Structure maintenance management system
The system optimizes power usage in structure maintenance by activating sensors only when needed and prioritizing data transmission, reducing power consumption and extending battery life.
Patent Information
- Application Number
- JP2023061143
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-05
- Publication Date
- 2024-10-18
AI Technical Summary
Existing structure maintenance systems fail to consider power saving for measurement elements such as sensors, leading to inefficient power consumption and frequent battery replacements.
A structure maintenance management system with a base unit and slave unit configuration, where power consumption is minimized by activating measurement elements only when necessary, using low-speed communication and battery-powered slave units, and prioritizing data transmission based on measurement priority.
Reduces power consumption and extends battery life, allowing for efficient data acquisition during high-frequency measurement needs while minimizing maintenance efforts.
Smart Images

Figure 2024148217000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a structure maintenance management system. [Background technology]
[0002] There is a demand for the maintenance of infrastructure structures such as road tunnels, bridges, and dams. In the maintenance of structures, instead of visual inspection, sensors are attached to the structures to carry out inspections. The sensors include vibration sensors, tilt sensors, and strain gauges. In the maintenance of structures using sensors, power supply equipment is required to supply power to the sensors. In addition, if the sensor is a built-in battery type, the battery must be replaced periodically.
[0003] A system for managing the power supply of a device that detects abnormalities in a structure is known (Patent Document 1). In the system described in Patent Document 1, a power supply control circuit is provided in the structural abnormality detection device, and when the detection wiring board detects an abnormality, power supply power is supplied to the communication module, thereby reducing power consumption. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2017-161250 A Summary of the Invention [Problem to be solved by the invention]
[0005] However, in the system described in Patent Document 1, no consideration is given to power saving in elements that perform measurements, such as sensors that perform measurements. In the maintenance and management of structures, there is a demand for power saving in elements that perform measurements.
[0006] The present invention has been made in consideration of the above points, and provides a structure maintenance management system that can achieve power saving in elements that perform measurements in the maintenance of structures. [Means for solving the problem]
[0007] The present invention has been made to solve the above problems, and one aspect of the present invention is a system including a parent unit and a child unit, the parent unit including a parent unit side communication unit that communicates with the child unit, a detection unit that detects a state of a structure, and a control unit, the child unit including a child unit side communication unit that communicates with the parent unit, a measurement unit that measures the structure, a measurement control unit that controls the measurement unit, and a power control unit that controls power supplies of elements that constitute the child unit, and the control unit instructs the child unit to start an operation when the detection unit detects that the structure is in a first state. a child unit operation start signal, which is a signal to start the child unit, to the child unit via the parent unit communication unit, and receives measurement data measured by the child unit from the child unit via the parent unit communication unit; the power supply control unit starts up when the child unit operation start signal is received by the child unit communication unit in a standby state, and controls to turn on the power supply of the measurement control unit and the measurement unit; the measurement control unit causes the measurement unit to perform the measurement, and transmits the measurement data measured by the measurement unit to the parent unit via the child unit communication unit.
[0008] Moreover, one aspect of the present invention is that, in the above-mentioned structure maintenance management system, when the detection unit detects that the structure is in the first state, the control unit shortens the time interval for transmitting the child unit operation start signal to the child unit compared to the period when the structure is in a second state different from the first state, and transmits the signal to the child unit via the parent unit side communication unit, and when the detection unit detects that the structure is in the second state, the control unit stops transmitting the child unit operation start signal to the child unit, and the measurement control unit causes the measurement unit to perform the measurement each time the child unit operation start signal is received by the child unit side communication unit.
[0009] Moreover, one aspect of the present invention is that, in the above-mentioned structure maintenance management system, the slave unit further includes a temporary memory unit that stores the measurement data, and the measurement control unit causes the measurement unit to perform the measurement each time the slave unit operation start signal is received by the slave unit side communication unit, and the measurement control unit stores the measurement data measured by the measurement unit in the temporary memory unit, and if the slave unit operation start signal is not received within a predetermined time after the slave unit operation start signal was last received by the slave unit side communication unit, the measurement data stored in the temporary memory unit is transmitted to the parent unit via the slave unit side communication unit.
[0010] Moreover, one aspect of the present invention is that, in the above-mentioned structure maintenance management system, the slave unit operation start signal includes priority information specifying a priority for the type of the measurement data to be transmitted from the slave unit to the parent unit, the measurement data stored in the temporary memory unit by the measurement control unit is first measurement data, and the measurement data measured by the measurement unit includes second measurement data of a type having a higher priority for transmission to the parent unit than the first measurement data, the measurement control unit stores the first measurement data measured by the measurement unit in the temporary memory unit based on the priority information, and when a predetermined condition is satisfied, transmits the first measurement data stored in the temporary memory unit to the parent unit via the slave unit side communication unit, and the measurement control unit transmits the second measurement data measured by the measurement unit to the parent unit via the slave unit side communication unit based on the priority information immediately after measurement is performed by the measurement unit.
[0011] Moreover, one aspect of the present invention is that, in the above-mentioned structure maintenance management system, the slave unit operation start signal includes priority information that specifies a priority for the type of measurement data to be transmitted from the slave unit to the parent unit, and when the detection unit detects that the structure is in the first state, the control unit transmits the slave unit operation start signal including the priority information that specifies a high priority for a third measurement data as a type of measurement data to the slave unit via the parent unit side communication unit, and when the detection unit detects that the structure is in a second state different from the first state, the control unit transmits the slave unit operation start signal including the priority information that specifies a high priority for a fourth measurement data different from the third measurement data as a type of measurement data to the slave unit via the parent unit side communication unit.
[0012] Moreover, one aspect of the present invention is that in the above-mentioned structure maintenance management system, the slave unit operation start signal includes priority information that specifies a priority for the type of measurement data to be sent from the slave unit to the parent unit, and when the detection unit detects that the structure is in the first state, the control unit transmits the slave unit operation start signal including the priority information that specifies a high priority for the measurement data corresponding to the type of the structure to the slave unit via the parent unit side communication unit.
[0013] In one aspect of the present invention, in the above-mentioned structure maintenance management system, the first state includes a state in which the structure is performing an operation.
[0014] In one aspect of the present invention, in the above-mentioned structure maintenance management system, the first state includes a state in which the structure is vibrating by a predetermined magnitude or more due to a natural phenomenon.
[0015] Moreover, one aspect of the present invention is that, in the above-mentioned structure maintenance management system, the parent unit is installed in a part of the structure where an external power source is located, and the child unit is installed in a part of the structure where an external power source is not located.
[0016] In one aspect of the present invention, in the above-mentioned structure maintenance management system, the parent communication unit and the child communication unit each perform low-power, low-speed communication. Effect of the Invention
[0017] According to the present invention, it is possible to realize power saving in elements that perform measurements in the maintenance and management of structures. [Brief description of the drawings]
[0018] [Figure 1] 1 is a diagram showing an example of the configuration of a structure maintenance management system 1 according to an embodiment of the present invention. [Diagram 2] FIG. 1 is a diagram showing an example of a structure 5 that is a target for maintenance management by a structure maintenance management system 1 according to an embodiment of the present invention. [Diagram 3] 2 is a diagram illustrating an example of a functional configuration of a parent device 2 and a child device 3 according to an embodiment of the present invention. [Figure 4] FIG. 4 is a diagram showing an example of a flow of a parent device operation according to an embodiment of the present invention. [Diagram 5] FIG. 11 is a diagram showing an example of a flow of an operation of a child device according to an embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0019] (Embodiment) Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings. 1 is a diagram showing an example of the configuration of a structure maintenance system 1 according to this embodiment. The structure maintenance system 1 is a system for performing maintenance of a structure 5. The structure maintenance system 1 includes a parent unit 2 and a child unit 3.
