Power-supply control apparatus, switched-mode power supply, and vehicle
The power supply control device addresses off-skip control issues in switching power supplies by implementing an off-skip function and pseudo current correction, ensuring stable output voltage and feedback control, particularly under varying input conditions.
Patent Information
- Application Number
- JP2023068583
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-19
- Publication Date
- 2024-10-31
AI Technical Summary
Conventional switching power supplies face limitations in off-skip control, particularly when the difference between input and output voltages is small, leading to potential drops in output voltage and instability in feedback control loops.
The power supply control device incorporates an off-skip function that skips periodic off-transitions of the switch element by ignoring reset signals during feedback control, ensuring the switch element remains on, and includes a pseudo current generation circuit to correct current detection gaps, maintaining stable feedback control.
This approach enhances load and power supply response characteristics by preventing unintended output voltage drops and stabilizing the feedback control loop, even under varying input voltage conditions.
Smart Images

Figure 2024154645000001_ABST
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a power supply control device, a switching power supply, and a vehicle. [Background technology]
[0002] 2. Description of the Related Art Conventionally, switching power supplies that generate a desired output voltage from an input voltage are used in various applications.
[0003] As an example of the related art, Patent Document 1 by the applicant of the present application can be mentioned. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2008-67454 A Summary of the Invention [Problem to be solved by the invention]
[0005] However, in conventional switching power supplies (particularly power supply control devices used therein), there is room for improvement in terms of off-skip control. [Means for solving the problem]
[0006] For example, a power supply control device according to the present disclosure includes a controller configured to perform duty control of a switch element that forms an output stage of a switching power supply that generates an output voltage from an input voltage, the controller having an off-skip function that skips periodic off transitions of the switch element, and when the off-skip function is active, the controller ignores a reset signal based on feedback control of the output voltage and maintains the switch element in an on state.
[0007] However, other features, elements, steps, advantages, and characteristics will become more apparent from the detailed description that follows and the accompanying drawings related thereto. Effect of the Invention
[0008] According to the power supply control device according to the present disclosure, appropriate off-skip control is possible. [Brief description of the drawings]
[0009] [Figure 1] FIG. 1 is a diagram showing the overall configuration of a switching power supply. [Diagram 2] FIG. 2 is a diagram illustrating a first embodiment (comparative example) of a controller. [Diagram 3] FIG. 3 is a diagram illustrating the off-skip function of the first embodiment. [Figure 4] FIG. 4 is a diagram showing the hysteresis characteristic of the switching frequency. [Diagram 5] FIG. 5 is a diagram showing the relationship between the control signal and the on-duty in the first embodiment. [Figure 6] FIG. 6 is a diagram showing how a gap occurs between the actual value and the sampled value of the inductor current due to a frequency division operation. [Figure 7] FIG. 7 is a diagram showing an example of the introduction of a pseudo current generating circuit. [Figure 8] FIG. 8 is a diagram for explaining the difference between the frequency division operation and the PWM operation. [Figure 9] FIG. 9 is a diagram showing hysteresis factors of the start / stop threshold of the frequency division operation. [Figure 10] FIG. 10 is a diagram for explaining the conditions under which hysteresis occurs and whether or not it occurs. [Figure 11] FIG. 11 is a diagram showing the state before and after the start of the frequency division operation. [Figure 12] FIG. 12 is a diagram showing a second embodiment of the controller. [Figure 13] FIG. 13 is a diagram illustrating the off-skip function of the second embodiment. [Figure 14] FIG. 14 is a diagram showing the relationship between the control signal and the on-duty in the second embodiment. [Figure 15] FIG. 15 is a diagram showing the appearance of the vehicle.
MODE FOR CARRYING OUT THE INVENTION
[0010] <Switching Power Supply (Overall Configuration)> FIG. 1 is a diagram showing the overall configuration of the switching power supply A. The switching power supply A of the present embodiment is a step-down DC / DC converter that generates an output voltage Vo (<Vi) from an input voltage Vi and supplies it to a load Z. Speaking with reference to this figure, the switching power supply A includes a power control device 100 and various discrete components (for example, an inductor L1, capacitors C1 and C2, and resistors R1 and R2) externally attached thereto.
[0011] The power control device 100 is a semiconductor integrated circuit device (so-called power control IC [integrated circuit]) configured to control a half-bridge output stage HB (including output elements 1 and rectifying elements 2 to be described later) of the switching power supply A.
[0012] Note that the power control device 100 includes external terminals T1 to T5 as means for establishing an electrical connection with the outside of the device. The external terminal T1 is a power supply terminal. The external terminal T2 is a switch output terminal. The external terminal T3 is a ground terminal. The external terminal T4 is a feedback input terminal. The external terminal T5 is a bootstrap terminal. Of course, the power control device 100 may be provided with external terminals other than those described above.
[0013] The external connections of the power supply control device 100 will be described. The external terminal T1 is connected to an application terminal of the input voltage Vi. The external terminal T2 is connected to a first terminal of the inductor L1. The external terminal T3 is connected to an application terminal of the ground voltage GND (=0V). The external terminal T4 is connected to a first terminal of each of the resistors R1 and R2. The external terminal T5 is connected to a first terminal of the capacitor C2. The first terminal of the capacitor C1 and the second terminals of the inductor L1, the capacitor C2, and the resistor R1 are all connected to an application terminal of the output voltage Vo (=a first terminal of the load Z). The second terminals of the capacitor C1, the resistor R2, and the load Z are all connected to an application terminal of the ground voltage GND.
[0014] <Power supply control device> Continuing with the description, the internal configuration of the power supply control device 100 will be described with reference to Fig. 1. The power supply control device 100 includes an output element 1, a rectifier element 2, an error amplifier 3, a soft start circuit 4, a phase compensation circuit 5, a current detection circuit 6, a gm amplifier 7, a phase compensation circuit 8, an oscillator 9, a ramp signal generation circuit 10, a comparator 11, a controller 12, a driver 13, and a diode 14.
