Control device and control method
The control device and method address delayed responses in blast furnace operations by using state space models and disturbance estimators to quickly determine operation amounts, stabilizing conditions and accurately predicting hot metal temperature changes.
Patent Information
- Application Number
- JP2023062263
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-06
- Publication Date
- 2024-10-18
AI Technical Summary
Existing blast furnace control methods struggle with delayed responses due to observable quantities being observed with a relatively slow time response, leading to unstable operations and deviations from desired conditions, particularly in hot metal temperature, which are not accurately predicted by regression models influenced by disturbances and measurement errors.
A control device and method utilizing a first state space model for quick response observables, a disturbance estimator, and a second state space model for slow response observables, along with a temperature change estimator, to determine operation amounts without waiting for late observations, incorporating principal component analysis to refine regression models for accurate hot metal temperature prediction.
Enables prompt and accurate control of blast furnace operations by estimating hot metal temperature changes with quick and slow response observables, allowing for timely adjustments to stabilize furnace conditions and reduce deviations.
Smart Images

Figure 2024148803000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a control device and a control method, and to a control device and a control method capable of executing control to appropriately determine the operation amount of a blast furnace without waiting for the observation results of observable amounts that can be observed with a relatively slow time response to operations or disturbances on the blast furnace. [Background technology]
[0002] In recent years, the blast furnace process has been moving toward using cheap iron ore and operating under low reducing agent ratio conditions, and there is an increasing need to stabilize the blast furnace conditions.
[0003] However, operation using cheap, low-quality raw materials and low-reducing materials can easily lead to unstable furnace conditions, which can cause fluctuations in production volume and a decrease in furnace heat. For example, it is known that various types of disturbances occur due to charged raw materials such as iron ore and coke, causing fluctuations in blast furnace operation. Therefore, in order to achieve stable blast furnace operation, it is necessary to operate the blast furnace while taking these disturbances into consideration.
[0004] In addition, during blast furnace operation, various operations are performed on the blast furnace, such as adding materials and changing conditions. In order to optimize blast furnace operation, the changes that occur as a result of the operations are observed as observable quantities, and the observed quantities are fed back to adjust the amount of operation to be performed next.
[0005] As a technique related to blast furnace operation, a method has been proposed for predicting the molten iron temperature in a blast furnace using a physical model capable of calculating the state inside the blast furnace (see Non-Patent Document 1).
[0006] Patent Document 2 discloses a technique for correcting a predicted value of a molten iron temperature calculated by a model capable of calculating the molten iron temperature, by using a regression model based on operational indexes such as gas utilization rate and CSL. In Patent Document 2, in consideration of the fact that the prediction accuracy of the molten iron temperature may decrease due to the influence of disturbances such as the reducibility of iron ore and gas drift, the difference between the calculated value and the actual value is calculated as the calculation error of the molten iron temperature based on the time change rate of the error in the past interval of output variables other than the molten iron temperature, and the prediction accuracy of the change amount of the molten iron temperature is improved by removing the influence of the prediction error resulting from a change in the manipulated variable from the time of calculation. [Prior art documents] [Patent documents]
[0007] [Patent Document 1] Patent Publication 2019-19385 [Non-patent literature]
[0008] [Non-Patent Document 1] Hagiwara: Introduction to Digital Control, Corona Publishing, 1999 Summary of the Invention [Problem to be solved by the invention]
[0009] However, observables that reflect the results of an operation or disturbance include observables that are observed at a relatively late timing after the operation (observables that can be observed with a relatively slow time response to the operation or disturbance) and observables that are observed at a relatively early timing (observables that can be observed with a relatively fast time response to the operation or disturbance).
[0010] For this reason, even if the amount of operation for the next operation is adjusted by simply feeding back the amount of observation observed at a relatively early timing, it is not possible to perform appropriate control that reflects the amount of observation observed at a relatively late timing, and even if the amount of operation for the next operation is adjusted by simply feeding back the amount of observation observed at a relatively late timing, there is a problem that the response is too late, and it becomes too late.
[0011] For example, the molten iron temperature, which is an important indicator in operation, is observed at a relatively late timing relative to the influence of operations and disturbances. For example, even if an operation is performed to bring the molten iron temperature closer to the desired value at the time when it is observed that the molten iron temperature has deviated from the desired value, it will take a long time for the operation to bring the molten iron temperature closer to the desired value. In this case, the state of the blast furnace where the temperature is significantly different from the desired temperature continues for a long period of time, causing problems in operation.
[0012] Moreover, changes in the actual value of the molten iron temperature are not only due to factors that can be explained by the time change rate of operational indicators such as the gas utilization rate and RAR, but also due to disturbance changes influenced by various factors such as changes in the heat exchange coefficient between the solid and liquid in the lower part of the furnace, changes in the movement of the molten iron flow at the hearth, variations in heat removal at the hearth, heat removal in the runner after tapping, and measurement errors when measuring the temperature.
[0013] Furthermore, the measured value of the molten iron temperature may be affected by heat removal from the hearth, particularly heat removal when switching between laths, and for example, even if an actual measured value (measured temperature value) is used as is to construct a regression equation and determine the regression coefficients, the regression coefficients may be inaccurate. For this reason, even if a regression model is constructed in which the calculation error of the molten iron temperature superimposed with various disturbances is used as the objective variable and the time rate of change of the operation index is used as the explanatory variable, as in the method of Patent Document 1, there is a problem in that it is difficult to accurately calculate the regression coefficients.
[0014] One aspect of the present invention aims to realize a technology that enables control to be performed to appropriately determine the operation amount of a blast furnace without waiting for the observation results of observable quantities that can be observed with a relatively slow time response to operations or disturbances on the blast furnace. [Means for solving the problem]
[0015] In order to solve the above-mentioned problems, a control device according to one embodiment of the present invention is a control device for controlling a blast furnace process, and includes a first state space model that estimates an observable quantity that is observable with a relatively fast time response to an operation or disturbance on the blast furnace and a state of the blast furnace corresponding to the observable quantity that is observable with the relatively fast time response, and a disturbance estimation observer, and includes: a disturbance estimation unit that estimates a disturbance value from an observation quantity observed when a first time has elapsed after an operation on the blast furnace; a temperature change estimation unit that estimates a change in molten iron temperature from the estimated disturbance value; a second state space model that estimates a state of the blast furnace corresponding to an observation quantity including an observable quantity that is observable with a relatively slow time response to an operation or disturbance on the blast furnace and an observation quantity including the observable quantity that is observable with the relatively slow time response; and a disturbance estimation unit that estimates a disturbance value from an observation quantity observed when a first time has elapsed after an operation on the blast furnace, and a temperature change estimation unit that estimates a change in molten iron temperature from the estimated disturbance value. and a third state space model using the first and second state space models, and estimating an observation quantity observed when a second time longer than the first time has elapsed after an operation on the blast furnace and a state of the blast furnace corresponding to the observation quantity; and an operation quantity determination unit determining an operation quantity for a next operation on the blast furnace based on a result of the estimation by the state observation quantity estimation unit, wherein the temperature change estimation unit comprises: a principal component analysis execution unit that acquires at least an actual measurement value of the molten iron temperature and an analytical value of the Si concentration in the molten iron in a time series, and performs principal component analysis on a matrix obtained from the time series actual measurement value of the molten iron temperature and the analytical value of the Si concentration in the molten iron; and an estimation calculation execution unit that uses coefficients calculated based on the analysis result of the principal component analysis to execute a calculation related to estimating an amount of change in the molten iron temperature by a regression model in which the estimated disturbance value is an explanatory variable.
