Metal base material management system, metal base material management method and metal base material management program

The metal base material management system addresses the challenge of managing metal base materials across multiple companies by deriving and procuring the necessary materials accurately and promptly, enhancing manufacturing efficiency.

JP2024139249AActive Publication Date: 2024-10-09METAL ONE CORP
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
JP2023050106
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-27
Publication Date
2024-10-09
Estimated Expiration
2043-03-27

AI Technical Summary

Technical Problem

The existing systems fail to provide quick and accurate management of metal base materials across multiple companies involved in manufacturing processes, including automobile manufacturers, parts suppliers, procurement management companies, and steel manufacturers, especially when product specifications or production plans change.

Method used

A metal base material management system that collects component and element part information from authorized personnel, derives the necessary base material type and amount through a management server, and outputs the results to ensure timely and accurate procurement.

Benefits of technology

Enables quick and accurate securing and procurement of metal base materials by managing the supply chain, facilitating seamless cooperation among various companies involved in manufacturing processes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024139249000001_ABST
    Figure 2024139249000001_ABST
Patent Text Reader

Abstract

To provide a metal base material management system that rapidly and accurately realizes securement and procurement of a metal base material by managing a supply chain related to a product manufactured using the metal base material.SOLUTION: A metal base material management system includes: a first acquisition part for receiving and acquiring an input of component information related to a component for manufacturing a product, from an authorized person of a manufacturing company producing the product; a second acquisition part for receiving and acquiring an input of element component information related to an element component, together with metal information related to metal to be used for the element component, from an authorized person of a commissioned company producing or compacting the element component for manufacturing the component; a derivation part for collecting the element component information and the metal information acquired by the second acquisition part, in order to derive at least a base material type and a base material quantity of the metal base material required for manufacturing the product; and an output part for outputting a derivation result according to the derivation part.SELECTED DRAWING: Figure 3
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a metal base material management system, a metal base material management method, and a metal base material management program. [Background technology]

[0002] For example, in order to supply the right amount of steel at the right time for the automobile manufacturing process, a system is known in which large coils shipped from a steelworks are divided at a coil center according to demand and then shipped to automobile manufacturing plants (see, for example, Patent Document 1). [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2009-051586 A Summary of the Invention [Problem to be solved by the invention]

[0004] A wide variety of companies are involved in the manufacture of automobiles, including automobile manufacturers that ultimately complete the product, parts manufacturers that are commissioned to supply the parts that are assembled into the automobile, procurement management companies that procure the metal materials used to manufacture those parts, steel manufacturers that manufacture those metal materials, etc. Similarly, many companies support the manufacture of manufactured products that are mass-produced using metal for at least some of their parts.

[0005] The more companies that support the manufacturing of manufactured goods, the more intricate collaboration is required to secure the metal materials that are the raw materials for the parts. For example, if there is a change in the specifications of a manufactured product or if the production plan fluctuates, the type and amount of metal materials required may also change. In such cases, not only is a rapid relay of information required from the upstream manufacturing company to the end steel manufacturer, but accurate re-estimation of the type and amount of metal materials is also required. In the past, such high-level collaboration was not necessarily realized.

[0006] The present invention has been made to solve such problems, and provides a metal base material management system etc. that realizes rapid and accurate securing and procurement of metal base materials by managing the supply chain related to manufactured products made using metal materials. [Means for solving the problem]

[0007] A metal base material management system in a first aspect of the present invention includes a first acquisition unit that accepts and acquires input of component part information regarding components used to manufacture the manufactured product from an authorized person of a manufacturing company that manufactures the manufactured product, a second acquisition unit that accepts and acquires input of element part information regarding the element parts, along with input of metal information regarding metals used in the element parts, from an authorized person of a contracted company that manufactures or consolidates element parts for manufacturing the element parts, a derivation unit that collects the element part information and metal information acquired by the second acquisition unit to derive at least the base material type and base material quantity of the metal base material required to manufacture the manufactured product, and an output unit that outputs the derivation result by the derivation unit.

[0008] In addition, a metal base material management method in a second aspect of the present invention includes a first acquisition step of accepting and acquiring input of component part information regarding component parts used to manufacture the manufactured product from an authorized person of a manufacturing company that manufactures the manufactured product, a second acquisition step of accepting and acquiring input of element part information regarding the element parts, together with input of metal information regarding metals used in the element parts, from an authorized person of a contracted company that manufactures or consolidates element parts for manufacturing the component parts, a derivation step of collecting the element part information and metal information acquired in the second acquisition step to derive at least the base material type and base material quantity of the metal base material required to manufacture the manufactured product, and an output step of outputting the derivation result obtained in the derivation step.

[0009] In addition, a metal base material management program in a third aspect of the present invention causes a computer to execute a first acquisition step of accepting and acquiring input of component part information regarding the components used to manufacture the manufactured product from an authorized person of a manufacturing company that manufactures the manufactured product, a second acquisition step of accepting and acquiring input of element part information regarding the element parts, together with input of metal information regarding the metals used in the element parts, from an authorized person of a contracted company that manufactures or consolidates the element parts used to manufacture the component parts, a derivation step of collecting the element part information and metal information acquired in the second acquisition step to derive at least the base material type and base material quantity of the metal base material required to manufacture the manufactured product, and an output step of outputting the derivation result obtained in the derivation step. Effect of the Invention

[0010] The present invention makes it possible to provide a metal base material management system that enables rapid and accurate securing and procurement of metal base materials by managing the supply chain related to manufactured products made using metal materials. [Brief description of the drawings]

