Crane placement support system

The crane placement support system addresses the challenge of selecting crane positions by using a structure model and crane data to determine optimal crane positions, enhancing cost efficiency and process optimization.

JP2024143118AInactive Publication Date: 2024-10-11YOKOGAWA CORP TECH INFORMATION +1

Patent Information

Application Number
JP2023055625
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-30
Publication Date
2024-10-11
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing technologies lack the ability to easily and appropriately select crane positions, which significantly impact construction costs, and there is a shortage of engineers with the necessary expertise to make informed decisions.

Method used

A crane placement support system that utilizes a structure model and crane specification data to determine optimal crane positions based on the layout relationship between the planned erection position, crane position, and ground assembly position, incorporating a crane selection, erection member designation, and crane position selection means.

Benefits of technology

Enables easy and appropriate crane position selection, reducing construction costs and allowing simultaneous display of crane postures, thereby optimizing the construction process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024143118000001_ABST
    Figure 2024143118000001_ABST
Patent Text Reader

Abstract

To provide a crane placement support system that can select crane positions more easily and appropriately than conventional technologies, about which there are problems to solve.SOLUTION: A crane placement support system 100 that uses a structure model and crane specification data to help to determine placement positions of a crane includes crane selection means, installation member designation means, and crane position selection means. The crane position selection means selects crane positions to place the crane in relation to the crane records and basic assembly positions to assemble basic installation members, based on the crane records designated by the crane selection means and the installation member model related to the installation members designated by the installation member designation means.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to technology relating to erection using a crane, and more specifically, to a crane placement support system that can determine appropriate crane placement depending on the erection members. [Background technology]

[0002] A bridge is mainly composed of a substructure, such as abutments and piers, and a superstructure, such as girders and decks. The girders may be constructed directly on the substructure, or may be assembled elsewhere and then erected on the substructure. In this way, when constructing a structure, the finished product may be preassembled in a yard or factory, for example, and then installed in the correct location. The method of assembling the finished product elsewhere is called "ground assembly."

[0003] For example, when assembling multiple components (hereinafter referred to as "construction components") that make up a main girder on the ground, two or more individual components or materials manufactured in a factory may be transported to a yard near the substructure, and the individual components may be assembled on the spot to construct the construction components. The assembled construction components are then erected on piers, etc., using mobile cranes such as rough terrain cranes, all-terrain cranes, and crawler cranes. That is, the mobile crane lifts the construction components at the site where they were assembled on the ground (hereinafter simply referred to as the "construction position"), then rotates the lifted construction components to move them to the planned position (hereinafter referred to as the "planned construction position"), where they are lowered and installed.

[0004] The shorter the lifting radius of a crane, the heavier the weight it can lift, and conversely, the longer the lifting radius, the smaller the weight it can lift. For this reason, a "rated load table" is set for each crane, which shows the relationship between the lifting radius and the lifting load. By referring to this rated load table, it is possible to select a crane with the appropriate capacity for the work.

[0005] Furthermore, when selecting a crane, that is, when selecting the crane's lifting capacity, shape, dimensions, etc. (hereinafter referred to as crane standard), the location where the crane will be placed during work (hereinafter simply referred to as "crane position") is extremely important. For example, if the crane can be placed close to the place where the load is hoisted and also close to the place where it is lowered (i.e., if the hoisting radius can be made small), a crane with a relatively small crane standard can be selected. On the other hand, in cases where a larger hoisting radius is required even for the same load weight, a crane with a relatively large crane standard must be selected. And since rental fees are determined according to the crane standard, the selection of the crane standard has a direct impact on the overall construction cost.

[0006] Typically, the main girders of a bridge are quite long, which means that a large number of construction members need to be erected. Therefore, the crane position needs to be changed for each construction member, or for a certain number of construction members, and it is common to proceed with the erection work by repeatedly "resetting" the crane, so to speak. Also, because construction members have different shapes, dimensions, and weights, it is not uncommon to prepare cranes with different crane standards for each construction member (or for a certain number of construction members). Furthermore, the crane position may be restricted depending on the planned erection position of the construction members, and in cases where the working radius is affected by these restrictions, a crane with a different crane standard must be prepared.

[0007] Thus, the crane standard cannot be selected appropriately by simply referring to the rated load table, but must be selected taking into account the construction yard and surrounding environment, as well as the overall situation of the construction work. In particular, the selection of the crane position, which is important for selecting the crane standard, requires sufficient experience and knowledge. Therefore, in the current situation, engineers with sufficient experience and knowledge select the crane position and the crane standard after fully understanding the construction plan for the entire work.

