Boiler system and operation method for boiler system

The boiler system efficiently recycles ammonia by directing it to the water supply system, enhancing pH and reducing equipment requirements for ammonia disposal.

JP2024145455APending Publication Date: 2024-10-15MITSUBISHI HEAVY IND LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2023057814
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-31
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

The disposal of ammonia fuel and ammonia water from boiler systems requires additional equipment and processing to render them harmless, which is burdensome and inefficient.

Method used

A boiler system that incorporates an ammonia recovery system to guide ammonia supplied to the fuel supply system to a water supply system, increasing the pH of boiler water, thereby reusing ammonia without additional equipment or work.

Benefits of technology

The system allows for the appropriate reuse of ammonia in the boiler system by integrating it into the water supply, suppressing corrosion and eliminating the need for extra equipment or processes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024145455000001_ABST
    Figure 2024145455000001_ABST
Patent Text Reader

Abstract

To appropriately reuse ammonia supplied to a fuel supply system for supplying fuel containing the ammonia to a burner without requiring an additional facility and a work burden.SOLUTION: A boiler system 100 comprises a boiler 10 for generating steam by burning ammonia fuel with an ammonia fuel burner 210A, a first fuel supply system 210 for supplying the ammonia fuel containing ammonia to the ammonia fuel burner 210A, a water supply system for supplying boiler water to the boiler 10, and an ammonia recovery system 220 for increasing a pH value of the boiler water by guiding the ammonia supplied to the first fuel supply system 210, to the water supply system.SELECTED DRAWING: Figure 3
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a boiler system and a method of operating a boiler system. [Background technology]

[0002] In recent years, a technology that uses ammonia fuel as fuel for generating steam to drive a generator or the like has been proposed as an effective technology for decarbonization (see, for example, Patent Document 1). The boiler disclosed in Patent Document 1 supplies ammonia fuel to a burner from an ammonia supplying means, supplies coal fuel to the burner from a coal supplying means, and co-burns both ammonia fuel and coal fuel in the boiler furnace. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2020-112280 A Summary of the Invention [Problem to be solved by the invention]

[0004] When ammonia fuel is supplied to a burner from an ammonia fuel supply system, it may be necessary to appropriately discharge the ammonia fuel remaining inside the ammonia fuel supply system, for example, when the combustion of the ammonia fuel in a boiler is stopped, etc. In this case, for example, a method of pushing out the ammonia fuel with nitrogen gas and discharging it to a recovery facility, or a method of dissolving ammonia gas in water to produce ammonia water and discharging it to a recovery facility can be considered.

[0005] When disposing of the ammonia fuel and ammonia water discharged to the recovery facility, a device for detoxifying them is required. Although it is possible to reuse the ammonia fuel and ammonia water discharged to the recovery facility, for example, a process such as removing nitrogen gas mixed with the ammonia fuel is required, and the equipment and work required for reuse are burdensome.

[0006] The present disclosure has been made in consideration of the above circumstances, and has an object to provide a boiler system and an operating method for a boiler system that are capable of appropriately reusing ammonia supplied to a fuel supply system that supplies fuel containing ammonia to a burner, without requiring additional equipment or the burden of work. [Means for solving the problem]

[0007] In order to solve the above problems, the present disclosure employs the following solutions. The boiler system according to the present disclosure includes a boiler that generates steam by burning a first fuel with a first burner, a first fuel supply system that supplies the first fuel containing ammonia to the first burner, a feed water system that supplies boiler water to the boiler, and an ammonia recovery system that introduces ammonia supplied to the first fuel supply system into the feed water system to increase the pH of the boiler water.

[0008] In a boiler system operation method according to the present disclosure, the boiler system includes a boiler that generates steam by burning a first fuel with a first burner, a first fuel supply system that supplies the first fuel containing ammonia to the first burner, and a feedwater system that supplies boiler water to the boiler, and includes an ammonia injection process that introduces ammonia supplied to the first fuel supply system into the feedwater system to increase the pH of the boiler water. Effect of the Invention

[0009] According to the present disclosure, it is possible to provide a boiler system and an operating method of a boiler system that are capable of appropriately reusing ammonia supplied to a fuel supply system that supplies fuel containing ammonia to a burner without requiring additional equipment or the burden of work. [Brief description of the drawings]

[0010] [Figure 1] 1 is a schematic configuration diagram showing a boiler according to a first embodiment of the present disclosure. [Diagram 2] 1 is a schematic diagram showing a boiler water circulation system in a boiler system according to a first embodiment of the present disclosure. [Diagram 3] 1 is a schematic configuration diagram showing a fuel supply system and an ammonia recovery system in a boiler system according to a first embodiment of the present disclosure. FIG. [Figure 4] 3 is a flowchart showing a method for operating the boiler system according to the first embodiment of the present disclosure. [Diagram 5] FIG. 11 is a schematic configuration diagram showing a fuel supply system and an ammonia recovery system in a boiler system according to a second embodiment of the present disclosure. [Figure 6] FIG. 11 is a schematic configuration diagram showing a fuel supply system and an ammonia recovery system in a boiler system according to a third embodiment of the present disclosure. [Figure 7] FIG. 11 is a schematic configuration diagram showing a fuel supply system and an ammonia recovery system in a boiler system according to a fourth embodiment of the present disclosure. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0011] [First embodiment] Hereinafter, a boiler system according to a first embodiment of the present disclosure will be described with reference to the drawings. Note that the present disclosure is not limited to this embodiment, and when there are multiple embodiments, the present disclosure also includes a configuration in which each embodiment is combined. In the following description, up and above refer to the upper side in the vertical direction, and down and below refer to the lower side in the vertical direction, and the vertical direction is not precise and includes an error.

[0012] Fig. 1 is a schematic diagram showing a boiler 10 according to a first embodiment of the present disclosure. The boiler 10 of this embodiment is a boiler that can burn pulverized fuel obtained by pulverizing solid fuel and ammonia fuel containing ammonia with a burner, and exchange heat generated by this combustion with feed water or steam to generate superheated steam. Biomass fuel, coal, etc. are used as the solid fuel.

[0013] The boiler 10 has a furnace 11, a combustion device 20, and a combustion gas passage 12. The furnace 11 has a hollow rectangular cylinder shape and is installed vertically. The furnace wall 11a constituting the inner wall surface of the furnace 11 is composed of a plurality of heat transfer tubes and fins connecting the heat transfer tubes, and recovers heat generated by the combustion of pulverized fuel by heat exchange with water and steam flowing inside the heat transfer tubes, while suppressing a temperature rise of the furnace wall 11a.

