In-furnace scaffold construction method

The use of foldable, integrated scaffolding units with a hanging construction method addresses inefficiencies in conventional methods by enabling rapid assembly and disassembly of in-furnace scaffolding, improving safety and management efficiency.

JP2024138721APending Publication Date: 2024-10-09KYC MACHINE IND
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
JP2023049360
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-27
Publication Date
2024-10-09

AI Technical Summary

Technical Problem

The conventional hanging construction method for in-furnace scaffolding in boiler furnaces of thermal power plants is inefficient, requiring a long assembly and disassembly time due to the connection of multiple temporary members, and is cumbersome to manage and transport.

Method used

A method involving the use of foldable scaffolding units with integrated supports and handrails, transported in a compact state, which are assembled and connected within the furnace using a hanging construction method, reducing the need for individual member connections and allowing efficient assembly and disassembly.

Benefits of technology

The method significantly reduces assembly and disassembly time, enhances safety by allowing work on a stable stage rather than at heights, and simplifies storage and management of scaffolding components.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024138721000001_ABST
    Figure 2024138721000001_ABST
Patent Text Reader

Abstract

To provide an in-furnace scaffold construction method capable of efficiently assembling and disassembling the in-furnace scaffold.SOLUTION: An in-furnace scaffold construction method of the invention is a method to assemble the in-furnace scaffold by a suspending method in a furnace having a space inside and comprises: a transportation step to transport a plurality of scaffold units 10 in a folded state to a boiler furnace 1 through an opening formed on a furnace wall in the boiler furnace 1; an assembly step to shift the transported plurality of scaffold units 10 from the folded state to an assembled state; a lifting step to lift one of the scaffold units 10 shifted to the assembled state in the assembly step upward; and a connection step to suspend and connect the other scaffold unit 10 different from the scaffold unit 10 shifted to the assembled state in the assembly step below the scaffold unit 10 lifted in the lifting step.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a method for constructing an in-furnace scaffold to be installed inside a boiler furnace of, for example, a thermal power plant. [Background technology]

[0002] Conventionally, for example, a boiler furnace in a thermal power plant has a hollow interior and a hopper structure in which the furnace bottom tapers downward. The upper part of the boiler furnace is a furnace section for generating high-temperature, high-pressure steam, and is formed in a substantially rectangular prism shape (see, for example, Patent Document 1). In this furnace bottom and furnace section, for example, during maintenance such as inspection and repair of the inside of the boiler furnace, an in-furnace scaffold is assembled inside.

[0003] The in-furnace scaffolding is assembled, for example, by using a hanging construction method (see, for example, Patent Document 2). Fig. 12 is a side view showing a schematic configuration of a conventional in-furnace scaffolding assembled by using the hanging construction method. The in-furnace scaffolding 61 is constructed and configured in a substantially rectangular frame shape in a plan view on a stage 63 of a furnace section 62. For convenience of explanation, the in-furnace scaffolding 61 shown in the figure has eight layers in the height direction, but in reality, the in-furnace scaffolding has about 15 to 20 layers.

[0004] As shown in Patent Document 2, in the hanging construction method, for example, a hanging frame member placed on the ground is lifted upward, and multiple height-adjustable supports are attached to the hanging frame member. Then, after supports are attached to each height-adjustable support, the hanging beam member is lifted further upward, and handrail materials, scaffolding boards, etc. are attached between each support. Thereafter, the hanging frame member is lifted upward intermittently in the same manner, and a predetermined number of temporary members such as supports, handrail materials, and scaffolding boards are connected below.

[0005] A scaffolding block consisting of these connected supports, handrails, scaffolding boards, etc. is treated as one unit, and other scaffolding blocks are connected to the sides of it to construct an in-furnace scaffolding 61 as shown in Figure 12. [Prior art documents] [Patent documents]

[0006] [Patent Document 1] JP 2012-52305 A [Patent Document 2] JP 2017-206859 A Summary of the Invention [Problem to be solved by the invention]

[0007] Here, for example, in the case of a boiler furnace of a thermal power plant, in order to minimize opportunity loss due to equipment shutdowns, it is required that assembly and dismantling work for the in-furnace scaffolding 61 constructed within the boiler furnace be completed in a short period of time.