[0015] The output element 1 and the rectifier element 2 may be N-channel metal oxide semiconductor field effect transistors (MOSFETs). N-channel MOSFETs generally have a lower on-resistance value than P-channel MOSFETs of the same size. Therefore, in applications that handle high voltages and large currents, it is preferable to use N-channel MOSFETs as the output element 1 and the rectifier element 2.
[0016] The drain of the output element 1 is connected to the external terminal T1. The source of the output element 1 and the drain of the rectifier element 2 are both connected to the external terminal T2. The source of the rectifier element 2 is connected to the external terminal T3. The gates of the output element 1 and the rectifier element 2 are connected to application terminals of gate drive signals G1 and G2, respectively. The output element 1 and the rectifier element 2 connected in this manner function as the upper switch element and the lower switch element, respectively, that form the half-bridge output stage HB of the switching power supply A.
[0017] The output element 1 and the rectifier element 2 are switched in a complementary manner in response to gate drive signals G1 and G2. The term "complementary" here should be interpreted in a broad sense to include not only the case where the on / off states of the output element 1 and the rectifier element 2 are completely reversed, but also the case where a period during which both are simultaneously off (so-called dead time) is provided.
[0018] For example, consider the case where the gate drive signal G1 is at a high level (=Vb) and the gate drive signal G2 is at a low level (=GND). In this case, the output element 1 is turned on and the rectifier element 2 is turned off. As a result, the upper inductor current IL1 flows through the current path from the external terminal T1 to the external terminal T2 via the output element 1, and electrical energy is stored in the inductor L1. This state corresponds to the on-period Ton of the half-bridge output stage HB.
[0019] On the other hand, consider the case where the gate drive signal G1 is at a low level (=Vsw) and the gate drive signal G2 is at a high level (=Vreg). In this case, the output element 1 is in an off state and the rectifier element 2 is in an on state. As a result, the lower inductor current IL2 flows through the current path from the external terminal T3 to the external terminal T2 via the rectifier element 2 until the electrical energy stored in the inductor L1 runs out. This state corresponds to the off period Toff of the half-bridge output stage HB.
[0020] In this way, by repeatedly switching and driving the half-bridge output stage HB by the power control device 100, a rectangular-wave switch voltage Vsw appears at the external terminal T2. Therefore, a DC output voltage Vo is obtained by smoothing the switch voltage Vsw with the inductor L1 and the capacitor C1.
[0021] Note that the output element 1 and the rectifying element 2 may be externally attached to the power control device 100 respectively. In that case, external terminals for externally outputting the gate drive signals G1 and G2 are required respectively. Also, the output element 1 and the rectifying element 2 may be N-channel IGBTs [insulated gate bipolar transistors] respectively.
[0022] Also, the rectifying element 2 may be a diode. That is, regarding the rectification method of the switching power supply A, not limited to the synchronous rectification method, the diode rectification method may be adopted.
[0023] Also, the output stage of the switching power supply A is not limited to the buck type, and may be a boost type, a buck-boost type, or an inversion type (negative output type).
[0024] The error amplifier 3 (corresponding to the first amplifier) generates an error signal Verr according to the difference between the lower of a predetermined reference voltage Vref and a soft start voltage Vss respectively input to two non-inverting input terminals (+) and a feedback voltage Vfb (= divided voltage of the output voltage Vo) input to the inverting input terminal (-) via the external terminal T4. The error amplifier 3 may be a current-output type gm amplifier. For example, when Vfb < Vref (or Vss), a current flows from the error amplifier 3 toward the phase compensation circuit 5. As a result, the error signal Verr is pulled up. Conversely, when Vfb > Vref (or Vss), a current is drawn from the phase compensation circuit 5 toward the error amplifier 3. As a result, the error signal Verr is pulled down.
[0025] When the switching power supply A is started up or restarted, the soft-start circuit 4 generates a soft-start voltage Vss that rises gently with a predetermined gradient.
[0026] The phase compensation circuit 5 may be an RC circuit connected between the output terminal of the error amplifier 3 and the ground terminal. The capacitance and resistance values forming the phase compensation circuit 5 may be appropriately set in consideration of the gain of the voltage feedback loop. A part or the whole of the phase compensation circuit 5 may be externally attached to the power supply control device 100.
[0027] The current detection circuit 6 generates a current detection signal Isns that corresponds to the current (for example, the lower inductor current IL2) flowing through the half-bridge output stage HB.
[0028] The gm amplifier 7 (corresponding to the second amplifier) generates a control signal Vc according to the difference between the error signal Verr input to the non-inverting input terminal (+) and the current detection signal Isns input to the inverting input terminal (-). For example, when Verr>Isns, a current is flowed from the gm amplifier 7 to the phase compensation circuit 8. As a result, the control signal Vc is raised. Conversely, when Verr>Isns, a current is drawn from the phase compensation circuit 8 to the gm amplifier 7. As a result, the control signal Vc is lowered.
[0029] In this way, the current detection circuit 6 and the gm amplifier 7 enable current feedback control (so-called current mode control). This improves the load responsiveness of the switching power supply A. However, as a topology for current feedback control, various methods other than the method using the gm amplifier 7 (such as a method of adding the current detection signal Isns to the ramp signal Vr) can be adopted.
[0030] The phase compensation circuit 8 may be an RC circuit connected between the output terminal of the gm amplifier 7 and the ground terminal. The capacitance and resistance values forming the phase compensation circuit 8 may be appropriately set in consideration of the gain of the current feedback loop. A part or the whole of the phase compensation circuit 8 may be externally attached to the power supply control device 100.
[0031] The oscillator 9 generates a set signal SET at a predetermined switching frequency Fsw.
[0032] The ramp signal generating circuit 10 generates a ramp signal Vr having a triangular or sawtooth waveform in synchronization with a set signal SET.
[0033] The comparator 11 compares the control signal Vc input to the non-inverting input terminal (+) from the gm amplifier 7 with the ramp signal Vr input to the inverting input terminal (-) from the ramp signal generating circuit 10 to generate a reset signal RST. Therefore, the reset signal RST becomes high level when Vc>Vr, and <Vrであるときにローレベルとなる。
[0034] The controller 12 generates gate control signals S1 and S2 to perform switching control of the half-bridge output stage HB (particularly, duty control of the output element 1) in response to the set signal SET and the reset signal RST. The controller 12 basically determines the on-timing of the output element 1 in response to the set signal SET. The controller 12 also basically determines the off-timing of the output element 1 in response to the reset signal RST.