[0014] The combustion device 20 is installed in the lower region of the furnace 11. The combustion device 20 of this embodiment has a plurality of pulverized fuel burners (second burners) 21A, 21B, 21C (hereinafter, they may be collectively referred to as "pulverized fuel burners 21") attached to the furnace wall 11a, and an ammonia fuel burner (first burner) 210A. The pulverized fuel burners 21 are arranged in a plurality of stages along the vertical direction (three stages in the example shown in FIG. 1), with each set consisting of those arranged at equal intervals along the circumferential direction of the furnace 11 (for example, four burners installed at each corner of the rectangular furnace 11). The ammonia fuel burner 210A is arranged in one stage or a plurality of stages (one stage in the example shown in FIG. 1), with each set consisting of those arranged at equal intervals along the circumferential direction of the furnace 11 (for example, four burners installed at each corner of the rectangular furnace 11).

[0015] 1, only two of one set of pulverized fuel burners 21 are shown, and each set is denoted by the reference numerals 21A, 21B, and 21C. The shape of the furnace 11, the number of burner stages, the number of burners in one stage, the arrangement of the burners, and the like are not limited to this embodiment.

[0016] The pulverized fuel burners 21A, 21B, 21C are respectively connected to a plurality of pulverized fuel supply units 31A, 31B, 31C (hereinafter, may be collectively referred to as "pulverized fuel supply units 31") via a plurality of pulverized fuel supply pipes 22A, 22B, 22C (hereinafter, may be collectively referred to as "pulverized fuel supply pipes 22").

[0017] The pulverized fuel supply units 31A, 31B, and 31C are, for example, vertical roller mills in which a grinding table (not shown) is supported inside so as to be rotatable and a plurality of grinding rollers (not shown) are supported above the grinding table so as to be rotatable in conjunction with the rotation of the grinding table. The solid fuel pulverized by the cooperation of the grinding rollers and the grinding table is transported to a classifier (not shown) provided in the pulverized fuel supply units 31A, 31B, and 31C by primary air (carrier gas, oxidizing gas) supplied to the pulverized fuel supply units 31A, 31B, and 31C.

[0018] In the classifier, the fuel is classified into pulverized fuel having a particle size smaller than that suitable for combustion in the pulverized fuel burners 21A, 21B, 21C and coarse pulverized fuel having a particle size larger than the particle size. The pulverized fuel passes through the classifier and is supplied to the pulverized fuel burners 21A, 21B, 21C via the pulverized fuel supply pipes 22A, 22B, 22C together with primary air. The coarse pulverized fuel that does not pass through the classifier falls onto the grinding table by its own weight inside the pulverized fuel supply section 31A, 31B, 31C and is re-ground.

[0019] The first fuel supply system 210 is a device that supplies ammonia fuel containing ammonia to the ammonia fuel burner 210A. The ammonia fuel is supplied to the ammonia fuel burner 210A via an ammonia fuel supply pipe 210a. The supply of the ammonia fuel including the first fuel supply system 210 will be described later.

[0020] In the boiler system 100 of this embodiment, the boiler 10 burns ammonia fuel (first fuel) with the ammonia fuel burner 210A (first burner) and burns pulverized fuel (second fuel) with the pulverized fuel burners (second burners) 21A, 21B, and 21C to generate steam. Note that the number and arrangement of the ammonia fuel burner (first burner) 210A and the pulverized fuel burners (second burners) 21 are not limited to the form shown in FIG. 1.

[0021] In the boiler system 100 of this embodiment, the first fuel supply system 210 is a first fuel supply system that supplies ammonia fuel to the ammonia fuel burner 210A. In addition, in the boiler system 100 of this embodiment, the pulverized fuel supply units 31A, 31B, and 31C and the pulverized fuel supply pipes 22A, 22B, and 22C are a second fuel supply system that supplies pulverized fuel to the pulverized fuel burners 21A, 21B, and 21C.

[0022] An air register 23 is provided on the outside of the furnace 11 at the mounting position of the pulverized fuel burner 21 and the ammonia fuel burner 210A, and one end of an air duct 24 is connected to the air register 23. A forced draft fan (FDF: Forced Draft Fan) 32 is connected to the other end of the air duct 24. The air supplied from the forced draft fan 32 is heated by an air preheater 42 installed in the air duct 24 (details will be described later), and is supplied to the pulverized fuel burner 21 via the air register 23 as secondary air (combustion air, oxidizing gas), and is introduced into the furnace 11.

[0023] The combustion gas passage 12 is connected to the vertical upper part of the furnace 11. The combustion gas passage 12 is provided with superheaters 102A, 102B, and 102C (hereinafter, sometimes collectively referred to as "superheaters 102"), reheaters 103A and 103B (hereinafter, sometimes collectively referred to as "reheater 103"), and a coal economizer 104 as heat exchangers for recovering heat from the combustion gas, and heat is exchanged between the combustion gas generated in the furnace 11 and feed water or steam flowing inside each heat exchanger. The arrangement and shape of each heat exchanger are not limited to the form shown in FIG. 1.

[0024] A flue 13 is connected to the downstream side of the combustion gas passage 12, and discharges the combustion gas whose heat has been recovered by the heat exchanger. An air preheater (air heater) 42 is provided between the flue 13 and the air duct 24, and heat is exchanged between the air flowing through the air duct 24 and the combustion gas flowing through the flue 13, and the primary air supplied to the pulverized fuel supply units 31A, 31B, and 31C and the secondary air supplied to the pulverized fuel burner 21 and the ammonia fuel burner 210A are heated, thereby recovering further heat from the combustion gas after heat exchange with water and steam.

[0025] A denitration device 43 may be provided in the flue 13 at a position upstream of the air preheater 42. The denitration device 43 supplies a reducing agent having an effect of reducing nitrogen oxides, such as ammonia or urea water, to the combustion gas flowing through the flue 13, and promotes a reaction between the nitrogen oxides (NOx) in the combustion gas to which the reducing agent has been supplied and the reducing agent by the catalytic action of a denitration catalyst provided in the denitration device 43, thereby removing and reducing the nitrogen oxides in the combustion gas.

[0026] A gas duct 41 is connected to the flue 13 downstream of the air preheater 42. The gas duct 41 is provided with environmental equipment such as a dust collector 44, such as an electrostatic precipitator, for removing ash and the like from the combustion gas, a desulfurization equipment 46 for removing sulfur oxides, and an induced draft fan (IDF) 45 for directing the exhaust gas to these environmental equipment. The downstream end of the gas duct 41 is connected to a chimney 47, and the combustion gas treated in the environmental equipment is discharged to the outside of the system as exhaust gas.

[0027] In the boiler 10, when the pulverized fuel supply units 31A, 31B, and 31C are driven, the pulverized fuel is supplied together with the primary air to the pulverized fuel burners 21A, 21B, and 21C through the pulverized fuel supply pipes 22A, 22B, and 22C. Secondary air heated by the air preheater 42 is supplied to the pulverized fuel burners 21A, 21B, and 21C through the air duct 24 and the air box 23. The pulverized fuel burners 21A, 21B, and 21C blow a pulverized fuel mixture, which is a mixture of fuel and primary air, into the furnace 11, and also blow secondary air into the furnace 11.

