In-furnace scaffold construction method

The use of foldable scaffolding units with integrated support and lifting mechanisms addresses the inefficiencies of conventional methods by enabling rapid assembly and disassembly of in-furnace scaffolding, reducing downtime and improving management efficiency.

JP2024138720APending Publication Date: 2024-10-09KYC MACHINE IND
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023049359
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-27
Publication Date
2024-10-09

AI Technical Summary

Technical Problem

Conventional methods for constructing in-furnace scaffolding in boiler furnaces of thermal power plants are time-consuming and inefficient due to the need for assembling and dismantling numerous temporary members, which prolongs equipment downtime and complicates management of these components.

Method used

A method involving the use of foldable scaffolding units with integrated support and lifting mechanisms, allowing for efficient assembly and disassembly by stacking and lifting these units in multiple layers within the furnace using a lifting device, eliminating the need for individual connection of temporary members.

Benefits of technology

This approach significantly reduces the time required for scaffolding assembly and disassembly, enhances workability, and simplifies storage and management of components, minimizing equipment downtime and improving operational efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024138720000001_ABST
    Figure 2024138720000001_ABST
Patent Text Reader

Abstract

To provide an in-furnace scaffold construction method capable of efficiently assembling and disassembling the in-furnace scaffold.SOLUTION: An in-furnace scaffold construction method of the invention comprises: a transportation step to transport a scaffold unit 10 in a folded state, a post 22 having a bracket 32 to support the scaffold unit 10, and a lifting device 21 to lift the post 22 upward into a boiler furnace 1 through an opening formed on a furnace wall in the boiler furnace 1; an arrangement step to arrange the lifting device 21 at a prescribed position in the boiler furnace 1; a placement step to place the scaffold unit 10 on the bracket 32 of the post 22; an assembly step to shift the scaffold unit 10 from the folded state to an assembled state; and a lifting step to lift the post 22 by the lifting device 21 to a prescribed height. A plurality of layers of the scaffold unit 10 are successively installed by repeating the placement step, the assembly step and the lifting step.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a method for constructing an in-furnace scaffold to be installed inside a boiler furnace of, for example, a thermal power plant. [Background technology]

[0002] Conventionally, for example, a boiler furnace in a thermal power plant has a hollow interior and a hopper structure in which the furnace bottom tapers downward. The upper part of the boiler furnace is a furnace section for generating high-temperature, high-pressure steam, and is formed in a substantially rectangular prism shape (see, for example, Patent Document 1). In this furnace bottom and furnace section, for example, during maintenance such as inspection and repair of the inside of the boiler furnace, an in-furnace scaffold is assembled inside.

[0003] Conventional in-furnace scaffolding is assembled, for example, using a large assembly and large sweeping construction method. Fig. 21 is a perspective view showing a schematic configuration of a conventional in-furnace scaffolding assembled using the large assembly and large sweeping construction method. In-furnace scaffolding 51 is constructed and configured in a substantially rectangular frame shape in a plan view on a stage 53 of a furnace section 52. Note that, for convenience of explanation, the in-furnace scaffolding 51 shown in the figure is three layers in the height direction, but in reality, the in-furnace scaffolding will be about 15 to 20 layers.

[0004] In the large-scale assembly and removal method, as shown in Fig. 22, for example, a single-layer foundation scaffold 54 is assembled at a position on a stage 53 where the in-furnace scaffold 51 is actually installed. More specifically, a plurality of jacks 56 are lined up at the position where the in-furnace scaffold 51 is to be installed, and then supports 57, scaffolding boards 58, handrails 59, etc. are connected onto the jacks 56 to assemble the foundation scaffold 54.

[0005] After that, an upper layer scaffolding 60 made up of multiple layers is assembled at a position different from the assembly position of the base scaffolding 54. More specifically, as shown in Fig. 23, a temporary assembly jig 64 made up of jacks 61, horizontal ties 62, etc. is installed, and supports 65, scaffolding boards 66, handrails 67, etc. are connected onto the temporary assembly jig 64 to assemble, for example, a two-layer scaffolding.

[0006] 24, the upper scaffolding 60 excluding the temporary assembly jig 64 is hoisted by a crane or the like using a wire W and connected to the upper part of the foundation scaffolding 54. The in-furnace scaffolding 51 is constructed by further connecting a plurality of connected foundation scaffoldings 54 and upper scaffoldings 60 vertically and horizontally, forming a substantially rectangular frame-shaped in-furnace scaffolding as shown in FIG. [Prior art documents] [Patent documents]

[0007] [Patent Document 1] JP 2012-52305 A Summary of the Invention [Problem to be solved by the invention]

[0008] Here, for example, in the case of a boiler furnace of a thermal power plant, in order to minimize the opportunity loss due to the equipment being stopped, it is required to complete the assembly and dismantling work of the furnace scaffolding 51 constructed in the boiler furnace in a short time.

