Solar charging system

The solar charging system addresses battery capacity loss by dynamically adjusting charging limits based on deterioration, maintaining power usage and preventing circuit degradation.

JP2024140743AActive Publication Date: 2024-10-10TOYOTA JIDOSHA KK
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2023052053
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-28
Publication Date
2024-10-10
Estimated Expiration
2043-03-28

AI Technical Summary

Technical Problem

The full charge capacity of batteries decreases due to deterioration, narrowing the usable capacity range and reducing the amount of power that can be utilized in charging cycles, leading to potential circuit deterioration.

Method used

A solar charging system with a control device that adjusts the charging range based on battery deterioration by widening the usage range when the battery's full charge capacity decreases, setting a larger upper limit and smaller lower limit to maintain efficient power usage.

Benefits of technology

This approach suppresses the decrease in usable power and extends the charging cycle period, preventing battery and circuit deterioration.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024140743000001_ABST
    Figure 2024140743000001_ABST
Patent Text Reader

Abstract

To inhibit actually usable electric energy from reducing in a charge cycle of a battery.SOLUTION: A solar charging system comprises a first battery 40 for storing power generated by a solar panel 10, a second battery 50 for storing power supplied from the first battery 40, and a controller 21. The controller 21 charges the second battery 50 by performing power supply from the first battery 40 to the second battery 50 when a charging rate of the first battery 40 becomes equal to or larger than an upper limit and stops the power supply from the first battery 40 to the second battery 50 to charge the first battery 40 when the charging rate of the first battery 40 becomes equal to or smaller than a lower limit. The controller 21 executes change processing of extending a use range, which is a range from the upper limit to the lower limit, in the case that the degree of deterioration of the first battery 40 is high as compared with that in the case that the degree of deterioration is low.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a solar charging system. [Background technology]

[0002] The solar charging system described in Patent Document 1 includes a solar panel, a first battery, a second battery, and a control device that controls charging of the first battery and the second battery. The first battery stores power generated by the solar panel. The second battery stores power supplied from the first battery. When the charging rate of the first battery reaches or exceeds a predetermined upper limit, the control device supplies power from the first battery to the second battery to charge the second battery. When the charging rate of the first battery falls below a predetermined lower limit due to the power supply to the second battery, the control device stops the power supply from the first battery to the second battery and charges the first battery. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Patent No. 7180295 Summary of the Invention [Problem to be solved by the invention]

[0004] The full charge capacity of the battery gradually decreases due to deterioration. Therefore, when the range from the upper limit to the lower limit is set as the usage range, as the battery deteriorates, the capacity range of the battery in the usage range narrows. Therefore, the amount of power that can actually be used in the charging cycle of the first battery, which repeats charging and discharging, decreases. [Means for solving the problem]

[0005] A solar charging system for solving the above problem includes a solar panel, a first battery that stores power generated by the solar panel, a second battery that stores power supplied from the first battery, and a control device. When the charging rate of the first battery becomes equal to or higher than a predetermined upper limit, the control device supplies power from the first battery to the second battery to charge the second battery, and when the charging rate of the first battery becomes equal to or lower than a predetermined lower limit, the control device executes a process of stopping the supply of power from the first battery to the second battery to charge the first battery. When the range from the upper limit to the lower limit is set as a usage range, the control device executes a change process of changing the usage range when the deterioration level of the first battery is high so that the usage range is wider than when the deterioration level is low. Effect of the Invention

[0006] This can reduce the decrease in the amount of power that can actually be used during the battery charging cycle. [Brief description of the drawings]

[0007] [Figure 1] FIG. 1 is a schematic diagram of a solar charging system. [Diagram 2] FIG. 2 is a graph showing a change in capacity of the first battery. [Diagram 3] FIG. 3 is a flowchart showing a procedure of the process executed by the control device. [Figure 4] FIG. 4 is a graph showing how the upper and lower limits are set in the modified example. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0008] <Outline of solar charging system> An embodiment of a solar charging system will be described below with reference to Figures 1 and 2. The solar charging system of this embodiment is mounted on a vehicle.

[0009] As shown in FIG. 1, the solar charging system 100 includes a solar panel 10, a control unit 20, a battery monitoring unit 30, a first battery 40, a second battery 50, a relay 60, and a third converter 70.

