Erosion amount management device of rotor blade of steam turbine
The erosion amount management device in steam turbines predicts future erosion based on past data and operating conditions, addressing the challenge of inaccurate erosion forecasting in conventional systems, enabling timely blade replacements.
Patent Information
- Application Number
- JP2024123108
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2024-07-30
- Publication Date
- 2024-10-07
- Estimated Expiration
- 2043-03-22
AI Technical Summary
Conventional steam turbine management systems fail to predict future rotor blade erosion accurately, making it difficult for users to anticipate when the erosion will reach replacement thresholds, especially in thermal power generation facilities shifting towards regulated thermal power operations.
A device that includes past and future erosion amount management features, utilizing data from steam temperature and electrical output detectors to calculate and display predicted erosion amounts, allowing users to visualize and plan for blade replacements based on future operating conditions.
Enables accurate prediction and visualization of rotor blade erosion over time, facilitating timely replacement planning and reducing unexpected equipment failures.
Smart Images

Figure 2024138159000001_ABST
Abstract
Description
[Technical field]
[0001] An embodiment of the present invention relates to an erosion amount management device for a rotor blade of a steam turbine. [Background technology]
[0002] In the low-pressure turbine stages of a steam turbine, some of the steam may condense into water droplets. These water droplets collide with the moving blades of the steam turbine and erode them. Among the low-pressure turbine stages, the final stage moving blades are prone to erosion by water droplets.
[0003] The corrosion of the rotor blades caused by water droplets, known as erosion, is inspected periodically every few years. If the amount of erosion is found to exceed the standard value set by the rotor blade manufacturer during this inspection, replacement of the rotor blade is recommended.
[0004] In recent years, the introduction of renewable energy has been accelerated in power generation facilities as a measure to reduce carbon dioxide (CO2) emissions. In power generation using renewable energy, the amount of power generated varies depending on factors such as the weather. For this reason, in recent years, thermal power generation facilities have been shifting to an operation centered on regulating thermal power in order to compensate for the unstable power supply in power generation using renewable energy. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] Japanese Patent Application Publication No. 61-207804 [Patent Document 2] Patent No. 4575176 [Patent Document 3] JP 2002-297710 A Summary of the Invention [Problem to be solved by the invention]
[0006] As described above, in thermal power generation facilities equipped with steam turbines, operation is shifting from operation centered on rated load to operation centered on adjustable thermal power, so there is a risk that erosion will progress further in the steam turbine.
[0007] A user who manages a steam turbine in a thermal power plant can know the amount of erosion of a rotor blade during a periodic inspection. However, in a conventional steam turbine management system, the user cannot know information that predicts the amount of erosion of the rotor blade from the past periodic inspection to the present, or information that predicts the future amount of erosion of the rotor blade based on the future operating conditions of the actual machine. In addition, in a conventional steam turbine management system, the user cannot know information such as the time when the amount of erosion will reach a threshold value at which the rotor blade should be replaced in the future.
[0008] An object of the present invention is to provide an erosion amount management device for steam turbine rotor blades, which is capable of recognizing, in a chronological order, the amount of erosion from the past to the present predicted based on operating data and the amount of future erosion predicted based on future operating conditions. [Means for solving the problem]
[0009] An erosion amount management device for a steam turbine rotor blade according to an embodiment includes a display information generation unit that generates display information to cause a display unit to display past erosion amount related information indicating information regarding past erosion amounts of the rotor blades of the steam turbine from the past to the present calculated based on measured information, and future erosion amount related information indicating information regarding a future erosion amount of the rotor blades in the future calculated based on future operating conditions and the past erosion amount related information input through an operation using a user interface screen.The display information generation unit generates the display information to cause the display unit to display, each time the future operating conditions are input, the past erosion amount related information at the time the future operating conditions are input and the future erosion amount related information from the time the future operating conditions are input. [Brief description of the drawings]
[0010] [Figure 1] 1 is a system diagram illustrating a configuration of a steam turbine facility equipped with an erosion amount management device according to a first embodiment. [Diagram 2] 1 is a block diagram showing a functional configuration of an erosion amount management device according to a first embodiment; [Diagram 3] FIG. 4 is a diagram showing an example of an input screen for future operating conditions displayed on a user interface in the erosion amount management device of the first embodiment. [Figure 4] FIG. 4 is a diagram showing an example of an input screen for inputting a periodic inspection result regarding erosion to the erosion amount management device of the first embodiment. [Diagram 5] 5 is a flowchart for explaining a flow of calculation of a past erosion amount in a periodic erosion calculation unit of the erosion amount management device according to the first embodiment. [Figure 6] 5 is a flowchart for explaining a flow of calculation of a future erosion amount in a future erosion calculation unit of the erosion amount management device according to the first embodiment. [Figure 7] 4 is a diagram for explaining a method of calculating a recommended replacement timing, a recommended preparation timing, and a preparation threshold value in a future erosion calculation unit of the erosion amount management device of the first embodiment. FIG. [Figure 8] 4 is a diagram for explaining a method of calculating a recommended replacement timing, a recommended preparation timing, and a preparation threshold value in a future erosion calculation unit of the erosion amount management device of the first embodiment. FIG. [Figure 9] FIG. 2 is a diagram showing an example of a display screen on which display information is displayed on the day the erosion amount management device of the first embodiment is introduced; [Figure 10] 4 is a flowchart for explaining a periodic erosion calculation processing method in the erosion amount management device according to the first embodiment. [Figure 11]4 is a flowchart for explaining a future erosion calculation processing method in the erosion amount management device according to the first embodiment. [Figure 12] 13 is a flowchart for explaining a future erosion calculation processing method in the erosion amount management device according to the second embodiment. [Figure 13] 13 is a flowchart for explaining a future erosion calculation processing method in the erosion amount management device according to the second embodiment. [Figure 14] FIG. 11 is a diagram showing an example of a display screen in the erosion amount management device according to the second embodiment. [Figure 15] FIG. 11 is a diagram showing an example of a selection screen for selecting a comparison calculation result to be displayed on a user interface in the erosion amount management device according to the second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] Hereinafter, an embodiment of the present invention will be described with reference to the drawings.
[0012] (First embodiment) 1 is a system diagram that shows a schematic configuration of a steam turbine facility 1 including an erosion amount control device 18 according to a first embodiment. The erosion amount control device 18 functions as a device for controlling the amount of erosion of rotor blades of a steam turbine.
[0013] 1, the steam turbine facility 1 includes a boiler 10, a high-pressure turbine 11, a reheater 12, an intermediate-pressure turbine 13, a low-pressure turbine 14, a generator 15, a condenser 16, a feedwater pump 17, and an erosion amount management device 18. Here, the rotor blades of the low-pressure turbine 14 function as rotor blades of a steam turbine whose erosion amount is managed by the erosion amount management device 18.
[0014] Within the low-pressure turbine 14, erosion due to water droplets is likely to progress in downstream turbine stages where the steam temperature and steam pressure are low. For this reason, the erosion amount management device 18 manages, for example, the amount of erosion in the moving blades of the final stage of the low-pressure turbine 14. Note that the erosion amount management device 18 may manage the amount of erosion in moving blades of other turbine stages that are subject to erosion due to water droplets, in addition to the moving blades of the final stage.
[0015] The steam turbine facility 1 includes an erosion amount management device 18, a steam temperature detector 30, and an output detector 31 as an erosion amount management system for calculating and managing the amount of erosion of rotor blades in a steam turbine.
[0016] The boiler 10 heats feedwater to generate steam, and outputs the steam to a main steam pipe 20. The high-pressure turbine 11 is rotated by steam introduced from the main steam pipe 20, and discharges the steam to a low-temperature reheat steam pipe 21. The reheater 12 reheats the steam introduced from the low-temperature reheat steam pipe 21, and outputs the steam to a high-temperature reheat steam pipe 22.
[0017] The intermediate-pressure turbine 13 is rotated by steam introduced from the high-temperature reheat steam pipe 22, and discharges the steam to a crossover pipe 23. The low-pressure turbine 14 is rotated by steam introduced from the crossover pipe 23, and discharges the steam to an exhaust pipe 24. The generator 15 generates electricity by being driven by the high-pressure turbine 11, the intermediate-pressure turbine 13, and the low-pressure turbine 14. The generator 15 is connected, for example, on the same shaft as the high-pressure turbine 11, the intermediate-pressure turbine 13, and the low-pressure turbine 14.
[0018] The condenser 16 condenses the steam introduced from the exhaust pipe 24 to produce condensed water. The feed water pump 17 supplies the condensed water of the condenser 16 to the boiler 10 via the feed water pipe 25 as feed water.
[0019] The erosion amount control device 18 is a device for calculating and controlling the amount of erosion of the rotor blades in the steam turbine. Details of the erosion amount control device 18 will be described later.
[0020] The steam temperature detector 30 detects the temperature of steam introduced into the intermediate-pressure turbine 13, and outputs a detection signal to the erosion amount management device 18. As shown in Fig. 1, the steam temperature detector 30 is provided, for example, in the high-temperature reheat steam pipe 22, and detects the temperature at the inlet of the intermediate-pressure turbine 13. The steam temperature detector 30 is constituted, for example, by a thermocouple. Note that the inlet of the intermediate-pressure turbine 13 refers to the inlet of the first turbine stage.
[0021] The output detector 31 detects the electric output of the generator 15 and outputs a detection signal to the erosion amount control device 18 .
[0022] Next, the erosion amount control device 18 will be described.
