Auxiliary formwork erecting device for suspended staggered-floor balcony formwork

By using the auxiliary support device of cantilevered disassembled balcony formwork in high-rise buildings, and using the combination of guide rails and hydraulic support components, the safety risks and operational difficulties of installation and removal of cantilevered disassembled balcony formwork are solved, achieving more efficient Safer construction process.

CN118911415APending Publication Date: 2024-11-08CHINA RAILWAY NO 5 ENG GRP BUILDING ENG +1

Patent Information

Application Number
CN202411184841.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-27
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

In high-rise buildings, the erection and demolition of the formwork support system of cantilevered split-level balcony poses great safety risks, and the labor cost is high and the operation is difficult. Especially as the height of the building increases, the erection and formwork installation and demolition have become More difficult.

Method used

An auxiliary support device for cantilevered disassembled balcony formwork is designed. By setting guide rails on the exterior wall shear wall and lattice columns, the sliding blocks and hydraulic support components are used to realize the movable installation and stable support of the aluminum formwork, reducing manpower operation. Improve safety.

Benefits of technology

It effectively reduces labor costs, simplifies operation difficulty, improves the safety and efficiency of installation and demolition of cantilevered split-level balcony formwork, and is suitable for the construction of cantilevered split-level balcony in high-rise buildings.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911415A_ABST
    Figure CN118911415A_ABST
Patent Text Reader

Abstract

The invention discloses an auxiliary formwork erecting device for a suspended staggered-floor balcony formwork, and belongs to the technical field of auxiliary devices for pouring concrete into building formworks. The structure comprises an outer wall shear wall of a building with a suspended staggered-floor balcony to be poured, and latticed columns are installed at the position, located on the front side end face of the outer wall shear wall, of the ground; a first guide rail and a second guide rail are installed on the two opposite end faces of the outer wall shear wall and the latticed column respectively. The first guide rail and the second guide rail are vertically arranged; a first sliding block is movably mounted on the first guide rail; a second sliding block is movably mounted on the second guide rail; hydraulic supporting assemblies are movably mounted on the first sliding block and the second sliding block; a first aluminum template and a second aluminum template which are split are correspondingly mounted on the hydraulic supporting assembly; the problems that at present, when an aluminum alloy formwork of a suspended staggered-floor balcony is installed through an external frame body, the consumed labor cost is high, and the operation difficulty is large are effectively solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of auxiliary devices for pouring concrete into building templates, and in particular to an auxiliary formwork device for a cantilevered staggered balcony template. Background Art

[0002] At present, the construction of cantilevered staggered balconies in high-rise residential areas is mostly done by first setting up a formwork support system on the ground and then installing aluminum alloy formwork on the support frame located at the design position of the cantilevered staggered balcony; this is achieved in conjunction with the layer-by-layer pouring of the main building; but in actual operation, since the cantilevered staggered balcony structure is usually three-story and one cantilevered, that is, the floor height between balconies is usually 9m as high as the three-story building, this makes the erection and dismantling of the formwork support system more difficult and poses a greater safety risk; at the same time, as the building height increases, whether it is the erection of the external frame or the installation of the formwork, the corresponding manual operation difficulty will increase. In addition, there are also great difficulties in the later dismantling work, which is the main problem currently faced. Summary of the invention

[0003] The technical problem to be solved by the present invention is to provide an auxiliary formwork device for a cantilevered staggered balcony formwork, so as to solve the problem that the labor cost is high and the operation is difficult when the aluminum alloy formwork of the cantilevered staggered balcony is currently installed through an external frame.

[0004] To solve the above problems, the present invention provides the following technical solutions: A cantilevered staggered balcony formwork auxiliary formwork device; it comprises an external wall shear wall of a building where a cantilevered staggered balcony is to be cast, a lattice column is installed on the ground at a position located at the front end surface of the external wall shear wall; a first guide rail and a second guide rail are respectively installed on two opposite end surfaces of the external wall shear wall and the lattice column; the first guide rail and the second guide rail are both arranged vertically; a first slider is movably installed on the first guide rail; a second slider is movably installed on the second guide rail; a hydraulic support assembly is movably installed on both the first slider and the second slider; It also includes a first aluminum formwork and a second aluminum formwork for casting a cantilevered staggered balcony; the first aluminum formwork and the second aluminum formwork are detachably connected, and the first aluminum formwork and the second aluminum formwork are movably mounted on hydraulic support assemblies corresponding to the first slider and the second slider, respectively.