[0010] The solar panel 10 is configured by arranging a plurality of solar cells, which generate electricity when exposed to sunlight, in a panel shape. The solar panel 10 is installed, for example, on the roof of a vehicle VC.

[0011] The control unit 20 includes a control device 21, a first converter 25, and a second converter . The control device 21 includes a CPU and a storage device. The CPU of the control device 21 executes a program stored in the storage device of the control device 21 to perform various controls such as power generation control of the solar panel 10, charging control of the first battery 40, and charging control of the second battery 50. The first converter 25 is a DC-DC converter that converts the power generated by the solar panel 10. The second converter 26 is a DC-DC converter that converts the power converted by the first converter 25 and supplies it to the first battery 40.

[0012] The third converter 70 is a DC-DC converter that converts the power stored in the first battery 40 and the power generated by the solar panel 10 and supplies the converted power to the second battery 50. The control device 21 controls the driving of the first converter 25, the second converter 26, and the third converter 70.

[0013] The battery monitoring unit 30 includes a battery control device 31. The battery control device 31 includes a CPU and a storage device. The CPU of the battery control device 31 executes a program stored in the storage device of the battery control device 31 to monitor the state of the second battery 50 and to perform opening and closing control of a relay 60 for charging the second battery 50. The battery control device 31 is connected to the control device 21 so as to be able to communicate with each other. The battery control device 31 transmits to the control device 21 the state of the second battery 50 detected by a sensor or the like, that is, the input current, the output current, the voltage, the temperature, and the like. The control device 21 transmits an opening and closing instruction signal for the relay 60 to the battery control device 31.

[0014] The first battery 40 is a secondary battery that is charged with the power generated by the solar panel 10, and is, for example, a lithium ion battery. The first battery 40 is not limited to a lithium ion battery and may be another type of battery. The first battery 40 is an auxiliary battery that supplies power to auxiliary devices of the vehicle VC. The auxiliary devices of the vehicle VC are, for example, an electric oil pump, a navigation system, lamps, and various sensors. The control device 21 acquires the state of the first battery 40 detected by a sensor or the like, that is, the input current, the output current, the voltage, the temperature, and the like. Then, the control device 21 calculates the capacity CH, which is the current amount of stored electricity of the first battery 40, the current full charge capacity CHmax of the first battery 40, and the charging rate SOC of the first battery 40 based on the acquired data. The charging rate SOC is a value obtained by dividing the full charge capacity CHmax by the capacity CH.

[0015] The second battery 50 is a secondary battery, for example a lithium ion battery, that charges the electric power converted by the third converter 70, i.e., the electric power stored in the first battery 40 or the electric power generated by the solar panel 10. The first battery 40 is not limited to a lithium ion battery and may be another type of battery. The second battery 50 is a drive battery that supplies electric power to a motor that drives the vehicle VC.

[0016] The relay 60 is provided in a circuit between the third converter 70 and the second battery 50. When the relay 60 is closed, power is exchanged between the third converter 70 and the second battery 50. When the relay 60 is opened, the exchange of power between the third converter 70 and the second battery 50 is interrupted.

[0017] <Charging process executed by the control device 21> The control device 21 acquires the charging rate SOC of the first battery 40 at every predetermined cycle. When the charging rate SOC is equal to or higher than a predetermined upper limit SOCH, the control device 21 supplies power from the first battery 40 to the second battery 50 to charge the second battery 50. When the charging rate SOC of the first battery 40 is equal to or lower than a predetermined lower limit SOCL due to the power supply to the second battery 50, the control device 21 stops the power supply from the first battery 40 to the second battery 50. Then, the control device 21 charges the first battery 40 using the power generated by the solar panel 10. The control device 21 repeatedly executes such a charging cycle of the first battery 40 during the start-up of the solar charging system 100. The upper limit SOCH is a value smaller by a predetermined value than the value at which the first battery 40 becomes overcharged, and is determined in advance. The lower limit SOCL is a value larger by a predetermined value than the value at which the first battery 40 becomes overdischarged, and is determined in advance.

