Carbon dioxide emission management system and carbon dioxide emission management method
The carbon dioxide emission management system simplifies the tracking and reduction of emissions from construction machines by identifying energy sources, calculating loads, and creating plans to align with targets, addressing the complexity of diverse energy types and suppliers.
Patent Information
- Application Number
- JP2023065398
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-13
- Publication Date
- 2024-10-25
Smart Images

Figure 2024151754000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a carbon dioxide emission management system and a carbon dioxide emission management method. [Background technology]
[0002] In recent years, there has been a demand for managing and reducing carbon dioxide emissions. For example, Patent Document 1 discloses a carbon dioxide emission management device that manages the amount of carbon dioxide emissions emitted from manufacturing equipment at each base. The carbon dioxide emission management device converts the amount of power consumption input for each manufacturing equipment into a carbon dioxide emission amount based on a carbon dioxide conversion value. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2009-199495 A Summary of the Invention [Problem to be solved by the invention]
[0004] Meanwhile, in construction work, multiple types of construction machinery that use different energy sources (fuel, electricity, etc.) are used. In addition, in construction work, there are cases where subcontractors other than the main construction company participate in the work, or when construction work is ordered as a joint venture, and construction machinery from multiple businesses is mixed at one construction site. For this reason, management of carbon dioxide emissions from construction machinery used in construction work can easily become complicated. [Means for solving the problem]
[0005] A carbon dioxide emission management system that solves the above problems identifies a source of energy supply to construction machinery used in construction work, identifies the carbon dioxide emission unit of the energy supplied by the source to the construction machinery, calculates a carbon dioxide emission load based on the carbon dioxide emission unit and the amount of the energy supplied to the construction machinery, records the carbon dioxide emission load in association with first identification information of the construction machinery, and outputs a comparison with a carbon dioxide emission target according to the carbon dioxide emission load. Effect of the Invention
[0006] According to the present invention, the carbon dioxide emission load of each construction machine can be easily managed. [Brief description of the drawings]
[0007] [Figure 1] FIG. 1 is a schematic diagram of a carbon dioxide emission management system. [Diagram 2] FIG. 2 is a block diagram of a reading terminal. [Diagram 3] FIG. 3 is a block diagram of the management server. [Figure 4] FIG. 4 is a table showing the contents stored in the construction machine storage unit. [Diagram 5] FIG. 5 is a table showing the contents stored in the supplier storage unit. [Figure 6] FIG. 6 is a table showing the contents stored in the supply history storage unit. [Figure 7] FIG. 7 is a flowchart showing the procedure of the supply history recording process. [Figure 8] FIG. 8 is a flowchart showing the procedures of the comparison process, the replacement plan creation process, and the supply plan creation process. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0008] Hereinafter, one embodiment of the present invention will be described with reference to FIGS. As shown in FIG. 1, a carbon dioxide emission management system 1 manages the carbon dioxide emission load of a construction machine 2 used in construction work carried out at a construction site 100. At the construction site 100, a plurality of types of construction machines 2 with different power sources (energy) are used. For example, at the construction site 100, an EV construction machine 2A powered by electricity, a hydrogen construction machine 2B powered by hydrogen, and a biofuel construction machine 2C powered by biomass fuel are used as the construction machines 2. Note that this is not limited to this, and for example, a construction machine 2 powered by gasoline, diesel, or the like may be used. Furthermore, when fuel such as gasoline or diesel is used as the power source of the construction machine 2, a fuel additive for the purpose of improving fuel efficiency may be added to the fuel.
[0009] A supply source 3 that supplies energy to the construction machine 2 is disposed at the construction site 100. For example, a portable battery 3A, a charger 3B, a hydrogen station 3C, and a tank truck 3D are disposed at the construction site 100 as the supply source 3. The portable battery 3A and the charger 3B supply power to the EV construction machine 2A. The hydrogen station 3C supplies hydrogen to the hydrogen construction machine 2B. The tank truck 3D supplies biomass fuel to the biofuel construction machine 2C.
