30. Subsequently, the climbing carriage 9 can be moved along the climbing rail 7 by a single stroke of the cylinder-piston drive 48 of the self-climbing drive 47 to the level of the next concreting section, here at the level of thesecond concreting section 5B. The holding device 34 on the climbing carriage 9 is then connected to the second brackets 18 of the additional suspension shoes 44 on the second concreting section 5B. Thus, the climbing unit 6 is arranged in the holding position, in which the third concreting section can be produced above the second concreting section 5B.

[0002] List of reference numbers: 1 Climbing system 2 Climbing device 3 Structure 4 Formwork 5 Concreting section 6 Climbing unit 7 Climbing rail 8 Climbing scaffold 9 Climbing or scaffolding carriage 9A Guide shoe 10 Working platform 10A Platform support 11 First suspension shoe 12 Anchor 13 Locking anchor 14 Suspension cone 15 Anchor part 16 Suspension part 17 First bracket 18 Second bracket 19 First holding opening 20 First holding bolt 21 Second holding opening 22 Second holding bolt 23 Longitudinal axis 24 Ball element 25 Ball socket 26 Receiving groove 27 First engagement bar 28 Second engagement bar 29 Base plate 30 Second suspension shoe 31 Holding fork 32 Fork elements 33 Holding elements 34 Holding device 35 Suspension openings 36 Flange 37 Climbing profile 38 Fastening device 39 Fastening plate 40 Bearing section 41 Fastening sections 42 Bearing pin 43 Mounting hole 44 Additional suspension shoes 45 Support part 46 Boom 47 Self-climbing drive 48 Cylinder-piston drive 49 Column element 50 Additional boom 51Guide element 52 Support element 53 Additional column element 54 Strut framework 55 Cantilever element 56 Support element 57 Horizontal beam 58 Working platform flooring 59 Opposite wall sections of the shaft 60 Transfer 61 Horizontal beam

Claims

Claims:

1. Suspension shoe (11, 30, 44) for use with a climbing unit (6) comprising a first climbing component, in particular a climbing rail (7), and a second climbing component, in particular a climbing carriage (9) slidable along the climbing rail (7), comprising: an anchor (12) for anchoring in a concrete section (5; 5A, 5B) of a structure (3), a suspension part (16) connected to the anchor (12), characterized in that the suspension part (16) comprises a first holder (17) for releasably holding the first climbing component of the climbing unit (6), in particular the climbing rail (7), and a second holder (18) for releasably holding the second climbing component of the climbing unit (6), in particular the climbing carriage (9). 2.Suspension shoe (11, 30, 44) according to claim 1, characterized in that the first holder (17) has a first retaining opening (19) for the passage of a first retaining bolt (20) and / or the second holder (18) has a second retaining opening (21) for the passage of a second retaining bolt (22).

3. Suspension shoe (11, 30, 44) according to claim 1 or 2, characterized in that the first (17) and the second holder (18) are provided at substantially the same height on both sides of the anchor (12).

4. Suspension shoe (11, 30, 44) according to any one of claims 1 to 3, characterized in that the suspension part (16) is connected to the anchor (12) so as to be tiltable, in particular about a horizontal axis.

5. Suspension shoe (11, 30, 44) according to claim 4, characterized in that the anchor (12) has a ball element (24) and the suspension part has a ball socket (25), wherein the ball element (24) of the anchor (12) is tiltable in the ball socket. (25) of the suspension part (16).

6. Suspension shoe (11, 30, 44) according to one of claims 1 to 5, characterized in that the suspension part (16) has a receiving groove (26), extending in particular in a horizontal direction, for receiving a first engagement strip (27) on the climbing rail and / or a second engagement strip (28) on the climbing carriage (9).

7. Suspension shoe (11, 30, 44) according to one of claims 1 to 6, characterized in that the suspension part (16) has a base plate (29) in which the receiving groove (26) and / or the ball socket (25) is preferably recessed.