[0020] The master unit 2 detects the state of the structure 5. When the master unit 2 detects that the structure 5 is in a predetermined state, it transmits a slave unit operation start signal A1 to the slave unit 3 by wireless communication. When the master unit 2 receives the slave unit operation start signal A1, it performs measurements on the structure 5. The slave unit 3 transmits the measured measurement data B1 to the master unit 2 by wireless communication.
[0021] FIG. 2 shows an example of a structure 5 that is maintained by the structure maintenance management system 1. In this embodiment, the structure 5 is, as an example, a dam gate, which is a hydroelectric power plant-related facility. The structure 5 includes a hoist 50 and a gate 51. The hoist 50 is an electric hoist. An external power source (not shown) is provided on the side of the hoist 50. The hoist 50 winds up a wire, thereby raising and lowering the gate 51 (this is called gate operation). No external power source is provided on the side of the gate 51.
[0022] The parent machine 2 is installed on the side of the hoisting machine 50. That is, the parent machine 2 is installed in a portion of the structure 5 where an external power source is disposed. The parent machine 2 is supplied with power from an external power source provided on the side of the hoisting machine 50. The external power source is, for example, a commercial power source.
[0023] The slave unit 3 is installed on the side of the gate 51. In other words, the slave unit 3 is installed in a part of the structure 5 where no external power source is located. The slave unit 3 is supplied with power from a battery built into it. If wiring for a power source were installed on the side of the gate 51, there is a possibility that the wiring would be cut off when the gate 51 is raised and lowered, or that the operation of the gate 51 would be hindered. For this reason, it is not preferable to install an external power source on the side of the gate 51. Accordingly, the slave unit 3 is configured to be powered by a battery.
[0024] The battery provided in the child device 3 is preferably a small battery. The battery is, for example, a lithium ion battery. The battery provided in the child device 3 may be a small solar battery or the like.
[0025] The master unit 2 includes a small computer 20 , a server 21 , a master unit communication module 22 , a vibration sensor 23 , a clamp meter 24 , and an external communication module 25 .
[0026] The small-sized computer 20 performs various controls for the entire parent device 2. The small-sized computer 20 is, for example, a single-board computer. The small-sized computer 20 is not limited to a single-board computer, but is preferably small and has low power consumption.
[0027] The server 21 executes various processes on the data acquired by the parent device 2. The server 21 is, for example, a single board computer. Note that the server 21 may be integrated with the small computer 20.
[0028] The master communication module 22 performs wireless communication with the slave 3. One example of the wireless communication is low-power, low-speed communication. For example, LORA (LoRaWAN), a standard for low-power, wide-area wireless communication, is preferably used for the wireless communication between the master 2 and the slave 3. Note that the wireless communication between the master 2 and the slave 3 may be wireless communication other than LORA as long as it is low-power, low-speed communication. Furthermore, the wireless communication between the master 2 and the slave 3 may be wireless communication other than low-power, low-speed communication.
[0029] The vibration sensor 23 detects vibration of the structure 5. The vibration of the structure 5 is vibration caused by an earthquake. The vibration sensor 23 is attached to a predetermined position of the hoisting machine 50 or a predetermined position near the hoisting machine 50, for example. The clamp meter 24 detects the gate operation by the hoist 50. The clamp meter 24 is attached to a control panel that controls the hoist 50, for example.
[0030] The external communication module 25 performs wireless communication with the client terminal 4. For example, a mobile communication network is used for the wireless communication between the master unit 2 and the client terminal 4. The external communication module 25 includes a router.
[0031] The small computer 20 is connected to the server 21, the parent communication module 22, the vibration sensor 23, the clamp meter 24, and the external communication module 25 by signal lines. The small computer 20, the server 21, the parent communication module 22, and the external communication module 25 are housed in a housing, for example. The vibration sensor 23 and the clamp meter 24 are provided on the outside of the housing. The signal lines connecting the vibration sensor 23 and the clamp meter 24 to the small computer 20 are cables covered with a sheath at least on the outside of the housing.
[0032] The slave unit 3 includes a slave unit communication module 30, a measurement circuit power supply module 31, a measurement control microcomputer 32, a temporary storage memory 33, an RTC module , an acceleration sensor 35, and a distortion sensor .
[0033] The child device communication module 30 performs wireless communication with the parent device 2. The wireless communication is, for example, the above-mentioned low-power, low-speed communication. Therefore, the parent device side communication unit 201 and the child device side communication unit 300 each perform low-power, low-speed communication.
[0034] The measurement circuit power supply module 31 manages the power supply of each of the components that make up the slave unit 3. Here, among the components that make up the slave unit 3, the slave unit communication module 30 is always active. Among the components that make up the slave unit 3, the measurement circuit power supply module 31, the measurement control microcomputer 32, the primary storage memory 33, the RTC module 34, the acceleration sensor 35, and the distortion sensor 36 are active only during measurement.
[0035] The measurement control microcomputer 32 performs various controls regarding the measurement by the child device 3. The measurement control microcomputer 32 is, for example, a microcontroller.
[0036] The primary storage memory 33 temporarily stores the measured measurement data B1. The primary storage memory 33 is, for example, a nonvolatile ferroelectric memory such as FRAM (registered trademark) (Ferroelectric RAM). The primary storage memory 33 may be a nonvolatile memory other than the nonvolatile ferroelectric memory, but it is preferable that the primary storage memory 33 has low power consumption.
[0037] The RTC module 34 measures the time when the measurement data B1 is measured.
[0038] The acceleration sensor 35 measures the vibration (acceleration) of the gate 51. The acceleration sensor 35 is, for example, a three-axis acceleration sensor. The acceleration sensor 35 is attached to the gate 51 at a predetermined position.
[0039] The strain sensor 36 measures the strain of the gate 51. The strain sensor 36 is, for example, a strain gauge. The strain sensor 36 is attached to the gate 51 at a predetermined position.
[0040] The slave communication module 30 and the measurement circuit power supply module 31 are connected by signal lines. The measurement control microcomputer 32 is connected by signal lines to the slave communication module 30, the measurement circuit power supply module 31, the primary storage memory 33, the RTC module 34, the acceleration sensor 35, and the distortion sensor 36.
[0041] The slave communication module 30, the measurement circuit power supply module 31, the measurement control microcomputer 32, the primary storage memory 33, and the RTC module 34 are housed in a housing, for example. The acceleration sensor 35 and the strain sensor 36 are provided outside the housing. The signal lines connecting the acceleration sensor 35 and the strain sensor 36 to the measurement control microcomputer 32 are cables covered with a sheath at least outside the housing.
[0042] The client terminal 4 is provided with the measurement data B1 by wireless communication from the master unit 2. The client terminal 4 is, for example, a personal computer (PC) or a smartphone. A user can check the measurement data B1 at a location away from the structure 5 using the client terminal 4.
