Pump control device and cryogenic liquid supply system
The pump control device enhances the mass flow rate of cryogenic liquids by adjusting discharge pressure through heat-based control, reducing operational costs and pump usage.
Patent Information
- Application Number
- JP2023055628
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-30
- Publication Date
- 2024-10-11
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing systems for delivering cryogenic liquids like LNG and LPG face challenges in increasing the mass flow rate while maintaining discharge pressure, leading to increased operational costs and potential line blockages.
A pump control device that adjusts the mass flow rate based on the heat amount of the cryogenic liquid, using a control unit to set a rated mass flow rate per unit time, and a heat quantity acquisition unit to determine the maximum mass flow rate, ensuring the discharge pressure is maintained.
The mass flow rate of cryogenic liquids is increased while preventing a decrease in discharge pressure, thereby reducing the number of operating pumps and lowering operational costs.
Smart Images

Figure 2024143120000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a pump control device and a cryogenic liquid supply system. [Background technology]
[0002] LNG terminals vaporize liquefied natural gas (hereinafter referred to as "LNG") stored in LNG tanks and supply it to users such as general households and gas power generation facilities. LNG terminals are equipped with vaporizers that vaporize LNG, and LNG is pumped up by multiple pumps installed in the LNG tanks to deliver it to the vaporizers. For example, Patent Document 1 describes a technology for providing an LNG base discharge pump device that operates the number of discharge pumps required for discharge and can discharge LNG to gas consumers without any problems even if one of them trips until the backup pump is started, by providing an LNG holder on the discharge side of the discharge pump to pressurize and store the low-temperature liquid, and by operating the number of discharge pumps required for the original discharge, so that even if one of them trips and stops, LNG can be supplied from the LNG holder until the backup discharge pump is started. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Japanese Patent Application Publication No. 10-318499 Summary of the Invention [Problem to be solved by the invention]
[0004] Here, operating the discharge pump that pumps up LNG requires costs such as the cost of electricity required for operation, the cost of regular inspection and repair of the discharge pump, etc. Therefore, reducing the number of discharge pumps in operation can reduce costs. Increasing the mass flow rate of the cryogenic liquid discharged from each discharge pump can be considered as a method for reducing the number of operating discharge pumps that discharge cryogenic liquid such as LNG and liquefied petroleum gas (hereinafter referred to as "LPG"). However, simply increasing the mass flow rate of the cryogenic liquid flowing from the discharge pump reduces the discharge pressure. Furthermore, the reduction in the discharge pressure of the discharge pump can cause LNG to be stuck in the discharge line. An object of the present invention is to increase the mass flow rate of the cryogenic liquid discharged from the discharge pump while suppressing a decrease in the discharge pressure. [Means for solving the problem]
[0005] The pump control device to which the present invention is applicable is a pump control device that includes a heat quantity acquisition unit that acquires information regarding the heat quantity of the cryogenic liquid dispensed from a tank that stores the cryogenic liquid, and a control unit that controls the mass flow rate of the cryogenic liquid dispensed by a dispense pump provided in the tank that dispenses the cryogenic liquid based on the acquired heat quantity. Here, the control unit can be characterized in that it sets a rated mass flow rate, which is the mass flow rate of the cryogenic liquid that each of the discharge pumps discharges per unit time, based on the amount of heat, and controls each of the discharge pumps. The information on the calorific value may be a result of periodically measuring the calorific value of the cryogenic liquid in the tank. The heat acquisition unit can also acquire a place-of-origin measured heat quantity, which is the heat quantity of the cryogenic liquid measured at the place of origin where the cryogenic liquid to be supplied to the tank is produced, and the control unit can set the rated mass flow rate based on the place-of-origin measured heat quantity. The control unit may be configured to increase the rated mass flow rate as the calorific value of the cryogenic liquid in the tank increases.