[0011] [Figure 1] 1 is a conceptual diagram showing a situation in which a metal base material management system according to an embodiment of the present invention is used. [Diagram 2] FIG. 2 is a hardware configuration diagram of a management server. [Diagram 3] FIG. 2 is a diagram showing an example of an association diagram showing the interrelationships between management units from component parts to base materials. [Figure 4] FIG. 13 is a diagram showing another example of the correlation diagram. [Diagram 5] FIG. 2 is a diagram illustrating an example of a data structure of component data, which is a management unit of a component. [Figure 6] FIG. 2 is a diagram showing an example of a data structure of element data, which is a management unit of an element; [Figure 7] FIG. 13 is a diagram showing an example of the range of viewing authority. [Figure 8] FIG. 13 is a diagram showing an example of displaying the derivation results of the base material type and the base material amount using a tree structure. [Figure 9] FIG. 13 is a diagram showing a display example of a registration inquiry. [Figure 10] FIG. 4 is a flowchart showing a processing procedure of a calculation unit. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0012] The present invention will be described below through embodiments of the invention, but the invention according to the claims is not limited to the following embodiments. Furthermore, not all of the configurations described in the embodiments are necessarily essential as means for solving the problems.

[0013] FIG. 1 is a conceptual diagram showing a situation in which the metal base material management system according to the present embodiment is used. The metal base material management system is a system that mainly aggregates component data related to components for manufacturing manufactured products and element part data related to element parts for manufacturing the components, and derives the base material type and base material amount of the metal base material required for manufacturing the manufactured products. The management server 100 executes various arithmetic processing required as a metal base material management system. The management server 100 is connected to a manufacturing company terminal 200, contract company terminals 310 and 320, and a procurement management company terminal 400 via a network 900. In this embodiment, the network 900 is assumed to be the Internet, but it may be a dedicated line or the like.

[0014] The manufacturing company terminal 200 is installed in a manufacturing company that manufactures manufactured products, and is a terminal operated by an authorized person, such as an employee of the manufacturing company, who is permitted to access the metal base material management system. The authorized person logs into the system after passing through authorization authentication such as password input, and then operates the manufacturing company terminal 200 while visually checking the display monitor 201 connected to the manufacturing company terminal 200.

[0015] The commissioned company terminal 310 is installed in the commissioned company A that is commissioned by the manufacturing company or other commissioned companies to manufacture or consolidate element parts, and is a terminal operated by an authorized person who is an employee or the like at the commissioned company A who is permitted to access the metal base material management system. The authorized person operates the commissioned company terminal 310 while visually checking the display monitor 311 connected to the commissioned company terminal 310 after logging in to the system through authority authentication such as password input. The commissioned company terminal 320, like the commissioned company terminal 310, is installed in the commissioned company B that is commissioned by the manufacturing company or other commissioned companies to manufacture or consolidate element parts, and is a terminal operated by an authorized person who is an employee or the like at the commissioned company B who is permitted to access the metal base material management system. The authorized person operates the commissioned company terminal 320 while visually checking the display monitor 321 connected to the commissioned company terminal 320 after logging in to the system through authority authentication such as password input. The relationship between commissioned company A and commissioned company B may be a parallel relationship in which each is commissioned by a manufacturing company to manufacture or consolidate different element parts, or a hierarchical relationship in which one is commissioned by the other to manufacture or consolidate further element parts. Note that in this embodiment, the act of "consolidation" in which components or element parts are not manufactured by the company itself but are procured from other companies and only inspected is also covered as a company that is responsible for the components or element parts, but in the following explanation, the act of consolidation may also be referred to simply as "manufacturing."

[0016] The procurement management company terminal 400 is installed in a procurement management company that compiles and procures the base material type and amount of the metal base material required to manufacture a product, and is a terminal operated by an authorized person, such as an employee of the procurement management company, who is permitted to access the metal base material management system. The authorized person logs into the system after authorization authentication by inputting a password or the like, and operates the procurement management company terminal 400 while visually checking the display monitor 401 connected to the procurement management company terminal 400. Each terminal may be a desktop or notebook PC, or a mobile terminal such as a tablet terminal. In this embodiment, the metal base material management system will be described in particular in relation to the manufacturing company, the contract company, and the procurement management company, but the metal base material management system may also be connected to a terminal of a steel company that procures the base material and a terminal of a processing company that processes the base material into steel.

[0017] In this embodiment, the management server 100 collectively processes various calculation processes required for the metal base material management system. However, the metal base material management system may be configured such that the management server 100 shares the calculation processes with each terminal. The management server 100 may be operated by a procurement management company or a manufacturing management company. Alternatively, a third party in charge of system operation may be in charge of management and operation. For example, when the system is operated by a procurement management company, the management server 100 may be installed at the procurement management company. Of course, the system is not limited to being built on-premise, and cloud services may also be used.

[0018] 2 is a hardware configuration diagram of the management server 100. The management server 100 is mainly composed of a calculation unit 110, a storage unit 120, and a communication unit 130. The calculation unit 110 is a processor (CPU: Central Processing Unit) that controls the management server 100 and executes programs. The processor may be configured to cooperate with a calculation processing chip such as an ASIC (Application Specific Integrated Circuit) or a GPU (Graphics Processing Unit). The calculation unit 110 can read out and execute a metal base material management program stored in the storage unit 120.

[0019] The storage unit 120 is a non-volatile storage medium, and is configured, for example, by an HDD (Hard Disk Drive). In addition to the metal base material management program, the storage unit 120 can store an authentication database for performing authority authentication, and various parameter values, functions, lookup tables, and the like used for other control and calculation. The communication unit 130 includes, for example, a LAN unit, and transmits and receives various information, command signals, and the like to and from each terminal via the network 900.

