LNG vaporizer hot water circulation system and control method for the same
The system stabilizes LNG vaporization by managing pressure fluctuations through controlled pump adjustments and valve operations, ensuring consistent hot water supply in the LNG vaporizer system.
Patent Information
- Application Number
- JP2024116180
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2024-07-19
- Publication Date
- 2024-10-11
AI Technical Summary
Changing the number of operating circulation pumps in an LNG vaporizer hot water circulation system causes pressure fluctuations in the hot water supply header, leading to instability in LNG vaporization.
Implement a system with multiple hot water boilers, circulation pumps, pressure regulating valves, and control devices (PIC and PLC) to manage pressure and circulation pump frequency, using PID control with adjusted target values and temporary control modifications to stabilize pressure during pump changes.
Suppresses pressure fluctuations in the hot water supply header, enhancing the stability of LNG vaporization by maintaining consistent hot water supply.
Smart Images

Figure 2024144448000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to an LNG vaporizer hot water circulation system that circulates hot water through an LNG (liquefied natural gas) vaporizer, and a control method thereof. [Background technology]
[0002] City gas is produced by adding LNG (liquefied petroleum gas) to adjust the calorific value, vaporizing the natural gas, and odorizing it before being delivered to consumers. LNG can be vaporized in a variety of ways, one of which is to vaporize it in an LNG vaporizer using hot water as a heat medium. When vaporizing LNG with hot water, hot water is circulated and supplied to the LNG vaporizer by the LNG vaporizer hot water circulation system, which is a cold and hot water circulation water supply system.
[0003] Since the demand for city gas varies depending on the time of day, the amount of gas produced must be adjusted according to the fluctuation in gas demand, and for this purpose, the amount of LNG vaporized must be adjusted. The more hot water flow rate to the LNG vaporizer, the more LNG is vaporized, so adjusting the hot water flow rate to the LNG vaporizer is important. Therefore, the LNG vaporizer hot water circulation system can adjust the hot water flow rate to the LNG vaporizer by increasing or decreasing the number of hot water boilers and circulation pumps in operation (i.e., adding or decreasing the number of units), and by adjusting the amount of hot water bypassed from the hot water supply header to the hot water return header. In this case, the hot water flow rate to the LNG vaporizer changes stepwise and greatly depending on the number of circulation pumps in operation, so hot water that exceeds the hot water flow rate required by the LNG vaporizer is bypassed from the hot water supply header to the hot water return header.
[0004] The above LNG vaporizer hot water circulation system has the advantage that it can circulate a larger amount of hot water than the LNG vaporizer requires, which improves the ability to follow fluctuations in gas demand and momentary power outages and ensures a stable supply of city gas. On the other hand, it has the disadvantage that a certain amount of hot water is always circulated even during times when gas demand is low and hot water is not needed, so electricity is required to circulate the excess hot water that is bypassed. To address this issue, if an inverter is introduced into the circulation pump and the output frequency of the circulation pump is PID controlled, it will be possible to circulate only the amount of hot water required by the LNG vaporizer, eliminating the need to bypass the excess hot water.
[0005] When PID-controlled circulation pumps are used, pressure fluctuations can be an issue when changing the number of operating pumps. To address this issue, there are known techniques for smoothly changing the number of PID-controlled circulation pumps in operation (see, for example, Patent Documents 1 and 2). [Prior art documents] [Patent documents]
[0006] [Patent Document 1] JP 2013-40593 A [Patent Document 2] JP 2011-214442 A Summary of the Invention [Problem to be solved by the invention]
[0007] In an LNG vaporizer hot water circulation system, when the number of operating circulation pumps is changed, the pressure in the hot water header fluctuates, which may result in a fluctuation in the amount of hot water supplied to the LNG vaporizer, making the vaporization of LNG unstable. Therefore, an object of the present invention is to suppress the pressure fluctuation in the hot water header when the number of operating circulation pumps is changed in an LNG vaporizer hot water circulation system. [Means for solving the problem]
[0008] According to one aspect of the present invention, there is provided an LNG vaporizer hot water circulation system for circulating hot water to an LNG vaporizer, comprising: a plurality of hot water boilers for generating the hot water; a plurality of circulation pumps whose rotation speeds are controlled by an inverter and which circulate the hot water generated by the plurality of hot water boilers within the system; a hot water supply header for collecting the hot water generated by the plurality of hot water boilers and sending the collected hot water to the LNG vaporizer; a return hot water header for recovering the hot water that has been heat exchanged in the LNG vaporizer and distributing and returning the collected hot water to the plurality of circulation pumps; and a hot water supply header and a return hot water header connected to each other. An LNG vaporizer hot water circulation system is provided, which includes a pressure regulating valve provided in a bypass pipeline, a valve control device that controls the pressure regulating valve so that the pressure in the hot water header is equal to or lower than a first target value, and a pump control device that PID controls the output frequency of the circulating pump by giving a frequency command value to the inverter so that the pressure in the hot water header is equal to a second target value that is slightly lower than the first target value under normal circumstances, and that controls the circulating pump in a manner different from normal circumstances for a certain period of time immediately after the number of operating circulating pumps is changed.
