Construction method of rubble mound, information processor, and information processing program
By using a displacement influence map to adjust the height of construction areas based on expected displacement, the rubble mound is compacted to the desired height, addressing issues of upheaval and subsidence in existing methods.
Patent Information
- Application Number
- JP2023043522
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-17
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2043-03-17
AI Technical Summary
Existing rubble mound construction methods face issues with areas prone to upheaval or subsidence due to the impact of rigid objects, leading to the need for additional rubble addition or recompaction to maintain the designed height.
A method involving the use of a displacement influence map to divide the construction site into multiple areas, calculate impact evaluation points, and adjust the height of each area based on the expected displacement effects, ensuring the rubble mound is compacted to the desired height without additional rubble or recompaction.
The method allows for the rubble mound to be completed at the designed height without the need for removing or adding rubble, ensuring precise leveling and stability.
Smart Images

Figure 2024132664000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a rubble mound construction method, an information processing device, and an information processing program. [Background technology]
[0002] In a method for constructing a rubble mound for a breakwater or revetment, in which a weight is dropped onto rubble piles dumped on the seabed to compact the rubble piles, a technique has been proposed to solve the problem of the rubble piles rising up around the point where the weight is dropped. For example, Patent Document 1 describes a method in which a roll compacting operation is performed by repeatedly causing a weight to fall freely on an underwater rubble foundation with a required extra pile height higher than the planned top height of the foundation consolidation and leveling method, to consolidate and level the rubble piles to the planned top height, and a required amount of the rubble piles that have been wrinkled and raised by the roll compacting operation is removed by a rubble removal means such as a grab bucket, and the removed portion is then roll compacted by a weight. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2001-241041 A Summary of the Invention [Problem to be solved by the invention]
[0004] In a rubble mound under construction, there are areas that are prone to heave or subside due to the impact of a rigid object (such as the dropping of a weight) around the area that has already been compacted. If the raised rubble is simply removed without considering the effects of subsidence, there is a possibility that areas that had been kept at the design height will sink as compaction proceeds, making it necessary to add more rubble.
[0005] One aspect of the present invention has been made in consideration of the above-mentioned problems, and has an object to finish the top of the riprap mound to the designed height in a method for constructing a riprap mound in which riprap is compacted by striking it with a rigid object, without having to remove the riprap that has already been added, add more riprap later, or perform re-compaction, which would be a rework. [Means for solving the problem]
[0006] In order to solve the above problems, a method for constructing a rubble mound according to one embodiment of the present invention is a method for constructing a rubble mound in which rubble groups dumped on the seabed are struck from above with a rigid object to compact the rubble groups, the method comprising the steps of: calculating, for one of a plurality of construction locations, an impact assessment point indicating the magnitude of the impact that the rubble groups will have when the rubble groups at the construction locations surrounding the one construction location, by reflecting the construction order of the plurality of construction locations, using a displacement impact map indicating the magnitude of the impact that the rubble groups will have around the location where they will be struck and compacted with the rigid object; determining, based on the calculated impact assessment point, the height of the top of the corresponding construction location immediately after compaction when the rubble groups at the corresponding construction location are compacted to a height obtained by adding / reducing the amount of displacement due to the impact when the rubble groups at the surrounding construction locations are compacted to a predetermined design height; and striking the rubble groups at each construction location with the rigid object from above to compact the top of the construction location so as to be the determined height.
[0007] Furthermore, an information processing device according to another aspect of the present invention is an information processing device used for constructing a rubble mound in which rubble dumped on the seabed is struck from above with a rigid object to compact the rubble, and is equipped with: a calculation unit that uses a displacement impact map indicating the magnitude of the impact on the rubble around the point where the rubble is struck and compacted with the rigid object to calculate, for one of a plurality of construction points into which the construction site of the rubble mound is divided, an impact assessment point indicating the magnitude of the impact when the rubble at the construction points surrounding the one construction point is compacted, while reflecting the construction order for the plurality of construction points; and a determination unit that determines, based on the calculated impact assessment point, the height of the top of the corresponding construction point immediately after compaction when the rubble at the corresponding construction point is compacted to a predetermined design height plus or minus the amount of displacement due to the impact when the rubble at the surrounding construction points is compacted.