[0008] In the conventional method of constructing the in-furnace scaffolding 61 using the hanging construction method, temporary members such as supports, handrails, and scaffolding boards are connected and assembled one by one. Therefore, there is a problem that the workability is poor due to the large number of parts, and it takes a long time to assemble the in-furnace scaffolding 61. In addition, in the dismantling work of dismantling the in-furnace scaffolding 61, multiple types of temporary members must be removed one by one, which also takes a long time.

[0009] Furthermore, before assembling the in-furnace scaffolding 61, the various types of temporary materials must be transported and stored in a limited area, such as on the stage 63 inside the furnace. Therefore, there was also a problem that managing the types and quantities of those temporary materials was very time-consuming and troublesome.

[0010] The present invention was devised in light of the above-mentioned circumstances, and its object is to provide a method for constructing an internal scaffolding that enables efficient assembly and dismantling of the internal scaffolding. [Means for solving the problem]

[0011] The method for constructing an in-furnace scaffold provided by the present invention is a method for constructing an in-furnace scaffold assembled by a hanging construction method inside a furnace having a space inside, and is characterized in that it comprises a transporting process for transporting a plurality of scaffolding units in a folded state into the furnace through an opening formed in the furnace wall inside the furnace, an assembly process for changing the transported plurality of scaffolding units from the folded state to an assembled state, a lifting process for lifting upward one of the scaffolding units that has been put into an assembled state in the assembly process, and a connecting process for suspending and connecting another scaffolding unit, different from the scaffolding unit that has been put into an assembled state in the assembly process, below the scaffolding unit lifted by the lifting process.

[0012] In the method for constructing an internal scaffolding of the present invention, in the assembly process, each pillar of the scaffolding unit and the other scaffolding unit is rotated along the outer surface of the baseboard to erect each, and the handrails placed on the upper surface of the scaffolding board are removed and hung on the pillars.

[0013] In the method for constructing an in-furnace scaffolding of the present invention, in the connecting process, the scaffolding unit and the other scaffolding unit may be connected by respectively connecting the lower ends of each pillar of the scaffolding unit to the upper ends of each pillar of the other scaffolding unit.

[0014] In the method for constructing an internal scaffolding of the present invention, in the assembly process, the other scaffolding unit is brought from a folded state to an assembled state at a location different from below the scaffolding unit lifted upward in the lifting process, and then the other scaffolding unit in the assembled state is moved to below the scaffolding unit lifted upward.

[0015] In the method for constructing a scaffolding inside a furnace of the present invention, in the lifting process, the lower end height of the scaffolding unit lifted upward is made higher than the upper end height of the other scaffolding unit being moved below the scaffolding unit, and in the connecting process, the other scaffolding unit is raised toward the scaffolding unit and connected to it.

[0016] In the method for constructing an in-furnace scaffolding of the present invention, it is preferable that the method further includes a scaffolding block assembling process for continuously suspending and connecting one or more other scaffolding units different from the other scaffolding units below the other scaffolding units connected by the connecting process, and assembling a scaffolding block by connecting the scaffolding units, the other scaffolding units, and the one or more other scaffolding units, and a scaffolding block connecting process for connecting the multiple scaffolding blocks assembled by the scaffolding block assembling process in the left-right direction. Effect of the Invention