[0028] Furthermore, when ammonia fuel is used in the boiler 10, ammonia fuel is supplied from the first fuel supply system 210 to the ammonia fuel burner 210A via the ammonia fuel supply pipe 210a. Secondary air heated in the air preheater 42 is supplied to the ammonia fuel burner 210A from the air duct 24 through the wind box 23. The ammonia fuel burner 210A blows ammonia fuel into the furnace 11 and also blows secondary air into the furnace 11.

[0029] The pulverized fuel mixture and ammonia fuel injected into the furnace 11 ignite and react with the secondary air to form a flame. A flame is formed in the lower region of the furnace 11, and high-temperature combustion gas rises inside the furnace 11 and flows into the combustion gas passage 12. In this embodiment, air is used as the oxidizing gas (primary air, secondary air), but the oxidizing gas may have a higher or lower oxygen ratio than air. By adjusting the ratio of the amount of oxygen to the amount of fuel supplied to an appropriate range, stable combustion is achieved in the furnace 11.

[0030] The combustion gas flowing into the combustion gas passage 12 exchanges heat with water and steam in a superheater 102, a reheater 103, and a coal economizer 104 arranged inside the combustion gas passage 12, and is then discharged into the flue 13, where nitrogen oxides are removed in a denitration device 43, and the combustion gas exchanges heat with primary air and secondary air in an air preheater 42, and is then discharged into a gas duct 41, where ash and the like are removed in a dust collector 44, and sulfur oxides are removed in a desulfurization device 46, and the combustion gas is then discharged to the outside of the system from a chimney 47. Note that the arrangement of the heat exchangers in the combustion gas passage 12 and the devices from the flue 13 to the gas duct 41 with respect to the combustion gas flow does not necessarily have to be in the order described above.

[0031] Next, a configuration will be described in which boiler water is supplied to the boiler 10, and steam is generated from the boiler water and supplied to the steam turbine 111 in a boiler system 100 including the boiler 10. Fig. 2 is a schematic configuration diagram showing a boiler water circulation system in the boiler system 100 according to the first embodiment of the present disclosure. Note that Fig. 2 does not accurately show the positions of the heat exchangers (superheaters 102A, 102B, 102C, reheaters 103A, 103B, economizer 104) in the combustion gas passage 12, and the arrangement order of the heat exchangers with respect to the combustion gas flow is not limited to that shown in Fig. 2.

[0032] As shown in FIG. 2, the boiler system 100 of this embodiment includes a heat exchanger provided in the boiler 10, a steam turbine 111 that is rotationally driven by steam generated in the boiler 10, and a generator 113 that is connected to the steam turbine 111 and generates electricity using the rotational force of the steam turbine 111.

[0033] The steam turbine 111 is composed of, for example, a high-pressure turbine 111A, an intermediate-pressure turbine 111B, and a low-pressure turbine 111C. Steam heated by a superheater 102 of the boiler 10 drives and rotates the high-pressure turbine 111A, and is then reheated by a reheater 103 of the boiler 10 to drive and rotate the intermediate-pressure turbine 111B and the low-pressure turbine 111C. A condenser 112 is connected to the low-pressure turbine 111C, and the steam that drives and rotates the low-pressure turbine 111C is condensed by heat exchange with cooling water (e.g., seawater or river water) in the condenser 112 to become condensed water.

[0034] The condenser 112 is connected to the economizer 104 via a feedwater line L1. For example, a condensate pump 121, a low-pressure feedwater heater 122, a boiler feedwater pump 123, and a high-pressure feedwater heater 124 are provided on the feedwater line L1. A part of the steam that drives the steam turbine 111 is extracted and supplied to the low-pressure feedwater heater 122 and the high-pressure feedwater heater 124 via an extraction line (not shown) as a heat source, and the feedwater supplied to the economizer 104 is heated.

[0035] In the boiler system 100, a feedwater system 240 that supplies boiler water to the boiler 10 is configured by a feedwater line L1, a condensate pump 121, a low-pressure feedwater heater 122, and a boiler feedwater pump 123. A chemical liquid (e.g., ammonia water adjusted to a predetermined concentration) supplied from a chemical liquid injection equipment 230 is injected into the feedwater line L1 downstream of the condensate pump 121 and upstream of the low-pressure feedwater heater 122. The chemical liquid injection equipment 230 injects the chemical liquid to increase the pH value of the boiler water in order to prevent corrosion from occurring in the piping of the feedwater system 240.

[0036] For example, a case where the boiler 10 is a once-through boiler will be described. The economizer 104 is connected to a heat transfer tube constituting the furnace wall 11a. The feed water heated by the economizer 104 is heated by radiation from the flame in the furnace 11 while passing through the heat transfer tube constituting the furnace wall 11a, and is led to the steam separator 125. The steam separated by the steam separator 125 is supplied to the superheater 102, and the drain water separated by the steam separator 125 flows into the steam separator drain tank 126 and is led to the condenser 112 via the drain water line L2.

[0037] When the combustion gas flows through the combustion gas passage 12, heat of the combustion gas is recovered by the superheater 102, the reheater 103, and the economizer 104. Meanwhile, the feed water supplied from the boiler feed water pump 123 is preheated by the economizer 104, and then heated to become steam while passing through the heat transfer tubes constituting the furnace wall 11a, and is guided to the steam separator 125. The steam separated by the steam separator 125 is guided to the superheaters 102A, 102B, and 102C, and is superheated by the combustion gas.

[0038] The superheated steam generated in the superheater 102 is supplied to the high-pressure turbine 111A via the steam line L3, and drives the high-pressure turbine 111A to rotate. The steam discharged from the high-pressure turbine 111A is introduced into the reheater 103A and the reheater 103B via the steam line L4, and is superheated again. The resuperheated steam is supplied to the low-pressure turbine 111C via the intermediate-pressure turbine 111B via the steam line L5, and drives the intermediate-pressure turbine 111B and the low-pressure turbine 111C to rotate. The rotating shaft of the steam turbine 111 drives the generator 113 to rotate, thereby generating electricity. The steam discharged from the low-pressure turbine 111C is cooled in the condenser 112 to become condensed water, and is sent again to the economizer 104 via the water supply line L1.

[0039] Next, the first fuel supply system 210 and the ammonia recovery system 220 in the boiler system 100 according to the first embodiment of the present disclosure will be described. Fig. 3 is a schematic configuration diagram showing the first fuel supply system 210 and the ammonia recovery system 220 in the boiler system 100 according to the first embodiment of the present disclosure. As shown in Fig. 3, the boiler system 100 of this embodiment includes the first fuel supply system 210, the ammonia recovery system 220, a chemical injection facility (ammonia supply system) 230, and a control device 250.

[0040] The first fuel supply system 210 is a system that supplies an ammonia fuel (first fuel) containing ammonia to the ammonia fuel burner (first burner) 210A. As shown in Fig. 3, the first fuel supply system 210 includes an ammonia fuel tank 211, a pump 212, a heater 213, an on-off valve 214, and a control valve 215.

