Building floor structure
The described building floor structure allows for efficient on-site manufacturing of double beams in reverse-beam wide-floor structures by pre-drilling holes and using spacers to align and connect beam members, addressing alignment and noise issues while controlling deflection.
Patent Information
- Application Number
- JP2023059163
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-31
- Publication Date
- 2024-10-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Conventional techniques fail to efficiently manufacture double beams in apartment buildings with reverse-beam wide-floor structures without worrying about the left and right ends, limiting work efficiency and room exclusivity.
A building floor structure where through holes are pre-drilled in beam members at predetermined pitches to allow for the connection of double beams without orientation concerns, using a double beam spacer to maintain spacing and reduce noise.
Enables efficient on-site manufacturing of double beams in reverse-beam wide-floor structures, ensuring proper alignment and reducing noise, while suppressing deflection within specified limits.
Smart Images

Figure 2024146329000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a floor structure of a building. [Background technology]
[0002] Conventionally, in a building floor structure (hereinafter referred to as "reverse beam slidable floor structure") in which multiple sidings are supported between opposing reverse beams with a gap between them protruding from the top surface of a slab, and flooring is laid on the sidings, Σ-shaped beam members have been used as sidings. In addition, two beam members connected back to back (hereinafter referred to as "double beams") have been used as sidings in locations where a large floor load is applied. Specifically, a double beam is formed by inserting and fixing connecting members into the through holes in each of the two beam members (see, for example, Patent Document 1). [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Patent No. 2990425 Summary of the Invention [Problem to be solved by the invention]
[0004] Here, in apartment buildings where the inverted beam large sliding floor structure is applied, the area of each room is limited, and the act of swinging around a long Σ-shaped beam member significantly reduces work efficiency. Therefore, when connecting beam members on-site to manufacture a double beam, it is required to set the position of the through hole in advance so that it can be used on either the left or right end without worrying about the left and right ends. However, conventional techniques including that of Patent Document 1 are unable to fully meet such demands.
[0005] The present invention has been made in consideration of these circumstances, and has as its object to manufacture a double beam by connecting beam members on-site at an apartment building where an inverted beam sliding floor structure is used, by setting the position of the through holes in advance so that either the left or right end can be used without worrying about it. [Means for solving the problem]
[0006] In order to achieve the above object, the floor structure of a building according to one embodiment of the present invention comprises: A floor structure of a building in which a plurality of reverse beams are protruding from the upper surface of the slab at intervals, a plurality of joists are supported in a first direction between the opposing reverse beams, and floor materials are laid on the joists, A double beam is a structure in which two beam members arranged in parallel with each other in the first direction are connected by a connecting member penetrating in a second direction substantially perpendicular to the first direction, When at least a part of the joist is constituted by the double beam, In each of the two beam members constituting the double beam, When the through holes through which the connecting members pass are formed at predetermined pitches L in the first direction, The number N of the through holes (N is an integer value of 2 or more) is defined by formula (1), When the number N of the through holes is defined by the formula (1), the pitch L1 of the through holes from the end of the beam member in the first direction to the first through hole is defined by the formula (2). N = L ÷ 100 - 1 (decimal point is rounded down) (1) L1=(L―100×N)÷2<100 (2) The floor structure of the building. Effect of the Invention
[0007] According to the present invention, when beam members are connected to manufacture a double beam on-site for an apartment building to which an inverted beam sliding floor structure is applied, the position of the through holes can be set in advance so that the double beam can be used on either the left or right end without regard for the two ends. [Brief description of the drawings]
[0008] [Figure 1] This is a partially cutaway plan view of an apartment building that uses a reverse beam large sliding floor structure. [Diagram 2] FIG. 2 is a cross-sectional view taken along line 2-2 in FIG. [Diagram 3] FIG. 13 is a diagram showing a table illustrating the relationship between the span (distance between joist supports) and pitch (maximum joist pich) of a beam member. [Figure 4] FIG. 13 is a diagram for explaining reinforcement of a beam member at an opening in a floor. [Diagram 5] FIG. 13 shows a table of the number of beam members required depending on the size of the opening. [Figure 6] FIG. 3 is an enlarged view of a portion G in FIG. [Figure 7] FIG. 2 is a diagram showing an example of the configuration of a double beam and a double beam spacer that constitute a joist. [Figure 8] FIG. 13 is a diagram for explaining the pitch from both ends of a beam member to the first one. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0009] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. First, with reference to Figs. 1 to 4, an embodiment of an underfloor structure of the present invention to which a reverse beam sliding floor structure is applied will be described. Fig. 1 is a partially cutaway plan view of an apartment house to which a reverse beam sliding floor structure is applied. Fig. 2 is a cross-sectional view taken along line 2-2 in Fig. 1.
