Temporarily placed surplus soil structure, surplus soil temporarily placing method, and backfill structure using temporarily placed surplus soil

Weir materials with circular or track-shaped configurations enhance soil storage capacity and construction efficiency by securely containing excavated soil within frame-shaped grooves, addressing the limitations of flexible bags and improving compaction and reuse.

JP2024141281APending Publication Date: 2024-10-10DAIWA HOUSE INDUSTRY CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023052832
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-29
Publication Date
2024-10-10

AI Technical Summary

Technical Problem

Existing methods for temporarily storing excavated soil in limited planar dimensions face challenges in securing a large amount without using flexible container bags, which are time-consuming and require significant effort for management, and do not effectively address the issue of soil collapse.

Method used

The use of weir materials with circular, oval, or track-shaped configurations within frame-shaped grooves to temporarily store excavated soil, providing compressive forces that enhance soil retention and eliminate the need for flexible container bags, while also serving as a work scaffold for construction.

Benefits of technology

This approach allows for increased storage capacity and improved construction efficiency by securely containing soil without flexible bags, reducing management time and effort, and facilitating easier compaction and reuse of the stored soil.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024141281000001_ABST
    Figure 2024141281000001_ABST
Patent Text Reader

Abstract

To provide a temporarily placed surplus soil structure and a surplus soil temporarily placing method, and a backfill structure using temporarily placed surplus soil which can secure as much surplus soil as possible without using a flexible container bag when temporarily placing surplus soil inside a frame-shaped groove with limited planar dimensions.SOLUTION: A dam material 30 having a planar shape of either a circular, elliptical, or track shape is installed inside a frame-shaped groove 10 formed by excavating the ground G in order to construct a frame-shaped foundation 20 in a plan view, and surplus soil generated when the ground G is excavated is temporarily placed inside the dam material 30, to form a temporarily placed surplus soil structure 70.SELECTED DRAWING: Figure 3B
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a temporary soil placement structure, a soil temporary placement method, and a backfill structure using temporary soil placement. [Background technology]

[0002] When constructing buildings such as detached houses and apartment buildings, if the site is too narrow to secure a place to store the surplus soil, the surplus soil is temporarily stored by piling it up inside a frame-shaped trench that is formed by excavating the ground to construct a frame-shaped foundation. If necessary, the surplus soil is temporarily stored in a bag-shaped packaging material such as a flexible container bag. This frame-shaped foundation is, for example, a slab foundation with a footing and a rising portion, and the slab foundation is constructed in a linear rectangular frame shape in plan view.

[0003] Incidentally, the foundations of modern houses (the aforementioned strip foundations) often have a frame-shaped perimeter foundation and partition foundations that further divide the area inside the perimeter foundation, and the dimensions of the rectangular area in plan view that is divided are relatively small, such as 4P x 5P (1P indicates the module width, e.g., 910 mm) or 2P x 2P. Therefore, when temporarily storing waste soil in such an area with small plan dimensions, if the soil is piled up to a height of 5 m or less with a slope of about 30 degrees, the amount of soil temporarily stored will inevitably be small. Furthermore, increasing the slope in order to increase the amount of soil temporarily stored is not desirable due to safety issues such as the collapse of the piled soil.

[0004] Here, FIG. 1 shows a plan view of an example of a foundation of a house, and FIG. 2 shows a vertical cross-sectional view of the foundation and piled up surplus soil in the II-II direction. At the site S, by excavating the ground G, a peripheral groove D1 (an example of a frame-shaped groove D) having a rectangular frame shape in plan view is constructed, and multiple straight grooves D2 (another example of a frame-shaped groove D) are constructed in a manner that they intersect each other inside the peripheral groove D1. A peripheral foundation K1 (an example of a foundation K) is constructed in the frame-shaped groove D1, and a partition foundation K2 (another example of a foundation K) is constructed in the straight groove D2, so that multiple temporary storage areas A1 to A3 having small shapes in plan view are formed by the peripheral foundation K1 and the multiple partition foundations K2. The foundation K is a strip foundation having a footing Ka and a rising portion Kb.

[0005] When the site S is small, the residual soil Z1 to Z3 is temporarily stored in each of the temporary storage areas A1 to A3 in a manner that provides a safe normal gradient θ1 capable of preventing collapse.