[0008] The information processing device according to each aspect of the present invention may be realized by a computer. In this case, the information processing program of the information processing device that realizes the information processing device by the computer by operating the computer as each part (software element) of the information processing device, and the computer-readable recording medium on which it is recorded, also fall within the scope of the present invention. Effect of the Invention
[0009] According to one aspect of the present invention, the top of the riprap mound can be finished to the designed height without having to remove the riprap that has already been poured, pour in additional riprap later, or perform re-compaction, which would be a rework. [Brief description of the drawings]
[0010] [Figure 1] FIG. 1 is a side view showing an example of compaction and leveling work using a weight according to an embodiment of one aspect of the present invention. [Diagram 2] FIG. 2 is an enlarged side view of a part of FIG. [Diagram 3] A flowchart showing an example of the configuration of an information processing device provided in the compaction device according to the same embodiment. [Figure 4] 13 is a graph showing an example of displacement shape data used by the information processing device according to the embodiment for information processing, in which the peripheral portion is compacted. [Diagram 5] 13 is a graph showing another example of displaced shape data used for information processing by the information processing device according to the embodiment when the peripheral portion is not compacted. [Figure 6] 11 is a diagram showing an example of a displacement influence map used for information processing by the information processing device according to the embodiment. FIG. [Figure 7] 1 is a diagram showing an example of how to divide a construction site into a plurality of construction locations and how to set the order of construction. FIG. [Figure 8] 11 is a diagram illustrating calculation of an impact assessment point performed by the information processing device according to the embodiment. FIG. [Figure 9] 11 is a list showing an example of finishing patterns used for information processing by the information processing apparatus according to the embodiment. [Figure 10] 10 is a flow chart showing an example of a flow of a method for constructing a rubble mound according to an embodiment of another aspect of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] <Embodiment> Hereinafter, one embodiment of the present invention will be described in detail.
[0012] [Compaction equipment] First, an overview of the compaction device will be described. The compaction device 100 is a device used for constructing a rubble mound. As shown in FIG. 1, the compaction device 100 according to this embodiment includes a crane 1, a weight 2 (rigid body), and an information processing device 3. The crane 1 and the weight 2 may be conventionally known. The form of the compaction device 100 is not limited to the form in which a weight is dropped using a crane as shown in FIG. 1. That is, the compaction device 100 may be a form in which a strike is applied by a rigid body such as a hammer, or a form in which a seabed crawling machine equipped with a weight or hammer is used. The information processing device 3 may be provided in the crane 1, or may be provided at a location away from the crane 1 in a state in which it can communicate with the crane 1.
[0013] When the compaction device 100 is used to strike riprap piles dumped on the seabed from above, the riprap piles below the weight 2 sink and are compacted, as shown in Figure 2. At this time, the riprap piles also sink near the end 2a of the weight 2. Meanwhile, the riprap piles rise horizontally away from the end 2a of the weight 2. The extent and degree of the sinking and uplifting of the riprap piles around the striking part differs depending on whether the riprap piles have already been compacted. The differences in the extent and degree of the sinking and uplifting of the riprap piles will be described later.
[0014] [Details of information processing device] Next, the information processing device 3 will be described in detail. The information processing device 3 is a computer used for constructing a riprap mound in which riprap piles dumped on the seabed are compacted by hitting the riprap piles from above with a rigid object. As shown in Fig. 3, the information processing device 3 includes an input unit 31, an output unit 32, a storage unit 33, and a control unit 34.
[0015] [Input section] The input unit 31 is composed of at least one of a communication module that receives data and signals from other devices, a terminal that is connected to other devices, a drive that reads information from a recording medium, and an operation device that can be operated by a user. The operation device includes at least one of a keyboard, a mouse, and a touch panel.
[0016] [Output section] The output unit 32 is composed of at least one of a communication module that transmits data and signals to other devices (display device, crane 1, etc.), a terminal that connects to other devices, a drive that writes information to a recording medium, and a display device such as a display that displays images.
[0017] [Storage section] The storage unit 33 stores various programs (including an information processing program 331) in which operations to be performed by the control unit 34 are described. The storage unit 33 according to this embodiment also stores displacement shape data 332 (described in detail below). The storage unit 33 according to this embodiment also stores a displacement influence map 333 (described in detail below). The storage unit 33 according to this embodiment also includes a semiconductor memory, a hard disk drive, and the like.