[0017] According to the present invention, a plurality of scaffolding units in a folded state are transported into a furnace, each of the transported scaffolding units is assembled from the folded state, one of the assembled scaffolding units is lifted upward, and another scaffolding unit different from the assembled scaffolding unit is suspended and connected below the lifted scaffolding unit to construct an in-furnace scaffold. The scaffolding unit has a length equivalent to a plurality of spans of a conventional temporary scaffold, and the members are integrally constructed, so that it is not necessary to assemble the in-furnace scaffold by connecting a plurality of types of temporary members one by one as in the conventional method, and the assembly and dismantling work time when constructing the in-furnace scaffold can be significantly reduced. In addition, since the scaffolding unit is foldable, it can be smoothly transported into the furnace, for example, and can be easily stored and maintained. In addition, since the assembly work can be performed on a stage inside the furnace, and there is no need to work at high altitudes, the construction work of the in-furnace scaffold can be performed more safely. [Brief description of the drawings]

[0018] [Figure 1]1 is a side view showing the schematic configuration of an internal scaffolding constructed by applying the internal scaffolding construction method according to this embodiment. FIG. [Diagram 2] FIG. 2 is a perspective view showing the assembled state of the scaffolding unit. [Diagram 3] 13A to 13C are diagrams for explaining the assembly procedure of the scaffolding unit. [Figure 4] 13A to 13C are diagrams for explaining the assembly procedure of the scaffolding unit. [Diagram 5] FIG. 13 is a diagram for explaining the assembly procedure of the in-furnace scaffolding. [Figure 6] FIG. [Figure 7] FIG. 13 is a diagram for explaining the assembly procedure of the in-furnace scaffolding. [Figure 8] FIG. 13 is a diagram for explaining the assembly procedure of the in-furnace scaffolding. [Figure 9] FIG. 13 is a diagram for explaining the assembly procedure of the in-furnace scaffolding. [Figure 10] FIG. 13 is a diagram for explaining the assembly procedure of the in-furnace scaffolding. [Figure 11] FIG. [Figure 12] FIG. 1 is a side view showing a schematic configuration of a conventional in-furnace scaffolding. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0019] Hereinafter, an embodiment of the present invention will be described in detail with reference to the drawings.

[0020] 1 is a side view showing a schematic configuration of an in-furnace scaffold constructed by applying the in-furnace scaffold construction method according to the present embodiment. The in-furnace scaffold according to the present embodiment is installed, for example, inside a boiler furnace of a thermal power plant. As described later, the in-furnace scaffold construction method uses a hanging construction method.

[0021] As shown in FIG. 1, a boiler furnace 1 of a thermal power plant is composed of a furnace bottom 2 having a hopper structure tapering downward, and a furnace section 3 formed above the furnace bottom 2. The furnace section 3 has an overall structure formed in a hollow, approximately rectangular prism shape. The in-furnace scaffolding 4 according to this embodiment is suspended from a suspension point (not shown) at the top of the furnace section 3, and is used during maintenance such as inspection and repair of the inside of the furnace section 3. For convenience of explanation, the in-furnace scaffolding 4 shown in FIG. 1 has an eight-layer structure in the height direction, but is not limited to this (in reality, about 15 to 20 layers are installed).

[0022] Although not shown, the in-furnace scaffolding 4 is configured to have a substantially rectangular frame shape in plan view along the inner wall surface of the furnace section 3, and is constructed by combining a plurality of scaffolding units 10, which will be described later. As shown in Fig. 1, which is viewed from one side of the in-furnace scaffolding 4, for example, two scaffolding units 10 are connected to one side of one layer, and the scaffolding units 10 are connected in the height direction.

[0023] In addition, in the side view of the in-furnace scaffolding 4 shown in Fig. 1, the two supports 6 on both the left and right ends show a part of the scaffolding on the left and right side sides, and the scaffolding on the side in the depth direction is omitted. In addition, the configuration of the in-furnace scaffolding 4 is not limited to the configuration shown in Fig. 1.

[0024] As shown in Figure 2, one scaffolding unit 10 is composed of a scaffolding board 11 for workers to perform inspection work, etc., a pair of baseboards 12 extending upward and downward from both longitudinal ends of the scaffolding board 11, a number of posts 13 supported by the baseboards 12 so as to be able to rotate freely, and a pair of handrails 14 hung on the posts 13, all of which are connected together.