[0041] The ammonia fuel tank 211 is a container for storing ammonia fuel supplied from an external ammonia supply source. The ammonia fuel stored in the ammonia fuel tank 211 is supplied to the heater 213 by a pump 212. The heater 213 heats the ammonia liquid to a temperature suitable for combustion in the ammonia fuel burner 210A, and supplies the heated ammonia fuel to the ammonia fuel burner 210A via the ammonia fuel supply pipe 210a. The boiler 10 burns the ammonia fuel supplied to the ammonia fuel burner 210A to generate steam. Note that the heater 213 may be omitted depending on the properties of the ammonia fuel used.

[0042] The on-off valve 214 is a valve body that is in an open state when ammonia fuel is supplied to the ammonia fuel burner 210A and is in a closed state when ammonia fuel is not supplied to the ammonia fuel burner 210A. The control valve 215 is a valve body for adjusting the amount of ammonia fuel supplied to the ammonia fuel burner 210A when the on-off valve 214 is in an open state. The ammonia fuel burner 210A also includes a burner valve 210B that switches between supplying and not supplying ammonia fuel.

[0043] The ammonia recovery system 220 is a system that introduces the ammonia fuel supplied to the first fuel supply system 210 to a water supply system 240 via a chemical injection facility 230, and increases the pH value of the boiler water. The ammonia recovery system 220 includes an on-off valve 221, an on-off valve 222, an on-off valve 223, an on-off valve 224, an on-off valve 225, an ammonia recovery tank (storage unit) 226, a control valve 227, a pump 228, and a control valve 229.

[0044] The ammonia recovery system 220 is controlled by the control device 250 to open the on-off valves 221, 222, 223, 224, and 225 when the supply of ammonia fuel from the first fuel supply system 210 to the ammonia fuel burner 210A is stopped (at that time, the burner valve 210B of the ammonia fuel burner 210A is closed) and the ammonia fuel is discharged from the first fuel supply system 210.

[0045] The ammonia recovery system 220 supplies nitrogen gas from a nitrogen gas line 220a to an ammonia fuel tank 211 via an on-off valve 221, and supplies nitrogen gas from the nitrogen gas line 220a to an ammonia fuel supply pipe 210a via an on-off valve 222. The ammonia fuel remaining in the first fuel supply system 210 is discharged by the nitrogen gas through on-off valves 223, 224, and 225 to a discharge line 220b. The ammonia fuel and nitrogen gas discharged to the discharge line 220b are recovered in an ammonia recovery tank 226. The on-off valves 221, 222, 223, 224, and 225 are controlled by a control device 250.

[0046] The ammonia recovery tank 226 is a container that stores the ammonia fuel discharged through the discharge line 220b from the first fuel supply system 210 or the ammonia fuel tank 211. Hereinafter, the ammonia fuel discharged through the discharge line 220b from the first fuel supply system 210 or the ammonia fuel tank 211 and stored in the ammonia recovery tank 226 is referred to as recovered ammonia.

[0047] The seal pot 226c is a device that dissolves ammonia contained in the evaporated gas present above the ammonia recovery tank 226, which evaporates from the recovered ammonia in the ammonia recovery tank 226, into water, and releases the gas that does not contain ammonia into the atmosphere. Water is stored inside the seal pot 226c, and the evaporated gas present above the ammonia recovery tank 226 is introduced into it from below.

[0048] In this embodiment, in order to discharge the ammonia fuel from the first fuel supply system 210 to the ammonia recovery system 220 using nitrogen gas, the nitrogen gas flows into the ammonia recovery tank 226 through the discharge line 220b. The nitrogen gas is led to the upper part of the ammonia recovery tank 226 together with the ammonia gas, and is discharged into the atmosphere through the seal pot 226c. In this way, according to the boiler system 100 of this embodiment, the nitrogen gas used to discharge the ammonia fuel from the first fuel supply system 210 to the ammonia recovery system 220 can be appropriately separated and discharged into the atmosphere. Since the nitrogen gas is separated from the recovered ammonia on the upstream side of the pump 228, it is possible to prevent a malfunction in which cavitation occurs in the pump 228 and the pump 228 is damaged.

[0049] The control valve 227 is a valve body that controls the amount of makeup water supplied to the ammonia recovery tank 226. The ammonia recovery tank 226 is provided with a level gauge (not shown), and the amount of makeup water supplied is controlled by the control valve 227 so that the liquid level in the tank is maintained at a predetermined level.

[0050] The pump 228 is a device that transfers the recovered ammonia from the ammonia recovery tank 226 to the storage tank 231 of the chemical liquid injection equipment 230. The control valve 229 is a valve body that adjusts the amount of recovered ammonia supplied from the ammonia recovery tank 226 to the storage tank 231 of the chemical liquid injection equipment 230.

[0051] The chemical liquid injection equipment 230 is equipment that injects ammonia water adjusted to a predetermined concentration into boiler water of the feed water system 240. Hereinafter, the ammonia water adjusted to a predetermined concentration to be injected into the boiler water is referred to as an ammonia chemical liquid. The chemical liquid injection equipment 230 has a storage tank (storage section) 231, an electric conductivity meter (first measurement section) 232, a control valve (first concentration adjustment section) 233, a control valve (first concentration adjustment section) 234, and a pump 236.

[0052] The storage tank 231 is a device for storing ammonia chemical liquid to be injected into the boiler water. Dilution water is supplied to the storage tank 231 via a control valve 233, raw ammonia (ammonia water of a specified concentration that is circulating, or ammonia gas obtained by evaporating the ammonia water) is supplied to the storage tank 231 via a control valve 234, and recovered ammonia is supplied from the ammonia recovery system 220.

[0053] The electrical conductivity meter 232 is a device that measures the electrical conductivity of the ammonia chemical liquid stored in the storage tank 231. The electrical conductivity meter 232 refers to a table that is stored in advance, for example, in which electrical conductivity is associated with the pH value of the ammonia water, and calculates the pH value of the ammonia chemical liquid from the measured electrical conductivity. The pH value measured by the electrical conductivity meter 232 is transmitted to the control device 250.

[0054] The control valve 233 is a valve body that controls the amount of dilution water supplied to the storage tank 231. The control valve 234 is a valve body that controls the amount of undiluted ammonia supplied to the storage tank 231. The control valves 233 and 234 function as a concentration adjustment unit (first concentration adjustment unit) that adjusts the concentration of the ammonia chemical stored in the storage tank 231 in accordance with the pH value measured by the electrical conductivity meter 232 so that the pH value measured by the electrical conductivity meter 232 becomes a target value (first target value).

[0055] Pump 236 is disposed in ammonia supply line 230a, and injects the ammonia chemical solution, the concentration of which has been adjusted in storage tank 231, into the boiler water in feedwater system 240. The flow rate of the injected ammonia chemical solution is controlled to an amount according to the concentration of the ammonia chemical solution and the flow rate of the boiler water so that the pH value of the boiler water in feedwater system 240 falls within a predetermined range.