[0009] In the construction method of the in-furnace scaffolding 51 using the conventional large-scale assembly and sweeping construction method, the upper scaffolding 60 is lifted up in blocks by wires W or the like, but the upper scaffolding 60 is assembled by connecting temporary members such as supports 65, scaffolding boards 66 and handrails 67 one by one (see FIG. 23). Similarly, the foundation scaffolding 54 is also assembled by connecting temporary members such as supports 57, scaffolding boards 58 and handrails 59 one by one (see FIG. 22).

[0010] Thus, since the internal scaffolding 51 has a large number of temporary material parts, there was a problem that the workability of assembling the internal scaffolding 51 was poor and the assembly work took a long time. Also, in the dismantling work of dismantling the internal scaffolding 51, it was necessary to remove multiple types of temporary material one by one, which also took a long time.

[0011] Furthermore, before assembling the in-furnace scaffolding 51, the various types of temporary materials must be transported and stored in a limited area, such as on the stage 53 inside the furnace. Therefore, there was also a problem that managing the types and quantities of those temporary materials was very time-consuming and troublesome.

[0012] The present invention was devised in light of the above-mentioned circumstances, and its object is to provide a method for constructing an internal scaffolding that enables efficient assembly and dismantling of the internal scaffolding. [Means for solving the problem]

[0013] The method of constructing an in-furnace scaffold provided by the present invention is a method of constructing an in-furnace scaffold consisting of a plurality of scaffolding units, each of which has a length of at least a plurality of spans and is substantially flat inside a furnace having an internal space, a pair of baseboards extending in the vertical direction and provided at both ends of the scaffolding board, and a plurality of posts each supported rotatably on the outer surface of each baseboard, the method including a transporting step of transporting the plurality of scaffolding units in a folded state, a plurality of posts each having a support portion for supporting the scaffolding units, and a plurality of lifting devices for lifting the posts upward into the furnace through openings formed in a furnace wall inside the furnace; The method includes a placement process for placing each of the scaffolding units at a predetermined position within the furnace; a placement process for placing any of the scaffolding units transported by the transportation process on the support part of the post arranged near the lifting device; an assembly process for transitioning the scaffolding unit placed on the support part by the placement process from a folded state to an assembled state; and a lifting process for lifting the post having the support part on which the scaffolding unit is placed, to a predetermined height by each of the lifting devices, and is characterized in that the scaffolding units are connected together in multiple layers by repeatedly performing the placement process, the assembly process, and the lifting process.

[0014] In the method for constructing an internal furnace scaffolding of the present invention, in the assembly process, each of the posts is rotated along the outer surface of the baseboard to erect it, and the handrails placed on the upper surface of the scaffolding board are removed and hung on the posts.

[0015] In the method for constructing an in-furnace scaffolding of the present invention, when there are multiple scaffolding units assembled in the assembly process in the left-right direction, it is preferable to further include a connecting process for connecting these multiple scaffolding units to each other in the left-right direction.

[0016] In the method for constructing in-furnace scaffolding of the present invention, in the connecting process, when the other scaffolding unit has already been assembled on the upper layer, it is preferable to connect the pillars of that scaffolding unit in the vertical direction to the pillars of the scaffolding unit connected in the left-right direction.

[0017] In the method for constructing an in-furnace scaffolding of the present invention, in the connecting step, the multiple scaffolding units assembled in the assembling step may be connected so as to form an approximately U-shape in a plan view.

[0018] In the method of constructing an in-furnace scaffolding of the present invention, the lifting device has a hook portion for hooking the post, a link portion for moving the hook portion closer to or away from the post, and a movable mechanism for moving the hook portion in an upward and downward direction, and in the lifting process, the hook portion displaced toward the post by the link portion supports the post, and the hook portion is moved upward by the movable mechanism to lift the post to a predetermined height. Effect of the Invention

[0019] According to the present invention, a plurality of scaffolding units in a folded state are transported into a furnace, each of the transported scaffolding units is assembled from the folded state, and the assembled scaffolding units are connected in a plurality of layers while being lifted by a lifting device to construct an in-furnace scaffolding. The scaffolding units are made to have a length equivalent to a plurality of spans of a conventional temporary scaffolding, and the members are integrally constructed, so that there is no need to assemble the in-furnace scaffolding by connecting a plurality of types of temporary members one by one as in the conventional method, and the work time for assembly and dismantling when constructing the in-furnace scaffolding can be significantly reduced. In addition, since the scaffolding units are foldable, they can be smoothly transported into the furnace, for example, and can be easily stored and maintained. [Brief description of the drawings]