[0035] In addition to the basic functions described above, the controller 12 has various additional functions (such as a backflow prevention function during light load and an output shutdown function upon detection of an abnormality).
[0036] The controller 12 also has an off-skip function (= a division function of the switching frequency Fsw) that skips periodic off transitions of the output element 1 when the difference between the input voltage Vi and the output voltage Vo is small, for example. This function will be described in detail later.
[0037] The driver 13 generates gate drive signals G1 and G2 in response to the gate control signals S1 and S2. For example, the driver 13 sets the gate drive signal G1 to a high level (=Vb) when the gate control signal S1 is at a high level (=Vreg), and sets the gate drive signal G1 to a low level (=Vsw) when the gate control signal S1 is at a low level (=GND). The driver 13 also sets the gate drive signal G2 to a high level (=Vreg) when the gate control signal S2 is at a high level (=Vreg), and sets the gate drive signal G2 to a low level (=GND) when the gate control signal S2 is at a low level (=GND).
[0038] The anode of the diode 14 is connected to the application terminal of the internal power supply voltage Vreg. The cathode of the diode 14 is connected to the external terminal T5 (=the application terminal of the boost voltage Vb). The diode 14 connected in this manner forms a bootstrap circuit BST together with the above-mentioned capacitor C2.
[0039] The operation of the bootstrap circuit BST will be briefly explained. When the output element 1 is in an off state and the rectifier element 2 is in an on state, the switch voltage Vsw of the external terminal T2 becomes a low level (=GND). Therefore, the diode 14 becomes in a forward bias state. Therefore, the capacitor C2 is charged by the internal power supply voltage Vreg. At this time, the boost voltage Vb becomes a voltage value (=Vreg-Vf) obtained by subtracting the forward drop voltage Vf of the diode 14 from the internal power supply voltage Vreg.
[0040] On the other hand, when the output element 1 is on and the rectifier element 2 is off, the switch voltage Vsw rises from low level (=GND) to high level (=Vi). At this time, due to the law of conservation of charge of the capacitor C2, the boost voltage Vb is also raised by the increase in the switch voltage Vsw. In other words, the boost voltage Vb rises to a voltage (=Vi+Vreg-Vf) that is higher than the input voltage Vi by the voltage across the capacitor C2 (=Vreg-Vf).
[0041] In this way, the bootstrap circuit BST generates the boost voltage Vb by charging the capacitor C2 when the output element 1 is in the off state. The boost voltage Vb is supplied to the driver 13 as the drive voltage for the output element 1. Therefore, the driver 13 can raise the high level of the gate drive signal G1 (= the on voltage for turning on the output element 1) to a level higher than the input voltage Vi. As a result, the output element 1 is reliably turned on.
[0042] <Controller (first embodiment)> 2 is a diagram showing a first embodiment of the controller 12 (corresponding to a comparative example to be compared with a second embodiment (FIG. 6) described later). The controller 12 of this embodiment includes a D flip-flop 120.
[0043] A set signal SET is input to the clock terminal (>) of the D flip-flop 120. A fixed voltage (e.g., a high-level voltage Vdd) is input to the data terminal (D) of the D flip-flop 120. A reset signal RST is input to the reset terminal (R) of the D flip-flop 120. The D flip-flop 120 outputs a duty control signal S0 from the output terminal (Q).
[0044] That is, the D flip-flop 120 switches the logical level of the duty control signal S0 in response to the set signal SET and the reset signal RST. For example, the D flip-flop 120 latches and outputs a fixed voltage at the data end (D) at the falling edge of the set signal SET. As a result, the duty control signal S0 is set to a high level (=Vdd). Also, for example, the D flip-flop 120 resets the duty control signal S0 to a low level at the falling edge of the reset signal RST.
[0045] The duty control signal S0 determines the on-duty Don (=the ratio of the on-period Ton to the switching period Tsw, Don=Ton / Tsw) of the output element 1. The above-mentioned gate control signals S1 and S2 are basically generated from the duty control signal S0.
[0046] As described above, the controller 12 has an off-skip function that skips the periodic off transition of the output element 1 when the difference between the input voltage Vi and the output voltage Vo is small. The off-skip function will be described in detail below.
[0047] <Off-skip function (first embodiment)> In the power supply control device 100, an N-channel MOSFET is used as the output element 1. Therefore, in order to reliably turn on the output element 1, it is necessary to apply a gate drive signal G1 higher than the input voltage Vi (=high level of the switch voltage Vsw) to the gate of the output element 1. Therefore, in the power supply control device 100, a bootstrap circuit BST is adopted as a drive voltage generating means for the driver 13.
[0048] However, the bootstrap circuit BST requires a charging period for the capacitor C2. That is, in order to generate a boost voltage Vb higher than the switch voltage Vsw, an off period Toff (=Tsw-Ton) during which the output element 1 is turned off and the rectifier element 2 is turned on is essential.
[0049] Therefore, in the power supply control device 100, a minimum off period Toff_min (= the minimum value of the off period Toff) is ensured so as not to impede the charging operation of the capacitor C2. From the opposite perspective, in the power supply control device 100, a maximum on period Ton_max (= the maximum value of the on period Ton) is limited.
[0050] In this way, in the power supply control device 100 employing the bootstrap circuit BST, the on-duty Don of the output element 1 cannot be set to 1 (=100%). Therefore, for example, when the difference between the input voltage Vi and the output voltage Vo is small, the output voltage Vo may fall below the target value due to the assurance of the minimum off-period Toff_min (=limitation of the maximum on-period Ton_max).
[0051] As a measure to suppress such a decrease in output, the controller 12 is provided with an off-skip function.
[0052] 3 is a diagram showing the off-skip function of the first embodiment. In this diagram, from the top, a set signal SET, a control signal Vc (dashed line), a ramp signal Vr (solid line), a reset signal RST, and a duty control signal S0 are depicted.
