Decentralized power supply control system and decentralized power supply control method
The distributed power supply control system addresses delays in control commands by using predicted measurement data to ensure accurate and timely control of distributed power sources, improving operational efficiency and detection of abnormalities.
Patent Information
- Application Number
- JP2023053578
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-29
- Publication Date
- 2024-10-10
- Estimated Expiration
- 2043-03-29
AI Technical Summary
The delay in control commands due to the presence of a relay server between a business server and distributed power sources leads to inaccurate control, as the state of the power sources may differ from the expected state by the time the commands are received, making proper control difficult.
A distributed power supply control system with a first server generating control commands based on predicted values of measurement data calculated by a second server, which stores and processes measurement data from distributed power sources, reducing delays and ensuring accurate control.
The system enables precise control of distributed power sources by predicting their states, allowing for timely and effective management of their lifespan and abnormalities, thereby enhancing operational efficiency.
Smart Images

Figure 2024141758000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a distributed power supply control system and a distributed power supply control method. [Background technology]
[0002] In recent years, in order to share a power storage device within a community, a server that controls charging or discharging of the power storage device while reserving a portion of the capacity of the power storage device has become known (for example, Patent Document 1). [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2016-174486 A Summary of the Invention [Problem to be solved by the invention]
[0004] Incidentally, a case is assumed in which a relay server that relays control commands transmitted from the business server to the distributed power source is placed between the distributed power source and a server (hereinafter, business server) that controls a distributed power source such as a power storage device. For example, the relay server can detect the life or anomaly of the distributed power source by acquiring measurement data related to the distributed power source.
[0005] However, in a case where a relay server is placed between the business operator server and the distributed power source, when the business operator server transmits a control command, a delay time is assumed between when the measurement data is transmitted from the distributed power source and when the control command reaches the distributed power source. For example, the delay time may be the time it takes for the relay server to collect the measurement data from the distributed power source, the time it takes for the business operator server to read the measurement data from the relay server, the time it takes for the business operator server to generate a control command based on the measurement data, and so on.
[0006] In other words, since the control commands for controlling the distributed power source are generated based on measurement data from the previous delay time described above, the state of the distributed power source may differ from that expected, and the distributed power source may not be able to be controlled appropriately.
[0007] Therefore, the present invention has been made to solve the above-mentioned problems, and aims to provide a distributed power supply control system and a distributed power supply control method that enable appropriate control of a distributed power supply while detecting the lifespan or abnormalities of the distributed power supply. [Means for solving the problem]
[0008] One aspect of the disclosure is a distributed power source control system comprising a first server that generates control commands to control a distributed power source installed in a facility, and a second server that relays the control commands between the first server and the distributed power source, wherein the second server comprises a memory unit that stores measurement data related to the distributed power source and a calculation unit that calculates a predicted value of the measurement data based on a predetermined time, and the first server comprises a generation unit that generates the control commands based on the predicted value of the measurement data.
[0009] One aspect of the disclosure is a distributed power source control method comprising the steps of: a first server generating a control command to control a distributed power source installed in a facility; a second server relaying the control command between the first server and the distributed power source; the second server storing measurement data related to the distributed power source; the second server calculating a predicted value of the measurement data based on a predetermined time; and the first server generating the control command based on the predicted value of the measurement data. Effect of the Invention
[0010] According to the present invention, it is possible to provide a distributed power supply control system and a distributed power supply control method that are capable of appropriately controlling a distributed power supply while detecting the lifespan or abnormality of the distributed power supply. [Brief description of the drawings]
[0011] [Figure 1] FIG. 1 is a diagram showing a distributed power supply control system 1 according to an embodiment. [Diagram 2] FIG. 2 is a diagram showing a facility 100 according to the embodiment. [Diagram 3] FIG. 3 is a diagram showing the first server 200 according to the embodiment. [Figure 4] FIG. 4 is a diagram showing the second server 300 according to the embodiment. [Diagram 5] FIG. 5 is a diagram for explaining a predicted value of measurement data according to the embodiment. [Figure 6] FIG. 6 is a diagram for explaining an operation example according to the embodiment. [Figure 7] FIG. 7 is a diagram for explaining an operation example according to the embodiment. [Figure 8] FIG. 8 is a diagram for explaining an operation example according to the embodiment. [Figure 9] FIG. 9 is a diagram for explaining an operation example according to the embodiment. [Figure 10] FIG. 10 is a diagram for explaining an operation example according to the embodiment. [Figure 11] FIG. 11 is a diagram for explaining an operation example according to the embodiment. [Figure 12] FIG. 12 is a diagram for explaining an operation example according to the embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0012] Hereinafter, the embodiments will be described with reference to the drawings. In the following description of the drawings, the same or similar parts are denoted by the same or similar reference numerals. However, the drawings are schematic.
[0013] [Embodiment] (Distributed Power Control System) A distributed power supply control system according to an embodiment will be described below. The distributed power supply control system may be simply called a power system.
[0014] 1, the distributed power supply control system 1 includes a facility 100. The distributed power supply control system 1 includes a first server 200 and a second server 300.
[0015] Here, the facility 100, the first server 200, and the second server 300 are configured to be able to communicate with each other via a network 11. The network 11 may include the Internet, a dedicated line such as a VPN (Virtual Private Network), or a mobile communication network.
