Joining device and joining method not requiring temporary bolt in rc(PC) construction
A temporary fixing method and jig secure the steel beam member to the reinforced concrete column by sandwiching reinforcing bars, addressing the risk of shifting or falling in steel frame construction, thereby ensuring stable joint connections.
Patent Information
- Application Number
- JP2023048024
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-24
- Publication Date
- 2024-10-04
AI Technical Summary
In column-reinforced concrete-beam steel-frame composite structures, there is a risk of the steel beam member shifting or falling when joined to the steel beam member at the column-beam joint.
A temporary fixing method and fixing jig are used to secure the steel beam member to the reinforced concrete column by sandwiching reinforcing bars with two fixing members, preventing shifting or falling during the joining process.
The method and jig effectively prevent the steel beam member from shifting or falling, ensuring stable joint connections in steel frame construction.
Smart Images

Figure 2024136783000001_ABST
Abstract
Description
[Technical field]
[0001] This invention relates to a method for temporarily fixing a steel beam member to a reinforced concrete column in a composite structure with reinforced concrete columns and steel beams, and to a fixing jig used therefor. [Background technology]
[0002] Patent Document 1 discloses a construction method in which a rigid frame is constructed by using reinforced concrete columns and steel frame beams. Patent Document 2 discloses a joining device and joining method for steel frame construction that does not require temporary bolts. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Japanese Patent Application Publication No. 4-34146 [Patent Document 2] JP 2019-157526 A Summary of the Invention [Problem to be solved by the invention]
[0004] In a composite structure with reinforced concrete columns and steel beams, when the steel girder bridging the columns is joined to the steel beam member at the column-beam joint, there is a risk that the steel beam member may shift or collapse. The present invention aims to solve such problems, for example. [Means for solving the problem]
[0005] The temporary fixing method includes a beam member placing step of placing a steel beam member between two reinforcing bars on the top surface of a reinforced concrete column with the two reinforcing bars protruding upward from the top surface, a fixing member placing step of placing two fixing members on the top surface of the steel beam member so as to clamp the two reinforcing bars protruding above the top surface of the steel beam member, and a fixing member fixing step of fixing the two fixing members, thereby temporarily fixing the steel beam member to the reinforced concrete column. The fixing jig is placed on the upper surface of the reinforced concrete column, on the upper surface of the steel beam member placed between the two reinforcing bars protruding upward from the upper surface, and has two fixing members that clamp the two reinforcing bars and are fixed to the two reinforcing bars, thereby temporarily fixing the steel beam member to the reinforced concrete column. Effect of the Invention
[0006] According to the temporary fixing method and the fixing jig, by temporarily fixing a steel beam member to a reinforced concrete column, it is possible to prevent the steel beam member from shifting or collapsing when joining a steel girder to the steel beam member. [Brief description of the drawings]
[0007] [Figure 1] FIG. [Diagram 2] FIG. [Diagram 3] FIG. 4 is a perspective view showing the fixing jig attached to the column-beam joint. [Figure 4] A floor plan showing a building under construction. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0008] The column-beam joint 80 will be described with reference to FIG. The column-beam joint 80 includes, for example, a column 81, beam members 83a to 83c, and a closing plate 84.
[0009] Pillar 81 is made of reinforced concrete and has, for example, a rectangular prism shape extending in the ±Z directions (approximately vertical directions). Pillar 81 has, for example, sixteen reinforcing bars 82a to 82p protruding in the +Z direction (upward) from its +Z side surface (upper surface).
[0010] The beam members 83a to 83c are steel frames, for example H-shaped steel. The beam member 83a extends, for example, in the ±X direction. The beam members 83b and 83c extend, for example, in the ±Y direction. The beam members 83a to 83c are placed on the upper surface of the pillar 81.
[0011] The closing plate 84 is, for example, a steel plate, and has a generally rectangular tubular shape that is approximately the same size as the pillar 81. The closing plate 84 is fixed to the beam members 83a to 83c.
[0012] The space surrounded by the closing plate 84 is divided into, for example, four sections by beam members 83a to 83c. For example, four reinforcing bars 82a to 82p are arranged in each of the four spaces, and extend above the upper surfaces of the upper flanges of the beam members 83a to 83c. Note that the number and arrangement of the reinforcing bars are not limited to this, and other numbers and arrangements may be used. Beam members 83a to 83c extend to the outside of closing plate 84. Steel girders that bridge other columns are fixed to the ends of beam members 83a to 83c. After that, ready-mix concrete is poured into the space surrounded by closing plate 84.
