Compaction method for backfill sand
The method of using a rod-shaped vibrator with controlled vibration and water application ensures effective compaction of backfill sand in narrow trenches, achieving uniform compaction and reducing construction time.
Patent Information
- Application Number
- JP2023054044
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-29
- Publication Date
- 2024-10-10
AI Technical Summary
Existing methods for compacting backfill sand in narrow excavations, such as utility line trenches, often fail to achieve a predetermined degree of compaction, necessitating rework and road closures.
A method involving a rod-shaped vibrator inserted into the backfill sand, applying vibration while moving up and down and pouring water, with specific vibration times and patterns to ensure compaction, and optionally using a rod-shaped member to enhance compaction.
Achieves a consistent 90% compaction degree across the entire excavation area, reducing rework and shortening construction time while maintaining road accessibility.
Smart Images

Figure 2024142067000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a method for compacting backfill sand. [Background technology]
[0002] Generally, electric cable joint tunnels that store electric wires, communication cables, etc. are buried under roads. Construction of these electric cable joint tunnels involves excavating a depth of about 2m, and after construction, backfill sand is poured into the excavated trench, which is then compacted and paved with asphalt. This construction is carried out with road traffic restrictions, so it is required that the asphalt paving be completed within the restricted time and traffic be opened. Backfill sand is generally compacted using heavy machinery such as compaction rollers and rammers, but when the excavation area is narrow, such as in the construction of electric cable joint tunnels, heavy machinery such as compaction rollers and rammers cannot be used.
[0003] Patent Document 1 discloses a method of compacting backfill sand in which a rod-shaped vibrator is inserted into the backfill sand and vibration is applied to compact the backfill sand while pouring water into the sand. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] Japanese Patent Application Publication No. 7-62641 Summary of the Invention [Problem to be solved by the invention]
[0005] With the technology of Patent Document 1, there are cases where the specified degree of compaction of the backfill sand cannot be ensured after compaction work of the backfill sand, making it necessary to redo the compaction work. The present invention has been made in consideration of the above-mentioned circumstances, and has an object to provide a method for compacting backfill sand that can sufficiently ensure a predetermined degree of compaction of the backfill sand. [Means for solving the problem]
[0006] In this invention, backfill sand is poured into an excavated section of a roadbed, a rod-shaped vibrator is inserted into the backfill sand layer, water is poured in while the backfill sand layer is vibrated, and the vibrator is moved up and down in the depth direction of the backfill sand layer to compact it. Effect of the Invention
[0007] According to the present invention, a predetermined degree of compaction can be maintained after the compaction work of backfill sand. [Brief description of the drawings]
[0008] [Figure 1] FIG. 2 is a schematic diagram showing the compaction work of backfill sand according to the first embodiment. [Diagram 2] 1 is a graph showing the relationship between vibration time and degree of compaction. [Diagram 3] FIG. 1 is a diagram showing the range of compaction. [Figure 4] FIG. 11 is a schematic diagram showing the compaction work of backfill sand 13 according to the second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0009] (Embodiment 1) FIG. 1 is a schematic diagram showing the compaction work of backfill sand 13. In the target roadbed G shown in FIG. 1, for example, an electric cable common trench for storing electric wires, communication cables, etc. is buried. In the construction of an electric cable common trench, for example, a narrow excavation 1 is formed by excavating the target roadbed G to a depth of about 2 m. After construction, backfill sand 13 is poured into the excavation 1, which is then compacted and then asphalt pavement is performed. The backfill sand 13 is generally compacted using heavy machinery such as a compaction roller or a rammer, but if the excavation 1 is narrow, it is not possible to use heavy machinery such as a compaction roller or a rammer. In the first embodiment, the backfill sand 13 is compacted by the compaction method shown below.
[0010] The vibrator 11A is connected to the generator 7 via an electric wire cord 11. A worker P inserts a vibrator 11A into the backfill sand 13 and compacts the backfill sand 13 by applying vibration to the layer of backfill sand 13 while pouring water into it.
[0011] Backfill sand 13 is poured into the excavated portion 1 of the roadbed G in multiple batches. With reference to Fig. 1, the backfill sand 13A and backfill sand 13B shown by imaginary lines are poured in layers and compacted in order. Finally, the backfill sand 13 is poured over almost the entire height of the excavated portion 1 and compacted. During the compaction work, after inserting the vibrator 11A deep into the layer of backfill sand 13, the vibrator 11A is moved up and down so that vibrations are applied to almost the entire layer of backfill sand 13.