[0053] At time t11, when the set signal SET falls to a low level, the duty control signal S0 is set to a high level. As a result, the output element 1 is turned on and the rectifier element 2 is turned off. When the set signal SET falls to a low level, the ramp signal Vr starts to rise at a predetermined slope.
[0054] At time t12, the control signal Vc and the ramp signal Vr cross each other during the period from when the set signal SET falls to a low level at time t11 until when the set signal SET rises to a high level at time t13. At this time, the reset signal RST falls to a low level, so the duty control signal S0 is reset to a low level. As a result, the output element 1 is turned off and the rectifier element 2 is turned on.
[0055] At time t13, when the set signal SET rises to a high level, the ramp signal Vr is reset to an initial value (for example, 0 V).
[0056] At time t14, when the set signal SET falls to a low level, the duty control signal S0 is set to a high level again. As a result, the output element 1 is turned on and the rectifier element 2 is turned off. Also, at time t14, when the set signal SET falls to a low level, the ramp signal Vr starts to rise again with a predetermined slope.
[0057] The interval from the falling edge of the set signal SET in one cycle to the falling edge of the next cycle (=times t11 to t14) corresponds to the switching period Tsw. The high-level period of the duty control signal S0 corresponds to the on-period Ton. The low-level period of the duty control signal S0 corresponds to the off-period Toff (=Tsw-Ton).
[0058] In this way, when the off-skip function is not working, the controller 12 turns the output element 1 on in response to the set signal SET, and turns the output element 1 off in response to the reset signal RST. Therefore, the on-duty Don is PWM (pulse width modulation) controlled so that it increases as the control signal Vc increases.
[0059] Next, consider a case where the control signal Vc rises as the input voltage Vi drops, for example, as shown from time t14 to t15. In this case, a situation may occur in which the control signal Vc does not intersect with the slope voltage V2 during the period from when the set signal SET falls to a low level at time t14 to when the set signal SET rises to a high level at time t15.
[0060] In this situation, the reset signal RST does not fall to a low level. Therefore, at time t15, the ramp signal Vr is reset to an initial value (e.g., 0 V) without the duty control signal S0 being reset to a low level. As a result, the off period Toff (= the low level period of the duty control signal S0) that has come periodically up until that point is skipped. That is, the periodic off transition of the output element 1 is skipped.
[0061] According to such off-skip control, the set signal SET is apparently divided by n. Therefore, the switching period Tsw is extended to n×Tsw (n=2 in the figure, see times t14 to t18). That is, the on-period Ton of the output element 1 is extended beyond the above-mentioned maximum on-period Ton_max. As a result, the on-duty Don of the output element 1 is raised to quasi-100%. Therefore, the load response characteristics and power supply response characteristics of the switching power supply A are improved.
[0062] For example, consider a case where the switching power supply A is directly connected to an in-vehicle battery as a primary power supply. In this case, a drop in the input voltage Vi (=battery voltage) may occur during cranking (=starting the vehicle engine). Even in such a situation, the above-mentioned off-skip control can minimize unintended drops in the output voltage Vo.
[0063] However, in the off-skip control of the first embodiment, as shown at time t17, even when the above-mentioned off-skip control is working, the duty control signal S0 is immediately lowered to the low level at the point in time when the reset signal RST is lowered to the low level. That is, regardless of whether the switching frequency Fsw is divided or not, the transition condition from the on period Ton to the off period Toff is only the reset signal RST.
[0064] Figure 4 shows the hysteresis characteristic of the switching frequency Fsw. The horizontal axis of this figure represents the input voltage Vi. The vertical axis (left) of this figure represents the output voltage Vo. The vertical axis (right) of this figure represents the switching frequency Fsw.
[0065] The output voltage Vo is maintained at a desired target value (={(R1+R2) / R2}×Vref) when the input voltage Vi is higher than the minimum input voltage VLL.
[0066] In addition, as shown on the horizontal axis of this figure, the start threshold VL and release threshold VH for switching between enabling and disabling the off-skip function (= the division function of the switching frequency Fsw) have hysteresis Vhys (= VH - VL).
[0067] For example, when the switching frequency Fsw is set to the first frequency fH (e.g., 440 kHz), the off-skipping function works when the input voltage Vi drops below the start threshold VL (e.g., 9.91 V). As a result, the switching frequency Fsw is lowered from the first frequency fH to the second frequency fL (e.g., 220 kHz).
[0068] On the other hand, when the switching frequency Fsw is set to the second frequency fL, the off-skipping function stops working when the input voltage rises above the release threshold VH (e.g., 12.45 V). As a result, the switching frequency Fsw is raised from the second frequency fL to the first frequency fH.
[0069] Therefore, when the input voltage Vi is at the intermediate value VM (where VL < VM < VH, e.g., VM = 10 V), as shown by points P1 and P2 in the figure, the switching frequency Fsw can take either the first frequency fH or the second frequency fL. That is, when the input voltage Vi is at the intermediate value VM, the frequency division function (= off-skipping function) of the switching frequency Fsw may or may not work. That is, when the input voltage Vi is at the intermediate value VM, the switching frequency Fsw cannot be fixed for operation.
[0070] FIG. 5 is a diagram showing the relationship between the control signal Vc and the on-duty Don in the first embodiment. The horizontal axis of this figure shows the control signal Vc. The vertical axis of this figure shows the on-duty Don. As shown in this figure, in the off-skipping control of the first embodiment, the on-duty Don does not increase monotonically with respect to the control signal Vc. Therefore, the system may become unstable. Hereinafter, the cause of such a problem will be considered in detail.
[0071] 6 is a diagram showing how a gap occurs between the actual value and the sampled value of the inductor current IL due to frequency division (=off-skip control). From the top to the bottom, the switch voltage Vsw, the inductor current IL, and the current detection signal Isns are depicted.
[0072] The power supply control device 100 samples the inductor current IL (specifically, the lower inductor current IL2) only during the on-period of the rectifying element 2, particularly at the midpoint timing of the same period. Therefore, if the on-period of the rectifying element 2 is skipped due to frequency division operation, it becomes impossible to obtain current information (= generate the current detection signal Isns). As a result, a gap IL_gap may occur between the actual value (solid line) and the sampled value (dashed line) of the inductor current IL. Therefore, in order to stably operate the feedback control loop, it is necessary to correct the gap IL_gap by pulling down the current detection signal Isns during frequency division operation (= off-skip).