[0006] Viewed from another perspective, the cryogenic liquid supply system to which the present invention is applied includes a cryogenic tank for storing cryogenic liquid, a plurality of dispensing pumps for dispensing the cryogenic liquid stored in the cryogenic tank to a demand destination, a calorific value acquisition unit for acquiring information regarding the calorific value of the cryogenic liquid in the cryogenic tank, and a pump control device for setting a maximum mass flow rate that is the upper limit of the mass flow rate of the cryogenic liquid dispensed by each of the dispensing pumps based on the acquired calorific value. It is a cryogenic liquid supply system comprising.
Effect of the Invention
[0007] According to the invention of the present application, it is possible to increase the mass flow rate of the cryogenic liquid discharged from the dispensing pump while suppressing a decrease in the discharge pressure.
Brief Description of the Drawings
[0008] [Figure 1] FIG. 1 is a diagram showing an example of the overall configuration of the LNG supply system 1 to which the present embodiment is applied. [Diagram 2] FIG. 18 is a diagram showing an example of the functional configuration of the overall control device according to the present embodiment. [Diagram 3] FIG. 21 is a diagram showing an example of the processing performed by the overall control device. [Figure 4] FIG. 24 is a diagram showing an example of the control performed by the pump control unit.
Embodiments for Carrying Out the Invention
[0009] Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings. <Overall Configuration of LNG Supply System 1> FIG. 1 is a diagram showing an example of the overall configuration of the LNG supply system 1 to which the present embodiment is applied. The LNG supply system 1 to which this embodiment is applied comprises an LNG tank 10 for storing LNG as an example of a cryogenic liquid, an LNG receiving line 11 for supplying LNG to the LNG tank 10, a gas chromatograph 12 for measuring the calorific value of the LNG, a liquid density meter 13 for measuring the liquid density of the LNG in the LNG tank 10, and a number of pumps 20-1, 20-2, 20-3, 20-4, 20-5 for dispensing the LNG stored in the LNG tank 10. Furthermore, the LNG supply system 1 includes a vaporizer 50 that vaporizes LNG (two vaporizers 50-1 and 50-2 in the example of FIG. 1), a discharge line 40 that is a pipeline for discharging LNG discharged from the LNG tank 10 to the vaporizers 50-1 and 50-2, flow control valves 71-1 and 71-2 that adjust the flow rate of LNG flowing through the discharge line 40, flow meters 72-1 and 72-2 that measure the flow rate of LNG flowing through the discharge line 40, and a trunk conduit 60 that sends NG (Natural Gas) vaporized by the vaporizer 50 to a demand destination. Furthermore, the LNG supply system 1 includes an overall control device 30 that controls the entire LNG supply system 1.
[0010] The LNG tank 10 is, for example, an underground double-shell tank having an inner tank for storing LNG, an outer tank surrounding the inner tank, and a cold insulation layer between the inner tank and the outer tank filled with a cold insulation material (e.g., perlite).
[0011] The LNG receiving line 11 is a pipeline for receiving LNG unloaded from an LNG tanker into the LNG tank 10. For example, an unloading arm (not shown) of an LNG tanker (not shown) is connected to the LNG receiving line 11, and LNG is supplied from the LNG tanker.
[0012] The gas chromatograph 12 is a device that measures the amount (concentration) of a specific gas contained in a gas or liquid that is vaporized by heat. A portion of the LNG flowing through the LNG receiving line 11 is sampled to measure the calorific value of the LNG. Here, the calorific value of LNG refers to the amount of heat generated when LNG is burned, and is expressed as the calorific value per unit volume (MJ / m3).
[0013] In the present embodiment, two to four pumps 20 are normally operated, with at least one pump 20 on standby as a backup pump in case any of the pumps 20 is stopped in an emergency. Hereinafter, when the pumps 20-1, 20-2, 20-3, 20-4, and 20-5 are not to be distinguished from one another, they will be simply referred to as "pumps 20." Note that the number of pumps 20 included in the LNG supply system 1 is not limited to the example shown in FIG. 1.