[0023] 2 is a block diagram showing a functional configuration of an erosion amount management device 18 according to a first embodiment. The erosion amount management device 18 is a device that predicts and manages the amount of erosion from the past to the present based on operation data of an actual machine, and the amount of erosion in the future based on assumed operating conditions. The erosion amount management device 18 also generates display information for displaying the prediction results, such as the amount of erosion, on a display unit.
[0024] As shown in FIG. 2, the erosion amount management device 18 includes a measurement data acquisition unit 40, a user interface 50, a storage unit 60, and a calculation unit 70.
[0025] The measurement data acquiring unit 40 is an interface that acquires a detection signal related to the steam temperature output from the steam temperature detector 30 and a detection signal related to the electrical output output from the output detector 31. The measurement data acquiring unit 40 acquires these detection signals at a predetermined time interval. For example, the measurement data acquiring unit 40 acquires the detection signals at one-hour intervals.
[0026] The measurement data acquisition unit 40 has a function of converting the acquired detection signal related to the steam temperature and the detection signal related to the electrical output into steam temperature information and electrical output information, respectively. The measurement data acquisition unit 40 outputs the converted steam temperature information and electrical output information to the measurement data storage unit 62 of the storage unit 60.
[0027] The user interface 50 includes a display unit that displays various information to a user (administrator) and an input device through which the user inputs various information. The display unit is, for example, a display. The display unit may be configured with a touch panel that has a function as a display screen and also has a function as an input device that allows direct input to the screen. The input device is, for example, a keyboard, a mouse, etc.
[0028] The storage unit 60 includes an input information storage unit 61, a measurement data storage unit 62, a program storage unit 63, a calculation result storage unit 64, a template storage unit 65, and a display information storage unit 66. The storage unit 60 is realized by, for example, a hard disk drive, a non-volatile memory device, etc. The storage unit 60 may not be physically integrated with the erosion amount management device 18, but may be connected via a network (not shown).
[0029] The input information storage unit 61 stores, for example, future operating conditions, various setting conditions, and the like, which are input via the user interface 50. The input information storage unit 61 also stores, for example, various setting conditions, design information of the rotor blades to be managed, information on periodic inspection results relating to the amount of erosion, and the like, which are input from an input device at the manufacturer of the erosion amount management device 18.
[0030] Here, the future operating conditions are used in a calculation to predict a future amount of erosion. The future operating conditions are future operating conditions in the steam turbine equipment 1. The future operating conditions include the operating time in one day (24 hours) for each divided load and the annual availability rate. Examples of the future operating conditions include a preset default operating mode, a customized operating mode in which the operating time and annual availability rate for each divided load are arbitrarily set by the user, and the like. Here, the divided load refers to a load obtained by dividing the load range of the steam turbine (for example, a range from 0% load to 100% load) into a predetermined load unit (for example, 10% load unit). For example, when the load range of the steam turbine from 0% load to 100% load is divided into 10% load units, the divided loads are 10% load, 20% load, 30% load, 40% load, 50% load, 60% load, 70% load, 80% load, 90% load, and 100% load.
[0031] FIG. 3 is a diagram showing an example of an input screen 80 for inputting future operating conditions to be displayed on the user interface 50 in the erosion amount management device 18 of the first embodiment.
[0032] 3, for example, a past operation performance mode (Same as specific year) 82, a base load operation mode (Base load) 83, and a peak load operation mode (Peak load) 84 are set as default operation modes. A detailed operation setting mode (Detailed operation plan setting) 85 is set as a customized operation mode.
[0033] The input screen 80 shown in Fig. 3 is an example of a screen selected and input by the user via the user interface 50. In the selection pattern 81 in the upper part of Fig. 3, the user selects a white circle in the column of the operation mode to be selected for each year to turn it into a black circle. In the input screen 80 shown in Fig. 3, a past operation performance mode 82 is selected for 2024, a base load operation mode 83 for 2025 and 2026, a peak load operation mode 84 for 2027 and 2028, and a detailed operation setting mode 85 for 2029-2032.
[0034] 3 shows a period up to 2032, but is not limited to this period. For example, a period further into the future, such as 2040, may be set as the period.
[0035] The past operation performance mode 82 is a mode in which operation is performed in the same operation pattern as the operation pattern of the selected year. In the past operation performance mode 82, the operation mode is set based on the 10% load unit sectional load and the operation time at each sectional load calculated from the operation data from January to December of the selected year. In addition, in the past operation performance mode 82, the operation mode is set based on the availability factor of the selected year. Note that in FIG. 3, the operation pattern for 2021 is selected.
[0036] Here, the availability rate is the proportion of the number of days that the steam turbine equipment 1 operates in each year. In other words, the availability rate is a value expressed as a percentage obtained by dividing the number of days that the steam turbine equipment 1 operates in a year by 365 days.
[0037] The base load operation mode 83 is a mode in which the system operates at a high load ranging from 70% load to 100% load, for example. In the base load operation mode 83, for example, a load range is set in 10% load increments from 70% load to 100% load. In the base load operation mode 83, an operating rate is set for each year.
[0038] The base load operation mode 83 is a default value, and is set, for example, by referring to past operation data of the steam turbine equipment 1. The base load operation mode 83 is set, for example, on an annual basis.
[0039] Table 1 shows an example of a baseload operation mode 83.
[0040] [Table 1]
[0041] Table 1 shows an example in which the operation hours per day (24 hours) are set for each classified load for each year from 2024 to 2032. As shown in Table 1, for example, the base load operation mode 83 for 2024 is set as follows: 100% load (rated load): 3 hours, 90% load: 10 hours, 80% load: 9 hours, 70% load: 2 hours. The availability rate is also set to 89%.
[0042] Here, an example is shown in which the load range from 100% load to 70% load is divided into 10% load units as the base load operation mode 83, but the present invention is not limited to this setting. The load range in the base load operation mode 83 may be set wider or narrower than the range in the above example. The load unit may be set wider or narrower than the 10% load unit. The number of years set may be shorter or longer than the number of years set in Table 1.
[0043] The peak load operation mode 84 is a mode in which the system operates with load fluctuations in the range from low load to rated load (100% load). In the peak load operation mode 84, for example, load divisions are set in which the load range from 100% load to 20% load is divided in 10% load increments. The peak load operation mode 84 is set on an annual basis. Table 2 shows an example of the peak load operation mode 84.
[0044] [Table 2]
[0045] In Table 2, the operation hours per day (24 hours) are set for each load category for each year from 2024 to 2032. For example, the peak load operation mode 84 for 2024 is set as follows: 100% load (rated load): 1 hour, 90% load: 5 hours, 80% load: 2 hours, 70% load: 1 hour, 60% load: 1 hour, 50% load: 1 hour, 40% load: 4 hours, 30% load: 8 hours, 20% load: 1 hour. The availability rate is also set to 89%.
[0046] The peak load operation mode 84 is a default value, but is set, for example, by referring to past operation data of the steam turbine equipment 1. Here, an example is shown in which the load range from 100% load to 20% load is divided into 10% load units as the peak load operation mode 84, but the setting is not limited to this. The load range in the peak load operation mode 84 may be set wider or narrower than the range in the above example. The load unit may be set wider or narrower than the 10% load unit. The number of years set may be shorter or longer than the number of years set in Table 2.
[0047] In the detailed operation setting mode 85, the operation time in one day (24 hours) is set arbitrarily for each load category shown in the operation data 86 column in the lower part of FIG. 3. The availability rate is also set arbitrarily. The user inputs the operation time for each load category in the year column of the detailed operation setting mode 85. In FIG. 3, the operation time is input in the column for 2029 to 2032 where the detailed operation setting mode 85 is set.
[0048] In addition, an example is shown here in which the load range from 100% load to 20% load is divided into 10% load units as the operation data 86 of the detailed operation setting mode 85, but the setting is not limited to this. The load range in the detailed operation setting mode 85 may be set wider or narrower than the range in the above example. Also, the load unit may be set wider or narrower than the 10% load unit.
[0049] Here, the user who has input the above-mentioned future operating conditions presses the Save button 87 in Fig. 3. The user interface 50 receives the input from the Save button 87 and outputs information related to the future operating conditions to the input information storage unit 61. The input information storage unit 61 inputs and stores the information related to the future operating conditions.
[0050] Furthermore, the input information storage unit 61 stores a correspondence table of steam temperature information at the inlet of the intermediate pressure turbine 13 and electrical output information of the generator 15, which is set based on heat balance in correspondence with the categorized loads under future operating conditions. As a result, for example, since steam temperature information and electrical output information are stored for each categorized load under future operating conditions, the future erosion calculation unit 72 can calculate the amount of future erosion based on this steam temperature information and electrical output information.
[0051] The input information storage unit 61 also stores information on regular inspection results relating to the amount of erosion, etc. Here, FIG. 4 is a diagram showing an example of an input screen 90 for inputting regular inspection results relating to erosion to the erosion amount management device 18 of the first embodiment. The regular inspection results are input, for example, by the manufacturer. The input screen 90 shown in FIG. 4 is displayed, for example, on an operation screen of an input device at the manufacturer. Then, information relating to the regular inspection results from the input device at the manufacturer is output to the input information storage unit 61. The input information storage unit 61 inputs and stores information relating to the regular inspection results. The input device at the manufacturer is set to be accessible to the erosion amount management device 18.
[0052] "X1: Theoretical Chord Length" shown on the input screen 90 in Figure 4 is the chord length of a new blade. The chord length of a new blade varies depending on the blade specifications, etc. Therefore, information regarding the chord length of a new blade is input by the manufacturer based on the blade specifications, etc., and stored in the input information storage unit 61. The input chord length is displayed in a numerical value field 91 indicating the value of X1.