[0008] On the other hand, considering the recent labor shortage in the construction industry, it is expected that it will become difficult to secure engineers with appropriate capabilities, and there has been a demand for a technology that can easily and appropriately select a crane position without relying on such engineers. With the recent advancement of information technology, efforts are being made to virtually position cranes using so-called three-dimensional models. For example, Patent Document 1 proposes a technology that determines whether a crane will interfere with the surrounding environment when rotating. [Prior art documents] [Patent documents]

[0009] [Patent Document 1] Patent Publication No. 2017-016489 Summary of the Invention [Problem to be solved by the invention]

[0010] The technology disclosed in Patent Document 1 is merely a technology for determining whether interference occurs, and is not a technology for selecting a crane size, much less for supporting the determination of a crane position, which is important for selecting a crane size. As described above, the selection of a crane size affects construction costs, and therefore a technology for easily and appropriately selecting a crane position without relying on an engineer with appropriate capabilities has been desired.

[0011] An object of the present invention is to solve the problems associated with the conventional technology, that is, to provide a crane placement support system that can select a crane position more easily and appropriately than the conventional technology. [Means for solving the problem]

[0012] The present invention was developed with a focus on selecting an appropriate crane position based on the relative positions of the planned installation positions of the installation members, the crane position, and the ground assembly position, and is based on an unprecedented idea.

[0013] The crane placement support system of the present invention is a system that supports the determination of the placement position of a crane in a construction area using a structure model and crane specification data, and is equipped with a crane selection means, an erection member designation means, and a crane position selection means. This structure model is a model having three-dimensional spatial information of a structure composed of multiple erection members, and includes an erection member model for each erection member. The erection member model is configured to include the shape and weight of the erection member and the planned erection position. The crane specification data is configured to include multiple crane records, and this crane record is configured to include dimension parameters and capacity parameters related to the crane, the dimension parameters include the boom length of the crane, and the capacity parameters include the rated load related to the crane. The crane selection means constituting the crane placement support system of the present invention is a means for selecting a predetermined crane record from the crane specification data by an operator's operation, and the erection member designation means is a means for designating an erection member by an operator's operation. The crane position selection means is a means for selecting a crane position for placing the crane related to the crane record and a ground assembly position for assembling the installation member on the ground, based on the crane record designated by the crane selection means and the installation member model related to the installation member designated by the installation member designation means. The crane position selection means selects the crane position and the ground assembly position based on a predetermined target planar arrangement, and this target planar arrangement is predetermined by the planar arrangement of the planned installation position, the crane position, and the ground assembly position.

[0014] The crane placement support system of the present invention may further include a crane placement range setting means and a ground assembly range setting means. The crane placement range setting means is a means for setting a crane placement range within the construction area within which a crane can be placed, and the ground assembly range setting means is a means for setting a ground assembly range within the construction area within which an erection member can be assembled. In this case, the crane position selection means selects a crane position so as to be included in the crane placement range, and selects a ground assembly position so as to be included in the ground assembly range.

[0015] The crane placement support system of the present invention may be configured such that two or more installation members can be designated by the installation member designation means. In this case, the crane position selection means selects a crane position on the condition that the crane can erect two or more installation members designated by the installation member designation means at the same position.

[0016] The crane placement support system of the present invention can further include a display control means for displaying the hoisting posture of the crane on the display means, and when the crane position selection means selects the crane position and the ground assembly position, the display means simultaneously displays the hoisting posture of the crane at the ground assembly position and the hoisting posture of the crane at the planned erection position.

[0017] The crane placement assistance system of the present invention can also select a crane record from the crane specification data based on the crane specifications input by an operator, including the crane boom length and the lifting load.

