Air conditioner

The air conditioner design addresses ignition risks by separating flammable refrigerant piping, using protection members, and employing tool-tightenable joints to ensure safe and efficient dual refrigerant system operation.

JP2024146235AInactive Publication Date: 2024-10-15DAIKIN INDUSTRIES LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023059016
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-31
Publication Date
2024-10-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The installation of air conditioners using dual refrigerant circuits with flammable and non-flammable refrigerants poses risks of ignition and damage during brazing and piping connection, particularly due to the use of flames.

Method used

The air conditioner design includes a minimum 50 mm separation of flammable refrigerant piping from connection points, uses protection members or separate casings, employs tool-tightenable joints, and separates circuits to prevent flame exposure, and utilizes non-flammable refrigerant piping for connections.

Benefits of technology

This configuration effectively prevents ignition and damage to flammable refrigerant piping during brazing and connection changes, ensuring safe and efficient operation of dual refrigerant systems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024146235000001_ABST
    Figure 2024146235000001_ABST
Patent Text Reader

Abstract

To reduce the influence on piping for combustible refrigerant in changing a connection in a circuit for refrigerant other than the combustible refrigerant.SOLUTION: An air conditioner uses combustible refrigerant and refrigerant other than the combustible refrigerant. A part in a refrigerant side of a circuit for the refrigerant other than the combustible refrigerant where pipe connections are replaced on the maintenance is constituted so that flame in soldering does not scorch a combustible refrigerant circuit.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to an air conditioner. [Background technology]

[0002] Patent Document 1 discloses a refrigeration cycle device that performs heating operation by performing a binary refrigeration cycle including a user-side refrigeration cycle using a first refrigerant of 1 MPa or less at 30°C and a heat source-side refrigeration cycle using a second refrigerant of 1.5 MPa or more at 30°C, and performs cooling operation by performing a single refrigeration cycle using the first refrigerant, thereby efficiently performing cooling operation and heating operation. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2022-159196 A Summary of the Invention [Problem to be solved by the invention]

[0004] When installing an air conditioner or other device that uses a refrigerant circuit, a flame may be used to braze the piping where the piping is to be changed. For example, in the case of an air conditioner that uses a binary cycle that uses a flammable refrigerant and a refrigerant other than a flammable refrigerant, there is a risk that the piping of the flammable refrigerant may be burned by the flame during brazing. In addition, there is a risk that the piping of the flammable refrigerant may be accidentally cut during installation, which may affect the piping of the flammable refrigerant. An object of the present disclosure is to reduce the impact on piping for a flammable refrigerant when switching the connection of a circuit on the refrigerant other than the flammable refrigerant side in an air conditioner that uses a flammable refrigerant and a refrigerant other than the flammable refrigerant. [Means for solving the problem]

[0005] The air conditioner of the present disclosure is an air conditioner that uses a flammable refrigerant and a refrigerant other than the flammable refrigerant, and is configured so that the brazing flame does not burn the flammable refrigerant circuit at the portion where the piping is changed over during service, which is laid in the circuit on the refrigerant other than the flammable refrigerant side. In this case, it is possible to reduce the impact on the flammable refrigerant piping when changing over the refrigerant circuit other than the flammable refrigerant. Here, in the air conditioner of the present disclosure, the distance between the piping of the flammable refrigerant circuit and the part of the circuit on the other refrigerant side where the switching is performed is 50 mm or more, which makes it possible to prevent the piping of the flammable refrigerant circuit from being burned by a flame used when brazing the part of the circuit on the other refrigerant side where the switching is performed. In addition, in the air conditioner of the present disclosure, a protective member is provided between the portion where the compressor in the circuit on the other refrigerant side is switched and the flammable refrigerant circuit, so that the piping of the flammable refrigerant circuit can be protected from flames used when brazing the portion where the piping of the circuit on the other refrigerant side is switched. In addition, in the air conditioner of the present disclosure, a container or sheet metal provided in the circuit on the other refrigerant side is provided between the portion where the compressor in the circuit on the other refrigerant side is switched and the flammable refrigerant circuit. In this case, the components of the circuit on the other refrigerant side can be used to protect the piping of the flammable refrigerant circuit from the flame used when brazing the portion where the piping of the circuit on the other refrigerant side is switched. In addition, in the air conditioner of the present disclosure, the flammable refrigerant circuit and the circuit for the other refrigerant are housed in separate casings, whereby it is possible to prevent influence on the piping of the flammable refrigerant circuit when switching the connection of the refrigerant circuit other than the flammable refrigerant. In addition, in the air conditioner of the present disclosure, only the piping of the circuit on the other refrigerant side is used to connect the flammable refrigerant and the other refrigerant, which prevents the connection part of the flammable refrigerant and the other refrigerant circuit from being affected by the flame used when brazing the part where the piping of the circuit on the other refrigerant side is switched. Furthermore, the air conditioner of the present disclosure has a structure that allows parts of the circuit on the other refrigerant side to be replaced without the need for brazing, thereby realizing a configuration in which the brazing flame does not burn the piping of the flammable refrigerant circuit. In addition, in the air conditioner of the present disclosure, at least in the portion where the switching is performed, a joint that can be tightened with a tool is used, in which case the switching of the piping of the circuit on the other refrigerant side can be performed without the need for brazing. The air conditioner of the present disclosure also includes at least a compressor, a four-way valve, and an electric valve as replacement parts. In this case, when replacing the compressor, the four-way valve, or the electric valve, the effect on the piping for the flammable refrigerant can be reduced when switching the connections of the refrigerant circuits other than the flammable refrigerant. Here, in the air conditioner of the present disclosure, the piping or dew protection tube used in the flammable refrigerant circuit is different in color, shape, or material from the piping or dew protection tube used in the circuit on the other refrigerant side. In this case, it is possible to prevent confusion between the piping or dew protection tube used in the flammable refrigerant circuit and the piping or dew protection tube used in the circuit on the other refrigerant side. Moreover, the air conditioner of the present disclosure uses a hydrocarbon as the flammable refrigerant. [Brief description of the drawings]

