Crane with luffing aid device and method for luffing such crane
The hoisting assist device in the mobile lattice boom crane addresses the limitations of conventional cranes by using an auxiliary arm and traction element to provide additional torque, enabling safe and efficient lifting of longer or heavier booms without external aid.
Patent Information
- Application Number
- JP2024049372
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-03-28
- Filing Date
- 2024-03-26
- Publication Date
- 2024-10-11
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Conventional lattice boom cranes face limitations in raising longer or heavier booms due to the maximum load capacity of the cable winch and bracing systems, necessitating external assistance.
A mobile lattice boom crane equipped with a hoisting assist device that includes an auxiliary arm and a variable length traction element to provide additional torque for lifting, allowing the boom to be raised without overloading the bracing or retraction mechanism.
Enables the use of longer and heavier booms safely and efficiently without external assistance, by providing additional lifting torque through the traction element, thus preventing overloading of the bracing system.
Smart Images

Figure 2024144309000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a crane, in particular a mobile lattice boom crane, according to the preamble of claim 1, and to a method for raising and lowering the boom of such a crane. [Background technology]
[0002] A conventional lattice boom crane generally comprises a movable lower carriage, a rotatable upper carriage mounted on the lower carriage, and a lattice boom articulated to the upper carriage about a horizontal pivot axis. The latter usually comprises a link piece connected to the upper carriage and a number of lattice sections connected by bolt connections to form a main boom.
[0003] The boom of a lattice boom crane is generally reinforced by an additional bracing frame (also known as an A-frame or SA-frame) to increase the bracing angle for the boom and to increase the lever action around the boom pivot point. The bracing frame is articulated to the upper carriage so that it can pivot about a horizontal pivot axis and is usually connected to the boom via a bracing system having multiple bracing rods. The bracing frame is connected to the upper carriage via a length-adjustable bracing system, the length of which can be actively adjusted by means of a retraction mechanism. In particular, the bracing frame can be pivoted about its pivot axis by winding and unwinding (rewinding) the bracing cable at the cable winch of the upper carriage, thereby allowing the boom to be raised and lowered.
[0004] In this type of crane, the initial lifting of the boom from a lowered position is also accomplished using a bracing cabling, a bracing frame and bracing cabling, or a retraction mechanism, which generates a torque that raises the boom vertically. Summary of the Invention [Problem to be solved by the invention]
[0005] However, with longer or heavier booms, which are increasingly required in recent years (e.g. for erecting larger wind turbines), the problem arises that both the cable winch and the bracing are stretched to their maximum load capacity, so that the bracing, bracing frame and retraction mechanism system described above reaches its limits.
[0006] Against this background, it is an object of the present invention to enable the use of longer and / or heavier booms in cranes of this type, in particular to enable longer or heavier booms to be easily and safely raised without the need for external assistance such as an assist crane. [Means for solving the problem]
[0007] According to the invention, this object is achieved by a crane having the features of claim 1 and by a method having the features of claim 14. Advantageous embodiments of the invention follow from the dependent claims and the following description.
[0008] Thus, on the one hand, a crane, in particular a mobile lattice boom crane, is proposed, which comprises an upper carriage and a boom mounted on the upper carriage so as to rise or swivel about a horizontal pivot. In particular, the upper carriage is rotatably mounted on a movable lower carriage. A bracing frame is also articulated to the upper carriage so as to be rotatable about a horizontal pivot, the bracing frame being part of the bracing of the boom. In other words, the boom is reinforced by the bracing frame, and the boom rises and falls by pivoting the bracing frame. The boom follows the movement of the bracing frame.
[0009] According to the present invention, the crane includes a hoisting assist device that applies a torque to the boom in addition to the bracing to hoist the boom in a flat boom position. The hoisting assist device assists in raising the boom from a flat boom position, particularly a laid-out position, when the bracing alone is insufficient to generate a lifting torque, or when at least one of the components for generating the lifting torque is applied with a lifting torque exceeding its capacity or load capacity.
[0010] The luffing auxiliary device has an auxiliary arm, one of which is pivotally attached to the upper carriage and the other of which is connected to the upper carriage via a holding element and to the boom via a towing element of variable length. The towing element is arranged between the auxiliary arm and the boom and is configured to exert a traction force on the boom in the direction of the auxiliary arm, which assists the raising process. The torque generated by the towing element acts in addition to the torque exerted via the bracing frame and the bracing, so that the boom can also be raised from a flat or lowered position without overloading the bracing or the retracting mechanism.