[0018] [Control Unit] The control unit 34 includes a data acquisition unit 341, a calculation unit 342, a determination unit 343, and an output control unit 344. The control unit 34 according to this embodiment is configured with a processor, a memory, etc. When the processor executes the information processing program 331 stored in the storage unit 33, the information processing program 331 causes the control unit 34 to function as each of the control blocks 341 to 344.
[0019] (Data Acquisition Section) The data acquisition unit 341 acquires the displacement shape data 332 stored in the memory unit 33. The displacement shape data 332 is data indicating the amount of displacement of the riprap group around the impact point that occurs when the riprap group is impacted from above with a rigid object. The displacement shape data 332 is data obtained by numerical analysis or actual measurement. A method for creating the displacement shape data 332 will be explained in the "Method for constructing a riprap mound" below. The data acquisition unit 341 may be configured to acquire the displacement shape data 332 from another device via the input unit 31, rather than from the memory unit 33.
[0020] As shown in FIG. 4, the displacement shape data 332 according to this embodiment is a graph in which the horizontal axis represents the horizontal distance from the end 2a of the weight 2 (the side surface of the lower end of the weight 2: see FIG. 2) when it falls on the riprap group, and the vertical axis represents the displacement of the riprap group. The displacement of the riprap group is a relative value (a dimensionless displacement) when the height of the top of the weight 2 before it falls is 0 and the amount of settlement of the weight 2 is, for example, -1.0. The tendency of the displacement of the riprap group differs depending on whether the surroundings of the riprap group have already been compacted or have not yet been compacted. The displacement shape data 332 when the surroundings have already been compacted indicates that, for example, when the surrounding area to be compacted is compacted as shown in FIG. 4, a drag-in settlement occurs within a range of about 3 m from the point where the weight 2 falls, and a gentle uplift occurs within a range of about 4 m from the point where the weight 2 falls. On the other hand, the displacement shape data 332 in the case where the surrounding area to be compacted has not yet been compacted indicates that drag-in settlement occurs within a range of about 0.5 m from the point where the weight 2 falls, and a large uplift occurs within a range of about 2 m from the point where the weight 2 falls, as shown in Figure 5. In other words, both Figures 4 and 5 show results in which settlement occurs near the end 2a of the weight 2, and there is a tendency for uplift to occur away from that point.
[0021] The data acquisition unit 341 also acquires the displacement impact map 333 stored in the memory unit 33. The displacement impact map 333 is a map that indicates the magnitude of the impact on the riprap group around the area where the riprap is compacted by hitting with a rigid object. The displacement impact map 333 is also a map that is created based on the displacement shape data 332. A method for creating the displacement impact map 333 will be explained in the "Method for constructing a riprap mound" below. The data acquisition unit 341 may be configured to acquire the displacement impact map 333 from another device via the input unit 31, rather than from the memory unit 33.
[0022] As shown in FIG. 6, the displacement influence map 333 according to this embodiment is in the form of a grid of n squares x n squares (for example, 7 squares x 7 squares). One square corresponds to one of the construction sites P1 to PN (N is the order of construction) obtained by dividing the construction site of the rubble mound. The central square corresponds to the construction site of the compaction target (weight drop site). Some squares within a predetermined range from the central square have a numerical value written in them. This numerical value indicates the magnitude of the influence on the rubble group at the construction site corresponding to the square in which the numerical value is written, when the construction site corresponding to the central square of the map is compacted. Hereinafter, the numerical value written in each square of the displacement influence map 333 is referred to as an influence value. A positive influence value means that the construction site corresponding to the square is likely to rise due to the compaction of the surrounding area. Also, the larger the influence value, the greater the degree of uplift. On the other hand, a negative influence value means that the construction site corresponding to the square is likely to sink due to the compaction of the surrounding area. Moreover, the larger the absolute value of the influence value, the greater the degree of subsidence.