[0013] The fixing jig 10 will be described with reference to FIG. The fixing jig 10 temporarily fixes the beam members 83a to 83c, thereby preventing the beam members 83a to 83c from shifting or collapsing when a main girder is fixed to the beam members 83a to 83c of the beam-column joint portion 80. The fixing jig 10 includes, for example, two fixing members 12 and 13, twelve nuts 41-46 and 61-66, and four clamping plates 51-54.
[0014] The fixing member 12 is, for example, a channel steel and extends, for example, in the ±x direction. The web is disposed approximately perpendicular to the ±y direction, and the flanges protrude in the +y direction from each of the ±Z ends of the web. The fixing member 12 has two through holes 21 and 22 provided in a web, spaced apart in the ±x direction. Bolts 23 and 24 are inserted into the through holes 21 and 22, respectively, from the +y side to the -y side. This causes the male threads of the bolts 23 and 24 to protrude from the web in the -y direction. The bolts 23 and 24 may be fixed to the fixing member 12 by welding or the like. In this way, when nuts 41 to 46, which will be described later, are screwed onto the bolts 23 and 24, the bolts 23 and 24 can be prevented from rotating together, allowing them to be securely tightened.
[0015] The fixing member 13 is, for example, a channel steel, and extends, for example, in the ±x direction. The web is disposed approximately perpendicular to the ±y direction, and the flanges protrude from the ±Z direction ends of the web in the -y direction. The fixing member 13 is slightly shorter than the fixing member 12, and the ±x direction ends of the flanges have corners chamfered on the -y side. This prevents the fixing jigs 10 from interfering with each other when two fixing jigs 10 are used to fix beam members extending in different directions. Two through holes 31 and 32 are provided in the web of the fixing member 13, spaced apart in the ±x direction. The distance between the through holes 31 and 32 is approximately the same as the distance between the through holes 21 and 22. This allows the tips of the bolts 23 and 24 to be inserted into the through holes 31 and 32, respectively.
[0016] Nuts 41 to 43 are screwed onto bolt 23. Nuts 44 to 46 are screwed onto bolt 24. Nuts 41 and 44 are disposed on the +y side of fixing member 13 and prevent fixing member 13 from moving in the +y direction relative to fixing member 12. Nuts 42 and 45 are disposed on the -y side of fixing member 13 and prevent fixing member 13 from moving in the -y direction relative to fixing member 12. Nuts 43 and 46 are disposed further on the -y side of nuts 42 and 45 and prevent nuts 42 and 45 from coming off.
[0017] The clamping plates 51 to 54 are, for example, octagonal steel plates with a through hole in the center. The clamping plates 51 and 53 are fitted to the reinforcing bars of the beam-column joint 80 and press the fixing members 12 and 13 from the -Z side (below). The clamping plates 52 and 54 are fitted to the reinforcing bars into which the clamping plates 51 and 53 are respectively fitted and press the fixing members 12 and 13 from the +Z side (above). Nuts 61-63 are screwed onto the rebar into which clamping plates 51 and 52 are fitted. Nuts 64-66 are screwed onto the rebar into which clamping plates 53 and 54 are fitted. Nuts 61 and 64 are arranged on the -Z side of clamping plates 51 and 53 to prevent clamping plates 51 and 53 from moving in the -Z direction. Nuts 62 and 65 are arranged on the +Z side of clamping plates 52 and 54 to prevent clamping plates 52 and 54 from moving in the +Z direction. Nuts 63 and 66 are arranged further on the +Z side of nuts 62 and 65 to prevent nuts 62 and 65 from coming off.
[0018] A method of using the fixing jig 10 will be described with reference to FIG. In this figure, two fixing jigs 10 are arranged in opposing positions to make the fixing jigs 10 easier to see. However, only one fixing jig 10 may be arranged for one column 81, or two fixing jigs 10 may be arranged in adjacent positions to temporarily fix beam members extending in different directions.