[0016] In order to solve the above-mentioned problems, a control method according to one aspect of the present invention is a control method for a control device that controls a process of a blast furnace, and includes a first state space model that estimates an observable quantity that is observable with a relatively fast time response to an operation or disturbance on the blast furnace and a state of the blast furnace corresponding to the observable quantity that is observable with the relatively fast time response, and a disturbance estimation observer, and includes a disturbance estimation step of estimating a disturbance value from an observation quantity observed when a first time has elapsed after an operation on the blast furnace, a temperature change estimation step of estimating an amount of change in molten iron temperature from the estimated disturbance value, a second state space model that estimates a state of the blast furnace corresponding to an observation quantity including an observable quantity that is observable with a relatively slow time response to an operation or disturbance on the blast furnace and an observation quantity including the observable quantity that is observable with the relatively slow time response, and a disturbance estimation step of estimating an amount of change in molten iron temperature from the estimated disturbance value. and a third state space model using the first and second state space models, and estimating an observation quantity observed when a second time longer than the first time has elapsed after an operation on the blast furnace and a state of the blast furnace corresponding to the observation quantity; and an operation quantity determination step determining an operation quantity related to a next operation on the blast furnace based on a result of the estimation in the state observation quantity estimation step, wherein the temperature change estimation step includes a principal component analysis execution step of acquiring at least an actual measurement value of the molten iron temperature and an analytical value of the Si concentration in the molten iron in a time series and performing a principal component analysis on a matrix obtained from the time series actual measurement value of the molten iron temperature and the analytical value of the Si concentration in the molten iron, and an estimation calculation execution step of performing a calculation related to an estimation of an amount of change in the molten iron temperature by a regression model using coefficients calculated based on the analysis result of the principal component analysis and having the estimated disturbance value as an explanatory variable. Effect of the Invention
[0017] According to one aspect of the present invention, control can be performed to appropriately determine the operation amount of a blast furnace without waiting for the observation results of observable amounts that can be observed with a relatively slow time response to operations or disturbances on the blast furnace. [Brief description of the drawings]
[0018] [Figure 1] FIG. 1 is a diagram illustrating an overview of a blast furnace process. [Diagram 2] FIG. 2 is a diagram showing the relationship between a blast furnace process and operation and observation quantities. [Diagram 3] FIG. 2 is a diagram illustrating an overview of operation input in blast furnace operation. [Figure 4] 1 is a graph showing an example of changes in the measured value of the molten iron temperature. [Diagram 5] 1 is a graph illustrating an example of changes in the analytical value of the Si concentration in molten iron. [Figure 6] 5 is a graph in which the first principal component obtained as a result of principal component analysis is plotted over the changes in the measured values of the molten iron temperature shown in FIG. 4. [Figure 7] 6 is a graph in which the first principal component obtained as a result of principal component analysis is plotted over the change in the analytical value of the Si concentration in the molten iron shown in FIG. 5. [Figure 8] FIG. 2 is a block diagram showing a configuration example of a control device for controlling a blast furnace process. [Figure 9] 4 is a block diagram showing a detailed configuration example of a temperature change amount estimation unit. FIG. [Figure 10] 11 is a flowchart illustrating an example of a control process. [Figure 11] 11 is a flowchart illustrating an example of a temperature change amount estimation process. [Figure 12] 1 is a graph relating to verification of the estimation result of the amount of change in molten iron temperature according to this embodiment. [Figure 13] 13 is a flowchart illustrating another example of the temperature change estimation process. [Figure 14] FIG. 2 is a block diagram illustrating a physical configuration of a computer used as a control device. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0019] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Exemplary embodiments of the present invention will now be described in detail with reference to the accompanying drawings. First, an overview of a blast furnace process will be described.
[0020] Fig. 1 is a diagram for explaining the outline of the blast furnace process. In the blast furnace process, as shown in Fig. 1, sintered ore and coke are charged from the top of the blast furnace 101 so as to create alternating layers, and hot air and pulverized coal as a reducing agent are blown in from the blast tuyeres at the bottom of the furnace. The hot air gasifies the pulverized coal and coke, and high-temperature reducing gases such as carbon monoxide and hydrogen rise up inside the furnace, melting the sintered ore while removing oxygen, and the molten iron comes into contact with the carbon in the coke and is reduced, becoming molten iron containing just under 5% carbon, which accumulates in the basin at the bottom of the furnace.
[0021] The molten iron is taken out from a tap hole installed at the side of the hearth and transported to the next steelmaking process. Gases such as coke oven gas (COG) or natural gas (NG) may be blown into the furnace through the blast tuyeres (or other tuyeres).
[0022] In addition, in blast furnace operation, operation control indexes are set, the time transition of the operation control indexes is monitored, and operation operations for the blast furnace process are performed with the corresponding operation amount to control the furnace condition. Therefore, setting appropriate operation control indexes is extremely important for stable operation of the blast furnace. Details of the operation control indexes will be described later, but the operation control indexes include indexes that should be kept at set target values (in this embodiment, control amount) and indexes that are mainly used to grasp changes in the furnace condition (in this embodiment, observation amount).
[0023] Figure 2 is a diagram showing the relationship between the blast furnace process 1 and the manipulated variable u and observed variable y. As shown in Figure 2, the blast furnace process 1 inputs the manipulated variable u and outputs the observed variable y. The state of the blast furnace process 1 is represented by x.
[0024] The operation amount u is a value related to the air blowing amount, the amount of pulverized coal (the amount of pulverized coal injection PCI or the pulverized coal ratio PCR), or the like.
[0025] The observed quantities y are molten iron temperature, gas composition (e.g., CO concentration, CO2 concentration, N2 concentration, H2 concentration), gas utilization rate (e.g., CO utilization rate, H2 utilization rate), carbon solution loss (CSL), CO utilization rate, H2 utilization rate, iron tapping rate, molten iron Si, molten iron temperature, etc. Among these observed quantities y, molten iron temperature, molten iron Si, and iron tapping rate are often regarded as controlled quantities with target values set.
[0026] In recent years, the blast furnace process has been moving toward using cheap iron ore and operating under low reducing agent ratio conditions, and there is an increasing need to stabilize the blast furnace conditions.
[0027] However, operation using cheap, low-quality raw materials and low-reducing materials can easily cause unstable furnace conditions, leading to fluctuations in production volume and a drop in furnace heat. For example, it is known that various types of disturbances occur due to charged raw materials such as iron ore and coke, causing fluctuations in blast furnace operation. Therefore, in order to achieve stable blast furnace operation, it is necessary to operate the blast furnace while taking these disturbances into consideration.
[0028] In addition, during blast furnace operation, various operations are performed on the blast furnace, such as adding materials and changing conditions. In order to optimize blast furnace operation, the changes that occur as a result of the operations are observed as observable quantities, and the observed quantities are fed back to adjust the amount of operation to be performed next.
[0029] Figure 3 is a diagram for explaining an overview of operation inputs in blast furnace operation. As shown in Figure 3, in process control, disturbance and state estimation is performed, and an estimated disturbance value d^ and an estimated blast furnace state value x^ are calculated. Here, x^ and d^ are represented by a ^ (hat) placed above x and d, respectively. The letters with a hat will be represented in the same way hereafter.
[0030] The manipulated variable u is determined based on the calculated estimated disturbance value d^ and the estimated value x^ of the blast furnace state, and the operation input is performed.
[0031] The operation corresponding to the operation amount u affects the blast furnace process. The blast furnace process includes a fast response P1 and a slow response P2 to the operation or disturbance. The fast response P1 means that it takes a relatively short time to obtain a response to the operation or disturbance, and the slow response P2 means that it takes a relatively long time to obtain a response to the operation or disturbance. The fast response P1 causes, for example, changes in the gas utilization rate, CSL, etc., and the slow response P2 causes, for example, changes in the molten iron temperature, etc.
[0032] Although details will be described later, the fast reaction P1 corresponds to a chemical reaction process such as the reduction reaction of ore or the consumption reaction of coke, while the slow reaction P2 roughly corresponds to the movement and heat transfer phenomenon of reaction heat generated in the fast reaction.
[0033] The values of the indices such as the gas utilization rate, CSL, and molten iron temperature that change due to the fast reaction P1 and the slow reaction P2 are fed back to the process control as observed quantities. That is, disturbance and state estimation is performed based on the observed quantities, and the estimated disturbance value d^ and the estimated blast furnace state value x^ are recalculated. Then, a new operation value u is determined based on the calculated estimated disturbance value d^ and estimated blast furnace state value x^, and operation input is performed.
[0034] 3, the observables observed as a result of an operation include observables related to indices that change due to a fast response P1 to an operation or disturbance, and observables related to indices that change due to a slow response P2 to an operation or disturbance. That is, among the observables fed back to the process control, an index that has changed due to a slow response P2 is actually an index that has changed in response to an operation or disturbance that was input a considerable amount in time, and an index that has changed due to a fast response P1 is actually an index that has changed in response to an operation or disturbance that was input a little while ago.
[0035] An observable related to an index that changes due to a fast response P1 to an operation or disturbance (e.g., gas utilization rate, CSL) can be observed a relatively short time after the operation or disturbance occurs, and such an observable can be said to be an observable that can be observed with a relatively fast time response to an operation or disturbance. On the other hand, an observable related to an index that changes due to a slow response P2 to an operation or disturbance (e.g., molten iron temperature) can be observed a relatively long time after the operation or disturbance occurs, and such an observable can be said to be an observable that can be observed with a relatively slow time response to an operation or disturbance.