[0010] The portable battery 3A is charged, for example, by a container-type battery 4A or a cubicle 4B installed at the construction site 100. The charger 3B is supplied with power from the cubicle 4B. The power supplied to the portable battery 3A and the charger 3B is preferably green power that has a small environmental impact and is generated by natural energy such as wind power or solar power. The cubicle 4B may supply power to facilities and equipment within the construction site 100 in addition to the portable battery 3A and the charger 3B.
[0011] Each construction machine 2 is provided with a first readable portion 5. One example of the first readable portion 5 is a two-dimensional code. The first readable portion 5 may be an RFID tag or an IC tag that uses NFC communication. In this case, it is preferable that the first readable portion 5 is less susceptible to dirt when used at the construction site 100. First identification information for identifying each construction machine 2 is recorded in the first readable portion 5.
[0012] Each supply source 3 is provided with a second readable unit 6. The second readable unit 6 is, for example, a storage medium capable of rewriting information such as an RFID tag or an IC tag using NFC communication. The second readable unit 6 stores second identification information for identifying each supply source 3, information on the amount of energy supplied to the construction machine 2, and information on the date and time of supply.
[0013] The supply source 3 includes a measuring means for measuring the amount of energy supplied to the construction machine 2, and a rewriting means for rewriting the information recorded in the second readable unit 6. When supplying energy to the construction machine 2, the supply source 3 rewrites the information on the amount of energy supplied to the construction machine 2 and the supply date and time stored in the second readable unit 6.
[0014] The carbon dioxide emission management system 1 includes a reading terminal 10, an approval terminal 20, and a management server 30. The reading terminal 10, the approval terminal 20, and the management server 30 are connected to each other via a network line. The reading terminal 10 is, for example, a mobile terminal such as a smartphone or a tablet terminal. After supplying energy from the supply source 3 to the construction machine 2, the reading terminal 10 reads the first readable portion 5 of the construction machine 2 and the second readable portion 6 of the supply source 3.
[0015] The approval terminal 20 is, for example, an information processing terminal such as a desktop computer, a laptop computer, a smartphone, or a tablet. In the approval terminal 20, the contents of the supply history of energy supplied from the supplier 3 to the construction machine 2 are displayed on a display or the like. An approval officer such as a manager or a person in charge of the construction site 100 checks the contents of the supply history displayed on the approval terminal 20 and performs approval processing of the supply history using the approval terminal 20. The approval terminal 20 includes a control unit (not shown) for performing the approval processing.
[0016] [Reading terminal 10] As shown in FIG. 2, the reading terminal 10 includes a control unit 11, a storage unit 12, a first reading unit 13, a second reading unit 14, a display unit 15, an operation unit 16, and a communication unit 17.
[0017] The control unit 11 controls the operation of each unit included in the reading terminal 10. The control unit 11 includes a processor that executes various processes by software, such as a CPU or MPU. The storage unit 12 includes a temporary memory and a non-volatile memory. The temporary memory temporarily stores data to be processed by the reading terminal 10. An example of the temporary memory is a RAM. The non-volatile memory is, for example, a flash memory, an HDD, or an SSD. The non-volatile memory stores various programs, such as application programs for an operator to operate the reading terminal 10.
[0018] The first reading unit 13 reads the first readable unit 5 provided on the construction machine 2. The first reading unit 13 is, for example, an imaging unit such as a camera capable of reading two-dimensional codes. The second reading unit 14 reads the second readable unit 6 provided on the supplier 3. The second reading unit 14 is, for example, an NFC communication unit capable of reading information on an IC tag by NFC communication.
[0019] The display unit 15 is a display that displays various information. The operation unit 16 is an input device for the worker to operate the reading terminal 10. As an example, the reading terminal 10 includes a touch panel in which the display unit 15 and the operation unit 16 are integrated. The communication unit 17 is responsible for communication with the approval terminal 20 and the management server 30 via a network line.