[0018] The crane placement support system of the present invention may further include a construction plan storage means and an optimal construction plan selection means. The construction plan storage means is a means for storing the crane positions for each construction member as a construction plan when the crane positions for all the construction members constituting the structure are selected. The optimal construction plan selection means is a means for selecting an optimal construction plan from two or more construction plans having different crane records, and selects the optimal construction plan based on the number of crane positions included in the construction plan and the cost related to the crane. Effect of the Invention

[0019] The crane placement support system of the present invention has the following advantages. (1) The crane position can be easily and appropriately selected without relying on engineers with appropriate skills. By appropriately selecting the crane position, construction costs can be appropriately reduced. (2) By providing a display control means, the hoisting position of the crane at the ground assembly position and the hoisting position of the crane at the planned erection position can be confirmed simultaneously as a single image. (3) By providing a means for selecting an optimal construction plan, erection work can be performed at an appropriate crane position throughout the entire construction work, and construction costs can be appropriately reduced. [Brief description of the drawings]

[0020] [Figure 1] 1 is a block diagram showing the main configuration of a crane placement support system according to the present invention. [Diagram 2] FIG. 4 is a model diagram showing a target planar arrangement. [Diagram 3] A model diagram explaining the "target planar layout" in which the lengths of the starting line segment and the ending line segment are each set as the suspension radius, and the target included angle is 180°. [Figure 4] (a) is a screen shot showing the crane placed at the crane position as viewed from above, and (b) is a screen shot showing the crane placed at the crane position as viewed from an oblique angle. [Diagram 5] An image showing the lifting position of the crane at the ground assembly position and the lifting position of the crane at the planned erection position. [Figure 6] FIG. 2 is a flowchart showing the main processing flow of the crane placement support system of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0021] An example of an embodiment of the crane placement support system of the present invention will be described with reference to the drawings. Note that the present invention can be used for various structures consisting of multiple erection members, but for convenience, an example of a bridge (particularly, a superstructure) will be described here.

[0022] 1.Definition Before describing the embodiments of the present invention, the following definitions of terms used herein will be given.

[0023] (Construction area) The area set for constructing a bridge, i.e. the construction yard, is referred to here as the "construction area." Furthermore, within this construction area, the area in which a crane can be placed is referred to as the "crane placement range," and the area in which the erection members can be assembled on the ground is referred to as the "ground assembly range." Furthermore, within the construction area, the position where the crane will actually be placed is referred to as the "crane position."

[0024] (Structure model) The crane placement support system of the present invention utilizes a model (so-called 3D model) having three-dimensional spatial information related to the target structure (here, a bridge). This model of the structure is referred to as the "structure model" here. The target structure is composed of multiple erection members, and therefore the structure model includes models related to each of the erection members (hereinafter referred to as "erection member models"). The erection member model is configured to include the planned erection position (planned position to be erected), which is part of the structure model, as well as the shape, dimensions, weight, center of gravity, etc. related to the erection members.

[0025] (Crane specification data) The crane placement support system of the present invention utilizes a table containing information on multiple types of cranes. The table related to this crane is referred to herein as "crane specification data," and the records that make up the crane specification data are referred to as "crane records." Of course, the crane specification data is composed of multiple crane records. The crane record is composed of parameters that indicate the dimensions of the crane (hereinafter referred to as "dimension parameters") and parameters related to the capacity of the crane (hereinafter referred to as "capacity parameters"), and can also be composed of an identifier that identifies the record (hereinafter referred to as "crane identifier") and the name of the crane. The dimension parameters include at least the boom length of the crane, and can also include the vehicle length, vehicle width, vehicle height, and outrigger width when extended. The capacity parameters include at least the rated load of the crane, and can also include the maximum lifting load. The rated load is composed of a combination of the "lifting radius (also called the working radius)" and the "maximum load by radius" that can be lifted with that lifting radius, that is, the capacity parameters include multiple combinations of "lifting radius - maximum load by radius."

[0026] 2.Crane placement support system Next, the crane placement support system of the present invention will be described. Figure 1 is a block diagram showing the main configuration of the crane placement support system 100 of the present invention. As shown in this figure, the crane placement support system 100 of the present invention is configured to include a crane selection means 101, an erection member designation means 102, and a crane position selection means 103, and can also be configured to include a crane placement range setting means 104, a ground assembly range setting means 105, a display control means 106, an optimal construction plan selection means 107, a display means 108, a crane specification data storage means 109, a structure model storage means 110, a construction plan storage means 111, and the like.

[0027] The crane selection means 101, the erection member designation means 102, the crane position selection means 103, the crane placement range setting means 104, the site assembly range setting means 105, the display control means 106, and the optimum construction plan selection means 107 that constitute the crane placement support system 100 can be manufactured as dedicated devices, or a general-purpose computer device can be used. In other words, the computer device executes arithmetic processing according to a predetermined program, thereby performing processing specific to each means. This computer device is equipped with a processor such as a CPU, memories such as ROM and RAM, and some further include input means such as a mouse and a keyboard, and a display, and can be configured, for example, by a personal computer (PC) or a server. If the computer device includes a display, the display can also be used as the display means 108.