[0020] The calculation unit 110 also plays a role as a functional calculation unit that executes various calculations according to the processing instructed by the base material management program executed by the base material management system. The calculation unit 110 can function as a first acquisition unit 111, a second acquisition unit 112, a derivation unit 113, and an output unit 114. The first acquisition unit 111 mainly receives and acquires component information related to components from an authorized person of the manufacturing company. The first acquisition unit 111 generates component data from the acquired component information. The second acquisition unit 112 mainly receives and acquires element information related to element parts from an authorized person of the contracted company together with metal information related to metals used in the element parts. The second acquisition unit 112 generates element data from the acquired element information. The derivation unit 113 mainly collects the element data generated by the second acquisition unit 112 and derives at least the base material type and the base material amount of the metal base material required to manufacture the manufactured product. Output unit 114 mainly outputs the result of derivation by derivation unit 113 to each terminal.

[0021] Now, as shown in FIG. 1, in the manufacture of manufactured products using metals, in addition to the manufacturing company (finished product manufacturer) that finally completes the product, a wide variety of companies are involved, such as a commissioned company (parts manufacturer) that is commissioned to supply element parts necessary for manufacturing the component parts that make up the manufactured product, a procurement management company that procures the metal material that is the material for the element parts, and a steel company or processing company that is responsible for manufacturing and processing the metal material. The more companies that support the manufacture of manufactured products, the more detailed cooperation is required to secure the metal material that is the material for the parts. For example, when the specifications of the manufactured product change or the production plan fluctuates, the type and amount of the required metal material may also change. In that case, not only is a quick transmission relay required from the upstream manufacturing company to the end steel manufacturer, but accurate re-estimation of the type and amount of the metal material is also required. The base material management system in this embodiment aims to manage the supply chain related to manufactured products using metal materials, and realizes quick and accurate securing and procurement of metal base materials at the start of manufacturing the manufactured product or when the design is changed.

[0022] Specifically, the metal base material management system divides the process from the component parts (referred to as "upstream" in this embodiment) to the base material (referred to as "downstream" in this embodiment) into hierarchical levels, where the process branches and merges, and manages each of these as a management unit. As will be described later, the management unit is constructed as data that structures related information. Each management unit is registered by a specific manufacturing company or contract company, or is automatically generated by the metal base material management system.

[0023] A specific example will be described. Figure 3 is a diagram showing an example of an association diagram showing the interrelationships between the management units from the component parts to the base material. The base material management system comprehensively manages each data of these management units, including the interrelationships.

[0024] When manufacturing a finished product, an authorized person at the manufacturing company inputs information about component part A and information about component part B from the manufacturing company terminal 200. The first acquisition unit 111 of the management server 100 acquires the input information and generates component part data 501 about component part A and component part data 502 about component part B. As will be described in detail later, each of the component part data 501, 502 includes management information, component part information, and metal information as part of the component part information.

[0025] The base material management system recognizes from the component information described in the component data 501 that the component A is manufactured by three element parts (element parts A-1 to A-3). Therefore, the base material management system generates three element part data 511 to 513 branching from the component data 501 as data waiting for data input. The component part data 501 includes company information commissioned to manufacture the element parts A-1 to A-3, which are lower-level items. An authorized person of the commissioned commissioned company inputs information on the element parts A-1 to A-3 from the commissioned company terminal 310 (here, the commissioned company A is the company commissioned to manufacture the element parts A-1 to A-3). The second acquisition unit 112 of the management server 100 acquires the input information and sets the element part data 511 related to the element part A-1, the element part data 512 related to the element part A-2, and the element part data 513 related to the element part A-3 as input data. As will be described in detail later, each of the element part data 511 to 513 includes management information, element part information, and metal information as a part of the element part information.

[0026] In addition, there may be cases where the component information does not include information on what element parts are used to manufacture the component. For example, if the component information in the component data 501 does not include information that the component A is manufactured by the element parts A-1 to A-3, the authorized person of the contracted company that manufactures the element parts A-1 to A-3 regularly checks the registration status of the component parts, and when it is recognized that such a component A has been registered, inputs the element part data 511 to 513 related to the element parts A-1 to A-3. At this time, the authorized person gives to each element part data linking information indicating that the element parts A-1 to A-3 are element parts necessary for manufacturing the component A (the element part data 511 to 513 branch off from the component part data 501). The linking information may be, for example, the name of the component described in the manufactured product name of the management information described later, or link information to the target component part data.

[0027] The base material management system recognizes from the component information described in the component data 502 that the component B is manufactured by two element parts (element parts B-1 and B-2). Therefore, the base material management system generates two element part data 514 and 515 branching from the component part data 502 as data waiting for data input. The component part data 502 includes company information commissioned to manufacture the element parts B-1 and B-2, which are lower-level items. An authorized person of the commissioned commissioned company inputs information on the element parts B-1 and B-2 from the commissioned company terminal 310 (again, the commissioned company A is the company commissioned to manufacture the element parts B-1 and B-2). The second acquisition unit 112 of the management server 100 acquires the input information and sets the element part data 514 related to the element part B-1 and the element part data 515 related to the element part B-2 as input data. Each of the element part data 514, 515 also includes management information, element part information, and metal information as part of the element part information.

[0028] When all element part data have been input, the derivation unit 113 of the management server 100 consolidates the element part data and derives the base material type and base material amount of the metal base material required to manufacture the component parts A and B that constitute the manufactured product. Specifically, the derivation unit 113 first executes an error check to determine whether all element part data have been input. The error check includes a minimum unit check to check whether each element part is the minimum unit, that is, whether there are any lower element parts that are further subordinate to that element part. As will be described later in detail, the element part information includes a description of the lower item configuration, and if the lower item configuration is "none", that element part is recognized as the minimum unit. If there is an element part for which the element part data of the lower element part has not been input, the derivation unit 113 reserves the process of deriving the base material type and base material amount of the metal base material. At this time, a notice prompting the input may be sent to the terminal of the commissioned company.