[0025] The scaffolding board 11 has a total length (corresponding to the total length of one scaffolding unit 10) that is equal to or longer than a plurality of spans (for example, three spans or more) of conventional temporary scaffolding. Note that the scaffolding board 11 may actually be a plurality of single board members arranged side by side.

[0026] The pair of skirting boards 12 are connected by a plurality of connecting members (not shown) extending in the left-right direction in front view on the underside of the scaffolding board 11. A plurality of posts 13 are supported rotatably along the outer surfaces of the pair of skirting boards 12. Each post 13 extends in a substantially vertical direction in the assembled state of the scaffolding unit 10 (see FIG. 2), and is bolted to the skirting board 12 at a predetermined position away from the lower end. Each post 13 has a tenon 15 formed at its lower end, and a recess is formed at its upper end into which the tenon 15 of another post 13 or a tenon 33 (see FIG. 6) at the lower end of a connecting member 32 in a hoisting tool 30 described later fits. Since the posts 13 are mainly subjected to a tensile force in the height direction, flat steel, for example, can be used as a member constituting the posts 13. This allows the posts 13 to be made lighter than, for example, steel pipes.

[0027] One handrail 14 is hung on two support posts 13 aligned in the longitudinal direction along one baseboard 12 on the near side. The other handrail 14 is also hung on two support posts 13 aligned along the other baseboard 12 on the opposing depth side.

[0028] Each handrail 14 is made up of two rod-shaped members 16 that extend in the longitudinal direction and vertically in parallel, and multiple connecting members 17 that vertically connect each rod-shaped member 16. Each handrail 14 is hung on the support post 13 by fitting an unillustrated locking piece into an unillustrated pocket formed in the support post 13.

[0029] The scaffolding unit 10 shown in Fig. 2 is in an assembled state, and this scaffolding unit 10 is of a foldable type. That is, as shown in Fig. 3(a), the scaffolding unit 10 is in a substantially flat plate shape in the folded state, and the multiple supports 13 are arranged along the respective outer surfaces of a pair of baseboards 12. Also, the handrails 14 are placed on the upper surface of the scaffolding board 11 in the folded state. The scaffolding boards 11 are transported in this folded state, or stacked for temporary storage.

[0030] To change the scaffolding unit 10 from the folded state shown in FIG. 3(a) to the assembled state shown in FIG. 2, one pair of posts 13 are rotated and erected along the baseboard 12 as shown in FIG. 3(b) (see arrow A in the figure). Next, the other pair of posts 13 are rotated and erected along the baseboard 12 (see arrow B in FIG. 4). Then, the handrails 14 are taken out from the top surface of the scaffolding board 11, and the handrails 14 are hooked to each of the two posts 13 lined up along the baseboard 12 as shown in FIG. 2. In this way, in this embodiment, a scaffolding of multiple spans or more can be easily assembled using the scaffolding unit 10.

[0031] Next, a method for constructing the in-furnace scaffolding 4 according to this embodiment will be described.

[0032] In this construction method, a suspension construction method is adopted to construct an in-furnace scaffold 4 using multiple scaffold units 10. Here, it is assumed that other scaffolds have already been assembled at the furnace bottom 2 of the boiler furnace 1, and a stage 5 is provided above them below the furnace section 3. The scaffold units 10 of this in-furnace scaffold 4 are assembled on the stage 5.

[0033] First, the multiple scaffolding units 10 are carried in a folded state (see FIG. 3(a)) onto the stage 5 of the furnace section 3. For example, the boiler furnace 1 has an opening (not shown) called a boiler manhole in its furnace wall. Usually, the furnace wall of the boiler furnace 1 is configured with multiple wall tubes (not shown) extending linearly, but these wall tubes need to be curved around the opening. If the wall tubes are curved, the above-mentioned flow will be impeded, so the opening is formed with a relatively small diameter (for example, a diameter of 600 to 800 mm).