[0020] [Administration Server 30] 3, the management server 30 includes a control unit 31, a storage unit 32, a display unit 33, an operation unit 34, and a communication unit 35. The control unit 31 controls the operation of each unit included in the management server 30. The control unit 31 includes a processor, such as a CPU or MPU, that executes various processes using software.
[0021] The control unit 31 executes a carbon dioxide emission management program to function as a carbon dioxide load calculation unit 31A, a comparison unit 31B, a replacement plan creation unit 31C, and a supply plan creation unit 31D.
[0022] The carbon dioxide load calculation unit 31A calculates the carbon dioxide emission load of the construction machine 2 based on the carbon dioxide emission unit of the energy supplied to the construction machine 2 and the amount of energy supplied to the construction machine 2.
[0023] The comparison unit 31B outputs a comparison with the carbon dioxide emission target according to the carbon dioxide emission load calculated by the carbon dioxide load calculation unit 31A. The replacement plan creation unit 31C creates a replacement plan to replace the construction machinery 2 used in the construction work by identifying the energy type of the construction machinery 2 to be used in future processes planned for the construction work in accordance with a comparison with the carbon dioxide emission target.
[0024] The supply plan creation unit 31D calculates the required amount of the supply source 3 in accordance with the replacement plan for the construction machines 2 to be used in the future process created by the replacement plan creation unit 31C, and creates a supply plan for energy from the supply source 3 to the construction machines 2.
[0025] The storage unit 32 includes a temporary memory and a non-volatile memory. The temporary memory temporarily stores data processed by the management server 30. The temporary memory is, for example, a RAM. The non-volatile memory is, for example, a flash memory, a HDD, or an SSD. The non-volatile memory also stores programs for various processes executed by the control unit 31, such as a carbon dioxide emission management program for the control unit 31 to manage the carbon dioxide emission load of the construction machine 2 during construction work.
[0026] The non-volatile memory includes a construction machine storage unit 32A, a supply source storage unit 32B, a supply history storage unit 32C, a discharge target storage unit 32D, and a process storage unit 32E. The construction machine storage unit 32A is a database in which information on each construction machine 2 is stored in advance. The supply source storage unit 32B is a database in which information on each supply source 3 is stored in advance.
[0027] Each time energy is supplied from the supply source 3 to the construction machine 2, the carbon dioxide emission load calculated by the carbon dioxide load calculation unit 31A is stored in the supply history storage unit 32C in association with the first identification information of the construction machine 2.
[0028] The emission target memory unit 32D stores in advance carbon dioxide emission targets assigned to the construction machines 2 in construction work at the construction site 100. For example, the carbon dioxide emission targets assigned to the construction machines 2 in construction work are set as carbon dioxide emission target values for each process in accordance with the work content and work volume of the construction machines 2 in each process performed in the construction work. The sum of the carbon dioxide emission target values for each process is set as the carbon dioxide emission target value for the construction machines 2 in all processes of the construction work. For example, the emission target memory unit 32D may store carbon dioxide emission target values assigned for a predetermined period (weekly, monthly, etc.) as the carbon dioxide emission targets assigned to the construction machines 2 in construction work at the construction site 100.
[0029] The process memory unit 32E stores the construction work processes and the types and numbers of the construction machines 2 and suppliers 3 used in each process for each construction site 100. The process memory unit 32E stores the progress of the construction work by dividing the construction work processes into completed processes and future processes that have not been carried out.
[0030] The display unit 33 is a display that displays various information. The operation unit 34 is an input device for an operator to operate the management server 30. The operation unit 34 may be, for example, a mouse or a keyboard, or may be a touch panel in which the display unit 33 and the operation unit 34 are integrated. The communication unit 35 is responsible for communication with the reading terminal 10 and the approval terminal 20 via a network line.