[0009] According to another aspect of the present invention, there is provided a control method for an LNG vaporizer hot water circulation system including a plurality of hot water boilers that generate hot water, a plurality of circulation pumps whose rotation speeds are controlled by an inverter and that circulate the hot water generated by the plurality of hot water boilers within the system, a hot water header that collects the hot water generated by the plurality of hot water boilers and sends it to an LNG vaporizer, a return water header that recovers the hot water that has been heat exchanged in the LNG vaporizer and distributes it back to the plurality of circulation pumps, and a pressure regulating valve provided in a bypass pipeline connecting the hot water header and the return water header, wherein a valve control device controls the pressure regulating valve so that the pressure in the hot water header is equal to or lower than a target value, and a pump control device gives a frequency command value to the inverter to PID control the output frequency of the circulation pump so that the pressure in the hot water header during normal times becomes a second target value that is slightly lower than the first target value, and the control method for an LNG vaporizer hot water circulation system performs control of the circulation pump in a different manner from normal times for a certain period of time immediately after the number of operating circulation pumps is changed. Effect of the Invention
[0010] According to the present invention, it is possible to suppress pressure fluctuations in a hot water header when the number of operating circulation pumps is changed in an LNG vaporizer hot water circulation system, thereby improving the vaporization stability of LNG. [Brief description of the drawings]
[0011] [Figure 1] 1 is a schematic diagram of an LNG vaporizer hot water circulation system according to one embodiment of the present invention. [Diagram 2] 11 is a timing chart showing when the circulation pump is turned off and when the circulation pump is turned on. [Diagram 3] 11 is a graph showing an example of hot water pressure fluctuation when the gain of PID control is not changed and when it is temporarily increased when the circulation pump is turned off. [Figure 4] 11 is a graph showing an example of hot water pressure fluctuation in the case where PID control is not stopped and in the case where PID control is temporarily stopped when a circulation pump is added. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0012] Hereinafter, the embodiments of the present invention will be described in detail with reference to the drawings as appropriate. However, more detailed explanation than necessary may be omitted. For example, detailed explanation of already well-known matters or duplicate explanation of substantially the same configuration may be omitted. This is to avoid the following explanation becoming unnecessarily redundant and to facilitate understanding by those skilled in the art. Note that the inventor provides the accompanying drawings and the following explanation so that those skilled in the art can fully understand the present invention, and does not intend for them to limit the subject matter described in the claims.
[0013] <System Configuration> Fig. 1 is a schematic diagram of an LNG vaporizer hot water circulation system according to one embodiment of the present invention. An LNG vaporizer hot water circulation system (hereinafter, sometimes simply referred to as "the system") 100 according to this embodiment is a cold and hot water circulation water supply system that circulates and supplies hot water to an LNG vaporizer 200. Specifically, the system 100 includes a hot water header 10, a hot water return header 20, three circulation pumps 30, three hot water boilers 40, a hot water header pressure regulating valve 50, a PIC (pressure indication controller) 60, and a PLC (programmable logic controller) 70. In Fig. 1, the piping that transports the hot water is indicated by solid arrows, and the control signal lines are indicated by dashed lines. The arrows indicate the direction in which the hot water flows.
[0014] The hot water supply header 10 is a facility that collects hot water generated by the three hot water boilers 40 and sends the hot water to the LNG vaporizer 200. A pressure sensor 11 that measures the pressure inside the hot water supply header is connected to the hot water supply header 10.