[0043] Next, the functional configuration of the parent device 2 and the child device 3 will be described with reference to Fig. 3. Fig. 3 is a diagram showing an example of the functional configuration of the parent device 2 and the child device 3 according to this embodiment.
[0044] The master unit 2 includes a control unit 200 , a master unit side communication unit 201 , a detection unit 202 , and an external communication unit 203 .
[0045] The control unit 200 performs various controls over the entire parent unit 2. The control unit 200 includes a small computer 20 and a server 21.
[0046] The parent device side communication unit 201 communicates with the child device 3. The parent device side communication unit 201 includes a parent device communication module 22.
[0047] The detection unit 202 detects the state of the structure 5. The detection unit 202 includes a vibration sensor 23 and a clamp meter 24.
[0048] The external communication unit 203 performs wireless communication with a terminal device provided outside the structure maintenance system 1. The external communication unit 203 includes an external communication module 25. The terminal device with which the external communication unit 203 performs wireless communication includes the client terminal 4.
[0049] When the detection unit 202 detects that the structure 5 is in the first state, the control unit 200 transmits a slave unit operation start signal A1 to the slave unit 3 via the parent unit side communication unit 201. The slave unit operation start signal A1 is a signal for causing the slave unit 3 to start operation. The control unit 200 receives measurement data B1 measured by the slave unit 3 from the slave unit 3 via the parent unit side communication unit 201. The control unit 200 transmits the measurement data B1 received from the slave unit 3 to a terminal device provided outside the structure maintenance management system 1 via the external communication unit 203.
[0050] The slave unit 3 includes a slave-side communication unit 300 , a power supply control unit 301 , a measurement control unit 302 , a temporary storage unit 303 , a timer unit 304 , and a measurement unit 305 .
[0051] The child device side communication section 300 communicates with the parent device 2. The child device side communication section 300 includes a child device communication module 30.
[0052] The power supply control unit 301 controls the power supply of the elements constituting the child device 3. The power supply control unit 301 controls the power supply of each of the measurement control unit 302, the temporary storage unit 303, the timing unit 304, and the measurement unit 305. The power supply control unit 301 includes a measurement circuit power supply module 31.
[0053] When the child device operation start signal A1 is received by the child device side communication section 300 in the standby state, the power supply control section 301 starts up and controls the power supply of the measurement control section 302, the temporary storage section 303, the timing section 304, and the measurement section 305 to be turned on.
[0054] The measurement control unit 302 controls the measurement unit 305. The measurement control unit 302 includes a measurement control microcomputer 32. The measurement control unit 302 causes the measurement unit 305 to perform measurement. The measurement control unit 302 transmits measurement data B1 measured by the measurement unit 305 to the parent unit 2 via the child unit side communication unit 300.
[0055] The temporary storage unit 303 stores the measurement data B1. The measurement data B1 having a low priority is temporarily stored in the temporary storage unit 303 before being transmitted to the parent device 2. The measurement data B1 stored in the temporary storage unit 303 is also referred to as being accumulated in the temporary storage unit 303. The measurement data B1 stored in the temporary storage unit 303 is referred to as accumulated measurement data B12. The temporary storage unit 303 includes a primary storage memory 33.
[0056] The timekeeping unit 304 measures the time when the measurement data B1 is measured. The timekeeping unit 304 includes the RTC module .
[0057] The measurement unit 305 performs measurements related to the structure 5. The measurement unit 305 measures, for example, vibrations and distortions of the structure 5. The measurement unit 305 includes an acceleration sensor 35 and a distortion sensor 36. Note that the measurement unit 305 may be provided with one or more sensors (such as a sound sensor or a temperature sensor) depending on the type of measurement data to be measured.
[0058] Next, a parent operation, which is an operation of the parent unit 2, and a child operation, which is an operation of the child unit 3, will be described with reference to FIG. 4 and FIG. 4 is a diagram showing an example of the flow of parent unit operation according to this embodiment. The control unit 200 starts parent unit operation when the parent unit 2 is powered on. The control unit 200 repeatedly executes the parent unit operation while the power is on.
[0059] The states of the structure 5 include a normal state, a gate operation state, and an earthquake state. The gate operation state is a state in which the gate operation is being performed. The earthquake state is a state in which the structure 5 is vibrating due to the influence of an earthquake. Here, the earthquake state or the gate operation state is an example of a first state. Therefore, the first state includes a state in which the structure 5 is operating. In addition, the first state includes a state in which the structure 5 is vibrating by a predetermined magnitude or more due to a natural phenomenon. In this embodiment, as an example, an example in which the natural phenomenon is an earthquake will be described, but is not limited to this. The natural phenomenon may be a strong wind, a typhoon, or a flood, etc.
[0060] The operation modes of the master unit 2 include a standby mode and a high-frequency measurement mode. The high-frequency measurement mode includes an earthquake mode and a gate operation mode. The operation of the master unit 2 in these operation modes will be described below.
[0061] Step S10: The control unit 200 sets the operation mode of the parent unit 2 to a standby mode and starts operation. The standby mode of the parent unit 2 corresponds to the structure 5 being in a normal state. In the standby mode, the control unit 200 transmits a child unit operation start signal A1 to the child unit 3 via the parent unit side communication unit 201 at a predetermined time interval. The time interval is, for example, 24 hours. That is, in the standby mode, the control unit 200 transmits the child unit operation start signal A1 to the child unit 3 at a time interval once a day. Note that in the standby mode, the control unit 200 may stop transmitting the child unit operation start signal A1. Thereafter, the control unit 200 executes the operation of step S20.
[0062] Step S20: The control unit 200 determines whether or not an earthquake has been detected. The control unit 200 makes this determination based on the detection result by the detection unit 202. When the vibration sensor 23 detects vibrations of a predetermined magnitude or greater, the control unit 200 determines that an earthquake has been detected.
[0063] When the control unit 200 determines that an earthquake has been detected (step S20; YES), it changes the operation state of the parent unit 2 from standby mode to earthquake mode. Thereafter, the control unit 200 executes the operation of step S30. The earthquake mode of the parent unit 2 corresponds to the structure 5 being in an earthquake state. On the other hand, when the control unit 200 determines that an earthquake has not been detected (step S20; NO), it executes the operation of step S60.
[0064] Step S30: The control unit 200 transmits an earthquake mode slave unit operation start signal A12 to the slave unit 3 via the master unit side communication unit 201. After that, the control unit 200 executes the operation of step S40.
[0065] Step S40: The control unit 200 determines whether or not an earthquake has been detected. This determination is performed in the same manner as in step S20 described above.
[0066] When the control unit 200 determines that an earthquake has been detected (step S40; YES), it executes the operation of step S30 again. On the other hand, when the control unit 200 determines that an earthquake has not been detected (step S40; NO), it changes the operation state of the master unit 2 from the earthquake mode to the standby mode. Thereafter, the control unit 200 executes the operation of step S50.
[0067] Step S50: The control unit 200 receives the accumulated measurement data B12, which is the accumulated measurement data. After that, the control unit 200 executes the operation of step S10 again.
[0068] Step S60: The control unit 200 determines whether or not a gate operation has been detected. The control unit 200 makes this determination based on the detection result by the detection unit 202. When the clamp meter 24 detects that a gate operation has been detected by the hoist 50, the control unit 200 determines that a gate operation has been detected.