[0006] In addition, by stacking multiple FIBC bags containing soil surplus inside using the above-mentioned FIBC bags, the collapse of the piled FIBC bags due to friction between adjacent FIBC bags, etc. is suppressed, making it possible to increase the amount of soil surplus stored temporarily as much as possible compared to simply piling up the soil surplus. However, there is an inherent problem in that the reuse of FIBC bags requires time and effort for cleaning, tidying up, and managing the FIBC bags after use.

[0007] For these reasons, there is a need for a temporary soil storage structure and method that can secure as large a volume of soil as possible without using flexi-con bags when temporarily storing soil inside a frame-shaped trench with limited planar dimensions.

[0008] Here, a method for temporarily storing excavated soil is proposed in Patent Document 1. In this temporary storage method, when temporarily storing excavated soil containing contaminants, a contaminant capture and flow distribution layer including a contaminant capture layer that captures contaminants assumed to be contained in the excavated soil and a flow distribution layer that uniformly distributes moisture contained in the excavated soil is formed in a temporary storage yard, and the excavated soil is temporarily stored on top of the contaminant capture and flow distribution layer as a temporary storage mound. [Prior art documents] [Patent documents]

[0009] [Patent Document 1] JP 2012-35224 A Summary of the Invention [Problem to be solved by the invention]

[0010] The temporary storage method for excavated soil described in Patent Document 1 is said to be able to prevent contaminants from leaking out of the soil, but it does not disclose any solution to the above-mentioned problem, i.e., a means for securing as large an amount of soil as possible when temporarily storing the soil inside a frame-shaped trench with limited planar dimensions.

[0011] The present invention has been made in consideration of the above-mentioned problems, and aims to provide a temporary soil storage structure and method for temporary soil storage, and a backfill structure using temporary soil storage, which can secure as large an amount of soil as possible when temporarily storing soil inside a frame-shaped trench with limited planar dimensions without using flexi-con bags. [Means for solving the problem]

[0012] In order to achieve the above object, one aspect of the temporary soil structure according to the present invention is: A dam material having a circular, elliptical or track-shaped planar shape is installed inside a frame-shaped trench formed by excavating the ground in order to construct a frame-shaped foundation in a plan view. A feature of this construction is that the surplus soil generated when the ground is excavated is temporarily stored inside the dam material.

[0013] According to this embodiment, a dam material having a circular or other shape in plan view is installed inside the frame-shaped trench, and the waste soil is temporarily stored inside the dam material, so that columnar waste soil equivalent to the height of the dam material is temporarily stored so that it is surrounded by the dam material, and cone-shaped waste soil with a normal slope is temporarily stored on top of that.As a result, the amount of columnar waste soil stored in the dam material increases compared to conventional temporarily stored waste soil, and it becomes possible to secure as much waste soil as possible without using flexi-con bags.

[0014] Here, since the dam material has a planar shape that is either circular, elliptical, or track-shaped, and because shapes such as circular or track-shaped have curvature, the earth pressure acting on the dam material from the temporary residue inside the dam material becomes a circumferential compressive force on the dam material, making it possible for the hard (strong) dam material to restrain the temporary residue when subjected to a compressive force. In other words, even if the dam material does not originally have a very high rigidity, the circumferential compressive force generated by the acting earth pressure will harden the dam material, forming a dam material that is less likely to tip over or deform due to the earth pressure acting from the temporary residue. In the case of a rectangular frame-shaped dam material, the acting earth pressure does not act on it in the circumferential direction, so the corners of the rectangular frame have high rigidity, while the straight parts of the rectangular frame, for example the central region (area away from the corners), have low rigidity. Therefore, it may be necessary to take measures to prevent the dam material from tipping over or deforming, such as by inserting reinforcing bars into the ground.

[0015] The frame-shaped groove includes the frame-shaped groove having a rectangular frame shape in plan view as described above and a plurality of straight grooves constructed inside the frame-shaped groove, which form a plurality of frame-shaped grooves having a plurality of plan dimensions. In addition, a foundation such as the aforementioned strip foundation (perimeter foundation or partition foundation) is constructed in the frame-shaped groove.

[0016] In addition, the dam materials include wire mesh such as lath formwork, steel dam boards, hard resin dam boards, wooden dam boards, etc.