[0020] [Figure 1] 1 is an oblique view showing the schematic configuration of an internal scaffolding constructed by applying the internal scaffolding construction method according to this embodiment. FIG. [Diagram 2] This is a view from one side of the furnace scaffolding. [Diagram 3] FIG. 2 is a perspective view showing the assembled state of the scaffolding unit. [Figure 4] 13A to 13C are diagrams for explaining the assembly procedure of the scaffolding unit. [Diagram 5] 13A to 13C are diagrams for explaining the assembly procedure of the scaffolding unit. [Figure 6] 1A and 1B show the external appearance of a lifting device, where (a) is a side view and (b) is a front view. [Figure 7] 1 shows the external shape of the first post, where (a) is a side view and (b) is a front view. [Figure 8] 1 shows the external shape of a second post, where (a) is a side view and (b) is a plan view. [Figure 9] 1A and 1B are diagrams for explaining the operation of the lifting device, in which (a) shows the state when the hook portion supports the post, and (b) shows the state when the hook portion is retracted. [Figure 10] FIG. 13 is a diagram for explaining the assembly procedure of the in-furnace scaffolding. [Figure 11]1 is a partially cutaway plan view showing the positional relationship between a beam member, a lifting device, and a post. FIG. [Figure 12] FIG. 13 is a diagram for explaining the assembly procedure of the in-furnace scaffolding. [Figure 13] FIG. 13 is a diagram for explaining the assembly procedure of the in-furnace scaffolding. [Figure 14] A partially cutaway plan view showing the state when the scaffolding unit is supported by the post bracket and lifter. [Figure 15] A diagram showing the connection state between the baseboards of the scaffolding units. [Figure 16] FIG. 13 is a diagram for explaining the assembly procedure of the in-furnace scaffolding. [Figure 17] A diagram showing the connection state of the handrails of the scaffolding units. [Figure 18] FIG. 13 is a diagram for explaining the assembly procedure of the in-furnace scaffolding. [Figure 19] FIG. 13 is a diagram for explaining the assembly procedure of the in-furnace scaffolding. [Figure 20] FIG. 13 is a diagram for explaining the assembly procedure of the in-furnace scaffolding. [Figure 21] FIG. 1 is a perspective view showing a schematic configuration of a conventional in-furnace scaffolding. [Figure 22] FIG. 1 is a diagram for explaining the assembly procedure of a conventional in-furnace scaffold. [Figure 23] FIG. 1 is a diagram for explaining the assembly procedure of a conventional in-furnace scaffold. [Figure 24] FIG. 1 is a diagram for explaining the assembly procedure of a conventional in-furnace scaffold. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0021] Hereinafter, an embodiment of the present invention will be described in detail with reference to the drawings.

[0022] Fig. 1 is a perspective view showing a schematic configuration of an in-furnace scaffold constructed by applying the in-furnace scaffold construction method according to the present embodiment. Fig. 2 is a view from one side of the in-furnace scaffold. The in-furnace scaffold according to the present embodiment is installed, for example, inside a boiler furnace of a thermal power plant. As described later, the in-furnace scaffold construction method uses a so-called lifting method.

[0023] As shown in Fig. 1, a boiler furnace 1 of a thermal power plant is composed of a furnace bottom section 2 having a hopper structure tapering downward, and a furnace section 3 formed above the furnace bottom section 2 and having an overall structure formed in a hollow, approximately rectangular prism shape. The in-furnace scaffolding 4 according to this embodiment is installed on a stage 5 of the furnace section 3, and is used during maintenance such as inspection and repair of the inside of the furnace section 3. For convenience of explanation, the in-furnace scaffolding 4 shown in Fig. 1 has a three-layer structure in the height direction, but is not limited to this (in reality, about 15 to 20 layers are installed).

[0024] The in-furnace scaffolding 4 is configured to be roughly square-shaped in plan view along the inner wall surface of the furnace section 3 (see Fig. 1), and is constructed by combining a plurality of scaffolding units 10, which will be described later. As shown in Fig. 2, the in-furnace scaffolding 4 is constructed by connecting, for example, two scaffolding units 10 to one side of one layer, and stacking them one layer at a time in the height direction by lifting devices 21 and posts 22, which will be described later.

[0025] In addition, in the side view of the in-furnace scaffolding 4 shown in Fig. 2, the two supports 13 on both the left and right ends show a part of the scaffolding on the left and right side sides, and the scaffolding on the depth side sides is omitted. In addition, the configuration of the in-furnace scaffolding 4 is not limited to the configuration shown in Fig. 1 or Fig. 2.

[0026] Here, as shown in Figure 3, one scaffolding unit 10, which is a characteristic part of this embodiment, is composed of an integrally connected scaffolding board 11 for workers to perform inspection work, etc., a pair of baseboards 12 extending vertically from both longitudinal ends of the scaffolding board 11, a number of posts 13 supported by the baseboards 12 so as to be freely rotatable, and a pair of handrails 14 hung on the posts 13.