[0005] Preferably, there are two first aluminum templates, and the shapes of the two first aluminum templates are consistent; the first aluminum template includes a first beam groove plate; a first rectangular plate is arranged on a side plate of the first beam groove plate, and a notch end side of the first beam groove plate is arranged close to the wall surface; the two first aluminum templates are detachably connected at the first rectangular plate; The second aluminum template includes a second rectangular plate; the first rectangular plates on the two first aluminum templates can be detachably mounted on one side of the second rectangular plate; a pair of second beam groove plates and a third beam groove plate that are connected to each other are also mounted on the other three sides of the second rectangular plate; the groove specifications of the second beam groove plate are consistent with the groove specifications of the first beam groove plate.

[0006] Furthermore, the width of the first rectangular plate is half of the width of the second rectangular plate, and the length of the first rectangular plate is smaller than the length of the second rectangular plate.

[0007] Preferably, the first guide rail and the first slider are arranged in pairs, and the first guide rails are respectively arranged on the left and right sides of the exterior wall shear wall close to the position of the cantilevered staggered balcony to be cast.

[0008] Preferably, a plurality of cast type-one balconies or type-two balconies are arranged on the exterior wall shear wall; the lattice column comprises a pair of vertical columns; the vertical columns are installed by means of a cast foundation arranged on the ground; a plurality of connecting columns are arranged between the vertical columns; the height of the connecting columns is consistent with the setting height of the type-one balcony, and a lattice column wall support is detachably installed between the connecting columns and the type-one balcony; the number of the second guide rails is an even number, and the second guide rails are respectively arranged on two vertical columns.

[0009] Furthermore, the spacing between the two columns is consistent with the width of the cantilevered staggered balcony to be cast; the shortest distance between the plane where the two second guide rails are located and the first-type balcony is smaller than the height of the second aluminum formwork.

[0010] Furthermore, a support plate is installed between the two second sliders; a number of auxiliary hydraulic support rods are arranged on the end surface of the support plate facing the outer wall shear wall; one end of the auxiliary hydraulic support rod is hinged on the support plate, and the other end is hingedly installed on the lower bottom surface of the second aluminum formwork.

[0011] Preferably, the hydraulic support components arranged on the first slide block and the second slide block are consistent; the hydraulic support component includes a first hydraulic telescopic rod and a second hydraulic telescopic rod; One end of the first hydraulic telescopic rod located on the first slider is fixed to the first slider, and the other end is hingedly mounted on the outer side wall of the first aluminum template, and the two ends of the corresponding second hydraulic telescopic rod are respectively hingedly connected to the first slider and the first aluminum template; One end of the first hydraulic telescopic rod on the second slider is fixed on the second slider, and the other end is hingedly mounted on the outer side wall of the second aluminum template. The two ends of the corresponding second hydraulic telescopic rod are respectively hinged with the second slider and the second aluminum template.

[0012] Furthermore, the movements of the two first sliding blocks on the first guide rail are independent of each other.

