Monitoring and optimization of gas consumption
The smart gas meter optimizes consumption by analyzing usage patterns and adjusting cut-offs based on time and temperature, effectively managing gas usage to reduce bills and promote ecological and economic benefits.
Patent Information
- Application Number
- FR2022009902
- Authority / Receiving Office
- FR · FR
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2022-09-29
- Publication Date
- 2024-11-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing gas meters lack the ability to optimize and control gas consumption effectively, leading to unnecessary cut-offs that penalize users and are not ecologically or economically beneficial.
A smart gas meter with a processing unit that analyzes consumption data to identify specific usage patterns, allowing targeted gas cut-offs during high consumption periods, with adjustable thresholds based on time, day, and temperature, and integrates a communication system to control a valve for precise gas management.
The solution enables efficient gas consumption optimization, reducing bills while minimizing user inconvenience by cutting off gas only when necessary, promoting ecological and economic benefits.
Smart Images

Figure 00000018_0000 
Figure 00000019_0000 
Figure 00000020_0000
Abstract
Description
Title of the invention: Monitoring and optimization of gas consumption
[0001] The invention relates to the field of so-called “smart” gas meters.
[0002] BACKGROUND OF THE INVENTION
[0003] A gas meter very conventionally comprises an internal conduit in which the gas supplied to an installation by a distribution network circulates, and a measuring device which measures the gas consumption of said installation.
[0004] The measuring device is for example an ultrasonic measuring device comprising an upstream transducer (network side) and a downstream transducer (installation side). Each transducer successively plays the role of an emitter and a receiver of ultrasonic signals. The upstream transducer thus emits an ultrasonic signal into the internal conduit, which is received by the downstream transducer after having traveled a predefined path (of perfectly controlled length) in the gas. Then, the downstream transducer in turn emits an ultrasonic signal, which is received by the upstream transducer after having traveled the predefined path (in the other direction) in the gas. The ultrasonic measuring device then evaluates the gas flow rate from the flight times of the ultrasonic signals between the transducers. Estimating the gas flow rate makes it possible to evaluate and invoice the volume of gas consumed.
[0005] Some modern gas meters, called "smart", must be able to cut off the gas flow.
[0006] In some countries, when an end user (i.e. a subscriber) does not pay his gas bills, the distributor cuts off the gas until the end of the day as soon as the consumption of the installation exceeds a certain daily threshold.
[0007] The gas cut-off is conventionally carried out by controlling a motorized valve which is integrated into a cut-off box located near the meter, or even which is integrated into the meter.
[0008] It is envisaged that such smart gas meters could be used to help the user limit their gas consumption. Such a feature is of undeniable interest in terms of ecology, but is also very advantageous for the user's purchasing power.
[0009] SUBJECT OF THE INVENTION
[0010] The object of the invention is to control and optimize the gas consumption of an installation in order, in particular, to reduce the gas bill. Summary of the invention
[0011] With a view to achieving this goal, a gas meter is proposed comprising: a measuring device arranged to produce measurements of gas consumption of an installation; a valve, or means of communication with a cut-off box located outside the meter and incorporating a valve; a processing unit arranged for, each current day, during each current period of a predetermined set of at least one successive period defined in the current day: analyzing the gas consumption measurements to produce measurements of predefined parameters relating to gas consumption, and detecting, from said measurements of the predefined parameters, one or more operating phases of at least one predetermined system of the installation; for each predetermined system, following each phase of operation of said predetermined system, if a cumulative gas consumption during the current period of said predetermined system exceeds a predetermined threshold associated with said predetermined system, close the valve until the end of said current period.
[0012] Each current day is therefore divided into one or more successive periods.
[0013] During each current period, the gas meter detects in the measurements of gas consumption one or more signatures each representing the operation of a predetermined system (for example a boiler, a water heater), then cuts off the gas until the end of the current period when the cumulative gas consumption over the current period by the same system exceeds a predetermined threshold. The gas is therefore cut off only in specific use cases, with the aim not of penalizing the user, but rather of helping them limit their gas consumption.
[0014] A gas meter as previously described is further provided, in which the predefined parameters include a gas draw time and / or an average gas flow rate and / or a volume of gas consumed.