[0019] First, the pillar 81 is installed, and the beam members 83a to 83c and the closing plate 84 are placed on the upper surface of the pillar 81. Thereafter, the fixing jig 10 is used to temporarily fix, for example, the beam member 83c.
[0020] Specifically, first, nut 61 is screwed onto reinforcing bar 82m, and nut 64 is screwed onto reinforcing bar 82l, and these are disposed at approximately the same height as the top surface of the upper flange of beam member 83c. Next, the clamping plate 51 is fitted to the reinforcing bar 82m, and the clamping plate 53 is fitted to the reinforcing bar 82l, and then they are placed on the nuts 61 and 64. Thereafter, fixing member 13 is placed adjacent to the -Y sides of reinforcing bars 82m and 82l, and placed on clamping plates 51 and 53 and the upper surface of beam member 83c. Next, fixing member 12, with nut 41 screwed onto bolt 23 and nut 44 screwed onto bolt 24, is placed adjacent to the +Y side of reinforcing bars 82m and 82l and placed on clamping plates 51 and 53 and the upper surface of beam member 83c, and the tip of bolt 23 is inserted into through hole 31 of fixing member 13, and the tip of bolt 24 is inserted into through hole 32 of fixing member 13. Then, nuts 42 and 43 are screwed onto bolt 23, and nuts 45 and 46 are screwed onto bolt 24, thereby fixing member 13 to fixing member 12, and fixing members 12 and 13 clamp reinforcing bars 82m and 82l. Thereafter, the clamping plate 52 is fitted to the reinforcing bar 82 m , and the clamping plate 54 is fitted to the reinforcing bar 82 l , and these are placed on the upper flanges of the fixing members 12 and 13 . Then, nuts 62 and 63 are screwed onto reinforcing bar 82m, and nuts 65 and 66 are screwed onto reinforcing bar 82l to fix clamping plates 52 and 54. As a result, fixing members 12 and 13 are fixed to reinforcing bars 82m and 82l, and beam member 83c is temporarily fixed.
[0021] The steel girder is fixed to the beam member 83c temporarily fixed in this way. For example, after the steel girder is temporarily fixed to the beam member 83c using the joining device described in Patent Document 2, the steel girder is fixed to the beam member 83c by tightening bolts at four locations on the web and two locations on the upper flange. At this time, since the beam member 83c is temporarily fixed to the reinforcing bars 82m and 82l by the fixing jig 10, the beam member 83c can be prevented from shifting or falling.
[0022] The means for fixing the fixing members 12 and 13 to the reinforcing bars 82m and 82l is not limited to bolts and nuts, but may be, for example, fastening fixtures.
[0023] With reference to FIG. 4, the use of fixture 10 will be further described. This figure shows a building under construction, with twelve beam-column joints 80a-80l installed on twelve columns, five girders 90a-90e already installed, and the remaining twelve girders 90f-90q are about to be installed.
[0024] At this point, the beam members in the ±Y directions of the column-beam joints 80d-80f are connected to the beam members in the ±Y directions of the column-beam joints 80a-80c via the girders 90c-90e, so there is no need to temporarily fix them. On the other hand, the beam members in the ±X directions of the column-beam joints 80d-80f are not yet connected, so they need to be temporarily fixed. First, the beam members in the ±X directions of the column-beam joint 80d are temporarily fixed by the fixing jig 10a.
[0025] Thereafter, a girder 90f is installed to bridge between the column-beam joint 80d and the column-beam joint 80e. This also fixes the beam members in the ±X directions of the column-beam joint 80e, so next, a girder 90g is installed to bridge between the column-beam joint 80e and the column-beam joint 80f. Thereafter, a girder 90h is installed to bridge between the column-beam joint 80e and the column-beam joint 80f.
[0026] Next, a girder 90i is installed to bridge between the column-beam joint 80d and the column-beam joint 80g. As a result, the beam members in the ±Y directions of the column-beam joint 80g are also fixed, but since only the main girder 90i is connected to the column-beam joint 80g, it is somewhat unstable. For this reason, the beam members in the ±Y directions of the column-beam joint 80j are fixed with the fixing jig 10b, and then a main girder 90j bridging between the column-beam joint 80g and the column-beam joint 80j is installed. Then, a girder 90k is installed to bridge between the column-beam joint 80g and the column-beam joint 80h.