[0028] In addition, the crane specification data storage means 109 for storing crane specification data, the structure model storage means 110 for storing structure models, and the construction plan storage means 111 for storing construction plans described below can utilize the storage device of a general-purpose computer (for example, a personal computer) or can be constructed in a database server. When constructed in a database server, they can be placed in a local network (LAN: Local Area Network) or can be a cloud server that stores data via the Internet (i.e., wireless communication).

[0029] Below, each of the main elements constituting the crane placement support system 100 of the present invention will be described in detail.

[0030] (Means for selecting a crane) The crane selection means 101 is a means for selecting a desired crane, and more specifically, a means for selecting a desired crane record from the crane specification data. For example, when the crane specification data is displayed on the display means 108 and the operator operates a pointing device (mouse, touch panel, pen tablet, touch pad, track pad, track ball, etc.) or a keyboard while visually checking the data to specify a crane record, the crane selection means 101 can read out the corresponding crane record from the crane specification data storage means 109. Alternatively, when the operator operates a keyboard or the like to input "crane specifications", the crane selection means 101 can read out a crane record that is similar to (or coincides with) the crane specifications from the crane specification data storage means 109. Here, the crane specifications refer to various attribute information related to the crane, and examples of the crane specifications include the boom length, vehicle length, vehicle width, vehicle height, outrigger width when extended, and maximum lifting load of the crane.

[0031] (Erection member designation means) The installation member designation means 102 is a means for selecting a desired installation member, more specifically, a means for selecting a desired installation member model from the installation member models included in the structure model. For example, when the structure model is displayed on the display means 108 and the operator operates a pointing device, a keyboard, or the like while visually checking the structure model to designate an installation member model, the installation member designation means 102 can read out the corresponding installation member model from the structure model storage means 110. The installation member designation means 102 can select one installation member or can simultaneously select two or more installation members.

[0032] (Crane placement range setting means and ground assembly range setting means) The crane placement range setting means 104 is a means for setting a crane placement range within the construction area, and the ground assembly range setting means 105 is a means for setting a ground assembly range within the construction area. For example, when the construction area made into a 3D model (a model having three-dimensional spatial information) is displayed on the display means 108 and the operator operates a pointing device, keyboard, etc. while visually checking it to specify a predetermined range, the crane placement range setting means 104 sets the crane placement range, and the ground assembly range setting means 105 sets the ground assembly range.

[0033] (Crane position selection means) The crane position selection means 103 is a means for selecting the crane position and the ground assembly position of the crane related to the crane record based on the crane record specified by the crane selection means 101 and the erection member model specified by the erection member designation means 102. However, when the crane arrangement range is set, the crane position is selected on the condition that it is included in the crane arrangement range, and when the ground assembly range is set, the ground assembly position is selected on the condition that it is included in the ground assembly range. The crane position selection means 103 selects a combination of the crane position and the ground assembly position that satisfies the specified conditions (crane record and erection member model), and therefore, depending on the conditions, one type of crane position and ground assembly position may be selected, or two or more types of crane positions and ground assembly positions may be selected. When two or more types of crane positions and ground assembly positions are selected, in other words, when two or more types of crane positions and ground assembly positions are selected as candidates, it is preferable to specify one crane position and ground assembly position by the operator's operation.

[0034] When the crane position selection means 103 selects the crane position, the rated load of the crane record is referred to. For example, the weight of the erection member model is set as the maximum load by radius, and the suspension radius corresponding to the maximum load by radius is extracted, and a circle (hereinafter referred to as the "suspension line") whose center is the planned erection position of the erection member model and whose radius is the suspension radius is set, and the top of the suspension line can be selected as a candidate for the crane position. Furthermore, the intersection of the suspension line with a predetermined direction (hereinafter referred to as the "specific direction"), such as a direction perpendicular to the bridge axis direction of the bridge, can also be selected as the crane position. This specific direction can be set as a "line" such as 90° with respect to the bridge axis direction, or can be set with a radial width such as 80 to 100°. Of course, when a crane arrangement range is set, the crane position is selected on the condition that it is included in the crane arrangement range. In this case, the part where the specific direction and the suspension line intersect is set as the crane position (or its candidate).