[0015] A gas meter as previously described is further provided, wherein, for at least one of the at least one predetermined system, the predetermined threshold associated with said predetermined system depends on said current period and / or the current day and / or the period of the year to which the current day belongs.
[0016] A gas meter is further provided as previously described, the gas meter comprising a temperature sensor or being connected to equipment incorporating a temperature sensor, the gas meter being such that, for at least one of the at less than a predetermined system, the predetermined threshold associated with said predetermined system depends on a temperature measured by the temperature sensor.
[0017] We further propose a gas meter as previously described, in which said predetermined threshold is:
[0018] - equal to a first value when said temperature is lower than a first threshold ;
[0019] - equal to a second value when said temperature is greater than a second threshold ;
[0020] - equal to a linear function of said temperature when said temperature is between the first threshold and the second threshold.
[0021] A gas meter is further proposed as previously described, in which, for at least one of the at least one predetermined system, the processing unit is arranged, to detect the operating phases of said predetermined system, to compare the measurements of the predefined parameters with predefined levels which depend on the period of the year to which the current day belongs.
[0022] A gas meter is further proposed as previously described, the gas meter comprising a temperature sensor or being connected to equipment incorporating a temperature sensor, the gas meter being such that, for at least one of the at least one predetermined system, the processing unit is arranged, to detect the operating phases of said predetermined system, to compare the measurements of the predefined parameters with predefined levels which depend on a temperature measured by the temperature sensor.
[0023] A gas meter as previously described is further provided, in which the predetermined set of at least one successive period comprises at least one period during which closing of the valve is prohibited.
[0024] There is further provided a gas meter as previously described, wherein the at least one predetermined system comprises a boiler and a water heater.
[0025] A gas meter as previously described is further provided, in which the valve is a ball valve.
[0026] A monitoring method is further proposed, implemented in the processing unit of a gas meter as previously described, and comprising the steps, each current day, during each current period of a predetermined set of at least one successive period defined in the current day, of: • analyze the gas consumption measurements to produce measurements of predefined parameters relating to gas consumption, and detect, from said measurements of the predefined parameters, one or more operating phases of at least one predetermined system of the installation; • for each predetermined system, following each phase of operation of said predetermined system, if cumulative gas consumption during the current period of said predetermined system exceeds a predetermined threshold
[0027]
[0028]
[0029]
[0030]
[0031]
[0032]
[0033]
[0034]
[0035]
[0036]
[0037] associated with said predetermined system, close the valve until the end of said current period. We further propose a monitoring method as previously described, comprising the steps, for the current period, of: • detect the start of a gas draw; • at the end of said gas draw, estimate an average gas flow rate during said gas draw; • detect from the average gas flow rate an operating phase of one of at least one predetermined system of the installation; • compare the cumulative gas consumption during the current period of said predetermined system with the predetermined threshold associated with said predetermined system; • if the cumulative gas consumption of said predetermined system is greater than said predetermined threshold, check that current gas consumption is zero and, if so, close the valve until the end of said current period. We further propose a monitoring method as previously described, comprising the preliminary step of verifying that the current period is not a period during which the closing of the valve is prohibited. Further provided is a computer program comprising instructions which cause the processing unit of the gas meter as previously described to execute the steps of the monitoring method as previously described. Further provided is a computer-readable recording medium on which the computer program as previously described is recorded. The invention will be better understood in light of the following description of particular non-limiting embodiments of the invention. Brief description of the drawings Reference will be made to the attached drawings, including: [Fig.l] [Fig.l] represents a gas meter according to a first embodiment; [Fig.2] [Fig.2] represents steps of a monitoring process; [Fig.3] [Fig.3] represents a gas meter according to a second embodiment. DETAILED DESCRIPTION OF THE INVENTION With reference to [Fig.l], the invention is here implemented in a gas meter 1. The gas meter 1 is mounted on a main conduit 2 which allows a connection to be made to a gas distribution network 3 to an installation 4.
[0038] The meter 1 incorporates a first internal conduit 5 which extends in the continuity of the main conduit 2, so that the gas consumed by the installation 4 passes into the first internal conduit 5.
[0039] The counter 1 further incorporates a measuring device 6, which is here an ultrasonic measuring device and which operates like the device described earlier.