[0010] In Figures 1 and 2, the concrete structure F with an inverted beam structure forms the skeleton of the apartment building, and comprises horizontal structure parts Fh that extend horizontally and divide the building into multiple floors, and vertical structure parts Fv that extend vertically and connect the upper and lower horizontal structure parts Fh to each other.
[0011] On each floor separated by the horizontal structural portion Fh, multiple residential spaces H are arranged side by side, and each residential space H is separated by structural columns 1 erected at each of the four corners and connecting the upper and lower floor slabs Sf, as well as structural exterior walls 2 and structural partition walls 3 (load-bearing walls 3) that connect opposing structural columns 1 together.
[0012] Vertical and horizontal inverted girders 5L, 5T that divide the underfloor space Hd of each residential space H are integrally protruded upward from the floor slab Sf constituting the horizontal structural portion Fh. The lower ends of the structural partition walls 3 and the structural exterior walls 2 are integrally connected to these vertical and horizontal inverted girders 5L, 5T. Furthermore, these inverted girders 5L, 5T are integrally connected to the structural columns 1 located at the four corners of the residential space H.
[0013] In each residential space H, vertical and horizontal inverted small beams 6L, 6T lower than the inverted main beams 5L, 5T are integrally provided upward on the floor slab Sf. These vertical and horizontal inverted small beams 6L, 6T cross each other, and their ends are integrally connected to the middle parts of the horizontal and vertical inverted main beams 5T, 5L, respectively.
[0014] In addition, a passageway 7 is constructed on the outside of the residential space H, for example on the outside of one of the structural exterior walls 2 (left side in Figure 1) of multiple parallel residential spaces H, and a balcony 8 is constructed on the outside of the other structural exterior wall 2 (right side in Figure 1).
[0015] A floor structure Fr is supported between the vertical and horizontal inverted main beams 5L, 5T and the vertical and horizontal inverted minor beams 6L, 6T of each residential space H, and this floor structure Fr divides the residential space H into an under-floor space Hd (storage space Hd) and an above-floor space Hu (living space Hu).
[0016] As shown in Fig. 6, the floor structure Fr is integrally formed of a number of joists 10, a number of joists 11 supported perpendicularly on the joists 10, and floorboards 12 made of wood-based flooring boards or the like laid on the joists 11. The floorboards 12 are formed by integrally laminating a finishing material on a base material. Joists 11 made of wood are called wooden joists, and those made of steel are called steel joists. In the case of steel joists, it is preferable to interpose a cushioning material (soundproofing and vibration-proofing material) such as a rubber member between the joists and the joists 10. The joists 10 are called Σ beams when they are made by bending, for example, a rust-resistant galvanized steel plate into a cross-sectional Σ shape.