[0073] 7 is a diagram showing an example of the introduction of a pseudo current generating circuit. As shown in this diagram, a clamper 15 and a pseudo current generating circuit 16 can be introduced into the power supply control device 100 in addition to the above-mentioned components 1 to 14 (see FIG. 1).
[0074] The clamper 15 clamps the control signal Vc to a predetermined upper limit value or less. As shown in the figure, the clamper 15 may be connected to, for example, the phase compensation circuit 8 (in the figure, the connection node between the phase compensation resistor and the phase compensation capacitor). The clamper 15 may receive an input of a voltage detection signal Vo_SNS corresponding to the output voltage Vo.
[0075] The pseudo current generating circuit 16 corrects the above-mentioned gap IL_gap by lowering the current detection signal Isns during frequency division operation (=off-skip). Note that lowering the current detection signal Isns is nothing other than lowering the control signal Vc. The pseudo current generating circuit 16 may receive inputs of the input voltage Vi and the output voltage Vo.
[0076] 8 is a diagram for explaining the difference between frequency division operation and PWM operation. In this diagram, from the top, the input voltage Vi, the output voltage Vo, the switch voltage Vsw, the inductor current IL, the current detection signal Isns, the control signal Vc, and the ramp signal Vr are depicted.
[0077] As shown in this figure, in the power supply control device 100, PWM operation (denoted as "PWM" in the figure) and frequency division operation (denoted as "FRQ_DIV" in the figure) are switched depending on whether the control signal Vc and the ramp signal Vr intersect within one cycle of the switching period Tsw.
[0078] In particular, as shown by the dashed frame X1 in the figure, during frequency division operation, the current detection signal Isns carrying current information is gradually lowered. As a result, the control signal Vc and the ramp signal Vr intersect. This current information correction process corrects the gap IL_gap (FIG. 6) between the actual value and the sampled value of the inductor current IL. This improves the stability of the feedback control loop.
[0079] As shown by the dashed line frame X2 in the figure, the control signal Vc is limited to a predetermined upper limit value or less by the action of the clamper 15.
[0080] Also, as shown by the dashed frame X3 in the figure, when the control signal Vc and the ramp signal Vr cross within one cycle of the switching period Tsw, a pulse is generated in the reset signal RST (not shown in this figure), which results in the frequency division operation being released and the PWM operation being resumed.
[0081] 9 is a diagram showing the hysteresis factor of the start / stop threshold of the frequency division operation. In this figure, from the top, the switch voltage Vsw, the control signal Vc (dashed line), and the ramp signal Vr (solid line) are depicted.
[0082] The small dashed line of the control signal Vc indicates a state where no current information correction process has been performed by the pseudo current generating circuit 16. Hereinafter, the control signal Vc in this state may be referred to as the "control signal Vc before correction (small dashed line)."
[0083] On the other hand, the large dashed line of the control signal Vc indicates a state in which the current information correction process is performed by the pseudo current generating circuit 16. Hereinafter, the control signal Vc in this state may be referred to as the "corrected control signal Vc (large dashed line)."
[0084] In the dashed-dotted frame Y1 in the figure, the frequency division operation starts. If the off-pulse width (see (1) in the figure) generated immediately after the frequency division starts is large, feedback works and the uncorrected control signal Vc in the next period rises (see (2) in the figure). As a result, the on-duty Don decreases, and the monotonically increasing property of the on-duty Don may be impaired. The off-pulse width during the frequency division operation depends on the amount of correction of the control signal Vc by the pseudo current generating circuit 16 (see (3) in the figure). This point will be described later.
[0085] In the dashed-dotted frame Y2 in the figure, the above-mentioned frequency division operation continues, and the switching frequency Fsw is divided by 2. That is, the switching period Tsw is apparently extended by two times due to the above-mentioned off-skip control.
[0086] As mentioned above, the condition for returning from frequency division to PWM operation is that the control signal Vc and the ramp signal Vr intersect within one cycle of the switching period Tsw, generating a pulse in the reset signal RST. However, the control signal Vc (small dashed line) before correction rises to a level higher than the maximum value of the ramp signal Vr. Therefore, no pulse is generated in the reset signal RST, and frequency division operation continues. In terms of this figure, in the dashed frame Y2 in the figure, PWM operation is apparently performed according to the corrected control signal Vc (large dashed line).
[0087] When the input voltage Vi rises, feedback is activated and the pre-correction control signal Vc (small dashed line) drops (see (5) and (6) in the diagram). However, unless the pre-correction control signal Vc (small dashed line) intersects with the ramp signal Vr within one switching period Tsw and a pulse is generated in the reset signal RST, the previously described frequency division operation is maintained. This causes hysteresis in the start / stop threshold for the frequency division operation.
[0088] In the dashed-dotted frame Y2 in the figure, the uncorrected control signal Vc (small dashed line) intersects with the ramp signal Vr within one switching period Tsw (see (7) in the figure). Therefore, the frequency division operation is released and the PWM operation is resumed.
[0089] 10 is a diagram for explaining the conditions under which hysteresis occurs and whether it occurs or not. In this diagram, the solid line indicates the ramp signal Vr. In this diagram, the dashed line indicates the control signal Vc.
[0090] The correction amount Vps of the control signal Vc by the pseudo current generating circuit 16 is proportional to the difference (Vi-Vo) between the input voltage Vi and the output voltage Vo. In other words, the correction amount Vps is expressed as Vps=A×(Vi-Vo) (where A is a proportionality coefficient).
[0091] Furthermore, the amplitude Vpp of the ramp signal Vr is proportional to the input voltage Vi. That is, the amplitude Vpp is expressed as Vpp=B×Vi (where B is a proportionality coefficient).
[0092] Here, the condition for hysteresis to occur in the threshold for starting / stopping the frequency division operation is A>B. This conditional expression will be described in detail below.