[0017] In addition, another aspect of the temporary soil structure according to the present invention is The present invention is characterized in that the non-remnant soil area between the corners of the frame-shaped trench and the weir material, where no remnant soil is present, functions as a work scaffold.

[0018] According to this embodiment, since the planar shape of the dam material is either circular, elliptical, or track-shaped, a non-remnant soil area where no remnant soil exists is naturally formed between the corners of the frame-shaped trench and the dam material. This non-remnant soil area functions as a work scaffold, improving workability (constructibility) of reinforcement work, concrete pouring work, etc. when constructing a reinforced concrete foundation.

[0019] In another aspect of the temporary soil structure according to the present invention, The waste soil is characterized by having a columnar waste soil surrounded by the dam material and a cone-shaped waste soil placed on top of the columnar waste soil.

[0020] According to this embodiment, since the waste soil comprises columnar soil surrounded by dam material and cone-shaped soil placed on top of the columnar soil, the amount of waste soil equivalent to the columnar soil can be increased compared to conventional temporary storage soil, and it becomes possible to secure as large an amount of waste soil as possible without using flexi-con bags.

[0021] In another aspect of the temporary soil structure according to the present invention, The weir material is characterized in that it is made of wire mesh.

[0022] According to this aspect, the dam material is formed from a wire mesh such as a lath formwork, which improves the drainage of excess water from the temporary soil through the wire mesh.

[0023] In addition, one aspect of the backfill structure using temporary surplus soil according to the present invention is as follows: A backfill structure using temporary soil, in which the columnar soil and the cone-shaped soil forming the temporary soil structure are used as backfill soil, When the height of the dam material is lower than the design height of the backfill soil inside the frame-shaped trench, the dam material is left in place and the columnar waste soil surrounded by the dam material is used as backfill soil in a temporary state, and part or all of the cone-shaped waste soil is used as backfill soil in the space between the rising part of the foundation constructed in the frame-shaped trench and the dam material.

[0024] According to this embodiment, when the height of the dam material is lower than the design height of the backfill soil inside the frame-shaped trench, the columnar waste soil surrounded by the dam material is used as backfill soil in a temporary state, and some or all of the cone-shaped waste soil is used as backfill soil in the space between the rising part of the foundation constructed in the frame-shaped trench and the dam material, thereby forming a backfill structure in which the columnar waste soil restrained by the dam material has been sufficiently compacted backfill soil.

[0025] When the cone-shaped soil is placed on top of the columnar soil, the load of the cone-shaped soil is applied to the columnar soil, which compacts the columnar soil, and the compacted columnar soil is restrained by the surrounding dam material. In addition, because the dam material is left inside the backfill soil, when the backfill soil is compacted from the central region of the temporary storage area (the region of the columnar soil) with a ream or the like, the compacted backfill soil is restrained by the dam material, which has the effect of making the backfill soil easier to compact.

[0026] In addition, one aspect of the soil temporary storage method according to the present invention is to an excavation and installation process for excavating the ground to construct a frame-shaped trench in order to construct a frame-shaped foundation in a plan view, and installing a dam material having a circular, elliptical, or track-shaped plan view shape inside the frame-shaped trench; The method further comprises a temporary soil storage step of temporarily storing soil generated when the ground is excavated inside the dam material.

[0027] According to this embodiment, a dam material having a circular or other shape in plan view is placed inside a frame-shaped trench, and the waste soil is temporarily stored inside the dam material. This allows columnar soil equivalent to the height of the dam material to be temporarily stored so that it is surrounded by the dam material, and cone-shaped waste soil with a normal slope is temporarily stored on top of that.This allows the amount of temporarily stored soil to be increased by the amount of the columnar soil compared to conventional temporarily stored soil, and makes it possible to secure as much waste soil as possible without using flexi-con bags.

[0028] Another aspect of the soil temporary storage method according to the present invention is Following the soil temporary placement step, the foundation is constructed in the frame-shaped groove, In the foundation construction step, a non-remnant soil area between the corner of the frame-shaped groove and the weir material, where no remnant soil exists, is used as a work scaffold, The temporary soil placement process is characterized in that a columnar soil is constructed so as to be surrounded by the dam material, and then a cone-shaped soil is placed on top of the columnar soil.