[0036] For this reason, if an observation amount that is observed with a relatively slow time response to an operation or disturbance is fed back and reflected in the next operation amount, it is not possible to realize a rapid control operation.
[0037] For example, the change in the molten iron temperature, which is an important indicator in operation, is observed at a relatively late timing. Even if an operation is performed to bring the molten iron temperature closer to the target temperature at the time when it is observed that the molten iron temperature has deviated from the desired value (target temperature), it will take a long time for the molten iron temperature to approach the target temperature as a result of the operation. In this case, the state of the blast furnace where the temperature deviates greatly from the target temperature will continue for a long time.
[0038] <First embodiment> (State space model of a blast furnace) In this embodiment, the state of the blast furnace is obtained using a parameter that relates an observable quantity that can be observed with a relatively fast time response to operations or disturbances to an observable quantity that can be observed with a relatively slow time response to operations or disturbances. In other words, the state of the blast furnace can be quickly obtained without waiting for the observation results of the observable quantity that can be observed with a relatively slow time response to operations or disturbances, and the observable quantity corresponding to the state of the blast furnace can also be obtained.
[0039] In this embodiment, a discrete-time linear state space model using equations (1) and (2) expressing blast furnace operation is used to control the blast furnace process 1. The discrete-time linear state space model includes an equation expressing a discrete-time change in which the state (state variable) of the blast furnace process 1 changes from x0(k) to x0(k+1) when the current time is represented by k and an operation amount u(k) is applied at the current time.
[0040] Note that x0(k) indicates the state of the blast furnace, which is the state of factors within the blast furnace that affect the observable quantities, including various reaction heats and pressures. y0(k) indicates the general observable quantities of the blast furnace, including observable quantities that can be observed with a relatively slow time response (after a long time has passed) to operations and disturbances in relation to operations on the blast furnace. u(k) indicates the amount of operation on the blast furnace, and k is an index indicating time and minutes.
[0041] Examples of the manipulated variable u(k) include the amount of air blown and the amount of pulverized coal injected.
[0042] Examples of y0(k) include molten iron Si and molten iron temperature.
[0043] Moreover, the coefficients A0, B0, C0, and D0 are determined in advance.
number
number
[0044] Moreover, it is assumed that the values of the coefficients A, B, C, and D are specified in advance.
[0045] Since the factors and observations of the state of the blast furnace that are the subject of equations (1) and (2) and equations (3) and (4) are different, the variables and constants of the state space model are subscripted to distinguish between the two. On the other hand, the manipulated variable u(k) is common to equations (1) and (2) and equations (3) and (4), so it is not distinguished by a subscript.
[0046] Incidentally, formula (1) and formula (3) may be the same formula or may be different formulas.
number
number
[0047] That is, the calculated values of the observed quantities deviate from the actual measured values due to the influence of various disturbances that cause fluctuations in blast furnace operation, such as changes in the properties of the raw materials charged from the furnace top. For example, deviations occur when the main chemical reaction amounts in the furnace change unexpectedly due to the occurrence of disturbances. The main chemical reaction amounts in the furnace include the amount of indirect reduction reactions, the amount of direct reduction reactions, the amount of hydrogen reduction reactions, the amount of coke consumption, the amount of coke combustion reactions, and other chemical reaction amounts.
[0048] Therefore, in order to more accurately calculate the state and observation quantities of the blast furnace, it is necessary to feed back the actual measured values of the blast furnace affected by disturbances to the state space model shown in equations (1) to (4) and reflect them in the calculated values of the state space model.
[0049] In this case, if feedback is attempted after waiting for an observable quantity that can be observed with a relatively slow time response to operations or disturbances to actually be observed, the blast furnace state with a large deviation from the target temperature will continue for a long period of time, as described above. Therefore, it is desirable to use an observable quantity that can be observed with a relatively fast time response to operations or disturbances as the observable quantity to be fed back.
[0050] Here, the case where disturbance is taken into consideration for the formulas (3) and (4) will be considered.
[0051] When disturbance is taken into consideration, a known disturbance estimation observer is applied to calculate the disturbance estimate value d^(k) based on equations (3) and (4), which results in equations (5), (6), and (7).
number
number
number
[0052] The configuration procedure and design method of an observer in a discrete-time system are described in, for example, Non-Patent Document 1.
[0053] The estimated disturbance value d^(k) can be obtained by solving equations (5) to (7) using the values of the observed quantities y(k) that are actually observed. Here, as the values of the observed quantities y(k), for example, the observed quantities that can be observed with a relatively fast time response to operations and disturbances, such as the gas composition, CSL, CO utilization rate, H2 utilization rate, and tapping rate, can be actually observed and used.
[0054] Then, by using a state space model (equations (3) and (4)) that estimates observable quantities with a relatively fast time response to operations and disturbances, and a disturbance estimation observer, the disturbance value is estimated from the observation quantities observed a relatively short time after operations on the blast furnace.
[0055] As described above, since the discrepancy between the calculated value and the actual measured value is considered to be due to disturbance, it is possible to obtain an observation quantity close to the actual measured value by using this disturbance estimated value d^(k), as shown in equation (6). However, this disturbance estimated value d^(k) is obtained from an observation quantity that can be observed with a relatively fast time response to the operation or disturbance. Therefore, even if it is attempted to appropriately reflect the disturbance estimated value d^(k) in the state space model (equations (1) and (2)) that includes an observation quantity that can be observed with a relatively slow time response to the operation after the operation or disturbance, it is difficult because the calculation procedure is not self-evident.
[0056] Therefore, in accordance with the calculation procedure described below, we decided to introduce a parameter that relates observable quantities that can be observed with a relatively fast time response to operations or disturbances to observable quantities that can be observed with a relatively slow time response to operations or disturbances.
[0057] As described above, the disturbance corresponding to the estimated disturbance value d^(k) is considered to correspond to the change in chemical reaction resulting from the change in the properties of the raw materials charged from the top of the blast furnace. In other words, the amount of chemical reaction such as the amount of indirect reduction reaction, the amount of direct reduction reaction, the amount of hydrogen reduction reaction, the amount of coke consumption, the amount of coke combustion reaction, etc. in the furnace occurs due to disturbance factors such as the change in the properties of the raw materials charged from the top of the blast furnace.
[0058] Such changes in chemical reaction quantities occur relatively quickly, and are therefore thought to affect both observables that can be observed with a relatively fast time response to operations or disturbances, and observables that can be observed with a relatively slow time response to operations or disturbances.
[0059] Therefore, we will continue to study these changes in chemical reactions.
[0060] The change in the chemical reaction factors occurring inside the blast furnace, especially the change in the chemical reaction factors through the gas flow, is denoted as Δs. During the stable period of the furnace condition, the process fluctuation is relatively small, so the disturbance estimate d^(k) can be linearized and expressed as in equation (8).
number
[0061] In addition, since changes in chemical reaction factors in the furnace are accompanied by changes in heat, the relationship between each chemical reaction factor and the amount of heat generated, based on whether each chemical reaction is an exothermic or endothermic reaction, can be obtained as shown in equation (9).
number
[0062] The value of the reaction heat coefficient vector h in formula (9) can be calculated specifically using, for example, a model (blast furnace mathematical model) capable of calculating the time change of chemical reactions in a blast furnace, as described above. That is, in the operating state (operating point) that is the reference for linear approximation, various boundary condition setting values that can be set in the model, which correspond to disturbances around the operating point, are changed to perturb each chemical reaction factor in the furnace, and the perturbation amount from the operating point is calculated, thereby calculating the value of the reaction heat coefficient vector h in formula (9).
[0063] Furthermore, by substituting equation (8) into equation (9), equations (10) and (11) are obtained.
number
number
[0064] In this way, the amount of heat change ΔQ associated with the occurrence of a disturbance can be calculated from the disturbance estimated value d^(k).
[0065] From the nominal value of the heat exchange coefficient between the solid and liquid inside the blast furnace (e.g., the cohesive zone) and the amount of pig iron produced, the relationship between the heat change ΔQ and the temperature change ΔT of the molten iron can be expressed as shown in equation (12).
number
[0066] In this way, the amount of change in molten iron temperature can be estimated from the amount of heat change.
[0067] However, in reality, when heat is generated by chemical reactions in a blast furnace, the molten iron temperature does not change immediately, and there is a time delay (called dead time) due to the time it takes for the charges to descend into the furnace and the time the molten iron remains in the lower part of the furnace. Furthermore, because the heat capacity of the blast furnace is large, there is a time delay in the heat transfer to the molten iron temperature. As a result, it takes a long time for the molten iron temperature to change.