[0023] (Calculation section) The calculation unit 342 uses the displacement influence map 333 to calculate the influence evaluation point for the multiple N construction sites P1·PN, reflecting the construction order. The influence evaluation point is a numerical value indicating the magnitude of influence on one construction site Pn among the multiple construction sites P1·PN in which the construction site of the riprap mound is divided, when the riprap group at the construction sites Pn+1·PN around the one construction site Pn is compacted. The calculation unit 342 according to this embodiment refers to the displacement influence map 333, and identifies the influence points at the one construction site Pn when compacting each of the construction sites Pn+1·PN that are compacted after the one construction site Pn, and accumulates them. Note that the compaction of the construction sites P1·Pn-1 that are compacted before the one construction site Pn does not affect the one construction site Pn after compaction. For this reason, when calculating the impact assessment point at one construction site Pn, the construction sites P1··Pn-1, which are compacted before the one construction site Pn, are not taken into consideration.
[0024] As a specific example, as shown in FIG. 7, a construction site is divided into 108 (9 cells x 12 cells) construction locations (the numbers of the cells indicate the order of construction), and an impact assessment point for the fourth construction location P4 (where construction has been completed) is to be calculated (the impact assessment points for the first to third construction locations P1 to P3 have been calculated). The calculation unit 342 first identifies the impact value for the fourth construction location P4 when compacting the fifth construction location P5. As shown in FIG. 8, when the central cell of the displacement influence map 333 corresponds to the fifth construction location P5, the cell corresponding to the fourth construction location P4 is the cell one cell above the central cell. The impact value (-1) of the cell one cell above this central cell is the magnitude of the impact of the compaction of the fifth construction location P5 on the fourth construction location P4. In the same manner, the calculation unit 342 identifies the magnitude of the impact of the compaction of the sixth, seventh, to 108th construction locations on the fourth construction location P4.
[0025] Then, the identified influence values are accumulated. The accumulated value of the influence values becomes the influence evaluation point at one construction site Pn. A positive influence evaluation point indicates that the corresponding construction site is likely to rise due to subsequent compaction of the surrounding area. On the other hand, a negative influence evaluation point indicates that the construction site is likely to sink due to subsequent compaction of the surrounding area. Incidentally, the influence of the rubble rock group located far away from the falling position of the weight is small enough to be ignored judging from the numerical value of the (design) allowable range. For this reason, as shown in FIG. 6, the influence value of the mass far away from the central mass in the displacement influence map 333 is zero. Also, when the position of one construction site Pn is far away from the position where the surrounding compaction is performed and is outside the displacement influence map 333, the influence value may be set to zero. For example, in the case of the construction site shown in FIG. 7, when calculating the influence evaluation point at the construction site P4, for example, there is no problem even if the influence points of the construction sites 16, 17, 18 to 34, 35, 36 to 73, 74, 75, etc. that are far away are not identified. Therefore, for a construction site where it is known in advance that it is not possible to identify an influence point at a certain construction site Pn, the identification of the influence value is omitted. The calculation of the influence evaluation point at a certain construction site Pn as described above is similarly calculated for each construction site Pn+1·PN that is compacted after the certain construction site Pn.
[0026] (Decision Section) The determination unit 343 determines the finishing height H of the corresponding construction site Pn based on the calculated impact assessment point. The finishing height H is the height of the top of the corresponding construction site Pn immediately after compaction when the riprap group at the construction site Pn is compacted. Specifically, the determination unit 343 determines the finishing height H to be a height obtained by adding or subtracting the amount of displacement caused by the effect of compacting the riprap group at the surrounding construction sites from the predetermined design height HD. The determination unit 343 includes a height acquisition unit 343a, a prediction unit 343b, and a selection unit 343c.
[0027] The height acquisition unit 343a acquires the average height Hm of the top of each of the construction sites P1 to PN before the riprap group is compacted. The height acquisition unit 343a according to this embodiment acquires a numerical value input by the user to the input unit 31 as the average height Hm. The height acquisition unit 343a according to this embodiment also acquires the design height HD and the allowable error E. The design height HD is a target value that is desired to be this height after construction. The allowable error E is a height difference that is allowed to deviate from the design height HD. The height acquisition unit 343a acquires a numerical value input by the user to the input unit 31 as the design height HD and the allowable error E.
[0028] The prediction unit 343b predicts the distribution of the height of the top of the riprap mound after compaction of the riprap groups at all the construction sites P1 to PN for each finishing pattern, based on a plurality of finishing patterns set based on the average height Hm, the design height HD, and the allowable error E, and on the displacement shape data 332. Specifically, the prediction unit 343b provisionally determines the finishing height H of each of the construction sites P1 to PN, using, for example, four finishing patterns as shown in Fig. 9.