[0069] When the control unit 200 determines that a gate operation has been detected (step S60; YES), it changes the operation state of the parent unit 2 from the standby mode to the gate operation mode. Thereafter, the control unit 200 executes the operation of step S70. The gate operation mode of the parent unit 2 corresponds to the structure 5 being in a gate operation state. On the other hand, when the control unit 200 determines that a gate operation has not been detected (step S60; NO), it executes the operation of step S100.
[0070] Step S70: The control unit 200 transmits a gate operation mode child unit operation start signal A11 to the child unit 3 via the parent unit side communication unit 201. After that, the control unit 200 executes the operation of step S80.
[0071] Step S80: The control unit 200 determines whether or not a gate operation has been detected. This determination is performed in the same manner as in step S60 described above.
[0072] When the control unit 200 determines that the gate operation has been detected (step S80; YES), it executes the operation of step S70 again. On the other hand, when the control unit 200 determines that the gate operation has not been detected (step S80; NO), it changes the operation state of the parent unit 2 from the gate operation mode to the standby mode. After that, the control unit 200 executes the operation of step S90.
[0073] Step S90: The control unit 200 receives the accumulated measurement data B12, which is the accumulated measurement data. After that, the control unit 200 executes the operation of step S10 again.
[0074] Step S100: The control unit 200 determines whether or not a set time has elapsed. The set time is a time set for checking whether the child unit 3 is alive or dead. The set time is, for example, one hour.
[0075] When the control unit 200 determines that the set time has elapsed (step S100; YES), it executes the operation of step S110. On the other hand, when the control unit 200 determines that the set time has not elapsed (step S100; NO), it ends the parent unit operation.
[0076] Step S110: The control unit 200 transmits a dead-or-alive check mode child unit operation start signal A13 to the child unit 3 via the parent unit side communication unit 201. After that, the control unit 200 executes the operation of step S120.
[0077] Step S120: The control unit 200 judges whether or not response data is detected. When the parent-side communication unit 201 receives response data from the child unit 3 in response to the alive-or-dead mode child unit operation start signal A13, the control unit 200 judges that the response data is detected. The response data includes, for example, information indicating the remaining battery level of the child unit 3 and information indicating whether communication is possible.
[0078] When the control unit 200 determines that the response data is detected (step S120; YES), the control unit 200 executes the operation of step S10 again. On the other hand, when the control unit 200 determines that the response data is not detected (step S120; NO), the control unit 200 executes the operation of step S110 again. With this, the control unit 200 ends the parent unit operation.
[0079] The operations of steps S30 and S40 described above are repeatedly executed while it is determined that an earthquake has been detected. During this period, the time interval at which the earthquake mode child unit operation start signal A12 is transmitted is, for example, once every 0.1 seconds. The operations of steps S70 and S80 described above are repeatedly executed while it is determined that a gate operation has been detected. During this period, the time interval at which the gate operation mode child unit operation start signal A11 is transmitted is, for example, once every 0.1 seconds. Note that the time interval at which the earthquake mode child unit operation start signal A12 is transmitted and the time interval at which the gate operation mode child unit operation start signal A11 is transmitted may be different from each other.
[0080] Therefore, when the detection unit 202 detects that the structure 5 is in the first state (earthquake state or gate operation state), the control unit 200 shortens the time interval for transmitting the child unit operation start signal A1 (earthquake mode child unit operation start signal A12, or gate operation mode child unit operation start signal A11) to the child unit 3 compared to the period when the structure 5 is in a normal state different from the first state (earthquake state or gate operation state), and transmits the signal to the child unit 3 via the parent unit side communication unit 201.
[0081] That is, in the high frequency measurement mode (earthquake mode or gate operation mode), the control unit 200 transmits the child unit operation start signal A1 to the child unit 3 at a shorter time interval than in the standby mode. In other words, the time interval at which steps S30 and S40 are repeated (once every 0.1 seconds, for example) or the time interval at which steps S70 and S80 are repeated (once every 0.1 seconds, for example) is shorter than the time interval at which the child unit operation start signal A1 is transmitted to the child unit 3 in the standby mode (once a day, for example).
[0082] As described later, the slave unit 3 performs measurement every time it receives a slave unit operation start signal A1. The slave unit 3 instantly transmits the measured measurement data B1 having a high priority to be transmitted to the master unit 2 in the high frequency measurement mode as the immediately transmitted measurement data B11 to the master unit 2. Therefore, in the high frequency measurement mode, the master unit 2 receives the immediately transmitted measurement data B11 at the same time interval (once every 0.1 seconds) as the transmission of the slave unit operation start signal A1. In the present embodiment, as an example, the time interval at which the slave unit 3 performs the measurement is controlled by the time interval at which the control unit 200 transmits a slave unit operation start signal A1.
[0083] On the other hand, when the detection unit 202 detects that the structure 5 is in the normal state, the control unit 200 stops transmitting the child unit operation start signal A1 to the child unit 3.
[0084] Furthermore, the slave unit 3 accumulates, in the temporary storage unit 303, data of low priority to be transmitted to the master unit 2 in the earthquake mode or gate operation mode among the measured measurement data B1. If the slave unit 3 does not receive the slave unit operation start signal A1 within a predetermined time after receiving the last slave unit operation start signal A1, the slave unit 3 transmits the accumulated measurement data B12 stored in the temporary storage unit 303 to the master unit 2.
[0085] In earthquake mode, the high priority measurement data B1 transmitted from the slave unit 3 to the master unit 2 is the measurement data of the distortion of the gate 51. The reason for giving high priority to the measurement data of the distortion is that, when an earthquake occurs, the top priority is to confirm whether the gate can operate, and therefore, the damage condition of the gate 51 is confirmed by the distortion sensor 36. In the earthquake mode, the low-priority measurement data B1 transmitted from the slave unit 3 to the master unit 2 is measurement data other than distortion (measurement data of the vibration of the gate 51 in this example of the present embodiment).
[0086] In the gate operation mode, the high priority measurement data B1 transmitted from the slave unit 3 to the master unit 2 is the vibration measurement data of the gate 51. The reason for giving high priority to the vibration measurement data is that it is effective to collect behavior data during gate operation, and also to give priority to monitoring locations that are likely to be damaged due to the gate operation. In the gate operation mode, the low-priority measurement data B1 transmitted from the child device 3 to the parent device 2 is measurement data other than vibration (measurement data of the distortion of the gate 51 in one example of this embodiment).
[0087] The priority is specified by priority information C1. The priority information C1 is information that specifies the priority of the type of measurement data B1 transmitted from the child device 3 to the parent device 2. The child device operation start signal A1 includes the priority information C1.
[0088] When the detection unit 202 detects that the structure 5 is in the first state, the control unit 200 transmits a slave operation start signal A1 including priority information C1 that specifies a high priority for the third measurement data as a type of measurement data B1 to the slave unit 3 via the parent unit communication unit 201.
[0089] When the detection unit 202 detects that the structure 5 is in a second state different from the first state, the control unit 200 transmits a slave operation start signal A1 to the slave unit 3 via the parent unit side communication unit 201, the slave operation start signal A1 including priority information C1 specifying a high priority for a fourth measurement data, which is different from the third measurement data, as a type of measurement data B1. The third measurement data is, for example, measurement data of strain in the earthquake mode and measurement data of vibration in the gate operation mode. The fourth measurement data is, for example, measurement data of vibration in the earthquake mode and measurement data of strain in the earthquake mode.