[0029] If no error is detected by the error check, that is, when it is recognized that all element part data have been input, the derivation unit 113 starts a process of deriving the base material type and base material amount of the metal base material. Specifically, by referring to the metal information of the element part data 511 to 515, the derivation unit 113 derives the steel amount "3pc" which is the required amount of the steel material type "S01" from the element part data 511 and the element part data 514 in which the same steel material type "S01" is described, and generates the steel material data 531. Here, "3pc" indicates that, for example, there are three pieces of the steel material type S01 processed into a certain shape. Furthermore, after confirming that none of the element part data includes information on "steel material derivation target" which is not the target of base material amount derivation, the derivation unit 113 converts the steel material amount "3pc" of the steel material type "S01" into the base material amount "2.19t" of the base material type "X01" by referring to, for example, a lookup table, and generates the base material data 541. By generating such data, it can be understood that 3 pc of steel type S01 is required to manufacture element part A-1 and element part B-1, and 2.19 t of base material type X01 is required to manufacture 3 pc of steel type S01. The amounts of steel and base material derived here are calculated taking into consideration the production number of manufactured products. For example, when one component part A is used for one manufactured product, if 1000 pieces of the manufactured product are to be produced, "1000" is described as the required number of component part A in the management information of component part data 501 of component part A. The derivation unit 113 can derive the amount of steel and base material using such a description. Furthermore, the required number of each component part can be registered as the number expected to be required within a predetermined period (e.g., three months) from the present time. In this case, the derivation unit 113 may derive the steel type and the amount of steel, and the base material type and the amount of base material that need to be procured within the set predetermined period.

[0030] Here, an example has been described in which the derivation process of the base material type and base material amount of the metal base material is started when the element part data has been input. However, the start of the derivation process may be triggered by the input of information on the metal base material by an authorized person of the procurement management company. For example, the metal information of the element part data may not necessarily describe the expected steel material type or base material type, but may describe the type name recognized by each contracting company. In such a case, the authorized person of the procurement management company confirms which element parts are the same steel material type or base material type, and executes an input process to collect and associate them with each other. In the above example, even if the metal information described in the element part data 511 and the metal information described in the element part data 514 each describe a different type name, the authorized person of the management company identifies that they are the same type and inputs information to associate them. When the derivation unit 113 receives the input, it starts the derivation process and generates the steel material data 531.

[0031] Although the element part data 515 describes the steel material type "S11", there is no other element part data in which the steel material type "S11" is described. The element part data 515 also includes information on a "steel material derivation target" that is not a target for base material amount derivation. In this case, the derivation unit 113 derives the steel amount "5 pc" that is the required amount of the steel material type "S11" from the element part data 515 to generate the steel material data 532, and does not generate base material data associated with this. By generating such data, it can be understood that 5 pc of the steel material type S11 is required to manufacture the element part B-2. Note that, in the case where the same steel material type is described in a plurality of element part data, but some of them include information on the "steel material derivation target", the element part data including the information on the "steel material derivation target" is excluded to derive the base material type and its base material amount (i.e., base material data is generated). The excluded element part data is collected to derive the steel type and the amount of steel (i.e., steel data is generated), but the base material data associated with this is not generated.

[0032] The element part data 512 does not describe the steel type, but directly describes the base material type. In this case, the derivation unit 113 derives the base material amount "0.8t" which is the required amount of base material type "X03" from the element part data 512 to generate base material data 542. For example, if the element part data 512 describes the required number of element part A-2 and the weight per piece of the metal material corresponding to the base material type, the derivation unit 113 can derive the base material type and the base material amount. The correspondence between the base material type and the metal material and the weight per piece of the element part are described in a lookup table, and the derivation unit 113 may derive the base material type and the base material amount by referring to such a lookup table. By generating such data, it can be understood that 0.8t of base material type X03 is required to manufacture the element part A-2.

[0033] The element part data 513 includes information of "not to be derived." When deriving the base material type and its base material amount, or the steel material type and its steel amount, the derivation unit 113 excludes element part data in which "not to be derived" is described from the derivation. In other words, neither steel material data nor base material data is attached to the element part data 513. For example, when an element part is a part that does not need to be manufactured from a base material or a steel material, such as a standard bolt, or a part that is expected to be purchased from a specific manufacturer, the information of "not to be derived" is added to the element part data in this way.

[0034] After completing the above-mentioned processing, the derivation unit 113 transmits the generated steel material data and base material data to the procurement management company terminal 400. The authorized person of the procurement management company can grasp the base material type and its amount, and the steel material type and its amount by checking the display monitor 401 connected to the procurement management company terminal 400. In the above example, it is assumed that the component is manufactured by a plurality of element parts, but it is also possible to assume that the component is manufactured as a single part. In such a case, if the manufacture of the component is commissioned to a commissioned company, one element part data may be attached to one component data. If the component is manufactured by the manufacturing company itself, the component data may be described as the minimum unit with no subordinate element parts. In this case, the derivation unit 113 derives the base material type and its amount, and the steel material type and its amount from not only the element part data but also the component data.

[0035] Figure 4 shows another example of an association diagram that shows the interrelationships between the management basic units from component parts to base materials. In the example of Figure 3, the manufacturing company, the contract company, and the procurement management company each played a role in one layer from upstream to downstream, but in the example of Figure 4, the first contract company and the second contract company are involved as contract companies, and each is responsible for two consecutive layers from upstream to downstream.