[0040] The counter 1 further comprises a processing unit 7. The processing unit 7 comprises at least one processing component 8, which is for example a “general-purpose” processor, a processor specialized in signal processing (or DSP, for Digital Signal Processor), a microcontroller, or a programmable logic circuit such as an FPGA (for Field Programmable Gate Arrays) or an ASIC (for Application Specified Integrated Circuit). The processing unit 7 also comprises one or more memories 9, connected to or integrated in the processing component 8. At least one of these memories 9 forms a computer-readable recording medium, on which is recorded at least one computer program comprising instructions which cause the processing component 8 to execute at least some of the steps of the monitoring method which will be described below.
[0041] The processing unit 7 comprises a clock 10 of the RTC type (for Real Time Clock, which can be translated as “real time clock”) allowing it to integrate a calendar. A periodic resynchronization of the clock 10 is carried out via a communication network. The clock 10 makes it possible to implement a stopwatch.
[0042] The meter 1 is connected to equipment that incorporates a temperature sensor 11. Here, the equipment is positioned so that the sensitive cell of the temperature sensor 11 is in contact with the air outside the user's home. The meter 1 receives the measurements produced by the sensor 11, which are therefore measurements of the temperature prevailing outside the home.
[0043] In an alternative embodiment, the equipment incorporating the temperature sensor may be located outside and close to the meter, but inside the dwelling, so as to measure the ambient temperature around the meter.
[0044] In another embodiment, the temperature sensor could be located inside the meter.
[0045] The processing unit 7 acquires the temperature measurements produced by the temperature sensor 11.
[0046] The meter 1 further comprises first communication means which enable it to communicate with a cut-off box 12 located outside the meter 1.
[0047] The distance d between the meter 1 and the cut-off box 12 is typically between 1 cm and 20 cm.
[0048] The first means of communication comprise a first NFC interface 13 (for Near Field Communication). This is a “master” NFC interface.
[0049] The cut-off box 12 comprises a second internal conduit 14, a valve 15 and a second NFC interface 16 (“slave” NFC interface).
[0050] The second internal conduit 14 also extends in continuity with the main conduit 2 (and the first internal conduit 5 of the meter 1).
[0051] The valve 15 is a motorized (electromechanical) valve. The valve 15 comprises a movable member which extends into the second internal conduit 14 and a current position of which can be controlled to cut off the gas flow. Here, the valve 15 is a ball valve and the movable member is therefore a ball; the current position of the ball is an angular position.
[0052] The meter 1 and the cut-off box 12 communicate via the first NFC interface 13 and the second NFC interface 16. The meter 1 can thus control the valve 15 to cut off the gas supply to the installation.
[0053] The monitoring method which is implemented in the processing unit 7 of the meter 1 is now described.
[0054] The purpose of the monitoring method is to detect the use of a predetermined system of the installation 4 (among one or more predetermined systems), and to cut off the gas supplied to the installation 4 when the gas consumption by this system becomes too high.
[0055] The predetermined systems include, for example, a boiler, a water heater, a gas stove, a gas fireplace, etc.
[0056] The monitoring method is implemented here at the initiative of the user (but it could be implemented systematically, or at the initiative of the gas distributor or the network manager).
[0057] Each current day is divided into a predetermined set of at least one successive period. Here, each current day is divided into N successive periods Pk (k ranging from 1 to N). Each period Pk has a duration Hk and we therefore have, for each current day: [00581 Zl,Hk = 24 hours
[0059] The durations Hk of these periods Pk are not all necessarily identical.
[0060] The detection of possible overconsumption is carried out by predetermined system, and period by period (and not daily, unless the current day has only one period). Thus, each current day, for each current period, the gas cut-off is ordered when the cumulative consumption of the same predetermined system becomes too high over said current period.
[0061] The detection of the operating phases of these predetermined systems consists of detect in the gas consumption measurements signatures each representative of the use of a particular predetermined system.
[0062] Each signature corresponds to particular values of predefined parameters relating to gas consumption.
[0063] Thus, each current day, and for each current period, the processing unit 7 analyzes the gas consumption measurements and produces measurements of predefined parameters relating to the gas consumption.
[0064] By “measurement of gas consumption” is meant any measurement representative of gas consumption: index, flow measurement, volume measurement, etc.