[0011] The variable length towing element is arranged between the boom and the auxiliary arm, so that the towing element can be kept on the crane throughout the entire operation of the crane, eliminating the need for complex modification work. At the same time, if the towing element and the auxiliary arm are properly configured, the towing element is connected to the boom at the right position, so that the towing element can be used as a fallback support when the boom is at a steep angle.
[0012] The luffing assist device of the present invention allows a longer and / or heavier boom to be provided without overloading the bracing or retraction mechanisms, particularly during the initial raising process.
[0013] The holding element may also be of variable or fixed length and is used in particular to hold the auxiliary arm in position and create the necessary resistance while the variable length traction element pulls the boom towards the auxiliary arm.
[0014] In a possible embodiment, the towing element is connected to the auxiliary arm and the boom in an articulated manner, which allows a relative movement between the boom and the auxiliary arm. In particular, when the boom is raised at a stage, the auxiliary arm may not swivel with the boom, since the length of the towing element is shortened when the boom swivels. Preferably, the towing element is configured to remain connected to the boom, and preferably also to the auxiliary arm, throughout the entire operation of the crane.
[0015] In a further possible embodiment, the bracing frame is connected to the upper bogie via an actively adjustable bracing cable. The bracing frame is swivellable via a retraction mechanism and the bracing cable has a bracing cable that can be wound and unwound, in particular by a cable winch mounted on the upper bogie. The bracing cable is preferably guided by deflection pulleys of the upper bogie and the bracing frame. In a preferred embodiment, the cable is guided over several deflection pulleys of the bracing frame and several deflection pulleys of the upper bogie, i.e. wound several times, so that the bracing cable forms a pulley block. The cable winch is configured to raise and lower a boom connected to the bracing frame via a bracing by swiveling the bracing frame towards the rear of the upper bogie by winding up the bracing cable.
[0016] In a further possible embodiment, the traction element is a separate component from the bracing, bracing frame, and boom, and the additional traction force for raising the boom is exerted by the additional traction element of variable length in particular, and is not merely a by-product of the existing elements of the bracing, bracing frame, or other elements of the crane.
[0017] In principle, it is conceivable for the variable-length traction element to only be passively variable in length, and in particular for the traction force it exerts on the boom to depend on the relative angle between the boom and the auxiliary arm. For example, the traction element may include or be configured as a spring element. In this case, the traction force is maximum at the beginning of the lifting process and decreases with increasing boom angle. The traction force of the traction element alone is not sufficient to raise and lower the boom. For this reason, an additional restoring moment must be applied by bracing.
[0018] However, with only passively actuated traction elements, the traction forces cannot be influenced or modified, nor can the traction elements be used as fallback supports.
[0019] In another possible embodiment, the traction element is actively length-adjustable, which allows additional traction forces to be actively applied to the boom, which can preferably be controlled and / or regulated in a targeted manner. For this purpose, an electronic control unit is preferably provided, which in the simplest case can be the crane control unit itself. This also allows the traction element to be actively switched off in certain implementations, for example when the traction forces from the bracing alone are sufficient in steep boom positions.
[0020] The traction elements can be controlled and / or adjusted via the control unit to apply a constant or variable or changing traction force to the bracing frame or boom over time and / or over the entire swing angle of the boom. It is also conceivable that the cable winch of the bracing cable is controlled and / or adjusted by the control unit, whereby the control unit can interfere in the lifting process depending on the state of the traction elements. Synchronized operation of the cable winch and the traction elements is also possible. The control unit may be the crane control unit or a separate control unit connected thereto.
[0021] In yet another possible embodiment, the traction element is configured as a hydraulic cylinder. The traction force is generated by pressurizing the hydraulic cylinder by means of one or more hydraulic pumps and a corresponding control system using an electronic control unit. This allows the traction force to be controlled or adjusted depending on certain parameters, such as the boom angle. Alternatively, the actuator can be a cable drive or a spindle drive.
[0022] The traction element is preferably configured as a double-acting hydraulic cylinder, which can apply both traction and compression forces to the boom depending on the pressurization of the cylinder. This embodiment allows the traction element to be used not only as a lifting aid, but also as a hydraulic fallback support after the lifting process, preventing the boom from tipping over behind the upper car.