[0013] The present invention also provides a method for using the auxiliary formwork device for a cantilevered staggered balcony formwork, which comprises the following steps: S1. First, pour the main structure concrete other than the cantilevered staggered balcony to be poured in this operation step. The cantilevered staggered balcony to be poured is constructed by secondary pouring. At the same time, balcony steel bars are reserved in the uncast cantilevered staggered balcony structure. Subsequent operations can only be carried out when the strength of the poured main structure concrete reaches the standard; the first hydraulic telescopic rod, the second hydraulic telescopic rod and the auxiliary hydraulic support rod on the hydraulic support assembly are all in a retracted state. At this time, one end of the first rectangular plate on the two first aluminum templates and the second rectangular plate on the second aluminum template are both arranged vertically downward; S2. Move the first slider and the second slider to a height position close to the cantilevered staggered balcony to be installed and cast by using the first guide rail and the second guide rail respectively, and the height should avoid interference between the first aluminum formwork and the second aluminum formwork and the type 1 balcony or the type 2 balcony during the movement; S3, respectively operate the hydraulic support components on the first slider and the second slider; coordinately control the telescopic states of the first hydraulic telescopic rod, the second hydraulic telescopic rod and the auxiliary hydraulic support rod, so that the two first aluminum templates and the second aluminum templates rotate until the first rectangular plate and the second rectangular plate are successively placed horizontally; continue to control the telescopic states of the first hydraulic telescopic rod, the second hydraulic telescopic rod and the auxiliary hydraulic support rod, and at the same time control the lifting height of the first slider and the second slider so that the first aluminum template and the second aluminum template are moved one by one in a certain order to the position of the cantilevered staggered balcony to be cast; S5. Before pouring, the connection between the two first aluminum formworks, the second aluminum formwork and the external wall shear wall is reinforced; S6, pouring into the area enclosed by the first aluminum formwork, the second aluminum formwork and the external wall shear wall to obtain a cantilevered staggered balcony; S7. After the cantilevered staggered balcony to be cast meets the standards, the connection between the two first aluminum formworks, the second aluminum formwork and the external wall shear wall is removed and demoulding is performed. The cantilevered staggered balcony after casting is a new type I balcony; S8, controlling the telescopic state of the first hydraulic telescopic rod, the second hydraulic telescopic rod and the auxiliary hydraulic support rod, so that the two first aluminum templates and the second aluminum template are separated and sequentially translated downward vertically to avoid interference with the newly cast type one balcony; thereafter, the two first aluminum templates and the second aluminum template are sequentially controlled to move until the first hydraulic telescopic rod, the second hydraulic telescopic rod and the auxiliary hydraulic support rod are retracted to the initial length; S9. As the main structure of the building continues to be constructed upward, the first guide rail and the second guide rail are laid upward synchronously along the outer wall shear wall and the lattice column; thereafter, steps S1 to S8 are looped to complete the synchronous pouring construction of the cantilevered staggered balcony at the corresponding design height position while the main structure of the building is being constructed.

[0014] Beneficial effects of the present invention: The present invention provides an auxiliary formwork device for a cantilevered staggered balcony formwork; it refers to the hydraulic climbing formwork system in the current high-rise building field, and realizes the up and down movement of a slider by arranging guide rails on the relative end faces of the outer wall shear wall and the lattice column, and realizes the movable installation of the module through the hydraulic support assembly on the slider, thereby providing a stable supporting force; it effectively solves the problem of high labor cost and great operation difficulty when currently installing the aluminum alloy formwork of the cantilevered staggered balcony through an external frame. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 is a schematic diagram of the three-dimensional structure of the inventive device in this embodiment; Figure 2 yes Figure 1 A schematic diagram of the three-dimensional structure of the device in another viewing angle; Figure 3 yes Figure 1 A schematic diagram of the three-dimensional structure of the device in another viewing angle; Figure 4 yes Figure 1 A front view of the device; Figure 5 yes Figure 1 The right side view of the device in the middle; Figure 6 yes Figure 1 A top view of the device; Figure 7 yes Figure 6 Middle AA section view; Figure 8 yes Figure 6 Middle BB section view; Fig. 9 is a three-dimensional schematic diagram of the installation between the first aluminum template and the second aluminum template in this embodiment; Fig.10 yes Fig. 9 A schematic diagram of a three-dimensional structure in which the first aluminum template and the second aluminum template are mortised at the back; Fig.11 This is a schematic diagram of the second aluminum formwork after it is separated and reset from the cast cantilevered staggered balcony in this embodiment; Explanation of the accompanying drawings: 1. Exterior wall shear wall, 1A. Type 1 balcony, 1B. Type 2 balcony, 2. Lattice column, 2A. Vertical column, 2B. Connecting column, 2C. Lattice column wall support, 3. First guide rail, 4. Second guide rail, 5. First slider, 6. Second slider, 7. Hydraulic support assembly, 7A. First hydraulic telescopic rod, 7B. Second hydraulic telescopic rod, 8. First aluminum formwork, 8A. First beam trough plate, 8B. First rectangular plate, 9. Second aluminum formwork, 9A. Second rectangular plate, 9B. Second beam trough plate, 10. Support plate, 11. Auxiliary hydraulic support rod. DETAILED DESCRIPTION