[0017] As shown in Figure 1, each residential space H is formed in a rectangular shape in plan view, and in the direction perpendicular to its longitudinal direction, i.e., in the width direction of the residential space H, a plurality of joists 10 are supported between the relatively short spans of the vertical inverted main beams 5L and the vertical inverted small beams 6L. As shown in Figure 2, a step-like extension portion, i.e., a floor support portion 14, is integrally formed on the side of the vertical inverted main beam 5L at approximately the same level as the inverted secondary beams 6L, 6T (integrally formed at the same time as the vertical inverted main beam 5L is formed using a formwork). Between this floor support portion 14 and the upper surface of the vertical inverted small beam 6L, the ends of a plurality of joists 10 are supported in a floating manner via adjustable underfloor support fittings FS.
[0018] In such an inverted beam sliding floor structure shown in Figs. 1 and 2, the sliding beams 10 constituting the double floor are formed from Σ-shaped hot-dip galvanized steel material (hereinafter referred to as "beam member"). The beam members are standard steel members, and the amount of deflection that occurs in the floor is determined by the cross-sectional properties of the steel member, which depend on the relationship between the span (distance between the joist supports) and pitch (maximum joist pick). When planning for the private areas of apartment buildings, the maximum deflection may be exceeded when using a single beam member due to the first or second case below. In such a case, it is necessary to use a double beam, in which two beam members are connected back to back, as the joists 10 and plan to keep the critical deflection within the specified value. Here, the specified value for the critical deflection is 1 / 500 or less of the span and within 10 mm.
[0019] The first case will be described with reference to FIG. FIG. 3 is a diagram showing the relationship between the span (distance between joist supports) and pitch (maximum joist pich) of a beam member. FIG. 3(A) is a diagram showing the relationship between span (distance between joist supports) and pitch (maximum joist pick) when the joist 10 is configured from one beam member (in the case of a single Σ beam). FIG. 3(B) is a diagram showing the relationship between the span (distance between joist supports) and pitch (maximum joist pich) when the joist 10 is configured as a double beam (Σ double beam). The first case is when the relationship in Figure 3 (A) holds, and the span (distance between the joist supports) exceeds 3,700 mm at the pitch (600 mm) in the standard beam member arrangement, if the joist 10 is constructed from a single beam member, the limit deflection amount will be exceeded, so that a double beam must be used for the beam member 10.
[0020] The second case will be described with reference to FIG. FIG. 4 is a diagram for explaining reinforcement of a beam member at an opening in a floor. FIG. 4(A) is a diagram showing the concept of an opening in a floor. In order for a resident to use the underfloor space Hd of the residential space H shown in Figures 1 and 2 as a storage space, an opening K is required that allows access from the above-floor space Hu (living space) to the underfloor space Hd, as shown in Figure 4(A). The opening K is formed in the floor in a rectangular shape having a space dimension L2×space dimension L3 (if L2=L3, the opening K is a square) as shown in FIG. 4(A). The vertical space dimension L2 in FIG. 4(A) is formed by inserting zero or more center beam members 10C between two side beam members 10S in parallel to the side beam members 10S. The horizontal space dimension L3 in FIG. 4(A) is formed by disposing two auxiliary beam members 10H between two side beam members 10S and perpendicular to the side beam members 10S with a space therebetween. Specifically, for example, an opening portion K is formed by fixing an auxiliary beam member 10H and a side beam member 10S (or a center beam member 10C) that are perpendicular to each other with a dedicated bracket (not shown). Here, as shown in Figure 4 (B), since there is actually a gap of 10 mm between the auxiliary beam member 10H and the side beam member 10S, it should be noted that the actual dimension A2 of the auxiliary beam member 10H has a relationship with the inner dimension A1 of "actual dimension A2 = inner dimension A1 - 2 x 10". FIG. 5 is a diagram showing a table of the number of beam members required depending on the size of the opening. As shown in Figure 5, if the vertical space dimension L2 exceeds 1,200 mm, the limit deflection amount will be exceeded if the side beam member 10S is constructed from a single beam member, so it is necessary to use a double beam for the side beam member 10S. Furthermore, as shown in Figure 5, if the horizontal space dimension L3 exceeds 1,200 mm, if the auxiliary beam member 10H is constructed from a single beam member, the limit deflection amount will be exceeded, so a double beam must be used for the auxiliary beam member 10H. The above is the second case. In other words, the vertical space dimension L2 or the horizontal space dimension L3 can be said to indicate the center-to-center distance between two opposing beam members 10 (the vertical space dimension L2 corresponds to two side beam members 10S, and the horizontal space dimension L3 corresponds to two auxiliary beam members 10H). Therefore, hereinafter, such center-to-center distance will be referred to as the "center-to-center distance between outer periphery beams." In this case, if the clearance dimension in at least one of the vertical and horizontal directions exceeds 1,200 mm at the center-to-center distance of the outer periphery beams, the limit deflection amount will be exceeded if the beam member is constructed from a single beam member, and therefore a double beam must be used for the beam member. This is the second case.