[0023] In yet another possible embodiment, the traction element can be controlled and / or adjusted by the control unit of the at least one hydraulic pump and the crane in such a way that in a first angle range of the boom the traction element applies a traction force to the boom in order to support the luffing process. The first angle range is preferably between a flat boom position, in particular a lowered boom position, and a predefined first limit angle at which an additional traction force is required to support the lifting process. The limit angle can be stored directly in the control unit or can be derived from other variables, for example a limit force of the bracing or a limit angle of the bracing frame.
[0024] In yet another possible embodiment, the traction element is configured to apply a compressive force to the boom in the direction away from the upper carriage in a third angle range of the boom, where the boom is in a particularly steep boom position within the first angle range. In the third angle range, the traction element serves in particular as a fallback support for the boom. In this range, no additional traction force is required, since the traction force or the corresponding torque that can be applied from the bracing alone is sufficient to pivot the boom. The traction element can therefore preferably be used as a fallback support. Due to the arrangement between the auxiliary arm and the boom and the pivoting of the auxiliary arm, the traction element does not have to be modified for this purpose.
[0025] Preferably, the control unit is configured to allow hydraulic fluid to flow out of or into the traction element in a controlled manner in a third angle range using a characteristic curve, thereby enabling the fallback support to operate as intended and provide optimal forces for each boom position.
[0026] In yet another possible embodiment, it is proposed to configure the towing element as a fallback support or to configure the towing element so that it can be used as a fallback support in addition to its function as a lifting aid. The auxiliary arm is preferably configured to act as an abutment for the tension load of the towing element in the fallback support mode of the towing element, so that the dropback support can be stably attached and the generated compressive forces can be transferred to the boom. The connection between the towing element and the auxiliary arm must therefore be configured to function both in towing and in compression. In the fallback support mode, the fallback support or towing element is preferably supported on the upper carriage.
[0027] In yet another possible embodiment, the crane further comprises a measuring device communicatively connected to the control unit, the control unit being configured to switch off the towing elements as a function of a variable detected by the measuring device, the detected variable being an angle (e.g. the angle of the boom and / or the angle of the bracing frame and / or the angle of the auxiliary arm) and / or a force (e.g. the force of the bracing and / or the force of the bracing cable and / or the force of the towing elements and / or the force of the holding elements).
[0028] The measuring device preferably comprises: at least one sensor for detecting an angle of the boom, the bracing frame and / or the auxiliary arm; at least one sensor for detecting the force of the bracing, retaining element and / or traction element; The present invention is provided with at least one of the following:
[0029] Additionally, sensors may be provided, for example to detect the speed of the boom and / or hydraulic pressure in the traction elements.
[0030] For example, the crane may have at least one sensor for detecting the angular position of the bracing frame, for example by detecting the position of a cable winch and / or a cable of the bracing frame and / or by directly detecting the angular position of the bracing frame.
[0031] The angular position of the boom may be detected indirectly, for example by detecting the angular position of the bracing frame and / or auxiliary arm, and / or by directly detecting the angular position of the boom using an angular encoder.
[0032] Alternatively or additionally, the crane may be equipped with at least one sensor for detecting the traction force exerted by the variable-length traction element. This may be done, for example, by a load cell connected to the traction element. Monitoring the traction force of the traction element may ensure correct operation during lifting and / or in fallback support mode and may prevent overloading of the surrounding structure (especially in case of a breakdown).
[0033] Alternatively or in addition, the crane may have at least one sensor for detecting the position and / or length of the variable-length towing element. In particular, the end positions (minimum and maximum extension positions) of the towing element can be detected by means of suitable sensors. The end position sensor or sensors inform the control unit when the towing element is fully retracted and / or extended. An end position sensor for detecting and initiating the maximum extension length of the towing element can be used to detect faults, for example when the bracing rods of the bracing are not connected correctly, thus protecting the towing element or the crane from damage. An end position sensor for detecting and initiating the minimum extension length of the towing element (which does not have to correspond to a physically limited minimum length but may represent a fixed minimum length) can be used to switch the towing element to an unpowered state after the initial lifting process is completed.
[0034] A control unit is preferably provided, which is configured to receive signals from the at least one sensor and, based on the sensor data, to control and / or adjust the traction force applied to the boom via the traction element. Preferably, the control unit is able to stop the cable winch if necessary to interfere with the lifting process and prevent damage in case of a fault. Alternatively or additionally, the control unit may be configured to issue a corresponding warning (e.g. visual and / or acoustic warning signal) to the operator.