[0016] The facility 100 is connected to the power system 12 and may receive power from the power system 12 or may supply power to the power system 12. Power from the power system 12 to the facility 100 may be referred to as forward flow power. Power from the facility 100 to the power system 12 may be referred to as reverse flow power. In FIG. 1, facilities 100A to 100C are illustrated as examples of the facility 100.
[0017] Although not particularly limited, the facility 100 may be a facility such as a residence, a facility such as a store, or a facility such as an office. The facility 100 may be an apartment building including two or more residences. The facility 100 may be a complex including at least two or more facilities of residences, stores, and offices. Details of the facility 100 will be described later (see FIG. 2). Note that a user who owns or manages the facility 100 may also be referred to as the facility 100.
[0018] The first server 200 is managed by a business operator (electricity retailer) that sells electricity to the facility 100. The electricity retailer may include a local power business operator (general electric utility) that manages infrastructure such as the power grid 12, and may also include a new power business operator other than the local power business operator. The new power business operator may be expected to sell electricity to the facility by procuring electricity from the electricity market. The first server 200 may be referred to as a business operator server. Details of the first server 200 will be described later (see FIG. 3). The business operator that manages the first server 200 may also be referred to as the first server.
[0019] Here, the electricity market may include a wholesale electricity market for trading electricity (procured electricity) supplied to facility 100, an electricity adjustment market for adjusting the gap between electricity supply and demand after the gate of the wholesale electricity market is closed, and a capacity market for trading supply capacity (e.g., reverse flow electricity). The electricity market may include electricity trading with other retail electricity suppliers. The electricity market may include electricity trading with other power generation suppliers. In other words, the electricity market may be an exchange for trading electricity, regardless of the form such as one-to-one, one-to-other, or many-to-many.
[0020] In the embodiment, the first server 200 is an example of a first server that generates a control command to control the distributed power sources installed in the facility 100.
[0021] The second server 300 may be managed by a business that manufactures or sells the distributed power source. The second server 300 may receive measurement data related to the distributed power source and detect the life or abnormality of the distributed power source based on the measurement data. The second server 300 relays control commands between the first server 200 and the distributed power source. That is, the first server 200 does not directly issue at least some control commands to the distributed power source. The second server 300 relays measurement data between the distributed power source and the first server 200. That is, the first server 200 acquires at least some of the measurement data only from the second server 300. The second server 300 may process the measurement data when relaying the measurement data. The second server may be called a relay server. Details of the second server 300 will be described later (see FIG. 4). The business that manages the second server 300 may also be called the second server.
[0022] Here, the measurement data related to the distributed power source may include the operation mode of the distributed power source, the output power value of the distributed power source, the time associated with these, etc. For example, when the distributed power source is the power storage device 120, the measurement data related to the power storage device 120 may include the operation mode of the power storage device 120 (e.g., charge mode, discharge mode, standby mode), the charge power value of the power storage device 120, the discharge power value of the power storage device 120, the chargeable power value (available capacity value) of the power storage device 120, the dischargeable power value of the power storage device 120 (remaining storage amount value), the time associated with these, etc.
[0023] In the embodiment, the second server 300 is an example of a second server that relays control commands between the first server 200 and the distributed power sources.
[0024] (facility) A facility according to an embodiment will be described below. As shown in Fig. 2, the facility 100 may include a solar cell device 110, a power storage device 120, a fuel cell device 130, a load device 140, and an EMS (Energy Management System) 160. The facility 100 may also include a measuring device 190.
[0025] The solar cell device 110 is a distributed power source that generates power in response to light such as sunlight. For example, the solar cell device 110 is configured with a PCS (Power Conditioning System) and a solar panel. Here, installation may mean that the solar cell device 110 and the power grid 12 are connected.
[0026] The power storage device 120 is a distributed power source that charges and discharges power. For example, the power storage device 120 is configured by a PCS and a power storage cell. Here, "installed" may mean that the power storage device 120 is connected to the power system 12. In the following, the power storage device 120 is an example of a distributed power source used to adjust the power supply and demand balance of the power system 12. The power storage device 120 may be considered to be an example of a distributed power source used for VPP (Virtual Power Plant) control.
[0027] The fuel cell device 130 is a distributed power source that generates power using fuel. For example, the fuel cell device 130 is composed of a PCS and a fuel cell. Here, "installation" may mean that the fuel cell device 130 and the power system 12 are connected.
[0028] For example, the fuel cell device 130 may be a solid oxide fuel cell (SOFC; Solid Oxide Fuel Cell), a polymer electrolyte fuel cell (PEFC; Polymer Electrolyte Fuel Cell), a phosphoric acid fuel cell (PAFC; Phosphoric Acid Fuel Cell), or a molten carbonate fuel cell (MCFC; Molten Carbonate Fuel Cell).
[0029] The load device 140 is a device that consumes electric power. For example, the load device 140 may include an air conditioner, a heat pump water heater, a lighting device, and the like.
[0030] The EMS 160 manages the power related to the facility 100. The EMS 160 may control the solar cell device 110, the power storage device 120, the fuel cell device 130, and the load device 140. In the embodiment, the EMS 160 is illustrated as an apparatus that receives a control command from the first server 200, but such an apparatus may be referred to as a Gateway or simply as a control unit. The EMS 160 may be referred to as a Local EMS (LEMS) or a Home EMS (HEMS) to distinguish it from the first server 200.