[0093] Fig. 11 is a diagram showing the state before and after the start of the frequency division operation. The upper part of the figure shows the control signal Vc (dotted line), ramp signal Vr (solid line), and switch voltage Vsw immediately before the start of the frequency division operation. Meanwhile, the lower part of the figure shows the control signal Vc (dotted line), ramp signal Vr (solid line), and switch voltage Vsw immediately after the start of the frequency division operation. The small dashed line of the control signal Vc indicates the signal level before correction.
[0094] The off-pulse width immediately after the start of frequency division is thicker than the off-pulse width immediately before the start of frequency division by an increment ΔT that depends on the correction amount Vps of the control signal Vc. In other words, if the off-pulse width immediately before the start of frequency division is Toff_min, the off-pulse width immediately after the start of frequency division is expressed as Toff_min+ΔT.
[0095] If the on-duty immediately after the start of frequency division is smaller than the on-duty immediately before the start of frequency division, the control signal Vc rises. As a result, hysteresis occurs in the start / stop threshold of frequency division operation. This can be expressed as a conditional equation as follows (1).
[0096]
number
[0097] Here, the off-pulse width Toff_min immediately before the start of frequency division is (1-Don) x Tsw. Therefore, the above formula (1) can be rewritten as the following formula (2).
[0098]
number
[0099] Further, the increment ΔT is expressed by the following equation (3) using the correction amount Vps (=A×(Vi−Vo)) of the control signal Vc and the amplitude Vpp (=B×Vi) of the ramp signal Vr.
[0100]
number
[0101] Therefore, by substituting equation (3) into equation (2) and rearranging, the condition for hysteresis to occur in the start / stop threshold for the frequency division operation is A>B.
[0102] In the following, in consideration of the above considerations, a second embodiment capable of performing more appropriate off-skip control will be proposed.
[0103] <Controller (Second embodiment)> 12 is a diagram showing a second embodiment of the controller 12. The controller 12 of this embodiment includes D flip-flops 121 and 122, an inverter 123, and an OR gate .
[0104] A set signal SET is input to the clock terminal (>) of the D flip-flop 121 (corresponding to the first D flip-flop). A fixed voltage (e.g., a high-level voltage Vdd) is input to the data terminal (D) of the D flip-flop 121. A reset signal RST is input to the reset terminal (R) of the D flip-flop 121. The D flip-flop 121 outputs an output signal Q1 (corresponding to the first output signal) from the output terminal (Q).
[0105] That is, the D flip-flop 121 switches the logic level of the output signal Q1 according to the set signal SET and the reset signal RST. For example, the D flip-flop 121 latches and outputs a fixed voltage at the data end (D) at the rising timing of the set signal SET (for example, the opposite timing to that of the above-mentioned D flip-flop 120). As a result, the output signal Q1 is set to a high level (=Vdd). Also, for example, the D flip-flop 121 resets the output signal Q1 to a low level at the falling timing of the reset signal RST (for example, the same timing as that of the above-mentioned D flip-flop 120).
[0106] The inverted set signal SETB is input to the clock terminal (>) of the D flip-flop 122 (corresponding to a second D flip-flop). The output signal Q1 is input to the data terminal (D) of the D flip-flop 122. The power-on reset signal POR is input to the reset terminal (R) of the D flip-flop 122. The D flip-flop 122 outputs an output signal Q2 (corresponding to a second output signal) from the output terminal (Q).
[0107] That is, the D flip-flop 122 switches the logic level of the output signal Q2 in response to the inverted set signal SETB and the power-on reset signal POR. For example, the D flip-flop 122 latches and outputs a fixed voltage at the data end (D) at the rising timing of the inverted set signal SETB (=the falling timing of the set signal SET). As a result, the output signal Q2 is set to the logic level of the output signal Q1. Also, for example, the D flip-flop 122 resets the output signal Q2 to a low level at the falling timing of the power-on reset signal POR. Note that the power-on reset signal POR may be lowered to a low level, for example, when the power supply control device 100 is started up.
[0108] The inverter 123 inverts the logic level of the set signal SET to generate the inverted set signal SETB. Therefore, the inverted set signal SETB is at a low level when the set signal SET is at a high level. Also, the inverted set signal SETB is at a high level when the set signal SET is at a low level.
[0109] The OR gate 124 generates the duty control signal S0 by performing a logical OR operation on the output signals Q1 and Q2. Therefore, the duty control signal S0 is at a high level when at least one of the output signals Q1 and Q2 is at a high level. The duty control signal S0 is at a low level when both the output signals Q1 and Q2 are at a low level.
[0110] As described above, the duty control signal S0 determines the on-duty Don of the output element 1. That is, the above-mentioned gate control signals S1 and S2 are basically generated from the duty control signal S0.
[0111] <Off-skip function (second embodiment)> 13 is a diagram showing the off-skip function of the second embodiment. In this diagram, from the top, a set signal SET, a control signal Vc (dashed line) and a ramp signal Vr (solid line), a reset signal RST, output signals Q1 and Q2, and a duty control signal S0 are depicted.
[0112] At time t21, when the set signal SET rises to a high level, the output signal Q1 is set to a high level. Therefore, the duty control signal S0 becomes a high level. As a result, the output element 1 is turned on and the rectifier element 2 is turned off. In addition, when the set signal SET rises to a high level, the ramp signal Vr starts to rise at a predetermined slope.
[0113] At time t22, the control signal Vc and the ramp signal Vr cross each other during the period from when the set signal SET rises to high level at time t21 to when the set signal SET falls to low level at time t23. At this time, the reset signal RST falls to low level, so the output signal Q1 is reset to low level. Therefore, the duty control signal S0 becomes low level. As a result, the output element 1 is turned off and the rectifier element 2 is turned on.
[0114] At time t23, when the set signal SET falls to a low level, the ramp signal Vr is reset to an initial value (for example, 0 V). When the set signal SET falls to a low level, an inverted set signal SETB (not shown) rises to a high level. Therefore, the output signal Q2 is latched to the logic level of the output signal Q1 (here, a low level).