[0068] For this reason, taking into account the dead time and the time constant of the heat transfer phenomenon, the time change of ΔT is expressed as the dynamics of a first-order lag system including dead time, as shown in equation (13). Equation (13) is expressed as a discrete-time model that is time-discretized at an appropriate calculation period, and the time delay of the influence of the heat of each chemical reaction can be set individually.
number
[0069] Moreover, the formula (13) can also be transformed into the formula (14) by using the formulas (8) to (11).
number
[0070] In other words, the disturbance estimate used to calculate the change in the molten iron temperature is calculated using the observations observed over the past time k´lag,i. In this case, the observations that can be observed with a relatively fast time response to operations and disturbances are used as the observations observed in the past. This is because disturbances that affect the change in the molten iron temperature ΔT are considered to affect both the observations that can be observed with a relatively fast time response to operations and disturbances and the observations that can be observed with a relatively slow time response to operations and disturbances.
[0071] In this way, it becomes possible to calculate the amount of change in the molten iron temperature ΔT from the amount of heat change accompanying the occurrence of a disturbance. In this case, the amount of change in the molten iron temperature is obtained from an observable amount that can be observed with a relatively fast time response to operations or disturbances, and the obtained amount of change in the molten iron temperature can be applied to the state of the blast furnace including an observable amount that can be observed with a relatively slow time response to operations or disturbances. In other words, the amount of change in the molten iron temperature functions as a parameter that relates an observable amount that can be observed with a relatively fast time response to operations or disturbances to an observable amount that can be observed with a relatively slow time response to operations or disturbances.
[0072] In addition, although details will be described later, in this embodiment, a method for more simply calculating the amount of change ΔT in the molten iron temperature is adopted. In this case, a method for estimating the amount of change ΔT in the molten iron temperature is adopted by a regression model in which the disturbance value estimated by the formula (7) is used as an explanatory variable and the calculated value related to the amount of change ΔT in the molten iron temperature is used as a response variable.
[0073] Equations (1) and (2), which show the state of a blast furnace, include observable quantities that have a relatively slow time response to operations and disturbances. By adding the effects of disturbances such as those used in equations (5) to (7) and the change in molten iron temperature ΔT, a state space model of the blast furnace can be expressed as equations (15) to (17).
number
number
number
[0074] Although the above-mentioned formula (16) includes the direct term D0u(k), when the estimation target is the molten iron temperature, the direct term does not need to be considered and can be omitted. Therefore, formula (16) can be rewritten as formula (18).
number
number
number
number
number
[0075] Therefore, the state of the blast furnace required for determining the operation amount can be quickly obtained without waiting for the observation results of the observable amount that can be observed with a relatively slow time response to the operation or disturbance. In addition, the state space model of equations (19) to (21) makes it possible to accurately calculate the observable amount that can be observed with a relatively slow time response to the operation or disturbance, such as the molten iron temperature and the molten iron Si. Therefore, it becomes possible to appropriately control the blast furnace process by feeding back the observable amount that can be observed with a relatively slow time response to the operation or disturbance.
[0076] (Method of estimating the amount of change in molten iron temperature using a regression model) Next, we will explain a method for more simply calculating the amount of change in the molten iron temperature, ΔT. As described above, we will consider a method for estimating the amount of change in the molten iron temperature, ΔT, using a regression model with the disturbance value calculated by Equation (7) as the explanatory variable and the amount of change in the molten iron temperature, ΔT, as the objective variable.
[0077] Using the conversion coefficient β and vector v used in the calculation of equation (14), the coefficient wi is defined as shown in equation (24).
[0078]
number
[0079]
number
[0080]
number
[0081] Next, the calculated value t k and the disturbance estimate element E ki and are defined as shown in equations (26) and (27), respectively.
[0082]
number
[0083]
number
[0084] In this case, equation (28) can be derived from equations (23), (24), (26) and (27).
[0085]
number
[0086] The calculated value t is calculated using the estimated value y0^(k) and the measured value y0(k) at time k=1,2,3,...T. k By calculating this, equation (28) can be generated for time k = 1, 2, 3, ... T. This makes it possible to generate a linear regression model with vector t as the objective variable and vector E as the explanatory variable. This linear regression model is shown by equation (29).
[0087]
number
[0088] However, changes in the measured molten iron temperature are not only due to factors that can be explained by the time change rate of operational indicators such as gas utilization rate and RAR, but also due to disturbance changes influenced by various factors such as changes in the heat exchange coefficient between the solid and liquid in the lower part of the furnace, changes in the movement of the molten iron flow at the hearth, variations in heat removal at the hearth, heat removal in the runner after tapping, and measurement errors when measuring the temperature.
[0089] In addition, the actual measured value of the molten iron temperature may be affected by heat removal from the hearth, particularly when the lane is switched over. For example, even if the actual measured value is used as is to construct a regression equation and determine the regression coefficients, the regression coefficients may be inaccurate.
[0090] For this reason, it is necessary to remove abnormal fluctuations, such as the effect of heat removal at the hearth, from the actual measured value of the molten iron temperature y0(k) to obtain a value that more accurately represents the temperature, and then generate a new linear regression model of equation (29) to obtain more accurate regression coefficients.
[0091] The method for removing abnormal fluctuations, such as the effect of heat removal at the hearth, from the measured molten iron temperature value y0(k) is described below.
[0092] It is difficult to distinguish between abnormal fluctuation components and fluctuation components that are actually influenced by the heat inside the furnace (furnace heat) from time-series data consisting only of the actual measured value of the molten iron temperature. For this reason, in this embodiment, in addition to the actual measured value of the molten iron temperature, several other operation indices that are influenced by the furnace heat and relatively unaffected by the heat removal at the hearth are used.
[0093] For example, the analytical value of the Si concentration in the molten iron, or the calculated slag temperature or the equilibrium Mn concentration of the slag-metal interface reaction (see Nippon Steel & Sumitomo Metal Technical Report No. 413 (2019), pp. 123-129, Behavior of Molten Iron and Slag in the Lower Part of a Blast Furnace and Its Application to Thermal Indicators), can be used as another operational indicator that is affected by furnace heat and relatively unaffected by heat removal at the hearth. Here, the analytical value of the Si concentration in the molten iron is explained as being used as another operational indicator that is affected by furnace heat and relatively unaffected by heat removal at the hearth.
[0094] The vector y HMT and is defined by equation (30).
[0095]
number
[0096] The actual measured value of the molten iron temperature and the analytical value of the silicon concentration in the molten iron contain not only the actual thermal fluctuation components in the furnace that are common to both values, but also other abnormal fluctuation components. For example, the actual measured value of the molten iron temperature is superimposed with thermal fluctuations due to the effect of heat removal in the hearth, and the analytical value of the silicon concentration in the molten iron is superimposed with fluctuations caused by analytical errors, etc.
[0097] In this embodiment, the vector y HMT and vector y Si and are arranged to generate a matrix X shown in equation (31), and a principal component analysis is performed on matrix X.
[0098]
number
[0099]
number
[0100] Here, the coefficient a multiplied by the first principal component PC1 in equation (32) is 11 and coefficient a 21 If and have the same sign, the first principal component PC1 can be interpreted as a factor that can commonly explain the fluctuations of the molten iron temperature and the i concentration in the molten iron over time. In this case, the vector y HMT The first principal component PC1 constituting the above can be regarded as the thermal fluctuation component in the actual furnace.
[0101] FIG. 4 is a graph showing an example of the change in the measured value y0 of the molten iron temperature. The horizontal axis of FIG. 4 indicates time, and the vertical axis indicates temperature, showing the change in the measured value of the molten iron temperature over time. The measured value y0 of the molten iron temperature repeats small amplitudes of rise and fall, but for example, a particularly prominent drop can be seen at the position circled in the figure. Such a prominent drop is highly likely to be an abnormal fluctuation due to, for example, the effect of heat extraction at the hearth.
[0102] Fig. 5 is a graph showing an example of the change in the analytical value of the Si concentration in the molten iron. The horizontal axis of Fig. 5 shows time, and the vertical axis shows concentration. S The change in the Si concentration in the molten iron is shown in Fig. SThe value of the 100% 100% 15 ...