[0018] <Regarding the change process executed by the control device 21> The full charge capacity CHmax of the first battery 40 gradually decreases due to the deterioration of the first battery 40. Therefore, when the range from the upper limit value SOCH to the lower limit value SOCL is defined as the usage range UR, as the deterioration of the first battery 40 progresses, the capacity range CHR of the first battery 40 in the usage range UR narrows. Therefore, the amount of electric power EE that can actually be used in the charging cycle of the first battery 40, which repeats charging and discharging, decreases. Note that the capacity CH of the first battery 40 when the charging rate SOC of the first battery 40 is equal to the upper limit value SOCH is defined as the maximum value of the capacity range CHR, and the capacity CH of the first battery 40 when the charging rate SOC of the first battery 40 is equal to the lower limit value SOCL is defined as the minimum value of the capacity range CHR. At this time, the amount of electric power EE is equal to the maximum value of the capacity range CHR minus the minimum value of the capacity range CHR.

[0019] 2 shows the capacity A of the undegraded first battery 40 and the capacity B of the degraded first battery 40. As shown in FIG. 2, the full charge capacity CHmaxb of the degraded first battery 40 is smaller than the full charge capacity CHmaxa of the undegraded first battery 40. Therefore, even if the upper limit value SOCH and the lower limit value SOCL are the same and the usage range UR is the same, the capacity range CHRb of the degraded first battery 40 is narrower than the capacity range CHRa of the undegraded first battery 40. Therefore, the amount of power EEb that the degraded first battery 40 can actually use in the charging cycle of the first battery 40 is smaller than the amount of power EEa that the undegraded first battery 40 can actually use.

[0020] When the amount of electric power EE that can actually be used is reduced in this way, the period of the charging cycle of the first battery 40 becomes shorter. This may cause deterioration of the first battery 40 and deterioration of the circuit that switches between charging and discharging the first battery 40. In addition, when the period of the charging cycle of the first battery 40 becomes shorter, the period of the charging cycle of the second battery 50 that uses the electric power of the first battery 40 may also become shorter. This may cause deterioration of the second battery 50 and deterioration of the circuit that switches between charging and discharging the second battery 50.

[0021] Therefore, when the deterioration level of the first battery 40 is high, the control device 21 executes a change process to change the usage range UR so that the usage range UR is wider than when the deterioration level is low. By executing this change process, the amount of electric power EE that can actually be used in the charging cycle of the first battery 40 is suppressed from decreasing.

[0022] 3 shows the procedure of the process executed by the control device 21 to execute the change process. The control device 21 executes this process at predetermined intervals during the startup of the solar charging system 100. In the following, the step number of each process is represented by a number preceded by "S."

[0023] When starting this process, the control device 21 acquires the current full charge capacity CHmax of the first battery 40 (S100). Next, the control device 21 judges whether the acquired full charge capacity CHmax is equal to or less than a threshold value CHmaxref (S110). As the deterioration of the first battery 40 progresses and the degree of deterioration increases, the full charge capacity CHmax decreases. Therefore, the full charge capacity CHmax is a value indicating the degree of deterioration of the first battery 40. The threshold value CHmaxref is a value for judging that the degree of deterioration of the first battery 40 has increased to the extent that the usage range UR needs to be widened based on the full charge capacity CHmax being equal to or less than the threshold value CHmaxref, and is an adaptation value.

[0024] Then, in the process of S110, when the control device 21 determines that the full charge capacity CHmax is equal to or less than the threshold value CHmaxref (S110: YES), the control device 21 executes a change process to change both the upper limit value SOCH and the lower limit value SOCL (S120). In this change process, the control device 21 executes a process to set a value obtained by adding a default value α to the currently set upper limit value SOCH as a new upper limit value SOCH. As the default value α, a value capable of suppressing overcharging of the first battery 40 is set in advance. Also, in the process of S120, the control device 21 executes a process to set a value obtained by subtracting a default value β from the currently set lower limit value SOCL as a new lower limit value SOCL. As the default value β, a value capable of suppressing overdischarge of the first battery 40 is set in advance. By executing this change process, the value of the upper limit value SOCH becomes larger and the value of the lower limit value SOCL becomes smaller compared to before the execution of the change process.