[0006] [Figure 1] 1 is a circuit diagram showing a configuration example of an air conditioner according to an embodiment of the present invention. [Diagram 2] 5 is a diagram showing an example of installation of a protective member installed between a connection switching point of a first refrigerant circuit and a pipe of a second refrigerant circuit. FIG. [Diagram 3] FIG. 11 is a diagram showing an example of installation in which a container provided in a first refrigerant circuit is installed between a portion in the first refrigerant circuit where piping is switched and piping of a second refrigerant circuit. [Figure 4] FIG. 4 is a diagram showing an example of the configuration of an outdoor unit in which a first refrigerant circuit and a second refrigerant circuit are housed in separate casings. [Diagram 5] FIG. 4 is a diagram showing an example of the structure of an outdoor unit in which a first refrigerant circuit and a second refrigerant circuit are housed in separate casings. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0007] Hereinafter, embodiments will be described in detail with reference to the accompanying drawings. <Air conditioner configuration> FIG. 1 is a circuit diagram showing an example of the configuration of an air conditioner according to the present embodiment. The air conditioner 1 according to this embodiment includes an indoor unit 10 and an outdoor unit 20. The indoor unit 10 includes, for example, an indoor heat exchanger 11. The indoor heat exchanger 11 functions as a condenser during heating operation and as an evaporator during cooling operation. The indoor unit 10 may include an indoor fan (not shown). 1, the air conditioner 1 includes one indoor unit 10, but is not limited to this configuration. For example, the air conditioner 1 may include multiple indoor units 10. In this case, the refrigerant piping branches off to each indoor unit 10. The indoor unit 10 and the outdoor unit 20 are connected to each other by piping, each of which has a liquid shut-off valve 37 and a gas shut-off valve 38. When multiple indoor units 10 are provided, the refrigerant piping branches to each indoor unit 10, and multiple indoor units 10 are connected to the outdoor unit 20.

[0008] The outdoor unit 20 includes a first refrigerant circuit 21 and a second refrigerant circuit 22. The first refrigerant circuit 21 is connected to the indoor unit 10 by piping each having a liquid shutoff valve 37 and a gas shutoff valve 38. The first refrigerant circuit 21 is filled with a refrigerant other than a flammable refrigerant, and the second refrigerant circuit 22 is filled with a flammable refrigerant. The first refrigerant circuit 21 is filled with, for example, carbon dioxide as a refrigerant other than the flammable refrigerant. The second refrigerant circuit 22 is filled with, for example, propane as a flammable refrigerant. Note that the refrigerant to be filled is not limited to the above, and the flammable refrigerant may be, for example, another hydrocarbon. The second refrigerant circuit 22 functions as an assist circuit that enhances the capacity of the first refrigerant circuit 21.

[0009] The first refrigerant circuit 21 is composed of a first compressor 31, a first sub-accumulator 32, a four-way switching valve 33, a first outdoor heat exchanger 34, a cascade heat exchanger 35, a first electric valve 36, a liquid stop valve 37, the indoor heat exchanger 11, a gas stop valve 38, and a low-pressure receiver 39 connected in sequence. The second refrigerant circuit 22 is configured by connecting a second compressor 41, a second sub-accumulator 42, a second outdoor heat exchanger 43, and a second motor-operated valve 44 in this order. The first refrigerant circuit 21 and the second refrigerant circuit 22 are not limited to the above-mentioned configuration. For example, the first refrigerant circuit 21 and the second refrigerant circuit 22 may be configured to include a filter, a heat sink, an oil separator, etc. Also, they may be configured to include a high-pressure switch as a pressure sensor or a protective detector.