[0036] The first acquisition unit 111 of the management server 100 acquires information input by an authorized person of the manufacturing company, and generates component data 503 for component C. Upon recognizing that component C is manufactured by element parts C-1 and C-2, the second acquisition unit 112 acquires information input by an authorized person of the first contracted company commissioned to manufacture these element parts, and generates element part data 516, 517 for element parts C-1, C-2.

[0037] The element part data 516 includes information on two element parts C-1-1 and C-1-2 as sub-item configurations of the element part information, and when a second contracted company is designated as the manufacturer, the second acquisition unit 112 acquires information entered by an authorized person of the second contracted company and generates element part data 521, 522 relating to the element parts C-1-1, C-1-2.

[0038] If no error is detected by the error check, that is, when it is recognized that all element part data have been input, the derivation unit 113 starts a process of deriving the base material type and base material amount of the metal base material. Specifically, the derivation unit 113 targets the element part data 516, 517 generated by input from the first contract company and the element part data 521, 522 generated by input from the second contract company, and derives the base material type and its base material amount from the element part data recognized as the smallest unit among them. The derivation unit 113 derives the base material amount "3.2t" which is the required amount of base material type "X05" from the element part data 521 and element part data 517 in which the same base material type "X05" is described, and generates base material data 543. In addition, the derivation unit 113 derives the base material amount "0.4t" which is the required amount of base material type "X06" from the element part data 522 in which the base material type "X06" is described, and generates base material data 544. By generating such data, it can be understood that 3.2 t of base material type X05 is required to manufacture element parts C-1-1 and C-2, and 0.4 t of base material type X06 is required to manufacture element part C-1-2.

[0039] Here, since element part C-1 is manufactured from element parts C-1-1 and C-1-2, it can be said that metal information only needs to be input for element parts C-1-1 and C-1-2. In other words, since element part C-1 is not the smallest unit element part, the authorized person of the first commissioned company may omit inputting metal information for element part C-1, and first acquisition unit 111 may generate element part data 516 by allowing such omission.

[0040] Conversely, element part data in which the sub-item configuration is described as "none" and the element part is recognized as a minimum unit but has no metal information that can be recognized by the derivation unit 113 is subject to detection in the error check. When such element part data is detected by the error check, the derivation unit 113 executes error processing such as issuing a reminder to correct input information to the terminal of the contracted company that manufactures the element part related to the element part data.

[0041] Next, the data structures of the component data and element part data will be described. FIG. 5 is a diagram showing an example of the data structure of component data 501 as an example of component data which is a management unit of a component. As described above, the component data includes management information, component information, and metal information as part of the component information. The management information may include manufacturing company information, manufactured product name, management period, lower-level item company information, etc. The manufacturing company information includes the name of the manufacturing company that manufactures the manufactured product using component A. By including the manufacturing company information in the management information, the metal base material management system according to this embodiment can provide its services to a plurality of manufacturing companies (finished product manufacturers) in the same system, for example.

[0042] The manufactured product name is the name of a manufactured product manufactured by component A. The management period is the period during which the component data 501 is treated as valid. If there is component data that is past the management period, for example, even though valid element part data exists, there is no component part data located upstream of it, and this will be detected by an error check. If such non-existence is detected by an error check, the derivation unit 113 executes error processing such as issuing a reminder to the manufacturing company's terminal to update the input information.

[0043] The lower-level item company information includes the name of the contracted company designated to manufacture the lower-level item (element part) when the component part information described later includes a lower-level item configuration. The second acquisition unit 112 accepts input of information on the element part, which is the lower-level item, from the terminal of the contracted company described here.

[0044] In addition to metal information, component part information may include item name, item code, sub-item structure, etc. The item name is the name of component part A, and the item code is the control code or the like assigned to component part A. The sub-item structure is the item code or the like of each of the element parts required to manufacture component part A. If component part A is manufactured as a stand-alone part, one item code or "none" is entered. For example, if the component is to be manufactured by a contract company, one item code should be entered, and if the manufacturing company manufactures it itself, "none" should be entered.

[0045] Metal information may include type, variety, quantity, related type, etc. Type is described when a type is to be specified for a specific subitem (element part), for example, when "steel" is to be specified for the element part "506BX", it is described as "506BX-steel". For subitems for which no particular type is specified, the contracted company in charge of manufacturing the subitem may freely set it. Variety is described when a variety is to be specified for a specific subitem, for example, when "SS400", a steel variety, is to be specified for the element part "506BX", it is described as "506BX-SS400". For subitems for which no particular variety is specified, it may freely set it by the contracted company in charge of manufacturing the subitem. Quantity is described when a quantity is to be specified for a specific subitem, for example, when "7pc", a quantity unit for the steel variety, is to be specified for the element part "506BX", it is described as "506BX-7pc". For subitems for which no particular quantity is specified, it may freely set it by the contracted company in charge of manufacturing the subitem. The linkage type individually specifies whether or not a lower-level item (element part) is to be a linkage target. For element parts that are not to be a linkage target, element part data is generated but information that is not to be derived is added, and the derivation unit 113 derives the base material type and its base material amount, or the steel material type and its steel amount, excluding element part data in which "not to be derivated" is described.

[0046] The first acquisition unit 111 may acquire each of these pieces of information by receiving input from an authorized person of the manufacturing company via the manufacturing company terminal 200 individually, or may automatically collect them from a designated destination such as a list designated by the authorized person. The management information, component information, and metal information may include various items other than those described above. Conversely, for example, when a specific contract company is preset for a specific subitem, the subitem company information may be omitted, and may be modified in various ways according to the system specifications.