[0014] The delivery line 40 is a pipeline for delivering the LNG discharged from the pump 20 to the vaporizer 50. The delivery line 40 includes a first delivery line 41 connected to the vaporizer 50-1, and a second delivery line 42 branching from the first delivery line 41 and connected to the vaporizer 50-2. The first delivery line 41 is provided with a flow rate control valve 71-1 for adjusting the flow rate of LNG flowing into the vaporizer 50-1, and a flow meter 72-1 for measuring the mass flow rate flowing into the vaporizer 50-1. The second delivery line 42 is provided with a flow rate control valve 71-2 for adjusting the flow rate of LNG flowing into the vaporizer 50-2, and a flow meter 72-2 for measuring the mass flow rate flowing into the vaporizer 50-2.
[0015] The vaporizer 50 is a device for vaporizing LNG supplied to the vaporizers 50-1 and 50-2 with seawater or the like to generate NG, similarly to known vaporizers. The trunk conduit 60 branches into and connects to the vaporizer 50-1 and the vaporizer 50-2, and the NG vaporized by the vaporizer 50-1 and the NG vaporized by the vaporizer 50-2 join together. The discharge pressure of the joined NG is adjusted to a predetermined value. This predetermined value is determined for various reasons. For example, the predetermined value of the discharge pressure of the trunk conduit 60 is determined based on the discharge pressure required by the demand destination, or, if the trunk conduit 60 is connected to another conduit, the condition based on that conduit. In this embodiment, the discharge pressure of the trunk conduit 60 is adjusted to 2.7 MPa. The discharge pressure of the trunk conduit 60 varies within a certain range depending on the condition of the connection destination of the trunk conduit 60.
[0016] The overall control device 30 includes a CPU (Central Processing Unit) 31 that controls the entire LNG supply system 1, a RAM (Random Access Memory) 32 that is used as a working area during calculations, and a ROM (Read Only Memory) 33 that stores various programs executed by the CPU 31. The overall control device 30 also includes a storage device 34 that stores various information, and a communication interface (hereinafter, referred to as "communication I / F") 35 that transmits and receives data. The overall control device 30 is connected to devices controlled by the overall control device 30 via communication means, and is also connected to various detection means via communication means. Here, the devices controlled by the overall control device 30 are, for example, the pump 20 and flow rate control valves 71-1 and 71-2. The various detection means are, for example, the gas chromatograph 12, the liquid density meter 13, and flow meters 72-1 and 72-2. The overall control device 30 is an example of a pump control device.
[0017] <Functional configuration of the overall control device 30> Next, the functional configuration of the overall control device 30 according to this embodiment will be described with reference to FIG. FIG. 2 is a diagram showing an example of a functional configuration of overall control device 30 according to the present embodiment. The overall control device 30 includes a regulating valve control unit 310 that adjusts the flow rate of LNG to the vaporizer 50 , and a pump control unit 320 that controls the mass flow rate of LNG discharged by the pump 20 .
[0018] The regulating valve control unit 310 includes a demand acquisition unit 311 , a vaporizer flow rate determination unit 312 , a flow rate acquisition unit 313 , and a regulating valve control unit 314 . The demand acquisition unit 311 acquires the demand amount of LNG to be flowed to the demand destination. The demand amount of LNG is constantly received from the demander. The vaporizer flow rate determination unit 312 determines the amount of LNG to be flowed through the vaporizer 50-1 and the vaporizer 50-2 in accordance with the demand amount. The amount of LNG to be flowed through the vaporizer 50-1 and the vaporizer 50-2 may be the same or different amounts of LNG may be flowed through the vaporizer 50-1 and the vaporizer 50-2. The flow rate acquiring unit 313 acquires the mass flow rate of LNG flowing into the vaporizers 50-1 and 50-2. The flow rate acquiring unit 313 acquires information on the flow rate flowing into the vaporizer 50-1 from the flowmeter 72-1, and acquires information on the flow rate flowing into the vaporizer 50-2 from the flowmeter 72-2. The regulating valve control unit 314 changes the opening degree of the flow rate regulating valves 71-1 and 71-2 to adjust the amount of LNG flowing through the vaporizers 50-1 and 50-2.
[0019] The pump control unit 320 includes a heat quantity acquisition unit 321 , a liquid density acquisition unit 322 , a discharge mass determination unit 323 , and a pump number determination unit 324 .