[0103] The measured values of the molten iron temperature shown in Fig. 4 are arranged in time series as a vector y HMT The analytical values of the Si concentration in the molten iron shown in Fig. 5 are arranged in time series as a vector y Si The coefficients a obtained from the principal component analysis based on 11 The value of is 0.707, and the coefficient a 21 The value of was 0.707. In this case, the coefficient a 11 and coefficient a 21 Since and have the same sign, the vector y HMT The first principal component PC1 constituting the above can be regarded as the thermal fluctuation component in the actual furnace.
[0104] FIG. 6 is a graph in which the first principal component PC1 obtained as a result of the principal component analysis is plotted superimposed on the change in the measured value y0 of the molten iron temperature shown in FIG.
[0105] In Fig. 6, the horizontal axis indicates time and the vertical axis indicates temperature, and the graph shows the changes over time in the measured molten iron temperature y0 and the first principal component PC1.
[0106] FIG. 7 shows the analytical value y of the Si concentration in the molten iron shown in FIG. S This is a graph in which the first principal component PC1 obtained as a result of principal component analysis is plotted on top of the changes in
[0107] In actual practice, the principal component analysis is performed after standardizing the data (average 0, variance 1), but when plotting the first principal component on the graph in Figures 6 and 7, the first principal component is converted into units of the molten iron temperature and the Si concentration in the molten iron. When converting the first principal component into units of the molten iron temperature, the calculation shown in Equation (33) is performed.
[0108]
number
[0109] Similarly, the first principal component can be converted into the unit system of the Si concentration in the molten iron.
[0110] In Fig. 6, the horizontal axis indicates time and the vertical axis indicates temperature. S and the change over time of the first principal component PC1 are shown.
[0111] As can be seen from Fig. 6, the time when the first principal component PC1 rises or falls is almost the same as the time when the measured value y0 of the molten iron temperature rises or falls, respectively, and the measured value y0 of the molten iron temperature changes with the change in the first principal component PC1. Also, as can be seen from Fig. 7, the time when the first principal component PC1 rises or falls is almost the same as the time when the analyzed value y0 of the Si concentration in the molten iron S The times at which the first principal component PC1 rises and falls are almost equal, respectively, and the measured value y0 of the molten iron temperature changes with the change in the first principal component PC1.
[0112] As can be seen from the circled positions in Figs. 6 and 7, the measured value of the molten iron temperature y0 and the analyzed value of the Si concentration in the molten iron y S No significant increase or decrease in temperature occurs in the first principal component PC1. For this reason, the first principal component can be used as a value that more accurately represents the temperature by removing abnormal fluctuations such as the effect of heat removal in the hearth from the actual measured value of the molten iron temperature.
[0113] Therefore, in this embodiment, the value of ΔT(k) used in the calculation of equation (26) is replaced with the value of the change in the first principal component PC1, and the calculated value t k The calculated value t k A linear regression model of equation (29) is generated using the above equation, and the regression coefficient vector w is obtained.
[0114] In this way, an accurate regression coefficient vector w can be obtained. Then, by substituting the calculated regression coefficient vector w into equation (24) and performing the calculation, it becomes possible to accurately estimate the change in the molten iron temperature ΔT.
[0115] (Control device configuration) Fig. 8 is a block diagram showing a configuration example of a control device for controlling a blast furnace process. The control device 200 shown in Fig. 8 is a device that observes an operation index and controls the blast furnace process. As shown in Fig. 8, the control device 200 has an estimation unit 201 and an operation control unit 202.
[0116] The estimation unit 201 estimates the observation amount to be observed in the future and the state of the blast furnace corresponding to the observation amount based on various operation indicators, and outputs the estimated value. The estimation unit 201 is supplied with information indicating the operation amount related to the operation of the blast furnace from an operation unit (not shown).
[0117] The operation control unit 202 controls the determination of the operation amount for the blast furnace so as to optimize the operation of the blast furnace based on the estimation result of the estimation unit 201. For example, when it is estimated that the molten iron temperature will rise above the target temperature, the operation amount for the next operation is controlled so that the molten iron temperature will be lowered by the next operation. The operation amount is, for example, the blast amount, the pulverized coal injection amount, etc.
[0118] As shown in FIG. 8, the estimation unit 201 includes a disturbance estimation unit 211 , a temperature change amount estimation unit 212 , and a state / observation amount estimation unit 213 .
[0119] The disturbance estimation unit 211 uses a state space model (equations (3) and (4)) that estimates observable quantities that can be observed with a relatively fast time response to operations and disturbances on the blast furnace and the state of the blast furnace corresponding to the observable quantities that can be observed with a relatively fast time response, and a disturbance estimation observer, to estimate a disturbance value from the observable quantities observed when a first time has elapsed after operations on the blast furnace.
[0120] The state space model expressed by equations (3) and (4) will be referred to as the first state space model as appropriate. Observable quantities that can be observed with a relatively fast time response to operations and disturbances on the blast furnace related to the first state space model include gas composition, carbon solution loss (CSL), CO utilization rate, H2 utilization rate, and iron production rate.
[0121] That is, the disturbance estimation unit 211 uses the operation amount u(k) related to the input operation and the actually measured observation amount y(k) to solve the above-mentioned equations (5) to (7) to obtain the disturbance estimated value d^(k). Then, an equation is generated that linearizes the obtained disturbance estimated value d^(k) as shown in the above-mentioned equation (8).
[0122] The temperature change amount estimation unit 212 estimates the amount of change in the molten iron temperature from the disturbance value estimated by the disturbance estimation unit 211.
[0123] The state / observable estimation unit 213 generates a state space model using the state space model (equations (1) and (2)) that estimates the state of the blast furnace corresponding to the observables including the observables observable with a relatively slow time response to operations on the blast furnace and disturbances and the observables including the observables with a relatively slow time response, and the change in the molten iron temperature ΔT(k) estimated by the temperature change estimation unit 212, and estimates the observables observed when a second time longer than the first time has elapsed after operations on the blast furnace and the state of the blast furnace corresponding to the observables.
[0124] The state space model expressed by equations (1) and (2) is referred to as the second state space model. Observable quantities that can be observed with a relatively slow time response to operations and disturbances related to the second state space model include molten iron Si, molten iron temperature, etc.
[0125] That is, the state and observed quantity estimator 213 generates a state space model represented by equations (15) to (17) by adding the influence of disturbances such as those used in equations (5) to (7) and the change amount ΔT of the molten iron temperature to equations (1) and (2) that indicate the state of the blast furnace, including observed quantities that can be observed with a relatively slow time response to operations and disturbances. Furthermore, the state and observed quantity estimator 213 makes it possible to calculate the estimated values of the observed quantities at future prediction times kp=1, 2, ..., Hp in the state space model represented by equations (15) to (17). That is, a state space model represented by equations (19), (20), and (21) is generated.
[0126] The state space model expressed by equations (19), (20) and (21) will be referred to as a third state space model as appropriate.
[0127] Then, the observation quantity (molten iron temperature) to be observed in the future and the state of the blast furnace corresponding to the observation quantity are estimated by this third state space model. That is, an estimated value of the molten iron temperature at time k+kp is calculated as the observation quantity y0^(k+kp) expressed by the above-mentioned equation (21). Also, an estimated value of the state of the blast furnace x0^(k+kp) expressed by the above-mentioned equation (19) is calculated.
[0128] The estimation unit 201 supplies the estimation result of the state / observable quantity estimation unit 213 to the operation control unit 202 .
[0129] The state / observation quantity estimator 213 may be included in the operation controller 202. In this case, the estimator 201 may supply the molten iron temperature change amount ΔT(k) calculated by the temperature change amount estimator 212 to the operation controller 202.
[0130] (Example of the configuration of the temperature change amount estimation unit) Fig. 9 is a block diagram showing a detailed configuration example of the temperature change amount estimation unit 212 in Fig. 8. In this example, the temperature change amount estimation unit 212 has an actual measurement value acquisition unit 231, a principal component analysis execution unit 232, a regression coefficient calculation unit 233, and an estimation calculation execution unit 234.
[0131] The actual measurement value acquisition unit 231 acquires the actual measurement value of the molten iron temperature and the actual measurement values of other operation indices at each time. As the actual measurement value of the other operation indices, for example, the analysis value of the Si concentration in the molten iron is acquired. That is, the actual measurement value acquisition unit 231 acquires the actual measurement value of the molten iron temperature and the analysis value of the Si concentration in the molten iron in time series.
[0132] The actual measured value of the molten iron temperature and the analytical value of the Si concentration in the molten iron at each time may be measured by the actual measured value acquisition unit 231, or values measured by an external measuring instrument may be supplied to the actual measured value acquisition unit 231.