[0015] The return hot water header 20 is a facility that recovers the hot water that has been heat exchanged in the LNG vaporizer 200 and distributes and returns it to each circulation pump 30. The hot water that has been heat exchanged in the LNG vaporizer 200 does not immediately return to the return hot water header 20, but may return to the return hot water header 20 via heat exchange equipment 300 such as a cogeneration system (CGS) or a waste treatment heat exchange equipment, recovering the exhaust heat generated there.
[0016] The LNG vaporizer 200 is a facility that vaporizes LNG at −162° C. transferred from an LNG tank (not shown) by heat exchange with hot water supplied from the hot water supply header 10, and returns it to natural gas. LNG is mixed with LPG for calorific value adjustment upstream of the LNG vaporizer 200 to adjust the calorific value, and odorant is added. The LNG is vaporized in the LNG vaporizer 200 and becomes city gas, which is supplied to consumers.
[0017] The hot water supply header 10 and the hot water return header 20 are connected by a bypass pipe 80 so that hot water can be bypassed. A hot water supply header pressure regulating valve (hereinafter, sometimes simply referred to as a "pressure regulating valve") 50 is provided in the path of the bypass pipe 80. The pressure regulating valve 50 opens when the pressure in the hot water supply header 10 increases, and returns hot water directly from the hot water supply header 10 to the hot water return header 20 via the bypass pipe 80.
[0018] The circulation pump 30 is specifically a non-positive-displacement pump, more specifically a centrifugal pump that rotates an impeller inside a casing to transport liquid by centrifugal force. The circulation pump 30 is driven by an electric motor (not shown). The rotation speed of the electric motor is controlled by an inverter 32, thereby controlling the output frequency of the circulation pump 30.
[0019] A hot water boiler 40 is connected to the output of the circulation pump 30. The hot water boiler 40 is a facility that heats the water (hot water whose temperature has been reduced) sent from the circulation pump 30 to a predetermined temperature and generates hot water to be supplied to the LNG vaporizer 200. The hot water boiler 40 may be any of an electric boiler, a gas boiler, an oil boiler, or any other type of boiler.
[0020] In this way, in the LNG vaporizer hot water circulation system 100 of this embodiment, the hot water (hot water with a reduced temperature) discharged from each circulation pump 30 is heated in each hot water boiler 40 and collected in the hot water header 10, from there it is sent to the LNG vaporizer 200 for heat exchange, and then returns to the hot water return header 20 after recovering waste heat in the heat exchange equipment 300, and is distributed and returned from the hot water return header 20 to each circulation pump 30, thereby circulating the hot water within the system.
[0021] <Control System> The PIC 60 and the PLC 70 are control devices that control the controlled object using a safety target value provided by a host device (not shown) and the measured value of the pressure sensor 11 as control inputs. The PIC 60 controls the pressure regulating valve 50, and the PLC 70 controls each circulating pump 30.
[0022] When the measured value of the pressure sensor 11 exceeds the safety target value, the PIC 60 opens the pressure regulating valve 50 to return hot water from the hot water supply header 10 to the hot water return header 20 via the bypass pipe 80. This keeps the pressure in the hot water supply header 10 always below the safety target value, and prevents an excessive amount of hot water from being supplied from the hot water supply header 10 to the LNG vaporizer 200.
[0023] The PLC 70 performs PID control of the output frequency of the circulating pump 30 so that the pressure in the hot water supply header 10 becomes a target value. Specifically, the PLC 70 determines a frequency command value for the inverters 32 based on the error between the measurement value of the pressure sensor 11 and the target value and provides this value in common to each inverter 32, and each inverter 32 controls the rotation speed of the corresponding circulating pump 30 according to the provided frequency command value. This controls the output frequency of each circulating pump 30, and the flow rate of hot water delivered from each circulating pump 30.
[0024] At this time, the PLC 70 sets a value slightly lower than the safety target value as a target value. For example, when the safety target value is 0.45 MPa, the PLC 70 sets a target value of 0.43 MPa, which is 0.02 MPa lower than the safety target value, and PID controls the output frequency of the circulation pump 30 so that the pressure in the hot water supply header 10 is maintained at 0.43 MPa. In this way, the PLC 70 PID controls the output frequency of the circulation pump 30 using a value slightly lower than the safety target value as a target value, so that the pressure in the hot water supply header 10 is maintained at a value slightly lower than the safety target value under normal conditions. Therefore, under normal conditions, the pressure regulating valve 50 remains closed without being opened, and hot water returned from the hot water supply header 10 to the hot water return header 20 via the bypass pipe 80 can be eliminated.
