Flexible casing system for securing an underground tunnel for water transport and method for installing such a system
The flexible tubing system addresses the inefficiencies of traditional repair methods by enabling rapid, adaptable, and durable repair of underground water transport galleries using a flexible casing system with membranes and stiffeners, ensuring structural integrity.
Patent Information
- Application Number
- FR2022011906
- Authority / Receiving Office
- FR · FR
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2022-11-16
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2042-11-16
AI Technical Summary
Existing methods for repairing damaged coatings in underground water transport galleries require significant resources, time, and are not suitable for emergency repairs, necessitating prior sizing studies and investigations.
A flexible tubing system comprising an external and internal annular membrane with stiffeners, injection ports, and air inlets/outlets, allowing for rapid deployment and pressurization to secure the gallery using a construction mixture.
Enables quick, adaptable, and durable repair of underground galleries by withstanding physical and chemical constraints, ensuring structural integrity over a medium-term period.
Smart Images

Figure 00000008_0000 
Figure 00000009_0000 
Figure 00000010_0000
Abstract
Description
Title of the invention: Flexible tubing system for securing an underground gallery for transporting water and method of installing such a system Technical field
[0001] The invention relates to the general field of maintenance of underground galleries for the transport of water.
[0002] It relates more specifically to a flexible tubing system and a method of installing such a system making it possible to quickly secure an underground gallery for the transport of water whose lining has been damaged. Prior art Underground galleries are structures used for transporting water. Their walls, generally in the form of a vault, can be provided with a protective coating. Geotechnical or geological phenomena can damage this coating.
[0004] In order to repair the damaged lining of an underground gallery, it is known to use concrete spraying or the installation of metal arches. However, these repair techniques require preliminary dimensioning studies and investigations with significant resources. Also, such repair operations take time and are not compatible with emergency repairs for rapid return to service of the structure. Statement of the invention
[0005] The object of the invention is therefore to propose a flexible tubing system which does not have the aforementioned drawbacks.
[0006] According to the invention, this aim is achieved by means of a flexible tubing system for securing an underground gallery for the transport of water, comprising: - at least one external annular membrane made of a flexible material and intended to be applied against the internal profile of the gallery to be repaired; - at least one internal annular membrane made of a flexible material and mounted inside the external membrane and connected to the latter so as to form with the latter at least one annular pocket; - a plurality of stiffeners positioned in the annular pocket to maintain a constant thickness thereof; - a plurality of injection sockets for a construction mixture opening into the interior of the annular pocket; - at least one compressed air inlet opening inside the annular pocket; and - at least one air outlet opening inside the annular pocket and opening outwards via an air pressure regulating valve.
[0007] The system according to the invention is remarkable in that it can be adapted to several gallery profiles for securing them for subsequent definitive repair work. In addition, it is modular, easy to transport and capable of being implemented quickly by simple injection of compressed air in order to pressurize the annular pocket. Thanks to the injection of construction mixture into the pocket, it is also capable of withstanding both the physical constraints inherent in underground galleries, such as water pressure, ground pressure, water friction, etc., and chemical constraints (such as possible cement, resins, water, etc.). Finally, such a system is capable of ensuring its securing functions over a medium-term period.
[0008] Preferably, the stiffeners are in the form of I-beams having two opposing flanges which are assembled on respective inner walls of the outer membrane and the inner membrane.
[0009] Also preferably, the inner membrane has a higher rigidity than the outer membrane.
[0010] The internal and external membranes and the stiffeners can be made from elastomer complexes.
[0011] According to one embodiment, the system comprises two outer membranes connected in a sealed manner to each other to form an outer annular bag, and two inner membranes connected in a sealed manner to each other to form an inner annular bag mounted inside the outer bag, the outer bag comprising injection ports for a construction mixture opening into the interior of the outer bag and the inner and outer bags each comprising a compressed air inlet and an air outlet.
[0012] The invention also relates to a method of installing a flexible tubing system as defined above, comprising the successive steps of: - horizontal centering of the external and internal membranes relative to the area of the underground gallery to be repaired; - pressurizing the pocket by injecting compressed air via the compressed air inlet; - injecting a construction mix into the pocket via the injection ports to fill it with construction mix while maintaining a substantially constant air pressure inside the pocket; and - stopping the injection of the construction mixture once the pocket is filled.