[0065] The predefined parameters include, for example, a gas draw time and / or an average gas flow rate and / or a volume of gas consumed.
[0066] The processing unit 7 then detects, from the measurements of the predefined parameters, operating phases of at least one predetermined system of the installation. By “operating phase”, we mean a period during which the predetermined system operates and draws gas continuously.
[0067] Then, for each predetermined system, if the cumulative gas consumption of said predetermined system over the current period exceeds a predetermined threshold associated with said predetermined system, the processing unit 7 commands a closing of the valve 15 to cut off the gas supply to the installation 4 until the end of the current period.
[0068] Cutting off the gas therefore consists of modifying the angular position of the ball of the valve 15 to close the valve 15.
[0069] It may be provided that, for at least one of the predetermined systems, the predetermined threshold associated with said predetermined system depends on the current period of the current day: it may thus be relevant to authorize higher consumption in the morning (before leaving for work or school) and in the evening (on returning).
[0070] It may also be provided that, for at least one of the predetermined systems, the predetermined threshold associated with said predetermined system depends on the current day: the authorized consumption may thus be higher at the weekend or on a public holiday.
[0071] It can also be provided that, for at least one of the predetermined systems, the predetermined threshold associated with said predetermined system depends on the period of the year to which the current day belongs: in winter, the authorized consumption can thus be higher.
[0072] The predetermined threshold may also depend on several of these parameters, and therefore on the current period and / or the current day and / or the period of the year to which the current day belongs.
[0073] The predetermined system in question is for example a gas boiler, the gas consumption is higher in winter than in summer.
[0074] Similarly, for at least one of the predetermined systems (the boiler again, for example), the detection of the operating phases of said predetermined system may comprise the step of comparing the measurements of the predefined parameters with predefined levels which depend on the period of the year to which the current day belongs.
[0075] The processing unit 7 can also use the temperature measurements produced by the temperature sensor 11.
[0076] It is then expected that, for at least one of the predetermined systems (the boiler again, for example), the predetermined threshold associated with said predetermined system depends on the temperature measured by the temperature sensor 11.
[0077] Similarly, it can be provided that, for at least one of the predetermined systems, the processing unit 7 is arranged, to detect the operating phases of said predetermined system, to compare the measurements of the predefined parameters with predefined levels which depend on the temperature measured by the temperature sensor 11.
[0078] It may also be provided that the predetermined periods include one or more periods during which the closing of the valve 15 is prohibited, and therefore during which the gas cannot be cut off.
[0079] These periods include, for example, a period in the morning (before leaving for work or school) and a period in the evening (upon returning).
[0080] The user can optionally define these periods himself by communicating with the counter 1, which then includes communication means 18 adapted for this use.
[0081] These communication means 18 may be wireless radioelectric means (NFC, Wi-Fi, Bluetooth, etc.), or even wired. It may also be an interface using, for example, one or more buttons and a screen positioned on the meter 1.
[0082] The water distributor (or the network manager) could also define these periods; in this case, the second means of communication 18 are for example cellular means of communication.
[0083] It is noted that the communication means 18 can be, more generally, used by the user and / or by the water distributor (or the network manager) to adjust the consumption thresholds, the number and duration of successive periods in current days, etc.
[0084] We are interested in a particular embodiment, in which the predetermined systems of an installation comprise a gas boiler 20 and a water heater 21.