[0035] Preferably, the control unit is configured to perform the lifting process automatically. The process of generating additional traction force is therefore performed automatically, in particular, for example until a defined limit angle of the boom is exceeded and / or until a predetermined limit force (for example in the bracing) is exceeded and / or until a predetermined limit length of the traction element is exceeded. The traction element can be de-powered automatically, for example by the control unit.
[0036] In another possible embodiment, it is conceivable to allow the bracing frame and the auxiliary arm to pivot independently of each other. The auxiliary arm is preferably passively pivotable and follows the pivoting movement of the boom due to the coupling with the boom via the towing element in the second angle range of the boom. In particular, the second angle range is between the above-mentioned first and third angle ranges. In the second angle range, the boom is preferably raised to such an extent that the traction force that can be applied only by the bracing is sufficient to pivot the boom. The boom is preferably not yet raised at such an angle that it requires the use of a fallback support. In this region, the towing element is preferably switched off and retracted. The towing element thus acts in particular as a coupling element coupling the pivoting movement of the auxiliary arm and the boom. On the other hand, in the first angle range, the towing element is retracted (i.e. its length is shortened) when the boom pivots, so that the auxiliary arm pivots more slowly with the boom or does not pivot at all.
[0037] In another possible embodiment, it is proposed that the holding element is flexible and preferably comprises a traction cable, the term traction cable being interpreted broadly so as to also include a chain or a combination of chain and cable.
[0038] The holding element can be of fixed length, i.e. it represents a traction element of non-variable length, or it can be actively length adjustable, for example comprising or corresponding to a hydraulic cylinder that holds the auxiliary arm in place during the lifting movement and acts as an abutment.
[0039] In another possible embodiment, the holding element is configured to be placed on the upper carriage when the traction element transitions to the fallback support mode. In the fallback support mode, the holding element is therefore placed on the upper carriage and is not in particular towed or compressed. The holding element is preferably configured as a traction cable. The holding element is therefore preferably only required in the lifting process to form an abutment for the auxiliary arm or the traction element of variable length. On the other hand, in the fallback support mode, the holding element is not required, since in particular the folded auxiliary arm forms an abutment for the traction element acting as a fallback support, which is loaded in tension.
[0040] In principle, more than one traction element can be provided, for example two parallel aligned traction elements arranged next to each other or parallel to each other. It is also conceivable that several traction elements are arranged at different distances from the pivot axis of the boom and / or the pivot axis of the bracing frame.
[0041] Preferably, the boom has a link piece which is articulated to the upper carriage and one or more boom pieces (especially grid pieces) which are connected to the link piece or to each other (especially bolted). The towing element is preferably connected to the link piece.
[0042] The invention also relates to a method for raising and lowering the boom of a crane according to the invention. The starting point of the method is that the boom is in a flat position, i.e. the boom is erected and in particular rests on the ground or on a supporting device. This is the case when the crane is set up before the boom is raised for the first time. To raise and lower the boom, a bracing frame connected to the boom via a bracing is swung backwards, in particular by appropriately activating a bracing cable.
[0043] The boom and bracing frame are connected to each other and perform synchronized pivoting movements. The bracing exerts an upward moment on the boom. A variable length traction element is installed between the auxiliary arm and the boom, exerting a traction force on the boom towards the auxiliary arm, resulting in a torque acting in addition to the torque exerted through the bracing that supports the lifting of the boom and thus prevents the retraction mechanism from overloading. By continuing to pivot the bracing frame backwards towards the rear of the upper carriage, the boom is raised or erected.
[0044] When the boom is raised, the length of the traction element is particularly short so that the auxiliary arm is not displaced, at least during the initial lifting phase, which causes the bracing frame to pivot backwards relative to the auxiliary arm.
[0045] At steeper boom positions, the torque required to move the boom is less than during the initial ascent, so that it can be swung by bracing alone without overloading the retraction mechanism. When the boom exceeds a certain angle or the traction element shortens to a certain length, the traction element is preferably stopped by the control unit to not apply any force to the boom. The angle, force, and / or length of the traction element can be used as limit values.
[0046] The method according to the invention obviously offers the same advantages and characteristics as the crane according to the invention, so it will not be repeated here and the above description of possible embodiments of the crane according to the invention also applies accordingly to this method.