[0133] The principal component analysis execution unit 232 calculates the vector y HMT and a vector y Si Then, the principal component analysis execution unit 232 generates the vector y HMT and vector y Si and are arranged to generate a matrix X shown in equation (31), and a principal component analysis is performed on matrix X.
[0134] As a result, the principal components of each vector are reconstructed by a linear combination as shown in equation (32). As a result, the first principal component PC1 and the second principal component PC2 are obtained as described above.
[0135] The regression coefficient calculation unit 233 generates multiple regression equations in which the actual measured values of the molten iron temperature acquired in time series are used as the objective variable and the estimated disturbance values are used as the explanatory variables, and calculates the coefficients of the regression model by substituting the value obtained by converting the time series values of the first principal component of the principal component analysis into temperature as the actual measured values of the molten iron temperature.
[0136] That is, the regression coefficient calculation unit 233 replaces the value of ΔT(k) used in the calculation of equation (26) with the value of the change in the first principal component PC1 converted into the unit system of the molten iron temperature, and calculates the calculated value t kThe calculated value t k Using this, the regression coefficient calculation unit 233 generates a linear regression model of the equation (29) and obtains the vector w, which is the regression coefficient.
[0137] The estimation calculation execution unit 234 uses the coefficients (vector w) calculated based on the results of the principal component analysis to execute a calculation related to estimating the amount of change in the molten iron temperature using a regression model with the estimated disturbance value as an explanatory variable.
[0138] That is, the estimation calculation execution unit 234 estimates the amount of change ΔT in the molten iron temperature by substituting the vector w of the regression coefficients calculated by the regression coefficient calculation unit 233 into equation (24) and executing a calculation.
[0139] (Control process flow) Next, a description will be given of the flow of control processing by the control device 200. Fig. 10 is a flowchart illustrating an example of the control processing.
[0140] In step S101, the disturbance estimation unit 211 uses a first state space model that estimates an observable quantity that can be observed with a relatively fast time response to operations or disturbances on the blast furnace and the state of the blast furnace corresponding to that observable quantity, and a disturbance estimation observer to estimate a disturbance value from the observable quantity observed when a first time has elapsed after operations on the blast furnace.
[0141] In step S102, the temperature change amount estimation unit 212 executes a temperature change amount estimation process to estimate the amount of change in the molten iron temperature from the disturbance value estimated in the process of step S101.
[0142] In step S103, the state / observable estimation unit 213 generates a second state space model that estimates the observables including observables that can be observed with a relatively slow time response to operations on the blast furnace and disturbances, and the state of the blast furnace corresponding to the observables, and a third state space model that uses the change in molten iron temperature calculated in the processing of step S102, and estimates the observables observed when a second time longer than the first time has elapsed after operations on the blast furnace, and the state of the blast furnace corresponding to the observables.
[0143] In step S104, the operation control unit 202 determines the amount of operation related to the next operation based on the estimation result by the processing in step S103 so as to optimize the operation of the blast furnace.
[0144] In this manner, the control process is carried out.
[0145] (Flow of temperature change estimation process) Next, a detailed example of the temperature change amount estimation process in step S102 of Fig. 10 will be described. Fig. 11 is a flowchart illustrating an example of the temperature change amount estimation process.
[0146] In step S121, the actual measurement value acquisition unit 231 acquires the actual measurement value of the molten iron temperature and the actual measurement values of other operation indices at each time. As the actual measurement value of the other operation indices, for example, the analysis value of the Si concentration in the molten iron is acquired. That is, the actual measurement value acquisition unit 231 acquires the actual measurement value of the molten iron temperature and the analysis value of the Si concentration in the molten iron in time series.
[0147] In step S122, the principal component analysis execution unit 232 calculates the vector y HMT and the vector y Si Then, the principal component analysis execution unit 232 generates the vector y HMT and vector y Si and are arranged to generate a matrix X shown in equation (31), and a principal component analysis is performed on matrix X.
[0148] In step S123, the regression coefficient calculation unit 233 generates multiple regression equations in which the actual measured values of the molten iron temperature acquired in time series are used as the objective variable and the estimated disturbance values are used as the explanatory variables, and calculates the coefficients of the regression model by substituting the value obtained by converting the time series values of the first principal component of the principal component analysis into temperature as the actual measured values of the molten iron temperature.
[0149] At this time, the regression coefficient calculation unit 233 replaces the value of ΔT(k) used in the calculation of equation (26) with the value of the change in the first principal component PC1 converted into the unit system of the molten iron temperature, and calculates the calculated value t k The calculated value t k Using this, the regression coefficient calculation unit 233 generates a linear regression model of the equation (29) and obtains the vector w, which is the regression coefficient.
[0150] In step S124, the estimation calculation execution unit 234 uses the coefficients (vector w) calculated based on the results of the principal component analysis to execute a calculation to estimate the amount of change in the molten iron temperature using a regression model with the estimated disturbance value as an explanatory variable.
[0151] At this time, the estimation calculation execution unit 234 estimates the amount of change ΔT in the molten iron temperature by substituting the vector w of the regression coefficients calculated in step S123 into equation (24) and executing a calculation.
[0152] In this manner, the temperature change amount estimation process is performed.
[0153] The processes of steps S121 to S123 may be executed in advance, and the coefficients calculated in step S123 may be stored in the estimation unit 201. In this case, as the process of step S102 in Fig. 10, only step S124 in Fig. 11 may be executed.
[0154] (Verification of the estimation results) Fig. 12 is a graph related to verification of the estimation result of the amount of change in the molten pig iron temperature according to this embodiment. The graph in Fig. 12 shows the accuracy of the calculation result of the amount of change in the molten pig iron temperature using the method according to this embodiment.
[0155] In this verification, as described above, the amount of change in the molten iron temperature estimated by calculating the coefficient (vector w) and substituting it into equation (24) and performing a calculation is compared with the amount of change in the molten iron temperature calculated from the actual measured value of the molten iron temperature.
[0156] In Fig. 12, the vertical axis is the estimated value and the horizontal axis is the measured value, and the estimated value corresponding to the measured value of the change in the molten iron temperature is plotted. As can be seen from this graph, good results were obtained for the estimation of the change in the molten iron temperature. The R 2 was 0.3585.
[0157] (Effects of the First Embodiment) As described above, according to this embodiment, the amount of change in the molten iron temperature is obtained from an observable quantity that can be observed with a relatively fast time response to operations or disturbances, and the obtained amount of change in the molten iron temperature can be applied to the state of the blast furnace including an observable quantity that can be observed with a relatively slow time response to operations or disturbances. Therefore, when an observable quantity that can be observed with a relatively fast time response to operations or disturbances is observed, it is possible to estimate an observable quantity that can be observed with a relatively slow time response to operations or disturbances.
[0158] According to the present embodiment, the amount of change in the molten iron temperature is estimated by a regression model in which the disturbance values estimated from the observation values observed after a relatively short time has passed are used as explanatory variables in response to the operation or disturbance of the blast furnace, making it possible to estimate the molten iron temperature by simple calculation.
[0159] Furthermore, according to this embodiment, the regression coefficients of the regression model are calculated not from the actual measured value of the change in the molten iron temperature, but from a value that more accurately represents the temperature by removing abnormal fluctuations, such as the effect of heat removal from the hearth, from the actual measured value of the molten iron temperature. That is, the regression coefficients are calculated using values obtained by performing a principal component analysis of a vector including not only the time series value of the change in the molten iron temperature, but also the time series value of another operation index (e.g., the Si concentration in the molten iron) that is affected by the furnace heat and relatively unaffected by heat removal from the hearth. Therefore, the regression model makes it possible to accurately estimate the change in the molten iron temperature.
[0160] As a result, according to this embodiment, by feeding back changes in observation quantities (e.g., gas utilization rate, CSL) observed at relatively early timing, it becomes possible to accurately determine the operation quantities so that the observation quantities observed at relatively late timing (e.g., molten iron temperature) approach the target values. In other words, it becomes possible to execute control that appropriately determines the operation quantities of the blast furnace without waiting for the observation results of the observation quantities that can be observed at relatively late timing.