[0025] If the hot water flow rate required by the LNG vaporizer 200 changes significantly and the requirement cannot be met simply by adjusting the output of the circulating pump 30 in operation, the number of circulating pumps 30 in operation may be changed by adding or removing circulation pumps 30, thereby increasing or decreasing the amount of hot water supplied to the LNG vaporizer 200.
[0026] For example, if the demand for LNG increases and the LNG vaporizer 200 requires a large amount of hot water to vaporize a large amount of LNG, and the required hot water flow rate cannot be achieved with the number of circulation pumps 30 currently in operation, the idle circulation pumps 30 can be restarted, i.e., by adding additional circulation pumps 30, the amount of hot water circulating within the system can be increased, and the amount of hot water supplied to the LNG vaporizer 200 can be increased.
[0027] On the other hand, when the demand for LNG decreases and there is a surplus of hot water supplied to the LNG vaporizer 200, and the output of the multiple circulation pumps 30 in operation is lowered to the lower limit, the pressure in the hot water supply header 10 increases, opening the pressure regulating valve 50 and returning the surplus hot water from the hot water supply header 10 to the hot water return header 20 via the bypass pipe 80. However, this results in wasted hot water not used for vaporizing LNG circulating within the system, so by stopping one of the circulation pumps 30 in operation, i.e., by reducing the number of circulation pumps 30, the amount of hot water circulating within the system is reduced, and the amount of hot water supplied to the LNG vaporizer 200 is reduced, thereby eliminating the wasted hot water being bypassed.
[0028] If the PLC 70 adds or reduces the speed of the circulation pump 30 while the PLC 70 is PID controlling the output frequency of the circulation pump 30, the pressure in the hot water header 10 fluctuates, which may result in fluctuations in the amount of hot water supplied to the LNG vaporizer 200 and unstable vaporization of LNG. Therefore, as described below, the PLC 70 controls the circulation pump 30 differently from normal control for a certain period of time immediately after the circulation pump 30 is added or reduced, thereby suppressing pressure fluctuations in the hot water header 10.
[0029] 2 is a timing chart when the circulation pump is turned off and turned on. (a) represents the hot water flow rate required by the LNG vaporizer 200, (b) represents the safety target value, (c) represents the pressure in the hot water header 10, (d) represents the operation of the pressure regulating valve 50, (e) represents the frequency command value given by the PLC 70 to the inverter 32, (f) represents the output frequency of one of the circulation pumps 30 (for convenience, referred to as "pump A"), (g) represents the output frequency of another of the circulation pumps 30 (for convenience, referred to as "pump B"), and (h) represents the output frequency of yet another of the circulation pumps 30 (for convenience, referred to as "pump C"). Note that the various values shown in the timing chart are merely examples.
[0030] The timing chart illustrated in Figure 2 illustrates a scenario in which, while hot water is being circulated by operating three pumps, pump A, B, and C, the required hot water flow rate of the LNG vaporizer 200 decreases, so pump C is stopped and the system is switched to hot water circulation by operating only two pumps, pump A and pump B, and then, the required hot water flow rate of the LNG vaporizer 200 increases, so pump C is restarted and the system is switched back to hot water circulation by operating three pumps, pump A, B, and C.
[0031] Before time t1, the three pumps A, B, and C are PID-controlled by the PLC 70 so that the pressure in the hot water supply header 10 becomes the target value (0.43 MPa). Specifically, the PLC 70 issues a frequency command value of 30 Hz to the inverter 32, and the inverter 32 operates at an output frequency of 30 Hz in response to the command. During this normal operation, the pressure in the hot water supply header 10 is maintained at a target value (0.43 MPa) that is lower than the safety target value (0.45 MPa), and the pressure regulating valve 50 is closed. Therefore, the hot water is not bypassed from the hot water supply header 10 to the hot water return header 20 via the bypass pipe 80, and all the hot water delivered from the three pumps A, B, and C is supplied to the LNG vaporizer 200.