[0021] The necessity for the double beam explained above with reference to FIGS. 3 to 5 can be summarized as follows. In other words, if the first case is taken as the first condition and the second case as the second condition, in cases where either the first condition or the second condition is met and the limit deflection would be exceeded when using a single beam member, a double beam is used to keep the limit deflection to the specified value of less than 1 / 500 of the span and within 10 mm. Here, the first condition is that when the maximum joist pitch in the standard beam arrangement is 600 mm, the distance between the joist supports, called the span, exceeds 3,700 mm. The second condition is that, as shown in Figures 4 and 5, at least one of the vertical and horizontal dimensions of the opening K in the floor must exceed 1,200 mm in terms of the center-to-center distance of the outer beams.
[0022] Further, hereinafter, an example of the double beam configuration will be described in detail with reference to FIG. 6 and FIG. FIG. 6 is an enlarged view of a portion G in FIG. FIG. 7 is a diagram showing a configuration example of a double beam and a double beam spacer that constitute a joist. FIG. 7(A) shows a cross-sectional view of the double beam in the second direction. FIG. 7B shows a side view of the double beam spacer in a direction perpendicular to that shown in FIG. 7A. FIG. 7(C) shows a side view of the double beam spacer from the same direction as FIG. 7(A).
[0023] The joists 10 are configured to increase their strength, particularly their bending strength, without increasing their height. Therefore, in this embodiment, when the above-mentioned first condition (see FIG. 3) or second condition (see FIG. 4 and FIG. 5) is satisfied, the joists 10 are configured as double beams in which a pair of Σ-shaped beam members 51-1, 51-2 are connected back to back, as shown in FIG. 7(A). Here, when there is no need to distinguish between the beam members 51-1 and 51-2, they will be collectively referred to as "beam member 51." As shown in FIG. 7(A), through holes 50 are formed in the center at predetermined intervals (for example, 100 mm) in the longitudinal direction of beam member 51 (called the "first direction" in accordance with the description in the figure). In addition, with the beam members 51-1, 51-2 arranged back-to-back with the double beam spacer 70 in between, a connecting member 71 is inserted into each of the through holes 50 of the beam members 51-1, 51-2, and bolts 72 are fastened to the connecting member 71 from both ends of each of the beam members 51-1, 51-2 to form a double beam. Note that Figure 6 is an image diagram that emphasizes through hole 50, and the actual appearance shows the end of connecting member 71 inserted into through hole 50 and connecting member 71 fastened to bolt 72.