[0047] FIG. 6 is a diagram showing an example of the data configuration of element part data 511 as an example of element part data which is a management unit of an element part. As described above, the element part data includes management information, element part information, and metal information as part of the element part information. The management information may include commissioned company information, manufactured product name, management period, sub-item company information, etc. The commissioned company information includes the company name of the commissioned company which manufactures the element part A-1. By including the commissioned company information in the management information, the metal base material management system according to this embodiment can provide the service by defining the scope of viewing authority for each of a plurality of commissioned companies, as described below.

[0048] The manufactured product name is the name of a component manufactured using the element part A-1. In the illustrated example, since "third unit" is described, the element part data 511 is recognized as data linked to the component part data 501 of the component part "third unit" (matching the item name "third unit" of the component part information shown in FIG. 5). In this embodiment, the component part data and the element part data are linked (linked) via the contents described in the component part name, but the linking is not limited to this, and other data formats such as having link information or pointers between data may be used. The management period is a period during which the element part data 511 is treated as valid. If there is component part data that has passed the management period, an element part for manufacturing an upstream component part or element part will be missing, and this will be detected by an error check. If such a missing part is detected by an error check, the derivation unit 113 executes error processing such as issuing a reminder to the terminal of the contracted company to update the input information.

[0049] The lower-level item company information includes the name of the commissioned company designated to manufacture the lower-level item (element part) when the element part information described later includes a lower-level item configuration. The second acquisition unit 112 accepts input of information on the element part, which is the lower-level item, from the terminal of the commissioned company described here.

[0050] In addition to metal information, the element part information may include item name, item code, sub-item structure, etc. The item name is the name of element part A-1, and the item code is the control code or the like given to element part A-1. The sub-item structure is the item code or the like of each element part required to manufacture element part A-1. If element part A-1 is the smallest unit, it is set to "none."

[0051] The metal information may include type, variety, quantity, association type, etc. The type is the type of metal used in manufacturing the element part A-1, and is described as, for example, "steel material." The variety is the variety for the metal type specified by the type, and is described as, for example, "506BX." The quantity is the quantity unit of the metal variety specified by the variety required to manufacture the element part A-1, and is described as, for example, "7pc." The association type specifies whether or not the element part A-1 is a correlation target. If it is not a correlation target, the information "not to be derived" is added. Note that, when each item is specified in the higher-level component data, the specified contents may be copied as is for these metal information. The authorized person of the commissioned company may change the specified contents of the items specified by his / her authority.

[0052] The second acquisition unit 112 may acquire each of these pieces of information by accepting input from an authorized person of the commissioned company individually via the commissioned company terminals 310, 320, or may automatically collect the information from a designated destination such as a list designated by the authorized person. In addition, the information may be provisionally input by the manufacturing company or automatically provisionally input according to a predetermined template, and the authorized person may approve the information. Note that the management information, component part information, and metal information may include various items other than those described above. These items may be modified in various ways depending on the system specifications.

[0053] Next, the viewing authority for the information input to the base material management system and the calculated results will be explained. Fig. 7 is a diagram showing an example of the range of viewing authority, and in particular, a diagram showing the viewing authority of each of the commissioned companies when the manufacturing of element parts is shared between two commissioned companies. Here, a case will be explained in which the first commissioned company is responsible for manufacturing element parts A-1 to A-3 and the second commissioned company is responsible for manufacturing element parts B-1 and B-2 in the correlation diagram shown in Fig. 3.

[0054] In principle, the viewing authority of a commissioned company is given to data related to the upstream and downstream management basic units connected to the element parts that the commissioned company is responsible for manufacturing in the linkage diagram. In the example shown in Fig. 7, the first commissioned company is responsible for manufacturing element parts A-1 to A-3, so the first commissioned company has viewing authority to the following data (areas surrounded by the dashed line in the figure): component part data 501 related to the component part A manufactured by these element parts, steel data 531 related to the steel type S01 derived using the element part A-1, base material data 541 related to the base material type X01 for manufacturing the steel type S01, and base material data 542 related to the base material type X03 derived using the element part A-2. Similarly, since the second contract company is responsible for manufacturing element parts B-1 and B-2, the second contract company has the viewing authority to view component part data 502 related to component part B manufactured by these element parts, steel material data 531 related to steel material grade S01 derived using element part B-1, base material data 541 related to base material grade X01 for manufacturing steel material grade S01, and steel material data 532 related to steel material grade S11 derived using element part B-2 (area surrounded by two-dot chain line in the figure). Note that, if special authority is granted upon application or the like from the contract company, the second contract company may also be allowed to view element part data of other element parts not manufactured by the contract company and data related to the management basic unit associated therewith.

[0055] The manufacturing company and the procurement management company may be granted the right to view all data. In addition, when multiple manufacturing companies that have overlapping contract companies for the manufacture of element parts use the services of this system, it is preferable to grant the right to view only the data related to the management basic unit connected to the component parts entered by each manufacturing company. In addition, the procurement management company may grant the steel processing company and the steel company, which are the suppliers to which the procurement management company checks the steel data and the base material data and places an order, the right to view the data related to the upstream management basic unit connected to the steel data and the base material data. In this way, each company involved in this system can check the information entered and the calculated results within the scope of the given viewing authority, making it possible for smooth and detailed mutual cooperation to be achieved, and ultimately making it possible to quickly and accurately secure and procure metal base materials, etc.

[0056] FIG. 8 is a diagram showing a display example that displays the derivation results of the base material type and base material amount using a tree structure. Specifically, the viewer is the authorized person of the first commissioned company in FIG. 7, and this is a display example displayed on a display monitor connected to the commissioned company terminal of the first commissioned company. A window 601 that is an execution window of the metal base material management program is displayed on the display monitor. A tree display 610 displayed in the window 601 is similar to an association diagram that shows the interrelationships between the management basic units that the first commissioned company has the viewing authority to view. Such a tree display 610 allows the authorized person of the commissioned company to have an overview of the information and calculation results related to the element parts in which the commissioned company is involved.