[0031] 4, the construction machine storage unit 32A stores information about the construction machine 2, such as the construction site 100 where the construction machine 2 is used, the business establishment (branch office, cooperating company, etc.) that manages the construction machine 2, the model of the construction machine 2, the energy type corresponding to the construction machine 2, and energy efficiency, which is the amount of energy consumed per unit of work, in association with first identification information unique to each construction machine 2. Furthermore, when the construction machine 2 is an EV construction machine 2A, the construction machine storage unit 32A stores the charging time required for the internal battery of the EV construction machine 2A to be fully charged from an empty state.
[0032] The energy efficiency is calculated based on the amount of energy consumed when performing a predetermined standard operation. For example, the energy efficiency of a backhoe, which is an example of the construction machine 2, can be calculated by a method conforming to the Japan Construction Machinery and Construction Association standard JCMAS H020 "Earth-moving machines - Energy consumption test method - Hydraulic excavators."
[0033] As shown in Figure 5, the supply source memory unit 32B stores information about the supply source 3, such as the construction site 100 where the supply source 3 is used, the type of energy supplied, and the carbon dioxide emission unit of the energy supplied by each supply source 3, in association with second identification information unique to each supply source 3.
[0034] As shown in FIG. 6, the supply history memory unit 32C stores, as supply history information, the supply date and time, the construction site 100 where the supply was made, the type of energy supplied, first identification information identifying the construction machine 2, second identification information identifying the supply source 3, the carbon dioxide emission unit of the supplied energy, the amount of energy supplied, and the carbon dioxide emission load calculated in the carbon dioxide load calculation unit 31A.
[0035] [Carbon dioxide emission management method] 7 and 8, a carbon dioxide emission management method using the carbon dioxide emission management system 1 will be described below. As the carbon dioxide emission management method, the carbon dioxide emission management system 1 executes a supply history recording process, a comparison process, a replacement plan creation process, and a supply plan creation process.
[0036] [Supply history record processing] The supply history recording process will be described below with reference to Fig. 7. The supply history recording process is executed when the supply of energy from the supply source 3 to the construction machine 2 is completed. In addition, when the supply of energy to the construction machine 2 is completed, the supply source 3 rewrites and updates the information on the amount of energy supplied and the supply date and time stored in the second readable portion 6.
[0037] 7, the supply history recording process includes steps S1 to S6. First, the control unit 11 of the reading terminal 10 executes a process of acquiring first identification information of the construction machine 2 to which energy has been supplied by reading the first readable portion 5 of the construction machine 2 with the first reading unit 13 (step S1).
[0038] Next, the control unit 11 of the reading terminal 10 executes a process of acquiring the second identification information of the energy supply source 3 that supplied the energy, the amount of energy supply, and the supply date and time by reading the second readable unit 6 of the energy supply source 3 with the second reading unit 14 (step S2). After that, the control unit 11 of the reading terminal 10 executes a process of transmitting to the management server 30 the first identification information acquired in step S1, and the second identification information, the amount of energy supply, and the supply date and time acquired in step S2.
[0039] Next, the control unit 31 of the management server 30 executes a process of identifying the carbon dioxide emission intensity (step S3). Specifically, the carbon dioxide load calculation unit 31A of the management server 30 acquires the carbon dioxide emission intensity of the energy supplied by the supply source 3 from the supply source storage unit 32B based on the second identification information.
[0040] Next, the control unit 31 of the management server 30 executes a process of calculating the carbon dioxide emission load (step S4). Specifically, the carbon dioxide emission load calculation unit 31A of the management server 30 calculates the carbon dioxide emission load of the construction machine 2 by multiplying the energy supply amount transmitted from the reading terminal 10 in step S2 by the carbon dioxide emission unit determined in step S3.
[0041] Thereafter, the control unit 31 of the management server 30 transmits information capable of identifying the construction machine 2 and the supplier 3, as well as the supply date and time, the amount of energy supplied, and the carbon dioxide emission load calculated in step S4, to the approval terminal 20 as a supply history.
[0042] Next, the control unit of the approval terminal 20 executes the approval process (step S5). Specifically, after the approval staff checks the contents of the supply history transmitted to the approval terminal 20, for example, they input an approval command by operating the approval terminal 20. In response to the input of the approval command, the control unit of the approval terminal 20 notifies the management server 30 that the supply history has been approved by the approval staff.