[0053] "X2: Inspected Chord Length" is the chord length measured during regular inspection. "X3: Inspected Notch Depth" is the distance between the most protruding and most recessed parts of the V-shaped irregularities in the eroded area, as shown on input screen 90. "X3: Inspected Notch Depth" is measured during regular inspection. "Y: Amount of erosion" is the amount of erosion obtained during regular inspection. "Y: Amount of erosion" is obtained by calculating "X1-(X2-X3)".
[0054] Values based on the results of regular inspections are entered into the X2 and X3 value fields 92 and 93. After the X2 and X3 values are entered, the Y value field 94 displays the amount of erosion.
[0055] The input device at the manufacturer receives input from the Upload button 95 and outputs information related to the regular inspection results to the input information storage unit 61. The input information storage unit 61 inputs and stores the information related to the regular inspection results. The input device at the manufacturer receives input from the All Delete button 96 and deletes the numerical values in the numerical value columns 92, 93, and 94 for X2, X3, and Y, for example.
[0056] Although an example has been shown here in which the manufacturer inputs the regular inspection results, the user may also be able to input them. In this case, the input screen 90 shown in FIG. 4 is displayed on the display unit of the user interface 50. When the user inputs the regular inspection results, the user inputs the regular inspection results and then presses the Upload button 95. Then, the user interface 50 receives the input from the Upload button 95 and outputs information related to the regular inspection results to the input information storage unit 61. The input information storage unit 61 inputs and stores the information related to the regular inspection results. The Back button 97 on the input screen 90 is a button that is pressed when returning to the display screen 100 described later without pressing the Upload button 95.
[0057] The information on the latest periodic inspection result is used as an initial erosion value when the periodic erosion calculation unit 71 calculates the amount of erosion, for example.
[0058] The input information storage unit 61 stores a replacement threshold, which is an erosion amount at which a blade should be replaced. Here, it is recommended that a blade whose erosion amount has reached the replacement threshold be replaced. The replacement threshold is a default value that is set based on, for example, the specifications of the blade. Therefore, the replacement threshold is stored in advance in the input information storage unit 61. The manufacturer stores the replacement threshold in the input information storage unit 61 in advance.
[0059] When the erosion amount management device 18 is introduced, the input information storage unit 61 stores, as an initial value, a preparation period for determining a recommended preparation timing, which will be described later. The preparation period is a period necessary to prepare a new rotor blade. The user can change the preparation period from the initial value to a specified period by requesting the manufacturer. In this case, information related to the changed preparation period is output from an input device at the manufacturer to the input information storage unit 61 of the erosion amount management device 18. Then, the input information storage unit 61 stores the information related to the changed preparation period.
[0060] The measurement data storage unit 62 stores the steam temperature information and the electrical output information output from the measurement data acquisition unit 40. The measurement data storage unit 62 stores the steam temperature information and the electrical output information output from the measurement data acquisition unit 40 every hour, for example.
[0061] The program storage unit 63 stores, in the erosion amount management device 18, programs for calculating the amount of erosion and managing the amount of erosion, various calculation formulas for calculating the amount of erosion, various parameters, and the like.
[0062] The calculation result storage unit 64 stores the results of calculations performed by the calculation unit 70. The calculation result storage unit 64 stores, for example, information relating to the amount of erosion from the past to the present, calculated by the periodic erosion calculation unit 71. Here, the calculation result storage unit 64 stores, for example, the calculation results of the amount of erosion from the past to the present, as information relating to the amount of erosion from the past to the present. Note that this information functions as information relating to the amount of past erosion.
[0063] The calculation result storage unit 64 stores, for example, information on the future amount of erosion calculated by the future erosion calculation unit 72. The calculation result storage unit 64 stores the recommended replacement time when the future amount of erosion calculated by the calculation of the future erosion calculation unit 72 will reach the replacement threshold value. The recommended replacement time is specified by date. A method for calculating the recommended replacement time will be described later.
[0064] Here, the recommended preparation time is defined as the time a predetermined preparation period before the recommended replacement time. The recommended preparation time refers to the time when it is recommended to start preparation for a new blade for a blade whose recommended replacement time has been identified. Note that the recommended preparation time is also identified by date, similar to the recommended replacement time. For example, if the recommended replacement time is June 1, 2040 and the preparation period is three years, the recommended preparation time will be June 1, 2037. As described above, the preparation period is stored in the input information storage unit 61.
[0065] The calculation result storage unit 64 also stores the amount of future erosion at the recommended preparation time calculated by the future erosion calculation unit 72 as a preparation threshold. That is, the amount of erosion at the recommended preparation time is the preparation threshold. A method for calculating the preparation threshold will be described later.
[0066] The calculation result storage unit 64 stores, as information related to the future amount of erosion, calculation results such as the future amount of erosion, the preparation threshold, the recommended preparation time, the recommended replacement time, etc. Note that this information functions as future amount of erosion related information.
[0067] The template storage unit 65 stores information relating to a template screen that is the basis of a screen that displays the calculation results stored in the calculation result storage unit 64. Information relating to various template screens to be displayed on the display unit of the user interface 50 is stored in advance in the template storage unit 65.
[0068] The display information storage unit 66 stores the display information generated by the display information generation unit 73 of the calculation unit 70 to be displayed on the display unit.
[0069] The calculation unit 70 is a calculation block including a fixed-period erosion calculation unit 71, a future erosion calculation unit 72, and a display information generation unit 73. The calculation unit 70 reads out a program for executing the erosion amount management device 18 from the program storage unit 63 in response to a user's input to start execution from the user interface 50. This makes it possible to execute the respective functions of the fixed-period erosion calculation unit 71, the future erosion calculation unit 72, and the display information generation unit 73.
[0070] The fixed-period erosion calculation unit 71 is a calculation block that reads out an arithmetic formula and parameters for calculating the amount of erosion from the program storage unit 63, and calculates the amount of erosion in a fixed period based on the steam temperature information and electrical output information stored in the measurement data storage unit 62. The fixed-period erosion calculation unit 71 outputs information related to the calculated amount of erosion to the calculation result storage unit 64.
[0071] Here, the fixed period refers to a period from a specified date in the past to the present, for example, an hourly period. The fixed period erosion calculation unit 71 calculates the amount of erosion at fixed periods (for example, every hour) based on the steam temperature information and the electrical output information, using the amount of erosion measured in a regular inspection on a specified date in the past as an initial value. The current amount of erosion is calculated by adding the amount of erosion that has progressed from a specified date in the past to the present, to the amount of erosion measured in a regular inspection on a specified date in the past. Note that the amount of erosion that has progressed from a specified date in the past to the present, calculated by the fixed period erosion calculation unit 71, is a predicted value.
[0072] Furthermore, the periodic erosion calculation unit 71 determines whether or not the calculated amount of erosion has reached a replacement threshold, based on the replacement threshold stored in the input information storage unit 61. Furthermore, the periodic erosion calculation unit 71 determines whether or not the calculated amount of erosion has reached a preparation threshold, based on the preparation threshold stored in the input information storage unit 61. The operation of the periodic erosion calculation unit 71 relating to this determination will be described later.
[0073] The future erosion calculation unit 72 is a calculation block that reads out an arithmetic formula and parameters for calculating the amount of erosion from the program storage unit 63, and calculates the amount of future erosion based on the future operating conditions stored in the input information storage unit 61. The future erosion calculation unit 72 outputs information related to the calculated amount of erosion to the calculation result storage unit 64.
[0074] Here, future refers to a period from the present to a future year set as the future operating conditions. The future erosion calculation unit 72 uses the current erosion amount calculated by the periodic erosion calculation unit 71 as an initial value and calculates the future erosion amount for each predetermined year (for example, every year) based on the future operating conditions stored in the input information storage unit 61. Note that the future erosion amount calculated by the future erosion calculation unit 72 is a predicted value.
[0075] Furthermore, the future erosion calculation unit 72 determines whether the amount of future erosion has reached the replacement threshold, based on the replacement threshold stored in the input information storage unit 61 and the calculated amount of future erosion. If the future erosion calculation unit 72 determines that the amount of future erosion has reached the replacement threshold, the future erosion calculation unit 72 calculates the recommended replacement time when the amount of future erosion will reach the replacement threshold.
[0076] Furthermore, when the future erosion calculation unit 72 determines that the future erosion amount has reached the replacement threshold, it calculates the recommended preparation timing and the preparation threshold based on the above-mentioned preparation period.
[0077] Here, for ease of explanation, the amount of erosion from the past to the present calculated by the periodic erosion calculation unit 71 will be referred to as the past erosion amount, and the amount of erosion from the present to a specified future date calculated by the future erosion calculation unit 72 will be referred to as the future erosion amount.
[0078] The display information generating unit 73 is a calculation block that generates display information to be displayed on the display unit of the user interface 50. The display information generating unit 73 generates the display information based on the information stored in the calculation result storage unit 64 and the template storage unit 65. Note that the display information generating unit 73 may directly input the calculation results of the fixed-period erosion calculation unit 71 and the future erosion calculation unit 72, for example, and generate the display information based on the information stored in the template storage unit 65.
[0079] The display information generating unit 73 outputs the generated display information to the display information storage unit 66. In addition, the display information generating unit 73 outputs the generated display information to the user interface 50.
[0080] Here, the above-mentioned erosion amount management device 18 can be configured as a computer device equipped with an arithmetic device such as a CPU (Central Processing Unit), a storage device such as a ROM (Read Only Memory) or a RAM (Random Access Memory), an external storage device such as a HDD (Hard Disk Drive) or a CD (Compact Disc) drive device, a display device such as a display, and input devices such as a keyboard and a mouse.