[0012] The inventors have discovered that when compacting the backfill sand 13, not only can the layer of backfill sand 13 be vibrated while inserting a vibrator 11A and pouring water into it, but also the layer of backfill sand 13 can be moved up and down in the depth direction of the layer of backfill sand 13, thereby making it possible to strengthen the compaction of the layer of backfill sand 13.
[0013] 2 is a graph showing the relationship between vibration time and compaction degree when it is assumed that not only is vibration applied to the layer of backfill sand 13 while pouring water, but also the vibrator 11A is moved up and down in the depth direction of the layer of backfill sand 13. The vibration time is the time during which the vibrator 11A applies vibration to the backfill sand 13.
[0014] In Fig. 2, the circular plots indicate the degree of compaction at the position where the vibrator 11A was inserted, the triangular plots indicate the degree of compaction at a position 15 cm away from the position where the vibrator 11A was inserted, and the square plots indicate the degree of compaction at a position 30 cm away from the position where the vibrator 11A was inserted.
[0015] 2, for example, when the vibration time is 5 seconds, a compaction degree of 90% is ensured immediately above the position where the vibrator 11A is inserted and at a position 15 cm away from the position where the vibrator 11A is inserted. However, at a position 30 cm away from the position where the vibrator 11A is inserted, a compaction degree of 90% is not ensured. In contrast, when the vibration time was 10 seconds, the degree of compaction was 90% or more at all of the positions directly above the position where the vibrator 11A was inserted, 15 cm away from that position, and 30 cm away. Furthermore, when the vibration time was set to 15 seconds, no significant improvement in the degree of compaction was observed compared to when the vibration time was set to 10 seconds.
[0016] From the above, it was found that when the vibrator 11A is moved up and down in the depth direction of the layer of backfill sand 13, if the vibration time of the vibrator 11A is set to 10 seconds or more, a compaction degree of 90% can be ensured at a position 30 cm away from the position where the vibrator 11A is inserted. In this case, it is desirable to move the vibrator 11A up and down over almost the entire area of the layer of backfill sand 13 in the depth direction.
[0017] Fig. 3 is a diagram showing the compaction range. Fig. 3 shows a square range 21 and circular ranges 23A, 23B, 23C, 23D, 23E, and 23F. Hereinafter, the circular ranges may be collectively referred to as the circular range 23.
[0018] When compacting a square area 21, according to the graph shown in FIG. 2, the vibrator 11A needs to compact the backfill sand 13 with a radius of 30 cm to a compaction degree of 90% or more with a vibration time of 10 seconds.
[0019] In the case of backfill sand 13 in a square area 21, the backfill sand 13 can be compacted to a compaction degree of 90% or more by inserting the vibrator 11A into the center of each of the circular areas 23A, 23B, 23C, 23D, 23E, and 23F six times.
[0020] In this embodiment, as shown in FIG. 2, a correlation is obtained regarding the degree of compaction (%) between the vibration time (S) of the vibrator and the area of the layer of backfill sand 13 within a predetermined radius from the vibrator. Then, the vibrator 11A is inserted into the backfill sand 13 at a predetermined radius from the vibrator based on the correlation regarding the degree of compaction (%) and vibrated for a predetermined period of time, thereby vibrating the backfill sand 13 and compacting it.
[0021] The circular area 23 is an example of the area of the layer of the backfill sand 13 within a predetermined radius centered on the vibrator 11A, which can ensure a predetermined degree of compaction of the backfill sand 13. The vibration time of 10 seconds is also an example of the predetermined time.
[0022] The effects of this embodiment will be described below. In this embodiment, the method of compacting the backfill sand 13 involves pouring the backfill sand 13 into the excavated portion 1 of the roadbed G, inserting a rod-shaped vibrator 11A into the layer of backfill sand 13 and vibrating the layer of backfill sand 13 while pouring water in, and moving the vibrator 11A up and down in the depth direction of the layer of backfill sand 13 to compact it. This makes it possible to maintain a predetermined degree of compaction after the backfill sand 13 is compacted.