[0047] In a possible embodiment of the method, the traction element is used as a fallback support for the boom after the lifting process. Preferably, the fallback support is only effective at certain boom angles, in particular at steep boom angles where the fallback support is intended to prevent the boom from tipping backwards. In intermediate cases, i.e. when the boom position is not so steep and the swing is possible only with the bracing and retraction mechanism, the traction element is preferably switched off.
[0048] Further features, details and advantages of the invention emerge from the following exemplary embodiments which are described with reference to the drawings. [Brief description of the drawings]
[0049] [Figure 1] FIG. 1 illustrates a side view of a crane according to an exemplary embodiment of the present invention. [Diagram 2] FIG. 2 shows, in schematic side view, one stage of the crane boom raising process. [Diagram 3] FIG. 3 shows, in schematic side view, another stage in the boom raising process of the crane. [Figure 4] FIG. 4 shows, in schematic side view, another stage in the boom raising process of the crane. [Diagram 5]FIG. 5 shows, in schematic side view, another stage in the boom raising process of the crane. [Figure 6] FIG. 6 shows a schematic diagram of a crane according to yet another exemplary embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0050] 1 to 5 show in schematic side view a preferred exemplary embodiment of a crane 10 according to the present invention. The exemplary embodiment of the crane 10 described here is a mobile lattice boom crane 10 comprising a lower carriage 12 with a crawler chassis and an upper carriage 14 mounted on the lower carriage 12 for rotation about a vertical axis of rotation. A lattice boom 16 is articulated to the upper carriage 14 for pivoting about a horizontal axis of rotation. The boom 16 is pivotally mounted on the upper carriage 17 and has a link piece 17 to which one or more lattice sections of the lattice boom 16 are bolted. This connection can be made in the usual manner using a fork finger type connection.
[0051] The boom 16 is reinforced by a bracing 19, preferably having a plurality of tension rods. In order to increase the angle with respect to the boom 16, i.e., to generate a lever at the pivot axis of the boom 16 to generate a lifting torque, the bracing frame 18 is connected to the upper carriage 14 so as to rotate about a pivot axis parallel to the boom pivot axis. The boom 16 and the bracing frame 18 can rotate about the same pivot axis, and can also rotate about a parallel, separate pivot axis. Since the bracing frame 18 is connected to the boom 16 through the bracing 19, the boom 16 luffs up and down by rotating the bracing frame 18. To assemble the bracing 19, the boom 16 is preferably mounted and placed on the ground (or a trolley), and then the bracing 19 is assembled.
[0052] The boom 16 is swiveled and raised and lowered by swiveling the bracing frame 18. It is connected to the upper carriage 14 via a bracing cabling 20, adjustable by means of a retraction mechanism. The bracing cabling 20 in particular comprises a tension cable 22, which is attached to a cable winch 24 arranged on the upper carriage 14 and allows it to be wound and unwound. These components are shown diagrammatically in FIG. 6 on the basis of a particular exemplary embodiment of the crane 10 according to the invention and can also be provided in the exemplary embodiment of FIGS. 1-5. The tension cable 22 is preferably guided over one or more deflection pulleys 28 rotatably mounted on the bracing frame 18 and over one or more deflection pulleys 26 rotatably mounted at the rear of the upper structure, such that the bracing cabling 20 forms a pulley block. The torque required to raise the boom 16 is thus generated by the retraction mechanism or the cable winch 24. The traction force of the bracing cabling 20 is transmitted to the boom 16 via the bracing 19.
[0053] FIG. 1 shows the crane 10 with the boom 16 in position (e.g., after boom assembly and before the boom 16 is raised and the crane 10 is in operation). When raising the boom 16 from this position, a large torque is required due to the low boom angle or flat boom position. If this is done using only the retraction mechanism or bracing 19, a longer or heavier boom 16 may overload the bracing system or cable winch 24. To avoid this, an assist crane, for example, can be used to apply additional torque to the initial lifting process until the boom 16 can be rotated within its load limit at a larger angle using only the retraction mechanism.
[0054] In accordance with the present invention, another approach is taken that allows for the use of larger and heavier booms without resorting to external assist devices. In accordance with the present invention, the crane 10 has an integrated luffing assist device 30 that generates additional lift torque during the initial luffing process of the boom 16 to reduce the load on the retraction mechanism or bracing 19.