[0010] The first compressor 31 has a discharge side connected to the first port (P1) of the four-way switching valve 33, and a suction side connected to the first sub-accumulator 32. The first sub-accumulator 32 separates the refrigerant into gas and liquid, and causes only the gaseous refrigerant to be sucked into the first compressor 31. The first compressor 31 compresses the sucked gaseous refrigerant and discharges it from the discharge side.

[0011] The four-way switching valve 33 has a first port (P1), a second port (P2), a third port (P3), and a fourth port (P4), and can switch between a state in which the first port (P1) and the second port (P2) are connected and the third port (P3) and the fourth port (P4) are connected, and a state in which the first port (P1) and the fourth port (P4) are connected and the second port (P2) and the third port (P3) are connected. During cooling operation, the four-way switching valve 33 is in a state where the first port (P1) and the second port (P2) are connected to each other, and the third port (P3) and the fourth port (P4) are connected to each other, and during heating operation, the four-way switching valve 33 switches to a state where the first port (P1) and the fourth port (P4) are connected to each other, and the second port (P2) and the third port (P3) are connected to each other.

[0012] The first outdoor heat exchanger 34 exchanges heat between the refrigerant and the outside air. The first outdoor heat exchanger 34 functions as an evaporator during heating operation and as a condenser during cooling operation. The first outdoor heat exchanger 34 may be configured to include an outdoor fan 51 (see FIG. 2). The cascade heat exchanger 35 exchanges heat between the first refrigerant circuit 21 and the second refrigerant circuit 22. The cascade heat exchanger 35 is, for example, a double-pipe heat exchanger in which two pipes with different diameters are combined in an inner and outer double configuration. The cascade heat exchanger 35 may also be another type of heat exchanger, such as a plate heat exchanger.

[0013] The first electric valve 36 is configured so that its opening degree can be changed, and has a function of reducing the pressure of the refrigerant circulating in the first refrigerant circuit 21 and expanding the refrigerant. The liquid shutoff valve 37 and the gas shutoff valve 38 serve to connect the indoor piping with the outdoor piping. The low pressure receiver 39 has a function of storing the liquid refrigerant out of the refrigerant separated into gas and liquid.

[0014] The second compressor 41, the second sub-accumulator 42, the second outdoor heat exchanger 43, and the second electric valve 44 have the same functions as the first compressor 31, the first sub-accumulator 32, the first outdoor heat exchanger 34, and the first electric valve 36, respectively, in the second refrigerant circuit.

[0015] An example of a cooling operation will be described with respect to the flow of refrigerant in the first refrigerant circuit 21 and the second refrigerant circuit 22. During cooling operation, the four-way switching valve 33 is in a state in which the first port (P1) and the second port (P2) communicate with each other, and the third port (P3) and the fourth port (P4) communicate with each other.

[0016] In the first refrigerant circuit 21, the refrigerant is first compressed by the first compressor 31. The compressed refrigerant passes through the four-way switching valve 33 and enters the first outdoor heat exchanger 34. The first outdoor heat exchanger 34 functions as a condenser during cooling operation. The refrigerant discharged from the first outdoor heat exchanger 34 enters the cascade heat exchanger 35. During cooling operation, the cascade heat exchanger 35 functions as a condenser in the first refrigerant circuit 21. The refrigerant discharged from the cascade heat exchanger 35 is decompressed when passing through the first motor-operated valve 36, and passes through the liquid stop valve 37 to enter the indoor heat exchanger 11. The indoor heat exchanger 11 functions as an evaporator during cooling operation. The refrigerant discharged from the indoor heat exchanger 11 passes through the gas stop valve 38, the four-way switching valve 33, the low-pressure receiver 39, and the first sub-accumulator 32, and enters the first compressor 31 again.

[0017] Next, the flow of refrigerant in the second refrigerant circuit 22 will be described. In the second refrigerant circuit 22, the refrigerant is first compressed by the second compressor 41. The compressed refrigerant enters the second outdoor heat exchanger 43. The second outdoor heat exchanger 43 functions as a condenser during cooling operation. The refrigerant leaving the second outdoor heat exchanger 43 is decompressed as it passes through the second electric valve 44, and enters the cascade heat exchanger 35. During cooling operation, the cascade heat exchanger 35 functions as an evaporator in the second refrigerant circuit 22. The refrigerant leaving the cascade heat exchanger 35 passes through the second sub-accumulator 42, and enters the second compressor 41 again.