[0115] At time t24, when the set signal SET rises to a high level, the output signal Q1 is set to a high level again. Therefore, the duty control signal S0 becomes a high level again. As a result, the output element 1 is turned on and the rectifier element 2 is turned off. Also, at time t24, when the set signal SET rises to a high level, the ramp signal Vr starts to rise again with a predetermined slope.
[0116] The interval from the rising timing of the set signal SET in one cycle to the rising timing of the next cycle (=time t21 to t24) corresponds to the switching period Tsw. The high-level period of the duty control signal S0 corresponds to the on-period Ton. The low-level period of the duty control signal S0 corresponds to the off-period Toff (=Tsw-Ton).
[0117] In this way, when the off-skip function is not working, the controller 12 turns the output element 1 on in response to the set signal SET, and turns the output element 1 off in response to the reset signal RST. Therefore, the on-duty Don is PWM controlled so that it increases as the control signal Vc increases. The operation up to this point is basically the same as in the first embodiment (see times t11 to t14 in FIG. 3).
[0118] Next, consider a case where the control signal Vc rises as the input voltage Vi drops, for example, as shown from time t24 to t25. In this case, a situation may occur in which the control signal Vc does not intersect with the slope voltage V2 during the period from when the set signal SET rises to a high level at time t24 to when the set signal SET falls to a low level at time t25.
[0119] In this situation, the reset signal RST does not fall to a low level. Therefore, at time t25, the output signal Q1 is not reset to a low level. Therefore, the ramp signal Vr is reset to an initial value (e.g., 0 V) without the duty control signal S0 falling to a low level. As a result, the off period Toff (= the low level period of the duty control signal S0) that has occurred periodically up until that point is skipped. In other words, the periodic off transition of the output element 1 is skipped. As described above, this off skip control improves the load response characteristics and power supply response characteristics of the switching power supply A.
[0120] At time t25, when the set signal SET falls to a low level, the inverted set signal SETB (not shown) rises to a high level. Therefore, the output signal Q2 is latched to the logical level of the output signal Q1 (high level in this case). In this way, the output signal Q2 goes to a high level when the off-skip control is active. In other words, the output signal Q2 can be understood as a flag signal indicating whether the off-skip control is active or not.
[0121] At time t26, when the set signal SET rises to a high level, the output signal Q1 is set to a high level again. Therefore, the duty control signal S0 becomes a high level again. As a result, the output element 1 is turned on and the rectifier element 2 is turned off. Also, at time t24, when the set signal SET rises to a high level, the ramp signal Vr starts to rise again with a predetermined slope.
[0122] Now consider a case where the control signal Vc drops as the input voltage Vi rises. In this case, as shown at time t27, a situation may occur in which the control signal Vc and the ramp signal Vr cross each other between the time when the set signal SET rises to a high level at time t26 and the time when the set signal SET falls to a low level at time t28. At this time, the reset signal RST falls to a low level, so the output signal Q1 is reset to a low level.
[0123] On the other hand, the output signal Q2 is maintained at the previous logic level (high level in this case) until the set signal SET falls to low level, that is, until the inverted set signal SETB (not shown) rises to high level. Therefore, even if the reset signal RST falls to low level, the duty control signal S0 is maintained at high level. As a result, the output element 1 is maintained in the on state, and the rectifying element 2 is maintained in the on state.
[0124] In this way, when the off-skip function is working, the controller 12 ignores the reset signal RST and maintains the output element 1 in the on state. That is, the condition for transition from the on period Ton to the off period Toff is added that the off-skip function is not working, in other words, the output signal Q2 is at a low level.
[0125] According to this configuration, even if the reset signal RST falls to a low level while the off-skip function is active, the on-period Ton does not immediately transition to the off-period Toff. In other words, the width of the off-pulse generated immediately after the start of the frequency division operation does not increase. Therefore, the monotonically increasing nature of the on-duty Don can be maintained.
[0126] At time t28, when the set signal SET falls to a low level, the ramp signal Vr is reset to an initial value (for example, 0 V). Also, at time t28, when the set signal SET falls to a low level, an inverted set signal SETB (not shown) rises to a high level. Therefore, the output signal Q2 is latched to the logical level of the output signal Q1 (here, a low level). As a result, the duty control signal S0 becomes a low level, so that the output element 1 is turned off and the rectifying element 2 is turned on.
[0127] At time t29, when the set signal SET rises to a high level, the output signal Q1 is set to a high level again. Therefore, the duty control signal S0 becomes a high level again. As a result, the output element 1 is turned on and the rectifying element 2 is turned off.
[0128] That is, the period from when the set signal SET falls to a low level until it falls to a high level (=time t28 to t29) can be understood as the minimum off period Toff_min. In this way, when the controller 12 turns off the output element 1, it maintains the output element 1 in the off state for at least the minimum off period Toff_min. This makes it difficult to cause a disruption to the operation of the bootstrap circuit BST.
[0129] 14 is a diagram showing the relationship between the control signal Vc and the on-duty Don in the second embodiment. As in FIG. 5, the horizontal axis of this diagram indicates the control signal Vc. The vertical axis of this diagram indicates the on-duty Don. As shown in this diagram, in the off-skip control of the second embodiment, the on-duty Don increases monotonically with respect to the control signal Vc. Therefore, the system is more stable than in the first embodiment.
[0130] <Application to vehicles> 15 is a diagram showing the exterior of a vehicle B. Vehicle B of this configuration example is equipped with various electronic devices that operate by receiving power supply from a battery.
[0131] Vehicle B includes not only engine vehicles but also electric vehicles (BEVs [battery electric vehicles], HEVs [hybrid electric vehicles], PHEVs / PHVs (plug-in hybrid electric vehicle / plug-in hybrid vehicle), or xEVs such as FCEVs / FCVs (fuel cell electric vehicle / fuel cell vehicle)).
[0132] The switching power supply A described above can be incorporated into any of the electronic devices mounted on the vehicle B. In this case, the switching power supply A may be a primary power supply. In other words, the battery may directly supply the input voltage Vi to the switching power supply A.
[0133] <Additional Notes> The various embodiments described above will be generally described below.