[0081] (Calculations in the periodic erosion calculation unit 71 and the future erosion calculation unit 72) Here, the flow of calculations in the periodic erosion calculation unit 71 and the future erosion calculation unit 72 will be described.
[0082] Fig. 5 is a flowchart for explaining the flow of calculation of the past erosion amount in the periodic erosion calculation unit 71 of the erosion amount management device 18 of the first embodiment. Fig. 6 is a flowchart for explaining the flow of calculation of the future erosion amount in the future erosion calculation unit 72 of the erosion amount management device 18 of the first embodiment.
[0083] First, the flow of calculation of the past erosion amount in the periodic erosion calculation unit 71 will be described with reference to FIG.
[0084] As shown in Fig. 5, the fixed-period erosion calculation unit 71 reads out the steam temperature at the turbine inlet and the electrical output of the generator 15 from the measurement data storage unit 62 (step S1). Here, the steam temperature at the turbine inlet and the electrical output of the generator 15 function as measured information for calculating the amount of past erosion. Here, for example, the temperature of steam introduced into the intermediate-pressure turbine 13 is used as the steam temperature at the turbine inlet. When executing step S1, the fixed-period erosion calculation unit 71 reads out from the program storage unit 63 a program for calculating the amount of past erosion, an arithmetic formula and parameters for calculating the amount of past erosion, and design information of the rotor blades to be managed from the input information storage unit 61.
[0085] Then, the fixed-period erosion calculation unit 71 calculates the flow rate, wetness, pressure and flow velocity of steam at the inlet of the final stage moving blade of the low-pressure turbine 14 based on the steam temperature information and the electrical output information (step S2). Note that a program for fluid analysis or one-dimensional steam calculation may be stored in the fixed-period erosion calculation unit 71, and the fixed-period erosion calculation unit 71 may read out the steam temperature information and the electrical output information to calculate the flow rate, wetness, pressure and flow velocity at the inlet of the final stage moving blade.
[0086] Next, the fixed-period erosion calculation unit 71 calculates the amount of water (number of water droplets), water droplet diameter and water droplet collision velocity in the steam at the inlet of the final stage rotor blade based on the flow rate, wetness, pressure and flow velocity at the inlet of the final stage rotor blade (step S3).
[0087] The fixed-period erosion calculation unit 71 calculates the amount of water based on the flow rate and wetness. The fixed-period erosion calculation unit 71 calculates the water droplet diameter D by the following formula (1) using the pressure ρ, the flow velocity W, and the Weber number Weσ. D = Weσ / (ρW 2 ) …Formula (1)
[0088] The Weber number Weσ is a dimensionless number that expresses the ratio of the inertial force of steam to the surface tension of a water droplet. The diameter D of the water droplet becomes smaller as the pressure ρ increases.
[0089] The fixed-period erosion calculation unit 71 calculates the impact speed of the water droplets by calculating the trajectory of the water droplets from the flow velocity W and the water droplet diameter D. The larger the water droplet diameter, the more difficult it is for the water droplets to be accelerated by the steam, and the greater the speed difference between the steam and the water droplets. As a result, the impact speed of the water droplets with the rotor blades increases. The fixed-period erosion calculation unit 71 may also store a water droplet trajectory analysis program to calculate the impact speed of the water droplets.
[0090] Next, the fixed-period erosion calculation unit 71 calculates the erosion rate of the final stage rotor blade (step S5). Here, the amount of erosion E during a stable period in which the erosion rate is a certain constant value is expressed by the following formula (2) as a characteristic that changes linearly with respect to time t. E = a + bt ... Equation (2)
[0091] Here, a is a material property. By differentiating equation (2) with respect to time, the erosion rate dE / dt, which is the amount of erosion E per unit time, is given by the following equation (3). dE / dt=b …Equation (3)
[0092] Here, b is usually a function of the impact speed V of the water droplets, the diameter D of the water droplets, the amount of water (the number of water droplets N), and the material properties, and is expressed by the following equation (4). b = C1 × V p1 ×D q1 ×N…Formula (4)
[0093] where C1, p1, and q1 are material constants.
[0094] The material properties and correction coefficients of the final stage rotor blades are stored in advance in the input information storage unit 61. When calculating the erosion rate by equation (3), the fixed-period erosion calculation unit 71 reads out the material properties and correction coefficients from the input information storage unit 61 and uses them in calculating the erosion rate (step S4). The correction coefficients are the slope and intercept applied to the entire equation (2), and are used to fine-tune the graph shape determined by equation (2).
[0095] Next, the fixed-period erosion calculation unit 71 calculates the amount of erosion ΔE in a certain time range Δt by the following formula (5) (step S6). ΔE=dE / dt×Δt …Equation (5)
[0096] In this way, the amount of erosion E is calculated based on the erosion rate dE / dt. Specifically, the fixed-period erosion calculation unit 71 calculates the amount of erosion E by integrating ΔE calculated using equation (5) over the operating time of the steam turbine plant (from a predetermined date in the past to the present).
[0097] Here, the periodic erosion calculation unit 71 calculates the past erosion amount by adding the erosion amount E calculated by the above calculation to the erosion amount measured in a periodic inspection on a predetermined day in the past. In this way, the past erosion amount of the final stage that reflects the operation of the low-pressure turbine 14 is obtained.
[0098] The periodic erosion calculation unit 71 outputs the calculation results to the calculation result storage unit 64. The calculation of the past erosion amount in the periodic erosion calculation unit 71 is performed, for example, every hour. The most recently calculated past erosion amount corresponds to the current erosion amount.
[0099] Next, the flow of calculation of the amount of future erosion in the future erosion calculation unit 72 will be described with reference to FIG.
[0100] The calculation flow of future erosion calculation unit 72 is basically the same as the calculation flow of fixed periodic erosion calculation unit 71, except for steps S10 and S11 shown in Fig. 6. That is, the processing of steps S12 to S16 in the calculation of future erosion calculation unit 72 is basically the same as the processing of steps S2 to S6 in the calculation of fixed periodic erosion calculation unit 71. Therefore, here, the processing of steps S10 and S11 in the calculation of future erosion calculation unit 72 will mainly be described.
[0101] 6, the future erosion calculation unit 72 reads out future operating conditions from the input information storage unit 61 (step S10). When executing step S10, the future erosion calculation unit 72 reads out a program for calculating the amount of future erosion from the program storage unit 63, an arithmetic expression and parameters for calculating the amount of future erosion, and design information for the blades to be managed from the input information storage unit 61.
[0102] Next, the future erosion calculation unit 72 reads out from the input information storage unit 61 the steam temperature information at the inlet of the intermediate pressure turbine 13 and the electrical output information of the generator 15, which have been preset in correspondence with the classified loads based on the future operating conditions (step S11). Note that in this calculation, the steam temperature information and electrical output information read out from the input information storage unit 61 are treated in the same manner as the steam temperature information at the turbine inlet and the electrical output information of the generator 15 read out from the measurement data storage unit 62 in the calculation of the fixed-period erosion calculation unit 71 described above.
[0103] Then, similar to the calculations of the fixed-period erosion calculation unit 71, the future erosion calculation unit 72 calculates the flow rate, wetness, pressure and flow velocity of steam at the inlet of the final stage rotor blade of the low-pressure turbine 14 based on the steam temperature information and electrical output information (step S12).
[0104] The future erosion calculation unit 72 executes the processes from step S12 to step S15 to calculate the amount of erosion E. Here, in step S16, the future erosion calculation unit 72 calculates the amount of erosion E by integrating ΔE calculated using equation (5) over the operating time of the steam turbine plant (from the present to a predetermined day in the future).
[0105] The future erosion calculation unit 72 calculates the future erosion amount on a predetermined future date by adding the most recent past erosion amount calculated by the periodic erosion calculation unit 71 to the calculated erosion amount E progressing from the present to a predetermined future date. This makes it possible to obtain the future erosion amount of the final stage that reflects the future operation of the low-pressure turbine 14.
[0106] The future erosion calculation unit 72 outputs the calculation results to the calculation result storage unit 64. The calculation results of the future erosion amount in the future erosion calculation unit 72 are obtained for each year period set as the future operating conditions. That is, the calculation results in the future erosion calculation unit 72 are obtained on an annual basis.
[0107] (Calculation of recommended replacement timing, recommended preparation timing and preparation threshold) Here, a method for calculating the recommended replacement time, the recommended preparation time, and the preparation threshold will be described. Figures 7 and 8 are diagrams for explaining a method for calculating the recommended replacement time, the recommended preparation time, and the preparation threshold in the future erosion calculation unit 72 of the erosion amount management device 18 of the first embodiment. In Figures 7 and 8, the horizontal axis indicates time (year), and the vertical axis indicates the erosion amount ratio. Note that here, the expected date in the year on the horizontal axis is January 1st.
[0108] Here, the amount of erosion is shown as an erosion amount ratio. The erosion amount ratio is the ratio of the amount of erosion when the amount of erosion at the replacement threshold is set to 1. When the erosion amount ratio is smaller than 1.0, the amount of erosion is below the replacement threshold. When the erosion amount ratio is larger than 1.0, the amount of erosion exceeds the replacement threshold.
[0109] First, with reference to FIG. 7, a case where the preparation threshold is reached in the future will be described.
[0110] As shown in FIG. 7, the erosion amount ratio in 2032 is smaller than 1, and the erosion amount ratio in 2033 is larger than 1.0. Therefore, the erosion amount ratio reaches 1.0 between 2032 and 2033. In other words, the recommended replacement time is between 2032 and 2033.