[0034] The scaffolding unit 10 of this embodiment is carried into the inside of the boiler furnace 1 through this opening. In this case, the scaffolding unit 10 is carried in a folded state, and in this state is configured to be approximately flat and compact, so that it can be smoothly carried into the inside of the boiler furnace 1 through the above-mentioned opening. In addition, since the scaffolding unit 10 is configured with a plurality of members integrally, it can be carried in more quickly and efficiently than, for example, a conventional in-furnace scaffolding 61 (see FIG. 12), in which each temporary member is configured separately and each temporary member is carried into the inside of the boiler furnace 1.

[0035] When the scaffolding unit 10 is carried into the inside of the boiler furnace 1, the scaffolding unit 10 is assembled from the folded state to the assembled state. In this case, as shown in Fig. 5(a), the platforms 20 are arranged on the stage 5 below the suspension point (not shown) of the in-furnace scaffolding 4, and the scaffolding unit 10 is placed on the platforms 20 in the folded state.

[0036] Next, each scaffolding unit 10 has a pair of posts 13 rotated along the outer surface of the baseboard 12 (see arrows A and B in FIG. 1(b)), and is displaced from a state along the baseboard 12 to an upright state extending in a direction perpendicular to the baseboard 12. In the upright state, the lower ends of the posts 13 are suspended in the air. Next, a pair of handrails 14 are each removed from the top surface of the scaffolding board 11 and hooked onto the posts 13. As a result, each handrail 14 is supported by the posts 13, and one scaffolding unit 10 is assembled on the platform 20.

[0037] The scaffolding unit 10 assembled on the platform 20 is connected to the hoist 30 (see FIG. 6(c)). As shown in FIG. 6, the hoist 30 is composed of a frame member 31 having a lattice shape in a plan view and four connecting members 32 extending downward from the frame member 31. The connecting members 32 are provided at positions corresponding to the supports 13 of the scaffolding unit 10 connected below it. The hoist 30 is fixed by fitting tenons 33 at the lower ends of the connecting members 32 into recesses at the upper ends of the supports 13. The frame member 31 has four wire connecting parts 34 provided at its upper part, and is lifted by a wire W, for example, by a crane or the like (see FIG. 5(c)). At this time, the hoist 30 is lifted so that the height of the lower ends of the supports 13 of the scaffolding unit 10 is higher than the height of the upper ends of the supports 13 of other scaffolding units 10 different from the scaffolding unit 10, as shown in FIG. 8 described later.

[0038] Meanwhile, as shown in Fig. 7(a), a lifter 40 is placed on the stage 5 at a location different from that below the scaffolding unit 10 lifted upward (a location different from that below the suspension point of the in-furnace scaffolding 4), and another scaffolding unit 10 is placed in a folded state on the lifter 40. The lifter 40 is a device that enables the scaffolding unit 10 to be transported and raised and lowered on the stage 5. Next, as shown in Fig. 7(b), the other scaffolding unit 10 is assembled from the folded state to the assembled state on the lifter 40.

[0039] Thereafter, as shown in Fig. 8, the other scaffolding units 10 are moved below the scaffolding unit 10 that has been lifted upward by using the lifter 40. As described above, the scaffolding unit 10 that has been lifted upward is lifted to a height where it does not come into contact with the other scaffolding units 10, so that the other scaffolding units 10 can be moved smoothly.

[0040] 9(a), the other scaffolding unit 10 is raised toward the scaffolding unit 10 that has been lifted upward by using a lifter 40, and the tenons 15 at the lower ends of the lifted supports 13 are fitted into the protruding portions at the upper ends of the supports 13 of the other scaffolding unit 10 and fixed. In this way, the scaffolding unit 10 that has been lifted upward and the other scaffolding unit 10 are connected.