[0016] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments: Example: Reference Figures 1 to 8 The present embodiment provides an auxiliary formwork device for a cantilevered staggered balcony formwork; it comprises an external wall shear wall 1 of a building for pouring a cantilevered staggered balcony; a lattice column 2 is installed on the ground at the front end face of the external wall shear wall 1; a first guide rail 3 and a second guide rail 4 are installed on two opposite end faces of the external wall shear wall 1 and the lattice column 2, respectively; the first guide rail 3 and the second guide rail 4 are both arranged vertically; a first slider 5 is movably installed on the first guide rail 3; a second slider 6 is movably installed on the second guide rail 4; a hydraulic support assembly 7 is movably installed on both the first slider 5 and the second slider 6; the lattice column in the present embodiment is set on the ground, and adopts a reinforced concrete foundation mechanism; It also includes a first aluminum formwork 8 and a second aluminum formwork 9 for casting a cantilevered staggered balcony; the first aluminum formwork 8 and the second aluminum formwork 9 are detachably connected, and the first aluminum formwork 8 and the second aluminum formwork 9 are movably mounted on the hydraulic support assemblies 7 corresponding to the first slider 5 and the second slider 6, respectively.

[0017] refer to Fig. 9 There are two first aluminum templates 8, and the shapes of the two first aluminum templates 8 are consistent; the first aluminum template 8 includes a first beam groove plate 8A; a first rectangular plate 8B is arranged on a side plate of the first beam groove plate 8A, and a notch end side of the first beam groove plate 8A is arranged close to the wall surface; the two first aluminum templates 8 are detachably connected at the first rectangular plate 8B; The second aluminum template 9 includes a second rectangular plate 9A; the first rectangular plates 8B on the two first aluminum templates 8 can be detachably mounted on one side of the second rectangular plate 9A; a pair of second beam groove plates 9B and a third beam groove plate that are connected to each other are also mounted on the other three sides of the second rectangular plate 9A; the groove specifications of the second beam groove plate 9B are consistent with the groove specifications of the first beam groove plate 8A.

[0018] The width of the first rectangular plate 8B is half of the width of the second rectangular plate 9A, and the length of the first rectangular plate 8B is smaller than the length of the second rectangular plate 9A.

[0019] In this embodiment, the overall formwork structure is divided into three parts, among which the first aluminum formwork whose posture is controlled by the hydraulic support assemblies on the two first sliders is close to the external wall shear wall, and the second aluminum formwork is close to the lattice column; as can be seen from the figure, the size of the second aluminum formwork in this embodiment is obviously much larger than the first aluminum formwork; on the one hand, such a design allows the joint of the two to be closer to the external wall shear wall, which can facilitate the operator to connect and install the second aluminum formwork and the first aluminum formwork on the plane of the main building; on the other hand, the three separate formwork structures can cooperate with the actions of the hydraulic support assemblies in three directions respectively, avoiding possible interference between the formwork and the external wall shear wall.

[0020] The first guide rail 3 and the first slider 5 are arranged in pairs, and the first guide rail 3 is respectively arranged on the left and right sides of the exterior wall shear wall near the position of the cantilevered staggered balcony to be cast. The two first sliders 5 on the first guide rail 3 move independently of each other.

[0021] In the present embodiment, the first guide rail is the guide rail component on the hydraulic self-climbing formwork equipment, which is installed by means of a wall mount and a wall hanger mounted on the wall; the first slider is an electrically controlled hydraulic lifting member arranged on the climbing formwork platform; the second guide rail is a similar movable guide rail component directly arranged on the lattice column after referring to the characteristics of the guide rail component on the above-mentioned hydraulic self-climbing formwork equipment, and the second slider is also an electrically controlled hydraulic lifting member arranged on the climbing formwork platform; for the specific structure and working principle of the climbing formwork equipment, reference may be made to the patent authorization document with patent number CN102345381A and the name “Hydraulic Climbing Formwork System and Climbing Formwork Construction Method”; it should be noted that the present invention cites this patent document only to illustrate a conventional installation method and corresponding working principle of the first guide rail, the second guide rail, the first slider and the second slider. Under the condition of meeting specific use requirements, other similar automatic climbing structures that can achieve the same purpose should also be protected.