[0085] The type of gas consumption (boiler 20 or water heater 21) is recognized by a signature which is itself defined by the following predefined parameters: duration
[0086]
[0087]
[0088]
[0089]
[0090]
[0091]
[0092]
[0093]
[0094]
[0095]
[0096] gas draw, average gas flow rate and volume of gas consumed. The average gas flow rate thus typically falls within a different flow rate range (in L / minute) when gas is drawn, depending on whether the system drawing gas is a boiler or a water heater. Similarly, the gas draw time is typically below a different time threshold, and the volume of gas consumed is typically below a different volume threshold, depending on whether the system drawing gas is a boiler or a water heater. A boiler is supposed to consume around 1000m3 / year and draw gas periodically (for 10 minutes each time for example), over a cumulative period of 8 hours per day from October to March inclusive, and two hours per day from April to September inclusive. The cumulative consumption from October to March inclusive is approximately 800m3 and, between October and March, we have: - Average flow rate: D = 9.16L / minute; - Drawing time: t = 10 minutes; - Reference daily consumption volume threshold: S = 4395L. The cumulative consumption from April to September inclusive is approximately 200m3 and, between April and September, we have: - Average flow rate: D = 9.1 IL / minute; - Drawing time: t = 10 minutes; - Reference daily consumption volume threshold: S = 1093L. A water heater is supposed to consume about 300m3 / year and draw gas "on demand" in order to produce hot water (in the case of a shower, a bath, bathroom sink, kitchen sink). The cumulative duration of the gas draw is about 1 hour per day. We have: - Average flow rate: D = 13.70L / minute; - Draw duration: variable (a few seconds (bathroom, kitchen sink) to 5 minutes (shower) or even 15 minutes (bath); - Reference daily consumption volume threshold: S = 822L. The volume threshold therefore does not depend on the time of year for the water heater. We will now describe in more detail, with reference to [Fig.2], an example of implementation of the monitoring method. The N successive periods Pk, and the durations Hk of said periods, are pre-programmed in a table stored in one of the memories 9 of the processing unit 7. As we have seen, the successive periods possibly include one or more periods during which the closing of the valve 15 is prohibited. The process starts at step E0, for the current day. The “Period” variable is initialized to 0 (step El).
[0097]
[0098]
[0099]
[0100]
[0101]
[0102]
[0103]
[0104]
[0105]
[0106]
[0107]
[0108]
[0109]
[0110] [YES]
[0112] Processing unit 7 then opens valve 15, and increments the Period variable: Period = Period + 1 (step E2). The processing unit 7 checks whether the current period Pk is a period in which the closing of the valve 15 is prohibited (step E3). If this is the case, the processing unit 7 waits for the end of the current period Pk (step E4), then checks whether the current period Pk is the last of the current day (i.e. if Period = N): step E5. If so, the process moves to step EL. Otherwise, the process moves back to step E2. In step E3, if the current period Pk is not a period in which the closing of the valve 15 is prohibited, the method proceeds to step E6. The following variables are initialized by processing unit 7: - Summer boiler threshold = 1093L*Hk / 24; - Winter boiler threshold = 4395L*Hk / 24; - Boiler_threshold = Summer_boiler_threshold if the current day belongs to a period from April to September inclusive, and Boiler_threshold = Winter_boiler_threshold if the current day belongs to a period from October to March inclusive; - S_water heater = 822L*Hk / 24; - C_boiler = 0. Thus, for each period, and for each predetermined system, the predetermined consumption threshold is defined in proportion to the duration of said period compared to the corresponding daily reference threshold. The processing unit 7 then checks whether the present time corresponds to the end of the current period (step E7). If so, the process returns to step E2. Otherwise, the processing unit 7 attempts to detect the start of a gas draw (i.e. that a system in the installation begins to consume gas): step E8. A gas draw is considered to have started if the gas consumption is greater than or equal to a predefined threshold (for example IL) for a predefined duration (for example 10s). As long as the start of a gas draw is not detected, the process returns to step E7 (then again to step E8 if the current period is not over). When the start of a gas draw is detected, the processing unit 7 stores the index at the start of the draw (Index_start) and the time H1 of the start of the draw (HH: MM: SS): step E9. The variable Index_start is the consumption index measured at the present time by the measuring device 6 - that is to say the cumulative volume of gas measured at the present time. Then, the processing unit 7 checks whether the gas draw is complete (step E10). that the gas draw is not finished, the process loops back to step E10.
[0113] When the gas draw is finished, the processing unit 7 stores the index at the end of the draw (Index_fin) and the time H2 of the end of the draw (HH: MM: SS): step Eli.
[0114] At the end of the gas draw, the processing unit 7 estimates a duration of the gas draw (equal to H2 - H1) and an average gas flow rate during said gas draw (step E12).
[0115] Here, the processing unit 7 evaluates the average gas flow rate using the formula:
[0116] D = (Index_end - Index_start) / (H2 - Hl).
[0117] The processing unit 7 then attempts to detect, from the average gas flow rate, an operating phase of one of the at least one predetermined system (step El3).