[0027] The scaffolding board 11 has a total length (corresponding to the total length of one scaffolding unit 10) that is equal to or longer than a plurality of spans (for example, three spans or more) of conventional temporary scaffolding. The scaffolding board 11 may be a plurality of single board members arranged side by side.

[0028] The pair of baseboards 12 are connected by multiple connecting members (not shown) extending in the left-right direction when viewed from the front on the underside of the scaffolding board 11. Multiple posts 13 are rotatably supported along the outer surfaces of the pair of baseboards 12. When the scaffolding unit 10 is in an assembled state (see FIG. 3), each post 13 extends in a substantially vertical direction and is bolted to the baseboard 12 at a predetermined position away from the lower end. Each post 13 has a tenon 15 formed at its lower end and a recess formed at its upper end into which the tenon 15 of the other post 13 fits.

[0029] One handrail 14 is hung on two support posts 13 aligned in the longitudinal direction along one baseboard 12 on the near side. The other handrail 14 is also hung on two support posts 13 aligned along the other baseboard 12 on the opposing depth side.

[0030] Each handrail 14 is made up of two rod-shaped members 16 that extend in the longitudinal direction and vertically in parallel, and multiple connecting members 17 that vertically connect each rod-shaped member 16. Each handrail 14 is hung on the support post 13 by fitting an unillustrated locking piece into an unillustrated pocket formed in the support post 13.

[0031] The scaffolding unit 10 shown in Fig. 3 shows an assembled state, and this scaffolding unit 10 is of a foldable type. That is, as shown in Fig. 4(a), the scaffolding unit 10 is in a substantially flat plate shape in the folded state, and the multiple supports 13 are arranged along the respective outer surfaces of a pair of baseboards 12. Also, the handrails 14 are placed on the upper surface of the scaffolding board 11 in the folded state. The scaffolding boards 11 are transported in this folded state, or stacked for temporary storage.

[0032] To change the scaffolding unit 10 from the folded state shown in FIG. 4(a) to the assembled state shown in FIG. 3, one pair of posts 13 are rotated and erected along the baseboard 12 as shown in FIG. 4(b) (see arrow A in the figure). Next, the other pair of posts 13 are rotated and erected along the baseboard 12 (see arrow B in FIG. 5). Then, the handrails 14 are taken out from the top surface of the scaffolding board 11, and the handrails 14 are hooked to each of the two posts 13 lined up along the baseboard 12 as shown in FIG. 3. In this way, in this embodiment, a scaffolding of multiple spans or more can be easily assembled using the scaffolding unit 10.

[0033] The multiple scaffolding units 10 are stacked one layer at a time using lifting devices 21 and posts 22 shown in Figures 6 to 9. As shown in Figure 6, the lifting device 21 has a main body extending in the vertical direction and formed into a substantially rectangular prism shape, and is provided on the upper surface of the base 20, and a substantially cylindrical screw jack 25 extending in the vertical direction is provided in the inner space. The screw jack 25 has a threaded surface and can be rotated in the forward or reverse direction by a motor (not shown). The motor (not shown) is driven to rotate by a signal from a control panel (not shown).

[0034] The lifting device 21 is equipped with a support mechanism 24 for supporting the post 22 (see Figs. 7 and 8) and lifting it upward. The support mechanism 24 has a movable part 26 that is slidable along the open edge 21a (see Fig. 6(b)) of the lifting device 21. The back side of the movable part 26 is screwed into the screw jack 25. Therefore, the movable part 26 (support mechanism 24) is movable up and down as the screw jack 25 rotates.

[0035] The movable part 26 is provided with a pair of hook parts 28 that are rotatably supported near the lower end thereof and serve to support the post 22. Each hook part 28 has a predetermined length, and at its upper end, a notched recess 27 that is formed in a generally triangular valley shape is formed. These notched recesses 27 are for engaging a protruding piece 31 of the post 22, which will be described later, from below.

[0036] The movable portion 26 is provided with a pair of link portions 29 each having a handle loosely fitted into two long holes 29a near the upper end thereof. The handle is formed on one end of the link portion 29, and the other end of the link portion 29 is rotatable about a rotation shaft 29b in the center of the hook portion 28. The pair of link portions 29 are intended to move the pair of hook portions 28 closer to or farther away from the post 22.

[0037] By an operator operating the handle of the link portion 29 (for example, by displacing it upward or downward within the long hole 29a), the hook portion 28 can be moved toward or away from the post 22, as will be described later.