[0056] Next, a method for operating the boiler system 100 of this embodiment will be described. Fig. 4 is a flowchart showing a method for operating the boiler system 100 of the first embodiment of the present disclosure. Each process of this flowchart is executed by a control program stored in the control device 250.

[0057] In step S101, the control device 250 determines whether the boiler 10 shutdown condition, which is the condition for stopping the generation of steam in the boiler 10, is met. If YES, the control device 250 proceeds to step S101, and if NO, the control device 250 repeats the processing of step S101.

[0058] In step S102, the control device 250 controls the on-off valve 221, the on-off valve 222, the on-off valve 223, the on-off valve 224, and the on-off valve 225 to be open, and controls the ammonia fuel to be discharged from the first fuel supply system 210 and guided to the ammonia recovery tank 226.

[0059] In step S103, the control device 250 controls the ammonia recovery system 220 so as to transfer the recovered ammonia guided to the ammonia recovery tank 226 to the storage tank 231 of the chemical liquid injection facility 230.

[0060] In step S104, the control device 250 determines whether the transfer of recovered ammonia from the ammonia recovery system 220 to the chemical liquid injection equipment 230 has been completed. If YES, the process of this flowchart is terminated, and if NO, the process of step S103 is executed again.

[0061] In the operation method of the boiler system 100 shown in Fig. 4, it is determined whether the stop condition of the boiler 10 is satisfied in step S101, but other aspects may be used. For example, it may be determined whether the condition is satisfied for not supplying ammonia fuel from the first fuel supply system 210 to the ammonia fuel burner 210A and supplying pulverized fuel from the second fuel supply system (the pulverized fuel supplying parts 31A, 31B, 31C and the pulverized fuel supply pipes 22A, 22B, 22C) to the pulverized fuel burners 21A, 21B, 21C. That is, when not supplying ammonia fuel from the first fuel supply system 210 to the ammonia fuel burner 210A and supplying pulverized fuel from the second fuel supply system to the pulverized fuel burners 21A, 21B, 21C, the recovered ammonia discharged from the first fuel supply system 210 may be guided to the chemical liquid injection equipment 230 via the ammonia recovery system 220.

[0062] The actions and effects of the boiler system 100 of the present embodiment described above will be described. According to the boiler system 100 of this embodiment, ammonia supplied to the first fuel supply system 210 that supplies ammonia fuel containing ammonia to the ammonia fuel burner 210A is led to the feed water system 240 that supplies boiler water to the boiler 10 via the ammonia recovery system 220 and the chemical injection equipment 230. Since the pH value of the boiler water in the feed water system 240 increases when the ammonia is led to the feed water system 240, corrosion of the piping in the feed water system 240 can be appropriately suppressed. In other words, the ammonia supplied to the first fuel supply system 210 that supplies ammonia fuel containing ammonia to the ammonia fuel burner 210A can be appropriately reused in the feed water system 240 without requiring additional equipment or work load.

[0063] According to the boiler system 100 of this embodiment, the concentration of ammonia water is appropriately adjusted in the chemical liquid injection equipment 230, so that even if the concentration of ammonia guided from the ammonia recovery system 220 to the chemical liquid injection equipment 230 fluctuates, ammonia water whose concentration has been appropriately adjusted in the chemical liquid injection equipment 230 can be guided to the water supply system 240.

[0064] According to the boiler system 100 of this embodiment, in the ammonia recovery system 220 , the ammonia discharged from the first fuel supply system 210 can be stored in the ammonia recovery tank 226 and the ammonia can be guided to the water supply system 240 .

[0065] Second Embodiment Next, a boiler system 100A according to a second embodiment of the present disclosure will be described. This embodiment is a modified example of the first embodiment, and is the same as the first embodiment except as otherwise specifically described below, and therefore the description below will be omitted.

[0066] In the boiler system 100 of the first embodiment, the ammonia recovery system 220 includes the ammonia recovery tank 226 and the control valve 227. In contrast, in the boiler system 100A of the present embodiment, the ammonia recovery system 220 does not include the ammonia recovery tank 226, the control valve 227, the pump 228, and the seal pot 226c, but includes an electric conductivity meter (second measuring unit) 226b and a seal pot 235.

[0067] 5 is a schematic diagram showing the first fuel supply system 210 and the ammonia recovery system 220 in the boiler system 100A according to the second embodiment of the present disclosure. As shown in FIG. 5, the electrical conductivity meter 226b is a device that measures the electrical conductivity of the recovered ammonia flowing through the discharge line 220b. The electrical conductivity meter 226b refers to a table that is stored in advance, for example, in which electrical conductivity is associated with the pH value of the ammonia water, and calculates the pH value of the recovered ammonia from the measured electrical conductivity. The pH value measured by the electrical conductivity meter 226b is transmitted to the control device 250.

[0068] The control device 250 of this embodiment controls the control valve (flow rate adjuster) 229 to adjust the amount of ammonia liquid supplied to the water supply system 240 in accordance with the pH value measured by the electrical conductivity meter 226b. The control device 250 controls the control valve 229 so that the amount of ammonia liquid supplied to the water supply system 240 decreases as the pH value measured by the electrical conductivity meter 226b increases. The seal pot 235 is a device that dissolves ammonia contained in the evaporated gas present above the storage tank 231, which evaporates from the ammonia chemical liquid in the storage tank 231, into water, and releases the gas that does not contain ammonia into the atmosphere. Water is stored inside the seal pot 235, and the evaporated gas present above the storage tank 231 is introduced from below.

[0069] In this embodiment, in order to discharge the ammonia fuel from the first fuel supply system 210 to the ammonia recovery system 220 using nitrogen gas, the nitrogen gas flows into the storage tank 231 via the discharge line 220b. The nitrogen gas is guided to the upper part of the storage tank 231 together with the ammonia gas, and is discharged into the atmosphere via the seal pot 235. In this way, according to the boiler system 100 of this embodiment, the nitrogen gas used to discharge the ammonia fuel from the first fuel supply system 210 to the ammonia recovery system 220 can be appropriately separated and discharged into the atmosphere.

[0070] According to the boiler system 100A of the present embodiment, the ammonia recovery tank 226 and the control valve 227 of the boiler system 100 of the first embodiment are not necessary, so that the installation cost for installing them can be reduced. Also, according to the boiler system 100A of the present embodiment, in the ammonia recovery system 220, the pH value of the recovered ammonia discharged from the first fuel supply system 210 is measured by the electric conductivity meter 226b, and the supply amount of the recovered ammonia to the chemical liquid injection equipment 230 is adjusted by the control valve 229 according to the measured pH value. Therefore, for example, even if the concentration of the recovered ammonia fluctuates, it is possible to suppress a large fluctuation in the pH value of the ammonia chemical in the storage tank 231 of the chemical liquid injection equipment 230.