[0022] Considering the need to avoid interference when controlling the sliders to assemble the templates, it is considered to set the two first sliders as independent structures to achieve the regulation of the template lifting order.

[0023] A plurality of cast-in-place type-1 balconies 1A or type-2 balconies 1B are arranged on the external wall shear wall 1; the lattice column 2 includes a pair of columns 2A; the columns 2A are installed through a cast foundation arranged on the ground; a plurality of connecting columns 2B are arranged between the columns 2A; the height of the connecting columns 2B is consistent with the setting height of the type-1 balcony 1A, and a lattice column wall support 2C is detachably installed between the connecting columns 2B and the type-1 balcony 1A; the number of the second guide rails 4 is an even number, and the second guide rails 4 are respectively arranged on two columns 2A. In this embodiment, the type-1 balcony is essentially a cantilevered staggered balcony cast by the first aluminum formwork and the second aluminum formwork, and it can be seen from the illustration that its extended length is much greater than that of the type-2 balcony; and the lattice column wall support is arranged to improve the connection strength between the lattice column and the external wall shear wall.

[0024] The distance between the two columns 2A is consistent with the width of the cantilevered staggered balcony to be cast; the shortest distance between the plane where the two second guide rails 4 are located and the first-type balcony 1A is smaller than the height of the second aluminum template 9.

[0025] A support plate 10 is also installed between the two second sliders 6; a plurality of auxiliary hydraulic support rods 11 are also arranged on the end surface of the support plate 10 facing the external wall shear wall 1; one end of the auxiliary hydraulic support rod 11 is hinged on the support plate 10, and the other end is hingedly installed on the lower bottom surface of the second aluminum formwork 9.

[0026] The hydraulic support assembly 7 disposed on the first slide block 5 and the second slide block 6 is consistent; the hydraulic support assembly 7 includes a first hydraulic telescopic rod 7A and a second hydraulic telescopic rod 7B; One end of the first hydraulic telescopic rod 7A located on the first slider 5 is fixed on the first slider 5, and the other end is hingedly mounted on the outer wall of the first aluminum template 8, and the two ends of the corresponding second hydraulic telescopic rod 7B are respectively hingedly connected to the first slider 5 and the first aluminum template 8; One end of the first hydraulic telescopic rod 7A located on the second slider 6 is fixed on the second slider 6, and the other end is hingedly mounted on the outer wall of the second aluminum template 9. The corresponding two ends of the second hydraulic telescopic rod 7B are respectively hinged to the second slider 6 and the second aluminum template 9.

[0027] The hydraulic telescopic rods involved in this embodiment are all electrically controlled hydraulic telescopic rod structures, and the coordinated actions of the various hydraulic telescopic rods are controlled by a controller, thereby ensuring the stability of the template force and action.