[0023] Also, the vibrator 11A may be moved up and down over substantially the entire depth direction of the backfill sand 13 layer. This allows a predetermined degree of compaction to be maintained over almost the entire area of the backfill sand 13.
[0024] In addition, a correlation regarding the degree of compaction of the backfill sand 13 layer may be obtained between the vibration time (S) of the vibrator 11A and the area of the layer of backfill sand 13 within a specified radius centered on the vibrator 11A, and for each area based on the correlation, the vibrator 11A may be inserted into the backfill sand 13 and vibrated for a specified time, thereby vibrating the backfill sand 13 to compact it. This allows the work time to be shortened while maintaining a desired degree of compaction.
[0025] Also, the backfill sand 13 may be poured into the excavated portion 1 of the roadbed G in several batches, and each layer of the poured backfill sand 13 may be vibrated to compact it. According to this, even if the excavated portion 1 is deep, a predetermined degree of compaction can be maintained.
[0026] (Embodiment 2) FIG. 4 is a schematic diagram showing the compaction operation of the backfill sand 13 according to the second embodiment. The second embodiment has the same configuration as the first embodiment, but further includes a rod-shaped member 30 attached to the vibrator 11A. The rod-shaped member 30 is tightly fixed to the outer periphery of the vibrator 11A by a binder 32. The diameter of the rod-shaped member 30 is slightly smaller than the diameter of the vibrator 11A. The rod-shaped member 30 is disposed so as to protrude from the tip of the vibrator 11A.
[0027] The inventors have found that the degree of compaction can be improved by poking the backfill sand 13 with the rod-shaped member 30 when moving the vibrator 11A up and down. In particular, it has been found that when the rod-shaped member 30 has a diameter smaller than that of the vibrator 11A, the rod-shaped member 30 can easily penetrate into the layer of the backfill sand 13, improving workability.
[0028] According to the second embodiment, the method of compacting the backfill sand 13 is to attach a rod-shaped member 30 to the vibrator 11A, and to compact the layer of the backfill sand 13 by poking the rod-shaped member 30 as the vibrator 11A moves up and down. This allows the backfill sand 13 to be compacted by the rod-shaped members 30, which contributes to improving the degree of compaction.
[0029] From the viewpoint of strength, the rod-shaped member 30 is preferably made of a metal. Furthermore, from the viewpoint of availability, the rod-shaped member 30 is more preferably made of a steel bar.
[0030] (Other embodiments) The present invention is not limited to the above-described embodiments, and various modifications are possible. Embodiments obtained by appropriately combining the technical means disclosed in the different embodiments are also included in the technical scope of the present invention. Although not shown in the figures, a work vehicle equipped with a water tank and a generator may be used to vibrate the vibrator while pouring water into the work vehicle. [Explanation of symbols]
[0031] 1. Excavation Section 7. Generator 11 Electrical cord 11A Vibrator 13 Backfill sand 30 Rod-shaped member 32 Binding tool G Roadbed P worker
Claims
1. Backfill sand is poured into the excavated part of the roadbed, A rod-shaped vibrator is inserted into the backfill sand layer, and vibration is applied to the backfill sand layer while pouring water into the layer, and the vibrator is moved up and down in the depth direction of the backfill sand layer to compact it. Methods for compacting backfill sand.
2. A rod-shaped member is attached to the vibrator, and the backfill sand layer is poked and compacted by the rod-shaped member as the vibrator moves up and down. A method for compacting backfill sand according to claim 1.
3. The vibrator is moved up and down over substantially the entire depth direction of the backfill sand layer. A method for compacting backfill sand according to claim 1 or 2.
4. A correlation is obtained between a vibration time of the vibrator and an area of the backfill sand layer within a predetermined radius centered on the vibrator, the correlation being related to a degree of compaction of the backfill sand layer; For each of the areas based on the correlation, the vibrator is inserted into the backfill sand and vibrated for a predetermined period of time, thereby vibrating the backfill sand and compacting it. A method for compacting backfill sand according to claim 1.
5. The backfill sand is poured into the excavated portion of the roadbed in multiple batches, and each layer of the backfill sand is compacted. A method for compacting backfill sand according to claim 1.
Citation Information
Patent Citations
Method of compacting back-filled sand
JP1995062641A