[0055] The luffing assistant 30 has an auxiliary arm 32 which is pivotably attached to the upper carriage 14 about a horizontal pivot axis. The auxiliary arm 32 can pivot about the same axis as the boom 16 and / or the bracing frame 18 or about a parallel axis spaced apart therefrom. The auxiliary arm 32 is connected to the upper carriage 14 via a retaining element 34. The luffing assistant 30 further comprises a variable-length traction element 36 which is articulated on the one hand to the boom 16, in particular to the link piece 17, and on the other hand to the auxiliary arm 32, in particular to its end remote from the upper carriage 14.
[0056] In addition to the force F1 generated via the bracing 19, the boom 16 is provided with an additional traction force F2 or a corresponding additional moment acting on the boom 16 via a traction element 36 of variable length. To apply the required traction force F2, the auxiliary arm 32 is fixed or held against tilting towards the boom 16 via a holding element 34. The holding element 34 serves as an abutment for the auxiliary arm 32. By shortening the traction element 36 of variable length, a traction force F2 and thus a torque is generated which lifts the boom 16 off the ground or points it upwards.
[0057] In the exemplary embodiment shown here, the traction element 36 is configured as an actively adjustable double-acting hydraulic cylinder 36, but alternatively, an electric actuator such as an electromechanical drive, a spindle drive, a cable drive, or a passive element such as a spring can also be used. The hydraulic cylinder 36 is connected to the hydraulic system of the crane 10 and can be controlled via a control unit (not shown in detail), in particular via a crane control system, in order to generate the desired traction force in a targeted manner. Depending on the desired control, the traction element 36 can apply a constant or variable traction force to the boom 16 when raising it. In the following, the variable length traction element 36 is also referred to as "traction cylinder".
[0058] The process of lifting the boom 16 by the luffing auxiliary device 30 is shown in Fig. 2 to Fig. 5. In Fig. 2, the boom 16 is extended and supported on the ground. The force F1 of the bracing 19 is generated by the cable adjuster 20. This is not necessarily sufficient to lift the boom 16 off the ground. According to the present invention, an additional force F2 is introduced into the boom system. This additional force F2 generates a torque sufficient to lift the boom 16 off the ground. The additional force F2 is generated by a hydraulic cylinder 36 that is articulated with the boom 16 and the auxiliary arm 32. It is supplied with hydraulic pressure via one or more hydraulic pumps.
[0059] In FIG. 3, the boom 16 performs a lifting movement around its lifting axis and its center of gravity is displaced in the direction of the lifting axis. In this position, where the boom 16 has a large or steep boom angle, the force F1 transmitted through the bracing 19 is sufficient to lift the boom 16 further by itself. It should be noted that the auxiliary arm 32 and the holding element 34 have not rotated around the articulation point on the upper carriage 14. Their shape remains unchanged. On the other hand, the traction cylinder 36 shortens during the lifting process. The bracing frame 18 pivots together with the boom 16, since these movements are interdependent or coupled with each other.
[0060] In Fig. 4, the traction cylinder 36 has reached its end position and is retracted according to the geometrically arranged boom. The holding element 34 now starts to rest on the upper carriage 14. Preferably, the holding element 34 is configured as a traction cable or has such a cable. The auxiliary arm 32 pivots about its articulation point on the upper carriage 14 and rests on the upper carriage 14. It should be noted at this point that the terms "articulation point", "pivot axis" and "luffing axis" are used synonymously.
[0061] In the exemplary embodiment shown, the traction cylinder 36 is double acting, so that it can be loaded in compression as well as traction, providing a compressive force to the boom 16. This allows the traction cylinder to be used as a fallback press or fallback support when the boom 16 is in a steep angle position.
[0062] 5 shows a possible fallback support mode for the traction cylinder 36. As soon as the auxiliary arm 32 is fully positioned on the upper bogie 14, the auxiliary arm 32 acts as an abutment for the traction cylinder 36 and is subjected to a tensile load. This causes the traction cylinder 36 to apply a compressive force F D and acts as a fallback support for the boom 16. The connection between the traction cylinder 36 and the auxiliary arm 32 must therefore be capable of traction and compression and is configured accordingly.