[0090] In other words, the control unit 200 changes the priority of the type of measurement data B1 transmitted to the master unit 2 depending on the state of the structure 5.
[0091] In the gate operation mode, the high-priority measurement data B1 transmitted from the slave unit 3 to the master unit 2 is determined in advance according to the type of the structure 5. For example, if the gate 51 is a roller gate, the priority of one or more of the measurement data of the vibration and sound around the rollers is set high. In another example, if the gate 51 is a radial gate, the priority of the measurement data of the temperature of the support shaft, etc. is set high.
[0092] When the detection unit 202 detects that the structure 5 is in the first state, the control unit 200 transmits a slave operation start signal A1 including priority information C1 that specifies high priority for the measurement data B1 according to the type of structure 5 to the slave 3 via the parent unit side communication unit 201.
[0093] 5 is a diagram showing an example of a flow of the child device operation according to the present embodiment. The child device 3 starts the child device operation when the child device communication module 30 is powered on. The child device 3 repeatedly executes the child device operation while the child device communication module 30 is powered on.
[0094] Step S210: The slave unit 3 sets the operation mode of the slave unit 3 to standby mode and starts operation. In standby mode, only the slave unit side communication unit 300 is activated among the components constituting the slave unit 3. Therefore, in standby mode, the power supply control unit 301, the measurement control unit 302, the temporary storage unit 303, the timer unit 304, and the measurement unit 305 are not activated. Therefore, in standby mode, only the slave unit communication module 30 is activated among the components constituting the slave unit 3. Therefore, in standby mode, the measurement circuit power supply module 31, the measurement control microcomputer 32, the primary storage memory 33, the RTC module 34, the acceleration sensor 35, and the distortion sensor 36 are not activated. Thereafter, the slave unit 3 executes the operation of step S220.
[0095] Step S220: The child unit side communication section 300 determines whether or not the child unit earthquake mode operation start signal A12 has been received. If the child device side communication unit 300 determines that it has received the earthquake mode child device operation start signal A12 (step S220; YES), it executes the operation of step S230. On the other hand, if the child device side communication unit 300 determines that it has not received the earthquake mode child device operation start signal A12 (step S220; NO), it executes the operation of step S280.
[0096] Step S230: The child device side communication section 300 starts the power supply control section 301. Here, the child device communication module 30 starts the power supply control section 301 by transmitting a start-up signal to the power supply control section 301. This starts the measurement circuit power supply module 31.
[0097] When the power supply control unit 301 is started, it starts the measurement control unit 302, the temporary storage unit 303, the timer unit 304, and the measurement unit 305. This starts the measurement control microcomputer 32, the temporary storage memory 33, the RTC module 34, the acceleration sensor 35, and the distortion sensor 36.
[0098] When the measurement control unit 302 is started, it causes the measurement unit 305 to perform measurement. The acceleration sensor 35 and the strain sensor 36 included in the measurement unit 305 each perform one measurement. The measurement control unit 302 acquires the result of the measurement by the measurement unit 305 and generates measurement data B1. Here, the measurement control unit 302 includes the time of measurement by the measurement unit 305, which is clocked by the clock unit 304, in the measurement data B1. Therefore, the measurement data B1 includes a pair of the measurement result and the measurement time. Thereafter, the measurement control unit 302 executes the operation of step S240.
[0099] Step S240: The measurement control unit 302 transmits the immediate transmission measurement data B11 to the parent unit 2 via the child unit side communication unit 300, and stores the accumulated measurement data B12 in the temporary storage unit 303. Here, the measurement control unit 302 selects the immediate transmission measurement data B11 and the accumulated measurement data B12 from the measurement data B1 based on the priority information C1. As described above, the immediate transmission measurement data B11 is data of high priority to be transmitted to the parent unit 2 among the measurement data B1 in the high frequency measurement mode. The accumulated measurement data B12 is data of low priority to be transmitted to the parent unit 2 among the measurement data B1 in the high frequency measurement mode. The priority information C1 is included in the child unit operation start signal A1. The priority information C1 is supplied from the child unit side communication unit 300 to the measurement control unit 302.
[0100] In the earthquake mode, the measurement data of the distortion has a higher priority than the measurement data of the vibration. Therefore, the measurement control unit 302 transmits the measurement data of the distortion to the parent unit 2 as the immediately transmitted measurement data B11, and stores the measurement data of the vibration in the temporary storage unit 303 as the accumulated measurement data B12. Thereafter, the measurement control unit 302 executes the operation of step S250.
[0101] Step S250: The child device side communication unit 300 judges whether or not the earthquake mode child device operation start signal A12 has been received. If the child device side communication unit 300 does not receive the earthquake mode child device operation start signal A12 within a predetermined time (e.g., one second) after the child device side communication unit 300 last received the earthquake mode child device operation start signal A12, the child device side communication unit 300 judges that the earthquake mode child device operation start signal A12 has not been received.
[0102] If the child device side communication unit 300 determines that it has received the earthquake mode child device operation start signal A12 (step S250; YES), the measurement control unit 302 executes the operation of step S240 again. On the other hand, if the child device side communication unit 300 determines that it has not received the earthquake mode child device operation start signal A12 (step S250; NO), the measurement control unit 302 executes the operation of step S260.
[0103] Step S260: The measurement control unit 302 transmits the accumulated measurement data B12 stored in the temporary storage unit 303 to the parent unit 2 via the child unit side communication unit 300. Here, the measurement control unit 302 reads out all of the accumulated measurement data B12 stored in the temporary storage unit 303 from the temporary storage unit 303. The measurement control unit 302 causes the temporary storage unit 303 to erase the read accumulated measurement data B12. Thereafter, the slave unit 3 executes the operation of step S270.
[0104] Step S270: The power supply control unit 301 stops the measurement control unit 302. That is, the power supply control unit 301 turns off the power supply of the measurement control unit 302. The power supply control unit 301 also turns off the power supplies of the temporary storage unit 303, the timer unit 304, and the measurement unit 305. Furthermore, the power supply control unit 301 turns off its own power supply. After that, the slave unit 3 executes the operation of step S210 again.
[0105] Step S280: The child device side communication section 300 judges whether or not the gate operation mode child device operation start signal A11 has been received. If the child device side communication unit 300 determines that it has received the gate operation mode child device operation start signal A11 (step S280; YES), it executes the operation of step S290. On the other hand, if the child device side communication unit 300 determines that it has not received the earthquake mode child device operation start signal A12 (step S280; NO), it executes the operation of step S330.
[0106] Step S290: The child device side communication section 300 starts up the power supply control section 301. The operation of step S290 is similar to the operation of step S230 described above. Thereafter, the slave unit 3 executes the operation of step S300.
[0107] Step S300: The measurement control unit 302 transmits the instantaneous transmission measurement data B11 to the parent unit 2 via the child unit side communication unit 300, and stores the accumulated measurement data B12 in the temporary storage unit 303. The operation of step S300 differs from the operation of step S240 described above only in the priority indicated by the priority information C1. In the gate operation mode, the measurement data of vibration has a higher priority than the measurement data of distortion. Therefore, the measurement control unit 302 transmits the measurement data of vibration to the parent unit 2 as the instantaneous transmission measurement data B11, and stores the measurement data of distortion in the temporary storage unit 303 as the accumulated measurement data B12. Thereafter, the slave unit 3 executes the operation of step S310.