8. Climbing unit (6) for arrangement on a structure (3), comprising: a first suspension shoe (11) for anchoring to a concreting section (5; 5A, 5B) of the structure (3), a climbing rail (7), a climbing carriage (9) which is slidable along the climbing rail (7), characterized in that the first suspension shoe (11) is designed according to one of claims 1 to 7,wherein in a first climbing position of the climbing unit (6) a holding device (34) on the climbing carriage (9) is connected to the second bracket (18) of the first suspension shoe (11) and a fastening device (38) on the climbing rail (7) is detached from the first bracket (17) of the first suspension shoe (11), so that the climbing rail (7) is slidable along the first suspension shoe (11), wherein in a second climbing position the fastening device (38) on the climbing rail (7) is connected to the first bracket (17) of the first suspension shoe (11) and the holding device (34) on the climbing carriage (9) is detached from the second bracket (18) of the first suspension shoe (11), so that the climbing carriage (9) is slidable along the climbing rail (7).

9. Climbing unit (6) according to claim 8 with claim 2, wherein, characterized in that the fastening device (38) on the climbing rail (7) has a fastening opening (43) for arranging the first retaining bolt (20) and / or the retaining device (34) on the climbing carriage (9) has a suspension opening (35) for arranging the second retaining bolt (22).

10. Climbing unit (6) according to claim 8 or 9 with claim 6, characterized in that the fastening device (38) on the climbing rail (7) has a first engagement strip (27) and / or the retaining device (34) on the climbing carriage (9) has a second engagement strip (38), each for preferably substantially precise alignment in the receiving groove (26) of the first suspension shoe (11).

11. Climbing unit (6) according to any one of claims 8 to 10, characterized in that a second suspension shoe (30) according to any one of claims 1 to 7 is provided for anchoring to the concreting section (5).wherein in the first climbing position the holding device (34) on the climbing carriage (9) is connected to the second bracket (18) of the first (11) and second suspension shoe (30) and the fastening device (38) on the climbing rail (7) is released from the second bracket (18) of the first (11) and second suspension shoe (30) so that the climbing rail (7) is slidable along the first (11) and second suspension shoe (30), wherein in the second climbing position the fastening device (38) on the climbing rail (7) is connected to the first bracket (17) of the first (11) and second suspension shoe (30) and the holding device (34) on the climbing carriage (9) is released from the second bracket (18) of the first (11) and second suspension shoe (30) so that the climbing carriage (9) is slidable along the climbing rail (7).

12. Climbing unit (6) according to claim 11, characterized in that,that the first (11) and the second suspension shoe (30) are arranged at essentially the same height on both sides of the climbing rail (7).

13. Climbing unit (6) according to claim 11 or 12, characterized in that the climbing carriage (9) has a holding fork (31) with two fork elements (32) on both sides of the climbing rail (7), wherein the two fork elements (32), in particular at their free ends, each carry a holding element (33), in particular a holding plate, of the holding device (34), which in the first climbing position are connected, in particular via the second holding bolt (22), to the second supports (18) of the first (11) and second suspension shoe (30).

14. Climbing unit (6) according to any one of claims 8 to 13, characterized in that the climbing carriage (9) has a guide shoe (9A) for guiding along the climbing rail (7), in particular for gripping a climbing profile (37) of the climbing rail (7), wherein preferably a horizontal central axis of the guide shoe (9A) lies substantially in a vertical central plane of the climbing rail (7). 15.Climbing unit (6) according to any one of claims 11 to 14, characterized in that the fastening device (38) has a fastening plate (39) with a bearing section (40) and two fastening sections (41) on both sides of the bearing section (40), wherein the bearing section (40) is connected to the climbing rail (7), preferably via a bearing pin (42), and the fastening sections (41) are connected in the second climbing position to the first supports (17) of the first (11) and second suspension shoe (30), preferably via the two first retaining bolts (20).