[0063] The length of the traction cylinder 36 is appropriately selected for the geometrical requirements. The hydraulic medium must flow out of the traction cylinder 36 in a controlled manner as the boom 16 continues to rise. In order for the fallback device to operate as intended, it is preferable to control or regulate the compression according to a predefined characteristic curve. For this purpose, a path or distance 40 shown in FIG. 5 is provided to be able to follow the movement of the boom 16. The piston rod of the traction cylinder 36 is therefore not fully retracted in the fallback support mode, but remains extended by the distance 40.
[0064] In this solution, the force ratio for the fallback support operation of the traction cylinder 36 is preferably reversed by the control system, so that the traction cylinder 36 acts as a compression member. The wiring of the hydraulic traction cylinder 36 is adjusted according to the operational requirements. In case of a flat boom position after the initial erection, there is no fallback problem and the traction cylinder 36 can be switched off by the control system, since the force F1 generated by the retraction mechanism or transmitted by the bracing 19 is sufficient to pivot the boom 16.
[0065] The switching off can be based on measured sensor values. For example, the boom angle can be measured and / or the force of the bracing 19 can be measured. If a force is measured, a comparison is made against a limit force, if an angle is measured, a comparison is made against a limit angle. Other or additional measurements are also conceivable, such as, for example, the angle of the bracing frame 18, the angle of the auxiliary arm 32, the force in the traction cylinder 36 (and / or the hydraulic pressure of the traction cylinder 36 or of the hydraulic system), the force in the retaining element 34 and / or the force in the bracing cabling 20.
[0066] The controller or control unit may be configured to control and / or regulate both the traction cylinders 36 and the retraction mechanism or cable drum 24 .
[0067] The above-mentioned processes of raising, switching off, and fallback support modes are preferably at least partially automated, and optionally even fully automated, so that the crane operator does not have to manually switch between these modes. Instead, the controller can select different modes (flat boom position: raising assistance - combined traction forces F1+F2; intermediate boom position: traction elements 36 switched off - traction force F1; steep boom position: fallback support mode - traction force F1 and possible compression force F2) when raising the boom 16. D ) automatically.
[0068] The traction element 36 preferably remains attached to the boom 16 (or articulating piece 17) and auxiliary arm 32 during the entire operation of the crane.
[0069] 6 is a side view of yet another exemplary embodiment of the crane 10 according to the invention, showing further components of the retraction mechanism or bracing cabling 20, such as a cable winch 24 mounted on the upper cart 14 and deflection pulleys 26, 28 on the upper cart 14 and at the end of the bracing frame 18 for winding up the bracing cable 22. Here, the pivot axis of the auxiliary arm 32 is offset towards the rear of the upper cart with respect to the hoisting axis of the boom 16 (shown here only diagrammatically in lines) and with respect to the pivot axis of the bracing frame 18. However, it is also conceivable that the pivot axis of the auxiliary arm 32 is between the pivot axis of the bracing frame 18 and the boom 16, or coincides with one or both of these pivot axes. [Explanation of symbols]
[0070] 10. Crane 12 Lower bogie 14 Upper bogie 15 Upper bogie ballast 16. Boom 17 Connecting piece 18 Bracing frame 19 Bracing 20 Bracing Cabling 22 Bracing cable 24 Cable winch 26 Deflection pulley 28 Deflection pulley 30 Lifting aid device 32 Auxiliary Arm 34 Retention element 36 Variable length traction elements 40 distance F1 retraction mechanism and bracing for traction Traction force by traction elements during F2 ascent process F D Compressive force exerted by traction elements in fallback support mode
Claims
1. A crane (10), particularly a mobile lattice boom crane, comprising: an upper carriage (14); and a boom (16) connected to the upper carriage (14) so as to rotate about a horizontal axis, the boom being reinforced by a bracing frame (18) attached to the upper carriage (14) so as to rotate about the horizontal axis, the boom being capable of being raised and lowered by rotating the bracing frame (18), 1. A crane (10) comprising a hoisting auxiliary device (30) capable of applying a torque acting in addition to a bracing (19) to the boom (16) for hoisting the boom (16) in a flat boom position, the hoisting auxiliary device (30) being pivotally attached to an upper carriage (14) and having an auxiliary arm (32) connected to the upper carriage (14) via a holding element (34) and connected to the boom (16) via a towing element (36) of variable length, the towing element (36) being configured to apply a towing force to the boom (16) in the direction of the auxiliary arm (32).