[0161] <Second embodiment> In the first embodiment, the regression coefficient calculation unit 233 of the temperature change estimation unit 212 replaces the value of ΔT(k) used in the calculation of equation (26) with the value of the change in the first principal component PC1 converted into the unit system of the molten iron temperature, and calculates the calculated value t k It was explained that the calculation
[0162] However, for example, the amount of change in the measured value of the molten iron temperature may be used as the value of ΔT(k) used in the calculation of equation (26). In this case, however, as described above, it is necessary to remove abnormal fluctuations such as the influence of heat removal from the hearth from the measured value of the molten iron temperature y0(k). The abnormal fluctuations such as the influence of heat removal from the hearth correspond to the temperatures at the positions circled in Fig. 4, for example. In other words, by removing the measured values at the times corresponding to the positions circled in Fig. 4, the abnormal fluctuations such as the influence of heat removal from the hearth can be removed.
[0163] 6, as can be seen from the circled positions in the figure, the value obtained by converting the first principal component into the unit system of the molten iron temperature does not show any significant increase or decrease in the actual measured value of the molten iron temperature. Therefore, it is only necessary to identify the time when the actual measured value of the molten iron temperature and the value obtained by converting the first principal component into the unit system of the molten iron temperature deviate by, for example, a predetermined threshold value or more, and exclude the actual measured value at that time.
[0164] In this embodiment, the regression coefficient calculation unit 233 identifies the time at which the value obtained by converting the time series value of the first principal component of the principal component analysis to temperature deviates from the actual measured value of the molten iron temperature by more than a predetermined threshold value, selects the actual measured values of the molten iron temperature obtained in time series, excluding the actual measured values at the identified time, and calculates the coefficients of the regression model using the selected actual measured values of the molten iron temperature.
[0165] By doing so, it is possible to calculate accurate regression coefficients when calculating the regression coefficients of the regression model of equation (29).
[0166] (Another example of the flow of the temperature change estimation process) In the second embodiment, the contents of the temperature change estimation process executed in step S102 in Fig. 10 are partially different. Fig. 13 is a flowchart illustrating an example of the temperature change estimation process according to the second embodiment.
[0167] The processes in steps S141 and S142 are similar to those in steps S121 and S122 in FIG. 11, and therefore will not be described in detail.
[0168] In step S143, the regression coefficient calculation unit 233 identifies the time at which the value obtained by converting the time series value of the first principal component of the principal component analysis in step S142 into temperature deviates from the actual measured value of the molten iron temperature by a predetermined threshold value or more. Then, the regression coefficient calculation unit 233 selects actual measured values of the molten iron temperature excluding the actual measured values at the identified time from the actual measured values of the molten iron temperature acquired in time series in step S141, and calculates the coefficients of the regression model using the selected actual measured values of the molten iron temperature.
[0169] At this time, the regression coefficient calculation unit 233 calculates the value of ΔT(k) used in the calculation of the formula (26) from the actual measured values of the molten iron temperature acquired in time series, excluding the actual measured values at the specified time, and calculates the calculated value t k The calculated value t k Using this, the regression coefficient calculation unit 233 generates a linear regression model of the equation (29) and obtains the vector w, which is the regression coefficient.
[0170] The process of step S144 is similar to the process of step S124 in FIG. 11, and therefore a detailed description thereof will be omitted.
[0171] In this manner, the temperature change amount estimation process in the second embodiment is executed.
[0172] <Other embodiments> In the first and second embodiments, an example has been described in which only the analytical value of the Si concentration in the molten iron is used as another operation index that is affected by furnace heat and relatively unaffected by heat removal in the hearth, but other operation indexes may also be used. That is, when generating the matrix X on which the principal component analysis is performed, at least the actual measured value of the molten iron temperature at each time and the analytical value of the Si concentration in the molten iron should be obtained.
[0173] For example, the vector y HMT and vector y Si In addition to the above, vectors may be obtained that are time-series vectors of actual measured values of operational indicators such as the calculated slag temperature and the equilibrium Mn concentration of the slag-metal interface reaction. The vectors obtained are then denoted as vector y HMT and vector y Si may be arranged together to generate a matrix X, and a principal component analysis may be performed on the matrix X. Note that the more such operational indexes there are, the more accurate the principal component analysis can be performed.
[0174] <Example of software implementation> The functions of the control device 200 are implemented by a program for causing a computer to function as the device, and can be realized by a program for causing a computer to function as each block of the device.
[0175] Fig. 14 is a block diagram illustrating a physical configuration of a computer used as the control device 200. As shown in Fig. 14, the control device 200 can be configured by a computer including a bus 510, a processor 501, a main memory 502, an auxiliary memory 503, a communication interface 504, and an input / output interface 505. The processor 501, the main memory 502, the auxiliary memory 503, the communication interface 504, and the input / output interface 505 are connected to one another via the bus 510. An input device 506 and an output device 507 are connected to the input / output interface 505.
[0176] The processor 501 may be, for example, a CPU (Central Processing Unit), a microprocessor, a digital signal processor, a microcontroller, or a combination of these.
[0177] The main memory 502 may be, for example, a semiconductor RAM (random access memory).
[0178] For example, a flash memory, a hard disk drive (HDD), a solid state drive (SSD), or a combination of these may be used as the auxiliary memory 503. A program for causing the processor 501 to execute the above-mentioned operation of the control device 200 is stored in the auxiliary memory 503. The processor 501 loads the program stored in the auxiliary memory 503 onto the main memory 502, and executes each instruction included in the loaded program.
[0179] The communication interface 504 is an interface for connecting to a network.
[0180] As the input / output interface 505, for example, a USB interface, a short-range communication interface such as infrared or Bluetooth (registered trademark), or a combination of these is used.
[0181] The input device 506 may be, for example, a keyboard, a mouse, a touch pad, a microphone, or a combination of these. The output device 507 may be, for example, a display, a printer, a speaker, or a combination of these.
[0182] When the functions of the control device 200 are realized by a program for causing a computer to function as the device, the functions described in each of the above embodiments are realized by executing the above program by a processor 501 and a main memory 502.
[0183] The program may be non-transitory and may be recorded in one or more computer-readable recording media. The recording media may or may not be included in the device. In the latter case, the program may be provided to the device via any wired or wireless transmission medium.
[0184] In addition, some or all of the functions of the above-mentioned blocks may be realized by logic circuits. For example, an integrated circuit in which a logic circuit that functions as each of the above-mentioned control blocks is formed is also included in the scope of the present invention.
[0185] Furthermore, some or all of the functions of each of the above blocks may operate on the above device, or may operate on another device (for example, an edge computer or a cloud server, etc.).
[0186] The present invention is not limited to the above-described embodiments, and various modifications are possible within the scope of the claims. Embodiments obtained by appropriately combining the technical means disclosed in different embodiments are also included in the technical scope of the present invention.
[0187] 〔summary〕 A control device according to a first aspect of the present invention is a control device for controlling a process of a blast furnace, and includes a first state space model for estimating an observable quantity that is observable with a relatively fast time response to an operation or disturbance on the blast furnace and a state of the blast furnace corresponding to the observable quantity that is observable with the relatively fast time response, and a disturbance estimation observer, and includes a disturbance estimation unit that estimates a disturbance value from an observation quantity observed when a first time has elapsed after an operation on the blast furnace, a temperature change estimation unit that estimates a change in molten iron temperature from the estimated disturbance value, a second state space model that estimates a state of the blast furnace corresponding to an observation quantity including an observable quantity that is observable with a relatively slow time response to an operation or disturbance on the blast furnace and an observation quantity including the observable quantity that is observable with the relatively slow time response, and the change in molten iron temperature estimated by the temperature change estimation unit. the temperature change estimation unit comprises: a state observation quantity estimation unit that generates a third state space model and estimates an observation quantity observed when a second time longer than the first time has elapsed after operation on the blast furnace and a state of the blast furnace corresponding to the observation quantity; and an operation quantity determination unit that determines an operation quantity for a next operation on the blast furnace based on a result of the estimation by the state observation quantity estimation unit, wherein the temperature change estimation unit comprises: a principal component analysis execution unit that acquires at least an actual measurement value of the molten iron temperature and an analytical value of the Si concentration in the molten iron in time series and performs principal component analysis on a matrix obtained from the time series actual measurement value of the molten iron temperature and the analytical value of the Si concentration in the molten iron; and an estimation calculation execution unit that uses coefficients calculated based on the analysis result of the principal component analysis to perform a calculation related to estimating an amount of change in the molten iron temperature by a regression model in which the estimated disturbance value is an explanatory variable.
[0188] The control device according to a second aspect of the present invention is the same as in the first aspect above, and further includes a regression coefficient calculation unit that generates a plurality of regression equations in which the actual measured values of the molten iron temperature acquired in time series are used as objective variables and the estimated disturbance values are used as explanatory variables, and calculates coefficients of the regression model by substituting the value obtained by converting the time series values of the first principal component of the principal component analysis into temperature as the actual measured value of the molten iron temperature.