[0057] Furthermore, for example, when a specific information name (in the illustrated example, "Metal Information" of element part A-3) is specified by moving the cursor 630 displayed in a superimposed manner, the contents included in the information are displayed as shown in Figures 5 and 6. Note that before the derivation process by the derivation unit 113, the steel material data and base material data are not displayed.

[0058] As described above, the authorized person of the manufacturing company is responsible for inputting component part information, and when the input of all necessary items is completed and, for example, the registration button is pressed, the input related to the component part can be finalized. In response to the pressing of the registration button, the first acquisition unit 111 generates component part data related to the component part. Similarly, the authorized person of the commissioned company is responsible for inputting element part information, and when the input of all necessary items is completed and, for example, the registration button is pressed, the input related to the element part can be finalized. In response to the pressing of the registration button, the second acquisition unit 112 generates element part data related to the element part.

[0059] Since the input work of component part information and element part information includes manual work by each authorized person, input omissions and input errors may occur. In addition, as described above, some of the generated component part data and element part data have a management period, and data that has passed the management period needs to be corrected or replaced. Therefore, the authorized person in charge of inputting information needs to know correctly which information to input. Therefore, the first acquisition unit 111 and the second acquisition unit 112 present the information to be input in response to a request from the authorized person in charge of inputting.

[0060] Here, an example of a registration inquiry in which the second acquisition unit 112 presents information in response to a request from an authorized person of the first commissioned company will be described. Fig. 9 is a diagram showing a display example of a registration inquiry in which information is presented in response to a request from an authorized person of the commissioned company.

[0061] As shown in the figure, window 601 displays information on element parts that should be input by the authorized person of the first contract company in the form of a tree display 620 that is an extracted portion of the tree display 610 described using Fig. 8. Specifically, uninputted boxes 624 representing element parts A-1 to A-3 whose manufacture is handled by the first contract company, which hang down from an already inputted box 622 for component part A that has already been inputted, are shown in a thick frame together with a title 623 indicating that they are unregistered.

[0062] When the authority designates a specific uninputted box 624, for example by moving the superimposed cursor 630, an input screen for information corresponding to that component part appears. Note that, if subordinate information has already been input, already-inputted boxes 622 corresponding to the information may be displayed in addition to the tree display 620. The same is true for the display of a registration inquiry in which the first acquisition unit 111 presents information in response to a request from an authority of the manufacturing company, and an uninputted box 624 is displayed for an uninputted component part.

[0063] Next, a description will be given of the processing procedure of the metal base material management process executed by the calculation unit 110. Fig. 10 is a flow diagram showing the processing procedure of the calculation unit 110. The processing procedure described here does not include all of the processes described above, but simply shows the main processes.

[0064] The flow starts, for example, from the point in time when input of information on components for manufacturing a new product is accepted. In step S101, the first acquisition unit 111 accepts input of component information and the like related to components for manufacturing the product from an authorized person of the manufacturing company that manufactures the product. Specifically, an input acceptance screen is displayed on the display monitor of the manufacturing company terminal, and information input through the input acceptance screen is accepted via the communication unit 130. Then, for example, when pressing of a registration button is accepted, it is recognized that the input is completed, and component data is generated.

[0065] In the next step S102, the second acquisition unit 112 accepts input of element part information and the like related to the element parts from an authorized person of the commissioned company that manufactures the element parts. Specifically, an input acceptance screen is displayed on the display monitor of the commissioned company terminal, and information input through the input acceptance screen is accepted via the communication unit 130. Then, for example, when a registration button is accepted, the input is recognized as being completed, and element part data is generated. Note that, in the case where there are multiple commissioned companies that are commissioned to manufacture element parts, the second acquisition unit 112 accepts input of information from the authorized person of each commissioned company, and generates element part data. In particular, in the case where a commissioned company that is responsible for manufacturing a certain element part commissions another commissioned company to manufacture an element part required for manufacturing the element part, as shown in FIG. 4, information related to each element part is accepted in sequence, and each element part data is generated. In addition, if the second acquisition unit 112 detects that an authorized person at the commissioned company has entered component part information before the first acquisition unit 111 acquires the component part information, the second acquisition unit 112 may execute error processing such as notifying the user of this.

[0066] When the process proceeds to step S103, the derivation unit 113 executes an error check. As described above, the error check includes, for example, checking whether all element part data has been input, checking whether there is any missing metal information in element part data recognized as the minimum unit, and checking whether there is any data that is past the management period. If there is no error, the process proceeds to step S104. If an error is found, the process returns to step S102. However, if an error is found regarding the component part data, the process returns to step S101.

[0067] Proceeding to step S104, the derivation unit 113 collects the element part data generated in step S102 and derives the base material type and base material amount of the metal base material required to manufacture the target manufactured product, etc. In step S105, the output unit 114 outputs the derivation result derived by the derivation unit 113 to the procurement management company terminal via the communication unit 130 and displays it on a display monitor connected to the procurement management company terminal, or records the derivation result in the memory unit 120. When the output process is completed, the series of processes ends.

[0068] In the above embodiment, the information input is received in order from the upstream component to the downstream element component, but the information input of the element component may be received before the information input of the element component. For example, when a mutual relationship in which one element component is dependent on multiple component components is allowed, the information input of the element component may be received first, and when the information of a new component component is input, the linking from the element component to the component component may be received.