[0108] Step S310: The child device communication section 300 judges whether or not it has received the gate operation mode child device operation start signal A11. If the child device communication section 300 does not receive the gate operation mode child device operation start signal A11 within a predetermined time (e.g., one second) after it has last received the gate operation mode child device operation start signal A11, it judges that it has not received the gate operation mode child device operation start signal A11.
[0109] When the child device side communication unit 300 determines that it has received the gate operation mode child device operation start signal A11 (step S310; YES), the measurement control unit 302 executes the operation of step S300 again. On the other hand, when the child device side communication unit 300 determines that it has not received the gate operation mode child device operation start signal A11 (step S310; NO), it executes the operation of step S320.
[0110] Step S320: The measurement control unit 302 transmits the accumulated measurement data B12 stored in the temporary storage unit 303 to the parent unit 2 via the child unit side communication unit 300. The operation of step S320 is similar to the operation of step S260 described above, except that the type of the accumulated measurement data B12 is different. Thereafter, the slave unit 3 executes the operation of step S270.
[0111] Step S330: The child device side communication unit 300 determines whether or not it has received the alive-or-dead checking mode child device operation start signal A13. When the child device side communication unit 300 determines that the child device operation start signal A13 for the alive / dead confirmation mode has been received (step S330; YES), the child device 3 executes the operation of step S340. On the other hand, when the child device side communication unit 300 determines that the child device operation start signal A13 for the alive / dead confirmation mode has not been received (step S330; NO), the child device 3 ends the child device operation.
[0112] Step S340: The child device side communication unit 300 starts up the power supply control unit 301. The operation of step S340 is similar to the operation of step S230 described above. However, when the measurement control unit 302 is started up, it acquires the remaining battery power. Thereafter, the measurement control unit 302 executes the operation of step S350.
[0113] Step S350: The measurement control unit 302 transmits response data to the parent unit 2 via the child unit side communication unit 300. Here, the measurement control unit 302 transmits the response data to the parent unit 2, including information indicating the remaining battery level of the child unit 3 and information indicating whether communication is possible. Thereafter, the slave unit 3 executes the operation of step S360.
[0114] Step S360: The child device communication unit 300 judges whether or not it has received the child device operation start signal A13 for alive / dead confirmation mode. If the child device communication unit 300 does not receive the child device operation start signal A13 for alive / dead confirmation mode within a predetermined time (e.g., one second) after it has last received the child device operation start signal A13 for alive / dead confirmation mode, it judges that it has not received the child device operation start signal A13 for alive / dead confirmation mode.
[0115] When the child device side communication unit 300 determines that it has received the child device operation start signal A13 for alive / dead confirmation mode (step S360; YES), the measurement control unit 302 executes the operation of step S350 again. On the other hand, when the child device side communication unit 300 determines that it has not received the child device operation start signal A13 for alive / dead confirmation mode (step S360; NO), the measurement control unit 302 executes the operation of step S270. With the above, the slave unit 3 ends the slave unit operation.
[0116] The operation of step S240 described above is repeatedly executed while the child unit 3 continues to receive the earthquake mode child unit operation start signal A12. Also, the operation of step S300 described above is repeatedly executed while the child unit 3 continues to receive the gate operation mode child unit operation start signal A11. That is, the measurement control unit 302 causes the measurement unit 305 to perform measurement every time the child unit side communication unit 300 receives the child unit operation start signal A1.
[0117] As described above, the measurement control unit 302 stores the accumulated measurement data B12 measured by the measurement unit 305 in the temporary storage unit 303 based on the priority information C1, and when the child unit operation start signal A1 is not received within a predetermined time after the child unit side communication unit 300 last received the child unit operation start signal A1, the measurement control unit 302 transmits the accumulated measurement data B12 stored in the temporary storage unit 303 to the parent unit 2 via the child unit side communication unit 300. The accumulated measurement data B12 is an example of the first measurement data, which is the measurement data B1 stored in the temporary storage unit 303 by the measurement control unit 302.
[0118] On the other hand, the measurement control unit 302 transmits the measurement data B1 measured by the measurement unit 305 to the parent unit 2 via the child unit side communication unit 300 immediately after the measurement is performed by the measurement unit 305 based on the priority information C1. The immediately transmitted measurement data B11 is an example of a type of second measurement data having a higher priority to be transmitted to the parent unit 2 than the first measurement data included in the measurement data B1 measured by the measurement unit 305.
[0119] In addition, the power supply control unit 301 may activate some of the various sensors included in the timing unit 304 depending on the type of child unit operation start signal A1 received by the child unit side communication unit 300 or the priority indicated by the priority information C1.
[0120] For example, in earthquake mode, transmission of distortion measurement data is prioritized. When the child device side communication unit 300 receives an earthquake mode child device operation start signal A12, the power supply control unit 301 may activate only the distortion sensor 36 among the various sensors included in the clock unit 304. Also, for example, in gate operation mode, transmission of vibration measurement data is prioritized. When the child device side communication unit 300 receives a gate operation mode child device operation start signal A11, the power supply control unit 301 may activate only the acceleration sensor 35 among the various sensors included in the clock unit 304.
[0121] In the present embodiment, an example has been described in which the measurement data B1 of a type with a low priority designated by the priority information C1 is stored (accumulated) in the temporary storage unit 303, but the present invention is not limited to this. The measurement control unit 302 may store all the measurement data B1 in the temporary storage unit 303. Even in this case, as in the above-described embodiment, the measurement control unit 302 causes the measurement unit 305 to perform measurement every time the child device operation start signal A1 is received by the child device side communication unit 300. The measurement control unit 302 stores the measurement data B1 measured by the measurement unit 305 in the temporary storage unit 303, and transmits the measurement data B1 stored in the temporary storage unit 303 to the parent device 2 via the child device side communication unit 300 when the child device operation start signal A1 is not received within a predetermined time after the child device side communication unit 300 last received the child device operation start signal A1. In this case, the child device operation start signal A1 does not need to include the priority information C1.
[0122] In the present embodiment, an example has been described in which the measurement data B1 (accumulated measurement data B12) stored in temporary storage unit 303 is transmitted to parent unit 2 when child unit operation start signal A1 is not received within a predetermined time after the child unit side communication unit 300 last received child unit operation start signal A1, but this is not limited thereto. The measurement data B1 (accumulated measurement data B12) stored in temporary storage unit 303 may be transmitted to parent unit 2 at predetermined time intervals. In this case, the measurement data B1 stored in the temporary storage unit 303 may be transmitted after the parent device 2 ends the high frequency measurement mode and goes into the standby mode.
[0123] When free space is available in the band of wireless communication used by the slave side communication unit 300 for communication with the master unit 2, the measurement data B1 (accumulated measurement data B12) stored in the temporary storage unit 303 may be immediately transmitted using the free space. Of the measurement data B1 (accumulated measurement data B12) stored in the temporary storage unit 303, measurement data with a high priority is transmitted using the free space, and measurement data with a low priority does not have to be immediately transmitted even when free space is available.