[0029] According to this aspect, by using the non-remnant soil area as a work scaffold, the workability of rebar arrangement work and concrete pouring work when constructing a reinforced concrete foundation is improved. Furthermore, by constructing columnar soil surrounded by a dam material and placing cone-shaped soil on top of the columnar soil, the amount of soil equivalent to the columnar soil can be increased compared to conventional temporary storage soil, making it possible to secure as much soil as possible. Effect of the Invention

[0030] As can be understood from the above explanation, according to the temporary soil storage structure and temporary soil storage method of the present invention, and the backfill structure using temporary soil storage, it is possible to secure as large an amount of soil as possible when temporarily storing soil inside a frame-shaped trench with limited planar dimensions, without using flexi-con bags. [Brief description of the drawings]

[0031] [Figure 1]FIG. 1 is a plan view of an example of a conventional temporary soil storage structure in a temporary storage area inside a frame-shaped foundation. [Diagram 2] FIG. 2 is a view taken along the line II-II of FIG. 1, and is a vertical cross-sectional view of an example of a conventional temporary soil storage structure. [Figure 3A] FIG. 2 is a plan view of an example of a temporary soil storage structure according to an embodiment of the present invention. [Figure 3B] 3B is a view taken along the arrow BB in FIG. 3A, and is a vertical cross-sectional view of an example of a temporary soil placement structure according to the embodiment. [Figure 4] FIG. 11 is a plan view of another example of a temporary soil storage structure according to an embodiment of the present invention. [Diagram 5] FIG. 2 is a vertical cross-sectional view of an example of a backfill structure using temporary residual soil according to an embodiment of the present invention. [Figure 6] 6 is a view taken in the direction of an arrow VI in FIG. 5, and is a plan view of an example of a backfilling structure using temporary residual soil according to the embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0032] Hereinafter, an example of a temporary soil storage structure, a method for temporarily storing soil, and a backfill structure using the temporary soil storage structure according to the embodiment will be described with reference to the accompanying drawings. Note that in this specification and the drawings, substantially identical components may be designated by the same reference numerals to avoid redundant description.

[0033] [Temporary soil storage structure and temporary soil storage method according to the embodiment, and backfill structure using temporary soil storage] A temporary placement soil structure, a soil temporary placement method, and a backfill structure using temporary placement soil according to the embodiment will be described with reference to Figs. 1 to 6. Fig. 1 is a plan view of an example of a conventional temporary placement soil structure in a temporary placement area inside a frame-shaped foundation, and Fig. 2 is a view taken along the line II-II in Fig. 1, which is a vertical cross-sectional view of an example of a conventional temporary placement soil structure. Fig. 3A is a plan view of an example of a temporary placement soil structure according to the embodiment, and Fig. 3B is a view taken along the line BB in Fig. 3A, which is a vertical cross-sectional view of an example of a temporary placement soil structure according to the embodiment. Fig. 4 is a plan view of another example of a temporary placement soil structure according to the embodiment, and Fig. 5 is a vertical cross-sectional view of an example of a backfill structure using temporary placement soil according to the embodiment. Fig. 6 is a view taken along the line VI in Fig. 5, which is a plan view of an example of a backfill structure using temporary placement soil according to the embodiment.

[0034] As shown in Figures 3A and 3B, a frame-shaped trench 10 having a rectangular frame shape in plan view is constructed by excavating the ground G on a site S on which a house is to be constructed. Here, the illustrated example illustrates one rectangular frame-shaped (square frame-shaped) frame-shaped trench 10 for ease of understanding, but for example, as shown in Figure 1, a plurality of linear trenches may be provided inside a peripheral trench having a rectangular frame shape in plan view, providing a plurality of temporary placement areas.

[0035] Since there is not enough space to provide a sufficient temporary storage area in the area of ​​the site S outside the frame-shaped trench 10, the inside of the frame-shaped trench 10 is used as a temporary storage area A5 for the soil generated when the ground G was excavated and the frame-shaped trench 10 was constructed.

[0036] The dam material 30 having a circular shape in a plan view is placed in the temporary placement area A5. Although not shown in the drawings, reinforcing bars or the like may be inserted into the ground at multiple points around the periphery of the dam material 30 to prevent the dam material 30 from shifting out of position.