[0029] If the impact assessment score of the construction location Pn is positive, the finishing height is provisionally determined using the above-mentioned finishing pattern 1 or 2. On the other hand, if the impact assessment score of the construction location Pn is negative, the finishing height H is provisionally determined using the above-mentioned finishing pattern 3 or 4. For example, the finishing height H is provisionally determined by a combination of several different finishing patterns, such as when finishing pattern 1 is used for construction locations with positive impact assessment scores and finishing pattern 3 is used for construction locations with negative impact assessment scores, when finishing pattern 1 is used for construction locations with positive impact assessment scores and finishing pattern 4 is used for construction locations with negative impact assessment scores, when finishing pattern 2 is used for construction locations with positive impact assessment scores and finishing pattern 3 is used for construction locations with negative impact assessment scores, when finishing pattern 2 is used for construction locations with positive impact assessment scores and finishing pattern 4 is used for construction locations with negative impact assessment scores, and so on.
[0030] After the finishing height H of each of the work locations P1 to PN is provisionally determined, the displacement shape data 332 is used to predict the height of the top of the surrounding work locations when each work location Pn is compacted. The prediction is repeated from when the first work location P1 is compacted to when the last work location PN is compacted. When the prediction is made for when the last work location PN is compacted, the predicted value of each top height of the entire work site, that is, each of the work locations P1 to PN, is obtained. Then, the percentage of the predicted value of each top height falling within the allowable range (HD-E to HD+E) is calculated for each combination of the finishing patterns. Then, the combination of the finishing patterns with the highest percentage of predicted values falling within the allowable range is selected as the combination to be used for calculating the finishing height H when actually performing compaction.
[0031] (Modification of the control unit) The height acquisition unit 343a of the control unit 34 may be configured to be able to re-obtain the average height Hm (accept re-input of the average height Hm by the user) after the selection unit 343c selects the finishing height H (after compacting the riprap group at at least one of the construction sites Pn). The re-acquired average height Hm is obtained by re-measuring the average height Hm of the tops of the remaining construction sites Pn to PN after the compaction of some of the construction sites P1 to Pn-1 has actually been performed. In addition, the selection unit 343c of the control unit 34 may be configured to be able to re-select a finishing pattern according to the re-acquired average height Hm when the height acquisition unit 343a re-acquires the average height Hm. In this way, the finishing height H can be reviewed at any time. As a result, it is possible to prevent the actual average height Hm of the tops immediately before compacting each of the construction sites Pn to PN from deviating from the average height Hm measured when the finishing height H was initially determined due to the influence of compaction, etc., and as a result, the finishing height H from becoming a height different from the initial plan.
[0032] In addition, the determination unit 343 of the control unit 34 may be configured to determine the finishing height H based on the magnitude of the cumulative value of the influence evaluation points, rather than determining the finishing height H based on the above-mentioned finishing pattern.
[0033] [Output control section] The output control unit 344 causes the output unit 32 to output the finishing height H of each of the construction sites P1 to PN determined by the determination unit 343. When the output unit 32 is a communication module that transmits data or signals to a display device, a terminal connected to a display device, or the display device itself that displays images, the finishing height H of each of the construction sites P1 to PN is displayed on the display device. The operator of the compaction device 100 adjusts the height at which the weight is dropped by referring to the finishing height H displayed on the display device. On the other hand, when the output unit 32 is a communication module that transmits data or signals to the control unit of the crane 1, or a terminal connected to the control unit of the crane 1, the crane 1 can perform operations such as automatically lifting and dropping the weight 2 based on the input finishing height H.
[0034] [Effects of the information processing device] The riprap group at one construction site Pn, which has been compacted so that its top is at a determined height, rises or sinks due to the influence of each time compaction is performed at the surrounding construction sites. According to the information processing device described above, the height of the riprap group at one construction site Pn is set taking into consideration the amount of displacement caused by the influence of compacting the surrounding riprap group (lower at locations that are prone to rise, and higher at locations that are prone to sink). Therefore, when the compaction device 100 performs compaction based on the output of the information processing device 3, after the compaction of the first construction site Pn and the surrounding construction areas is all completed, the height of the top of the first construction site Pn settles at the design height HD. Therefore, according to the information processing device 3, it becomes possible to construct a riprap mound with a top leveled to a predetermined height without removing the riprap that has been added or adding more riprap later.