[0018] The function of the second refrigerant circuit 22 according to this embodiment will be described. When the air conditioner 1 does not include the second refrigerant circuit 22 and the cascade heat exchanger 35, the first refrigerant circuit 21 functions as a single circuit. In this case, the refrigerant flowing through the first refrigerant circuit 21 is compressed by the first compressor 31, condensed by the first outdoor heat exchanger 34, depressurized by the first motor-operated valve 36, and evaporated by the indoor heat exchanger 11. In the single circuit, the specific enthalpy decreases due to heat dissipation in the first outdoor heat exchanger 34, and the specific enthalpy increases due to heat absorption in the first outdoor heat exchanger 34 and compression in the first compressor 31. The specific enthalpy that increases due to heat absorption in the first outdoor heat exchanger 34 is the refrigeration effect in the refrigeration cycle, and the higher the refrigeration effect, the higher the cooling capacity of the air conditioner 1 can be.

[0019] In contrast, the air conditioner 1 according to this embodiment has a binary circuit equipped with the second refrigerant circuit 22 and the cascade heat exchanger 35. During cooling operation, the cascade heat exchanger 35 functions as a condenser in the first refrigerant circuit 21 and as an evaporator in the second refrigerant circuit 22. In this case, the refrigerant flowing through the first refrigerant circuit 21 is compressed by the first compressor 31, condensed by the first outdoor heat exchanger 34, condensed by the cascade heat exchanger 35, decompressed by the first motor-operated valve 36, and evaporated by the indoor heat exchanger 11.

[0020] In the air conditioner 1 according to this embodiment, the specific enthalpy decreases due to heat release in the first outdoor heat exchanger 34 and the cascade heat exchanger 35, and the specific enthalpy increases due to heat absorption in the first outdoor heat exchanger 34 and compression in the first compressor 31. The refrigerant flowing through the first refrigerant circuit 21 is cooled in the first outdoor heat exchanger 34, and is further cooled in the cascade heat exchanger 35. This makes it possible to earn a higher specific enthalpy than in the case of a single circuit, thereby improving the refrigeration effect. In this way, the second refrigerant circuit 22 acts as an assist circuit for the first refrigerant circuit 21, and increases the cooling capacity of the air conditioner 1.

[0021] Next, a description will be given of the flow of refrigerant in the first refrigerant circuit 21 and the second refrigerant circuit 22 during heating operation. During heating operation, the four-way selector valve 33 is in a state in which the first port (P1) and the fourth port (P4) are in communication with each other, and the second port (P2) and the third port (P3) are in communication with each other.

[0022] In the first refrigerant circuit 21, the refrigerant is first compressed by the first compressor 31. The compressed refrigerant passes through the four-way switching valve 33 and the gas stop valve 38, and enters the indoor heat exchanger 11. The indoor heat exchanger 11 functions as a condenser during heating operation. The refrigerant leaving the indoor heat exchanger 11 passes through the liquid stop valve 37, enters the outdoor unit 20, and is depressurized when passing through the first motor-operated valve 36. The depressurized refrigerant passes through the cascade heat exchanger 35, and enters the first outdoor heat exchanger 34. The first outdoor heat exchanger 34 functions as an evaporator during heating operation. The refrigerant leaving the first outdoor heat exchanger 34 passes through the four-way switching valve 33, the low-pressure receiver 39, and the first sub-accumulator 32, and enters the first compressor 31 again. The cascade heat exchanger 35 may be configured to perform heat exchange even during heating operation. In this case, the cascade heat exchanger 35 functions as an evaporator in the first refrigerant circuit 21.

[0023] <Outdoor unit structure> In this embodiment, the second refrigerant circuit 22 is filled with a flammable refrigerant, and the first refrigerant circuit 21 is filled with a refrigerant other than the flammable refrigerant. Therefore, in the outdoor unit 20 according to this embodiment, the first refrigerant circuit 21 and the second refrigerant circuit 22 are configured so that the flame used when brazing a portion of the first refrigerant circuit 21 where the piping is switched during service (hereinafter sometimes referred to as a switching point) does not heat the piping of the second refrigerant circuit 22.

[0024] Brazing is a process of connecting pipes together using a flame. For example, brazing is performed when branching refrigerant pipes or replacing components. In this case, it is necessary to prevent the flame used in the brazing process from burning the pipes of the second refrigerant circuit 22 filled with a flammable refrigerant. By configuring the pipes of the second refrigerant circuit 22 so that the flame used in the brazing work does not burn them, it is possible to reduce the impact on the pipes of the second refrigerant circuit 22 when switching the connection of the first refrigerant circuit 21. This enables efficient operation using a two-stage refrigeration cycle in which the first refrigerant circuit 21 is filled with carbon dioxide and the second refrigerant circuit 22 is filled with propane, for example.