[0035] When the crane position selection means 103 selects the ground assembly position, the "target planar arrangement" shown in FIG. 2 is referred to. FIG. 2 is a model diagram that shows the target planar arrangement. As shown in this figure, the target planar arrangement is an index that is determined in advance by the arrangement on a plane of the planned erection position, the crane position, and the ground assembly position. This target planar arrangement can be set based on the length of the line segment (hereinafter referred to as the "start line segment") connecting the ground assembly position F and the crane position C, the length of the line segment (hereinafter referred to as the "end line segment") connecting the planned erection position T and the crane position C, and the included angle (hereinafter referred to as the "target included angle") formed by the start line segment and the end line segment. For example, as shown in FIG. 3, if it is aimed that the planned erection position, the crane position, and the ground assembly position are aligned in a roughly straight line, the target planar arrangement can be set by extracting the lifting radius after setting the weight of the erection member model to the maximum load by radius, setting the lengths of the start line segment and the end line segment as the lifting radius, and setting the target included angle to 180°. As with the specific direction, the target included angle can also be set within a range, such as 170 to 190 degrees. Of course, when a ground assembly arrangement range is set, the crane position is selected on the condition that it is included in the crane arrangement range. This allows the crane position selection means 103 to select the ground assembly position (or its candidate) once the crane position is determined.

[0036] As described above, the erection member designation means 102 can also select two or more erection members at the same time. In this case, the crane position selection means 103 selects the crane position and the ground assembly position based on the crane record and two or more erection member models. For example, when erection members A and B adjacent to each other in the bridge axis direction are selected, the crane position is selected on the condition that the crane can erect the erection members A and B at the same crane position. In other words, a candidate crane position for installing the erection member A is selected based on the planned erection position of the erection member A and the rated load and specific direction of the crane record, and a candidate crane position for installing the erection member B is selected based on the planned erection position of the erection member B and the rated load and specific direction of the crane record, and the one common to each candidate is selected as the crane position. Similarly, based on the planned installation position, crane position, and target planar layout of installation member A, candidate assembly positions for assembling installation member A are selected, and based on the planned installation position, crane position, and target planar layout of installation member B, candidate assembly positions for assembling installation member B are selected, and the one common to each candidate is selected as the assembly position.

[0037] In reality, the crane moves the erection member that it lifts from the ground assembly position to the planned erection position by rotating it, but the erection member may interfere with nearby power lines, buildings, etc. (hereinafter referred to as "surrounding environment objects"). Therefore, it is preferable that the crane position selection means 103 selects the crane position and the ground assembly position under the condition that the erection member does not interfere with the surrounding environment objects while the crane is rotating. In this case, it is preferable to use the surrounding environment objects that have been made into a 3D model (a model having three-dimensional spatial information) and determine the interference between the erection member and the surrounding environment objects based on the dimensional parameters of the crane record and the shape of the erection member model.

[0038] (Display control means) Display control means 106 is means for causing display means 108 to display the state in which the crane (crane record) specified by crane selection means 101 is placed at the crane position selected by crane position selection means 103. For example, in Fig. 4(a), the state in which the crane placed at the crane position is viewed from above is displayed on display means 108 such as a display, and in Fig. 4(b), the state in which the crane placed at the crane position is viewed from an oblique direction is displayed on display means 108.

[0039] Furthermore, when the crane position selection means 103 selects the crane position and the ground assembly position, the display control means 106 causes the display means 108 to simultaneously display the hoisting position of the crane at the ground assembly position (hereinafter referred to as the "ground assembly side hoisting position") and the hoisting position of the crane at the planned erection position (hereinafter referred to as the "erection side hoisting position"), as shown in Fig. 5. At this time, the display control means 106 can be configured to display the ground assembly side hoisting position and the erection side hoisting position in response to an operator's operation after the crane position selection means 103 selects the crane position and the ground assembly position, or the display control means 106 can be configured to display the ground assembly side hoisting position and the erection side hoisting position in response to an operator's operation after the crane position selection means 103 selects the crane position and the ground assembly position, and the display control means 106 can be configured to display the ground assembly side hoisting position and the erection side hoisting position in response to an operator's operation after the crane position selection means 103 selects the crane position and the ground assembly position.

[0040] (Method of selecting optimal construction plan) Typically, the superstructure of a bridge is composed of multiple erection members. In other words, when planning the entire construction, the crane positions and ground assembly positions are selected for all of the erection members. For the sake of convenience, the combination of crane positions and ground assembly positions selected for all of the erection members is referred to as the "construction plan." It is then desirable to create multiple construction plans by changing the type of crane (i.e., crane record), or by changing the crane position and ground assembly position without changing the type of crane, and then to actually carry out construction using the most appropriate construction plan (hereinafter referred to as the "optimal construction plan").

[0041] The optimum construction plan selection means 107 is a means for selecting an optimum construction plan from among a plurality of construction plan patterns stored in the construction plan storage means 111. When the optimum construction plan selection means 107 selects an optimum construction plan, it can set a condition that the number of crane positions included in the construction plan is small. In other words, a construction plan that requires less crane relocation is selected. On the other hand, in cases where there is little crane relocation, a crane with a high lifting capacity (i.e., a large maximum lifting load) tends to be selected, but generally, the higher the lifting capacity of a crane, the more expensive it is. Therefore, it is advisable to calculate the cost of all cranes used for each construction plan (hereinafter referred to as "crane rent") and select an optimum construction plan based on the "number of crane positions" and the "crane rent." Specifically, it is possible to select as the optimal construction plan the construction plan with the smallest "number of crane positions" under the condition that the "crane rent" does not exceed a predetermined upper limit, or to select as the optimal construction plan the construction plan with the smallest "crane rent" under the condition that the "number of crane positions" does not exceed a predetermined upper limit (such as a number that is n (a natural number) less than the number of erection members that make up the superstructure). Alternatively, it is also possible to select the optimal construction plan under the condition that the numerical value obtained based on the "number of crane positions" and the "crane rent" is the smallest (or the largest in some cases), such as the product of the "number of crane positions" and the "crane rent" ("number of crane positions" x "crane rent") being the smallest.

[0042] In addition, the optimum construction plan selection means 107 can be configured to select an optimum construction plan based on the "number of crane positions" and "crane rental" included in the construction plan, in addition to (or instead of) selecting an optimum construction plan based on the "number of on-site assembly positions" included in the construction plan. In other words, the selection is made while taking into consideration the condition that a large number of erection members can be assembled on the ground at the same on-site assembly position. In addition, in the case of creating multiple patterns of construction plans by changing the crane position and on-site assembly position without changing the type of crane (i.e., crane record), the optimum construction plan can be selected by simply setting the condition that the number of crane positions included in the construction plan is the smallest, or by setting the condition that the number of on-site assembly positions included in the construction plan is the smallest.

[0043] (Processing flow) Below, the main processing of the crane placement support system 100 will be described in detail with reference to Fig. 6. Fig. 6 is a flow diagram showing the flow of the main processing of the crane placement support system 100 of the present invention. In this flow diagram, the action to be performed is shown in the center column, what is necessary for that action is shown in the left column, and what results from that action is shown in the right column.

[0044] As shown in FIG. 6, first, a crane record (i.e., a crane) is selected using the crane selection means 101 (Step 201 in FIG. 6), and an installation member model (i.e., an installation member) is specified using the installation member specification means 102 (Step 202 in FIG. 6). When a crane record is selected and an installation member model is specified, a crane position selection means 103 selects a crane position (Step 203 in FIG. 6). Depending on the combination of a crane record and an installation member model, it may be impossible to select a crane position, that is, it may be determined that the installation member model cannot be lifted, i.e., "unplaceable" (No in Step 204 in FIG. 6). In this case, another crane record is selected again (Step 201 in FIG. 6). On the other hand, if a crane position can be selected (Yes in Step 204 in FIG. 6), the process proceeds to the subsequent process.

[0045] Once the crane position is selected, the crane position selection means 103 selects the ground assembly position (Step 205 in FIG. 6). Depending on the combination of the crane record and the erection member model, it may not be possible to select the ground assembly position, i.e., it may be determined that "placement is not possible" (No in Step 206 in FIG. 6), for reasons such as the inability to select the ground assembly position within the ground assembly range. In this case, another crane record is selected again (Step 201 in FIG. 6). On the other hand, if the crane position and ground assembly position can be selected (Yes in Step 206 in FIG. 6), the process proceeds to the subsequent process.

[0046] When the crane position can be selected (Yes in Step 204 in FIG. 6) and the ground assembly position can be selected (Yes in Step 206 in FIG. 6), the crane position and the ground assembly position are temporarily determined (Step 207 in FIG. 6), and the display control means 106 causes the display means 108 to simultaneously display the ground assembly side hoisting position and the erection side hoisting position of the crane (Step 208 in FIG. 6).