[0038] The post 22 is supported by and lifted by the lifting device 21 (strictly speaking, by the hook portion 28 of the support mechanism 24) to move the scaffolding unit 10 upward. As shown in Fig. 7, the post 22 is formed in a substantially square prism shape having a predetermined height (for example, about 1 m), and a pair of protrusions 31 are formed on two of the four side surfaces that are not adjacent to each other. Each protrusion 31 is formed in a substantially V-shape, and when the lifting device 21 supports and lifts the post 22 upward, the protrusions 31 are hooked into the notched recesses 27 of the hook portion 28.

[0039] The posts 22 are classified into a type in which only a pair of protrusions 31 are formed on the side as shown in Fig. 7 (hereinafter referred to as "first post 22A"), and a type in which a pair of protrusions 31 and a pair of brackets 32 are attached as shown in Fig. 8 (hereinafter referred to as "second post 22B", and when the first post 22A and the second post 22B are collectively referred to as simply "post 22"). The second post 22B is provided with a pair of brackets 32 that extend perpendicularly from the corners of the second post 22B and have a predetermined length. The pair of brackets 32 are for placing and supporting the scaffolding unit 10 on the upper surface.

[0040] In this embodiment, the length of the support 13 of the scaffolding unit 10 (for example, about 2 m) is set to the height of one layer, which corresponds to the combined length of the two posts 22. The first post 22A and the second post 22B are stacked alternately (excluding the top), and the scaffolding unit 10 is placed only on the upper surface of the bracket 32 ​​of the second post 22B.

[0041] As shown in FIG. 9(a), when the lifting device 21 lifts the post 22, the hook portion 28 of the support mechanism 24 is displaced toward the post 22 to support it. For example, when the hook portion 28 of the support mechanism 24 is in a state in which it extends substantially parallel to the lifting device 21 as shown in FIG. 9(b), if an operator moves the handle (not shown) of the link portion 29, for example, downward within the long hole 29a, the hook portion 28 rotates around the rotation axis 29b and approaches the post 22 (see arrow P in FIG. 9(a)). In this state, the notched recess 27 at the tip of the hook portion 28 can hook the protruding piece 31 of the post 22 from below and support it. Strictly speaking, when the notched recess 27 hooks the protruding piece 31, it is necessary to hook it from below, so it is necessary to slightly move the support mechanism 24 upward.

[0042] Then, as the screw jack 25 (see FIG. 6(b)) rotates, the movable part 26 is moved upward, whereby the post 22 is lifted upward while being supported by the hook part 28 (see arrow U in FIG. 9(a)).

[0043] Furthermore, as shown in Fig. 9(b), when the support mechanism 24 is moved downward without abutting against the post 22, the hook portion 28 is moved away from the post 22. For example, when the hook portion 28 is in a state in which it supports the post 22 as shown in Fig. 9(a), if the operator moves the handle (not shown), for example, upward, the hook portion 28 rotates about the pivot shaft 29b and moves away from the post 22 (see the arrow S in Fig. 9(b)). Strictly speaking, when releasing the state in which the notched recess 27 is engaged with the protruding piece 31, the tip of the hook portion 28 abuts against the protruding piece 31, so it is necessary to slightly move the support mechanism 24 downward.

[0044] As a result, the hook portion 28 is in a state of extending substantially parallel to the lifting device 21, and even if the screw jack 25 is rotated and the support mechanism 24 moves downward (see arrow D in the figure), the hook portion 28 will not come into contact with the post 22. Therefore, the support mechanism 24 can easily move, for example, from the vicinity of the upper post 22 among the stacked posts 22 to the vicinity of the lower post 22.

[0045] Next, a method for constructing the in-furnace scaffolding 4 according to this embodiment will be described.

[0046] In this construction method, a lifting method is adopted to construct an in-furnace scaffold 4 in which multiple scaffold units 10 are stacked. Here, it is assumed that other scaffolds have already been assembled at the furnace bottom 2 of the boiler furnace 1, and a stage 5 is provided above them below the furnace section 3. This in-furnace scaffold 4 is assembled on the stage 5.

[0047] First, multiple scaffolding units 10 are carried in a folded state (see FIG. 4(a)) onto the stage 5 of the furnace section 3. For example, the boiler furnace 1 has an opening (not shown) called a boiler manhole in its furnace wall. Usually, the furnace wall of the boiler furnace 1 is configured with multiple wall tubes (not shown) extending linearly, but these wall tubes need to be curved around the opening. If the wall tubes are curved, the flow of steam is hindered, so the opening is formed with a relatively small diameter (for example, a diameter of 600 to 800 mm).

[0048] The scaffolding unit 10 of this embodiment is carried into the inside of the boiler furnace 1 through this opening. In this case, the scaffolding unit 10 is carried in a folded state, and in this state is configured to be approximately flat and compact, so that it can be smoothly carried into the inside of the boiler furnace 1 through the above-mentioned opening. In addition, since the scaffolding unit 10 is configured integrally with a plurality of members, it can be carried in quickly and efficiently compared to the case where each separate temporary member is carried into the inside of the boiler furnace 1, for example, as in the case of conventional in-furnace scaffolding (see Figs. 21 to 24).