[0071] Third Embodiment Next, a boiler system 100B according to a third embodiment of the present disclosure will be described. This embodiment is a modified example of the first embodiment, and is the same as the first embodiment except as otherwise specifically described below, and therefore the description below will be omitted.

[0072] The boiler system 100 of the first embodiment supplies recovered ammonia from the ammonia recovery system 220 to the storage tank 231 of the chemical liquid injection system 230. In contrast, the boiler system 100B of the present embodiment directly guides recovered ammonia from the ammonia recovery system 220 to the feed water system 240 without passing through the chemical liquid injection system 230.

[0073] FIG. 6 is a schematic diagram showing a first fuel supply system 210 and an ammonia recovery system 220 in a boiler system 100B according to a third embodiment of the present disclosure. As shown in FIG. 6, the boiler system 100B directly guides the recovered ammonia to an ammonia supply line 230a connected to a water supply system 240 without passing through a chemical injection facility 230. In this case, the recovered ammonia guided to the ammonia supply line 230a is adjusted to an appropriate concentration in the ammonia recovery tank 226. The control valve 227 adjusts the concentration of the recovered ammonia stored in the ammonia recovery tank 226 according to the pH value measured by the electrical conductivity meter 226a so that the pH value measured by the electrical conductivity meter 226a becomes a target value. The makeup water supplied from the control valve 227 to the ammonia recovery tank 226 is also used as dilution water to reduce the concentration of the recovered ammonia.

[0074] The electrical conductivity meter 226a is a device that measures the electrical conductivity of the recovered ammonia stored in the ammonia recovery tank 226. The electrical conductivity meter 226a refers to a pre-stored table that associates electrical conductivity with the pH value of the ammonia water, for example, and calculates the pH value of the recovered ammonia from the measured electrical conductivity. The pH value measured by the electrical conductivity meter 226a is transmitted to the control device 250.

[0075] The control valve 227 functions as a concentration adjustment unit (second concentration adjustment unit) that adjusts the concentration of recovered ammonia stored in the ammonia recovery tank 226 in accordance with the pH value measured by the electrical conductivity meter 226a so that the pH value measured by the electrical conductivity meter 226a becomes a target value (second target value).

[0076] According to the boiler system 100B of the present embodiment, recovered ammonia having a higher concentration than the ammonia chemical supplied from the chemical injection facility 230 to the ammonia supply line 230a can be supplied from the ammonia recovery tank 226 to the ammonia supply line 230a. Furthermore, by adjusting the concentration of recovered ammonia supplied from the ammonia recovery tank 226 to the ammonia supply line 230a so that it is approximately the same as the ammonia chemical supplied from the chemical injection equipment 230 to the ammonia supply line 230a, when the recovered ammonia supplied from the ammonia recovery tank 226 to the ammonia supply line 230a is insufficient, ammonia chemical can be supplied from the chemical injection equipment 230 to the ammonia supply line 230a. The chemical injection equipment 230 makes up for the shortage of the ammonia recovery tank 226, thereby reducing the amount of ammonia consumed.

[0077] Furthermore, according to the boiler system 100B of this embodiment, in cases where there is no particular problem in increasing the pH value of the boiler water even if there is a fluctuation in the concentration of ammonia supplied to the water supply system 240, for example, when the boiler 10 is stopped for a long period of time, the ammonia can be quickly guided from the ammonia recovery system 220 to the water supply system 240 without going through the chemical injection equipment 230.

[0078] [Fourth embodiment] Next, a boiler system 100C according to a fourth embodiment of the present disclosure will be described. This embodiment is a modified example of the first embodiment, and is the same as the first embodiment except as otherwise specifically described below, and therefore the description below will be omitted.

[0079] The boiler system 100 of the first embodiment discharges liquid ammonia fuel remaining in the first fuel supply system 210 to the ammonia recovery system 220 by nitrogen gas. On the other hand, the boiler system 100C of the present embodiment discharges gaseous ammonia fuel remaining in the first fuel supply system 210C to the ammonia recovery system 220C by nitrogen gas.

[0080] 7 is a schematic diagram showing a first fuel supply system 210C and an ammonia recovery system 220C in a boiler system 100C according to a fourth embodiment of the present disclosure. In the first fuel supply system 210C of this embodiment, a heater 213 heats and vaporizes liquid ammonia fuel supplied from an ammonia fuel tank 211, and supplies the gaseous ammonia fuel to an ammonia fuel burner 210A via an ammonia fuel supply pipe 210a.

[0081] The ammonia recovery system 220C is a system that introduces the gaseous ammonia fuel supplied to the first fuel supply system 210C to a water supply system 240 via a chemical injection system 230, and increases the pH value of the boiler water. The ammonia recovery system 220C includes an on-off valve 221C, an on-off valve 222C, an on-off valve 223C, an on-off valve 224C, a control valve 225C, an ammonia recovery tank (storage unit) 226, a control valve 227, a pump 228, and a control valve 229.

[0082] When the supply of ammonia fuel from the first fuel supply system 210C to the ammonia fuel burner 210A is stopped (at this time, the burner valve 210B of the ammonia fuel burner 210A is closed) and the ammonia fuel is discharged from the first fuel supply system 210C, the ammonia recovery system 220C recovers the liquid phase ammonia fuel remaining in the ammonia fuel tank 211 to the supply source of the ammonia fuel. After that, the ammonia recovery system 220C is controlled by the control device 250 to open the on-off valve 221C, the on-off valve 222C, the on-off valve 223C, the on-off valve 224C, and the control valve 225C.

[0083] The ammonia recovery system 220C is controlled by the control device 250 to supply nitrogen gas to the ammonia fuel supply pipe 210a via the nitrogen gas line 220Ca and discharge the gaseous ammonia fuel remaining in the first fuel supply system 210 to the ammonia recovery tank 226 via the discharge line 220Cb. The ammonia recovery system 220C is also controlled by the control device 250 to supply nitrogen gas to the ammonia fuel tank 211 via the nitrogen gas line 220Ca and discharge the gaseous ammonia fuel remaining in the ammonia fuel tank 211 to the discharge line 220Cb.

[0084] The ammonia recovery tank 226 is a container that stores the recovered ammonia discharged from the first fuel supply system 210. The recovered ammonia discharged from the first fuel supply system 210 and the ammonia fuel tank 211 is supplied to the ammonia recovery tank 226 via a discharge line 220Cb, and is dissolved in makeup water in the ammonia recovery tank 226 and stored as ammonia water.

[0085] The seal pot 226c is a device that dissolves ammonia contained in the evaporated gas present above the ammonia recovery tank 226, which evaporates from the recovered ammonia in the ammonia recovery tank 226, into water, and releases the gas that does not contain ammonia into the atmosphere. Water is stored inside the seal pot 226c, and the evaporated gas present above the ammonia recovery tank 226 is introduced into it from below.