[0047] Once the crane positions and ground assembly positions are selected for all the erection members that make up the bridge superstructure, i.e., a construction plan is created, the construction plan is stored in the construction plan storage means 111. Then, multiple patterns of construction plans are created while changing the type of crane (i.e., crane record) (Step 209 in FIG. 6). Then, once construction plans for expected patterns have been created, the optimal construction plan selection means 107 selects the optimal construction plan from the construction plan storage means 111 (Step 210 in FIG. 6). [Industrial Applicability]

[0048] The crane placement support system of the present invention can be used when installing erection members for constructing civil engineering structures such as bridges, as well as architectural structures, and can also be used when removing erection members. Considering that the present invention can appropriately suppress construction costs and ultimately reduce the costs of construction infrastructure by supporting the selection of appropriate crane positions, it is an invention that can be expected to not only be used industrially, but also to make a great contribution to society. [Explanation of symbols]

[0049] 100 Crane placement support system of the present invention 101 (Crane placement support system) crane selection means 102 (Crane placement support system) erection member designation means 103 Crane position selection means (for crane placement support system) 104 (Crane placement support system) crane placement range setting means 105 (Crane placement support system) ground assembly range setting means 106 (Crane placement support system) display control means 107 (Crane placement support system) Optimal construction plan selection method 108 (Crane placement support system) display means 109 (Crane placement support system) crane specification data storage means 110 (Crane placement support system) structure model storage means 111 (Crane placement support system) construction plan storage means

Claims

1. A system for supporting the determination of a crane position in a construction area by using a structure model having three-dimensional spatial information of a structure composed of a plurality of erection members and crane specification data, The structure model includes an installation member model for each of the installation members, The installation member model is configured to include a shape, a weight, and a planned installation position of the installation member, The crane specification data includes a plurality of crane records, The crane record is configured to include dimensional parameters related to a crane and capability parameters related to a crane, The dimensional parameters include a boom length of the crane; The capacity parameters include a rated load for the crane; A crane selection means for selecting a predetermined crane record from the crane specification data by an operator operation; An installation member designation means for designating the installation member by an operator operation; a crane position selection means for selecting a crane position for disposing a crane related to the crane record and a ground assembly position for assembling the installation member based on the crane record designated by the crane selection means and the installation member model related to the installation member designated by the installation member designation means, The crane position selection means selects the crane position and the ground assembly position based on a predetermined target planar arrangement, The target planar arrangement is determined by the planar arrangement of the planned erection position, the crane position, and the ground assembly position. A crane placement support system characterized by:

2. a crane arrangement range setting means for setting a crane arrangement range within the construction area in which a crane can be arranged; A ground assembly range setting means for setting a ground assembly range in which the erection member can be ground assembled within the construction area, The crane position selection means selects the crane position so as to be included in the crane arrangement range, and selects the on-site assembly position so as to be included in the on-site assembly range.

2. The crane placement support system according to claim 1.

3. The installation member designation means allows designation of two or more installation members, The crane position selection means selects the crane position on the condition that the crane can erect two or more of the installation members designated by the installation member designation means at the same position.

2. The crane placement support system according to claim 1.

4. Further comprising a display control means for displaying the hoisting posture of the crane on the display means, When the crane position selection means selects the crane position and the ground assembly position, the display control means causes the display means to simultaneously display the hoisting posture of the crane at the ground assembly position and the hoisting posture of the crane at the planned erection position.

2. The crane placement support system according to claim 1.

5. The crane selection means selects the crane record from the crane specification data based on the crane specifications input by an operator operation, The crane specifications include the boom length and / or the lifting load of the crane.

2. The crane placement support system according to claim 1.

6. a construction plan storage means for storing the crane positions for each of the erection members constituting the structure as a construction plan when the crane positions for each of the erection members are selected; An optimum construction plan selection means for selecting an optimum construction plan from two or more of the construction plans having different crane records; The optimum construction plan selection means selects the optimum construction plan based on the number of crane positions included in the construction plan and the cost associated with the crane.

2. The crane placement support system according to claim 1.

Citation Information

Patent Citations

  • Crane interference check system, bridge construction simulation system and 3D construction plan system having the systems

    JP2017016489A

Cited By

  • Information processing device, information processing method, and program

    JP7932820B1