[0043] Next, the control unit 31 of the management server 30 executes a storage process (step S6). Specifically, the control unit 31 stores the supply history approved by the approval terminal 20 in the supply history storage unit 32C. As a result, the carbon dioxide emission load calculated by the carbon dioxide load calculation unit 31A is stored in association with the first identification information that identifies the construction machine 2 in the supply history storage unit 32C.
[0044] [Comparative and planning processes] The comparison process, the replacement plan creation process, and the supply plan creation process will be described below with reference to FIG.
[0045] 8, the control unit 31 of the management server 30 executes a comparison process (step S10), a replacement plan creation process (step S20), and a supply plan creation process (step S30). These processes are performed at any timing, such as at predetermined intervals (weekly, monthly, etc.), during the construction work period.
[0046] [Contrast Processing] The comparison process in step S10 includes steps S11 to S13. First, the comparison unit 31B executes a process of calculating a predicted value of the carbon dioxide emission load of the construction machine 2 in all stages of the construction work from the actual carbon dioxide emission load stored in the supply history storage unit 32C (step S11).
[0047] Specifically, the comparison unit 31B extracts the actual carbon dioxide emission load at the construction site 100 from the supply history storage unit 32C. Next, the comparison unit 31B calculates a predicted value of the carbon dioxide emission load of the construction machine 2 for all processes of the construction work from the actual carbon dioxide emission load, according to the progress of the construction work stored in the process storage unit 32E. As an example, the comparison unit 31B calculates a predicted value of the carbon dioxide emission load of the construction machine 2 for all processes of the construction work from the actual carbon dioxide emission load, according to the ratio of completed processes to all processes of the construction work.
[0048] Next, the comparison unit 31B executes a process of acquiring the carbon dioxide emission load target from the emission target storage unit 32D (step S12). Specifically, the comparison unit 31B acquires the target value of the carbon dioxide emission load of the construction machine 2 in all stages of the construction work at the construction site 100 from the emission target storage unit 32D.
[0049] Next, the comparison unit 31B executes a process of comparing the predicted value of the carbon dioxide emission load of the construction machine 2 in all the processes of the construction work calculated in step S11 with the target value of the carbon dioxide emission load of the construction machine 2 in all the processes of the construction work extracted in step S12 (step S13). The comparison result is output in the form of, for example, the ratio of the predicted value to the target value, the difference between the target value and the predicted value, or both. At the same time, the comparison unit 31B judges whether the predicted value is greater than the target value. If the predicted value is greater than the target value, the process proceeds to the replacement plan creation process in step S20. If the predicted value is less than the target value, the process ends without performing the replacement plan creation process in step S20 and the supply plan creation process in step S30.
[0050] [Replacement Plan Creation Process] The replacement plan creation process in step S20 includes steps S21 to S24. First, the replacement plan creation unit 31C executes a process to calculate the amount of carbon dioxide emission that can be allocated to a future process (step S21). Specifically, the replacement plan creation unit 31C calculates the amount of carbon dioxide emission that can be allocated to a future process by subtracting the actual carbon dioxide emission load from the target value of the carbon dioxide emission load.
[0051] Next, the replacement plan preparation unit 31C executes a process of acquiring the energy efficiency of the construction machines 2 that can be used in future processes from the construction machine storage unit 32A (step S22). Next, the replacement plan creation unit 31C executes a process of acquiring the carbon dioxide emission intensity of the energy supplied by the supply source 3 that can be used in the future process from the supply source storage unit 32B (step S23).