[0032] <Control when circulation pump is turned off> When the required hot water flow rate of the LNG vaporizer 200 decreases at time t1, a stop command is issued to the operating pump C at time t2, so that pump C stops, and the remaining two pumps, pump A and pump B, are PID controlled so that the pressure in the hot water header 10 becomes the target value (0.43 MPa). Specifically, the frequency command value issued from the PLC 70 to the inverter 32 increases to 45 Hz, and the output frequencies of pumps A and B also increase following this, reaching 45 Hz at time t3.
[0033] At time t2, pump C stops and the number of operating circulation pumps 30 is reduced to two, pump A and pump B, so that the pressure in the hot water supply header 10 temporarily drops, then rises with the increase in the output frequency of pump A and pump B, and finally returns to the target value (0.43 MPa) at time t3 when the output frequency of pump A and pump B reaches 45 Hz. Here, the longer it takes for the output frequency of pump A and pump B to reach 45 Hz, the longer the time for the pressure in the hot water supply header 10 to drop, and the greater the amount of pressure drop, resulting in the hot water flow rate to the LNG vaporizer 200 falling far below the required amount and the amount of vaporization of LNG becoming unstable. Therefore, the PLC 70 increases the gain of the PID control for a certain period (for example, 10 seconds) from time t2 when pump C stops, so that the output frequency of pump A and pump B reaches the frequency command value issued by the PLC 70 more quickly, and then returns the gain of the PID control to its original value.
[0034] As a method for increasing the gains of the PID control, all of the P gain, I gain, and D gain may be increased, or some of them may be selectively increased.
[0035] Immediately after the number of operating circulation pumps 30 is reduced from three to two, the hot water circulation capacity decreases by 33%, whereas immediately after the number of operating circulation pumps 30 is reduced from two to one, the hot water circulation capacity decreases by 50%. The fewer the number of operating circulation pumps 30 after the reduction, the greater the decrease in hot water circulation capacity immediately after the reduction, and the greater the decrease in pressure in the hot water header 10. Therefore, it is preferable that the PLC 70 increases the gain of the PID control as the number of operating circulation pumps 30 after the reduction decreases. As a result, when the number of operating circulation pumps 30 after the reduction is small and the amount of pressure decrease in the hot water header 10 is large, the output frequency of the circulation pump 30 can be PID-controlled with a higher gain to quickly return the pressure in the hot water header 10 to the target value.
[0036] If the period for increasing the gain of the PID control is too short, the gain will return to the original value before the output frequency of pump A and pump B reaches the target value, and it will take a long time for the output frequency of pump A and pump B to reach the target value. Conversely, if the period for increasing the gain of the PID control is too long, PID control will continue with a high gain even after the output frequency of pump A and pump B reaches the target value, and there is a risk of the feedback system becoming unstable due to overcontrol. Therefore, it is preferable to set the period for increasing the gain of the PID control to a time that is a little longer than the time required for the output frequency of the circulation pump 30 to reach the target value, such as from time t2 to time t4 shown in the time chart.
[0037] 3 is a graph showing an example of hot water pressure fluctuation when the PID control gain is not changed and when it is temporarily increased when the circulation pump is turned off. When the PID control gain of the output frequency of the circulation pump 30 is not changed, the pressure fluctuation in the hot water header 10 is 0.04 MPa, whereas when the PID control gain is temporarily increased as in this embodiment, the pressure fluctuation is half, 0.02 MPa. In this way, by increasing the PID control gain of the output frequency of the circulation pump 30 for a certain period of time immediately after the circulation pump 30 is turned off, the pressure fluctuation in the hot water header 10 can be suppressed and the vaporization stability of LNG can be improved.
[0038] <Control when adding a circulation pump> Returning to FIG. 2, when the required hot water flow rate of the LNG vaporizer 200 increases at time t5 and returns to the value before time t1, an instruction to operate is issued to the stopped pump C, and the pump C starts operating. At this time, while the pumps A and C operate at an output frequency of 45 Hz, the output frequency of the pump C immediately after starting operation does not immediately increase to 45 Hz, and only the pump C among the three pumps A, B, and C that are in operation operates at a different output frequency. If the pumps A, B, and C are PID-controlled in a state in which the output frequencies of these pumps do not match, the control becomes unstable and the pressure fluctuation in the hot water header 10 becomes large. Therefore, the PLC 70 stops the PID control for a certain period (for example, 30 seconds) from the time t5 when the pump C starts operating, and performs open-loop control on the pumps A, B, and C to operate these three pumps at the output when the PID control was stopped (45 Hz in this case), and when the output frequencies match, resumes the PID control of the output frequencies of the pumps A, B, and C.