[0086] In this embodiment, nitrogen gas is used to discharge the ammonia fuel from the first fuel supply system 210C to the ammonia recovery system 220C, so that the nitrogen gas flows into the ammonia recovery tank 226 through the discharge line 220Cb. The nitrogen gas is guided to the upper part of the ammonia recovery tank 226 together with the ammonia gas, and is discharged into the atmosphere through the seal pot 226c.

[0087] In this way, according to the boiler system 100C of the present embodiment, the nitrogen gas used for discharging the ammonia fuel from the first fuel supply system 210C to the ammonia recovery system 220C can be appropriately separated and released into the atmosphere. Since the nitrogen gas is separated from the recovered ammonia upstream of the pump 228, it is possible to prevent the pump 228 from being damaged due to cavitation occurring in the pump 228.

[0088] The control valve 227 is a valve body that controls the amount of makeup water supplied to the ammonia recovery tank 226. The ammonia recovery tank 226 is provided with a level gauge (not shown), and the amount of makeup water supplied is controlled by the control valve 227 so that the liquid level in the tank is maintained at a predetermined level.

[0089] The pump 228 is a device that sends ammonia water from the ammonia recovery tank 226 to the storage tank 231 of the chemical liquid injection equipment 230. The control valve 229 is a valve body that adjusts the amount of recovered ammonia supplied from the ammonia recovery tank 226 to the storage tank 231 of the chemical liquid injection equipment 230.

[0090] 7 is configured to supply make-up water to the ammonia recovery tank 226 and supply liquid recovered ammonia to the storage tank 231 of the chemical liquid injection equipment 230, but other configurations are also possible. For example, make-up water may not be supplied to the ammonia recovery tank 226, but recovered ammonia may be stored as gaseous recovered ammonia, and the gaseous recovered ammonia may be supplied from the ammonia recovery tank 226 to the storage tank 231 of the chemical liquid injection equipment 230.

[0091] The boiler system and the operating method of the boiler system described in each of the above-described embodiments can be understood, for example, as follows. A boiler system (100) according to a first aspect of the present disclosure includes a boiler (10) that generates steam by burning a first fuel with a first burner (210A), a first fuel supply system (210) that supplies the first fuel containing ammonia to the first burner, a feedwater system (240) that supplies boiler water to the boiler, and an ammonia recovery system (220) that introduces ammonia supplied to the first fuel supply system into the feedwater system to increase the pH value of the boiler water.

[0092] According to the boiler system according to the first aspect of the present disclosure, ammonia supplied to the first fuel supply system that supplies the first fuel containing ammonia to the first burner is led by the ammonia recovery system to the feedwater system that supplies boiler water to the boiler. Since the pH value of the boiler water in the feedwater system increases when the ammonia is led to the feedwater system, corrosion of the piping in the feedwater system can be appropriately suppressed. In other words, the ammonia supplied to the first fuel supply system that supplies the fuel containing ammonia to the burner can be appropriately reused in the feedwater system without requiring additional equipment or work burden.

[0093] The boiler system according to a second aspect of the present disclosure is the first aspect, and further includes the following configuration: That is, the boiler system includes an ammonia supply system (230) that supplies ammonia water to the feedwater system, the ammonia supply system including a storage unit (231) that stores the ammonia water to be supplied to the feedwater system, a first measurement unit (232) that measures a pH value of the ammonia water stored in the storage unit, and a first concentration adjustment unit (233, 234) that adjusts the concentration of the ammonia water stored in the storage unit in accordance with the pH value so that the pH value measured by the first measurement unit becomes a first target value, and the ammonia recovery system guides the ammonia supplied to the first fuel supply system to the feedwater system via the ammonia supply system.

[0094] According to the boiler system according to the second aspect of the present disclosure, the concentration of ammonia water is appropriately adjusted in the ammonia supply system. Therefore, even if the concentration of ammonia led from the ammonia recovery system to the ammonia supply system fluctuates, the ammonia water whose concentration has been appropriately adjusted in the ammonia supply system can be led to the feedwater system.

[0095] A boiler system according to a third aspect of the present disclosure is the first aspect, further comprising the following configuration: An ammonia supply system that supplies ammonia water to the feedwater system, the ammonia supply system having a storage unit that stores the ammonia water to be supplied to the feedwater system, a first measurement unit that measures a pH value of the ammonia water stored in the storage unit, and a first concentration adjustment unit that adjusts the concentration of the ammonia water stored in the storage unit in accordance with the pH value so that the pH value measured by the first measurement unit becomes a first target value, and the ammonia recovery system directly guides the ammonia supplied to the first fuel supply system to the feedwater system without passing through the ammonia supply system.

[0096] According to the boiler system of the third aspect of the present disclosure, for example, when the boiler is stopped for an extended period of time, and there is no particular problem in increasing the pH value of the boiler water even if there is a fluctuation in the concentration of ammonia supplied to the feedwater system, the ammonia can be quickly guided from the ammonia recovery system to the feedwater system without going through the ammonia supply system.

[0097] A boiler system according to a fourth aspect of the present disclosure is the boiler system of any one of the first to third aspects, further including the following configuration: That is, the ammonia recovery system includes a storage unit (226) that stores the ammonia supplied to the first fuel supply system, a second measurement unit (226a) that measures a pH value of the ammonia stored in the storage unit, and a second concentration adjustment unit (227) that adjusts a pH value of ammonia water by diluting the ammonia stored in the storage unit with water in accordance with the pH value so that the pH value measured by the second measurement unit becomes a second target value.

[0098] According to the boiler system according to the fourth aspect of the present disclosure, in the ammonia recovery system, the ammonia supplied from the first fuel supply system is stored in the storage unit, and the pH value of the ammonia stored in the storage unit is appropriately adjusted by the second concentration adjustment unit before the ammonia is introduced into the feedwater system. Therefore, for example, it is possible to suppress ammonia being supplied to the feedwater system in a state where it is not diluted with water and has a high pH value, and thus to suppress a large fluctuation in the pH value of the boiler water.

[0099] A boiler system according to a fifth aspect of the present disclosure is any one of the first to third aspects, further comprising the following configuration: the ammonia recovery system has a second measurement unit that measures a pH value of ammonia supplied to the first fuel supply system, and a flow rate adjustment unit that adjusts the amount of ammonia supplied to the water supply system in accordance with the pH value measured by the second measurement unit.

[0100] According to the boiler system according to the fifth aspect of the present disclosure, in the ammonia recovery system, the pH value of the ammonia supplied from the first fuel supply system is measured by the second measurement unit, and the amount of ammonia supplied to the feedwater system is adjusted by the flow rate adjustment unit according to the measured pH value. Therefore, for example, it is possible to suppress a large fluctuation in the pH value of the boiler water caused by ammonia being supplied to the feedwater system with a high pH value without the amount of ammonia being adjusted by the flow rate adjustment unit.