[0111] The future erosion calculation unit 72 expresses the relationship between time and the erosion amount ratio as a linear function between the years 2032 and 2033. The future erosion calculation unit 72 then calculates the date when the erosion amount ratio will be 1.0.
[0112] In the example shown in Fig. 7, the erosion amount ratio in 2032 is 0.95, and the erosion amount ratio in 2033 is 1.05. The future erosion calculation unit 72 calculates the recommended replacement time when the erosion amount ratio will be 1.0 based on a linear function. In the example shown in Fig. 7, the calculation results in the recommended replacement time being July 1, 2032.
[0113] Next, the future erosion calculation unit 72 calculates the recommended preparation time based on the recommended replacement time and the preparation period. If the preparation period is three years, the recommended preparation time is July 1, 2029, three years before the recommended replacement time.
[0114] Next, the future erosion calculation unit 72 expresses the relationship between time and the erosion amount ratio as a linear function between the years 2029 and 2030. Then, the future erosion calculation unit 72 calculates the erosion amount ratio on July 1, 2029. In the example shown in FIG. 7, the calculation results in the erosion amount ratio on July 1, 2029 being 0.75. From this result, the preparation threshold, which is the erosion amount ratio at the recommended preparation time, is 0.75.
[0115] Then, the future erosion calculation unit 72 outputs the calculation results of the recommended replacement time, the recommended preparation time, and the preparation threshold value described above to the calculation result storage unit 64. The calculation result storage unit 64 receives and stores the calculation results of the recommended replacement time, the recommended preparation time, and the preparation threshold value.
[0116] Next, with reference to FIG. 8, a case where the preparation threshold is reached in the past will be described.
[0117] As shown in Figure 8, the erosion amount ratio will reach 1.0 between 2032 and 2033. In other words, the recommended replacement time lies between 2032 and 2033. Therefore, the recommended preparation time lies in the past than the present (2031).
[0118] As shown in Figure 8, in the same manner as explained with reference to Figure 7, the future erosion calculation unit 72 expresses the relationship between time and the erosion amount ratio as a linear function between the years 2032 and 2033 to calculate the date when the erosion amount ratio will be 1.0.
[0119] In the example shown in Fig. 8, the erosion amount ratio in 2032 is 0.95, and the erosion amount ratio in 2033 is 1.05. In the example shown in Fig. 8, as a result of the calculation, the recommended replacement date is July 1, 2032.
[0120] Next, the future erosion calculation unit 72 calculates the recommended preparation time based on the recommended replacement time and the preparation period. If the preparation period is three years, the recommended preparation time is July 1, 2029, three years before the recommended replacement time.
[0121] Next, the future erosion calculation unit 72 reads out the amount of erosion on July 1, 2029 from the calculation result storage unit 64, and calculates the erosion amount ratio. This calculated erosion amount ratio is the preparation threshold value.
[0122] Here, the amount of erosion on July 1, 2029 is the result of calculation by the fixed-period erosion calculation unit 71. Therefore, the calculation result storage unit 64 stores a plurality of data items every hour as the calculation results for this day. Therefore, as the amount of erosion on July 1, 2029, the future erosion calculation unit 72 refers to, for example, the maximum amount of erosion among the data on the amount of erosion on July 1, 2029.
[0123] Then, the future erosion calculation unit 72 outputs the calculation results of the recommended replacement time, the recommended preparation time, and the preparation threshold value described above to the calculation result storage unit 64. The calculation result storage unit 64 receives and stores the calculation results of the recommended replacement time, the recommended preparation time, and the preparation threshold value.
[0124] Here, if the calculation of the future erosion amount results in the erosion amount ratio not reaching 1.0 within the specified future calculation period, the recommended replacement timing, recommended preparation timing, and preparation threshold value cannot be obtained.
[0125] (About the erosion amount control device 18 at the time of introduction) First, the state of the erosion amount control device 18 at the time of introduction will be described.
[0126] When the erosion amount management device 18 is introduced, the display information storage unit 66 stores display information relating to the past erosion amount and the future erosion amount as of the date of introduction. That is, the erosion amount management device 18 at the time of introduction is in a state in which the display unit of the user interface 50 can display the past erosion amount and the future erosion amount as of the date of introduction.
[0127] In other words, the display information storage unit 66 stores display information as of the introduction date generated by the display information generation unit 73 based on the calculation results calculated by the fixed-period erosion calculation unit 71 and the future erosion calculation unit 72 stored in the calculation result storage unit 64, and information related to the template screen stored in the template storage unit 65.
[0128] The manufacturer processes the erosion amount control device 18 so that it is in the above-mentioned state on the day of installation.
[0129] Here, FIG. 9 is a diagram showing an example of the display screen 100 on which display information is displayed as of the date of introduction of the erosion amount management device 18 of the first embodiment.
[0130] As shown in FIG. 9, the display screen 100 displays the past erosion amount results (dashed line) calculated by the periodic erosion calculation unit 71 and the future erosion amount results (solid line) calculated by the future erosion calculation unit 72 in chronological order. In a graph 101 showing these erosion amount results, the horizontal axis shows the date, and the vertical axis shows the erosion amount ratio. Note that, in this example, January 1, 2024 is set as the present. Note that, in the graph 101, the erosion amount is shown as the erosion amount ratio. The erosion amount ratio is as described above.
[0131] 9 shows a time axis from January 1, 2014 to January 1, 2034. The range of this time axis is set by selecting a setting value in the time axis setting section 102 of the display screen 100. Here, an example is shown in which 5 years, 10 years, 15 years, and 20 years are set as the setting values in the time axis setting section 102. Note that 10 years is selected in FIG. 9.
[0132] The time axis shows a set value of the past from the present and a set value of the future from the present. For example, when 10 years is selected as the set value as shown in Fig. 9, the time range of the past 10 years from the present (January 1, 2024) to January 1, 2014 and the time range of the future 10 years from the present (January 1, 2024) to January 1, 2034 are displayed on the time axis.
[0133] In this way, the user can arbitrarily change the range of the time axis by selecting the setting value in the time axis setting section 102 .
[0134] 9, the calculation results for the amount of erosion from January 1, 2016 to January 1, 2032 are shown. In this case, the erosion amount ratio from January 1, 2016 to January 1, 2024 is the erosion amount ratio based on the amount of past erosion, and the erosion amount ratio from January 1, 2024 to January 1, 2032 is the erosion amount ratio based on the amount of future erosion.
[0135] Here, the erosion amount ratio on January 1, 2016 is shown based on the regular inspection results input from the input screen 90 shown in Fig. 4. In the graph 101 on the display screen 100, the erosion amount ratio based on the regular inspection results is shown with a black circle. Note that even if there are calculation results from before the latest regular inspection, for example, the display screen 100 shows the calculation results from the latest regular inspection onwards, and does not show the calculation results from before the latest regular inspection.
[0136] Furthermore, on the display screen 100, the replacement threshold is indicated by a dashed line as "Threshold 2," and the preparation threshold is indicated by a dashed line as "Threshold 1." In addition, in the graph 101, the erosion amount of the replacement threshold is indicated as an erosion amount ratio of 1. In addition, the preparation threshold shown in the graph 101 is indicated as an erosion amount ratio when the erosion amount of the replacement threshold is set to 1.
[0137] An alarm display 103 is displayed on the display screen 100. The alarm display 103 is displayed when the future erosion amount or the past erosion amount exceeds the replacement threshold value.
[0138] Since the replacement threshold is a default value stored as an initial value in the input information storage unit 61, "Threshold 2" is always displayed on the display screen 100. If the future erosion amount has not reached the replacement threshold, the preparation threshold, the recommended replacement time, and the recommended preparation time are not calculated. Therefore, the alarm display 103 is not displayed on the display screen 100.
[0139] The recommended replacement time and the recommended preparation time are displayed as the alarm display 103. Also, Fig. 9 shows an example of the alarm display 103 in which the number of days from the present until the recommended replacement time and the number of days from the present until the recommended preparation time are displayed. Note that the alarm display 103 includes at least the recommended replacement time and the recommended preparation time. Note that the replacement threshold, the preparation threshold, the recommended replacement time, and the recommended preparation time are as described above.
[0140] 9, the display screen 100 of the user interface 50 displays the changes over time in the past erosion amount and the future erosion amount on a single graph 101. Furthermore, when the future erosion amount exceeds the replacement threshold, the preparation threshold, the recommended replacement time, and the recommended preparation time are displayed on the display screen 100.
[0141] (Periodic erosion calculation processing) Next, the periodic erosion calculation process in the erosion amount control device 18 of the first embodiment will be described.
[0142] FIG. 10 is a flowchart for explaining a periodic erosion calculation processing method in the erosion amount management device 18 of the first embodiment.
[0143] 10, the fixed-period erosion calculation unit 71 determines whether the steam turbine equipment 1 is operating (step S20) based on, for example, information stored in the measurement data storage unit 62. The fixed-period erosion calculation unit 71 determines whether the steam turbine equipment 1 is operating based on, for example, steam temperature information and electrical output information.
[0144] When it is determined in step S20 that the steam turbine equipment 1 is not operating (No in step S20), the fixed-period erosion calculation process ends.
[0145] If it is determined in step S20 that the steam turbine equipment 1 is operating (Yes in step S20), the fixed-period erosion calculation unit 71 reads out a program for calculating the past erosion amount from the program memory unit 63, an equation and parameters for calculating the past erosion amount, design information for the rotor blades to be managed from the input information memory unit 61, and the steam temperature at the turbine inlet and the electrical output of the generator 15 stored in the measurement data memory unit 62 (step S21).
[0146] Next, the fixed-period erosion calculation unit 71 calculates the amount of past erosion by the calculation method described with reference to Fig. 5, and outputs the calculation result to the calculation result storage unit 64 (step S22). The calculation result storage unit 64 stores the calculation result.
[0147] The display information generating unit 73 generates display information based on the calculation results stored in the calculation result storage unit 64 and the information stored in the template storage unit 65 (step S23). Then, the display information generating unit 73 outputs the generated display information to the display information storage unit 66 and the user interface 50. The display information storage unit 66 stores the display information.
[0148] The user interface 50 displays the display information output from the display information generating unit 73 on the display unit as shown in FIG. 9 (step S24).
[0149] Here, the display information generating unit 73 outputs display information based on the calculation results to the display information storage unit 66 and the user interface 50 every hour. Therefore, the graph 101 showing the calculation results related to the past erosion amount displayed on the display unit is updated every hour. For example, after calculating the past erosion amount, the fixed-period erosion calculation unit 71 repeats the processes of steps S20 to S24 every hour.
[0150] After the process of step S22, the fixed-period erosion calculation unit 71 also refers to the calculation result storage unit 64 to determine whether or not a preparation threshold value has been stored (step S25).
[0151] Here, for example, in the calculation of the future erosion amount as of the introduction date of the erosion amount management device 18, if the future erosion amount reaches the replacement threshold within a future calculation designated period, a preparation threshold is stored in the calculation result storage unit 64. Also, in the calculation of the future erosion amount after the introduction of the erosion amount management device 18, if the future erosion amount reaches the replacement threshold within a future calculation designated period, a preparation threshold is stored in the calculation result storage unit 64.
[0152] On the other hand, in the calculation of the future erosion amount as of the introduction date of the erosion amount management device 18, if the future erosion amount does not reach the replacement threshold within the future calculation designated period, no preparation threshold is stored in the calculation result storage unit 64. Also, in the calculation of the future erosion amount after the introduction of the erosion amount management device 18, if the future erosion amount does not reach the replacement threshold within the future calculation designated period, no preparation threshold is stored in the calculation result storage unit 64.
[0153] When it is determined in step S25 that the preparation threshold value is not stored (No in step S25), the periodic erosion calculation unit 71 executes the process of step S25 again.
[0154] If it is determined in step S25 that the preparation threshold is stored (Yes in step S25), the periodic erosion calculation unit 71 determines whether or not the amount of past erosion has reached the preparation threshold based on the calculation result of step S22 (step S26).
[0155] When it is determined in step S26 that the amount of past erosion has not reached the preparation threshold value (No in step S26), the fixed-period erosion calculation unit 71 executes the process of step S25 again.
[0156] If it is determined in step S26 that the amount of past erosion has reached the preparation threshold (Yes in step S26), the periodic erosion calculation unit 71 determines whether the amount of past erosion has reached the replacement threshold based on the calculation result of step S22 (step S27).
[0157] Here, the case where the amount of past erosion reaches the preparation threshold value means that the amount of past erosion reaches the preparation threshold value based on the future prediction calculated by the future erosion calculation unit 72.
[0158] If it is determined in step S27 that the past erosion amount has not reached the replacement threshold (No in step S27), the fixed-period erosion calculation unit 71 outputs information about the date on which the past erosion amount reached the preparation threshold (information about the recommended preparation timing) to the calculation result storage unit 64. The calculation result storage unit 64 stores this information.
[0159] The display information generating unit 73 generates display information based on the calculation results stored in the calculation result storage unit 64 and the information stored in the template storage unit 65 (step S28). Then, the display information generating unit 73 outputs the generated display information to the display information storage unit 66 and the user interface 50. The display information storage unit 66 stores the display information.
[0160] The user interface 50 updates the display screen based on the display information output from the display information generating unit 73 (step S29). This update updates the information on the recommended preparation time in the alarm display 103 shown in FIG.
[0161] If it is determined in step S27 that the past erosion amount has reached the replacement threshold (Yes in step S27), the fixed-period erosion calculation unit 71 outputs information about the date on which the past erosion amount reached the replacement threshold (information about the recommended replacement timing) to the calculation result storage unit 64. The calculation result storage unit 64 stores the information.
[0162] The display information generating unit 73 generates display information based on the calculation results stored in the calculation result storage unit 64 and the information stored in the template storage unit 65 (step S30). Then, the display information generating unit 73 outputs the generated display information to the display information storage unit 66 and the user interface 50. The display information storage unit 66 stores the display information.
[0163] The user interface 50 updates the display screen based on the display information output from the display information generating unit 73 (step S31). This update updates the information on the recommended replacement time in the alarm display 103 shown in FIG.
[0164] Here, the calculation of the past erosion amount in the periodic erosion calculation unit 71 is executed, for example, every hour. Therefore, the information on the past erosion amount on the display screen 100 is updated every hour. Note that when the time range on the horizontal axis is the same, the information on the past erosion amount in the graph 101 of Fig. 9 increases with the passage of time.
[0165] By the periodic erosion calculation process described above, information on the past erosion amount is updated on the display screen 100 shown in Fig. 9. Furthermore, when the past erosion amount has reached the preparation threshold value, or when the past erosion amount has reached the replacement threshold value, the information on the alarm display 103 is updated.
[0166] (Future erosion calculation processing) Next, the future erosion calculation process in the erosion amount management device 18 of the first embodiment will be described.
[0167] FIG. 11 is a flowchart for explaining a future erosion calculation processing method in the erosion amount management device 18 of the first embodiment.
[0168] Here, the future operating conditions shown in Fig. 3 are initially set on the day the erosion amount management device 18 is installed. After installation, the user inputs the future operating conditions on an annual basis from the input screen 80 shown in Fig. 3 in the user interface 50.
[0169] For example, by pressing the selection button 105 of the selection display unit 104 on the display screen 100 shown in Fig. 9, a selection item of an input screen 80 for future operating conditions is displayed on the selection display unit 104, although not shown in the figure. When a selection item of the input screen 80 is selected on the selection display unit 104, the screen of the display unit of the user interface 50 switches to the input screen 80 for future operating conditions shown in Fig. 3. At this time, the display information generating unit 73 inputs information related to the selection of the input screen 80 from the user interface 50, and outputs display information for displaying the input screen 80 on the user interface 50.
[0170] After inputting the future driving conditions, the user presses the Save button 87 in Fig. 3. The user interface 50 receives the input from the Save button 87 and outputs information related to the future driving conditions to the input information storage unit 61. The input information storage unit 61 stores the information related to the future driving conditions. Note that the Back button 88 on the input screen 80 is a button to be pressed when returning to the display screen 100 without pressing the Save button 87.
[0171] Furthermore, the future erosion calculation unit 72 receives information from the user interface 50 in response to pressing of the Save button 87, and determines that future operating conditions have been input.
[0172] As shown in FIG. 11, the future erosion calculation unit 72 determines whether or not future operating conditions have been input (step S40).
[0173] In the determination in step S40, when it is determined that the future operating conditions have not been input (No in step S40), the future erosion calculation unit 72 executes the process of step S40 again.
[0174] If it is determined in step S40 that future operating conditions have been input (Yes in step S40), the future erosion calculation unit 72 reads out a program for calculating the future erosion amount from the program memory unit 63, an equation and parameters for calculating the future erosion amount, design information for the blades to be managed from the input information memory unit 61, and the future operating conditions stored in the input information memory unit 61 (step S41).
[0175] Next, the future erosion calculation unit 72 refers to the future operating conditions and determines whether or not a detailed operating mode setting is present (step S42).
[0176] In the determination in step S42, when it is determined that the detailed operation mode setting is present (Yes in step S42), the operation time and the availability rate for each load category under the future operating conditions are read out (step S43).
[0177] Next, the future erosion calculation unit 72 calculates the amount of future erosion by the calculation method described with reference to Fig. 6, and outputs the calculation result to the calculation result storage unit 64 (step S44). The calculation result storage unit 64 stores the calculation result.
[0178] The display information generating unit 73 generates display information based on the calculation results stored in the calculation result storage unit 64 and the information stored in the template storage unit 65 (step S45). Then, the display information generating unit 73 outputs the generated display information to the display information storage unit 66 and the user interface 50. The display information storage unit 66 stores the display information.
[0179] The user interface 50 displays the display information output from the display information generating unit 73 on the display unit as shown in FIG. 9 (step S46).
[0180] Here, each time the future erosion calculation unit 72 executes a calculation process for the future erosion amount, the display information generation unit 73 outputs display information based on the calculation results to the display information storage unit 66 and the user interface 50. Therefore, the graph 101 showing the calculation results related to the future erosion amount displayed on the display unit is updated each time the future erosion calculation unit 72 executes a calculation process for the future erosion amount. In other words, the graph 101 showing the calculation results related to the future erosion amount is updated each time information is received in response to pressing the Save button 87 on the input screen 80 for future operating conditions.
[0181] After the process of step S44, the future erosion calculation unit 72 determines whether or not the amount of future erosion has reached the replacement threshold value based on the calculation result of step S44 (step S47).
[0182] If it is determined in step S47 that the future erosion amount has not reached the replacement threshold value (No in step S47), the future erosion calculation unit 72 outputs information regarding the recommended replacement time to the calculation result storage unit 64. That is, the future erosion calculation unit 72 outputs information that there is no recommended replacement time to the calculation result storage unit 64. Here, if a predetermined recommended replacement time is stored in the calculation result storage unit 64, the calculation result storage unit 64 updates the information regarding the recommended replacement time to the newly input information that there is no recommended replacement time and stores it.
[0183] The display information generating unit 73 generates display information based on the calculation results stored in the calculation result storage unit 64 and the information stored in the template storage unit 65 (step S48). The display information generating unit 73 generates display information in which the alarm display 103 is deleted from the display screen 100 shown in Fig. 9. The display information generating unit 73 also generates display information in which the line indicating the preparation threshold (the two-dot chain line in Fig. 9) is deleted from the graph 101 on the display screen 100 shown in Fig. 9.
[0184] Then, the display information generating unit 73 outputs the generated display information to the display information storage unit 66 and the user interface 50. The display information storage unit 66 stores the display information.
[0185] The user interface 50 updates the display screen based on the display information output from the display information generating unit 73 (step S49). By this update, the alarm display 103 is deleted from the display screen 100. Furthermore, the line indicating the preparation threshold value (the two-dot chain line in FIG. 9) is deleted from the graph 101.
[0186] If it is determined in step S47 that the amount of future erosion has reached the replacement threshold value (Yes in step S47), the future erosion calculation unit 72 calculates the recommended replacement time and the recommended preparation time by the method described with reference to Figures 7 and 8, and outputs the calculation results to the calculation result storage unit 64 (step S50). The calculation result storage unit 64 stores the recommended replacement time and the recommended preparation time.
[0187] Next, the future erosion calculation unit 72 calculates the preparation threshold value by the method described with reference to Figures 7 and 8, and outputs the preparation threshold value to the calculation result storage unit 64 (step S51). The calculation result storage unit 64 stores the preparation threshold value.
[0188] The display information generating unit 73 generates display information based on the calculation results stored in the calculation result storage unit 64 and the information stored in the template storage unit 65 (step S52). The display information generating unit 73 generates display information for updating the alarm display 103 and displaying a preparation threshold line (a two-dot chain line in FIG. 9) on the graph 101 on the display screen 100 shown in FIG.
[0189] Then, the display information generating unit 73 outputs the generated display information to the display information storage unit 66 and the user interface 50. The display information storage unit 66 stores the display information.
[0190] The user interface 50 updates the display screen based on the display information output from the display information generating unit 73 (step S53). With this update, an alarm display 103 including the recommended replacement time and the recommended preparation time based on the current calculation result is displayed on the display screen 100. Furthermore, a line indicating the preparation threshold value (the two-dot chain line in FIG. 9) based on the current calculation result is displayed on the graph 101.
[0191] The calculation result of the future erosion amount in the above-mentioned future erosion calculation unit 72 is obtained for each year period set as the future operating conditions. That is, the calculation result in the future erosion calculation unit 72 is obtained on an annual basis.
[0192] In the future erosion calculation process, the processes of steps S41 to S53 are repeated every time information is received in response to pressing the Save button 87 on the future operating condition input screen 80. The information on the future erosion amount on the display screen 100 is updated every time information is received in response to pressing the Save button 87 on the future operating condition input screen 80.
[0193] By the above-mentioned future erosion calculation process, information on the future erosion amount is updated on the display screen 100 shown in Fig. 9. Information on the future erosion amount shown in the graph 101, for example, changes depending on the future operating conditions. In addition, the recommended replacement timing, the recommended preparation timing, and the preparation threshold value also change depending on the future operating conditions.
[0194] According to the erosion amount management device 18 of the first embodiment described above, the amount of past erosion from the past to the present predicted based on the operating data of the actual machine, and the amount of future erosion predicted based on assumed operating conditions in the future can be displayed in chronological order in a graph 101 on the display section of the user interface 50. This allows the user to visually confirm the change over time in the amount of erosion.
[0195] Furthermore, in the erosion amount management device 18, it is possible to display lines of the replacement threshold value and the preparation threshold value on the graph 101 on the display screen 100. This allows the user to visually confirm the recommended replacement time and the recommended preparation time.
[0196] Furthermore, in the erosion amount management device 18, the recommended replacement time and the recommended preparation time can be displayed on the display screen 100 as an alarm display 103. This allows the user to specifically recognize the recommended replacement time and the recommended preparation time. By specifically recognizing the recommended preparation time, the user can appropriately request the manufacture of the blade to be replaced.
[0197] The erosion amount management device 18 can display the calculation results of the future erosion amount based on the operating conditions input on the future operating condition input screen 80. Therefore, by changing the operating conditions on the future operating condition input screen 80, the user can visually confirm the difference in the future erosion amount due to the operating conditions in the graph 101 on the display screen 100. In addition, the user can visually confirm the difference in the recommended replacement timing and the recommended preparation timing due to the future operating conditions in the alarm display 103 on the display screen 100.
[0198] (Second embodiment) In the second embodiment, another example of information relating to the future erosion amount displayed on the display unit of the user interface 50 will be described.
[0199] 12 and 13 are flow charts for explaining a future erosion calculation processing method in the erosion amount management device 18 of the second embodiment. Since the flow chart cannot be shown in one figure due to the configuration of the drawings, a flow chart following No in step S40 in FIG. 12 is shown in FIG. 13. FIG. 14 is a diagram showing an example of a display screen 100A in the erosion amount management device 18 of the second embodiment. In the second embodiment, the same components as those in the erosion amount management device 18 of the first embodiment are given the same reference numerals, and duplicated explanations will be omitted or simplified.
[0200] The second embodiment differs from the erosion amount management device 18 in the first embodiment in that the display screen 100A showing the erosion amount calculation results can simultaneously display calculation results under other future operating conditions. This difference will be mainly described here. The periodic erosion calculation process in the second embodiment is similar to the periodic erosion calculation process in the first embodiment.
[0201] In the future erosion calculation processing in the second embodiment shown in FIG. 12 and FIG. 13, steps S60 to S65 are added to the future erosion calculation processing in the first embodiment.
[0202] Here, after inputting the future operating conditions, the user presses the Save button 87 in Fig. 3. In the future erosion calculation process in the second embodiment, similarly to the future erosion calculation process in the first embodiment, the user interface 50 receives input from the Save button 87 and outputs information related to the future operating conditions to the input information storage unit 61. The input information storage unit 61 stores the information related to the future operating conditions.
[0203] Furthermore, the future erosion calculation unit 72 receives information from the user interface 50 in response to pressing of the Save button 87, and determines that future operating conditions have been input.
[0204] As shown in FIG. 12, the future erosion calculation unit 72 determines whether or not future operating conditions have been input (step S40).
[0205] When it is determined in step S40 that the future operating conditions have been input (Yes in step S40), the processes from step S41 to step S46 are executed as described above. Then, after the process of step S46, the process of step S40 is executed as described above.
[0206] On the other hand, when it is determined in step S40 that the future operating conditions have not been input (No in step S40), as shown in Fig. 13, the display information generating unit 73 determines whether or not there is a request to display the results of the calculation under other future operating conditions (comparison calculation results) (step S60). The comparison calculation results are calculation results that have already been predicted based on other future operating conditions, and are stored in the calculation result storage unit 64. The other future operating conditions function as second future operating conditions, and the comparison calculation results function as second future erosion amount related information.
[0207] Here, FIG. 15 is a diagram showing an example of a selection screen 110 for selecting the comparison calculation results to be displayed on the user interface 50 in the erosion amount management device 18 of the second embodiment.
[0208] For example, by pressing the selection button 105 of the selection display section 104 on the display screen 100 shown in Fig. 9, selection items of a selection screen 110 are displayed on the selection display section 104, although this is not shown in the figure. Then, when a selection item of the selection screen 110 is selected on the selection display section 104, the screen of the display section of the user interface 50 switches to the selection screen 110 shown in Fig. 15. At this time, the display information generating section 73 inputs information related to the selection of the selection screen 110 from the user interface 50, and outputs display information for displaying the selection screen 110 on the user interface 50.
[0209] 15, a list of already calculated calculation results stored in the calculation result storage unit 64 is displayed in the list display unit 111. Also shown here is an example of the list display unit 111 that also displays the date and time stored in the calculation result storage unit 64. For example, the list display unit 111 displays the file names of five calculation results in descending order of the date and time stored in the calculation result storage unit 64. Note that the configuration displayed in the list display unit 111 is not limited to this. It is sufficient that the list display unit 111 displays a list of already calculated calculation results.
[0210] Here, Fig. 15 shows an example of a comparison calculation result calculated based on future operating conditions within the past hour. When these comparison calculation results are displayed on the graph 101 of the display screen 100A, the comparison calculation results can be compared in a state where the latest future erosion amount is not updated. In other words, whichever of these comparison calculation results is displayed on the graph 101, the starting point of the line showing the future erosion amount ratio in the comparison calculation result coincides with the starting point of the line showing the latest future erosion amount ratio, as shown in Fig. 15.
[0211] The comparison calculation result may be a result calculated more than one hour ago. For example, when selecting a comparison calculation result calculated several days ago, the starting point of the line showing the future erosion amount ratio in the comparison calculation result will be shifted from the starting point of the line showing the latest future erosion amount ratio. Even when the starting points are shifted in this way, the change tendency of the future erosion amount ratio can be compared.
[0212] The user selects the file name of the calculation result that the user wishes to display on the display screen 100 shown in Fig. 9 as the comparison calculation result from the list displayed in the list display section 111. Then, the user presses the Load button 112. When the user presses the Load button 112, the screen is switched to a display screen 100A showing the calculation result shown in Fig. 14.
[0213] The Back button 114 is a button that is pressed to return to the display screen 100 without pressing the Load button 112 or the Reset button 113.
[0214] The display information generating unit 73 receives a signal based on the pressing of the Load button 112 from the user interface 50, and determines in step S60 that there is a request to display the comparison calculation result.