2. The crane (10) according to claim 1, The towing element (36) is connected in an articulated manner to the auxiliary arm (32) and to the boom (16) and is preferably configured to remain connected to the boom (16) and preferably also to the auxiliary arm (32) throughout the entire operation of the crane (10).
3. A crane (10) according to claim 1 or 2, The bracing frame (18) is connected to the upper bogie (14) via actively adjustable bracing cabling (20), the bracing cabling (20) including a bracing cable (22) attached to a cable winch (24) that can be wound and unwound, and the cable winch (24) is configured to raise and lower the boom (16) connected to the bracing frame (18) via the bracing (19) by rotating the bracing frame (18) toward the rear of the upper bogie by winding up the bracing cable (22).
4. A crane (10) according to any one of claims 1 to 3, A crane (10) in which the towing element (36) is a separate component from the bracing (19), the bracing frame (18) and the boom (16).
5. A crane (10) according to any one of claims 1 to 4, A crane (10) in which the towing element (36) is actively adjustable in length and is preferably controllable and / or adjustable to provide a constant or varying towing force on the boom (16) as the boom (16) is erected.
6. A crane (10) according to claim 5, The crane (10) wherein the traction element (36) is configured as a hydraulic cylinder, and the traction element (36) is preferably configured as a double-acting hydraulic cylinder, thereby enabling both traction and compression forces to be applied to the boom (16).
7. A crane (10) according to claim 6, The crane (10) wherein the traction element (36) can be controlled and / or adjusted via at least one hydraulic pump and control unit of the crane (10) such that the traction element (36) applies a traction force to the boom (16) in a first angle range of the boom (16) to assist in the luffing process.
8. A crane (10) according to claim 7, The crane (10) is characterized in that the traction element (36) is configured to apply a compressive force to the boom (16) directed away from the upper carriage (14) in a third angular range of the boom (16), the boom (16) having a boom position that is steeper than in the first angular range, and the control unit is preferably configured to control hydraulic oil to flow out of or into the traction element (36) using a characteristic curve in the third angular range.
9. A crane (10) according to any one of claims 6 to 8, The towing element (36) is configured as a fallback support, and the auxiliary arm (32) is preferably configured to function as an abutment for the towing element (36) when the towing element (36) is in a fallback support mode.
10. A crane (10) according to any one of claims 6 to 9, a measuring device communicatively connected to a control unit, the control unit being configured to switch off the traction elements (36) in response to a variable detected by the measuring device; The measuring device preferably comprises at least at least one sensor for detecting an angle of the boom (16), the bracing frame (18) and / or the auxiliary arm (32); and at least one sensor for detecting a force of the bracing (19), the retaining element (34) and / or the traction element (36).
11. A crane (10) according to any one of claims 1 to 10, The bracing frame (18) and the auxiliary arm (32) are rotatable independently of each other, and the auxiliary arm (32) is preferably passively rotatable and follows the swinging movement of the boom (16) by being connected to the boom (16) through the traction element (36) in a second angular range of the boom (16).
12. A crane (10) according to any one of claims 1 to 11, A crane (10) in which the holding element (34) is flexible and preferably has a towing cable.
13. A crane (10) according to any one of claims 1 to 12, The crane (10) is characterized in that the holding element (34) rests on the upper carriage (14) in a fallback support mode of the traction element (36) and is designed in particular not to be loaded.
14. A method for raising and lowering a boom (16) of a crane (10) according to any one of claims 1 to 13, comprising the steps of: Providing the boom (16) in a flat, preferably laid-flat boom position; pivoting the bracing frame (18) rearward to apply an upward torque to the boom (16) and simultaneously applying a pulling force to the boom (16) via the traction element (36) towards the auxiliary arm (32) to assist in the luffing process; Raising and lowering the boom (16) by continuing to pivot the bracing frame (18); and Preferably, switching off said traction element (36) when a predetermined angle is exceeded and / or when a predetermined force is not reached. The method according to claim 1,
15. 15. The method of claim 14, A method in which the traction element (36) is used as a fallback support for the boom (16) after a lifting process, which preferably only operates at certain boom angles and is otherwise switched off.
Citation Information
Patent Citations
Method and apparatus for installation of leader of pile driver
JP1987078317A
Boom derricking device of crane
JP1997142783A
Auxiliary lifting device and cylinder
JP2019163173A
Crane assembly method
JP2021172500A
Multi-functional machine adaptable for drilling, boring and lifting
US20110147090A1