[0037] The waste soil generated when excavating the ground G and constructing the frame-shaped trench 10 is temporarily stored as columnar waste soil 40 (cylindrical waste soil in the illustrated example) inside the weir material 30, which is circular in plan view, and is further temporarily stored as cone-shaped waste soil 50 (cone-shaped waste soil in the illustrated example) on top of the columnar waste soil 40, thereby forming temporary stored waste soil 60 consisting of the columnar waste soil 40 and the cone-shaped waste soil 50. Here, the normal gradient θ1 of the cone-shaped waste soil 50 is set to a safe low gradient so that the waste soil will not collapse, for example, a gradient of about 30 degrees or less.

[0038] The dam material 30 is formed from a lath formwork, which is a wire mesh. By forming the dam material 30 from a lath formwork, it has the rigidity to resist the earth pressure P2 acting from the residual soil 60 inside, and furthermore, it can effectively drain excess water that permeates inside the residual soil 60 to the outside. Here, the dam material 30 may be formed from a steel dam plate, a hard resin dam plate, a wooden dam plate, or the like, in addition to the lath formwork. When such a dam plate is used, the excess water that permeates the residual soil 60 is drained to the outside from the underside of the dam material 30.

[0039] A dam material 30 having a circular shape in a plan view is installed in the temporary storage area A5 inside the frame-shaped trench 10, and all or part of the waste soil 60 generated when excavating the ground G is temporarily stored inside the dam material 30, thereby forming a temporary soil storage structure 70.

[0040] As shown in Fig. 3B, the weight of the cone-shaped residual soil 50 above acts as a load P1 on the columnar residual soil 40 inside the dam material 30. Then, with this load P1 as a surcharge, an earth pressure P2 acts in the radial direction (radial direction) of the dam material 30, which is circular in plan view, from the columnar residual soil 40, as shown in Fig. 3A.

[0041] At this time, since the dam material 30, which is circular in plan view, has a curvature, a compressive force Q1 is generated in the circumferential direction of the dam material 30. This circumferential compressive force Q1 strengthens the dam material 30, thereby providing a high restraining effect on the temporary retained soil 60 and forming a dam material 30 that is less likely to tip over or deform due to earth pressure P2.

[0042] If a rectangular dam material in plan view surrounds the temporarily stored soil, the corners of the dam material have high rigidity, but the rigidity of the central region of each straight section is low, and since no circumferential compressive force Q1 is generated as in the dam material 30 shown in Fig. 3A, the central region of the straight sections is prone to deformation and tipping due to the acting earth pressure P2. Therefore, in order to prevent such deformation and tipping, it becomes necessary to take protective measures such as inserting a large number of restraining materials such as rebars into the ground in the circumferential direction of the dam material, which leads to construction work.

[0043] By applying the dam material 30 which is circular in plan view as shown in Figures 3A and 3B, it is possible to eliminate the need to install numerous restraining materials to prevent such deformation and collapse, which is preferable as it reduces the amount of construction work required when temporarily storing the residual soil.

[0044] As is clear when compared with the conventional temporary soil storage structure shown in Figures 1 and 2, the temporary soil storage structure 70 shown in Figures 3A and 3B can temporarily store more soil than the temporary soil storage structure shown in Figure 1, etc., by the amount of soil column-shaped soil 40 inside the dam material 30, making it possible to secure as much soil as possible compared to the conventional structure. Furthermore, when increasing the amount of soil storage, it is not necessary to use flexible container bags, which require time-consuming cleaning, tidying up, and management after use when reusing the soil.

[0045] For example, as a result of trial calculations by the inventors, the volume V1 of residual soil of a square pyramid with a planar shape and planar dimensions of 4 m on each side and a height of 1 m is V1 = 1 / 3 × 4 m × 4 m × 1 m = 5.33 m 3 It becomes.

[0046] In contrast, if the planar shape is circular, the diameter is 4m (the above side is 4m), the height of the weir material is 0.2m (so the height of the columnar soil is 0.2m), and the height of the cone-shaped soil is 1m as above, the volume V2 of the soil is V2 = (0.2m x 2m x 2m x π) + (1 / 3 x 2m x 2m x 1m x π) = 6.70m 3 This means that the volume is 1.37m, which is smaller than the volume V1. 3 This is an estimated increase of approximately 25%.