[0124] In the present embodiment, an example has been described in which the time interval at which the child unit 3 performs measurement is controlled by the time interval at which the control unit 200 transmits the child unit operation start signal A1, but this is not limited to this. Measurement interval information that specifies the time interval at which the child unit 3 performs measurement (e.g., once every 0.1 seconds) may be included in the child unit operation start signal A1 and transmitted to the child unit 3.
[0125] In this case, in order to make the child device 3 stop the measurement, the control unit 200 transmits a child device operation stop signal which is a signal instructing the child device 3 to stop the measurement. In the child device 3, the measurement control unit 302 causes the measurement unit 305 to repeatedly perform measurement at the time interval designated by the measurement interval information until the child device side communication unit 300 receives the child device operation stop signal. When the child device side communication unit 300 receives the child device operation stop signal, the measurement control unit 302 causes the measurement unit 305 to stop the measurement.
[0126] In this embodiment, an example has been described in which the structure 5 is a dam gate, which is a hydroelectric power plant related facility, but this is not limited to this. The structure that is the subject of maintenance management by the structure maintenance management system 1 may be hydroelectric power plant related facility other than a dam gate. Hydroelectric power plant related facility other than a dam gate is, for example, a penstock or a dust collector. In the case of a penstock, the slave unit 3 is installed around the penstock. In the case of a dust collector, the slave unit 3 is installed near the dust collector.
[0127] Furthermore, the structures that are the targets of maintenance management by the structure maintenance management system 1 may be infrastructure other than hydroelectric power plant related facilities, such as tunnels, bridges, dams, and the like.
[0128] The measuring unit 305 is provided with a type of sensor according to the type of structure. For example, the measuring unit 305 may include a water level gauge.
[0129] The parent unit 2 and the child unit 3 are installed in predetermined parts of a structure depending on the type of the structure. The parent unit 2 is installed in a part where it is possible to receive power from an external power source. The parent unit 2 receives power from the external power source via a power cable. The child unit 3 is installed in a part where it is difficult to receive power from an external power source. The child unit 3 receives power from a battery installed in the child unit.
[0130] As described above, the structure maintenance management system 1 according to this embodiment includes the master unit 2 and the slave unit 3. The master unit 2 includes a master-side communication unit 201, a detection unit 202, and a control unit 200. The master-side communication unit 201 communicates with the slave unit 3. The detection unit 202 detects the state of the structure 5. The slave 3 includes a slave side communication unit 300, a measurement unit 305, a measurement control unit 302, and a power supply control unit 301. The slave side communication unit 300 communicates with the master 2. The measurement unit 305 measures the structure 5. The measurement control unit 302 controls the measurement unit 305. The power supply control unit 301 controls the power supplies of the elements that configure the slave 3. When the detection unit 202 detects that the structure 5 is in the first state, the control unit 200 transmits a slave operation start signal A1, which is a signal for causing the slave 3 to start operating, to the slave 3 via the parent unit side communication unit 201. The control unit 200 receives measurement data B1 measured by the slave 3 from the slave 3 via the parent unit side communication unit 201. When the child device operation start signal A1 is received by the child device side communication section 300 in the standby state, the power supply control section 301 is started up, and controls the power supplies of the measurement control section 302 and the measurement section 305 to be turned on. The measurement control unit 302 causes the measurement unit 305 to perform measurement, and transmits measurement data B1 measured by the measurement unit 305 to the parent unit 2 via the child unit side communication unit 300.
[0131] With this configuration, in the structure maintenance management system 1 according to this embodiment, the parent unit 2 and the child unit 3 that performs measurements are provided as separate entities, and the power required to measure the measurement data B1 is separated from the power required to process the measurement data B1 (such as managing the data and sending it to the client terminal 4). The elements of the child unit 3 that are required for measurement are powered on during measurement. Therefore, in the structure maintenance management system 1, power savings can be achieved in the elements that perform measurements (child unit 3) during the maintenance management of structures.
[0132] In the structure maintenance management system 1, even if an external power source is not installed near the part of the structure to be measured, the parent unit 2 can be installed near an external power source and power can be supplied to the parent unit 2 from the external power source, and the child unit 3 can be installed near the part to be measured and power can be supplied to the child unit 3 from an internal battery, thereby achieving power savings in the element that performs the measurement (child unit 3).
[0133] In conventional measuring devices, if an external power source is not installed near the part of the structure to be measured, power is supplied from a large battery. Conventional measuring devices consume a lot of power, and the large battery needs to be replaced periodically (for example, about once a month). The structure maintenance management system 1 has achieved power saving, and compared to conventional measuring devices that used large batteries, it can be operated for a long time and the battery of the slave unit 3 does not need to be replaced frequently. Therefore, the structure maintenance management system 1 reduces the maintenance work required by the user.
[0134] In addition, depending on the type of structure 5, there are places where people cannot easily reach and many places where frequent access for maintenance is difficult, so it is desirable to be able to operate for a long period of time. According to the structure maintenance management system 1, even if the slave unit 3 is installed in a place where people cannot easily reach, the battery does not need to be replaced frequently.
[0135] Furthermore, in the structure maintenance management system 1 according to this embodiment, when the detection unit 202 detects that the structure 5 is in the first state, the control unit 200 shortens the time interval for transmitting the slave unit operation start signal A1 to the slave unit 3 compared to the period during which the structure 5 is in a second state (in this embodiment, a normal state) different from the first state (in this embodiment, an earthquake state or a gate operation state), and transmits the signal to the slave unit 3 via the parent unit communication unit 201. When the detection unit 202 detects that the structure 5 is in the second state, the control unit 200 stops transmitting the slave unit operation start signal A1 to the slave unit 3. The measurement control unit 302 causes the measurement unit 305 to perform measurement every time the child unit operation start signal A1 is received by the child unit side communication unit 300.
[0136] With this configuration, the structure maintenance management system 1 according to this embodiment performs measurements frequently when detailed measurement data is required, and performs measurements less frequently or stops measurements when detailed measurement data is not required, thereby enabling efficient acquisition of measurement data. Note that with a typical dam gate, the period during which the gate is in operation is less than 1% of the year.
[0137] In addition, in the structure maintenance system 1 according to this embodiment, the slave operation start signal A1 includes priority information C1 that specifies the priority of the type of measurement data B1 transmitted from the slave 3 to the master 2. The measurement data B1 stored in the temporary memory unit 303 by the measurement control unit 302 is the first measurement data, and the measurement data B1 measured by the measurement unit 305 includes a type of second measurement data that has a higher priority for transmission to the parent unit 2 than the first measurement data. The measurement control unit 302 stores the first measurement data measured by the measurement unit 305 in the temporary memory unit 303 based on the priority information C1, and when a predetermined condition is satisfied, transmits the first measurement data stored in the temporary memory unit 303 to the parent unit 2 via the child unit side communication unit 300. The measurement control unit 302 transmits the second measurement data measured by the measurement unit 305 to the parent unit 2 via the child unit side communication unit 300 immediately after the measurement is performed by the measurement unit 305 based on the priority information C1. In this embodiment, the predetermined condition is that the child device operation start signal A1 is not received within a predetermined time after the child device side communication section 300 last received the child device operation start signal A1.