[0118] For this, the processing unit 7 compares the average gas flow rate with predefined levels.
[0119] If the average gas flow rate D is such that:
[0120] 8L / minute < D < lOL / minute,
[0121] then the processing unit 7 detects an operating phase of the boiler 20.
[0122] If the average gas flow rate D is such that:
[0123] 13L / minute < D < 15L / minute,
[0124] then the processing unit 7 detects an operating phase of the water heater 21.
[0125] If no predetermined system matches, the method proceeds to step E7.
[0126] If the predetermined system detected is the boiler 20, the processing unit 7 calculates the cumulative gas consumption of the boiler over the current period (step E14):
[0127] C_boiler = C_boiler + (Index_end - Index_start)
[0128] The processing unit 7 then compares the cumulative gas consumption of the boiler 20 over the current period Pk with the predetermined threshold associated with the boiler 20 (step El5).
[0129] The processing unit checks whether:
[0130] C_boiler > S_boiler.
[0131] If this is not the case, the method returns to step E7.
[0132] If this is the case, that is to say if the cumulative consumption of the boiler 20 over the current period is greater (here greater than or equal to) the predetermined threshold, the processing unit 7 verifies for safety reasons that the current gas consumption is zero (step El6).
[0133] As long as the current gas consumption is not zero, the method loops back to step E16.
[0134] When the current gas consumption becomes zero, the processing unit 7 controls the closing of the valve 15 (step E17).
[0135] The processing unit 7 then waits for the end of the current period (step E18), so that the valve 15 remains closed until the end of said current period, then the method returns to step E5.
[0136] Similarly, in step E13, if the predetermined system detected is the water heater 21, the processing unit 7 calculates the cumulative consumption of the water heater 21 (step E19):
[0137] C_water heater = C_water heater + (Index_end - Index_start)
[0138] The processing unit 7 then compares the cumulative consumption of the water heater 21 over the current period Pk with the predetermined threshold associated with the water heater (step E20).
[0139] The processing unit 7 checks whether:
[0140] C_water heater > S_water heater.
[0141] If this is not the case, the method returns to step E7.
[0142] If this is the case, that is to say if the cumulative gas consumption of the water heater 21 over the current period is greater (here greater than or equal to) the predetermined threshold, the processing unit 7 goes to step E16.
[0143] Alternatively, since temperature measurements are available, it can be provided that the predetermined threshold associated with one of the predetermined systems (or several) depends on the temperature measured by the temperature sensor 11
[0144] The predetermined threshold for the boiler 20 can thus be adapted according to the temperature (in °C) measured by the temperature sensor IL. The calendar period is then no longer taken into account.
[0145] The predetermined threshold for boiler 20 is for example: - equal to a first value when said temperature is lower than a first temperature threshold; - equal to a second value when said temperature is greater than a second temperature threshold; - equal to a linear function of said temperature when said temperature is between the first temperature threshold and the second temperature threshold.
[0146] Here, the first temperature threshold is equal to 0°C, the second temperature threshold is equal to 20°C, and we have, for the period Pk of duration Hk hours (S is the predetermined threshold, T the temperature measured by the sensor 11): if T < 0°C, S = 4395*Hk / 24 if T > 20°C, S = 1093*Hk / 24 If 0°C < T < 20°C:
[0147] S = (1093+(4395-1093)*(20-T) / 20)*Hk / 24
[0148] In a second embodiment, with reference to [Fig. 3], the valve 15 is this time not located in a cut-off box outside the meter 1, but is integrated into the meter 1. The monitoring method is implemented in the same way except that, in this configuration, the meter 1 does not need to communicate. communicate with external equipment: the processing unit 7 directly controls the valve 15.
[0149] Of course, the invention is not limited to the embodiments described but encompasses any variant falling within the scope of the invention as defined by the claims.
[0150] The signatures of the predetermined systems are not necessarily defined by the gas draw time, the average gas flow rate and the volume of gas consumed, but can be defined by only one or two of these predefined parameters.
[0151] The predefined parameters may also be different from those described here, and could for example include a consumption slope or a current (and not average) flow rate.
[0152] The predetermined systems of the installation, the consumption of which is monitored, may comprise one or more different systems, for example a gas stove, a gas fireplace, etc.