[0052] Next, the replacement plan creation unit 31C executes a process of identifying the type of construction machine 2 for each energy type for the construction machine 2 to be used in the future process (step S24). Specifically, the replacement plan creation unit 31C calculates the carbon dioxide emission load per unit work of each construction machine 2 by multiplying the energy efficiency of the construction machine 2 acquired in step S22 by the carbon dioxide emission intensity of the energy supplied by the supply source 3 acquired in step S23. Then, the replacement plan creation unit 31C predicts the carbon dioxide emission load in the future process based on the carbon dioxide emission load per unit work of each construction machine 2 and the workload of the construction machine 2 in the future process stored in the process storage unit 32E. The replacement plan creation unit 31C identifies the construction machine 2 to be used in the future process as the replacement plan so that the predicted value of the carbon dioxide emission load in the future process does not exceed the carbon dioxide emission possible amount. In other words, in the replacement plan, the construction machine 2 with a relatively small carbon dioxide emission load per workload is identified as the construction machine 2 to be used in the future process.
[0053] [Supply Planning Process] The supply plan creation process in step S30 includes the processes of step S31 and step S32. First, the supply plan creation unit 31D executes a process of acquiring, from the construction machine storage unit 32A, the charging time required for the EV construction machine 2A among the construction machines 2 to be used in the future process identified in the replacement plan creation process in step S20 (step S31).
[0054] Next, the supply plan creation unit 31D executes a process of calculating the required amount of supply sources 3 in the future process (step S32). As a specific example, if it is assumed that the electric construction machine 2A can handle a day's work volume with a single charge, the supply plan creation unit 31D calculates the required amount of supply sources 3 in the future process based on the number of electric construction machines 2A operating per day in the future process and the charging time required. For example, if the charging time required for one electric construction machine 2A is four hours, six electric construction machines 2A can be charged per day by one supply source 3. The supply plan creation unit 31D creates a supply plan so that the electric construction machines 2A can be charged smoothly in the future process, and calculates the required amount of supply sources 3 based on the supply plan.
[0055] [Operation of the embodiment] In the carbon dioxide emission management system 1, the carbon dioxide emission load for each construction machine 2 is calculated based on the carbon dioxide emission unit of the energy supplied by the supply source 3 and the amount of energy supplied to the construction machine 2. Then, the calculated carbon dioxide emission load is stored in the supply history storage unit 32C in association with the first identification information of the construction machine 2. Then, according to the actual carbon dioxide emission load calculated for each construction machine 2, a comparison with the carbon dioxide emission target is output.
[0056] [Effects of the embodiment] According to the above embodiment, the following effects can be obtained. (1) According to the carbon dioxide emission management system 1, even when construction machines 2 that use different energy sources or that are managed by different companies or business establishments are mixed at the construction site 100, it becomes easy to manage the carbon dioxide emission load of each construction machine 2.
[0057] (2) The comparison unit 31B outputs a comparison with the carbon dioxide emission target according to the actual carbon dioxide emission load, so that the achievement status of the carbon dioxide emission target can be confirmed based on the comparison result. (3) In the replacement plan creation process in step S20, the construction machine 2 to be used in future construction work processes is identified in accordance with a comparison with the carbon dioxide emission target. If the actual carbon dioxide emission load is high compared to the carbon dioxide emission target, the construction machine 2 with a small carbon dioxide emission load per work volume is selected, so that the actual carbon dioxide emission load in the construction work can be brought closer to the target value.
[0058] (4) By calculating the required amount of energy from the supply source 3 according to the energy type of the construction machine 2 to be used in the future process of the construction work identified in the replacement plan creation process in step S20, it is possible to supply energy efficiently.
[0059] (5) The first identification information, the second identification information, and the supply amount are obtained by reading the first readable part 5 provided on the construction machine 2 and the second readable part 6 provided on the supply source 3 with the reading terminal 10. This makes it possible to obtain information necessary for recording the carbon dioxide emission load without the need for an operator to input information.
[0060] [Example of change] The above embodiment can be modified as follows: The following modifications can be combined with each other to the extent that they are not technically inconsistent.