[0025] The configuration that prevents the piping of the second refrigerant circuit 22 from burning means that the second refrigerant circuit 22 is not affected when a flame is applied to the connection switching point of the first refrigerant circuit 21. The portion where the piping is changed over is, for example, a portion where a part is replaced, a portion where the piping is reconnected, etc. The parts to be replaced include, for example, functional parts such as a compressor, a four-way switching valve, and a motor-operated valve. The structure of the outdoor unit 20 according to this embodiment will be described below.

[0026] <First embodiment> In the first embodiment, the piping of the second refrigerant circuit 22 is configured to be at least a predetermined distance away from the connection switching points of the first refrigerant circuit 21. The predetermined distance is a distance at which the second refrigerant circuit 22 will not be burned by a brazing flame used at the connection switching points in the first refrigerant circuit 21. In the first embodiment, the piping of the second refrigerant circuit 22 is configured to be 50 mm or more away from the connection switching point of the first refrigerant circuit 21. When the piping of the second refrigerant circuit 22 is configured to be 50 mm or more away from the connection switching point of the first refrigerant circuit 21, the risk of the flame used during brazing burning the piping of the second refrigerant circuit 22 can be suppressed. This 50 mm is a value obtained by the inventors through repeated experiments and careful consideration as a range in which the tip of the burner can enter and the flame from the burner during brazing does not reach the piping of the second refrigerant circuit 22. According to the results of the experiments, a flame of 40 mm may reach the piping of the second refrigerant circuit 22 depending on its size, and in this embodiment, a value of 50 mm is selected as a preferable value with a margin.

[0027] To configure the portion where piping is switched in the first refrigerant circuit 21 and the piping of the second refrigerant circuit 22 at a distance of 50 mm or more, for example, the connection switching points of the first refrigerant circuit 21 are concentrated in a predetermined range, and the piping of the second refrigerant circuit 22 is installed so as to pass through a position away from this range. For example, components etc. that switch the piping in the first refrigerant circuit 21 are installed on the front side of the outdoor unit 20, and the piping of the second refrigerant circuit 22 is installed on the back side, separated by a distance of 50 mm or more. In addition, the cascade heat exchanger 35 can be configured, for example, by using a plate heat exchanger with a piping distance of 50 mm or more, so that the connection switching point of the first refrigerant circuit 21 and the piping of the second refrigerant circuit 22 are separated by a distance of 50 mm or more.

[0028] The structure of the outdoor unit according to the first embodiment is not limited to that described above, and may be any structure in which the part in the first refrigerant circuit 21 where the piping is switched is separated from the piping of the second refrigerant circuit 22 by 50 mm or more. By configuring the connection switching points of the first refrigerant circuit 21 and the piping of the second refrigerant circuit 22 to be separated by 50 mm or more, it is possible to prevent the flame used when brazing the connection switching points of the first refrigerant circuit 21 from burning the piping of the second refrigerant circuit 22. In addition, it is possible to reduce the risk of accidentally cutting the piping of the second refrigerant circuit 22.

[0029] <Second embodiment> In the second embodiment, a protective member 53 is installed between the connection switching point of the first refrigerant circuit 21 and the piping of the second refrigerant circuit 22. The protective member 53 is, for example, a thin metal plate. In the second embodiment, the protective member 53 is installed so that a flame used when brazing the connection switching point of the first refrigerant circuit 21 does not burn the piping of the second refrigerant circuit 22. For example, the protective member 53 is installed so as to surround the piping of the second refrigerant circuit 22.

[0030] The installation of a protective member 53 according to the second embodiment will be described with reference to Fig. 2. Fig. 2 is a diagram showing an example of an installation of a protective member 53 installed between a connection switching point of the first refrigerant circuit 21 and the piping of the second refrigerant circuit 22. In the following, the upper side of the outdoor unit 20 in Fig. 2 will be referred to as the "rear side of the outdoor unit 20", and the lower side in Fig. 2 will be referred to as the "front side of the outdoor unit 20". 2, some of the components of the first refrigerant circuit 21 and the second refrigerant circuit 22 are omitted.

[0031] 2, the piping 52 of the second refrigerant circuit 22 is installed so as to pass through the rear side of the outdoor unit 20, and components that switch the piping connections in the first refrigerant circuit 21 and the like are installed on the front side of the outdoor unit 20. Components that switch the piping connections include, for example, the first compressor 31, the four-way switching valve 33, the first motor-operated valve 36, and the like. A protective member 53 is installed between the connection switching point of the first refrigerant circuit 21 and the piping of the second refrigerant circuit 22.