16. Climbing unit (6) according to any one of claims 8 to 15, characterized in that a support element (45) is provided for support on the outside of the structure (3), in particular at the lower end of the climbing rail (7). 17.Climbing unit (6) according to one of claims 8 to 16, characterized by a self-climbing drive (47), in particular with a cylinder-piston drive (48), for moving the climbing carriage (9) relative to the climbing rail (7) and vice versa.

18. Climbing unit (6) according to claim 17, characterized in that a cantilever (46), in particular at the lower end of the climbing rail (7), is provided, to which the self-climbing drive (47) is connected.

19. Climbing unit (6) according to claim 17 or 18, characterized in that a climbing frame (8) comprising the climbing carriage (9) also comprises a preferably vertical column element (49) to which the self-climbing drive (47) is connected.

20. Climbing unit (6) according to claim 19, characterized in that the climbing frame (8) comprises a further column element (53) parallel to the column element (49), wherein preferably a strut truss (54) is provided between the column element (49) and the further column element (53).

21. Climbing unit (6) according to any one of claims 8 to 20, characterized in that a further climbing shoe (44), in particular a pair of further climbing shoes (44), is provided above the first climbing shoe (11). 22.

23. Climbing device (2) comprising: two climbing units (6) according to any one of claims 8 to 21, which are arranged side by side at a horizontal distance.

24. Climbing device according to claim 22, characterized in that at least one working platform (10) is provided.

25. Climbing device according to claim 22 or 23, characterized in that formwork (4), in particular wall formwork, is provided.

26. Climbing system (1) comprising: a climbing unit (6) according to any one of claims 8 to 21, a structure (3) with a concreting section (6), wherein the anchor (12) of the suspension shoe (11) is anchored within the concreting section (5) of the structure (3).

26. Method for erecting a structure (3) from superimposed concrete sections (5), comprising the steps of: i. providing a climbing unit (6) according to one of claims 8 to 21, ii. anchoring the first suspension shoe (11) to a first concrete section (5A) of the structure (3), iii. arranging the climbing unit (6) in the first climbing position on the first suspension shoe (11), wherein the holding device (34) on the climbing carriage (9) is connected to the second bracket (18) of the first suspension shoe (11) and the fastening device (38) on the climbing rail (7) is detached from the first bracket (17) of the first suspension shoe (11), iv. anchoring a further suspension shoe (44) to a second concrete section (5B), v. sliding the climbing rail (7) along the first suspension shoe (11), vi.

27. Arranging the climbing unit (6) in the second climbing position on the further suspension shoe (44), wherein the fastening device (38) on the climbing rail (7) is connected to the first bracket (17) of the further suspension shoe (44) and the holding device (34) on the climbing carriage (9) is detached from the second bracket (18) of the first suspension shoe (11), vii. Moving the climbing carriage (9) upwards along the climbing rail (7).

28. Method according to claim 26, characterized by the further step: viii. Arranging the climbing unit (6) in a holding position on the further suspension shoe (44), wherein the holding device (34) on the climbing carriage (9) is connected to the second bracket (18) of the further suspension shoe (44) and the fastening device (38) on the climbing rail (7) is connected to the first bracket (17) of the further suspension shoe (44).

29. Method according to claim 27, characterized by the further steps: ix. Arranging a formwork (4), in particular a wall formwork, in an engaged position; x. Concreting the third concreting section; xi. Arranging the formwork (4) in a stripped position, wherein the formwork (4) is moved away from the second concreting section (5B), preferably in a horizontal direction perpendicular to the second concreting section (5B).

29. Method according to one of claims 26 to 28, characterized in that the displacement of the climbing rail (7) along the first suspension shoe (11) and / or the displacement of the climbing carriage (9) along the climbing rail (7), in particular by the height of one of the concreting sections (5A, 5B), is effected by a single stroke of a cylinder-piston drive (48) of a self-climbing drive (47).