[0035] [How to build a rubble mound] Next, the method of constructing a rubble mound will be explained.
[0036] The construction method of the riprap mound is a method of compacting the riprap piles dumped on the seabed by hitting them from above with a rigid object. As shown in Fig. 10, the construction method of the riprap mound includes a data acquisition step S1, a map creation step S2, a calculation step S3, a determination step S4, and a compaction step S5.
[0037] [Data acquisition step] In the first data acquisition step S1, the displacement shape data 332 is acquired. In this data acquisition step S1, the displacement shape data 332 is acquired by numerical analysis or actual measurement. For example, the finite element method (FEM) can be used as the numerical analysis. Specifically, an analysis area is set in an axisymmetric model with a straight line extending vertically through the center of the weight 2 as the central axis, and a forced vertical downward displacement simulating the fall of the weight 2 is applied to the center of the model (corresponding to the construction location where the weight 2 is dropped). Then, the amount of displacement of the periphery of the model due to the effect of the forced displacement is analyzed. On the other hand, in the case of actual measurement, specifically, a plurality of measurement points are set in a straight line with horizontal intervals from the drop point of the weight 2. Then, the height of the top of each measurement point before the weight 2 is dropped is obtained by bathymetry. Then, the height of the top of each measurement point after the weight 2 is dropped is obtained by bathymetry. The difference in the height of the top of each measurement point before and after the weight 2 is dropped is calculated.
[0038] [Map creation steps] After acquiring the displacement shape data 332, the process proceeds to the map creation step S2. In the map creation step S2, a displacement influence map 333 is created based on the displacement shape data 332. Specifically, the distance from the point where the weight falls is divided into equal intervals (e.g., 2 m), and the amount of displacement in each interval is classified into multiple stages (e.g., three stages: "large", "medium", and "small"). The division width may be determined to be, for example, equal to the width of the construction sites P1 to PN. Then, a score is given to each classification. If the displacement is an uplift, a positive score is given, and if it is a subsidence, a negative score is given. For example, if the displacement is a large uplift (subsidence) classified as "large", the largest score (e.g., 1 point (-1 point)) is given. If the displacement is a relatively small uplift (subsidence) classified as "small", the smallest score (e.g., 0.25 point (-0.25 point)) is given. In the case of uplift (subsidence) classified as "medium," which is about the middle level, a score that is halfway between the scores assigned to the "large" and "small" classifications (for example, 0.5 points (-0.5 points)) is assigned. The level of displacement can be set according to the type of rubble and the condition of the ground before construction, and may be two levels or four or more levels.
[0039] [Calculation step] After the displacement influence map 333 is created, the process proceeds to calculation step S3. In calculation step S3, the displacement influence map 333 is used to calculate an impact assessment score for a plurality of construction locations, reflecting the construction order. The impact assessment score can be calculated, for example, by using the information processing device 3. A specific method for calculating the impact assessment score is as described in the explanation of the calculation unit 342 of the information processing device 3, and therefore a description thereof will be omitted here. The impact assessment score may be calculated by using a device other than the information processing device 3 (for example, a dedicated device for creating the displacement influence map 333, a PC on which an application for creating the displacement influence map 333 is installed, etc.), or may be calculated by a person.
[0040] [Decision Step] After the impact assessment point is calculated, the process proceeds to a determination step S4. In the determination step S4, the finish height H of the corresponding construction portion is determined based on the calculated impact assessment point. The determination step S4 according to the present embodiment includes a measurement step S41, a prediction step S42, and a selection step S43.
[0041] (Measurement step) In the measurement step S41, the average height of the top of each construction site before compacting the riprap group is measured. The measurement of the average height can be performed, for example, by using a predetermined measuring device (not shown).
[0042] (Prediction step) In the prediction step S42, the distribution of the top height of the riprap mound after compaction of the riprap group at all construction locations is predicted for each finishing pattern based on the average height, design height, and a plurality of finishing patterns set based on the allowable error, and the displacement shape data 332. The prediction of the top height distribution can be performed, for example, using the above-mentioned information processing device 3. The specific method of predicting the top height distribution is as described in the explanation of the prediction unit 343b of the above-mentioned information processing device 3, and therefore the explanation here is omitted. The prediction of the top height distribution may be performed using a device other than the above-mentioned information processing device 3 (for example, a device dedicated to predicting the top height distribution, a PC on which an application for predicting the top height distribution is installed, etc.), or may be performed by a person.
[0043] (Selection step) In the selection step S43, the finishing pattern that is the basis of the distribution with the highest ratio of construction locations with heights that do not exceed the allowable error is selected from among the distributions of the predicted heights, and the finishing height H is determined. The selection of the finishing height H can be performed, for example, using the information processing device 3. The specific method of selecting the finishing height H is as described in the explanation of the selection unit 343c of the information processing device 3, and therefore the explanation here is omitted. The calculation of the impact assessment point may be performed using a device other than the information processing device 3, or may be performed by a person.
[0044] [Compaction step] After the finishing height H is determined, the process proceeds to the compaction step S5. In the compaction step S5, the rubble group at each of the construction sites P1 to PN is struck from above with a rigid object to compact the top height of the construction sites P1 to PN to the finishing height H. Construction sites with positive impact assessment points at the construction sites to be compacted are likely to rise due to subsequent compaction of the surrounding area. For this reason, construction sites with positive impact assessment points are compacted so that the top height is lower than the design height HD. On the other hand, construction sites with negative impact assessment points at the construction sites to be compacted are likely to sink due to subsequent compaction of the surrounding area. For this reason, construction sites with negative impact assessment points are compacted so that the top height is higher than the design height HD. Whether the top height has reached the finishing height H is confirmed by a bathymetric survey.
[0045] When this type of compaction is performed in sequence at each of the construction sites P1 to PN, the construction sites surrounding the construction site being compacted are affected by the compaction. As a result, the construction sites with positive impact assessment points, which have been compacted so that the top height is lower than the design height HD, rise with each compaction. On the other hand, the construction sites with negative impact assessment points, which have been compacted so that the top height is higher than the design height HD, sink with each compaction. Then, when compaction is completed at all of the construction sites, the top height of each of the construction sites P1 to PN will be roughly the design height HD. In other words, a rubble mound with a top leveled at the overall design height HD is constructed.
[0046] [Variations in the mound construction method] The construction method of a riprap mound may include a re-measurement step and a re-selection step. In the re-measurement step, after compacting the riprap group at at least one construction site Pn, the average height of the tops of the remaining construction sites Pn+1 to PN is actually measured again. The re-measurement of the average height can be performed using the measuring device used in the above-mentioned measuring step S41. In the re-selection step, a finishing pattern according to the re-measured average height is re-selected. The re-selection of the finishing pattern can be performed using the means (such as the above-mentioned information processing device 3) used in the above-mentioned selection step S43.
[0047] [Effects of mound construction methods] The riprap group at one construction site Pn, which has been compacted so that its top is at a determined height, rises or sinks due to the effects of each compaction carried out at the surrounding construction sites. According to the construction method for a riprap mound explained above, the height of the riprap group at one construction site Pn is set taking into account the amount of displacement caused by the compaction of the surrounding riprap group (lower at locations that are prone to rise, and higher at locations that are prone to sink). Therefore, after the compaction of the first construction site Pn and all of the surrounding construction sites is completed, the top height of the first construction site Pn settles at the design height. Therefore, according to the construction method for a mound, a riprap mound with its top leveled to a predetermined height can be constructed without removing the riprap that has been put in or adding more riprap later.
[0048] [Variations] The present invention is not limited to the above-described embodiments, and various modifications are possible within the scope of the claims.
[0049] For example, some or all of the functions of the control blocks can be realized by logic circuits. For example, an integrated circuit in which a logic circuit that functions as each of the control blocks is formed is also included in the scope of the present invention. In addition, the functions of each of the control blocks can be realized by, for example, a quantum computer.
[0050] Furthermore, each process described in each of the above embodiments may be executed by AI (Artificial Intelligence). In this case, the AI may be executed by the control device or another device (for example, an edge computer or a cloud server).