[0028] When using the device of the present invention, the following procedures can be referred to for operation: S1. First, pour the main structure concrete other than the cantilevered staggered balcony to be poured in this operation step. The cantilevered staggered balcony to be poured is constructed by secondary pouring. At the same time, balcony steel bars are reserved in the uncast cantilevered staggered balcony structure. Subsequent operations can only be carried out when the strength of the poured main structure concrete reaches the standard; the first hydraulic telescopic rod 7A and the second hydraulic telescopic rod 7B and the auxiliary hydraulic support rod 11 on the hydraulic support assembly 7 are all in a contracted state. At this time, one end of the first rectangular plate 8A on the two first aluminum templates 8 and the second rectangular plate 9B on the second aluminum template 9 are both arranged vertically downward; S2, respectively move the first slider 5 and the second slider 6 to a height position close to the cantilevered staggered balcony to be installed and cast by the first guide rail 3 and the second guide rail 4, and the height should avoid interference between the first aluminum formwork 8 and the second aluminum formwork 9 and the type 1 balcony 1A or the type 2 balcony 1B during the movement; S3, respectively operate the hydraulic support assembly 7 located on the first slider 5 and the second slider 6; coordinately control the telescopic state of the first hydraulic telescopic rod 7A, the second hydraulic telescopic rod 7B and the auxiliary hydraulic support rod 11, so that the two first aluminum templates 8 and the second aluminum templates 9 are rotated until the first rectangular plate 8B and the second rectangular plate 9A are successively placed horizontally; continue to control the telescopic state of the first hydraulic telescopic rod 7A, the second hydraulic telescopic rod 7B and the auxiliary hydraulic support rod 11, and at the same time control the lifting height of the first slider 5 and the second slider 6 so that the first aluminum template 8 and the second aluminum template 9 are successively moved to the position of the cantilevered staggered balcony to be cast in a certain order; S5. Before pouring, the connection between the two first aluminum formworks 8, the second aluminum formwork 9 and the external wall shear wall is reinforced; Fig.10 In this embodiment, the two first aluminum templates 8 and the second aluminum template 9 are both provided with a plurality of mortise and tenon interfaces of sizes matching each other on the back of the corresponding first rectangular plate and the second rectangular plate. When splicing, one of the first aluminum templates is first raised to a specified position, and then the other aluminum template is raised from the bottom to the top until it is engaged with the mortise and tenon groove of the previous first aluminum template. After confirming that the connection between the first aluminum templates is completed, the second aluminum template is also raised from the bottom until it is engaged with the previous two first aluminum templates; S6, pouring into the area enclosed by the first aluminum formwork 8, the second aluminum formwork 9 and the external wall shear wall to obtain a cantilevered staggered balcony; S7, after the cantilevered staggered balcony to be cast meets the standards, the connection between the two first aluminum formworks 8, the second aluminum formwork 9 and the external wall shear wall is removed and demoulding is performed, and the cantilevered staggered balcony after casting is a new type I balcony 1A; S8, control the telescopic state of the first hydraulic telescopic rod 7A, the second hydraulic telescopic rod 7B and the auxiliary hydraulic support rod 11, so that the two first aluminum templates 8 and the second aluminum templates 9 are separated and translated vertically downward in sequence to avoid interference with the newly cast type I balcony 1A; thereafter, the two first aluminum templates 8 and the second aluminum templates 9 are controlled to move in sequence until the first hydraulic telescopic rod 7A, the second hydraulic telescopic rod 7B and the auxiliary hydraulic support rod 11 are retracted to the initial length; at this time, the relative position between the second aluminum template and the newly cast type I balcony and the second slider on the lattice column can be referred to Fig.10 Similarly, the relative external positioning between the first aluminum formwork, the newly cast type one balcony and the first slider also needs to achieve the same effect, so as to avoid interference between the subsequent slider and the formwork and the newly cast type one balcony during the upward movement; S9. As the main structure of the building continues to be constructed upward, the first guide rail 3 and the second guide rail 4 are synchronously laid upward along the external wall shear wall 1 and the lattice column 2; thereafter, steps S1 to S8 are looped to complete the synchronous pouring construction of the cantilevered staggered balcony at the corresponding design height position while the main structure of the building is being constructed.

Claims

1. An auxiliary formwork device for a cantilevered staggered balcony formwork, comprising an external wall shear wall (1) of a building where a cantilevered staggered balcony is to be cast; a lattice column (2) is installed on the ground at a position on the front side end surface of the external wall shear wall (1); the device is characterized in that: A first guide rail (3) and a second guide rail (4) are respectively mounted on two opposite end surfaces of the external wall shear wall (1) and the lattice column (2); the first guide rail (3) and the second guide rail (4) are both arranged vertically; a first slider (5) is movably mounted on the first guide rail (3); a second slider (6) is movably mounted on the second guide rail (4); and a hydraulic support assembly (7) is movably mounted on both the first slider (5) and the second slider (6); It also includes a first aluminum formwork (8) and a second aluminum formwork (9) for casting a cantilevered split-level balcony; the first aluminum formwork (8) and the second aluminum formwork (9) are in a detachable connection relationship, and the first aluminum formwork (8) and the second aluminum formwork (9) are respectively movably mounted on hydraulic support assemblies (7) corresponding to the first slider (5) and the second slider (6).