[0031] The measuring device 190 measures forward flow power (hereinafter also referred to as demand power) from the power system 12 to the facility 100. The measuring device 190 may measure reverse flow power from the facility 100 to the power system 12. For example, the measuring device 190 may be a Smart Meter belonging to a power company. The measuring device 190 may transmit an information element indicating a measurement result (an integrated value of forward flow power or reverse flow power) in a first interval (e.g., 30 minutes) to the EMS 160 at each first interval. The measuring device 190 may transmit an information element indicating a measurement result in a second interval (e.g., 1 minute) shorter than the first interval to the EMS 160. In addition, when the measuring device 190 is a current transformer, any of the solar cell device 110, the power storage device 120, the fuel cell device 130, the load device 140, and the EMS 160 may use the measuring device 190.
[0032] (First server) The first server according to the embodiment will be described below. As shown in FIG.
[0033] The communication unit 210 is configured by a communication module. The communication module may be a wireless communication module conforming to standards such as IEEE802.11a / b / g / n / ac / ax, ZigBee, Wi-SUN, LTE, 5G, and 6G, or may be a wired communication module conforming to standards such as IEEE802.3.
[0034] For example, the communication unit 210 may transmit a control command to the second server 300 to control the distributed power source. The communication unit 210 may receive measurement data related to the distributed power source from the second server 300. As described above, the measurement data may be processed by the second server 300. The processed measurement data may be a predicted value of the measurement data, which will be described later.
[0035] Here, the predicted value of the measurement data may include a predicted value of the operation mode of the distributed power source, a predicted value of the output power value of the distributed power source, etc. For example, when the distributed power source is the power storage device 120, the predicted value of the measurement data may include a predicted value of the operation mode (e.g., charge mode, discharge mode, standby mode) of the power storage device 120, a predicted value of the charge power value of the power storage device 120, a predicted value of the discharge power value of the power storage device 120, a predicted value of the chargeable power value (available capacity value) of the power storage device 120, a predicted value of the dischargeable power value (remaining storage capacity value) of the power storage device 120, etc.
[0036] The predicted value of the charging power value of the power storage device 120 and the predicted value of the discharging power value of the power storage device 120 may be expressed in W, Wh, or a coefficient.
[0037] The management unit 220 is configured with a storage medium such as a hard disk drive (HDD), a solid state drive (SSD), or a non-volatile memory.
[0038] For example, the management unit 220 may manage one or more facilities 100 connected to the power grid 12. The management of one or more facilities 100 may be interpreted as management of one or more distributed power sources connected to the power grid 12. For example, the management unit 220 may manage measurement data received from the second server 300.
[0039] The management unit 220 may manage information related to the facility 100. For example, the information related to the facility 100 includes the type of distributed power source (the solar cell device 110, the power storage device 120, or the fuel cell device 130) provided in the facility 100, the specifications of the distributed power source (the solar cell device 110, the power storage device 120, or the fuel cell device 130) provided in the facility 100, and the like. The specifications may include the rated power generation of the solar cell device 110, the rated charging power of the power storage device 120, the rated discharging power of the power storage device 120, and the rated output power of the fuel cell device 130. The specifications may include the rated capacity of the power storage device 120, the maximum charging and discharging power, and the like.
[0040] The control unit 230 may include at least one processor. The at least one processor may be configured by a single integrated circuit (IC), or may be configured by a plurality of circuits (such as integrated circuits and / or discrete circuits) communicatively connected to each other.
[0041] For example, the control unit 230 may formulate a control plan for the distributed power sources based on the measurement data received from the second server 300. The control plan may be formulated to minimize the cost of procuring power by the first server 200 (e.g., a new power supplier). The control plan may be formulated to minimize the cost of power demand of the facility 100. The control unit 230 may generate a control command according to the control plan.
[0042] In the embodiment, the control unit 230 constitutes a generating unit that generates a control command based on a predicted value of the measurement data. For example, if a control command is generated to supply power to the load device 140 or the like from the power storage device 120, the control unit 230 of the first server 200 acquires a predicted value (remaining power storage value) of the measurement data of each power storage device 120 managed by the management unit 320 of the second server 300 (the first server 200 may read the predicted value of the measurement data managed by the management unit 320, or may read it from the management unit 220 that manages the predicted value of the measurement data transmitted by the second server 300), calculates a discharge power value that can be outputted constantly at a time interval for which discharge control is scheduled based on the predicted value of the measurement data of each power storage device 120, and generates a control command (discharge time, discharge end time, and discharge power value) for each power storage device 120. Details of the predicted value of the measurement data will be described later.
[0043] (Second server) The second server according to the embodiment will be described below. As shown in FIG.
[0044] The communication unit 310 is configured by a communication module. The communication module may be a wireless communication module conforming to standards such as IEEE802.11a / b / g / n / ac / ax, ZigBee, Wi-SUN, LTE, 5G, and 6G, or may be a wired communication module conforming to standards such as IEEE802.3.
[0045] For example, the communication unit 310 receives a control command to control the distributed power source from the first server 200. The communication unit 310 transmits the control command received from the first server 200 to the distributed power source. The control command may be relayed from the first server 200 to the distributed power source without being processed by the second server 300.
[0046] For example, the communication unit 310 receives measurement data related to the distributed power source. The communication unit 310 transmits the measurement data received from the distributed power source to the first server 200. The measurement data may be processed by the second server 300 and then relayed from the distributed power source to the first server 200. The measurement data processed by the second server 300 may be a predicted value of the measurement data. The predicted value of the measurement data will be described in detail later.