[0051] The present invention is not limited to the above-described embodiments, and various modifications are possible within the scope of the claims. Embodiments obtained by appropriately combining the technical means disclosed in different embodiments are also included in the technical scope of the present invention. [Explanation of symbols]
[0052] 100 Compaction equipment 1. Crane 2 weight 2a end 3. Information processing equipment 31 Input section 32 Output section 33 Storage section 331 Information Processing Program 332 Displacement shape data 333 Displacement Impact Map 34 Control section 341 Data Acquisition Department 342 Calculation Unit 343 Decision Section 343a Height acquisition section 343b Prediction Department 343c Selection section 344 Output control section
Claims
1. A method for constructing a rubble mound in which rubble piles dumped on the seabed are compacted by hitting the rubble piles from above with a rigid object, comprising: a step of calculating, for one of a plurality of construction locations obtained by dividing the construction site of the riprap mound into the plurality of construction locations, an impact assessment point indicating the magnitude of the impact that would be caused when the riprap mound in the construction locations surrounding the one construction location is compacted, by using a displacement impact map indicating the magnitude of the impact on the riprap mound in the surrounding areas of the one construction location, while reflecting the construction order of the plurality of construction locations; A step of determining the height of the top of the corresponding construction site immediately after compaction when the riprap group at the corresponding construction site is compacted based on the calculated impact assessment point to be a height obtained by adding / reducing the amount of displacement caused by the compaction of the riprap group at the surrounding construction sites to / from a predetermined design height; A step of hitting the rubble group at each construction site from above with the rigid object to compact the top of the construction site to a determined height; A method for constructing a rubble mound having a
2. The method further includes a step of creating the displacement influence map based on displacement shape data indicating the amount of displacement of the riprap group around the impact point caused when the riprap group is impacted from above with the rigid object before performing the step of calculating the impact assessment point.
2. A method for constructing a rubble mound as claimed in claim 1.
3. The method further includes a step of acquiring the displacement shape data by numerical analysis or actual measurement before performing the step of creating the displacement influence map.
3. A method for constructing a rubble mound as claimed in claim 2.
4. In the step of determining the height of the top end, measuring the average height of the top of each construction site before compacting the rubble group; a step of predicting, for each finishing pattern, a distribution of heights of the top ends of the riprap mound after compaction of the riprap group at all construction sites is completed, based on a plurality of finishing patterns set based on the average height, the design height, and an allowable error, which is a height difference that is allowed to deviate from the design height, and based on the displacement shape data; A step of selecting a finishing pattern based on the distribution in which the proportion of construction points having a height that does not exceed the allowable error is the highest among the distributions of the predicted heights, and determining the height of the top end; Including, A method for constructing a rubble mound according to claim 2 or 3.
5. The step of determining the height of the top end includes: After compacting the riprap group at at least one construction site, re-measuring the average height by actual measurement; reselecting a finishing pattern according to the remeasured average height; Including, 5. A method for constructing a rubble mound as claimed in claim 4.
6. 1. An information processing device used in constructing a riprap mound for compacting a group of riprap dumped on the seabed by hitting the group of riprap dumped on the seabed from above with a rigid object, comprising: a calculation unit which uses a displacement influence map which indicates the magnitude of the influence on the riprap around the portion where the riprap mound is struck and compacted by the rigid object, and calculates, for one of the construction portions into which the construction site of the riprap mound is divided, an influence evaluation point which indicates the magnitude of the influence when the riprap around the one construction portion is compacted, while reflecting the construction order for the multiple construction portions; A determination unit that determines the height of the top of the corresponding construction site immediately after compaction when the riprap group at the corresponding construction site is compacted based on the calculated impact assessment point to a height obtained by adding / reducing the amount of displacement caused by the compaction of the riprap group at the surrounding construction sites to a predetermined design height; An information processing device comprising:
7. An information processing program for causing a computer to function as the information processing device according to claim 6, An information processing program for causing a computer to function as the calculation unit and the determination unit.
Citation Information
Patent Citations
Rubble leveler
JP1986233128A
Weight rolling type finishing method for underwater riprap mound
JP1991013624A
Weight free-falling type underwater riprap foundation consolidation leveling construction method
JP2001241041A
Weight free-falling type underwater rubble base leveling method and the weight used in the method
JP2002294706A
Upper surface leveling method, seafloor foundation construction method and upper surface leveling system
JP2013221285A
Cited By
Dynamic optimization method and device for riprap grid of channel BIM model
CN121051954A