Claims
Claims
1. Gas meter (1) comprising: • a measuring device (6) arranged to produce measurements of a gas consumption of an installation (4); • a valve (15), or means of communication (13) with a cut-off box (12) located outside the meter and incorporating a valve; • a processing unit (7) arranged to, each current day, during each current period of a predetermined set of at least one successive period defined in the current day: • analyze the measurements of the gas consumption to produce measurements of predefined parameters relating to the gas consumption, and detect, from said measurements of the predefined parameters, one or more operating phases of at least one predetermined system (20, 21) of the installation;• for each predetermined system, following each phase of operation of said predetermined system, if a cumulative gas consumption during the current period of said predetermined system exceeds a predetermined threshold associated with said predetermined system, close the valve (15) until the end of said current period.;
2. A gas meter according to claim 1, wherein the predefined parameters comprise a gas draw time and / or an average gas flow rate and / or a volume of gas consumed.
3. Gas meter according to one of the preceding claims, wherein, for at least one of the at least one predetermined system, the predetermined threshold associated with said predetermined system depends on said current period and / or the current day and / or the period of the year to which the current day belongs.
4. Gas meter according to one of the preceding claims, the gas meter comprising a temperature sensor or being connected to equipment incorporating a temperature sensor (11), the gas meter being such that, for at least one of the at least one predetermined system, the predetermined threshold associated with said predetermined system depends on a temperature measured by the temperature sensor.
5. Gas meter according to claim 4, wherein said predetermined threshold is: - equal to a first value when said temperature is lower than a first threshold; - equal to a second value when said temperature is higher than a second threshold; - equal to a linear function of said temperature when said temperature is between the first threshold and the second threshold.
6. Gas meter according to one of the preceding claims, wherein, for at least one of the at least one predetermined system, the processing unit (7) is arranged, to detect the operating phases of said predetermined system, to compare the measurements of the predefined parameters with predefined levels which depend on the period of the year to which the current day belongs.
7. Gas meter according to one of the preceding claims, the gas meter comprising a temperature sensor or being connected to equipment incorporating a temperature sensor (11), the gas meter being such that, for at least one of the at least one predetermined system, the processing unit (7) is arranged, to detect the operating phases of said predetermined system, to compare the measurements of the predefined parameters with predefined levels which depend on a temperature measured by the temperature sensor.
8. A gas meter according to any preceding claim, wherein the predetermined set of at least one successive period comprises at least one period during which closure of the valve (15) is prohibited.
9. A gas meter according to one of the preceding claims, wherein the at least one predetermined system comprises a boiler (20) and a water heater (21).
10. A gas meter according to any preceding claim, wherein the valve (15) is a ball valve.
11. Monitoring method, implemented in the processing unit (7) of a gas meter (1) according to one of the preceding claims, and comprising the steps, each current day, during each current period of a predetermined set of at least one successive period defined in the current day, of: • analyzing the gas consumption measurements to produce measurements of predefined parameters relating to the gas consumption, and detecting, from said measurements of the predefined parameters, one or more operating phases of at least one predetermined system (20, 21) of the installation; • for each predetermined system, following each operating phase of said predetermined system, if a cumulative gas consumption during the current period of said predetermined system exceeds a predetermined threshold associated with said predetermined system, closing the valve (15) until the end of said current period.
12. Monitoring method according to claim 11, comprising the steps, for the current period, of: • detecting a start of a gas draw; • at the end of said gas draw, estimating an average gas flow rate during said gas draw; • detecting from the average gas flow rate an operating phase of one of the at least one predetermined system of the installation; • comparing the cumulative gas consumption during the current period of said predetermined system with the predetermined threshold associated with said predetermined system; • if the cumulative gas consumption of said predetermined system is greater than said predetermined threshold, verifying that a current gas consumption is zero and, if so, closing the valve (15) until the end of said current period.
13. A monitoring method according to claim 12, comprising the preliminary step of verifying that the current period is not a period during which closing of the valve (15) is prohibited.
14. Computer program comprising instructions which cause the processing unit (7) of the gas meter (1) according to one of claims 1 to 10 to execute the steps of the monitoring method according to one of claims 11 to 13.
15. A computer-readable recording medium on which the computer program according to claim 14 is recorded.