[0041] Then, as shown in Fig. 9(b), the connected scaffolding unit 10 and the other scaffolding unit 10 are lifted upward. In this case, the height of the lower end of the support 13 of the other scaffolding unit 10 is made higher than the height of the upper end of the support 13 of the scaffolding unit 10 being moved below. Thereafter, the scaffolding units 10 are lifted upward in the same manner, and one or more scaffolding units 10 are successively suspended downward and connected. In this manner, a scaffolding block 18 consisting of multiple connected scaffolding units 10 is assembled (see Fig. 10).

[0042] As shown in Fig. 10(a), adjacent to the assembled scaffolding block 18, another scaffolding block 18 different from the scaffolding block 18 is assembled. As shown in Fig. 10(b), when the other scaffolding block 18 is assembled, adjacent scaffolding boards 11 and baseboards 12 in the left-right direction are connected by span adjustment members 50, and adjacent handrails 14 in the left-right direction are connected by span adjustment handrails 60, thereby connecting adjacent scaffolding blocks 18 in the left-right direction.

[0043] As shown in Fig. 11, the span adjustment member 50 is composed of a span adjustment scaffolding board 51 and a span adjustment frame 54. Here, Fig. 11(a) is a plan view of the span adjustment scaffolding board 51, Fig. 11(b) is a side view of the span adjustment scaffolding board 51, Fig. 11(c) is a front view of the span adjustment frame 54, and Fig. 11(d) is a side view of the span adjustment frame 54.

[0044] The span-adjustable scaffolding board 51 has, for example, two elongated holes 52 provided on one side in the longitudinal direction, and a plurality of bolt holes 53 provided on the other side in the longitudinal direction relative to the elongated holes 52. Since the span-adjustable scaffolding board 51 allows selection of the bolt holes 53 for fastening the bolts, it is possible to adjust the distance between adjacent scaffolding boards 11 in the left-right direction by bolting one scaffolding board 11 using the elongated holes 52 and bolting the other scaffolding board 11 using any of the bolt holes 53.

[0045] Furthermore, span adjustment frame 54 has two bolt holes 55 provided on one side in the longitudinal direction and multiple bolt holes 56 provided on the other side in the longitudinal direction of bolt holes 55. Since span adjustment frame 54 allows selection of bolt holes 56 for fastening bolts, it is possible to adjust the distance between adjacent baseboards 12 in the left-right direction by bolting one baseboard 12 using bolt hole 55 and bolting the other baseboard 12 using one of bolt holes 56.

[0046] Adjacent handrails 14 in the left and right direction are connected by a span adjustment handrail 60. By adjusting the distance between adjacent scaffolding blocks 18 in the left and right direction in this way, it is possible to prevent gaps from occurring between adjacent scaffolding boards 11 and between adjacent baseboards 12 at each corner, although this is not shown.

[0047] Furthermore, although not shown, the handrails 14 are also connected to each other at each corner by dedicated members. In this way, multiple scaffolding units 10 are connected in the left-right direction to provide the in-furnace scaffolding 4 as shown in FIG.

[0048] As described above, according to this embodiment, the in-furnace scaffold 4 is constructed by the hanging construction method using a plurality of scaffold units 10. Since one scaffold unit 10 has a length equivalent to a plurality of spans (for example, three spans) and the members are integrally constructed, it is not necessary to construct the in-furnace scaffold 4 by connecting, for example, a plurality of types of temporary members one by one for each span as in the conventional hanging construction method. In addition, the scaffold unit 10 can form one layer of the scaffold block 18 simply by rotating and fixing the support 13 along the baseboard 12. Therefore, the work time when constructing the in-furnace scaffold 4 can be significantly reduced. Similarly, the dismantling time of the in-furnace scaffold 4 can also be significantly reduced. In addition, since the assembly work can be performed on the stage 5 in the boiler furnace 1 and there is no need to work at high altitudes, the construction work of the in-furnace scaffold 4 can be performed more safely.