[0013] Preferably, the injection of compressed air inside the pocket is carried out to maintain an operating pressure of at least 2 bars.
[0014] Also preferably, the injection of the construction mixture inside the pocket is carried out in stages. Brief description of the drawings
[0015] [Fig-1] [Fig.l] is a front view of a system according to an embodiment of the invention.
[0016] [Fig.2] [Fig.2] is a longitudinal sectional view of the system of [Fig.l].
[0017] [Fig.3] [Fig.3] is a front view of a system according to another mode of realization lization of the invention.
[0018] [Fig.4] [Fig.4] is a longitudinal sectional view of the system of [Fig.3]. Description of the embodiments
[0019] The invention applies to any underground gallery 2 requiring securing with a view to repairing its internal lining.
[0020] The invention relates more specifically to a flexible tubing system 4 intended to be routed and deployed inside the underground gallery 2.
[0021] As shown in Figures 1 and 2, this flexible tubing system 4 comprises in particular an external annular membrane 6 which is made of a flexible material (for example an elastomer complex, reinforced or unreinforced) and which is intended to be applied against the internal profile 2a of the gallery 2.
[0022] The flexible tubing system 4 also comprises an internal annular membrane 8 which is also made of a flexible material (for example an elastomer complex) - preferably having a higher rigidity than that of the external membrane 6 - and which is mounted inside the external membrane and connected to the latter so as to form therewith a sealed annular pocket 10.
[0023] A plurality of stiffeners 12 are positioned inside the pocket 10 to ensure a constant thickness thereof. These stiffeners 12 are advantageously regularly distributed throughout the pocket 10.
[0024] For example, as shown in [Fig. 2], these stiffeners 12 are also made of an elastomer complex and are in the form of I-beams each having two opposite flanges which are assembled on respective inner walls of the outer membrane 6 and the inner membrane 8 (typically by vulcanization).
[0025] Furthermore, the flexible tubing system also comprises a plurality of injection ports 14 for a construction mixture which open into the interior of the pocket 10. Preferably, these injection ports 14 are positioned on the front face of the pocket 10, and are regularly spaced around the entire circumference of this pocket. last.
[0026] The flexible tubing system also comprises at least one compressed air inlet 16 which is intended to be connected to a compressed air pump 18 and which opens inside the pocket 10, and at least one air outlet 20 opening inside the pocket and opening to the outside via an air pressure regulating valve 22. Preferably, the compressed air inlet 16 is located in the upper part of the pocket 10, and the air outlet 20 is adjacent to the compressed air inlet.
[0027] The installation of such a flexible tubing system 4 is as follows.
[0028] The flexible tubing system is transported to its installation site by folding the outer 6 and inner 8 membranes in order to minimize its bulk.
[0029] In the area to be repaired, the outer and inner membranes are deployed and then centered relative to the area to be repaired. The pocket 10 formed between the membranes 6, 8 is then filled with compressed air using the compressed air pump 18 connected to the compressed air inlet 16. The flexible tubing system is held in place during its commissioning under an operating air pressure of approximately 6 bars.
[0030] Then, the construction mixture (typically high performance concrete, cement grout or composite resins) is injected under pressure inside the pocket 10 through the injection ports 14 in order to replace the entire volume of air present in the pocket.
[0031] Preferably, the injection of the construction mixture is carried out in successive stages starting from the lowest injection points towards the highest injection points. The period between two successive stages, which can be represented by two vertically adjacent injection points, corresponds to the setting time of the construction mixture.
[0032] The air pressure regulating valve 22 makes it possible to maintain a constant air pressure (of at least 2 bars) inside the bag during the injection of the construction mixture. This valve also makes it possible to avoid overpressure and to keep the system sufficiently rigid during the injection phase of the construction mixture.
[0033] In connection with Figures 3 and 4, a flexible tubing system 4' according to another embodiment of the invention will now be described.
[0034] In this further embodiment, the flexible tubing system 4' comprises two outer membranes 6a, 6b which are sealed together to form an outer annular pocket 24, and two inner membranes 8a, 8b which are sealed together to form an inner annular pocket 26 mounted inside the outer pocket.
[0035] More precisely, the external pocket 24 is formed by two membranes 6a, 6b made of a flexible material in order to best fit the internal profile of the gallery. to be repaired by adapting in particular to the irregularities of this internal profile.