[0049] 6 and the posts 22 shown in FIGS. 7 and 8 are brought into the boiler furnace 1 through the opening, similar to the multiple scaffolding units 10. The four lifting devices 21 brought into the boiler furnace 1 are arranged at the corners on the stage 5 of the furnace section 3, as shown in FIG. 10(a) (only two lifting devices 21 are shown because this figure is a view from one side. Note that, strictly speaking, the lifting devices 21 should be shown facing inward at 45 degrees, but for ease of explanation, a view of the lifting devices 21 from the side is shown).

[0050] More specifically, four lifting devices 21 are installed facing outward at the corners of the stage 5, and a plurality of first posts 22A are disposed near the outer side of each lifting device 21. The support mechanism 24 of each lifting device 21 supports each first post 22A. That is, the protruding piece 31 of the first post 22A is hooked from below into the notched recess 27 at the upper end of the hook portion 28 of the support mechanism 24.

[0051] Here, when the hook portion 28 of the lifting device 21 supports the post 22, specifically, the following operation is performed. For example, as shown in Fig. 9(b), when the hook portion 28 is separated from the post 22 and in a position where the hook portion 28 cannot support the post 22, the support mechanism 24 is moved to a position where the hook portion 28 can support the protruding piece 31 of the post 22.

[0052] That is, a signal from a not shown switchboard rotates and drives a not shown motor, which rotates the screw jack 25 of the lifting device 21 and moves the support mechanism 24 up and down. The operator then displaces the not shown handle downward, which causes the hook portion 28 to rotate about the rotation shaft 29b and approach the post 22. That is, the hook portion 28 can be moved to a position where it can support the post 22. The support mechanism 24 is then slightly moved upward, causing the notched recess 27 at the upper end of the hook portion 28 to hook the protruding piece 31 of the post 22 from below.

[0053] Next, as shown in Fig. 10(b), beam member 33 is moved and placed on the upper ends of the multiple first posts 22A while being supported by lifters 34. As shown in Fig. 11, beam member 33 is formed in a substantially frame shape in a plan view, and multiple positioning members 35 are formed on each of the inner corners. Beam member 33 is placed by placing portions of positioning members 35 on the upper ends of the four first posts 22A, respectively.

[0054] A plurality of suspension posts 36 are provided at predetermined intervals on the underside of the beam member 33 (see FIG. 10(b)). These suspension posts 36 are for connecting to the posts 13 of the scaffolding unit 10 provided on the top floor. Note that the beam member 33 is actually made up of a plurality of members, and is constructed by combining these members while being placed on the upper end of the first post 22A.

[0055] 12(a), the support mechanism 24 is moved upward, and the first post 22A is raised to a predetermined height H1 (see arrow U in the figure). Here, the predetermined height H1 is set to a height at which another first post 22A can be placed below the first post 22A. Thereafter, as shown in FIG. 12(b), the other first post 22A is placed below the first post 22A (see arrow C in the figure).

[0056] Next, the worker uses the unillustrated handle to move the hook portion 28 away from the first post 22A, and in this state, lowers the support mechanism 24 along the lifting device 21. Then, as shown in FIG. 1(c), the hook portion 28 supports another first post 22A.

[0057] Next, as shown in Fig. 1(d), the support mechanism 24 is moved upward by rotating the screw jack 25 (see arrow U in Fig. 1), and the beam member 33 and the two connected first posts 22A are raised to a predetermined height H2 by the support mechanism 24. Here, the predetermined height H2 is set to a height at which the second post 22B having the bracket 32 ​​can be disposed below the two stacked first posts 22A.

[0058] 13(a), the second post 22B is placed below the stacked first post 22A (see arrow C in the figure). Then, as shown in the figure (b), the scaffolding unit 10 brought into the boiler furnace 1 is placed on the upper surface of the bracket 32 ​​of the second post 22B while still in the folded state using multiple lifters 34.

[0059] In this case, as shown in Fig. 14, two scaffolding units 10 are arranged in a straight line, and one end of one of the scaffolding units 10 is supported by a bracket 32 ​​of a second post 22B. At this time, one of the scaffolding units 10 is in a cantilevered state, and the other end is supported by a lifter 34. Also, one end of the other scaffolding unit 10 is supported by a bracket 32 ​​of another second post 22B, and the other end is supported by another lifter 34.

[0060] Furthermore, each second post 22B is provided with a pair of brackets 32 that extend in a perpendicular direction, so that, as shown in Figure 14, each second post 22B supports one scaffolding unit 10 with one bracket 32, and supports another scaffolding unit 10 that is arranged in a perpendicular direction to the scaffolding unit 10 with the other bracket 32.