[0134] For example, a power supply control device according to the present disclosure includes a controller configured to perform duty control of a switch element that forms an output stage of a switching power supply that generates an output voltage from an input voltage, the controller having an off-skip function that skips periodic off transitions of the switch element, and when the off-skip function is active, the controller is configured to ignore a reset signal based on feedback control of the output voltage and maintain the switch element in an on state (first configuration).
[0135] The power supply control device according to the above first configuration may further include a first amplifier configured to generate an error signal according to a difference between a feedback voltage corresponding to the output voltage and a predetermined reference voltage, an oscillator configured to generate a set signal at a predetermined switching frequency, and a comparator configured to compare the error signal or a control signal corresponding thereto with a ramp signal to generate the reset signal, and the controller may be configured (second configuration) to turn on the switch element according to the set signal and turn off the switch element according to the reset signal when the off-skip function is not operating.
[0136] The power supply control device according to the second configuration may be configured (third configuration) further including a current detection circuit configured to generate a current detection signal corresponding to the current flowing through the output stage, and a second amplifier configured to generate the control signal corresponding to the difference between the error signal and the current detection signal.
[0137] The power supply control device according to any one of the first to third configurations may be configured (fourth configuration) to further include a bootstrap circuit configured to generate a drive voltage for the switch element by charging a capacitor when the switch element is in an off state.
[0138] In the power supply control device according to the fourth configuration, the controller may be configured (fifth configuration) to maintain the switch element in an off state for at least a minimum off period when the switch element is turned off.
[0139] In the power supply control device according to any one of the first to fifth configurations, the controller may be configured (sixth configuration) to include a first D flip-flop configured to receive the set signal at a clock terminal, a fixed voltage at a data terminal, and the reset signal at a reset terminal to output a first output signal from an output terminal, a second D flip-flop configured to receive an inverted set signal at a clock terminal, the first output signal at a data terminal, and output a second output signal from an output terminal, an inverter configured to invert a logical level of the set signal to generate the inverted set signal, and a logic gate configured to generate a duty control signal for the switch element from the first output signal and the second output signal.
[0140] Also, for example, a switching power supply according to the present disclosure has a configuration (seventh configuration) including a power supply control device having any one of the first to sixth configurations described above, and the output stage driven by the power supply control device.
[0141] In the switching power supply according to the seventh configuration, the switch element may be an N-channel type (eighth configuration).
[0142] In the switching power supply according to the seventh or eighth configuration, the output stage may be configured as a step-down type, a step-up type, a step-up / step-down type, or an inverting type (ninth configuration).
[0143] Also, for example, a vehicle according to the present disclosure has a configuration (tenth configuration) including a switching power supply according to any one of the seventh to ninth configurations above, and a battery configured to supply the input voltage to the switching power supply.
[0144] <Other> In addition, various technical features disclosed in this specification can be modified in various ways without departing from the spirit of the technical creation, in addition to the above-mentioned embodiment. In other words, the above-mentioned embodiment should be considered to be illustrative and not restrictive in all respects. In addition, the technical scope of the present disclosure is defined by the claims, and should be understood to include all modifications that fall within the meaning and scope equivalent to the claims. [Explanation of symbols]
[0145] 1 Output element (upper switch element) 2 Rectifier element (lower switch element) 3 Error Amplifier 4 Soft start circuit 5 Phase compensation circuit 6 Current detection circuit 7 gm amplifier 8 Phase compensation circuit 9. Oscillators 10 Ramp signal generating circuit 11 Comparator 12 Controller 120, 121, 122 D Flip-Flop 123 Inverter 124 OR Gate 13 Drivers 14 Diode 15 Clamper 16 Pseudo current generation circuit 100 Power supply control device A Switching power supply B Vehicle BST Bootstrap circuit C1, C2 capacitors HB Half-bridge Output Stage L1 Inductor R1, R2 resistance T1~T5 External terminals Z load
Claims
1. A controller configured to perform duty control of a switch element forming an output stage of a switching power supply that generates an output voltage from an input voltage, The controller has an off-skip function that skips periodic off transitions of the switch element, and when the off-skip function is active, the controller ignores a reset signal based on feedback control of the output voltage and maintains the switch element in an on state.
2. a first amplifier configured to generate an error signal according to a difference between a feedback voltage according to the output voltage and a predetermined reference voltage; an oscillator configured to generate a set signal at a predetermined switching frequency; a comparator configured to compare the error signal or a control signal corresponding thereto with a ramp signal to generate the reset signal; Further equipped with 2. The power supply control device according to claim 1, wherein the controller turns the switch element on in response to the set signal and turns the switch element off in response to the reset signal when the off-skip function is not operating.
3. a current detection circuit configured to generate a current detection signal corresponding to a current flowing through the output stage; a second amplifier configured to generate the control signal in response to a difference between the error signal and the current detection signal; The power control device of claim 2 further comprising:
4. The power supply control device according to claim 1 , further comprising a bootstrap circuit configured to generate a drive voltage for the switch element by charging a capacitor when the switch element is in an off state.
5. 5. The power supply control device according to claim 4, wherein the controller maintains the switch element in the off state for at least a minimum off period when the controller turns the switch element off.
6. The controller: a first D flip-flop configured to receive the set signal at a clock terminal, receive a fixed voltage at a data terminal, receive the reset signal at a reset terminal, and output a first output signal from an output terminal; a second D flip-flop configured to receive an inverted set signal at a clock terminal, receive the first output signal at a data terminal, and output a second output signal from an output terminal; an inverter configured to invert a logic level of the set signal to generate the inverted set signal; a logic gate configured to generate a duty control signal for the switch element from the first output signal and the second output signal; The power control device of claim 1 .
7. The power supply control device according to claim 1 ; the output stage driven by the power supply control device; A switching power supply comprising:
8. 8. The switching power supply according to claim 7, wherein the switching element is an N-channel type.
9. 8. The switching power supply of claim 7, wherein the output stage is a step-down type, a step-up type, a step-up / step-down type, or an inverting type.
10. A switching power supply according to claim 7; a battery configured to provide the input voltage to the switching power supply; A vehicle equipped with:
Citation Information
Patent Citations
DC-DC converter
JP2008067454A