[0039] At time t5, pump C starts to operate, increasing the number of operating circulation pumps 30 to three, pumps A, B, and C, so that the pressure in the hot water supply header 10 starts to rise and exceeds the safety target value at time t6. As a result, the pressure regulating valve 50 opens at time t6 and hot water is returned from the hot water supply header 10 to the hot water return header 20 via the bypass pipe 80, and the pressure in the hot water supply header 10 gradually decreases to the safety target value of 0.45 MPa at time t7, and is maintained at that value for a while. During this time, pumps A and B maintain the output when the PID control was stopped, and pump C gradually increases its output to catch up with the output of pumps A and B, so that hot water in an amount greater than the amount required by the LNG vaporizer 200 circulates in the system, but the excess hot water is bypassed by the action of the pressure regulating valve 50, and the pressure in the hot water supply header 10 is maintained at the safety target value.
[0040] Thereafter, at time t8, the output of pump C catches up with the output of pump A and pump B, and the output frequencies of pumps A, B, and C become equal. At time t9, the PLC 70 resumes PID control of the output frequencies of pumps A, B, and C and gradually lowers the frequency command value of the inverter 32 to 30 Hz. Following this, the output frequencies of pumps A, B, and C gradually decrease, returning to 30 Hz at time t10.
[0041] As the output frequencies of pumps A, B, and C drop to 30 Hz, the amount of hot water circulating within the system also decreases, and as the pressure in the hot water supply header 10 falls below the safety target value, the pressure regulating valve 50 closes and hot water is no longer returned from the hot water supply header 10 to the hot water return header 20 via the bypass pipe 80. After that, the pressure in the hot water supply header 10 continues to drop, and at time t11, it returns to 0.43 MPa, which is the target value of the PID control of the PLC 10, as it was before time t1.
[0042] If the period during which the PID control is temporarily stopped is too short, the PID control may be resumed before the output frequencies of pumps A, B, and C match, resulting in unstable control. Conversely, if the period during which the PID control is temporarily stopped is too long, the period during which the pressure regulating valve 50 adjusts the pressure in the hot water supply header 10 becomes longer, and the period during which hot water is returned from the hot water supply header 10 to the hot water return header 20 via the bypass pipe 80 becomes longer accordingly, resulting in a large amount of hot water being bypassed unnecessarily. Therefore, it is preferable that the period during which the PID control is temporarily stopped is set to a time that is a time required for the circulating pump 30 that has resumed operation to reach the output of the other circulating pumps that are operating, with a small margin added, such as from time t5 to time t9 illustrated in the time chart.
[0043] 4 is a graph showing an example of hot water pressure fluctuations when the PID control is not stopped and when it is temporarily stopped when the circulation pump is added. When the PID control of the output frequency of the circulation pump 30 is not stopped, the pressure fluctuation in the hot water header 10 is 0.07 MPa, whereas when the PID control is temporarily stopped as in this embodiment, the pressure fluctuation is reduced to 0.05 MPa. In this way, by stopping the PID control of the output frequency of the circulation pump 30 for a certain period of time immediately after the circulation pump 30 is added and performing open loop control, the pressure fluctuation in the hot water header 10 can be suppressed and the vaporization stability of LNG can be improved.
[0044] Effect In the LNG vaporizer hot water circulation 100 according to this embodiment, it is possible to suppress pressure fluctuations in the hot water header 10 when the number of operating circulation pumps 30 is changed. This makes it possible to improve the vaporization stability of LNG.
[0045] <<Variations>> The number of circulation pumps 30 is not limited to three, and may be reduced to two, or conversely, may be four or more. The PIC 60 and the PLC 70 may not be separate, and one control device may control the pressure regulating valve 50 and the circulation pump 60.