[0215] When it is determined in step S60 that there is a request to display the comparison calculation result (Yes in step S60), the display information generation unit 73 generates display information based on the calculation result stored in the calculation result storage unit 64 and the information stored in the template storage unit 65 (step S61). Here, the display information generation unit 73 reads out both the calculation result based on the future driving conditions stored in the calculation result storage unit 64 and the selected comparison calculation result. Then, the display information generation unit 73 outputs the generated display information to the display information storage unit 66 and the user interface 50. The display information storage unit 66 stores the display information.
[0216] The user interface 50 displays the display information output from the display information generating unit 73 on the display unit as shown in Fig. 14 (step S62). As shown in Fig. 14, both the calculation result based on the future operating conditions and the comparison calculation result are displayed as the future erosion amount on the display screen 100A.
[0217] Specifically, the erosion amount ratio in each calculation result is shown in time series as the future erosion amount, and the preparation threshold line in each calculation result is shown. The erosion amount ratio in the comparison calculation result is shown by a dashed line, and the preparation threshold line in the comparison calculation result is shown by a two-dot chain line (the two-dot chain line with a narrower gap). In addition, the recommended replacement time and recommended preparation time in each calculation result are displayed as an alarm display 103. As shown in FIG. 14, the erosion amount ratio in the past erosion amount is also shown in time series.
[0218] In addition, the preparation threshold in the comparison calculation result functions as a second preparation threshold, the recommended replacement time in the comparison calculation result functions as a second recommended replacement time, and the recommended preparation time in the comparison calculation result functions as the second recommended preparation time.
[0219] When it is determined in step S60 that there is no request to display the comparison operation result (No in step S60), the display information generating unit 73 determines whether there is a request to delete the display of the comparison operation result (step S63).
[0220] Here, the user can delete the comparison calculation result shown on the display screen 100A of Fig. 14 by pressing the Reset button 113 on the selection screen 110 of Fig. 15. The display information generating unit 73 receives a signal based on the pressing of the Reset button 113 from the user interface 50, and determines in step S63 that there is a request to delete the display of the comparison calculation result. When the user presses the Reset button 113, the screen is switched to a display screen showing the calculation result.
[0221] When it is determined in step S63 that there is a request to delete the display of the comparison calculation result (Yes in step S63), the display information generation unit 73 generates display information based on the calculation result stored in the calculation result storage unit 64 and the information stored in the template storage unit 65 (step S64). Here, the display information generation unit 73 reads out the calculation result based on the future driving conditions stored in the calculation result storage unit 64. Then, the display information generation unit 73 outputs the generated display information to the display information storage unit 66 and the user interface 50. The display information storage unit 66 stores the display information.
[0222] The user interface 50 displays the display information output from the display information generating unit 73 on the display unit as shown in Fig. 9 (step S65). That is, as shown in Fig. 9, the comparison calculation results are deleted from the display screen 100, and only the calculation results based on the future operating conditions are displayed.
[0223] In the determination at step S63, when it is determined that there is no request to delete the display of the comparison operation result (No at step S63), the process returns to step S40.
[0224] 12, after the process of step S44, the future erosion calculation unit 72 determines whether the amount of erosion has reached the replacement threshold based on the calculation result of step S44 (step S47), as described above. Then, the processes of steps S47 to S53 are executed, as described above.
[0225] The information on the future erosion amount on the display screen 100A is updated every time information is received in response to pressing the Save button 87 on the input screen 80 for future operating conditions, and the Load button 112 or Reset button 113 on the selection screen 110 for comparison calculation results.
[0226] Although an example in which one operation result is selected as the comparison operation result has been shown here, a setting may be made such that a plurality of comparison operation results can be selected.
[0227] According to the erosion amount control device 18 of the second embodiment described above, the same effects as those of the erosion amount control device 18 of the first embodiment can be obtained.
[0228] Furthermore, according to the erosion amount management device 18 of the second embodiment, both the calculation result predicted based on future operating conditions and the comparison calculation result can be displayed as the future erosion amount on the display screen 100A.
[0229] This allows the user to visually confirm the difference between the amount of erosion in the calculation result based on the future operating conditions and the amount of erosion in the comparative calculation result in the graph 101 on the display screen 100A. In addition, the user can visually confirm the difference between the recommended replacement timing and recommended preparation timing in the calculation result based on the future operating conditions and the recommended replacement timing and recommended preparation timing in the comparative calculation result in the alarm display 103 on the display screen 100A.
[0230] According to the embodiment described above, it is possible to recognize, in a chronological order, the amount of erosion from the past to the present predicted based on the operating data and the amount of erosion in the future predicted based on the future operating conditions.
[0231] Although some embodiments of the present invention have been described, these embodiments are presented as examples and are not intended to limit the scope of the invention. These novel embodiments can be implemented in various other forms, and various omissions, substitutions, and modifications can be made without departing from the spirit of the invention. These embodiments and their modifications are included in the scope and spirit of the invention, and are included in the scope of the invention and its equivalents described in the claims. [Explanation of symbols]
[0232] 1...steam turbine equipment, 10...boiler, 11...high pressure turbine, 12...reheater, 13...intermediate pressure turbine, 14...low pressure turbine, 15...generator, 16...condenser, 17...feed water pump, 18...erosion amount management device, 20...main steam pipe, 21...low temperature reheat steam pipe, 22...high temperature reheat steam pipe, 23...crossover pipe, 24...exhaust pipe, 25...feed water pipe, 30...steam temperature detector, 31...output detector, 40...measurement data acquisition unit, 50...user interface, 60...memory unit, 61...input information memory unit, 62...measurement data memory unit, 63...program memory unit, 64...calculation result memory unit, 65...template memory unit, 66...display information memory unit, 70...calculation unit, 71...fixed period erosion calculation unit , 72...future erosion calculation section, 73...display information generation section, 80, 90...input screen, 81...selection pattern, 82...past operation performance mode, 83...base load operation mode, 84...peak load operation mode, 85...detailed operation setting mode, 86...operation data, 87...save button, 91, 92, 93, 94...numerical field, 95...upload button, 96...delete button, 97, 114...back button, 100, 100A...display screen, 101...graph, 102...time axis setting section, 103...alarm display, 104...selection display section, 105...selection button, 110...selection screen, 111...list display section, 112...load button, 113...reset button.
Claims
1. a display information generating unit that generates display information for displaying on a display unit past erosion amount related information indicating information regarding past erosion amounts of rotor blades of a steam turbine from the past to the present calculated based on measured information, and future erosion amount related information indicating information regarding a future erosion amount of the rotor blades in the future calculated based on future operating conditions and the past erosion amount related information input through an operation using a user interface screen, The display information generating unit, each time the future driving condition is input, The past erosion amount related information at the time when the future operating conditions are input; The future erosion amount related information from the time point when the future operating conditions are input, a display unit that displays the above-mentioned display information on the display unit;
2. The display information generating unit 2. The apparatus for managing an amount of erosion of a moving blade of a steam turbine according to claim 1, further comprising: generating the display information for displaying both the information regarding the amount of past erosion and the information regarding the amount of future erosion in chronological order on the display unit.
3. The display information generating unit 2. The apparatus for managing an amount of erosion of moving blades of a steam turbine according to claim 1, wherein the display information is generated so that the information relating to the amount of erosion of the past is displayed on the display unit at predetermined time intervals.
4. The display information generating unit 2. The device for managing the amount of erosion of a steam turbine bucket according to claim 1, further comprising: a display unit that displays, on the display unit, information relating to a preparation threshold that indicates an amount of erosion at which it is recommended to start preparation for a new bucket, the preparation threshold being calculated based on the amount of future erosion.
5. The display information generating unit 2. The steam turbine blade erosion amount management device according to claim 1, further comprising: a display unit configured to display, on the display unit, a recommended preparation time for starting preparation of a new blade, the recommended preparation time being calculated based on the future erosion amount.
6. The display information generating unit 2. The steam turbine blade erosion amount management device according to claim 1, further comprising: a display unit configured to display, on the display unit, a recommended replacement time for replacing the blade, the recommended replacement time being calculated based on the future erosion amount.
7. The display information generating unit 2. The erosion amount management device for a steam turbine bucket according to claim 1, further comprising: generating the display information for displaying on the display unit second future erosion amount related information indicating information regarding a second future erosion amount of the bucket in the future calculated based on second future operating conditions and the past erosion amount related information inputted in an operation using a user interface screen.
8. The display information generating unit 8. The device for managing the amount of erosion of a steam turbine rotor blade according to claim 7, further comprising: a display unit that displays, on the display unit, information relating to a second preparation threshold that indicates an amount of erosion at which it is recommended to start preparation of a new rotor blade, the second preparation threshold being calculated based on the second future erosion amount.
9. The display information generating unit 8. The steam turbine blade erosion amount management device according to claim 7, further comprising: a display unit configured to display, on the display unit, a second preparation recommendation time at which it is recommended to start preparation of a new blade, the second preparation recommendation time being calculated based on the second future erosion amount.
10. The display information generating unit 8. The steam turbine blade erosion amount management device according to claim 7, further comprising: a display unit configured to display, on the display unit, a second recommended replacement time when it is recommended to replace the blade, the second recommended replacement time being calculated based on the second future erosion amount.
Citation Information
Patent Citations
Steam turbine damage evaluation device, method and program
JP2022183496A
Blade damage evaluation device, method and program
JP2023025354A
Steam turbine blade vibration monitor backpressure limiting system and method
US20150128596A1
Erosion preventing apparatus for movable vane for steam turbine
JP1986207804A
System and method for supporting maintenance plan of power plant
JP2002297710A