[0069] In addition, the error check can be set in various ways other than the above-mentioned error check. For example, an error check may be performed to extract a combination of management basic units that are not connected in a tree shape but are connected in a loop shape. An error check may be performed to check whether an unexpected base material type or steel type is described in the metal information of element part data recognized as a minimum unit. When such element part data is extracted, an error message may be sent to the terminal of the commissioned company that inputted the element part data, and a message may be sent to the terminal of the procurement management company to prompt the setting of such base material type or steel type. In addition, an error check may be performed to determine an error when an authorized person of the commissioned company links element part data to higher-level component part data and such linking is not specified correctly and the element part data becomes the highest-level part data.

[0070] The derivation unit 113 may execute the derivation process not only when it is recognized that all element part data recognized as the minimum unit is available, but also when requested by an authority of the procurement management company, or when set at a fixed interval. In this case, even if all element part data recognized as the minimum unit is not available, the result that can be derived at that time may be output. In this case, it is preferable to output information on missing data that can be recognized. [Explanation of symbols]

[0071] 100...management server, 110...calculation unit, 111...first acquisition unit, 112...second acquisition unit, 113...derivation unit, 114...output unit, 120...storage unit, 130...communication unit, 200...manufacturing company terminal, 201...display monitor, 310, 320...contracted company terminal, 311, 321...display monitor, 400...procurement management company terminal, 401...display monitor, 501, 502, 503...component part data, 511 to 517...element part data, 521, 522...element part data, 531, 532...steel data, 541 to 544...base material data, 601...window, 610, 620...tree display, 623...title, 622...already entered box, 624...unentered box, 630...cursor, 900...network

Claims

1. a first acquisition unit that accepts and acquires component information related to components for manufacturing the finished product from an authorized person of a manufacturing company that manufactures the finished product; a second acquisition unit that receives and acquires, from an authorized person of a contracted company that manufactures or collects element parts for manufacturing the component, element part information related to the element parts together with input of metal information related to metals used in the element parts; a derivation unit that derives at least a base material type and a base material amount of a metal base material required to manufacture the manufactured product by collecting the element part information and the metal information acquired by the second acquisition unit; an output unit that outputs a result derived by the derivation unit; A metal base material management system comprising:

2. The metal base material management system according to claim 1, wherein the derivation unit derives at least the steel type and the amount of steel required to manufacture the manufactured product, and derives the base material type and the amount of base material based on the steel type and the amount of steel.

3. 2. The metal base material management system of claim 1, wherein when the component information includes information of a steel material derivation target, the derivation unit excludes the component information to derive the base material type and the base material quantity, and collects the component information including the information of the steel material derivation target to derive the steel material type and the steel quantity required to manufacture the manufactured product.

4. The metal base material management system according to claim 1 , wherein when the element part information includes information that is not to be derived, the derivation unit excludes the element part information and derives the base material type and the base material amount.

5. The metal base material management system according to claim 1 , wherein the deriving unit executes an error process when the metal information does not exist for at least one of the element parts recognized as a minimum unit.

6. The metal base material management system according to claim 1, wherein the derivation unit derives the base material type and the base material quantity when it receives input of information regarding the metal base material from an authorized person of a procurement management company that manages the procurement of the metal base material.

7. 2. The metal base material management system according to claim 1, wherein the second acquisition unit accepts input of the metal information for the minimum unit of the component part when the component part is manufactured from a plurality of component parts, and allows omission of input of the metal information for the component parts that are not the minimum unit.

8. The metal base material management system according to claim 1, wherein the second acquisition unit executes error processing if the element part information is input by an authorized person of the contracted company before the first acquisition unit acquires the component part information.

9. The metal base material management system according to claim 1 , wherein the second acquisition unit presents information to be input in response to a request from an authorized person of the commissioned company.

10. The metal base material management system according to claim 1 , wherein the output unit outputs the derived result to a display unit so as to display the result together with a tree structure connecting the component parts, the element parts, and the base material type to one another.

11. The metal base material management system of claim 10, wherein the output unit limits the display information to be displayed on the display unit viewed by the authorized person of the manufacturing company and the display unit viewed by the authorized person of the commissioning company based on the component parts handled by the manufacturing company and the element parts handled by the commissioning company.

12. A first acquisition step of accepting and acquiring component information related to components for manufacturing the product from an authorized person of a manufacturing company that manufactures the product; A second acquisition step of accepting and acquiring, from an authorized person of a contracted company that manufactures or collects element parts for manufacturing the component, input of element part information regarding the element parts together with input of metal information regarding metals used in the element parts; a derivation step of collecting the element part information and the metal information acquired in the second acquisition step and deriving at least a base material type and a base material amount of a metal base material required to manufacture the manufactured product; an output step of outputting a result derived by the derivation step; A metal base material management method comprising the steps of:

13. A first acquisition step of accepting and acquiring component information related to components for manufacturing the product from an authorized person of a manufacturing company that manufactures the product; A second acquisition step of accepting and acquiring, from an authorized person of a contracted company that manufactures or collects element parts for manufacturing the component, input of element part information regarding the element parts together with input of metal information regarding metals used in the element parts; a derivation step of collecting the element part information and the metal information acquired in the second acquisition step and deriving at least a base material type and a base material amount of a metal base material required to manufacture the manufactured product; an output step of outputting a result derived by the derivation step; A metal base material management program that causes a computer to execute the above.

Citation Information

Patent Citations

  • System and method for material procurement between specific companies

    JP2003030466A

  • Supply chain management system, distributor-side device, parts manufacturer-side device, supply chain management device and method, its program and program recording medium

    JP2003048621A

  • Production control system, production control method, and program

    JP2012088784A

  • Production management device, production management method, and production management program

    JP2023046204A

  • Enhanced vendor managed inventory system and process

    US20030110104A1