[0036] As for the internal pocket 26, it is formed by two membranes 8a, 8b of which the innermost membrane 8a has a relatively high rigidity in order to resist the weight of the external pocket. The outermost membrane 8b is more flexible in terms of rigidity in order to compress the external pocket by resting on the other membrane 8a.
[0037] Stiffeners 12 are positioned in the inner pocket 26 to ensure a relatively constant thickness. Other stiffeners 12' may be placed in the outer pocket to resist the weight of the system.
[0038] The outer bag 24 is provided with injection ports 14 for the construction mixture. In addition, the outer bag 24 and the inner bag 26 are each provided with a compressed air inlet 16a, 16b and an air outlet 20a, 20b which are preferably located in the upper part of the bags and which are adjacent to each other.
[0039] The installation of such a 4' flexible tubing system is as follows.
[0040] The flexible tubing system is transported to its installation site by folding the membranes in order to minimize its bulk.
[0041] In the area to be repaired, the outer 24 and inner 26 pockets are deployed and then centered relative to the area to be repaired. The pockets are then filled with compressed air using compressed air pumps. In particular, the outer pocket 24 is pre-inflated to at least approximately 1 bar of pressure.
[0042] The raft area of the outer pocket is then filled with construction mix. The inner pocket is then inflated after having correctly aligned it with respect to the outer pocket until an operating air pressure of at least 2 bars is reached.
[0043] Then, the construction mixture is injected under pressure inside the external pocket through the injection ports 14 in order to replace the entire volume of air present in the external pocket.
[0044] Preferably, the injection of the construction mixture is carried out in successive stages starting from the lowest injection points towards the highest injection points. Here, there is no minimum waiting period between the stages.
[0045] Once the construction mix has completely filled the outer bag and set, the inner bag can be removed for reuse for another procedure.
Claims
Claims
1. Flexible tubing system (4; 4') for securing an underground gallery (2) for transporting water, comprising: - at least one external annular membrane (6) made of a flexible material and intended to be applied against the internal profile of the gallery to be repaired; - at least one internal annular membrane (8) made of a flexible material and mounted inside the external membrane while being connected to the latter so as to form therewith at least one annular pocket (10); - a plurality of stiffeners (12) positioned in the annular pocket to maintain a constant thickness thereof; - a plurality of injection sockets (14) for a construction mixture opening inside the annular pocket; - at least one compressed air inlet (16) opening inside the annular pocket;and - at least one air outlet (20) opening inside the annular pocket and opening outwards via an air pressure regulating valve (22).;
2. A system according to claim 1, wherein the stiffeners (12) are in the form of I-beams having two opposing flanges which are assembled on respective inner walls of the outer membrane (6) and the inner membrane (8).
3. System according to one of claims 1 and 2, in which the internal membrane (8) has a higher rigidity than that of the external membrane (6).
4. System according to any one of claims 1 to 3, in which the internal and external membranes and the stiffeners are made of elastomer complexes.
5. A system according to any one of claims 1 to 4, wherein the construction mixture comprises high performance concrete, cement grout or composite resins.
6. System (4') according to any one of claims 1 to 5, comprising two external membranes (6a, 6b) connected in a sealed manner to each other to form an outer annular pocket (24), and two inner membranes (8a, 8b) connected in a sealed manner to each other to form an inner annular pocket (26) mounted inside the outer pocket, the stiffeners (12) being positioned at least in the inner pocket; the outer pocket comprising injection ports (14) for a construction mixture opening into the interior of the outer pocket and the inner and outer pockets each comprising a compressed air inlet (16a, 16b) and an air outlet (20a, 20b).
7. A method of installing a flexible tubing system according to any one of claims 1 to 6, comprising the successive steps of: - horizontally centering the outer and inner membranes relative to the area of the underground gallery to be repaired; - pressurizing the pocket by injecting compressed air via the compressed air inlet; - injecting a construction mix inside the pocket via the injection ports to fill it with construction mix while maintaining a substantially constant air pressure inside the pocket; and - stopping the injection of the construction mix once the pocket is filled.
8. A method according to claim 7, wherein the injection of compressed air inside the pocket is carried out to maintain an operating pressure of at least 2 bars.
9. Method according to one of claims 7 and 8, in which the injection of the construction mixture inside the pocket is carried out in stages.