[0024] In this way, to construct a double beam, it is necessary to connect and integrate two Σ-shaped beam members 51-1 and 51-2 as shown in Fig. 7(A). However, when connecting two beam members 51-1 and 51-2 in parallel, if the beam members 51-1 and 51-2 are directly connected to each other, the steel members will rub against each other, causing so-called "floor squealing". For this reason, in order to prevent "floor squealing", the two beam members 51-1 and 51-2 need to be connected with a certain gap between them. The part for providing this "constant gap" is the double beam spacer 70 shown in FIGS. That is, the double beam spacer 70 is a part used to maintain the spacing when a double beam is used as the joist 10. As shown in FIG. 7(A), the distance between the double beams (joists 10) can be maintained simply by sandwiching a double beam spacer 70 between the beam members 51-1 and 51-2. Specifically, the φ12.5 mm through hole 701 (see Figs. 7(B) and 7(C)) of the double beam spacer 70 is aligned with the φ12.5 mm through holes 50 that are spaced at 100 mm intervals in the center of each of the beam members 51-1 and 51-2. With the positions aligned in this way, the connecting member 71 is inserted into the through holes 50 and 701, and M12 bolts 72 are fastened to both ends of the connecting member 71, thereby forming the joist 10 as a double beam. The double beam spacer 70 is attached at a position 300 to 500 mm in the first direction from both ends of the beam members 51-1, 51-2, and if the length of the beam members 51-1, 51-2 exceeds 3,000 mm, one additional position is attached in the center in the first direction. The material of the double beam spacer 70 is, for example, plastic.
[0025] Here, in this embodiment, when connecting beam members 51-1, 51-2 on-site to produce a double beam (joist 10), the position of the through hole 50 is preset as shown in Figure 8 so that either the left or right end can be used without regard for it. FIG. 8 is a diagram for explaining the pitch from both ends of the beam member to the first one. 8, the through holes 50 are formed at a predetermined pitch P in the first direction in a beam member 51 having a length L. The predetermined pitch P is determined in advance to be, for example, 100 mm. In this case, the number N of through holes 50 (N is an integer value of 2 or more) is defined by the following formula (1). N = L ÷ 100 - 1 (decimal point is rounded down) (1) In this manner, when the number N of through holes 50 is defined by formula (1), the pitch L1 of the through holes 50 from the end of the beam member 51 in the first direction to the first through hole 50 is defined by the following formula (2). L1=(L―100×N)÷2<100 (2) This makes the pitch L1, which is the edge clearance dimension from each end of the beam members 51-1, 51-2 to the first through hole 50, equal on the left and right. As a result, workers can integrate the beam members 51-1, 51-2 using the double beam spacer 70 (FIG. 7) without worrying about the orientation, to create a double beam (joist 10).
[0026] Although one embodiment of the present invention has been described above, the present invention is not limited to the above-described embodiment, and modifications, improvements, etc. within the scope that can achieve the object of the present invention are considered to be included in the present invention.
[0027] To sum up, the floor structure of a building to which the present invention is applied is sufficient as long as it has the following configuration, and various embodiments can be adopted. That is, the floor structure of the building to which the present invention is applied is as follows: A floor structure of a building (e.g., an inverted beam slat floor structure shown in Figs. 1 and 2) in which a plurality of inverted beams (e.g., inverted girders 5L, 5T and small beams 6L, 6T in Figs. 1 and 2) are protruding from the top surface of a slab (e.g., floor slab Sf in Figs. 1 and 2) at intervals, a plurality of slats (e.g., slat 10 in Figs. 1 and 2) are supported in a first direction between the inverted beams facing each other, and floor materials (e.g., floor boards 12 in Figs. 1 and 2) are laid on the slats, A double beam (e.g., a double beam configured as shown in FIG. 7A) is defined as two beam members (e.g., beam members 51-1 and 51-2 in FIG. 7A) arranged in parallel with each other in the first direction (e.g., the first direction in FIGS. 6 and 7) connected by a connecting member (e.g., connecting member 71 in FIG. 7A) penetrating in a second direction approximately perpendicular to the first direction. When at least a part of the joist is constituted by the double beam, In each of the two beam members having a length L constituting the double beam, When the through holes (e.g., the through holes 50 in FIGS. 6 to 8) through which the connecting members pass are formed at predetermined pitches (e.g., pitch P in FIG. 8) in the first direction, The number N of the through holes (N is an integer value of 2 or more) is defined by formula (1), When the number N of the through holes is defined by the formula (1), a pitch L1 (e.g., the pitch L1 in FIG. 8 ) of the through holes from an end of the beam member in the first direction to a first through hole is defined by the formula (2). N = L ÷ 100 - 1 (decimal point is rounded down) (1) L1=(L―100×N)÷2<100 (2) The floor structure of a building will suffice.