[0047] Next, an example of a temporary soil storage method according to the embodiment will be described with reference to FIGS. 3A and 3B.

[0048] At the site S, the ground G is excavated to construct a frame-shaped trench 10, and surplus soil generated during this construction is temporarily stored in a temporary storage area A5 inside the frame-shaped trench 10. To temporarily store this surplus soil, a dam material 30 having a circular shape in a plan view is installed in the temporary storage area A5 (this is the excavation and installation process).

[0049] Next, a part or all of the surplus soil generated during excavation of the ground G is first temporarily stored inside the dam material 30 up to the top level of the dam material 30 to form columnar surplus soil 40, and further surplus soil is piled up on top of the columnar surplus soil 40 to form cone-shaped surplus soil 50, which becomes temporary surplus soil 60. Here, if the amount of surplus soil generated during excavation is greater than the temporarily stored surplus soil 60, the excess surplus soil is transported outside the site (this is the end of the temporary surplus soil storage process).

[0050] Next, a reinforced concrete slab 20 is constructed in the frame-shaped groove 10. In this construction, reinforcing bars for the footing and the rising portion (not shown) are arranged, a formwork (not shown) is installed, concrete is poured into the formwork, and the concrete is allowed to harden before being removed, thereby constructing the slab 20 having a rectangular frame-like linear shape, which includes a footing 21 and a rising portion 22.

[0051] In constructing this slab foundation 20, the non-remnant soil area A7 between the corners of the frame-shaped trench 10 and the weir material 30, where no remnant soil exists, can be used as a work foothold during reinforcement work, formwork installation work, concrete pouring work, etc., thereby improving the workability of the foundation (above, the foundation construction process).

[0052] Regarding the planar shape of the dam material, the example shown in Figure 3A is circular, but since the planar shape of the dam material has a curved section with a curvature in the middle, when the earth pressure P2 of the residual soil acts on the dam material, a circumferential compressive force is generated in the dam material. Considering this, dam materials of shapes other than the circular planar shape shown in Figure 3A may also be used.

[0053] For example, as shown in Fig. 4, in the case of a frame-shaped trench 10A having a rectangular shape in plan view, the temporary storage area A6 inside the frame-shaped trench 10A also has a rectangular shape in plan view. In this embodiment, a weir material 30A having a track-like shape in plan view is installed, in which the corners of the rectangular shape of the temporary storage area A6 in plan view are curved, and the residual soil 60A (formed by the columnar residual soil having a track-like shape in plan view and the cone-shaped residual soil 50A above it) is stored inside the weir material, thereby making it possible to secure as much residual soil as possible.

[0054] Furthermore, since the planar shape of the four corners of the dam material 30A is curved (1 / 4 circle in the illustrated example), when earth pressure P3 from the residual soil 60A acts on the dam material 30A, a compressive force Q2 is generated in the circumferential direction of the dam material 30A. This compressive force Q2 strengthens the dam material 30A, thereby providing a high restraining effect on the temporarily stored residual soil 60 and forming a dam material 30A that is less likely to tip over or deform due to earth pressure P3.

[0055] In the illustrated example, a linear strip footing 20A having a rectangular shape is constructed inside a rectangular frame-shaped trench 10A in plan view. In addition to installing a dam material 30A having a track shape in plan view as in the illustrated example to store the temporary storage surplus soil 60A in the rectangular temporary storage area A6 in plan view, a dam material having an oblong shape in plan view may be installed to store the temporary storage surplus soil.

[0056] Next, a backfilling structure using temporary surplus soil according to an embodiment will be described with reference to Figs.

[0057] 3A and 3B, part or all of the cone-shaped residual soil 50 is collapsed and backfilled in the space between the dam material 30 and the continuous footing 20, and further backfilled in the excavated slope area on the outer periphery of the continuous footing 20. Specifically, as shown in FIG. 5, when the height t1 of the dam material 30 is lower than the design height t2 of the backfill soil 50A inside the frame-shaped trench 10, the columnar residual soil 40 surrounded by the dam material 30 is used as backfill soil while the dam material 30 is left in place, and part of the cone-shaped residual soil 50 is used as backfill soil 50A in the space between the rising portion 22 of the foundation 20 and the dam material 30, and further backfilled as backfill soil 50B in the excavated slope area outside the continuous footing 20, thereby forming a backfill structure 80.