[0061] Here, the two scaffolding units 10 arranged in a straight line have their baseboards 12 connected to each other by a substantially plate-shaped connecting member 37 and a bolt 38, as shown in FIG.

[0062] Next, the scaffolding unit 10 is assembled from the folded state to the assembled state as shown in Fig. 16. That is, as shown in Fig. 4(b) and Fig. 5, the pair of supports 13 are rotated along the outer surfaces of the baseboard 12, and are displaced from a state along the baseboard 12 to a state extending in a direction perpendicular to the baseboard 12. In addition, in the erected state, the lower ends of the supports 13 are suspended in the air.

[0063] Next, the pair of handrails 14 are each removed from the top surface of the scaffolding board 11 and hooked onto the support posts 13. As a result, each handrail 14 is supported by the support posts 13, and one scaffolding unit 10 is assembled. In this case, as shown in Fig. 17, the handrails 14 are connected to each other by a sliding member 40 fixed by a thumbscrew 39. Note that this figure shows the lower of the two rod-shaped members 16 of the handrail 14, and the thumbscrew 39 is attached to the upper side of the rod-shaped member 16 from below.

[0064] Although not shown, the baseboards 12 and handrails 14 are also connected to each other at each corner by dedicated members. In this way, the first layer of the in-furnace scaffolding 4 is constructed by connecting multiple scaffolding units 10 in the left-right direction.

[0065] Next, the support mechanism 24 is moved slightly downward so that the lower end of the first post 22A and the upper end of the second post 22B (see part E in Figure 16) are abutted against each other, and the lower end of the hanging support 36 of the beam member 33 is connected to the upper end of the support 13 of the erected scaffolding unit 10 (see part F in the same figure).

[0066] Thereafter, the hook portion 28 is temporarily moved away from the first post 22A, and as shown in Fig. 18(a), the support mechanism 24 is moved downward to support the second post 22B by the hook portion 28. Then, as shown in Fig. 18(b), the support mechanism 24 is moved upward to lift the beam member 33 and the multiple scaffolding units 10 together with the second post 22B to a predetermined height H1 (see arrow U in the figure). Thereafter, as shown in Fig. 18(c), the first post 22A is positioned below the second post 22B (see arrow C in the figure).

[0067] Next, the hook portion 28 is temporarily moved away from the second post 22B, and the support mechanism 24 is moved downward so that the positioned first post 22A is supported by the hook portion 28. Then, as shown in Fig. 19(a), the support mechanism 24 is moved upward to lift the beam member 33 and the multiple scaffolding units 10 together with the second post 22B to a predetermined height H2 at which another second post 22B can be positioned below the first post 22A (see arrow U in the figure).

[0068] Next, as shown in Fig. 20(b), the second post 22B is placed below the first post 22A, which is the lowest of the stacked posts 22 (see arrow C in Fig. 20). Next, as shown in Fig. 20(c), another scaffolding unit 10 that has been brought inside the boiler furnace 1 is placed in a folded state on the upper surface of the bracket 32 ​​of the placed second post 22B using a lifter 34. Then, as shown in Fig. 20(a), the placed another scaffolding unit 10 is assembled from the folded state to an assembled state, and a pair of handrails 14 are each hung on the support 13.

[0069] Next, the support mechanism 24 is moved slightly downward, so that the lower end of the first post 22A is abutted against the upper end of the second post 22B, as shown in Figure (b), and the lower end of the pillar 13 of the upper scaffolding unit 10 is connected to the upper end of the pillar 13 of the erected lower scaffolding unit 10.

[0070] After that, although not shown, the baseboards 12 and the handrails 14 are also connected to each other at each corner by dedicated members. In this way, the multiple scaffolding units 10 are connected in the left-right direction to construct the in-furnace scaffolding 4 in this layer.

[0071] Thereafter, the first post 22A and the second post 22B are alternately and repeatedly stacked, and when the second post 22B is placed on the bracket 32, the scaffolding unit 10 is placed, and the scaffolding unit 10 is brought from the folded state to the assembled state and connected to the upper scaffolding unit 10. In this way, the in-furnace scaffolding 4 as shown in FIG. 1 is constructed using the lifting method described above.

[0072] As described above, according to this embodiment, the in-furnace scaffold 4 is constructed by a lifting-type construction method using a plurality of scaffold units 10. Since one scaffold unit 10 has a length equivalent to a plurality of spans (e.g., three spans) and the members are integrally constructed, it is not necessary to construct the in-furnace scaffold 4 by connecting, for example, a plurality of types of temporary members one by one for each span as in the conventional large-scale assembly and removal-type construction method.