[0032] 2 is, for example, a pipe that connects the second compressor 41 and the second outdoor heat exchanger 43. In addition, for example, the pipe 52 is a pipe that connects the second outdoor heat exchanger 43 and the second motor-operated valve 44. In addition, the pipe 52 is not limited to one pipe, and a plurality of pipes are installed to pass through the back side of the outdoor unit 20. 2 is an example, and is not limited to this. For example, the protection member 53 may be disposed so as to surround the connection switching point of the first refrigerant circuit 21. With this configuration, the piping of the second refrigerant circuit 22 can be protected from the flame used when brazing the connection switching points of the first refrigerant circuit 21.

[0033] Moreover, instead of the protective member 53, a container or sheet metal provided in the first refrigerant circuit 21 may be installed between the connection switching point of the first refrigerant circuit 21 and the piping of the second refrigerant circuit 22. An example of using a container provided in the first refrigerant circuit 21 instead of the protective member 53 will be described with reference to Fig. 3. Fig. 3 is a diagram showing an installation example in which a container provided in the first refrigerant circuit 21 is installed between a portion in the first refrigerant circuit 21 where piping is switched and the piping of the second refrigerant circuit 22.

[0034] 3, similarly to the example shown in Fig. 2, the piping 52 of the second refrigerant circuit 22 is installed so as to pass through the rear side of the outdoor unit 20, and components for switching the piping connection in the first refrigerant circuit 21 and the like are installed on the front side of the outdoor unit 20. Then, a low-pressure receiver 39 provided in the first refrigerant circuit 21 is installed between the connection switching point of the first refrigerant circuit 21 and the piping of the second refrigerant circuit 22. The container provided in the first refrigerant circuit 21, which is installed between the connection switching point of the first refrigerant circuit 21 and the piping of the second refrigerant circuit 22, is not limited to the low-pressure receiver 39. For example, it may be any other functional part as long as it is not a compressor or other functional part that is to be replaced. With this configuration, the piping of the second refrigerant circuit 22 can be protected from the flame used when brazing the connection switching points of the first refrigerant circuit 21, without the need to install any additional protective members.

[0035] <Third embodiment> In the third embodiment, the first refrigerant circuit 21 and the second refrigerant circuit 22 are housed in separate casings. By housing the first refrigerant circuit 21 and the second refrigerant circuit 22 in separate casings, it is possible to prevent the flame used when brazing the connection switching points of the first refrigerant circuit 21 from burning the piping of the second refrigerant circuit 22. In this case, only the piping of the first refrigerant circuit 21 is used to connect the first refrigerant circuit 21 and the second refrigerant circuit 22. More specifically, the first refrigerant circuit 21 and the second refrigerant circuit 22 are connected by connecting the piping of the first refrigerant circuit 21 to a casing of the second refrigerant circuit.

[0036] A configuration example of the outdoor unit 20 according to the third embodiment will be described with reference to Fig. 4 and Fig. 5. Fig. 4 is a diagram showing a configuration example of the outdoor unit 20 in a case where the first refrigerant circuit 21 and the second refrigerant circuit 22 are housed in separate casings. Fig. 5 is a diagram showing a configuration example of the outdoor unit 20 in a case where the first refrigerant circuit 21 and the second refrigerant circuit 22 are housed in separate casings.

[0037] The outdoor unit 20 according to the third embodiment includes a first outdoor unit 61 and a second outdoor unit 62. The first outdoor unit 61 and the second outdoor unit 62 include a first outdoor fan 63 and a second outdoor fan 64, respectively. The first outdoor unit 61 has a first refrigerant circuit 21 therein, and the second outdoor unit 62 has a second refrigerant circuit 22 therein. The first refrigerant circuit 21 is connected to the indoor unit 10 (see FIG. 1) by piping that has a liquid shutoff valve 37 and a gas shutoff valve 38, respectively.

[0038] The components of the first refrigerant circuit 21 and the second refrigerant circuit 22 are the same as those in the case where the first refrigerant circuit 21 and the second refrigerant circuit 22 are housed in the same casing. The first outdoor unit 61 and the second outdoor unit 62 include the components of the first refrigerant circuit 21 and the second refrigerant circuit 22, respectively, in their respective casings.

[0039] In the third embodiment, the cascade heat exchanger 35, which is the connecting portion between the first refrigerant circuit 21 and the second refrigerant circuit 22, is installed inside the second outdoor unit 62. A part of the piping of the first refrigerant circuit 21 is connected to the second outdoor unit 62 and connected to the cascade heat exchanger 35. More specifically, in the first refrigerant circuit 21, the piping between the first outdoor heat exchanger 34 and the first motor-operated valve 36 extends outside the first outdoor unit 61 and is connected to the second outdoor unit 62. Then, the piping is connected to the cascade heat exchanger 35 inside the second outdoor unit 62.

[0040] In the third embodiment, a first refrigerant circuit 21 filled with a refrigerant other than a flammable refrigerant and a second refrigerant circuit 22 filled with a flammable refrigerant are housed in separate casings. Further, only the piping of the first refrigerant circuit 21 filled with a refrigerant other than a flammable refrigerant is used to connect the first refrigerant circuit 21 and the second refrigerant circuit 22. This configuration can prevent the piping of the second refrigerant circuit 22 from being burned by the flame used when brazing the connection switching points of the first refrigerant circuit 21.

[0041] <Fourth embodiment> In the fourth embodiment, the piping of the first refrigerant circuit 21 has a structure that allows parts to be replaced without brazing. The structure that allows parts to be replaced without brazing is, for example, a structure that allows parts to be replaced by using a joint for refrigerant piping. In the fourth embodiment, the use of a flame can be eliminated by having a structure in which the piping of the first refrigerant circuit 21 can be replaced without brazing. This structure eliminates the brazing work itself and realizes a structure in which the brazing flame does not heat the piping of the second refrigerant circuit 22.

[0042] For example, in the piping of the first refrigerant circuit 21 according to the fourth embodiment, at least in the portion where the connection change is performed, a joint that can be tightened with a tool is used. The tool is, for example, an adjustable wrench, and the first refrigerant circuit 21 according to the fourth embodiment allows parts replacement using such a tool. When a joint is used, the piping is connected with the joint, and connection change or part replacement can be performed by tightening with a tool such as an adjustable wrench. The joints used for the piping of the first refrigerant circuit 21 according to the fourth embodiment are not limited to those described above. For example, the joints used may be screw-in type joints or one-touch type joints.

[0043] In addition, in each of the first to fourth embodiments described above, the piping or dew protection cylinder used in the second refrigerant circuit 22 may be configured to be different in color, shape, or material from the piping or dew protection cylinder used in the first refrigerant circuit 21. This configuration makes it possible to prevent confusion between the pipe or dew protection tube used in the flammable refrigerant circuit and the pipe or dew protection tube used in the circuit on the other refrigerant side. It also makes it possible to prevent erroneous connection of the pipe or dew protection tube used in the flammable refrigerant circuit with the pipe or dew protection tube used in the circuit on the other refrigerant side.

[0044] <Effects> The air conditioner 1 of the present disclosure is an air conditioner that uses a flammable refrigerant and a refrigerant other than the flammable refrigerant, and is configured so that the brazing flame does not burn the second refrigerant circuit 22 at a portion where the piping is switched during service, which is laid in the first refrigerant circuit 21. In this case, it is possible to reduce the impact on the piping of the second refrigerant circuit 22 when the first refrigerant circuit 21 is switched. Here, in the air conditioner 1 of the present disclosure, the distance between the piping of the second refrigerant circuit 22 and the portion where the switching is performed of the first refrigerant circuit 21 is 50 mm or more. In this case, it is possible to prevent the piping of the second refrigerant circuit 22 from being burned by a flame used when brazing the portion where the piping of the first refrigerant circuit 21 is switched. Furthermore, in the air conditioner 1 of the present disclosure, a protective member 53 is installed between a portion where switching of the first compressor 31 provided in the first refrigerant circuit 21 is performed and the second refrigerant circuit 22. In this case, the piping of the second refrigerant circuit 22 can be protected from a flame used when brazing the portion where switching of the piping of the first refrigerant circuit 21 is performed. Furthermore, in the air conditioner 1 of the present disclosure, a container or sheet metal provided in the first refrigerant circuit 21 is placed between a portion where switching of the first compressor 31 provided in the first refrigerant circuit 21 is performed and the second refrigerant circuit 22. In this case, by utilizing the components of the first refrigerant circuit 21, the piping of the second refrigerant circuit 22 can be protected from a flame used when brazing the portion where switching of the piping of the first refrigerant circuit 21 is performed. In the air conditioner 1 of the present disclosure, the second refrigerant circuit 22 and the first refrigerant circuit 21 are housed in separate casings. In this case, when switching the connection of the first refrigerant circuit 21, it is possible to prevent influence on the piping of the second refrigerant circuit 22. Furthermore, in the air conditioner 1 of the present disclosure, the circuit connection between the flammable refrigerant and the other refrigerant uses only the piping of the first refrigerant circuit 21. In this case, it is possible to prevent the circuit connection portion between the flammable refrigerant and the other refrigerant from being affected by the flame used when brazing the portion where the piping of the first refrigerant circuit 21 is switched. Moreover, the air conditioner 1 of the present disclosure has a structure that allows parts of the first refrigerant circuit 21 to be replaced without the need for brazing. In this case, a configuration can be realized in which the piping of the second refrigerant circuit 22 is not burned by the brazing flame. Furthermore, in the air conditioner 1 of the present disclosure, at least in the portion where the reconnection is performed, a joint that can be tightened with a tool is used. In this case, the reconnection of the piping of the first refrigerant circuit 21 can be performed without the need for brazing. Furthermore, the air conditioner 1 of the present disclosure includes at least a compressor, a four-way switching valve, and an electric valve as replacement parts. In this case, when replacing the compressor, the four-way switching valve, and the electric valve, it is possible to reduce the influence on the piping of the second refrigerant circuit 22 when switching the connection of the first refrigerant circuit 21. Here, in the air conditioner 1 of the present disclosure, the piping or dew protection cylinder used in the second refrigerant circuit 22 is different in color, shape, or material from the piping or dew protection cylinder used in the first refrigerant circuit 21. In this case, it is possible to prevent confusion between the piping or dew protection cylinder used in the second refrigerant circuit 22 and the piping or dew protection cylinder used in the first refrigerant circuit 21. Moreover, the air conditioner 1 of the present disclosure uses a hydrocarbon as the flammable refrigerant.

[0045] Although the embodiments have been described above, the technical scope of the present disclosure is not limited to the scope of the above-described embodiments. It is clear from the claims that the technical scope of the present disclosure also includes combinations of two or more of the above-described embodiments, and modifications or improvements to the above-described embodiments. [Explanation of symbols]

[0046] Reference Signs List 1...air conditioner, 10...indoor unit, 11...indoor heat exchanger, 20...outdoor unit, 21...first refrigerant circuit, 22...second refrigerant circuit, 31...first compressor, 32...first sub-accumulator, 33...four-way switching valve, 34...first outdoor heat exchanger, 35...cascade heat exchanger, 36...first motor-operated valve, 37...liquid shut-off valve, 38...gas shut-off valve, 39...low-pressure receiver, 41...second compressor, 42...second sub-accumulator, 43...second outdoor heat exchanger, 44...second motor-operated valve, 51...outdoor fan, 52...piping, 53...protective member, 61...first outdoor unit, 62...second outdoor unit, 63...first outdoor fan, 64...second outdoor fan

Claims

1. An air conditioner that uses a flammable refrigerant and a refrigerant other than a flammable refrigerant, An air conditioner constructed so that the brazing flame does not burn the flammable refrigerant circuit at the section where the piping is changed over during service, which is laid in the circuit on the side of a refrigerant other than a flammable refrigerant.

2. 2. The air conditioner according to claim 1, wherein the distance between the piping of the flammable refrigerant circuit and the portion of the circuit on the other refrigerant side where the reconnection is performed is 50 mm or more.

3. 3. The air conditioner according to claim 1, further comprising a protective member disposed between a portion where a connection of a compressor provided in the circuit on the other refrigerant side is switched and the flammable refrigerant circuit.

4. 3. The air conditioner according to claim 1, wherein a container or sheet metal provided in the circuit on the other refrigerant side is installed between a portion where a compressor provided in the circuit on the other refrigerant side is switched and the flammable refrigerant circuit.

5. 2. The air conditioner according to claim 1, wherein the flammable refrigerant circuit and the other refrigerant circuit are housed in separate casings.

6. 6. The air conditioner according to claim 1, wherein the flammable refrigerant and the other refrigerant are connected to each other through piping only on the other refrigerant side of the circuit.

7. 2. The air conditioner according to claim 1, wherein the air conditioner has a structure that allows parts of the circuit on the other refrigerant side to be replaced without requiring brazing.

8. 10. The air conditioner according to claim 1, wherein a joint that can be tightened with a tool is used at least in the portion where the connection change is performed.

9. 10. The air conditioner according to claim 1, further comprising at least a compressor, a four-way switching valve, and an electrically operated valve as replacement parts.

10. 2. The air conditioner according to claim 1, wherein the piping or dew protection tube used in the flammable refrigerant circuit is different in color, shape, or material from the piping or dew protection tube used in the circuit on the other refrigerant side.

11. 2. The air conditioner according to claim 1, wherein the flammable refrigerant is a hydrocarbon.

Citation Information

Patent Citations

  • Refrigeration cycle device

    JP2022159196A