[0025] Then, when the process of S120 is completed, or when a negative determination is made in the process of S110, the control device 21 ends the execution of this process in the current cycle. <Actions and Effects of the Present Embodiment> (1) When the full charge capacity CHmax is equal to or smaller than the threshold value CHmaxref, the change process is executed to increase the upper limit value SOCH and decrease the lower limit value SOCL. Therefore, when the deterioration level of the first battery 40 is high, the above-mentioned usage range UR is changed so that the usage range UR is wider than when the deterioration level is low.

[0026] When the usage range UR is wider, the capacity range CHR of the first battery 40 is wider in the charge cycle of the first battery 40. Therefore, it is possible to suppress a decrease in the amount of electric power EE that can actually be used in the charge cycle of the first battery 40.

[0027] (2) It is possible to suppress a decrease in the amount of electric power EE that can actually be used in the charging cycle of the first battery 40, thereby suppressing a shortening of the period of the charging cycle of the first battery 40. As a result, it is possible to suppress deterioration of the first battery 40 and deterioration of the circuit that switches between charging and discharging the first battery 40.

[0028] (3) Suppressing the shortening of the charging cycle period of the first battery 40 also suppresses the shortening of the charging cycle period of the second battery 50 that uses the power of the first battery 40. As a result, deterioration of the second battery 50 and deterioration of the circuit that switches between charging and discharging the second battery 50 can also be suppressed.

[0029] <Example of change> This embodiment can be modified as follows: This embodiment and the following modifications can be combined with each other to the extent that there is no technical contradiction.

[0030] A value other than the full charge capacity CHmax may be used as a value indicating the deterioration level of the first battery 40. For example, the longer the accumulated usage time of the first battery 40, the more the first battery 40 deteriorates. Therefore, the accumulated usage time of the first battery 40 may be used as a value indicating the deterioration level of the first battery 40. Also, the longer the accumulated mileage of the vehicle VC, the more the first battery 40 deteriorates. Therefore, the accumulated mileage of the vehicle VC may be used as a value indicating the deterioration level of the first battery 40.

[0031] 4, the change process may be such that the upper limit value SOCH and the lower limit value SOCL are variably set so that the upper limit value SOCH increases and the lower limit value SOCL decreases as the full charge capacity CHmax of the first battery 40 decreases. In this case, the decrease in the amount of electric power EE that can actually be used in the charging cycle of the first battery 40 can be more precisely prevented.

[0032] The deterioration level of the first battery 40 may be classified. Then, the upper limit value SOCH and the lower limit value SOCL may be changed so that the usage range UR becomes wider for a higher deterioration level class.

[0033] In the change process, both the upper limit value SOCH and the lower limit value SOCL are changed, but it is also possible to change only the upper limit value SOCH or only the lower limit value SOCL. In the above embodiment, the usage range UR is changed based on the deterioration level of the first battery 40. However, the usage range UR may be changed based on other factors.

[0034] For example, the usage range UR may be changed based on the temperature of the first battery 40. More specifically, when the temperature of the first battery 40 is high, it is possible to suppress the input current or output current of the first battery 40 in order to suppress a temperature rise. Here, when suppressing the input current or output current, it is desirable to increase the voltage of the first battery 40 in order to suppress a decrease in the amount of electric power. Therefore, if the voltage of the first battery 40 is increased by increasing the upper limit value SOHL of the usage range UR to widen the usage range UR, it becomes possible to ensure the amount of electric power while suppressing a temperature rise of the first battery 40.

[0035] Furthermore, for example, when the temperature of the first battery 40 is low, the apparent capacity tends to decrease. Therefore, by widening the usage range UR when the temperature of the first battery 40 is low compared to when the temperature is high, it becomes possible to suppress a decrease in the amount of electric power EE that can actually be used in the charging cycle of the first battery 40.

[0036] Also, for example, the use range UR may be changed to suppress deterioration of a circuit (such as a relay circuit) that switches between charging and discharging the first battery 40, or deterioration of a circuit (such as a relay circuit) that switches between charging and discharging the second battery 50. That is, when the use range UR is widened, the period of the charging cycle of the first battery 40 is suppressed from shortening. Therefore, an increase in the number of times that the first battery 40 is switched between charging and discharging is suppressed, and deterioration of the circuit that switches between charging and discharging the first battery 40 is suppressed. Furthermore, when the period of the charging cycle of the first battery 40 is suppressed from shortening, the period of the charging cycle of the second battery 50 that uses the power of the first battery 40 is also suppressed from shortening. Therefore, an increase in the number of times that the second battery 50 is switched between charging and discharging is suppressed, and deterioration of the circuit that switches between charging and discharging the second battery 50 is suppressed.