[0073] In addition, the scaffolding unit 10 can form one layer of the in-furnace scaffolding 4 simply by rotating and fixing the supports 13 along the baseboards 12. Therefore, the work time required to construct the in-furnace scaffolding 4 can be significantly reduced. Similarly, the time required to dismantle the in-furnace scaffolding 4 can also be significantly reduced.

[0074] In addition, the scaffolding unit 10 can be folded, so that it can be smoothly brought into the boiler furnace 1. Furthermore, since the scaffolding unit 10 is in a substantially flat plate shape when folded, it can be simply stacked on top of each other when storing and maintaining it in a limited area such as on the stage 5 inside the boiler furnace 1, so that it can be stored and maintained in a space-saving manner. In addition, since the members of the scaffolding unit 10 are integrally constructed, there is no need to manage the type and quantity of temporary members before assembling the in-furnace scaffolding 4 as in the conventional case.

[0075] The scope of the present invention is not limited to the above-mentioned embodiment, and various modifications can be made within the scope of the invention. For example, in the above-mentioned embodiment, the in-furnace scaffold 4 is configured to be approximately square-shaped in a plan view, but this is not limited to this. In addition, in the above-mentioned embodiment, one side of the in-furnace scaffold 4 is configured by arranging two scaffold units 10, but this is not limited to this, and one or three or more scaffold units 10 may be arranged. In addition, the scaffold units 10, scaffold boards 11, baseboards 12, supports 13, handrails 14, etc. are not limited to the shapes, sizes, quantities, and positional relationships of the above-mentioned embodiment.

[0076] In the above embodiment, the scaffolding unit 10 is applied to the lifting type construction method, but may be applied to the large assembly and large lifting type construction method instead. Alternatively, it may be applied to the so-called hanging type construction method. [Explanation of symbols]

[0077] 1 Boiler furnace 4 Furnace scaffolding 10 Scaffolding Units 11 Scaffolding Planks 12 Baseboard 13 Posts 14 Handrails 21 Lifting equipment 22 Posts 22A 1st Post 22B 2nd Post 24 Support mechanism 25 Screw jack 26 Moving parts 28 Hook part 29 Link section 31 Projection piece 32 Bracket

Claims

1. A method for constructing a scaffolding for an interior of a furnace having an internal space, the scaffolding comprising a plurality of scaffolding units each having a substantially flat scaffolding board having a length of at least a plurality of spans, a pair of baseboards extending in the vertical direction at both ends of the scaffolding board, and a plurality of supports each supported rotatably on the outer surface of each baseboard, a transporting process for transporting the plurality of scaffolding units in a folded state, a plurality of posts having support portions for supporting the scaffolding units, and a plurality of lifting devices for lifting the posts upward into the furnace through openings formed in a furnace wall inside the furnace; a placement step of placing the plurality of lifting devices at predetermined positions within the furnace; A placing process of placing any one of the scaffolding units transported by the transporting process on a support portion of the post arranged near the lifting device; an assembly process for transitioning the scaffolding unit placed on the support portion by the placement process from a folded state to an assembled state; a lifting step of lifting the post having the support part on which the scaffold unit is placed to a predetermined height by each of the lifting devices, A method for constructing an in-furnace scaffolding, characterized in that the scaffolding units are connected in multiple layers by repeatedly performing the placing process, the assembling process, and the lifting process.

2. In the assembly process, Each of the posts is rotated along the outer surface of the baseboard to erect it, The method for constructing an in-furnace scaffold according to claim 1, further comprising the steps of: taking out handrails placed on the upper surface of the scaffold boards; and hooking the handrails onto the posts.

3. The method for constructing an in-furnace scaffold as described in claim 1, further comprising a connecting step of connecting the multiple scaffolding units to each other in the left-right direction when there are multiple scaffolding units assembled in the assembly step in the left-right direction.

4. In the connecting step, When the other scaffolding units have already been assembled in the upper layer, A method for constructing an internal scaffold as described in claim 3, wherein the support pillars of the scaffold unit and the support pillars of the scaffold units connected in the left-right direction are connected in the up-down direction.

5. In the connecting step, The method for constructing an in-furnace scaffold as described in claim 3, wherein the multiple scaffold units assembled in the assembly process are connected so as to form an approximately U-shape in a plan view.

6. The lifting device is A hook portion for hanging the post; a link portion that moves the hook portion closer to and away from the post; a movable mechanism for moving the hook portion in a vertical direction, In the lifting step, 2. The method for constructing an in-furnace scaffold as described in claim 1, wherein the hook portion displaced toward the post by the link portion supports the post, and the hook portion is moved upward by the movable mechanism to lift the post to a predetermined height.

Citation Information

Patent Citations

  • Scaffold inside boiler and construction method therefor

    JP2012052305A