[0101] A boiler system according to a sixth aspect of the present disclosure is the boiler system of any one of the first to third aspects, further comprising the following configuration: the boiler generates steam by burning a second fuel with a second burner, and includes a second fuel supply system that supplies the second fuel not containing ammonia to the second burner, and the ammonia recovery system guides the ammonia supplied to the first fuel supply system to the feedwater system when the first fuel is not supplied from the first fuel supply system to the first burner and the second fuel is supplied from the second fuel supply system to the second burner.

[0102] According to the boiler system relating to the sixth aspect of the present disclosure, when the first fuel is not supplied from the first fuel supply system to the first burner and the second fuel is supplied from the second fuel supply system to the second burner, the ammonia supplied to the first fuel supply system can be guided to the water supply system and the ammonia can be appropriately discharged from the first fuel supply system.

[0103] A boiler system according to a seventh aspect of the present disclosure is any one of the first to third aspects, further comprising the following configuration: the ammonia recovery system guides the ammonia supplied to the first fuel supply system to the water supply system when steam generation in the boiler is stopped.

[0104] According to the boiler system according to the seventh aspect of the present disclosure, when steam generation in the boiler is stopped, the ammonia supplied to the first fuel supply system can be guided to the feedwater system and the ammonia can be appropriately discharged from the first fuel supply system.

[0105] In a boiler system operation method according to an eighth aspect of the present disclosure, the boiler system includes a boiler that generates steam by burning a first fuel with a first burner, a first fuel supply system that supplies the first fuel containing ammonia to the first burner, and a feedwater system that supplies boiler water to the boiler, and includes an ammonia recovery process (S103) that introduces ammonia supplied to the first fuel supply system into the feedwater system to increase the pH value of the boiler water.

[0106] According to the boiler system operating method according to the eighth aspect of the present disclosure, ammonia supplied to a first fuel supply system that supplies a first fuel containing ammonia to a first burner is led to a feedwater system that supplies boiler water to the boiler by an ammonia recovery process. Since the pH value of the boiler water in the feedwater system increases when ammonia is led to the feedwater system, corrosion of the piping in the feedwater system can be appropriately suppressed. In other words, the ammonia supplied to the first fuel supply system that supplies a fuel containing ammonia to the burner can be appropriately reused in the feedwater system without requiring additional equipment or work burdens. [Explanation of symbols]

[0107] 10. Boiler 20 Combustion equipment 21, 21A, 21B, 21C Pulverized fuel burner 22,22A,22B,22C Pulverized fuel supply pipe 31,31A,31B,31C Fine powder fuel supply section 100, 100A, 100B, 100C Boiler System 210,210C 1st fuel supply system 210a Ammonia fuel supply pipe 210A Ammonia fuel burner (first burner) 210B Burner valve 211 Ammonia Fuel Tank 212 Pump 213 Heater 214 On-off valve 215 Control valve 220,220C Ammonia recovery system 220a, 220Ca Nitrogen gas line 220b Discharge line 220Cb discharge line 221, 221C, 222, 222C, 223, 223C, 224, 224C, 225 Opening and closing valves 225C Control valve 226 Ammonia recovery tank (storage section) 226a Electrical conductivity meter (second measuring section) 226b Electrical conductivity meter (second measuring section) 226c Seal Pot 227 Control valve 228 Pump 229 Control valve (flow control part) 230 Chemical injection equipment (ammonia supply system) 230a Ammonia supply line 231 Storage tank (storage section) 232 Electrical Conductivity Meter (First Measurement Unit) 233, 234 Control valve (first concentration adjustment section) 235 Seal Pot 236 Pump 240 Water supply system 250 Control device

Claims

1. a boiler that burns a first fuel with a first burner to generate steam; a first fuel supply system that supplies the first fuel containing ammonia to the first burner; a water supply system for supplying boiler water to the boiler; an ammonia recovery system that introduces the ammonia supplied to the first fuel supply system into the water supply system to increase the pH value of the boiler water.

2. an ammonia supply system for supplying ammonia water to the water supply system; The ammonia supply system includes: A storage unit that stores ammonia water to be supplied to the water supply system; A first measuring unit that measures a pH value of the ammonia water stored in the storage unit; a first concentration adjusting unit that adjusts the concentration of the ammonia water stored in the storage unit in accordance with the pH value so that the pH value measured by the first measuring unit becomes a first target value; 2. The boiler system according to claim 1, wherein the ammonia recovery system guides the ammonia supplied to the first fuel supply system through the ammonia supply system to the water supply system.

3. an ammonia supply system for supplying ammonia water to the water supply system; The ammonia supply system includes: A storage unit that stores ammonia water to be supplied to the water supply system; A first measuring unit that measures a pH value of the ammonia water stored in the storage unit; a first concentration adjusting unit that adjusts the concentration of the ammonia water stored in the storage unit in accordance with the pH value so that the pH value measured by the first measuring unit becomes a first target value; 2. The boiler system according to claim 1, wherein the ammonia recovery system guides the ammonia supplied to the first fuel supply system directly to the feedwater system without passing through the ammonia supply system.

4. The ammonia recovery system includes: a storage unit that stores the ammonia supplied to the first fuel supply system; A second measuring unit that measures a pH value of the ammonia stored in the storage unit; 4. The boiler system according to claim 1, further comprising: a second concentration adjustment unit that adjusts a pH value of the ammonia water by diluting the ammonia stored in the storage unit with water in accordance with the pH value so that the pH value measured by the second measurement unit becomes a second target value.

5. The ammonia recovery system includes: A second measurement unit that measures a pH value of ammonia supplied to the first fuel supply system; 4. The boiler system according to claim 1, further comprising: a flow rate adjusting unit that adjusts an amount of ammonia supplied to the water supply system in accordance with the pH value measured by the second measuring unit.

6. The boiler generates steam by burning a second fuel with a second burner; a second fuel supply system that supplies the second fuel containing no ammonia to the second burner; 4. The boiler system according to claim 1, wherein the ammonia recovery system guides the ammonia supplied to the first fuel supply system to the feedwater system when the first fuel is not supplied from the first fuel supply system to the first burner and the second fuel is supplied from the second fuel supply system to the second burner.

7. 4. The boiler system according to claim 1, wherein the ammonia recovery system guides the ammonia supplied to the first fuel supply system to the water supply system when steam generation in the boiler is stopped.

8. 1. A method for operating a boiler system, comprising: The boiler system includes: a boiler that burns a first fuel with a first burner to generate steam; a first fuel supply system that supplies the first fuel containing ammonia to the first burner; a water supply system for supplying boiler water to the boiler; An operating method for a boiler system comprising an ammonia recovery step of guiding ammonia supplied to the first fuel supply system to the water supply system to increase a pH value of the boiler water.

Citation Information

Patent Citations

  • Turbine facilities, heat recovery steam generator and water treatment method

    JP2007224820A

  • Boiler plant and operating method for the same

    JP2018009722A

  • Boiler plant, power generation plant, and control method of boiler plant

    JP2021055868A

  • Combustion state determination system

    WO2019092858A1

  • Ship

    WO2023276442A1