[0061] Although the configuration in which the first identification information is obtained by reading the first readable portion 5 provided on the construction machine 2 by the reading terminal 10 has been exemplified, the present invention is not limited thereto, and for example, the first identification information may be directly input to the reading terminal 10 by the operation unit 16 by the worker. Similarly, instead of the configuration in which the reading terminal 10 reads the second readable portion 6 provided on the supply source 3, the worker may directly input the second identification information, the supply amount, and the supply date and time to the reading terminal 10 by the operation unit 16. Also, the reading terminal 10 may obtain the second identification information by reading the second readable portion 6 provided on the supply source 3, and the worker may directly input the supply amount and the supply date and time to the reading terminal 10 by the operation unit 16. In this case, the supply source 3 does not need to rewrite the information on the supply amount and the supply date and time stored in the second readable portion 6 every time energy is supplied. Therefore, the supply source 3 does not need a rewriting means for rewriting the information recorded in the second readable portion 6.
[0062] If a sufficient number of supply sources 3 are prepared for the number of construction machines 2 at the construction site 100, the supply plan creation process in step S30 may be omitted. The above example illustrates a case where the supply plan creation process in step S30 is performed based on the required charging period. Alternatively, for example, when an EV construction machine 2A is used in a future process, the required number of portable batteries 3A, which is an example of a supply source 3, may be calculated based on the planned amount of power used by the EV construction machine 2A in the future process. Also, for example, when a biofuel construction machine 2C is used in a future process, the required number of tank trucks 3D, which is an example of a supply source 3, may be calculated based on the planned amount of biomass fuel used by the biofuel construction machine 2C in the future process.
[0063] The replacement plan creation process of step S20 is performed when the actual carbon dioxide emission load is large relative to the carbon dioxide emission target. Alternatively, or in addition to this, the replacement plan creation process may identify a construction machine 2 to be used in a future process when the actual carbon dioxide emission load is small relative to the carbon dioxide emission target. In this case, a construction machine 2 with a small carbon dioxide emission load per workload may be identified so as to further reduce the carbon dioxide emission load. Also, a construction machine 2 with a large carbon dioxide emission load per workload may be identified within a range that does not exceed the carbon dioxide emission target. In this case, a construction machine 2 with a small carbon dioxide emission load per workload can be assigned to another construction site 100 where a reduction in the carbon dioxide emission load is required.
[0064] In the comparison process of step S10, a predicted value of the carbon dioxide emission load of the construction machine 2 for all stages of the construction work is calculated from the actual carbon dioxide emission load, and a comparison with the target carbon dioxide emission load of the construction machine 2 for all stages of the construction work is output. This is not limited to the above, and for example, the actual carbon dioxide emission load may be compared with the target carbon dioxide emission load of the construction machine 2 corrected according to the progress of the construction work.
[0065] The carbon dioxide emission management system 1 may be used to bill other business operators who participated in the construction work for expenses according to the amount of energy supplied to the construction machine 2. For example, based on the first identification information of the construction machine 2 stored in the supply history storage unit 32C, the amount of energy supplied, and the business operator managing the construction machine 2, it is possible to bill the business operator for expenses according to the amount of energy supplied.
[0066] The information stored in databases such as the construction machinery storage unit 32A and the supply source storage unit 32B may be updated periodically or as needed when the content is changed. For example, when a power company notifies the user of a change in the carbon dioxide emission intensity of electricity, which is an example of energy supplied by the supply source 3, the information on the carbon dioxide emission intensity stored in the supply source storage unit 32B is updated.
[0067] The supply source storage unit 32B is exemplified as storing items such as the carbon dioxide emission intensity of the energy supplied by each supply source 3 in association with the second identification information unique to each supply source 3. Alternatively, for example, the supply source storage unit 32B may store intensity specification information, which is information for specifying the carbon dioxide emission intensity of the production method or production source of the energy supplied by the supply source 3, in association with the second identification information. For example, the supply source storage unit 32B may store the type of energy production method, such as a power generation method such as thermal power generation, hydroelectric power generation, wind power generation, or nuclear power generation, as the intensity specification information. In addition, for example, the supply source storage unit 32B may store the energy production source, such as a power company, a hydrogen manufacturer, or a fuel manufacturer, as the intensity specification information. When the intensity specification information is stored in the supply source storage unit 32B, the storage unit 32 further includes an intensity database. In the intensity database, the carbon dioxide emission intensity corresponding to the intensity specification information is stored in association with the intensity specification information. Therefore, in the above case, in the process of identifying the carbon dioxide emission intensity in step S3 etc., the carbon dioxide emission intensity of the energy supplied by the supplier 3 is obtained from the intensity database based on the intensity identification information corresponding to the supplier 3.