[0047] The management unit 320 is configured with a storage medium such as a hard disk drive (HDD), a solid state drive (SSD), or a non-volatile memory.
[0048] For example, the management unit 320 may manage measurement data received from the distributed power sources. The measurement data may be used to detect the life span or abnormality of the distributed power sources. In addition to the measurement data, the management unit 320 may also manage predicted values of the measurement data, which will be described later.
[0049] In the embodiment, the management unit 320 constitutes a memory unit that stores measurement data related to the distributed power sources.
[0050] The control unit 330 may include at least one processor. The at least one processor may be configured by a single integrated circuit (IC), or may be configured by a plurality of circuits (such as integrated circuits and / or discrete circuits) communicatively connected to each other.
[0051] In the embodiment, the control unit 330 constitutes a calculation unit that calculates a predicted value of the measurement data based on a predetermined time. The predetermined time may be a time after the time when the measurement data is received and a time before the time when the control of the distributed power source is executed by a control command.
[0052] Here, the control unit 330 may calculate predicted values of the measurement data before and after the predetermined time in addition to the predicted value of the measurement data at the predetermined time. The predetermined time may be two or more times defined at a constant time interval.
[0053] The control unit 330 may calculate a predicted value of the measurement data based on the state of the distributed power sources and the power consumption of the facility 100, etc.
[0054] The state of the distributed power source may include the operation mode and output power value of the distributed power source. For example, when the distributed power source is the power storage device 120, the state of the power storage device 120 may include the operation mode of the power storage device 120 (e.g., charge mode, discharge mode, standby mode), the charge power value of the power storage device 120, the discharge power value of the power storage device 120, the chargeable power value (available capacity value) of the power storage device 120, and the dischargeable power value (remaining storage amount value) of the power storage device 120.
[0055] As a specific method for calculating the predicted value, the following method is conceivable. For example, the control unit 330 acquires the remaining storage capacity value of the power storage device 120 and a schedule of the charging or discharging start time as measurement data from the distributed power source, and judges whether the power storage device 120 will be charged or discharged by a predetermined time. The control unit 330 calculates how much remaining power will be if the power storage device 120 is to be charged or discharged (in other words, how much will be charged or discharged). The calculated value is managed by the management unit 320 as a predicted value of the measurement data. The remaining storage capacity value of the power storage device 120 may be expressed in %, or in kWh.
[0056] (Predicted value of measurement data) The predicted value of the measurement data according to the embodiment will be described below. In the following, a case where the distributed power source is the power storage device 120 will be illustrated. The second server 300 receives measurement data at a predetermined interval (e.g., 10 minutes, etc.) from each of the two or more power storage devices 120 managed by the second server 300. The predetermined interval may be considered as an update interval of the measurement data of the two or more power storage devices 120. In the example, FIG. 5 shows options of a target period for which the second server 300 calculates a predicted value of the measurement data, where Alt.1 indicates that the target period is from when the reception of the measurement data from the power storage device 120 is started to when the transmission of a control command to the power storage device 120 is completed, Alt.2 indicates that the target period is from when the second server 300 receives a control command from the first server 200 to when the first server 200 completes reading the predicted value of the measurement data, and Alt.4 indicates that the target period is from when the second server 300 receives the last measurement data of the power storage device 120 to when the second server 300 receives the last measurement data of the power storage device 120.
[0057] As shown in Alt.1 to Alt.4 of FIG. 5, the second server 300 receives measurement data from a first power storage device 120 among the two or more power storage devices 120 at time t1, and receives measurement data from a last power storage device 120 among the two or more power storage devices 120 at time t2. The first power storage device 120 is the power storage device 120 that transmits the first measurement data used to formulate a control plan. The last power storage device 120 is the power storage device 120 that transmits the last measurement data used to formulate a control plan. Time t1 may be considered to be the time when the first measurement data arrives at the second server 300. Time t2 may be considered to be the time when the last measurement data arrives at the second server 300. The delay time between time t1 and time t2 is the delay time required for the measurement data collection process and the calculation of a predicted value of the measurement data from the collected measurement data.
[0058] 5, the first server 200 starts reading the predicted values of the measurement data from the second server 300 at time t2, and completes reading the predicted values of the measurement data from the second server 300 at time t3. The delay time between time t2 and time t3 is the delay time required for the process of reading the predicted values of the measurement data.
[0059] 5, the first server 200 starts generating a control command based on the predicted value of the measurement data at time t3, and completes generating the control command based on the predicted value of the measurement data at time t4. The delay time between time t3 and time t4 is the delay time required for the process of generating the control command.
[0060] 5, the first server 200 transmits a control command to the second server 300 at time t4, and the second server 300 completes transmission of the control command to the power storage device 120 at time t5. Time t5 may be considered to be the time at which the control command reaches the power storage device 120. The delay time between time t4 and time t5 is the delay time required for the transmission process of the control command.
[0061] First, a problem that arises in a case where there is a delay time between when measurement data is transmitted from the power storage device 120 and when a control command reaches the power storage device 120, as shown in FIG. 5, will be described.
[0062] Specifically, the control command is generated assuming measurement data from a maximum delay time before t5-t1. Therefore, the state of the power storage device 120 may differ from the assumption, and the power storage device 120 may not be appropriately controlled.
[0063] Secondly, an operation for solving the above-mentioned problem will be described.
[0064] Specifically, the second server 300 does not transmit the measurement data as it is to the first server 200, but transmits a predicted value of the measurement data calculated based on a predetermined time to the first server 200. As the predetermined time, alternatives Alt.1 to Alt.4 are possible, as shown in FIG.
[0065] In Alt.1, the predetermined time may be time t5. That is, a predicted value of the measurement data may be calculated based on the time when a control command is assumed to be transmitted to the power storage device 120 (or the time when a control command is assumed to reach the power storage device 120). Also, time t5 may be the time when a control command is transmitted to the first power storage device, the time when a control command is transmitted to the last power storage device, or the time when a control command is transmitted to an intermediate power storage device.
[0066] In Alt.2, the predetermined time may be time t4. That is, the predicted value of the measurement data may be calculated based on the time when the first server 200 is expected to transmit the control command to the second server 300.
[0067] In Alt.3, the predetermined time may be time t3. That is, the predicted value of the measurement data may be calculated based on the time when the first server 200 is assumed to complete reading the predicted value of the measurement data.
[0068] In Alt.4, the predetermined time may be time t2. That is, the predicted value of the measurement data may be calculated based on the time when the second server 300 is assumed to receive the last measurement data. The predicted value of the measurement data may be calculated based on the time when the predicted value of the measurement data is assumed to be calculated from the last measurement data received.
[0069] In Alt.1 to Alt.4, since it is assumed that the time when the power storage device 120 transmits the measurement data differs for each power storage device 120, the delay time referred to in calculating the predicted value of the measurement data may differ for each power storage device 120. The predicted value of the measurement data is calculated based on the state of each power storage device 120 and the power consumption of each facility 100 in which the power storage device 120 is installed.
[0070] (Example of operation) An operation example according to the embodiment will be described below. As the operation example, the following operation example is considered.
[0071] First, the first operational example will be described with reference to FIG.
[0072] In the first operation example, as shown in FIG. 6, the power storage device 120 transmits measurement data to the second server 300 in step S10.
[0073] In step S12, the second server 300 stores the measurement data.
[0074] In step S14, the second server 300 calculates a predicted value of the measurement data based on a predetermined time. The predetermined time may be any one of Alt.1 to Alt.4 shown in FIG.
[0075] In step S16, the second server 300 transmits the predicted value of the measurement data to the first server 200. Step S16 may be considered as a process in which the first server 200 reads the predicted value of the measurement data.
[0076] In step S18, the first server 200 formulates a control plan for the power storage device 120. In other words, the first server 200 generates a control command based on a predicted value of the measurement data.
[0077] In step S20, the first server 200 transmits a control command to the second server 300.
[0078] In step S22, the second server 300 transmits a control command to the power storage device 120.
[0079] Secondly, the second operation example will be described with reference to Fig. 7. In the following, differences from the first operation example will be mainly described.
[0080] In the second operation example, the communication unit 310 of the second server 300 constitutes a transmission unit that transmits the measurement data or the predicted value of the measurement data to the first server 200 in response to a request from the first server 200.
[0081] 7, the second server 300 may transmit measurement data to the first server 200X in response to a request from the first server 200X. Meanwhile, the second server 300 may transmit a predicted value of the measurement data to the first server 200Y in response to a request from the first server 200Y. In such a case, the first server 200X may formulate a control plan for the power storage device 120 after calculating the predicted value of the measurement data by itself.
[0082] That is, in the second operation example, the first server 200 may be able to select whether to receive the measurement data or the predicted value of the measurement data.
[0083] Thirdly, the operation example 3 will be described with reference to Fig. 8. In the following, differences from the operation example 1 will be mainly described. In Fig. 8, the same step numbers are assigned to the same steps as in Fig. 6. The description of the same steps as in Fig. 6 will be omitted.
[0084] In the third operation example, the control unit 330 of the second server 300 configures a control unit that, when transmitting a predicted value of the measurement data to the first server 200, restricts the operation of the power storage device 120 until a specific instruction is received from the first server 200. The specific instruction may be a control command itself, or an instruction to the effect that it is not necessary to restrict the operation of the power storage device 120.
[0085] 8, in step S17A, the second server 300 transmits a hold command to the power storage device 120 to instruct the power storage device 120 to limit the operation of the power storage device 120. In step S17B, the power storage device 120 limits its operation.
[0086] In the operation example 3, the restriction on the operation of the power storage device 120 may be a restriction on the operation of the power storage device in which the deviation of the measurement data from the predicted value at a predetermined time exceeds a threshold value. For example, even if the predicted value of the measurement data acquired by the first server 200 at 10:00 is "predicted value of the discharge power amount at 12:00: 2 kWh (or the remaining power storage value, etc.)", if the load increases more than expected, the discharge power of the power storage device 120 will reach 2 kWh at 11:00 earlier than predicted, and the deviation from the predicted value of the measurement data will become large. Therefore, an upper limit of the discharge power value is calculated so that the discharge power amount until 12:00 falls within the range of the predicted value of the discharge power amount, and this is used as a threshold value to restrict the operation of the power storage device 120. The restriction on the operation of the power storage device 120 may be a prohibition on the user of the facility 100 or the EMS 160 from changing the operation mode of the power storage device 120. The restriction on the operation of the power storage device 120 may be at least one of an upper limit and a lower limit of a charging power value of the power storage device 120 set by a user of the facility 100 or the EMS 160. The restriction on the operation of the power storage device 120 may be at least one of an upper limit and a lower limit of a discharging power value of the power storage device 120 set by a user of the facility 100 or the EMS 160.
[0087] Fourthly, the operation example 4 will be described with reference to Fig. 9. In the following, differences from the operation example 1 will be mainly described. In Fig. 9, the same step numbers are assigned to the same steps as in Fig. 6. The description of the same steps as in Fig. 6 will be omitted.
[0088] In the fourth operation example, the control unit 330 of the second server 300 calculates a predicted value of the measurement data with a predetermined time designated by the first server 200 as a reference.
[0089] For example, as shown in Fig. 9, in step S13, the first server 200 transmits a request for transmission of a predicted value of measurement data to the second server 300. The request includes an information element specifying a predetermined time. The predetermined time specified by the first server 200 may be any one of Alt.1 to Alt.4 shown in Fig. 5.
[0090] Fifthly, the fifth operational example will be described with reference to Fig. 10. In the following, differences from the first operational example will be mainly described.
[0091] In the fifth operation example, the control unit 330 of the second server 300 constitutes a selection unit that selects, based on the conditions specified by the first server 200, the power storage device 120 for which the predicted value of the measurement data is to be calculated.
[0092] 10, the first server 200 notifies the second server 300 of a condition for selecting the power storage device 120 for which the predicted value of the measurement data is to be calculated. The notification of the condition may be executed by the request described in the fourth operation example.
[0093] In the fifth operational example, the condition may be that the dischargeable power value (remaining power storage value) of the power storage device 120 is equal to or greater than a threshold value. The condition may be that the chargeable power value (available capacity value) of the power storage device 120 is equal to or greater than a threshold value. The condition may be that the forward flow power (purchased power) of the facility 100 in which the power storage device 120 is installed is equal to or greater than a threshold value, or that the forward flow power (purchased power) of the facility 100 in which the power storage device 120 is installed is equal to or less than a threshold value. The condition may be that the reverse flow power (sold power) of the facility 100 in which the power storage device 120 is installed is equal to or greater than a threshold value, or that the reverse flow power (sold power) of the facility 100 in which the power storage device 120 is installed is equal to or less than a threshold value.
[0094] Although not particularly limited, similarly to the operation example 3, the second server 300 may transmit a hold command to the power storage device 120 for which the predicted value of the measurement data is to be calculated. In other words, the operation of the power storage device 120 for which the predicted value of the measurement data is to be calculated may be restricted.
[0095] Sixth, the sixth operation example will be described with reference to Fig. 11. In the following, differences from the first operation example will be mainly described.
[0096] In operation example 6, the control unit 330 of the second server 300 configures a control unit that limits the operation of the storage device 120 when a predicted value of the measurement data is transmitted to the first server 200 and a condition corresponding to the predicted value of the measurement data is satisfied.
[0097] 11, the second server 300 transmits a holding command including an information element indicating a condition corresponding to a predicted value of the measurement data to the power storage device 120. The power storage device 120 may allow a user's operation until the condition is satisfied, and may restrict the user's operation when the condition is satisfied.
[0098] In operation example 6, the condition corresponding to the predicted value of the measurement data may be a condition in which the dischargeable power value (remaining storage capacity value) of the power storage device 120 falls below the predicted value, or a condition in which the chargeable power value (available capacity value) of the power storage device 120 falls below a threshold value.
[0099] Seventh, the seventh operation example will be described with reference to Fig. 12. In the following, differences from the third operation example will be mainly described. In Fig. 12, the same steps as those in Fig. 8 are given the same step numbers. The description of the same steps as those in Fig. 8 will be omitted.
[0100] In operation example 7, the control unit 330 of the second server 300 does not restrict the operation of the power storage device 120 corresponding to the predicted value of the measurement data when the scheduled time at which the control command is expected to be transmitted is after the specific time, and restricts the operation of the power storage device 120 corresponding to the predicted value of the measurement data when the scheduled time is before the specific time.
[0101] For example, as shown in FIG. 12, the processes of steps S17A and S17B are not performed if the scheduled time is after the specific time, and the processes of steps S17A and S17B are performed if the scheduled time is before the specific time.
[0102] In the seventh operation example, the scheduled time at which the control command is expected to be transmitted may be notified from the first server 200 to the second server 300. For example, the notification of the scheduled time may be performed by the request described in the fourth operation example.
[0103] In the seventh operation example, the specific time may be a time when a certain time (for example, two hours) has elapsed from the time of receiving the request described in the fourth operation example. The certain time may be an initial setting value within a time range in which the second server 300 does not impair the prediction accuracy of the predicted value of the measurement data, or may be determined according to the type of measurement data that can be acquired from the power storage device 120. That is, when the scheduled time is 12 hours (or one day) after the time of receiving the request, the scheduled time is later than the specific time, so that the second server 300 does not calculate a predicted value of the measurement data and transmits the measurement data to the first server 200, and does not need to restrict the operation of the power storage device 120. When transmitting the predicted value of the measurement data or the measurement data to the first server 200, the second server 300 may add a code indicating which data it is.
[0104] In operation example 7, when a predicted value of the measurement data is transmitted to the first server 200, if the value at a specified time deviates from the predicted value of the measurement data by more than a threshold value, the second server 300 may recalculate the predicted value of the measurement data and transmit the recalculated predicted value of the measurement data to the first server.
[0105] (Action and Effects) In the embodiment, the second server 300 stores the measurement data related to the power storage device 120, and transmits a predicted value of the measurement data calculated based on a predetermined time to the first server 200 (Operation Example 1). With this configuration, the second server generates measurement data assuming the delay time before, so that the distributed power source can be appropriately controlled. Furthermore, even if the first server 200 does not have a function for detecting the lifespan or abnormality, the second server 300 can detect the lifespan or abnormality from the SOC information, elapsed time (years), and charge / discharge information included in the measurement data, and notify the first server 200. The first server 200 and the second server 300 can appropriately control the power storage device 120 while detecting the lifespan or abnormality of the power storage device 120.
[0106] In the embodiment, the second server 300 may transmit the measurement data or a predicted value of the measurement data to the first server 200 in response to a request from the first server 200. According to such a configuration, the first server 200 can select whether to calculate the predicted value of the measurement data by itself while acquiring the measurement data, or to rely on the second server 300 to calculate the predicted value of the measurement data (operation example 2).
[0107] In the embodiment, when the second server 300 transmits a predicted value of the measurement data to the first server 200, the second server 300 may limit the operation of the power storage device 120 until a specific instruction is received from the first server 200 (Operation Example 3). With this configuration, it is possible to prevent the value at the stage when the control command reaches the power storage device 120 from deviating from the predicted value of the measurement data.
[0108] In the embodiment, the second server 300 may calculate a predicted value of the measurement data based on a predetermined time designated by the first server 200 (Operation Example 4). With this configuration, the first server 200 can arbitrarily designate the predetermined time.
[0109] In the embodiment, the second server 300 may select the power storage device 120 to be used for calculating the predicted value of the measurement data based on the conditions specified by the first server 200 (Operation Example 5). With such a configuration, the first server 200 (e.g., a new power supplier) can appropriately select the power storage device 120 that contributes to minimizing the cost of procuring power, and the facility 100 can appropriately use the power storage devices 120 that are not selected.
[0110] In an embodiment, when the second server 300 transmits the predicted value of the measurement data to the first server 200, if a condition corresponding to the predicted value of the measurement data is satisfied, the second server 300 may limit the operation of the power storage device 120 (Operation Example 6). With this configuration, it is possible to prevent the value at the stage when the control command reaches the power storage device 120 from deviating from the predicted value of the measurement data while suppressing unnecessary restrictions on the operation of the power storage device 120.
[0111] In the embodiment, the second server 300 may not calculate the predicted value of the measurement data when the scheduled time at which the control command is expected to be transmitted is after the specific time, but may calculate the predicted value of the measurement data when the scheduled time is before the specific time (Operation Example 7). With this configuration, in cases where the scheduled time is a time in the distant future and the prediction accuracy of the measurement data is not sufficiently guaranteed, it is possible to suppress the calculation of unnecessary predicted values of the measurement data.
[0112] In an embodiment, the second server 300 may not restrict the operation of the power storage device 120 when the scheduled time at which the control command is expected to be transmitted is after the specific time, but may restrict the operation of the power storage device 120 when the scheduled time is before the specific time (Operation Example 7). With this configuration, in a case where the scheduled time is a time in the distant future and the prediction accuracy of the measurement data is not sufficiently guaranteed, it is possible to prevent the operation of the power storage device 120 from being excessively restricted.
[0113] [Other embodiments] Although the present invention has been described by the above-mentioned embodiment, the description and drawings forming a part of this disclosure should not be understood as limiting the present invention. From this disclosure, various alternative embodiments, examples and operating techniques will become apparent to those skilled in the art.
[0114] Although not specifically mentioned in the above disclosure, two or more operation examples selected from operation example 1 to operation example 7 may be combined.
[0115] Although not specifically mentioned in the above disclosure, the measurement data regarding the distributed power source may include a value indicating the tidal power (purchased power) of the facility 100 in which the storage device 120 is installed, and may also include a value indicating the tidal power (purchased power) of the facility 100 in which the storage device 120 is installed.
[0116] In the above disclosure, a case in which the measurement data is transmitted from the power storage device 120 to the second server 300 has been exemplified. However, the above disclosure is not limited to this. For example, the measurement data may be transmitted from the EMS 160 to the second server 300.
[0117] In the above disclosure, the case where the distributed power source controlled by the first server 200 is the power storage device 120 has been exemplified. However, the above disclosure is not limited to this. The distributed power source controlled by the first server 200 may include a solar cell device 110, a fuel cell device 130, etc. The distributed power source controlled by the first server 200 may also include a wind power generation device, a geothermal power generation device, etc.
[0118] Although not specifically mentioned in the above disclosure, power may be expressed as an instantaneous value (W or kW) or an integrated value per unit time (Wh or kWh).
[0119] Although not specifically mentioned in the above disclosure, a program may be provided that causes a computer to execute each process performed by the first server 200 or the second server 300. The program may also be recorded in a computer-readable medium. Using the computer-readable medium, it is possible to install the program in the computer. Here, the computer-readable medium on which the program is recorded may be a non-transient recording medium. The non-transient recording medium is not particularly limited, and may be, for example, a recording medium such as a CD-ROM or a DVD-ROM.
[0120] Alternatively, a chip may be provided that is configured by a memory that stores a program for executing each process performed by the first server 200 or the second server 300, and a processor that executes the program stored in the memory.
[0121] [Note] The above disclosure may be expressed as follows:
[0122] A first feature is a distributed power source control system comprising: a first server that generates control commands to control a distributed power source installed in a facility; and a second server that relays the control commands between the first server and the distributed power source, wherein the second server comprises a memory unit that stores measurement data related to the distributed power source and a calculation unit that calculates a predicted value of the measurement data based on a predetermined time, and the first server comprises a generation unit that generates the control commands based on the predicted value of the measurement data.
[0123] A second feature is a distributed power supply control system in the first feature, wherein the second server includes a transmitting unit that transmits the measurement data or a predicted value of the measurement data to the first server in response to a request from the first server.
[0124] A third feature is a distributed power supply control system according to the first or second feature, wherein the second server includes a control unit that limits operation of the distributed power supply when the second server transmits a predicted value of the measurement data to the first server until a specific instruction is received from the first server.
[0125] A fourth feature is a distributed power supply control system in which, in at least one of the first to third features, the calculation unit calculates a predicted value of the measurement data based on the specified time specified by the first server.
[0126] A fifth feature is a distributed power supply control system in which, in at least one of the first to fourth features, the second server is provided with a selection unit that selects the distributed power supply to be used to calculate the predicted value of the measurement data based on conditions specified by the first server.
[0127] A sixth feature is a distributed power supply control system in which, in at least one of the first feature to the fifth feature, the second server is provided with a control unit that limits operation of the distributed power supply when a condition corresponding to the predicted value of the measurement data is satisfied when the predicted value of the measurement data is transmitted to the first server.
[0128] A seventh feature is a distributed power supply control system in which, in at least one of the first feature to the sixth feature, the second server is provided with a control unit that does not limit operation of the distributed power supply corresponding to the predicted value of the measurement data when the expected scheduled time of the control command is after a specific time, and limits operation of the distributed power supply corresponding to the predicted value of the measurement data when the scheduled time is before the specific time.
[0129] An eighth feature is a distributed power source control method comprising: a step A in which a first server generates a control command to control a distributed power source installed in a facility; a step B in which a second server relays the control command between the first server and the distributed power source; a step C in which the second server stores measurement data related to the distributed power source; and a step D in which the second server calculates a predicted value of the measurement data based on a predetermined time, wherein step A includes a step in which the first server generates the control command based on the predicted value of the measurement data. [Explanation of symbols]
[0130] Reference Signs List 1... Distributed power supply control system, 11... Network, 12... Power system, 100... Facility, 110... Solar cell device, 120... Power storage device, 130... Fuel cell device, 140... Load device, 160... EMS, 190... Measuring device, 200... First server, 210... Communication unit, 220... Management unit, 230... Control unit, 300... Second server, 310... Communication unit, 320... Management unit, 330... Control unit
Claims
1. A first server that generates a control command to control a distributed power source installed in a facility; a second server that relays the control command between the first server and the distributed power source, the second server includes a storage unit that stores measurement data related to the distributed power source, and a calculation unit that calculates a predicted value of the measurement data based on a predetermined time; The first server includes a generating unit that generates the control command based on a predicted value of the measurement data.
2. 2 . The distributed power supply control system according to claim 1 , wherein the second server comprises a transmission unit configured to transmit the measurement data or a predicted value of the measurement data to the first server in response to a request from the first server.
3. 2. The distributed power supply control system according to claim 1, further comprising a control unit that, when the second server transmits a predicted value of the measurement data to the first server, limits operation of the distributed power supply until a specific instruction is received from the first server.
4. The distributed power supply control system according to claim 1 , wherein the calculation unit calculates the predicted value of the measurement data based on the predetermined time designated by the first server.
5. 2. The distributed power supply control system according to claim 1, wherein the second server comprises a selection unit that selects the distributed power supplies to be used for calculating the predicted value of the measurement data based on conditions specified by the first server.
6. 2. The distributed power supply control system according to claim 1, wherein the second server is further configured to limit operation of the distributed power supply when a condition corresponding to the predicted value of the measurement data is satisfied when the predicted value of the measurement data is transmitted to the first server.
7. 2. The distributed power supply control system of claim 1, wherein the second server is provided with a control unit that does not limit the operation of the distributed power supply corresponding to the predicted value of the measurement data when the expected scheduled time of the control command is after a specific time, and that limits the operation of the distributed power supply corresponding to the predicted value of the measurement data when the scheduled time is before the specific time.
8. A step A in which a first server generates a control command to control a distributed power source installed in a facility; A step B in which a second server relays the control command between the first server and the distributed power source; A step C of the second server storing measurement data related to the distributed power source; and a step D in which the second server calculates a predicted value of the measurement data based on a predetermined time, The distributed power supply control method, wherein the step A includes a step of the first server generating the control command based on a predicted value of the measurement data.
Citation Information
Patent Citations
Electric system wide area dynamical control method and system for compensating distributive communication time delay
CN102738793A
Aggregation system, control method therefor, and controller
JP2018033213A
Controller for electric power system stabilizer
JP2018107911A
Control device, storage battery control device, control system, battery unit control device, control method, storage battery control method, battery unit control device operating method, and program
WO2017203664A1
Power management system, power management method and program
JP2016174486A