[0020] The calorific value acquiring unit 321 acquires information on the calorific value of the LNG in the LNG tank 10. Here, the calorific value of LNG is the amount of heat generated when the LNG is burned, and is expressed, for example, as the calorific value per unit volume (MJ / m3). Methods for measuring the calorific value of LNG include a method for measuring the amount of heat obtained when the LNG vaporized gas is burned, and a method for calculating the gas calorific value by performing gas component analysis. In this embodiment, the calorific value of LNG is measured using the gas chromatograph 12 when the LNG is poured into the LNG tank 10. The information on the calorific value of LNG in the LNG tank 10 is not particularly limited, and may include, for example, a method for acquiring the calorific value of LNG measured at the production site where the LNG is produced, a method for analyzing the gas using the gas chromatograph 12 to grasp the calorific value when LNG is supplied from a tanker to the LNG tank 10, or a method for grasping the calorific value by actual measurement once a month. The calorific value of LNG measured at the production site where the LNG is produced is an example of the calorific value measured at the production site.
[0021] The liquid density acquisition unit 322 acquires the liquid density of the LNG in the LNG tank 10. In this embodiment, it is measured by the liquid density meter 13 in the LNG tank 10. The liquid density of the LNG measured by the liquid density meter 13 is an example of information related to calorific value. In addition to a method of acquiring the liquid density at any time from the liquid density meter 13 in the LNG tank 10, for example, a method of measuring the LNG in the LNG tank 10 periodically (for example, once a month) or a method of measuring the density of the LNG in the LNG tank 10 when supplying LNG to the LNG tank 10 may be used.
[0022] The discharge mass determination unit 323 determines the discharge mass flow rate per pump 20 according to the information on the calorific value. This discharge mass flow rate is an example of a rated mass flow rate. The discharge mass determination unit 323 determines a discharge mass flow rate that satisfies the condition that the pressure of LNG on the upstream side of the flow rate control valve 71-1 in the first discharge line 41 is greater than the pressure on the downstream side, and that satisfies the condition that the pressure of LNG on the upstream side of the flow rate control valve 71-2 in the second discharge line 42 is greater than the pressure on the downstream side. The discharge mass flow rate is set to the discharge mass flow rate. The discharge mass determination unit 323 grasps the relationship between the information on the calorific value of LNG and the discharge mass flow rate that satisfies the above two conditions through prior experiments and simulations.
[0023] The pump number determination unit 324 determines the number of pumps required to supply LNG to the vaporizer 50 at a flow rate corresponding to the demand, and controls the pumps 20. Here, the required number is the number of pumps that will result in a mass flow rate obtained by multiplying the discharge mass flow rate per pump 20 by the number of pumps 20 exceeding at least the demand. Note that the required number may be determined so that the supply amount is greater than the amount obtained by adding a predetermined margin to the demand amount in case any of the pumps 20 stops in an emergency.
[0024] The processing performed by the overall control device 30 will now be described. <Processing of the overall control device 30> FIG. 3 is a diagram showing an example of the process performed by the overall control device 30. As shown in FIG. The process by which the overall control device 30 determines the number of pumps 20 to be operated will be described with reference to the flowchart of FIG. The information on the calorific value of LNG is information on the calorific value and / or liquid density. First, at least one of the calorific value acquisition unit 321 and the liquid density acquisition unit 322 acquires information on the calorific value of LNG in the LNG tank 10 (step 201). Next, the discharge mass determination unit 323 determines the discharge mass flow rate per pump 20 based on the information on the calorific value (step 202). More specifically, the discharge pressure of the pump is controlled to be maintained at a constant level or higher by reducing the discharge mass flow rate when the calorific value and / or liquid density of LNG is low and increasing the discharge mass flow rate when the calorific value and / or liquid density of LNG is high.
[0025] Next, the demand acquisition unit 311 acquires the demand amount from the LNG demand destination (step 203). Then, the pump number determination unit 324 determines the number of pumps 20 to be operated based on the demand amount acquired in step 203 and the flow rate determined in step 202 (step 204), and issues an instruction to operate the determined number of pumps 20 (step 205).
[0026] Next, the relationship between information about the calorific value of LNG and the discharge mass flow rate per pump will be described. 4 is a diagram showing an example of control performed by the pump control unit 320. Here, the pump capacity is determined based on "LNG liquid density (LNG density), pump head, and vaporizer flow rate" according to Bernoulli's theorem so that the pressure upstream of the flow control valve is constant.
[0027] Figure 4 shows LNG heat quantity 81, which is the heat value of LNG, LNG liquid density 82, which is the liquid density of LNG, pump capacity 83, which is the discharge mass flow rate per pump 20, FCV upstream pressure 84, which is the pressure upstream of flow control valves 71-1, 71-2, flow rate 85 of LNG flowing to vaporizers 50-1 and 50-2, opening degree 86 of flow control valves 71-1, 71-2, and downstream pressure 87, which is the pressure downstream of flow control valves 71-1, 71-2.
[0028] As described above, in this embodiment, the delivery pressure of the trunk conduit 60 is adjusted to 2.7 MPa. The delivery pressure of the trunk conduit 60 fluctuates within a certain range depending on the condition of the connected destination of the trunk conduit 60. Here, the downstream pressure 87 of the flow rate control valve 71-1 is a pressure to which the pressure loss when passing through the vaporizer 50-1 is added. Similarly, the downstream pressure 87 of the flow rate control valve 71-2 is a pressure to which the pressure loss when passing through the vaporizer 50-2 is added. The downstream pressures 87 of the flow rate control valves 71-1 and 71-2 fluctuate within a certain range due to fluctuations in the delivery pressure of the trunk conduit 60. The downstream pressure 87 in FIG. 4 is the downstream pressure 87 with the highest value within a range that can normally occur based on past performance. That is, if the FCV upstream pressure 84 is higher than the downstream pressure 87 adopted in FIG. 4, the LNG discharged from the pump 20 can pass through the flow rate control valves 71-1 and 71-2.
[0029] It is known that there is a correlation between the calorific value of LNG and the liquid density of LNG, and as the calorific value of LNG increases, the liquid density of LNG also increases. For example, when the calorific value of LNG is 39.74 (MJ / m3), the LNG density is 418.5 (kg / m3), and when the calorific value of LNG is 40.5 (MJ / m3), the LNG density is 425.0 (kg / m3), and so on. When the calorific value of LNG increases, the LNG density also increases. When maintaining the discharge pressure of pump 20 in this embodiment, the value of the calorific value of LNG and / or the liquid density of LNG can be used.
[0030] In this embodiment, the FCV upstream pressure 84 of the flow rate control valves (71-1, 71-2) is controlled to be constant at a predetermined level so that the LNG discharged from the pump 20 can pass through the flow rate control valves 71-1 and 71-2. In the example shown in FIG. 4, it is controlled in the range of 3.433 (MPa) to 3.459 (MPa). In order to perform this control, the pump capacity 83, which is the discharge mass flow rate per pump 20, is adjusted. In the example shown in FIG. 4, when the calorific value 81 of LNG and / or the liquid density 82 of LNG are the lowest, the pump capacity is set to 105 (t / h), and when the calorific value 81 of LNG and / or the liquid density 82 of LNG are the highest, it is set to 132.5 (t / h). In this way, when the calorific value 81 of LNG and / or the liquid density 82 of LNG are low, the pump capacity 83, which is the mass flow rate of the low-temperature liquid discharged from the discharge pump, cannot be increased. On the other hand, if the calorific value 81 of LNG and / or the liquid density 82 of LNG is increased, the pump capacity 83 can be increased.
[0031] In addition, in a state where the FCV upstream pressure 84 of the flow rate control valves (71-1, 71-2) is controlled to be substantially constant, the vaporizers (50-1, 50-2) are 135 / 205 (t / h) when the calorific value 81 of the LNG is 39.74 (MJ / m3), but are 160 / 250 (t / h) when the calorific value 81 of the LNG is 45 (MJ / m3). In this way, even in a state where the decrease in the discharge pressure is suppressed, it is possible to increase the amount of LNG flowing to the demand side. This makes it possible to increase the mass flow rate of the cryogenic liquid while suppressing the decrease in the discharge pressure even when the number of pumps 20, which are discharge pumps, in operation is reduced.
[0032] In this embodiment, the table shown in Fig. 4 is stored in the storage device 34 of the overall control device 30. The discharge mass determination unit 323 (see Fig. 2) refers to this table and determines the pump capacity 83 corresponding to the calorific value 81 of LNG and / or the liquid density 82 of LNG as the discharge mass flow rate per pump 20 (see S202 in Fig. 3). In this embodiment, the pump capacity is determined according to Bernoulli's theorem so that the upstream pressure of the flow control valves 71-1, 71-2 is substantially constant, but the correspondence between the calorific value 81 of LNG and / or the liquid density 82 of LNG and the pump capacity 83 for each LNG terminal may be determined by simulation or experiment and stored in the storage device 34. The discharge mass determination unit 323 (see FIG. 2) may calculate a pump capacity such that the upstream pressure of the flow control valves 71-1, 71-2 is constant from "the liquid density of LNG (LNG density), the pump head, and the vaporizer flow rate" using Bernoulli's theorem, without storing the table shown in FIG. 4, and determine the calculated pump capacity as the discharge mass flow rate per pump 20. [Explanation of symbols]
[0033] 1...LNG supply system, 10...LNG tank, 11...LNG receiving line, 12...gas chromatograph, 13...liquid density meter, 20-1, 20-2, 20-3, 20-4, 20-5...pump, 30...overall control device, 31...CPU, 40...discharge line, 41...first discharge line, 42...second discharge line, 50...vaporizer, 60...main conduit, 71-1...flow control valve, 71-2...flow control valve, 72-1...flow meter, 72-2...flow meter, 310...regulating valve control unit, 311...demand acquisition unit, 312...vaporizer flow rate determination unit, 313...flow rate acquisition unit, 314...regulating valve control unit, 320...pump control unit, 321...calorific value acquisition unit, 322...liquid level acquisition unit, 323...discharge mass determination unit, 324...number of pumps determination unit
Claims
1. a heat quantity acquiring unit that acquires information regarding a heat quantity of the cryogenic liquid discharged from a tank that stores the cryogenic liquid; a control unit that controls a mass flow rate of the cryogenic liquid discharged by a discharge pump that is provided in the tank and discharges the cryogenic liquid based on the acquired heat quantity; A pump control device comprising:
2. 2. The pump control device according to claim 1, wherein the control unit sets a rated mass flow rate, which is a mass flow rate of the cryogenic liquid discharged by each of the discharge pumps per unit time, based on the amount of heat, and controls each of the discharge pumps.
3. 3. The pump control device according to claim 2, wherein the information regarding the calorific value is a result of periodically measuring the calorific value of the cryogenic liquid in the tank.
4. The heat quantity acquisition unit acquires a production site measured heat quantity, which is a heat quantity of the cryogenic liquid measured in a production site where the cryogenic liquid to be supplied to the tank is produced, The pump control device according to claim 2 , wherein the control unit sets the rated mass flow rate based on the measured calorific value at the production site.
5. The pump control device according to claim 2 , wherein the control unit increases the rated mass flow rate as the heat quantity of the cryogenic liquid in the tank increases.
6. a cryogenic tank for storing a cryogenic liquid; A plurality of discharge pumps for discharging the cryogenic liquid stored in the cryogenic tank to a demand destination; a heat quantity acquiring unit for acquiring information regarding the heat quantity of the cryogenic liquid in the cryogenic tank; a pump control device that sets a maximum mass flow rate that is an upper limit of the mass flow rate of the cryogenic liquid discharged by each of the discharge pumps based on the acquired heat quantity; A cryogenic liquid supply system comprising:
Citation Information
Patent Citations
Delivery pump device in lng base
JP1998318499A