[0028] This makes it possible to manufacture a double beam by connecting beam components on-site for an apartment building to which an inverted beam sliding floor structure is applied by setting the position of the through holes in advance so that the double beam can be used on either the left or right end without worrying about the side.
[0029] Furthermore, in the case where the first or second condition is satisfied and the limit deflection amount is exceeded when using a single beam member, the double beam is adopted to keep the deflection amount within the specified value of 1 / 500 or less of the span and within 10 mm. It can be used as a floor structure for a building. Here, the first condition is that when the maximum joist pitch in a standard beam arrangement is 600 mm, the distance between the joist supports, called the span, exceeds 3,700 mm (see FIG. 3, for example). The second condition is that at least one of the vertical and horizontal free dimensions (e.g., free dimension L2 or L3 in Figure 4) of an opening in the floor material (e.g., opening K in Figure 4) exceeds 1,200 mm at the center-to-center distance of the outer periphery beams (e.g., see Figure 5).
[0030] In this way, by defining the first and second conditions for adopting a double beam, the limit deflection amount can be reliably suppressed to the defined value.
[0031] Furthermore, a resin double beam spacer (e.g., double beam spacer 70 in FIG. 7) can be sandwiched between the two beam members, and the connecting member can be passed through the through hole to join the two beam members to form the double beam.
[0032] In this way, by sandwiching the double beam spacer, a certain gap is created between the two beam members, making it possible to prevent "floor creaking" caused by the two beam members (steel members) rubbing against each other. [Explanation of symbols]
[0033] 5L, 5T... Inverted girder, 6L, 6T... Small girder, 10... Joist, 12... Floor board, 50... Through hole, 51, 51-1, 51-2... Beam member, L... Length of beam member, P... Pitch of through hole arrangement in beam member, L1... Pitch from end of beam member to first one, Sf... Floor slab, N... Number of through holes in beam member, K... Opening
Claims
1. A floor structure of a building in which a plurality of reverse beams are provided on the upper surface of a slab at intervals, a plurality of joists are supported in a first direction between the mutually opposing reverse beams, and floor materials are laid on the joists, A double beam is a structure in which two beam members arranged in parallel with each other in the first direction are connected by a connecting member penetrating in a second direction substantially perpendicular to the first direction, When at least a part of the joist is constituted by the double beam, In each of the two beam members having a length L constituting the double beam, When the through holes through which the connecting members pass are formed at predetermined pitches in the first direction, The number N of the through holes (N is an integer value of 2 or more) is defined by formula (1), When the number N of the through holes is defined by the formula (1), the pitch L1 of the through holes from the end of the beam member in the first direction to the first through hole is defined by the formula (2). N = L ÷ 100 - 1 (round down to nearest whole number) ... (1) L1=(L-100×N)÷2<100...(2) Floor structure of the building.
2. In the case where the first or second condition is satisfied and the limit deflection amount is exceeded when using a single beam member, the double beam is adopted in order to keep the deflection amount within the specified value of 1 / 500 or less of the span and within 10 mm. A floor structure of a building, comprising: The first condition is that when the maximum pitch of the beams in the standard beam arrangement is 600 mm, the distance between the beam supports, called the span, must exceed 3,700 mm. The second condition is that the opening of the flooring material in at least one of the vertical and horizontal directions exceeds 1,200 mm in the center-to-center distance of the outer periphery beams. The floor structure according to claim 1.
3. A resin double beam spacer is sandwiched between the two beam members, and the connecting member is inserted through the through hole to connect the two beam members together to form the double beam. The floor structure according to claim 1.
Citation Information
Patent Citations
Building floor structure
JP2990425B2