[0058] When the backfill soil 50A is laid, the upper part of the backfill soil 50A is compacted with a compaction device such as a runner, as shown in Fig. 5. For example, when the backfill soil 50A is compacted from the central region, a rolling pressure P5 is applied to the backfill soil 50A during compaction, and a radial spreading force P6 acts on the dam material 30, as shown in Fig. 6. This radial spreading force P6 causes a compressive force Q3 to act on the dam material 30, which is circular in plan view, in the same manner as in the case of the earth pressure described above, and the dam material 30 becomes stronger. The backfill soil 50A inside is restrained by the dam material 30, and the backfill soil 50A becomes easier to compact.

[0059] From the above, with the dam material 30, which is circular in plan view, left in place, part of the temporary retained soil 60 is collapsed and compacted to form backfill soil 50A, 50B, thereby forming a backfill structure 80 having efficiently and sufficiently compacted backfill soil 50A, 50B.

[0060] In addition, the present invention is not limited to the configuration shown here, and may be implemented in other embodiments in which other components are combined with the configurations and the like of the above-mentioned embodiment. In this regard, the present invention may be modified within the scope of the gist of the present invention, and may be appropriately determined according to the application form. [Explanation of symbols]

[0061] 10,10A: Frame groove 20,20A: Foundation (cloth foundation) 21: Footing 22: Rising part 30, 30A: Weir material (lath formwork) 40: Columnar soil (backfill soil) 50, 50A: Cone-shaped waste soil 60, 60A: Residual soil (temporarily stored residual soil) 70, 70A: Temporary soil structure 80: Backfill structure using temporary soil (backfill structure) S: Site G: Ground A5, A6: Temporary storage area A7: Non-remnant soil area (work scaffolding) P2,P4:Earth pressure Q1, Q2, Q3: Compressive force (circumferential compressive force)

Claims

1. A dam material having a circular, elliptical or track-shaped planar shape is installed inside a frame-shaped trench formed by excavating the ground in order to construct a frame-shaped foundation in a plan view. A temporary soil storage structure, characterized in that soil generated when the ground is excavated is temporarily stored inside the dam material.

2. The temporary soil storage structure according to claim 1, characterized in that a non-soil-removed area between the corners of the frame-shaped trench and the weir material, where no soil is present, functions as a work scaffold.

3. 3. A temporary soil storage structure according to claim 1 or 2, characterized in that the soil comprises a columnar soil surrounded by the dam material and a cone-shaped soil placed on top of the columnar soil.

4. The temporary soil structure according to claim 1 or 2, characterized in that the dam material is made of wire mesh.

5. A backfill structure using temporary soil, which forms the temporary soil structure according to claim 3, and in which the columnar soil and the cone-shaped soil are used as backfill soil, A backfill structure using temporary retained soil, characterized in that when the height of the dam material is lower than the design height of the backfill soil inside the frame-shaped trench, the dam material is left in place and the columnar soil surrounded by the dam material is used as backfill soil in a temporary state, and part or all of the cone-shaped soil is used as backfill soil in the space between the rising part of the foundation constructed in the frame-shaped trench and the dam material.

6. an excavation and installation process for excavating the ground to construct a frame-shaped trench in order to construct a frame-shaped foundation in a plan view, and installing a weir material having a circular, elliptical, or track-shaped plan view shape inside the frame-shaped trench; This method for temporary soil storage comprises a temporary soil storage step of temporarily storing soil generated when the ground is excavated inside the dam material.

7. Following the soil temporary placement step, the foundation is constructed in the frame-shaped groove, In the foundation construction step, a non-remnant soil area between the corner of the frame-shaped groove and the weir material, where no remnant soil exists, is used as a work scaffold, 7. The soil temporary storage method according to claim 6, characterized in that in the soil temporary storage step, a columnar soil surrounded by the dam material is constructed, and then a cone-shaped soil is placed on top of the columnar soil.

Citation Information

Patent Citations

  • Temporary placement method for excavated surplus soil

    JP2012035224A