[0189] The control device according to aspect 3 of the present invention, in accordance with aspect 1 above, further comprises a regression coefficient calculation unit, wherein the temperature change estimation unit generates a plurality of regression equations in which the actual measured values of the molten iron temperature acquired in time series are used as objective variables and the estimated disturbance values are explanatory variables, identifies a time at which the value obtained by converting the time series value of the first principal component of the principal component analysis into temperature deviates from the actual measured value of the molten iron temperature by more than a predetermined threshold, selects an actual measured value of the molten iron temperature acquired in time series excluding the actual measured value at the identified time, and calculates coefficients of the regression model using the selected actual measured values of the molten iron temperature.
[0190] A control device according to a fourth aspect of the present invention is configured in any one of the first to third aspects, wherein the observable quantity that can be observed with a relatively fast time response related to the first state space model is at least one of gas composition, carbon solution loss amount, CO utilization rate, H utilization rate, and iron tapping rate, and the observable quantity that can be observed with a relatively slow time response related to the second state space model is at least one of molten iron Si and molten iron temperature.
[0191] A control device according to a fifth aspect of the present invention is in any one of the first to fourth aspects, wherein the manipulated variable is an air flow rate or an amount of pulverized coal injection.
[0192] A control method according to a sixth aspect of the present invention is a control method for a control device that controls a process of a blast furnace, comprising: a first state space model that estimates an observable quantity that is observable with a relatively fast time response to an operation or disturbance on the blast furnace and a state of the blast furnace corresponding to the observable quantity that is observable with the relatively fast time response; and a disturbance estimation observer; a disturbance estimation step that estimates a disturbance value from an observation quantity observed when a first time has elapsed after an operation on the blast furnace; a temperature change estimation step that estimates a change in molten iron temperature from the estimated disturbance value; a second state space model that estimates a state of the blast furnace corresponding to an observation quantity including an observable quantity that is observable with a relatively slow time response to an operation or disturbance on the blast furnace and an observation quantity including the observable quantity that is observable with the relatively slow time response; and a second state space model that estimates a state of the blast furnace corresponding to an observation quantity including an observation quantity that is observable with a relatively slow time response to an operation or disturbance on the blast furnace and the change in molten iron temperature estimated by the processing of the temperature change estimation step. the temperature change estimation step includes a principal component analysis execution step of acquiring at least an actual measurement value of the molten iron temperature and an analytical value of the Si concentration in the molten iron in time series, and executing a principal component analysis on a matrix obtained from the actual measurement value of the molten iron temperature and the analytical value of the Si concentration in the molten iron in time series, and an estimation calculation execution step of executing a calculation related to an estimation of an amount of change in the molten iron temperature by a regression model using coefficients calculated based on the analysis result of the principal component analysis and having the estimated disturbance value as an explanatory variable. [Explanation of symbols]
[0193] 1 Blast Furnace Process 200 Control device 201 Estimation Department 202 Operation control section 211 Disturbance Estimation Unit 212 Temperature change amount estimation unit 213 State and Observation Estimation Unit 231 Actual value acquisition unit 232 Principal Component Analysis Execution Unit 233 Regression coefficient calculation unit 234 Estimation Calculation Execution Unit
Claims
1. A control device for controlling a process of a blast furnace, comprising: a disturbance estimation unit that estimates a disturbance value from an observation amount observed when a first time has elapsed after an operation on the blast furnace, using a first state space model and a disturbance estimation observer that estimates an observation amount that is observable with a relatively fast time response to an operation or disturbance on the blast furnace and a state of the blast furnace corresponding to the observation amount that is observable with the relatively fast time response; a temperature change estimation unit that estimates a change in the molten iron temperature from the estimated disturbance value; a state observation quantity estimator that generates a second state space model that estimates an observation quantity including an observation quantity observable with a relatively slow time response to operations on the blast furnace or disturbances and a state of the blast furnace corresponding to the observation quantity including the observation quantity observable with a relatively slow time response, and a third state space model that uses the amount of change in the molten iron temperature estimated by the temperature change quantity estimator, and estimates an observation quantity observed when a second time longer than the first time has elapsed after operations on the blast furnace and a state of the blast furnace corresponding to the observation quantity; an operation amount determination unit that determines an operation amount related to the next operation of the blast furnace based on the estimation result of the state observation amount estimation unit; having The temperature change amount estimation unit a principal component analysis execution unit that acquires at least an actual measurement value of the molten iron temperature and an analysis value of the Si concentration in the molten iron in a time series and executes a principal component analysis on a matrix obtained from the actual measurement value of the molten iron temperature and the analysis value of the Si concentration in the molten iron in the time series; an estimation calculation execution unit that uses coefficients calculated based on the analysis results of the principal component analysis to execute a calculation related to an estimation of an amount of change in the molten iron temperature by a regression model having the estimated disturbance value as an explanatory variable; A control device comprising:
2. The temperature change amount estimation unit generating a plurality of regression equations in which the actual measured values of the molten iron temperature acquired in time series are set as objective variables and the estimated disturbance values are set as explanatory variables; 2. The control device according to claim 1, further comprising a regression coefficient calculation unit that calculates coefficients of the regression model by substituting a value obtained by converting a time series value of a first principal component of the principal component analysis into temperature as an actual measured value of a molten iron temperature.
3. The temperature change amount estimation unit generating a plurality of regression equations in which the actual measured values of the molten iron temperature acquired in time series are set as objective variables and the estimated disturbance values are set as explanatory variables; Identifying a time at which a value obtained by converting the time series value of the first principal component of the principal component analysis into a temperature deviates from the actual measured value of the molten iron temperature by a predetermined threshold value or more, and selecting an actual measured value excluding the actual measured value at the identified time from the actual measured values of the molten iron temperature acquired in time series; The control device according to claim 1 , further comprising a regression coefficient calculation unit that calculates coefficients of the regression model using the selected actual measured value of the molten iron temperature.
4. The observable quantities that can be observed with a relatively fast time response related to the first state space model are the gas composition, the amount of carbon solution loss, the CO utilization rate, H 2 At least one of the utilization rate and the amount of hot metal produced; 2. The control device according to claim 1, wherein the observable quantity that can be observed with a relatively slow time response related to the second state space model is at least one of molten iron Si and molten iron temperature.
5. The control device according to claim 1 , wherein the manipulated variable is an air blowing amount or an amount of pulverized coal injection.
6. A control method for a control device that controls a process of a blast furnace, comprising: a disturbance estimation step of estimating a disturbance value from an observation quantity observed when a first time has elapsed after an operation on the blast furnace, using a first state space model that estimates an observation quantity that is observable with a relatively fast time response to an operation or disturbance on the blast furnace and a state of the blast furnace corresponding to the observation quantity that is observable with the relatively fast time response, and a disturbance estimation observer; a temperature change estimation step of estimating a change in the molten iron temperature from the estimated disturbance value; a state observation quantity estimation step of generating a second state space model that estimates an observation quantity including an observation quantity observable with a relatively slow time response to operations on the blast furnace or disturbances and a state of the blast furnace corresponding to the observation quantity including the observation quantity observable with a relatively slow time response, and a third state space model that uses the amount of change in the molten iron temperature estimated by the processing in the temperature change quantity estimation step, and estimating an observation quantity observed when a second time longer than the first time has elapsed after operations on the blast furnace and a state of the blast furnace corresponding to the observation quantity; an operation amount determination step of determining an operation amount related to the next operation of the blast furnace based on the estimation result of the state observation amount estimation step; having The temperature change amount estimation step includes: a principal component analysis execution step of acquiring at least an actual measurement value of the molten iron temperature and an analysis value of the Si concentration in the molten iron in a time series, and executing a principal component analysis on a matrix obtained from the actual measurement value of the molten iron temperature and the analysis value of the Si concentration in the molten iron in the time series; an estimation calculation execution step of executing a calculation for estimating an amount of change in the molten iron temperature by a regression model using coefficients calculated based on the analysis results of the principal component analysis and the estimated disturbance value as an explanatory variable; The control method includes:
Citation Information
Patent Citations
Controller, method, and program
JP2023025646A
Method and device for predicting molten iron temperature, operation method of blast furnace, operation guidance device, and method and device for controlling molten iron temperature
JP2019019385A
Cited By
Blast furnace operation methods
JP7931446B1