2. The auxiliary formwork device for cantilevered staggered balcony formwork according to claim 1 is characterized in that: There are two first aluminum templates (8), and the shapes of the two first aluminum templates (8) are consistent; the first aluminum template (8) comprises a first beam groove plate (8A); a first rectangular plate (8B) is arranged on a side plate of the first beam groove plate (8A), and a notch end side of the first beam groove plate (8A) is arranged close to the wall surface; the two first aluminum templates (8) are detachably connected at the first rectangular plate (8B); The second aluminum template (9) comprises a second rectangular plate (9A); the first rectangular plates (8B) on the two first aluminum templates (8) are detachably mounted on one side of the second rectangular plate (9A); a pair of second beam groove plates (9B) and a third beam groove plate that are in communication with each other are also mounted on the other three sides of the second rectangular plate (9A); the size of the groove opening of the second beam groove plate (9B) is consistent with the size of the groove opening of the first beam groove plate (8A).

3. The auxiliary formwork device for cantilevered staggered balcony formwork according to claim 2 is characterized in that: The width of the first rectangular plate (8B) is half the width of the second rectangular plate (9A), and its length is smaller than the length of the second rectangular plate (9A).

4. The auxiliary formwork device for cantilevered staggered balcony formwork according to claim 1 is characterized in that: The first guide rail (3) and the first sliding block (5) are arranged in pairs, and the first guide rail (3) is respectively arranged on the left and right sides of the external wall shear wall close to the position of the cantilevered staggered balcony to be cast.

5. The auxiliary formwork device for cantilevered staggered balcony formwork according to claim 1 is characterized in that: A plurality of cast-formed type-one balconies (1A) or type-two balconies (1B) are arranged on the external wall shear wall (1); the lattice column (2) comprises a pair of upright columns (2A); the upright columns (2A) are installed by means of a cast foundation arranged on the ground; a plurality of connecting columns (2B) are arranged between the upright columns (2A); the height of the connecting columns (2B) is consistent with the setting height of the type-one balconies (1A), and a lattice column wall support (2C) is detachably installed between the connecting columns (2B) and the type-one balconies (1A); the number of the second guide rails (4) is an even number, and the second guide rails (4) are respectively arranged on two upright columns (2A).

6. The auxiliary formwork device for cantilevered staggered balcony formwork according to claim 5, characterized in that: The distance between the two columns (2A) is consistent with the width of the cantilevered staggered balcony to be cast; and the shortest distance between the plane where the two second guide rails (4) are located and the first-type balcony (1A) is smaller than the height of the second aluminum formwork (9).

7. The auxiliary formwork device for cantilevered staggered balcony formwork according to claim 5 is characterized in that: A support plate (10) is also installed between the two second sliding blocks (6); a plurality of auxiliary hydraulic support rods (11) are also provided on the end surface of the support plate (10) facing the external wall shear wall (1); one end of the auxiliary hydraulic support rod (11) is hinged on the support plate (10), and the other end is hingedly installed on the lower bottom surface of the second aluminum formwork (9).

8. The auxiliary formwork device for cantilevered staggered balcony formwork according to claim 1, characterized in that: The hydraulic support components (7) arranged on the first slide block (5) and the second slide block (6) are consistent; The hydraulic support assembly (7) comprises a first hydraulic telescopic rod (7A) and a second hydraulic telescopic rod (7B); One end of a first hydraulic telescopic rod (7A) located on the first slider (5) is fixed to the first slider (5), and the other end is hingedly mounted on the outer wall of the first aluminum template (8); the two ends of a corresponding second hydraulic telescopic rod (7B) are respectively hingedly connected to the first slider (5) and the first aluminum template (8); One end of a first hydraulic telescopic rod (7A) located on the second slider (6) is fixed to the second slider (6), and the other end is hingedly mounted on the outer wall of the second aluminum template (9); the two ends of a corresponding second hydraulic telescopic rod (7B) are respectively hingedly connected to the second slider (6) and the second aluminum template (9).

9. The auxiliary formwork device for cantilevered staggered balcony formwork according to claim 4, characterized in that: The two first sliding blocks (5) move independently of each other on the first guide rail (3).