[0037] Therefore, the control device 21 estimates the deterioration level of the switching circuit that switches between charging and discharging the first battery 40 and the second battery 50 based on, for example, the accumulated startup time of the solar charging system 100 and the number of times the switching circuit switches between charging and discharging. When the deterioration level of the switching circuit is high, the control device 21 may execute a process of changing the usage range UR so that the usage range UR is wider than when the deterioration level is low. In this case, the speed at which the deterioration of the switching circuit progresses can be suppressed.

[0038] The first battery 40 is an auxiliary battery that supplies power to the auxiliary devices of the vehicle VC, but may be a battery used for other purposes. The second battery 50 is a drive battery that supplies power to the motor that drives the vehicle VC, but may be a battery used for other purposes.

[0039] Although the battery control device 31 controls the opening and closing of the relay 60, the control device 21 may directly control the opening and closing of the relay 60. The third converter 70 may be provided within the control unit 20.

[0040] The battery control device 31 may be provided within the control unit 20. Although the solar charging system 100 has been applied to the vehicle VC, it may be applied to something other than the vehicle VC.

[0041] The control device 21 is not limited to a device equipped with a CPU and a storage device and executing software processing. For example, a dedicated hardware circuit such as an ASIC may be provided to perform hardware processing of at least a part of the software processing in the above embodiment. That is, the control device may have any of the following configurations (a) to (c). (a) A processing device that executes all of the above processing according to a program, and a program storage device such as a ROM that stores the program. (b) A processing device and a program storage device that execute a part of the above processing according to a program, and a dedicated hardware circuit that executes the remaining processing. (c) A dedicated hardware circuit that executes all of the above processing. Here, the software execution device equipped with the processing device and the program storage device and the dedicated hardware circuit may be one or any multiple number. That is, the above processing can be executed by a processing circuit equipped with at least one of one or more software execution devices and one or more dedicated hardware circuits. The program storage device, i.e., the computer-readable medium, includes any available medium that can be accessed by a general-purpose or dedicated computer. [Explanation of symbols]

[0042] 10...Solar panel 20…Control unit 21...Control device 25…1st converter 26…Second converter 30…Battery monitoring unit 30…Battery control unit 31...Battery control device 40…1st battery 50…Second battery 60…Relay 70…Third converter 100...Solar charging system VC…Vehicle

Claims

1. a solar panel; and a first battery for storing the power generated by the solar panel; A solar charging system including a second battery that stores power supplied from the first battery, and a control device, the control device executes a process of supplying power from the first battery to the second battery to charge the second battery when the charging rate of the first battery becomes equal to or higher than a predetermined upper limit value, and stopping the supply of power from the first battery to the second battery to charge the first battery when the charging rate of the first battery becomes equal to or lower than a predetermined lower limit value, When the range from the upper limit value to the lower limit value is set as the usage range, The control device executes a change process for changing the usage range so that the usage range is wider when the deterioration level of the first battery is high than when the deterioration level of the first battery is low. Solar charging system.

2. The change process is a process of changing the usage range such that the usage range becomes wider as the deterioration level of the first battery increases. The solar charging system of claim 1 .

3. The change process is a process for increasing the upper limit value and decreasing the lower limit value compared to before the change process was performed. The solar charging system of claim 1 .

4. The first battery is an auxiliary battery that supplies power to an auxiliary device of a vehicle. The solar charging system of claim 1 .

5. The second battery is a driving battery that supplies power to a motor that drives a vehicle. The solar charging system of claim 1 .

Citation Information

Patent Citations

  • Power controller and rolling stock using the same

    JP2008099461A

  • On-vehicle charge controller

    JP2014007937A

  • Device for controlling battery in vehicle

    JP2015058818A

  • Control arrangement of battery pack

    JP2019091565A

  • Vehicle charging control system

    JP7180295B2