[0027] Next, a girder 90l is installed to bridge between the column-beam joint 80f and the column-beam joint 80i. Thereafter, a girder 90m is installed to bridge between the column-beam joint 80i and the column-beam joint 80l, and further a girder 90n is installed to bridge between the column-beam joint 80i and the column-beam joint 80h.
[0028] Next, the beam members in the ±X directions of the column-beam joint 80j are temporarily fixed by a fixing jig 10c, and then a main girder 90o bridging between the column-beam joint 80j and the column-beam joint 80k is installed. Thereafter, a girder 90p is installed to bridge between the column-beam joint 80k and the column-beam joint 80l, and further a girder 90q is installed to bridge between the column-beam joint 80k and the column-beam joint 80h.
[0029] By installing the girders 90f to 90q in this order, it is possible to minimize the effort required to temporarily fix the beam members with fixing jigs, and to prevent the beam members from shifting or collapsing.
[0030] The above-described embodiment is an example for facilitating understanding of the present invention. The present invention is not limited thereto, and includes various modifications, changes, additions, or deletions without departing from the scope defined by the appended claims. This can be easily understood by those skilled in the art from the above description.
[0031] For temporary joining work of girders in steel frame construction work (attaching, tightening, and removing temporary bolts), by using a special temporary bolt-free joining jig instead of temporary bolts, it is possible to reduce the amount of work and shorten the work time. The scope of application will be expanded to buildings with RCS structures (columns: reinforced concrete, beams and joints: steel). When applying this to an RCS structure, it is necessary to prevent the steel connection frame from shifting or collapsing when attaching the main girder. A special fixing jig is attached to the rebar protruding from the top of the RC column, and the joint steel frame is fixed with this jig, preventing the joint steel frame from shifting or falling when the main girder is installed. As a method of dealing with the load of the secondary beams and deck connected to the main girder, after the main girder is constructed (before the secondary beams are attached), four temporary bolts are attached to the web part of the main girder and two temporary bolts are attached to the upper flange part. The fixing fixtures do not need to be attached to all columns; taking into account the installation procedure for the steel girders, it is sufficient to attach them to only some of the columns. The fixing hardware may be fixed to the reinforcing bars using fastening fixtures. This will make it possible to reduce the time required for steel frame construction in RCS structure buildings and improve safety. [Explanation of symbols]
[0032] 10,10a~10c fixing jigs, 12,13 fixing members, 21,22,31,32 through holes, 23,24 bolts, 41~46,61~66 nuts, 51~54 clamping plates, 80,80a~80l column-beam joints, 81 columns, 82a~82p reinforcing bars, 83a~83c beam members, 84 closing plates, 90a~90q main beams.
Claims
1. A beam member placing process for placing a steel beam member between two reinforcing bars on an upper surface of a reinforced concrete column having two reinforcing bars protruding upward from the upper surface; Then, a fixing member placing process is performed to place two fixing members on the upper surface of the steel beam member so as to sandwich the two reinforcing bars protruding above the upper surface of the steel beam member; Then, a fixing member fixing step of fixing the two fixing members. thereby temporarily fixing the steel beam member to the reinforced concrete column.
2. The two fixing members are channel steels having a plurality of through holes in the webs, the first fixing member has a plurality of bolts that are respectively inserted into the plurality of through holes and fixed by welding; In the fixing member fixing step, the two fixing members are fixed to each other by inserting the tips of the bolts into the through holes of the second fixing member, respectively, and screwing a plurality of nuts into the through holes.
2. The method of claim 1.
3. In the fixing member fixing step, the two fixing members are fixed by clamping the two fixing members with a plurality of clamping plates fitted to each of the two reinforcing bars, The plurality of clamping plates are fixed to the two reinforcing bars by a plurality of nuts screwed onto each of the two reinforcing bars. The method of claim 1 or 2.
4. A fixing jig is placed on the upper surface of a steel beam member placed between two reinforcing bars protruding upward from the upper surface of a reinforced concrete column, and has two fixing members that clamp the two reinforcing bars and are fixed to the two reinforcing bars, thereby temporarily fixing the steel beam member to the reinforced concrete column.
Citation Information
Patent Citations
Connecting method for column and beam, and structure thereof
JP1992034146A
Temporary bolt-less joining device and joint method for steel frame construction
JP2019157526A