10. The method for using the auxiliary formwork device for cantilevered staggered balcony formwork according to any one of claims 1 to 9, characterized in that: The following steps are involved: S1. First, pour the main structure concrete other than the cantilevered staggered balcony to be poured in this operation step. The cantilevered staggered balcony to be poured is constructed by secondary pouring. At the same time, balcony steel bars are reserved in the structural part of the cantilevered staggered balcony to be poured. Subsequent operations can only be carried out when the strength of the poured main structure concrete reaches the standard. The pouring makes the first hydraulic telescopic rod (7A) and the second hydraulic telescopic rod (7B) and the auxiliary hydraulic support rod (11) on the hydraulic support assembly (7) all in a contracted state. At this time, one end of the first rectangular plate (8A) on the two first aluminum templates (8) and the second rectangular plate (9B) on the second aluminum template (9) are both arranged vertically downward; S2, using the first guide rail (3) and the second guide rail (4), respectively moving the first slider (5) and the second slider (6) to a height position close to the cantilevered staggered balcony to be installed and cast, the height being required to avoid interference between the first aluminum formwork (8) and the second aluminum formwork (9) and the type 1 balcony (1A) or the type 2 balcony (1B) during movement; S3, respectively operate the hydraulic support assembly (7) located on the first slider (5) and the second slider (6); coordinately control the telescopic state of the first hydraulic telescopic rod (7A), the second hydraulic telescopic rod (7B) and the auxiliary hydraulic support rod (11) to rotate the two first aluminum templates (8) and the second aluminum template (9) until the first rectangular plate (8B) and the second rectangular plate (9A) are successively placed horizontally; continue to control the telescopic state of the first hydraulic telescopic rod (7A), the second hydraulic telescopic rod (7B) and the auxiliary hydraulic support rod (11), and at the same time control the lifting height of the first slider (5) and the second slider (6) so that the first aluminum template (8) and the second aluminum template (9) are successively moved to the position of the cantilevered staggered balcony to be cast in a certain order; S5, before pouring, performing connection reinforcement processing on the two first aluminum formworks (8), the second aluminum formwork (9) and the external wall shear wall; S6, pouring into the area enclosed by the first aluminum formwork (8), the second aluminum formwork (9) and the external wall shear wall to obtain a cantilevered staggered balcony; S7, after the cantilevered staggered balcony to be cast meets the standards, the connection between the two first aluminum formworks (8), the second aluminum formwork (9) and the external wall shear wall is removed and demoulding is performed. The cantilevered staggered balcony after casting is a new type I balcony (1A); S8, controlling the telescopic state of the first hydraulic telescopic rod (7A), the second hydraulic telescopic rod (7B) and the auxiliary hydraulic support rod (11) so that the two first aluminum templates (8) and the second aluminum template (9) are separated and sequentially translated downward in the vertical direction to avoid interference with the newly cast type one balcony (1A); thereafter, the two first aluminum templates (8) and the second aluminum template (9) are sequentially controlled to move until the first hydraulic telescopic rod (7A), the second hydraulic telescopic rod (7B) and the auxiliary hydraulic support rod (11) are retracted to their initial length; S9, as the main structure of the building continues to be constructed upward, the first guide rail (3) and the second guide rail (4) are synchronously laid upward along the external wall shear wall (1) and the lattice column (2); Thereafter, steps S1 to S8 are looped to complete the synchronous pouring construction of the cantilevered staggered-level balcony at the corresponding design height position while the main building structure is being constructed.

Citation Information

Patent Citations

  • Climbing type building construction operation device outside building

    CN113756578A

  • Hydraulic creeping formwork construction frame

    CN211817954U

  • Combined structure of construction elevator and creeping formwork body

    CN216276883U

  • Integrated cantilever balcony beam plate

    CN218597525U

  • Adjustable special-shaped cantilever structure supporting formwork

    CN219993116U

Cited By

  • Cantilever building-based attached lifting scaffold outer protection system and construction method thereof

    CN119221689A

  • Auxiliary formwork erecting device for suspended staggered-floor balcony formwork

    CN120906346A

  • Overhanging staggered balcony template auxiliary formwork device

    CN120906346B