[0046] As described above, the embodiment has been described as an example of the technology of the present invention. For this purpose, the attached drawings and detailed description have been provided. Therefore, among the components described in the attached drawings and detailed description, not only components essential for solving the problem but also components that are not essential for solving the problem in order to illustrate the above technology may be included. Therefore, just because those non-essential components are described in the attached drawings or detailed description, it should not be immediately recognized that those non-essential components are essential. In addition, since the above-mentioned embodiment is intended to illustrate the technology of the present invention, various modifications, substitutions, additions, omissions, etc. may be made within the scope of the claims or their equivalents. [Explanation of symbols]
[0047] 100 LNG vaporizer hot water circulation system 10 Hot water header 20 Return water header 30 Circulation Pump 32 Inverter 40 Hot water boiler 50 Hot water header pressure regulating valve (pressure regulating valve) 60 PIC (valve control device) 70 PLC (Pump Control Device) 80 Bypass Pipe 200 LNG vaporizer
Claims
1. An LNG vaporizer hot water circulation system for circulating hot water to an LNG vaporizer, A plurality of hot water boilers for generating the hot water; A plurality of circulation pumps whose rotation speeds are controlled by an inverter and which circulate the hot water generated by the plurality of hot water boilers within the system; a hot water header that collects hot water generated by the plurality of hot water boilers and sends the hot water to the LNG vaporizer; a return header for recovering the hot water that has been heat exchanged in the LNG vaporizer and distributing and returning the hot water to the plurality of circulating pumps; a pressure regulating valve provided in a bypass pipe connecting the hot water supply header and the hot water return header; a valve control device that controls the pressure regulating valve so that the pressure in the hot water header is equal to or lower than a first target value; a pump control device that performs PID control of an output frequency of the circulating pump by providing a frequency command value to the inverter so that the pressure in the hot water header becomes a second target value that is slightly lower than the first target value during normal operation, and performs control of the circulating pump differently from normal operation for a certain period of time immediately after the number of operating circulating pumps is changed; and An LNG vaporizer hot water circulation system equipped with the above.
2. 2 . The LNG vaporizer hot water circulation system according to claim 1 , wherein the pump control device increases a gain of the PID control for a certain period of time immediately after the circulation pump is reduced, and then returns the gain of the PID control to its original value.
3. The LNG vaporizer hot water circulation system according to claim 2 , wherein the pump control device increases a gain of the PID control in the certain period as the number of the circulation pumps in operation after the reduction in the number of the circulation pumps is reduced.
4. 4. An LNG vaporizer hot water circulation system as described in any one of claims 1 to 3, wherein the pump control device stops the PID control for a certain period of time immediately after the circulation pump is added, performs open-loop control of the circulation pump, and then resumes the PID control.
5. a plurality of hot water boilers for generating hot water; A plurality of circulation pumps whose rotation speeds are controlled by an inverter and which circulate the hot water generated by the plurality of hot water boilers within the system; a hot water header that collects hot water generated by the plurality of hot water boilers and sends the hot water to an LNG vaporizer; a return header for recovering the hot water that has been heat exchanged in the LNG vaporizer and distributing and returning the hot water to the plurality of circulating pumps; A control method for an LNG vaporizer hot water circulation system including a pressure regulating valve provided in a bypass pipe connecting the hot water supply header and the return hot water header, a valve control device controls the pressure regulating valve so that the pressure in the hot water header is equal to or lower than a target value; A pump control device provides a frequency command value to the inverter so that the pressure in the hot water header becomes a second target value slightly lower than the first target value during normal operation, thereby PID-controlling the output frequency of the circulating pump, and performs control different from normal operation on the circulating pump for a certain period of time immediately after the number of operating circulating pumps is changed. A method for controlling an LNG vaporizer hot water circulation system comprising:
6. 6. The control method for an LNG vaporizer hot water circulation system according to claim 5, wherein the pump control device increases a gain of the PID control for a certain period of time immediately after the circulation pump is reduced, and then returns the gain of the PID control to its original value.
7. The control method for an LNG vaporizer hot water circulation system according to claim 6 , wherein the pump control device increases a gain of the PID control in the certain period as the number of the circulation pumps in operation after the reduction in the number of the circulation pumps is reduced.
8. A control method for an LNG vaporizer hot water circulation system as described in any one of claims 5 to 7, wherein the pump control device stops the PID control for a certain period of time immediately after the circulation pump is added, performs open loop control of the circulation pump, and then resumes the PID control.
Citation Information
Patent Citations
Water supply pressure control system and method
JP2009121722A
LNG satellite equipment
JP2011027282A
Pump unit and control method for pump unit
JP2017137849A
Control unit for controlling water supply equipment, and water supply equipment
JP2019210820A
Water supply device and method for controlling water supply device
JP2021055674A