[0138] With this configuration, in the structure maintenance management system 1 of this embodiment, in standby mode, measurements are performed low frequency, or measurements are stopped, or measurement data B1 is accumulated in the slave unit 3, and the accumulated measurement data B1 is transmitted to the master unit 2 at a specified time. When detailed data is required, such as during gate operation or an earthquake, measurements are performed frequently, so that measurement data can be acquired efficiently.
[0139] Furthermore, in the structure maintenance management system 1 according to this embodiment, the master side communication unit 201 and the slave side communication unit 300 each perform power-saving low-speed communication. In the structure maintenance management system 1 of this embodiment, even with low-power, low-speed communication, in standby mode, measurements are performed low frequency, or measurements are stopped, or measurement data B1 is accumulated in the slave unit 3, and the accumulated measurement data B1 is transmitted to the master unit 2 at a specified time, and when detailed data is required, measurements are performed frequently and measurement data B1 is transmitted, so that measurement data can be obtained efficiently with low power consumption.
[0140] The control unit 200 in the above-described embodiment may be realized by a computer. In that case, a program for realizing the control function may be recorded in a computer-readable recording medium, and the program recorded in the recording medium may be read into a computer system and executed to realize the control function. The term "computer system" as used herein refers to a computer system built into the control unit 200, and includes hardware such as an operating system (OS) and peripheral devices. The term "computer-readable recording medium" refers to portable media such as flexible disks, optical magnetic disks, ROMs (Read Only Memory), and CD-ROMs (Compact Disc-Read Only Memory), and storage devices such as hard disks built into a computer system. The term "computer-readable recording medium" may also include those that dynamically hold a program for a short period of time, such as a communication line when a program is transmitted via a network such as the Internet or a communication line such as a telephone line, and those that hold a program for a certain period of time, such as a volatile memory inside a computer system that is a server or client in that case. The above-described program may be for realizing a part of the above-described functions, or may be capable of realizing the above-described functions in combination with a program already recorded in the computer system. In addition, a part or the whole of the control unit 200 in the above-mentioned embodiment may be realized as an integrated circuit such as an LSI (Large Scale Integration). Each functional block of the control unit 200 may be individually processed, or may be integrated into a processor in part or in whole. The integrated circuit method is not limited to LSI, and may be realized by a dedicated circuit or a general-purpose processor. In addition, when an integrated circuit technology that replaces LSI appears due to the progress of semiconductor technology, an integrated circuit based on that technology may be used.
[0141] Although one embodiment of the present invention has been described in detail above with reference to the drawings, the specific configuration is not limited to the above, and various design changes, etc. are possible within the scope that does not deviate from the gist of the present invention. [Explanation of symbols]
[0142] 1...structure maintenance management system, 2...parent unit, 3...child unit, 200...control unit, 201...parent unit side communication unit, 202...detection unit, 300...child unit side communication unit, 301...power supply control unit, 302...measurement control unit, 305...measurement unit, A1...child unit operation start signal, B1...measurement data
Claims
1. The parent unit and A child unit and A system comprising: The parent unit is A parent device side communication unit that communicates with the child device; A detection unit that detects a state of a structure; A control unit; Equipped with The child device is A slave communication unit that communicates with the master unit; A measurement unit that performs measurements on the structure; A measurement control unit that controls the measurement unit; A power supply control unit that controls power supplies of the elements that configure the child device; Equipped with when the detection unit detects that the structure is in the first state, the control unit transmits a slave unit operation start signal, which is a signal for causing the slave unit to start an operation, to the slave unit via the master unit side communication unit, and receives measurement data measured by the slave unit from the slave unit via the master unit side communication unit; the power supply control unit is activated when the child device operation start signal is received by the child device side communication unit in a standby state, and controls the power supplies of the measurement control unit and the measurement unit to be turned on; The measurement control unit causes the measurement unit to perform the measurement, and transmits the measurement data measured by the measurement unit to the parent unit via the child unit side communication unit. Structural maintenance management system.
2. when the detection unit detects that the structure is in the first state, the control unit shortens a time interval for transmitting the child unit operation start signal to the child unit compared to a time period when the structure is in a second state different from the first state, and transmits the child unit operation start signal to the child unit via the parent unit side communication unit; When the detection unit detects that the structure is in the second state, the transmission of the child unit operation start signal to the child unit is stopped; The measurement control unit causes the measurement unit to perform the measurement every time the child device operation start signal is received by the child device side communication unit. The structure maintenance management system according to claim 1.
3. The slave unit further includes a temporary storage unit that stores the measurement data. the measurement control unit causes the measurement unit to perform the measurement every time the child device operation start signal is received by the child device side communication unit; the measurement control unit stores the measurement data measured by the measurement unit in the temporary storage unit, and when the child device operation start signal is not received within a predetermined time from the last reception of the child device operation start signal by the child device side communication unit, transmits the measurement data stored in the temporary storage unit to the parent device via the child device side communication unit. The structure maintenance management system according to claim 2.
4. the slave operation start signal includes priority information that specifies a priority of a type of the measurement data to be transmitted from the slave to the master; The measurement data stored in the temporary storage unit by the measurement control unit is first measurement data, The measurement data measured by the measurement unit includes second measurement data of a type having a higher priority to be transmitted to the parent device than the first measurement data, the measurement control unit stores the first measurement data measured by the measurement unit in the temporary storage unit based on the priority information, and when a predetermined condition is satisfied, transmits the first measurement data stored in the temporary storage unit to the parent unit via the child unit side communication unit; The measurement control unit transmits the second measurement data measured by the measurement unit to the parent unit via the child unit side communication unit immediately after the measurement is performed by the measurement unit based on the priority information. The structure maintenance management system according to claim 3.
5. the slave operation start signal includes priority information that specifies a priority of a type of the measurement data to be transmitted from the slave to the master; when the detection unit detects that the structure is in the first state, the control unit transmits the slave unit operation start signal to the slave unit via the master unit communication unit, the slave unit including the priority information specifying a high priority of third measurement data as a type of the measurement data; When the detection unit detects that the structure is in a second state different from the first state, the control unit transmits the slave unit operation start signal including the priority information specifying a high priority of fourth measurement data different from the third measurement data as a type of the measurement data to the slave unit via the master unit side communication unit. The structure maintenance management system according to claim 1.
6. the slave operation start signal includes priority information that specifies a priority of a type of the measurement data to be transmitted from the slave to the master; When the detection unit detects that the structure is in the first state, the control unit transmits the slave operation start signal, which includes the priority information specifying a high priority of the measurement data according to the type of the structure, to the slave via the master side communication unit. The structure maintenance management system according to claim 1.
7. The first state includes a state in which the structure is performing an operation. The structure maintenance management system according to claim 5 or 6.
8. The first state includes a state in which the structure is vibrating by a natural phenomenon at a predetermined magnitude or more. The structure maintenance management system according to claim 1.
9. The parent unit is installed in a portion of the structure where an external power source is disposed, The slave unit is installed in a portion of the structure where an external power source is not installed. The structure maintenance management system according to claim 1.
10. The parent device side communication unit and the child device side communication unit each perform low-power low-speed communication. The structure maintenance management system according to claim 1.
Citation Information
Patent Citations
Wiring board for detection to detect abnormality in structure, structure abnormality detection device, and structure abnormality detection system
JP2017161250A