[0049] In addition, the scaffolding unit 10 can be folded, so that it can be smoothly brought into the boiler furnace 1. Furthermore, since the scaffolding unit 10 is in a substantially flat plate shape when folded, it can be simply stacked on top of each other when storing and maintaining it in a limited area such as on the stage 5 inside the boiler furnace 1, so that it can be stored and maintained in a space-saving manner. In addition, since the members of the scaffolding unit 10 are integrally constructed, there is no need to manage the type and quantity of temporary members before assembling the in-furnace scaffolding, as in the past.

[0050] The scope of the present invention is not limited to the above-mentioned embodiment, and various modifications can be made without departing from the scope of the invention. For example, the scaffolding units 10, scaffolding boards 11, baseboards 12, posts 13, handrails 14, etc. are not limited to the shapes, sizes, quantities, positional relationships, etc. of the above-mentioned embodiment.

[0051] In the above embodiment, the scaffolding unit 10 is applied to the hanging construction method, but may be applied to a so-called lifting construction method instead. Alternatively, it may be applied to a so-called large assembly and large lifting construction method. [Explanation of symbols]

[0052] 1 Boiler furnace 4 Furnace scaffolding 5 Stage 10 Scaffolding Units 11 Scaffolding Planks 12 Baseboard 13 Posts 18 Scaffolding Blocks

Claims

1. A method for constructing an in-furnace scaffold by a hanging construction method in a furnace having a space inside, comprising: a transport process for transporting a plurality of scaffolding units, each of which has a length of at least a plurality of spans and is substantially flat, a pair of baseboards extending in the vertical direction at both ends of the scaffolding board, and a plurality of posts rotatably supported on the outer surfaces of each baseboard, into the furnace through an opening formed in a furnace wall within the furnace; an assembly process for assembling the plurality of transported scaffolding units from a folded state to an assembled state; a lifting process for lifting upward one of the scaffolding units that has been assembled in the assembling process; A connecting process of suspending and connecting another scaffolding unit, which is different from the scaffolding unit that has been assembled in the assembling process, below the scaffolding unit lifted in the lifting process; A method for constructing an in-furnace scaffolding, comprising:

2. In the assembly process, Each support of the scaffold unit and the other scaffold unit is rotated along the outer surface of the baseboard to erect it, The method for constructing an in-furnace scaffold according to claim 1, further comprising the steps of: taking out handrails placed on the upper surface of the scaffold boards; and hooking the handrails onto the posts.

3. In the connecting step, A method for constructing an internal scaffold as described in claim 1, wherein the scaffold unit and the other scaffold unit are connected by respectively connecting the lower ends of each pillar of the scaffold unit to the upper ends of each pillar of the other scaffold unit.

4. In the assembly process, The other scaffolding unit is brought from a folded state to an assembled state at a location different from below the scaffolding unit lifted upward in the lifting process, The method for constructing an internal scaffold according to claim 1, further comprising the steps of: moving the other scaffold unit in an assembled state to below the scaffold unit that has been lifted upward.

5. In the lifting process, The lower end height of the scaffolding unit lifted upward is made higher than the upper end height of the other scaffolding unit moved below the scaffolding unit, In the connecting step, The method for constructing an in-furnace scaffold according to claim 4, further comprising the step of raising the other scaffold unit toward the scaffold unit and connecting the other scaffold unit to the scaffold unit.

6. One or more other scaffolding units different from the other scaffolding units are continuously suspended and connected below the other scaffolding units connected by the connecting step, A scaffold block assembly process for assembling a scaffold block formed by connecting the scaffold unit, the other scaffold unit, and the one or more other scaffold units; The method for constructing an in-furnace scaffold as described in claim 1, further comprising a scaffold block connecting step of connecting the plurality of scaffold blocks assembled by the scaffold block assembling step in the left-right direction.