[0068] In the above embodiment, the replacement plan creation unit 31C identifies the type of construction machine 2 for each energy type to be used in a future process in accordance with a comparison between the actual carbon dioxide emission load and the carbon dioxide emission target. In addition, the replacement plan creation unit 31C may identify the construction machine 2 to be used in a construction work so that the carbon dioxide emission target assigned to the construction machine 2 in the construction work can be achieved at the planning stage before the start of the construction work. In this case, instead of the process of step S21, the carbon dioxide emission target assigned to the construction machine 2 in the construction work is used as the possible carbon dioxide emission amount. Then, the replacement plan creation unit 31C identifies the type of construction machine 2 for each energy type to be used in the construction work so that the predicted value of the carbon dioxide emission load in the construction work does not exceed the possible carbon dioxide emission amount by the same process as steps S22 to S24. [Explanation of symbols]
[0069] 1...Carbon dioxide emission management system, 2...Construction machinery, 2A...EV construction machinery, 2B...Hydrogen construction machinery, 2C...Biofuel construction machinery, 3...Supplier, 3A...Portable battery, 3B...Charger, 3C...Hydrogen station, 3D...Tank truck, 4A...Container battery, 4B...Cubicle, 5...First readable part, 6...Second readable part, 10...Reading terminal, 11...Control unit, 12...Memory unit, 13...First reading unit, 14...Second reading unit, 1 5...display unit, 16...operation unit, 17...communication unit, 20...approval terminal, 30...management server, 31...control unit, 31A...carbon dioxide load calculation unit, 31B...comparison unit, 31C...replacement plan creation unit, 31D...supply plan creation unit, 32...memory unit, 32A...construction machinery memory unit, 32B...supply source memory unit, 32C...supply history memory unit, 32D...emission target memory unit, 32E...process memory unit, 33...display unit, 34...operation unit, 35...communication unit, 100...construction site.
Claims
1. Identify the source of energy for construction machinery used in construction work, Identifying a carbon dioxide emission intensity of the energy supplied to the construction machine by the supplier; Calculating a carbon dioxide emission load based on the carbon dioxide emission unit and the amount of energy supplied to the construction machine; The carbon dioxide emission load is recorded in association with the first identification information of the construction machine; A comparison with a carbon dioxide emission target is output according to the carbon dioxide emission load. A carbon dioxide emission management system.
2. Identifying the construction machine to be used in a future process of the construction work according to a comparison with the carbon dioxide emission target. The carbon dioxide emission management system according to claim 1 .
3. Calculate the required quantity of the supply source according to the construction machine to be used in the future process of the construction work. The carbon dioxide emission management system according to claim 2 .
4. The first identification information is acquired by reading a first readable portion provided on the construction machine; A second readable portion provided at the supply source is read to obtain second identification information for identifying the supply source and the supply amount.
4. The carbon dioxide emission management system according to claim 1, wherein the carbon dioxide emission management system comprises:
5. A carbon dioxide emission management method for managing the carbon dioxide emission load of construction machinery used in construction work, comprising: Identifying a source of energy supply to the construction machine; Identifying a carbon dioxide emission intensity of the energy supplied to the construction machine by the supplier; Calculating the carbon dioxide emission load based on the carbon dioxide emission unit and the amount of energy supplied to the construction machine; The carbon dioxide emission load is recorded in association with identification information of the construction machine; A comparison with a carbon dioxide emission target is output according to the carbon dioxide emission load. A carbon dioxide emission management method comprising: