Storage house
The system addresses high-temperature drainage and mold issues by controlling water drainage and optimizing humidification settings, enhancing efficiency and durability in storage systems.
Patent Information
- Application Number
- JP2023069110
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-20
- Publication Date
- 2024-10-31
AI Technical Summary
Conventional storage systems face issues with draining water from humidifiers after humidification, leading to high-temperature drainage that can cause condensation, mold growth, and require additional construction for drainage equipment, and fail to optimize humidification settings for different menus.
The system includes a control unit that drains water in the humidifier's tank a predetermined time before the next humidification, uses a water temperature sensor to adjust drainage based on temperature, and allows for dynamic changes in temperature and time settings to optimize humidification for different food menus.
This approach reduces the risk of high-temperature drainage, prevents mold growth, optimizes humidification settings, and extends the durability of components, ensuring efficient and effective humidification for various food items.
Smart Images

Figure 2024154898000001_ABST
Abstract
Description
[Technical field]
[0001] The technology disclosed herein relates to a reservoir. [Background technology]
[0002] Conventionally, a storage facility equipped with a storage chamber and a humidifying device for humidifying the inside of the storage chamber has been known (see, for example, Patent Document 1). The cart-type food serving vehicle (corresponding to the storage facility) described in Patent Document 1 is used for serving food in a cooked school lunch, and is equipped with a tray storage chamber (corresponding to the storage chamber) for storing trays in multiple layers, and a steam device (corresponding to the humidifying device) for supplying steam into the tray storage chamber (see claim 1 in the same document).
[0003] Generally, a humidifier has a tank for storing water to be supplied as steam, and a humidifier heater that heats the water in the tank to generate steam. The humidifier heater heats the water to generate steam, thereby humidifying the storage chamber. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] Patent No. 7197124 Summary of the Invention [Problem to be solved by the invention]
[0005] The storage unit may drain the water in the tank of the humidifier after humidification in the storage chamber is completed. Conventionally, the problem of draining the water in the tank after humidification is completed has not been sufficiently considered. This specification discloses a technique for improving the problem that occurs when draining water from a tank of a humidifier after humidification of the storage compartment has been completed. [Means for solving the problem]
[0006] A storage facility comprising a storage chamber, a humidifier for humidifying the inside of the storage chamber, and a control unit, the humidifier having a tank for storing water, a humidifier heater for heating the water in the tank to generate steam, and a drainage side opening / closing unit for opening and closing a drainage path for draining the water in the tank, and the control unit opens the drainage path to drain the water in the tank after humidification of the storage chamber by the humidifier is completed, a predetermined time before the start time of the next humidification of the storage chamber. Effect of the Invention
[0007] According to the present disclosure, it is possible to improve the problem that occurs when draining water from the tank of a humidifier after humidification of the storage compartment has been completed. [Brief description of the drawings]
[0008] [Figure 1] FIG. 1 is an exploded perspective view of a reheating cart unit according to a first embodiment. [Diagram 2] Perspective view of the reheating cart unit [Diagram 3] Perspective view of the cart [Figure 4] Cart front view [Diagram 5] Perspective view of frame cart [Figure 6] Front cross-sectional view of the reheat cart unit [Figure 7] FIG. 1 is a perspective view showing the appearance of a humidifier; [Figure 8] Block diagram showing the configuration of a humidifier [Figure 9] Block diagram showing the electrical configuration of the reheating cart unit [Figure 10] Schematic diagram for explaining the operation mode of the reheating cart unit [Figure 11] Schematic diagram to explain the drainage process of water in a water heater tank [Figure 12] Wastewater treatment timing chart (when water temperature is 60°C or less) [Figure 13] Wastewater treatment timing chart (when water temperature is higher than 60°C) [Figure 14]Schematic diagram of a humidification setting table according to embodiment 3. [Figure 15] Graph showing changes in the operation rate of the humidifier heater and changes in temperature inside the refrigerator / warmer [Figure 16] Graph to explain heater output switching [Figure 17] Schematic diagram of a humidification setting table according to embodiment 4. [Figure 18] Flowchart of control 1 according to embodiment 5 [Figure 19] Control 2 Flowchart [Figure 20] Timing chart showing specific examples of control 1 and control 2 [Figure 21] FIG. 13 is a schematic diagram for explaining a process for draining all water from a water heater tank according to a sixth embodiment. [Figure 22] Flowchart of the process for draining all the water from the water heater tank DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0009] [Overview of the embodiment of the present disclosure] First, an overview of the embodiments of the present disclosure will be listed and described.
[0010] (1) The storage facility of the present disclosure comprises a storage chamber, a humidifier for humidifying the inside of the storage chamber, and a control unit. The humidifier has a tank for storing water, a humidifier heater for heating the water in the tank to generate steam, and a drainage side opening / closing unit for opening and closing a drainage path for draining the water in the tank. After humidification of the storage chamber by the humidifier has been completed, the control unit opens the drainage path a predetermined time before the next start time of humidifying the storage chamber to drain the water in the tank.
[0011] In a storage facility that humidifies the storage chamber, the water in the tank may be drained every time humidification in the storage chamber is completed to prevent impurities that have accumulated in the tank of the humidifier from remaining. In this case, it is possible to drain the water immediately after humidification is completed. However, since the water in the tank is at a high temperature of nearly 100°C immediately after humidification is completed, the following problems arise.
[0012] · Storage facilities must be designed to withstand high temperature wastewater. If hot wastewater flows from the storage facility's drainage route into the facility's drainage system, condensation may occur due to the effects of steam, which may lead to mold growth around the drainage system. When installing a new storage facility in an existing facility, construction of drainage facilities will be required so that the facility can withstand high-temperature wastewater.
[0013] Due to the characteristics of the product, a storage unit that humidifies the interior of the storage compartment may have a gap of several hours between the end of humidification and the start of the next humidification in the storage compartment. The storage unit described in (1) above uses this gap to wait for the water temperature in the tank to drop. In other words, the storage unit described in (1) above adds control to wait for the water temperature in the tank to drop after humidification has ended.
[0014] According to the storage facility described in (1) above, after humidification in the storage compartment is completed, the water in the tank is drained a predetermined time before the next humidification start time in the storage compartment, so the several hours between the end of humidification in the storage compartment and the start of the predetermined time can be used as a period for the high-temperature water in the tank to cool naturally at room temperature. Therefore, water at a lower temperature can be drained compared to when the water is drained immediately after humidification is completed. Therefore, the storage container described in (1) above can alleviate the problems (the three problems mentioned above) that arise when draining the water in the tank of the humidifier after humidification in the storage compartment is completed.
[0015] The above-mentioned predetermined time is preferably equal to or longer than the sum of the estimated time required to drain the water from the tank and the estimated time required to subsequently supply water to the tank for the next humidification. In this way, the supply of water to the tank is completed before the start time of the next humidification while the water with a lowered water temperature is being drained. The above phrase "opening the drainage path to drain the water in the tank a predetermined time before the humidification start time" includes cases where drainage starts immediately a predetermined time before the humidification start time, and cases where drainage starts after a certain time has elapsed since the humidification start time.
[0016] (2) The storage facility described in (1) above may further include a water supply side opening / closing unit that opens and closes a water supply path that supplies water to the tank, and the control unit may open the water supply path to supply water to the tank before the predetermined time, and then open the drainage path to drain the water in the tank.
[0017] According to the storage facility described in (2) above, the water temperature in the tank can be lowered by supplying water to the tank before draining it. This makes it possible to more reliably alleviate the problem of draining the water in the tank after humidifying the storage room. When water is supplied to the tank before being drained, it is preferable that the predetermined time be equal to or greater than the total time of the estimated time required to supply water to the tank, the estimated time required to drain the water from the tank, and then the estimated time required to supply water to the tank for the next humidification.
[0018] (3) The storage facility described in (2) above may be provided with a water temperature sensor that detects the water temperature in the tank, and the control unit may detect the water temperature in the tank when water supply to the tank is completed using the water temperature sensor, and if the detected water temperature is below a predetermined temperature, open the drainage path to drain the water in the tank.
[0019] The above-mentioned predetermined temperature is preferably a temperature that can suppress the occurrence of problems (the three problems mentioned above) caused by draining high-temperature water from the tank. An example of such a temperature is 60°C, which is the heat-resistant temperature of general resin materials. According to the storage facility described in (3) above, if the water temperature when the water supply to the tank is completed is higher than a predetermined temperature, the water is not drained, thereby preventing the occurrence of problems (the three problems mentioned above) caused by draining hot water from the tank.
[0020] Here, even if the water temperature is higher than the predetermined temperature when the water supply to the tank is completed, the water temperature may fall below the predetermined temperature before the next humidification start time in the storage compartment. However, if drainage is started when the water temperature falls below the predetermined temperature, it may not be in time for the next humidification start time because it takes time to drain the water and to supply water for the next humidification. For this reason, the storage described in (3) above does not drain the water if the water temperature is higher than the predetermined temperature when the water supply to the tank is completed, even if it subsequently falls below the predetermined temperature.
[0021] (4) In a storage facility described in any one of (1) to (3) above, when one operation of the humidifier is defined as the period from when humidification by the humidifier is started to when humidification is ended, the control unit may drain the water in the tank once for every n (n≧2) operations of the humidifier.
[0022] Draining the water in the tank after each operation of the humidifier poses the following problems: - Water must be supplied every time the humidifier is operated, increasing the amount of water used. The number of times and duration of water supply and drainage operation will increase, shortening the service life of the drainage opening / closing part, water supply opening / closing part, water level sensor, etc.
[0023] The storage facility described in (4) above has the following advantages over the case where the water is drained after each operation of the humidifier. -Reduction of water usage - The durability of the drainage opening and closing parts, water supply opening and closing parts, water level sensors, etc. is extended. This allows the storage facility to be used for a long period of time.
[0024] (5) The storage facility of the present disclosure comprises a storage chamber, a heating device for heating the inside of the storage chamber, a humidifying device for humidifying the inside of the storage chamber, an internal temperature sensor for detecting the temperature inside the storage chamber, a memory unit in which the temperature classification within the storage chamber when the heating device and the humidifying device are operating are stored in correspondence with output control information of the humidifying device, an operation unit, and a control unit, wherein the control unit executes a control process for controlling the output of the humidifying device based on the output control information associated with the temperature classification to which the temperature detected by the internal temperature sensor belongs, and a change acceptance process for accepting, via the operation unit, at least one of a change to the temperature classification and a change to the output control information associated with the temperature classification for at least two of the temperature classifications.
[0025] Conventionally, in a storage facility equipped with a heating device and a humidifier, the temperature category within the storage room during the period when the heating device and humidifier are operating is associated with output control information for the humidifier and stored in a memory unit, and the output of the humidifier is controlled based on the output control information associated with the temperature category to which the temperature within the storage room belongs. However, in conventional storage units, users could not change the temperature classification. The temperature classification of conventional storage units is thought to be a value recommended by the developer of the storage unit, and fixing the temperature classification may reduce the work of the user. However, when using a storage unit to humidify food, it is assumed that the user will want to humidify at the best setting for each menu. Conventionally, because the temperature classification was fixed, humidification could not always be done at the best setting. According to the storage facility described in (5) above, by accepting changes to the temperature range, it is more likely that humidification can be achieved at the optimal setting for each menu than in the past.
[0026] In addition, in some conventional storage units equipped with a heating device and a humidifying device, the user can change the output control information for one of the multiple temperature sections. However, in conventional storage units, the user can only change the output control information for one of the multiple temperature sections, and cannot change the output control information for the other temperature sections.
[0027] For example, in conventional storage facilities, when temperature categories were set such as below 75°C, between 75°C and 90°C, between 90°C and 100°C, and above 100°C, the user could only change the output control information for the temperature category of 100°C and above, and could not change the output control information for other temperature categories. According to the storage facility described in (5) above, by accepting changes to the output control information corresponding to at least two temperature ranges, it is more likely that humidification can be achieved at the optimal settings for each menu than in the past.
[0028] (6) The storage facility of the present disclosure comprises a storage chamber, a heating device for heating the inside of the storage chamber, a humidifying device for humidifying the inside of the storage chamber, a memory unit in which time segments during which the heating device and the humidifying device are operating are stored in correspondence with output control information of the humidifying device, an operation unit, and a control unit, wherein the control unit executes a control process for controlling the output of the humidifying device based on the output control information associated with the time segment to which the elapsed time from when humidification by the humidifying device is started belongs, and a change acceptance process for accepting, via the operation unit, at least one of a change to the time segment and a change to the output control information associated with the time segment for at least two of the time segments.
[0029] Conventionally, in a storage facility equipped with a heating device and a humidifier, the time segments during which the heating device and humidifier are operating are set in correspondence with output control information for the humidifier, and the output of the humidifier is controlled based on the output control information that corresponds to the time segment to which the elapsed time from the start of humidification belongs.
[0030] However, in conventional storage units, the user could not change the time segments. The time segments of conventional storage units and the output control information associated with them are considered to be values recommended by the developer of the storage unit, and fixing the time segments may reduce the user's effort. However, when using the storage unit to humidify food, it is assumed that the user would like to humidify at the optimal setting for each menu. Conventionally, because the time segments were fixed, humidification could not always be performed at the optimal setting. According to the storage facility described in (6) above, by accepting changes to the time divisions, it is more likely that humidification can be performed at the optimal setting for each menu than in the past.
[0031] In addition, in some conventional storage units equipped with a heating device and a humidifying device, the user can change the output control information for one of a plurality of time segments. However, in conventional storage units, the user can only change the output control information for one of the plurality of time segments, and cannot change the output control information for the other time segments. For example, in a conventional storage facility, when time periods such as early and late periods are set, the user can change the output control information only for the late period, and cannot change the output control information for the early period. According to the storage facility described in (6) above, by accepting changes to the output control information corresponding to at least two time segments, the possibility of achieving optimal humidification settings for each menu is increased compared to the conventional art.
[0032] (7) The storage facility of the present disclosure comprises a storage chamber, a heating device for heating the inside of the storage chamber, a humidifying device for humidifying the inside of the storage chamber, and a control unit, and the operating modes of the storage facility include a heat retention operation in which the heating device is operated until a predetermined stop operation is performed, and the control unit operates the humidifying device during the heat retention operation.
[0033] Although details will be described later, the reheating cart unit 10 (see FIG. 1), which is an example of a storage facility, has a heating operation, a steaming operation, and a warming operation as operation modes in which the heating device operates. Conventionally, a humidifier was operated during heating operation and steaming operation to prevent the food from drying out, but the humidifier was not operated during warming operation. The inventors of the present application have found that not operating the humidifier during warming operation causes the following problems. Food may dry out during the keep warm operation. If the humidifier is operated in the following order: heating, steaming, and warming, when the humidifier is stopped after the steaming operation, steam will escape from the storage chamber, causing the temperature inside the storage chamber to drop easily.
[0034] According to the storage facility described in (7) above, the humidifier is operated even during the heat retention operation, so that the following effects are achieved. - Humidification is now possible even during the keep warm mode, so food is less likely to dry out. -Since steam is less likely to escape after the steaming process, the temperature inside the storage chamber is prevented from dropping.
[0035] (8) The storage facility described in (7) above may include a memory unit in which output control information of the humidifier during the heat retention operation is stored, and an operation unit, and the control unit may execute a control process for controlling the output of the humidifier during the heat retention operation based on the output control information during the heat retention operation, and a change acceptance process for accepting changes to the output control information during the heat retention operation via the operation unit.
[0036] According to the storage facility described in (8) above, since the output control information of the humidifier during the keep-warm operation can be changed, it is highly likely that the food can be kept warm with the optimal settings for each menu.
[0037] (9) The storage facility of the present disclosure comprises a storage chamber, a humidifying device for humidifying the storage chamber, and a control unit. The humidifying device has a tank for storing water, a humidifying heater for heating the water in the tank to generate steam, a water supply side opening / closing unit for opening and closing a water supply path for supplying water to the tank, and a water level sensor for detecting the water level in the tank. The control unit opens the water supply path each time electricity is applied to the humidifying heater for a predetermined period of time to supply water up to a predetermined upper water level.
[0038] Since the water level in the tank drops when the humidifier is operating, storage facilities equipped with humidifiers supply water to the tank while the humidifier is operating. In conventional storage tanks, when the water level in the tank drops to a specified lower limit, water is supplied up to a specified upper limit. However, since there is generally a certain degree of difference between the lower limit and the upper limit, when water is supplied from the lower limit to the upper limit, a large amount of room temperature water is mixed with the high temperature water in the tank (for example, boiling water). For this reason, if the tank size is small, the water temperature drops significantly and humidification is interrupted. For this reason, in the past, it was made difficult to lower the water temperature by increasing the size of the tank. However, increasing the size of the tank brings about the following issues.
[0039] - Storage tank installation locations are limited. The storage facility itself will also become larger. - The wattage of the humidifier heater increases in proportion to the size of the tank, resulting in increased power consumption.
[0040] According to the storage facility described in (9) above, water is supplied up to the upper limit water level every time the humidifying heater is energized for a specified time. Therefore, by appropriately setting the specified time, the amount of water supplied each time can be reduced compared to when water is supplied from the lower limit water level to the upper limit water level. This makes it possible to maintain a high water temperature in the tank even if the tank is small in size. This makes it possible to reduce the issues (the three issues mentioned above) that arise from making the tank larger.
[0041] Here, the storage tank may control the heater output by repeatedly turning the humidifier heater on (energized) and off (non-energized). In this case, water is supplied every time the total on time reaches a predetermined time.
[0042] (10) In the storage facility described in (9) above, the control unit may open the water supply path to supply water up to the upper water level when the water level in the tank drops to a predetermined lower water level.
[0043] Assuming that the water supply to the tank is controlled based only on the time that the humidifier heater is energized, if the time that the power has been turned on has not yet reached a predetermined time when the water level in the tank drops to the lower limit, the water level will continue to drop until the predetermined time is reached, causing the water level in the tank to fall below the lower limit. If the water level is lower than the lower limit, some inconvenience may occur if the humidifier heater is used for heating. According to the storage facility described in (10) above, in addition to the water supply based on the power supply time, water is supplied up to the upper water level when the water level in the tank drops to the lower water level, so that the water level in the tank can be prevented from falling below the lower water level.
[0044] (11) A storage facility of the present disclosure includes a storage chamber, a humidifying device for humidifying the inside of the storage chamber, and a control unit. The humidifying device has a tank for storing water, a humidifying heater for heating the water in the tank to generate steam, a drainage side opening / closing unit for opening and closing a drainage path for draining the water in the tank, and a water level sensor for detecting the water level in the tank. The control unit executes a start process for opening the drainage path to start draining the water in the tank when the water level in the tank is at a predetermined upper water level, a measurement process for measuring the time until the water level in the tank drops from the upper water level to a predetermined lower water level, a prediction process for predicting the drainage time from when the drainage path was opened in the start process to when all the water in the tank is drained based on the time measured in the measurement process, and a termination process for closing the drainage path and ending the drainage when the drainage time predicted by the prediction process has elapsed from when the drainage path was opened in the start process.
[0045] A storage tank equipped with a humidifier may drain all of the water in the tank. In this case, the storage tank closes the drain path after draining all of the water in the tank, and ends the drainage. Conventionally, when a certain amount of time has passed since it was detected that the water level in the tank had dropped to a predetermined lower limit, the system assumes that all the water in the tank has been drained and closes the drain path. However, this has the following problems.
[0046] The time it takes for the water level in the tank to drop to the lower limit and then be completely drained varies depending on the model of the storage facility (more specifically, the type of tank), so a certain time must be determined for each model. However, determining an appropriate certain time for each model is a burden for the designer. -Drainage capacity differs depending on the installation location, so it is difficult to determine a single fixed time even for the same model. Specifically, the diameter, length, slope, and direction of the drainage piping that makes up the drainage path differ depending on the installation location. Since the drainage capacity of the drainage path depends on the piping, depending on the installation location, the amount of drainage per unit time may be less than expected at the time of design (in other words, the drainage capacity is low), making it difficult to determine a single fixed time. If the fixed time is determined based on the standard drainage capacity, if the installation location has low drainage capacity, the drainage may not finish within the fixed time and water may remain in the tank. By lengthening the fixed time, all the water can be drained even in installations with low drainage capacity, but regardless of the amount of water to be drained, the time required for drainage will be longer, resulting in unnecessary waiting time before moving on to various subsequent operations.
[0047] By using a flow sensor that measures the flow rate of the wastewater flowing through the drainage path, it is possible to know whether all the water in the tank has been drained or not, but this increases the number of parts and therefore the cost of the storage facility. According to the storage facility described in (11) above, the drain time is predicted based on the time it takes for the water level to drop from the upper limit to the lower limit, so it is possible to know with high accuracy the timing when all the water in the tank has been drained without using a flow rate sensor. This provides the following effects:
[0048] -The increase in costs due to the use of a flow sensor can be suppressed. - The drainage path is closed before all the water in the tank is drained, preventing water from remaining in the tank. This prevents the time between when all the water in the tank is drained and when the drain path is closed from being unnecessarily long. This allows the device to move on to the next operation as soon as all the water in the tank has been drained. - Because the time it takes for the water level to drop from the upper limit to the lower limit is measured for each installation location, the designer does not need to consider the drainage environment of the installation location, which reduces the burden on the designer. If the drain time gradually increases after installation, it can be assumed that this is due to the buildup of scale (a substance formed when inorganic salts dissolved in the water precipitate) on the pipes, and the user can be encouraged to clean the pipes.
[0049] (12) The storage facility described in (11) above further includes a water supply side opening / closing unit that opens and closes a water supply path that supplies water to the tank, and when the water level in the tank is below the upper water level, the control unit may open the water supply path to supply water up to the upper water level and then execute the start-up process.
[0050] According to the storage facility described in (12) above, even when the water level in the tank is below the upper water level, the drainage time can be predicted by supplying water up to the upper water level and then starting drainage.
[0051] [Details of the embodiment of the present disclosure] The present disclosure will be described in detail below with reference to the exemplary embodiments. The present disclosure is not limited to these examples, but is defined by the claims, and is intended to include all modifications within the meaning and scope of the claims. The embodiments of the present disclosure can be realized in various forms, such as an apparatus, a method, a computer program for implementing the functions of the apparatus or method, and a recording medium on which the computer program is recorded.
[0052] <Embodiment 1> The first embodiment will be described with reference to FIGS.
[0053] (1) Reheating cart unit configuration As a first embodiment of the storage facility of the present invention, a reheating cart unit 10 is exemplified. This reheating cart unit 10 is used in a so-called new cook-chill system, and specifically, it is a reheating device that can refrigerate food and the like that is served on dishes after rapid cooling and reheat it at a specified time.
[0054] 1 and 2, the reheating cart unit 10 of this embodiment is composed of a cart 12 with thermal insulation capable of accommodating food served on tableware and keeping the food hot or cold, and a station 14 capable of storing the cart 12 and circulating hot and cold air within the cart 12. After reheating, the cart 12 can be removed from the station 14 and transported and served.
[0055] The schematic configuration of the reheating cart unit 10 of this embodiment will be described below with reference to Fig. 1 to Fig. 6. In the drawings, directions are indicated by the symbols F, B, L, R, U, and D, which respectively indicate the near side (front side), far side (rear side), left side, right side, upper side, and lower side when the reheating cart unit 10 is viewed from the front with the cart 12 stored in the station 14.
[0056] 3 and 4, the cart 12 is composed of a frame cart 16 on which multiple trays T can be set, and a generally box-shaped insulated cart 18 capable of storing the frame cart 16. As shown in Fig. 5, the frame cart 16 is equipped with a base 20, a pair of side frames 21 standing on the left and right edges of the base 20, wheels 22 provided on the base 20, and a locking mechanism 23 provided on the bottom surface of the base 20 for preventing the frame cart 16 from moving.
[0057] The frame cart 16 also includes a heat-insulating partition wall 24 that stands in the center of the pair of side frames 21 in the left-right direction and has approximately the same dimensions as the base 20 in the front-rear direction. The partition wall 24 is formed by stacking separators 25 that are elongated in the front-rear direction. The frame cart 16 is configured so that a tray T can be inserted between the two separators 25 that are arranged vertically. The tray T can also be inserted from both the front and rear.
[0058] In addition, a plurality of tray guides 21a are provided on the pair of side frames 21, protruding toward the center, and the tray guides 21a support both the left and right ends of the tray T. With this configuration, the frame cart 16 is capable of setting a plurality of trays T in multiple levels, both above and below, on both the front and rear sides.
[0059] 3 and 4, the insulated cart 18 includes a generally rectangular insulated box 30 that opens at the front and rear, an insulated door 31 that opens and closes the front and rear openings of the insulated box 30, wheels 32 provided on the bottom surface of the insulated box 30, and a locking mechanism 33 provided on the bottom surface of the insulated box 30 to prohibit movement of the insulated cart 18. The insulated door 31 is of a double door type.
[0060] The insulated cart 18 is provided with grips 34, 35 on the sides of the front insulated door 31 that the user can grip when transporting the cart. The front insulated door 31 of the insulated cart 18 can be opened to allow the frame cart 16 to be taken in and out through the front opening. When the frame cart 16 is stored in the insulated cart 18, the inside of the insulated box 30 is partitioned into left and right by the partition wall 24 of the frame cart 16, forming a cold / hot storage compartment R1 (an example of a storage compartment) and a cold storage compartment R2.
[0061] The insulated cart 18 is adapted to receive and deliver air (hot air and cold air) between the station 14 and the insulated box 30. Specifically, the insulated box 30 has air intakes 36A, 36B and air exhausts 37A, 37B that open upward on the top surface 30a, as shown in Fig. 3. Also, the insulated box 30 has air supply paths 38A, 38B formed on the side walls 30b, 30c on both sides of the insulated box 30, respectively, for guiding air from the air intakes 36A, 36B to the cold / hot storage compartment R1 and the refrigerator compartment R2, as shown in Fig. 6.
[0062] The insulated box 30 is configured such that a foam material such as melamine foam or urethane foam is filled between the outer box and the inner box as an insulating material, and the side wall portions 30b, 30c are also configured to include a duct member 39 spaced apart on the inside, and the air supply paths 38A, 38B are formed between the duct member 39 and the inner box.
[0063] The air drawn in through the intake ports 36A, 36B and flowing through the air supply paths 38A, 38B is blown out into the cold / warm storage compartment R1 and the refrigerator compartment R2 from an air outlet 39a (see FIG. 1) consisting of a plurality of long holes formed in the duct member 39. On the other hand, the air in the cold / warm storage compartment R1 and the refrigerator compartment R2 flows toward the exhaust ports 37A, 37B formed penetrating the top surface portion 30a in the thickness direction.
[0064] As shown in Fig. 1, the station 14 is mainly composed of a main body 40 having a cart storage section 40a that opens like a gate when viewed from the front, and the cart 12 can be taken in and out of the cart storage section 40a from the front side. As shown in Fig. 2, the station 14 has a pair of side panels 41 and a front panel 42 on the upper side of the main body 40, and has a machine room R3 formed by them.
[0065] The machine room R3 accommodates a part of a refrigeration cycle type cooling unit 44, a humidifier 45, and a control box 46. The cooling unit 44, which will be described in detail later, includes a compressor 50, a condenser unit 51 consisting of a condenser 51a and a condenser fan 51b, and two evaporators 52A and 52B.
[0066] A display panel 48 having an operation unit 47 is disposed above the cart storage unit 40a of the main body 40. The operation unit 47 includes a display 47a on which various information on the reheating cart unit 10 is displayed, such as information on the temperature inside the chamber and the operating state. The operation unit 47 also includes a touch panel disposed in front of the display 47a, which allows, for example, input of various settings related to operation and operation instructions.
[0067] 6, the station 14 has two heat exchange chambers R4 and R5 arranged side by side in the portion covered by the display panel 48, that is, between the cart storage section 40a and the machine room R3. The first heat exchange chamber R4 houses a first evaporator 52A, and the second heat exchange chamber R5 houses a second evaporator 52B.
[0068] The first evaporator 52A and the second evaporator 52B are connected in parallel to the compressor 50 and the condenser 51a via refrigerant pipes and on-off valves. The supply of refrigerant to the two evaporators 52A and 52B is controlled by switching the on-off valves. In other words, the reheat cart unit 10 can switch between a state in which both the first evaporator 52A and the second evaporator 52B are operating, a state in which only the first evaporator 52A is operating, and a state in which only the second evaporator 52B is operating.
[0069] The first heat exchange chamber R4 also contains a heater 54 (an example of a heating device), which can heat the air in the first heat exchange chamber R4. The air in the first heat exchange chamber R4 can also be humidified by a humidifier 45 disposed in the machine chamber R3. The humidifier 45 will be described later.
[0070] The first heat exchange chamber R4 and the second heat exchange chamber R5 house a first circulation fan 55A and a second circulation fan 55B. These first circulation fan 55A and second circulation fan 55B suck in air from the lower side and send it out to the first evaporator 52A and the second evaporator 52B arranged at the rear side, thereby circulating air between the hot / cold storage chamber R1 and the refrigerator chamber R2 of the connected cart 12. The structure for circulating air between the station 14 and the cart 12 will be described below.
[0071] As shown in Fig. 6, the station 14 is provided with exhaust ducts 56A, 56B and intake ducts 57A, 57B below the first heat exchange chamber R4 and the second heat exchange chamber R5, which are connected to each other. These four ducts 56A, 56B, 57A, 57B are bellows-shaped members made of elastic material such as rubber, and are capable of expanding and contracting in the vertical direction. When the cart 12 is stored in the station 14, the intake ports 36A, 36B of the insulated cart 18 are located directly below the exhaust ducts 56A, 56B, and the exhaust ports 37A, 37B of the insulated cart 18 are located directly below the intake ducts 57A, 57B.
[0072] The station 14 has an extension mechanism 58 that extends and retracts the four ducts 56A, 56B, 57A, and 57B. The extension mechanism 58 extends and retracts the four ducts 56A, 56B, 57A, and 57B by rotating a lever 58a (see FIG. 2) to raise and lower a duct holding member 58b that holds the four ducts 56A, 56B, 57A, and 57B.
[0073] That is, after storing the cart 12 in the station 14, the user rotates the lever 58a to extend the four ducts 56A, 56B, 57A, 57B and lower the lower ends of the four ducts 56A, 56B, 57A, 57B. As a result, the lower ends of the four ducts 56A, 56B, 57A, 57B come into contact with the top surface 30a of the insulated cart 18 while covering the intake ports 36A, 36B and the exhaust ports 37A, 37B, and the cart 12 and the station 14 are connected to each other.
[0074] When the cart 12 and the station 14 are connected and the first circulation fan 55A is operated, the air in the first heat exchange chamber R4 is sent from the first exhaust duct 56A through the first intake port 36A of the cart 12 and the first air supply passage 38A to the cold / hot storage chamber R1, and the air in the cold / hot storage chamber R1 is returned to the first heat exchange chamber R4 from the first exhaust port 37A via the first intake duct 57A.
[0075] The first heat exchange chamber R4 is capable of cooling the air inside using the first evaporator 52A, or heating and humidifying the air inside using the heater 54 and the humidifier 45, and the cold / hot storage chamber R1, to which cold or hot air is sent from the first heat exchange chamber R4, functions as a refrigerator chamber or a hot storage chamber.
[0076] Similarly, when the second circulation fan 55B is operated, the air in the second heat exchange chamber R5 is sent from the second exhaust duct 56B through the second intake port 36B of the cart 12 and the second air supply passage 38B to the refrigerator chamber R2, and the air in the refrigerator chamber R2 is returned to the second heat exchange chamber R5 through the second exhaust port 37B and the second intake duct 57B. The second heat exchange chamber R5 is capable of cooling the air by the second evaporator 52B, and the refrigerator chamber R2 to which the cold air is sent from the second heat exchange chamber R5 functions as a refrigerator chamber.
[0077] An internal thermistor 71A (an example of an internal temperature sensor) is disposed in the first heat exchange chamber R4 to detect the temperature of the air in the hot / cold storage chamber R1 returned to the first heat exchange chamber R4 via the first intake duct 57A. An internal thermistor 71B is disposed in the second heat exchange chamber R5 to detect the temperature of the air in the refrigerator chamber R2 returned to the second heat exchange chamber R5 via the second intake duct 57B.
[0078] (2) Humidification device configuration The humidifier 45 will be described with reference to Fig. 2 and Fig. 7. As shown in Fig. 2, the humidifier 45 mainly comprises a metal water boiling tank 45a (one example of a tank) for storing water, and is configured to boil supplied water and supply the resulting steam to the first heat exchange chamber R4 via a steam pipe 45b, thereby humidifying the air in the first heat exchange chamber R4.
[0079] As shown in Figure 7, connected to the water boiling tank 45a are a water supply path 80 that supplies water to the water boiling tank 45a, a drainage path 81 that drains water from the water boiling tank 45a, and an overflow drainage path 82 that drains water that has overflowed from the water boiling tank 45a.
[0080] The overflow drainage path 82 has a first horizontal section 82a having one end connected to the upper end of the water heating tank 45a and extending horizontally in a U-shaped curve, a first vertical section 82b having one end connected to the other end of the first horizontal section 82a and extending downward, a U-shaped trap section 82c having one end connected to the lower end of the first vertical section 82b, a second horizontal section 82d having one end connected to the other end of the trap section 82c and extending horizontally, and a second vertical section 82e extending downward from the other end of the second horizontal section 82d and merging with the drainage path 81.
[0081] The configuration of the humidifier 45 will be described with reference to Fig. 8. The humidifier 45 includes a water boiling tank 45a, a steam pipe 45b (see Figs. 2 and 6), a humidifier heater 45c that heats the water in the water boiling tank 45a to generate steam, a water supply side opening / closing unit 45d that opens and closes the water supply path 80, a drainage side opening / closing unit 45e that opens and closes the drainage path 81, a water temperature sensor 45f that detects the water temperature in the water boiling tank 45a, and a water level sensor 45g that detects the water level in the water boiling tank 45a.
[0082] The water supply side opening / closing unit 45d has a water supply valve provided in the water supply path 80, and a drive device such as a motor that drives the water supply valve. The water supply side opening / closing unit 45d may be an electromagnetic valve. The drainage side opening / closing unit 45e has a drainage valve provided in the drainage path 81, and a drive device such as a motor that drives the drainage valve. The water supply side opening / closing unit 45d may be an electromagnetic valve.
[0083] The water level sensor 45g has a water level detection tank 85 that is erected outside the water boiling tank 45a. The lower part of the water level detection tank 85 is connected in communication with the lower part of the water boiling tank 45a by a communication pipe 86. The water level sensor 45g has a float 87 that moves up and down according to the water level in the water level detection tank 85, a float upper contact 88 provided corresponding to a predetermined upper limit water level yA, and a float lower contact 89 provided corresponding to a predetermined lower limit water level yB that is lower than the upper limit water level yA.
[0084] When the water level in the water level detection tank 85 (in other words, the water level in the water boiling tank 45a) is below the upper limit water level yA, the float upper contact 88 is open, and when it rises to the upper limit water level yA, the float upper contact 88 closes. When water is supplied to the water boiling tank 45a, the float upper contact 88 changes from open to closed, making it possible to know the timing when the water level in the water boiling tank 45a has risen to the upper limit water level yA. Similarly, the float lower contact 89 changes from closed to open, making it possible to know the timing when the water level in the water boiling tank 45a has dropped to a level lower than the lower limit water level yB.
[0085] When the reheating cart unit 10 supplies water to the water boiling tank 45a, the water supply is stopped when the water level rises to the upper limit water level yA. Therefore, the water level in the water boiling tank 45a does not basically become higher than the upper limit water level yA. The reason for providing the overflow drainage path 82 is to allow the supplied water to escape to the drainage path 81 in the event that the water supply does not stop due to some abnormality.
[0086] (3) Electrical configuration of the reheating cart unit The electrical configuration of the reheating cart unit 10 will be described with reference to Fig. 9. The reheating cart unit 10 is equipped with a control unit 60. The control unit 60 has a CPU 60A, a RAM 60B, and a storage unit 60C. The control unit 60 is electrically connected to an operation unit 47, an internal thermistor 71A, an internal thermistor 71B, a first circulation fan 55A, a second circulation fan 55B, a heater 54, a cooling unit 44 (more specifically, a compressor 50, etc.), a humidifier 45, a lever sensor 74, and a cart sensor 75. The lever sensor 74 is a sensor that detects the rotation of the lever 58a. The cart sensor 75 is a sensor that detects when the cart 12 is stored or removed.
[0087] (4) Operation of the reheat cart unit The operation modes of the reheating cart unit 10 will be described with reference to Fig. 10. The operation modes of the reheating cart unit 10 include chilling operation, cold storage operation, heating operation, steaming operation, warming operation, and pre-cooling operation.
[0088] Chilled operation is an operation for storing food in a refrigerated state. In chilled operation, the control unit 60 maintains the cold / hot storage compartment R1 and the cold storage compartment R2 within a predetermined temperature range by opening and closing the on-off valve and switching on and off the compressor 50 based on the temperature detected by the in-cabinet thermistor 71A and the temperature detected by the in-cabinet thermistor 71B. Cold storage operation is an operation for storing food in a refrigerated state at a temperature higher than that of chilled operation (temperature for frozen food).
[0089] The heating operation is an operation for heating food stored in the cold storage compartment R1. The steaming operation is an operation for steaming food heated by the heating operation. In the heating operation and the steaming operation, the inside of the cold storage compartment R1 is humidified by the humidifier 45 to prevent drying. The keep-warm operation is an operation for keeping warm the food steamed by the steaming operation. The pre-cooling operation will be explained later.
[0090] For example, when serving breakfast using the reheat cart unit 10, a user serves the quickly cooled breakfast on dishes and places them on each tray T. Hot food is placed on one side of the tray T and cold food on the other side. The user stores the cart 12 containing multiple trays T in the station 14 and connects the cart 12 and the station 14 to each other. The user then operates the operation unit 47 to set various set values such as the breakfast heating completion time, heating time, steaming time, and temperature for each operation mode. When the various set values are set, the control unit 60 sets the heating start time to a time that is the sum of the heating time and steaming time from the heating completion time. In other words, the control unit 60 sets the heating start time by calculating backwards from the heating completion time. When the heating operation starts, humidification by the humidifier 45 also starts, so the heating start time is also the humidification start time of the humidifier 45.
[0091] After the user sets the various set values described above, he or she presses the start button on the operation unit 47. When the start button is pressed, the control unit 60 starts chilling operation for the cold / warm storage compartment R1 and the refrigerator compartment R2. After starting chilling operation, the control unit 60 ends chilling operation for the cold / warm storage compartment R1 and starts heating operation when the heating start time arrives. For the refrigerator compartment R2, the control unit 60 ends chilling operation and starts cold storage operation.
[0092] The control unit 60 starts the steaming operation when the heating time has elapsed since starting the heating operation, and starts the warming operation when the steaming time has elapsed since starting the steaming operation. The warming operation continues until a predetermined stopping action is performed. The predetermined stopping action is the action of turning the lever 58a or the action of removing the cart 12. The predetermined stopping action can be determined as appropriate. When the warming operation is stopped, the cold storage operation of the refrigerator compartment R2 is also stopped.
[0093] The pre-cooling operation mentioned above will now be explained. Pre-cooling operation is an operation for cooling the inside of the cold / warm storage compartment R1 before chilling operation when chilling operation is performed after keeping warm operation etc. For example, when serving breakfast and then serving lunch, the inside of the cold / warm storage compartment R1 is hot because the breakfast was kept warm. By performing pre-cooling operation before storing lunch, the temperature inside the cold / warm storage compartment R1 can be lowered. Pre-cooling operation is started by pressing the pre-cooling button on the operation unit 47. The user can also operate the operation unit 47 to execute each operation mode individually.
[0094] (5) Drainage treatment of water from water heater tanks The drainage process of the water in the water boiling tank 45a will be described with reference to Fig. 11. The control unit 60 executes a drainage process to drain all the water in the water boiling tank 45a every time the steaming operation ends (in other words, every time humidification by the humidifier 45 ends) so that no impurities accumulated in the water boiling tank 45a remain. After executing the drainage process, the control unit 60 supplies water to the water boiling tank 45a by the next heating start time (i.e. the next humidification start time). A specific description will be given below.
[0095] (5-1) Starting conditions for wastewater treatment Wastewater treatment begins when the following conditions 1, 2, and 3 are met.
[0096] Condition 1: Humidification control is on. The humidification control being on means that the setting for humidifying the cooling / warming compartment R1 during heating operation and steaming operation is on. Here, it is assumed that the humidification control is on. Condition 2: The current operation mode of the cooling / warming compartment R1 is neither standby nor pre-cooling. In other words, the current operation mode of the cooling / warming compartment R1 is either chilling operation, heating operation, steaming operation, or warming operation. Condition 3: The time until the next heating start time (i.e., the next humidification start time) is 30 minutes (an example of a predetermined time) or less. 30 minutes is a time equal to or greater than the total time of the estimated time required to drain the water from the water boiling tank 45a and the estimated time required to subsequently supply water to the water boiling tank 45a for the next humidification.
[0097] A specific example in which the conditions for starting wastewater treatment are met will be described with reference to Fig. 11. In the example shown in Fig. 11, the operation is as follows. [7:00 a.m.] The steaming operation for breakfast is finished. When the steaming operation is finished, the humidification operation is also finished. Immediately after the humidification operation is finished, the water in the water heater tank 45a is at a high temperature of nearly 100°C. [7:30AM] Breakfast warming operation finished. [8:00AM] Pre-cooling begins for lunch. [9:00AM] Chilled operation begins for lunch. [11:30am] Heating operation begins for lunch (i.e. the start of next humidification operation).
[0098] In the example shown in Figure 11, the humidification control setting is on, so condition 1 is always met. Condition 3 is met at 11:00, which is 30 minutes before 11:30 (i.e., the next time humidification starts in the hot / cold storage compartment R1). At 11:00, chilled operation is in progress, so condition 2 is met. Therefore, conditions 1, 2, and 3 are met at 11:00, and drainage treatment is started.
[0099] As described above, even if the steaming operation (i.e., humidification operation) for breakfast ends at 7:00, the drainage process of the water in the water heating tank 45a does not begin until 11:00 (30 minutes before the next heating start time, in other words, 30 minutes before the next humidification start time), so the four hours from 7:00 to 11:00 (the several hours from the end of humidification in the cold / warm storage compartment R1 to the specified time before the next humidification start time in the cold / warm storage compartment R1) can be used as a period for the high-temperature water in the water heating tank 45a to be naturally cooled by room temperature.
[0100] (5-2) Wastewater treatment The control unit 60 in embodiment 1 does not immediately drain the water in the water heating tank 45a 30 minutes before the next humidification start time in the cold storage / warm storage compartment R1, but instead opens the water supply valve (in other words, opens the water supply path 80) to supply water to the water heating tank 45a up to the upper limit water level yA. Then, the control unit 60 detects the water temperature in the water boiling tank 45a after water is supplied using the water temperature sensor 45f, and if the detected water temperature is below 60°C (an example of a predetermined temperature), opens the drain valve (in other words, opens the drain path 81) to drain the water in the water boiling tank 45a. 60°C is the heat-resistant temperature of a typical resin material. The predetermined temperature is not limited to 60°C and can be determined as appropriate.
[0101] The aforementioned 30 minutes (an example of a specified time) is equal to or greater than the total time of the estimated time required to supply water to the water boiling tank 45a up to the upper water level yA, the estimated time required to drain the water from the water boiling tank 45a, and then the estimated time required to supply water to the water boiling tank 45a for the next humidification.
[0102] The drainage process will be described in more detail with reference to the timing chart shown in Fig. 12. Here, the drainage process that starts at 11:00 shown in Fig. 11 will be described as an example. The control unit 60 starts supplying water at time T1, which is 11:00. At time T2, the water level in the water heating tank 45a reaches the upper limit water level yA. At time T2, the control unit 60 closes the water supply valve to stop water supply.
[0103] When the control unit 60 stops the water supply at time T2, the water temperature sensor 45f detects the water temperature in the water heating tank 45a (i.e., the water temperature immediately after the water supply ends) and determines whether the water temperature is below 60° C. In the example shown in Fig. 12, the water temperature is below 60° C. Therefore, the control unit 60 opens the drain valve at time T2 to start draining. Time T3 is a time when a certain time has elapsed since time T2. When a certain time has elapsed since the start of drainage at time T2, the control unit 60 assumes that all the water in the water heating tank 45a has been drained, and closes the drain valve.
[0104] At time T3, the control unit 60 closes the drain valve as described above, and opens the water supply valve to start supplying water to the water heating tank 45a for the next humidification operation. Water supply is continued until time T4 when the water level in the water heating tank 45a reaches the upper limit water level yA. At time T4, the control unit 60 closes the water supply valve to stop water supply. Then, the control unit 60 puts the humidifier 45 on standby until the lunch heating start time (11:30), and starts the operation of the humidifier 45 when the heating start time arrives.
[0105] 13 is a timing chart for a case where it is determined that the water temperature is higher than 60°C at time T2 when water supply to the water heating tank 45a is completed. When the control unit 60 determines that the water temperature is higher than 60°C at time T2, it does not open the drain valve but leaves it closed. Then, the control unit 60 waits to operate the humidifier 45 until the heating start time (11:30 in this case), and starts operating the humidifier 45 when the heating start time is reached.
[0106] 13, the water temperature is higher than 60°C when the water supply is completed at time T2, but drops to 60°C or lower at the following time T5. However, since both draining water and supplying water for the next humidification take time, there is a possibility that starting drainage at time T5 will not be in time for the next heating start time (humidification start time). For this reason, if the water temperature at time T2 when the water supply to the water heating tank 45a is completed is higher than 60°C, the control unit 60 will not drain water even if it subsequently drops to 60°C or lower.
[0107] (6) Effects of the embodiment According to the reheating cart unit 10 of the first embodiment, after the humidification in the cold / warm storage compartment R1 is completed, the water in the water heater tank 45a is drained 30 minutes before the next humidification start time in the cold / warm storage compartment R1, so the several hours from the end of the humidification in the cold / warm storage compartment R1 to the said 30 minutes before can be used as a period for naturally cooling the high-temperature water in the water heater tank 45a by room temperature. Therefore, water at a lower temperature can be drained compared to the case where the water is drained immediately after the humidification is completed. Therefore, the reheating cart unit 10 can improve the problems (the three problems mentioned above) that occur when draining the water from the water heating tank 45a of the humidifier 45 after humidification of the hot and cold storage compartment R1 is completed.
[0108] The above-mentioned 30 minutes is equal to or longer than the total time of the estimated time required to drain the water from the water boiling tank 45a (estimated time from time T2 to time T3) and the estimated time required thereafter to supply water to the water boiling tank 45a for the next humidification (estimated time from time T3 to time T4). In this way, water with a lowered water temperature is drained, and the supply of water to the water boiling tank 45a is completed before the start time of the next humidification.
[0109] According to the reheating cart unit 10, the water temperature in the water boiling tank 45a can be lowered by supplying water to the upper water level yA before draining the water. This makes it possible to more reliably alleviate the problem of draining the water in the water boiling tank 45a after the humidification of the hot and cold storage compartment R1 is completed.
[0110] According to the reheating cart unit 10, if the water temperature at the time T2 when the water supply to the water heating tank 45a is completed is higher than 60°C, the water is not drained, thereby preventing the occurrence of problems (the three problems mentioned above) caused by draining high-temperature water in the water heating tank 45a.
[0111] <Embodiment 2> The drainage control according to the second embodiment is performed on the assumption that a water purifier is installed in the water supply path 80. In the above-described embodiment 1, if one operation of the humidifier 45 is defined as the period from when humidification by the humidifier 45 starts to when humidification ends (specifically, from when heating operation starts to when steaming operation ends), the water in the water heating tank 45a is drained each time the humidifier 45 is operated.
[0112] In contrast, the reheating cart unit 10 according to the second embodiment drains water from the tank once every n (n≧2) times the humidifier 45 is operated. n can be determined appropriately. For example, if draining is performed once every three times, the control unit 60 drains all the water from the water heating tank 45a after the humidifier 45 is operated three times, and cancels the drain control for the next two times the humidifier is operated.
[0113] The reheating cart unit 10 according to the second embodiment has the following advantages compared to the case where the water is drained every time the humidifier 45 is operated. -Reduction of water usage The durability and life of the drainage side opening / closing part 45e, the water supply side opening / closing part 45d, the water level sensor 45g, etc. is extended. This allows the reheating cart unit 10 to be used for a long period of time.
[0114] Here, if a water purifier is not installed in the water supply path 80, there is a concern that impurities will remain in the water boiling tank 45a unless the water in the water boiling tank 45a is drained every time. In contrast, if a water purifier is installed in the water supply path 80, impurities are less likely to remain even if the water is not drained every time. For this reason, when performing the drainage control of embodiment 2, it is preferable to install a water purifier in the water supply path 80.
[0115] <Embodiment 3> The third embodiment will be described with reference to FIGS. The humidification setting table 90 will be described with reference to Fig. 14. The humidification setting table 90 is a table in which the temperature category in the cold / hot storage compartment R1 during heating operation (i.e., the period during which the heater 54 and the humidification heater 45c are operating) and the heater output of the humidification heater 45c (an example of output control information for the humidification device) are associated with each other. The humidification setting table 90 is stored in the memory unit 60C.
[0116] During heating operation, the control unit 60 detects the internal temperature of the cold / hot storage compartment R1 using the internal thermistor 71A, and controls the output of the humidifying heater 45c based on the heater output associated with the temperature category to which the detected temperature belongs (an example of control processing). In the following description, the internal temperature of the cold / hot storage compartment R1 is referred to as the heating chamber intake temperature.
[0117] Furthermore, the humidification setting table 90 associates the time segments during the steaming operation (i.e., the period during which the heater 54 and the humidification heater 45c are operating) with the heater output. When the heating operation ends and the operation is switched to the steaming operation, the control unit 60 controls the output of the humidification heater 45c based on the heater output associated with the time segment to which the elapsed time (steaming elapsed time) belongs since the operation was switched to the steaming operation (in other words, since the humidification by the humidification heater 45c started for the steaming operation) (one example of a control process).
[0118] (1) Humidification setting table The humidification setting table 90 will be specifically described with reference to FIG.
[0119] (1-1) Temperature classification during heating operation 14, the heating chamber intake temperature during heating operation (i.e., the internal temperature of the hot / cold storage chamber R1) is divided into four categories: temperature category 1 (control), temperature category 2 (early heating), temperature category 3 (middle heating), and temperature category 4 (late heating). In the humidification setting table 90, the humidification start temperature is the start temperature of each category (except for temperature category 1).
[0120] Temperature category 1 is the temperature during the period in which the water in the water heating tank 45a is heated. The heater output associated with temperature category 1 is preset to a fixed heater output for controlling the water temperature in the water heating tank 45a to 93°C. Temperature categories 2, 3, and 4 have a set start temperature (humidification start temperature) for that temperature category. Temperature category 2 can be set to a temperature of 50°C or higher. For example, if temperature category 2 is set to 50°C, temperature category 3 to 80°C, and temperature category 4 to 100°C, temperature category 1 will automatically be in the range below 50°C. Temperature category 2 will be in the range of 50°C or higher and below 80°C, temperature category 3 will be in the range of 80°C or higher and below 100°C, and temperature category 4 will be in the range of 100°C or higher.
[0121] (1-2) Time division during steaming operation In the example shown in FIG. 14, the period during the steaming operation is divided into an early period and a late period. As mentioned above, the steaming time is set in advance by the user. The early period is set to any time (minutes) that is shorter than the steaming time. The late period is automatically determined as the steaming time minus the initial time. For example, if the steaming time is 20 minutes and the initial time is set to 5 minutes, the late period will be 15 minutes. The user may set the latter time, and the initial time may be the time obtained by subtracting the latter time from the steaming time.
[0122] (1-3) Heater output Specifically, the heater output is, for example, the operation rate of the humidifying heater 45c. The operation rate is expressed as the percentage of time during one cycle that the humidifying heater 45c is turned on. For example, if one cycle is 10 seconds and the heater output is 70%, the humidifying heater 45c is repeatedly turned off for 3 seconds and turned on for 7 seconds. This controls the heater output to 70%. The heater output can also be referred to as the operation rate of the humidifying heater 45c.
[0123] (2) Changing the humidification setting table The control unit 60 accepts, via the operation unit 47, at least one of a change in the temperature category of the heating operation and a change in the heater output associated with at least two temperature categories (an example of a change acceptance process). Furthermore, the control unit 60 accepts, via the operation unit 47, at least one of a change in the time segment of the steaming operation and a change in the heater output associated with at least two of the time segments (an example of a change acceptance process).
[0124] First, we will explain how to change the temperature category for heating operation. While the user can directly change temperature categories 2, 3, and 4, temperature category 1 cannot be directly changed. Temperature category 1 is automatically changed when temperature category 2 is changed. For example, if the user sets temperature category 2 to 50°C, temperature category 1 will automatically become less than 50°C. As mentioned above, temperatures above 50°C can be set in temperature category 2. Only temperatures higher than the previous temperature category can be set in temperature categories 3 and 4. For example, if the user sets temperature category 2 to 55°C, temperature category 3 can be set to a temperature above 56°C.
[0125] Next, we will explain how to change the time division of the steaming operation. The user can change the initial time (minutes) of the steaming operation period. The initial time can only be set to a time shorter than the steaming time. As mentioned above, when the user sets the initial time, the time obtained by subtracting the initial time from the steaming time is automatically set as the later time.
[0126] Next, changing the heater output will be described. As described above, the heater output associated with temperature category 1 is fixed. Therefore, the user can change the heater output associated with temperature categories 2, 3, and 4 during heating operation, and the heater output associated with the early and late stages of steaming operation.
[0127] (3) Change in humidifier heater operation rate With reference to Fig. 15, the change in the operation rate of the humidifying heater 45c and the change in the temperature (heating chamber suction temperature) in the cold / warm storage compartment R1 will be described. In Fig. 15, time T2 is the start time of the heating operation. Time T1 is 10 minutes before the heating start time. 10 minutes before the heating start time, the control unit 60 starts operation of the humidifying heater 45c with a heater output of temperature category 1. Then, at time T2, heating in the cold / warm storage compartment R1 starts. When heating starts, the temperature in the cold / warm storage compartment R1 rises.
[0128] 15, at time T3, the heating chamber suction temperature reaches the start temperature of temperature category 2. Therefore, at time T3, the heater output of humidification heater 45c is switched to the heater output of temperature category 2. Similarly, at time T4, the heater output is switched to the heater output of temperature category 3, and at time T5, the heater output is switched to the heater output of temperature category 4.
[0129] In the example shown in Fig. 15, the operation is switched to the steaming operation at time T6. When the operation is switched to the steaming operation, the control unit 60 switches to the heater output associated with the initial period until the initial period of the steaming operation has elapsed, and then switches to the heater output associated with the later period at time T7 when the initial period has elapsed.
[0130] The switching of heater output will be described with reference to Fig. 16. Here, a case is shown where the heating operation is switched to the beginning of the steaming operation at the time point T6 described above. In the example shown in Fig. 16, the heater output immediately before switching to the steaming operation is 70%, and the heater output at the beginning of the steaming operation is 40%. If the heater output (operation rate) changes while the humidifying heater 45c is on, the on-time is determined by the operation rate after the change.
[0131] (4) Effects of the embodiment According to the reheating cart unit 10 of the third embodiment, since the temperature range of the heating operation can be changed, it is more likely that humidification can be performed with the optimal setting for each menu than in the past.
[0132] The reheating cart unit 10 accepts changes in heater output corresponding to at least two temperature sections, so that it is more likely that humidification can be performed with the optimal settings for each menu than in the past.
[0133] According to the reheating cart unit 10, since the time section of the steaming operation can be changed, it is more likely that humidification can be performed with the best setting for each menu than in the past.
[0134] The reheat cart unit 10 accepts changes in heater output corresponding to at least two time segments, so that it is more likely that humidification can be achieved with the optimal settings for each menu than in the past.
[0135] <Embodiment 4> The fourth embodiment will be described with reference to FIG. In the above-described first to third embodiments, the humidifier 45 is not operated during the heat-retention operation. In contrast, in the fourth embodiment, the humidifier 45 is operated even during the heat-retention operation.
[0136] A humidification setting table 91 according to the fourth embodiment will be described with reference to Fig. 17. The humidification setting table 91 is obtained by adding a heater output (an example of output control information) in the heat retention operation to the humidification setting table 90 according to the third embodiment. The control unit 60 according to the fourth embodiment controls the output of the humidification heater 45c during the heat retention operation based on the heater output during the heat retention operation (an example of a control process). The control unit 60 then accepts a change in the heater output during the heat retention operation via the operation unit 47 (an example of a change acceptance process).
[0137] Here, there are two patterns for the heat-retention operation: The operation of the humidifier 45 during the heat-retention operation can be performed in either of the two patterns. Pattern 1: A pattern in which the user operates the operation unit 47 to execute the keep-warm operation alone. Pattern 2: When the start button is pressed, the chilling operation, heating operation, steaming operation and keep warm operation are performed in this order.
[0138] According to the reheating cart unit 10 of the fourth embodiment, the humidifier 45 is operated even during the warming operation, and therefore the following effects are achieved. - Humidification is now possible even during the keep warm mode, so food is less likely to dry out. -Since steam is less likely to escape after the steaming operation, the drop in temperature in the cooling / warming compartment R1 is suppressed.
[0139] According to the reheating cart unit 10, since the heater output of the humidifier 45 during the warming operation can be changed, it is highly possible to keep food warm with the optimal settings for each menu.
[0140] <Embodiment 5> The fifth embodiment will be described with reference to FIGS. When the humidifier 45 is operated, the water level in the water boiling tank 45a drops. Therefore, the control unit 60 supplies water to the water boiling tank 45a while the humidifier 45 is operating. The control unit 60 according to the fifth embodiment performs the following two controls regarding the supply of water to the water boiling tank 45a while the humidifier 45 is operating.
[0141] [Control 1] Every time the total on-time of the humidifying heater 45c reaches a predetermined water supply time interval (an example of a predetermined time), water is supplied up to the upper limit water level yA. For example, when the humidifying heater 45c is operated at 70% output, the humidifying heater 45c is turned off for 3 seconds and turned on for 7 seconds, assuming that one cycle is 10 seconds. In this case, if this cycle is repeated 10 times, the total on-time of the humidifying heater 45c is 70 seconds.
[0142] [Control 2] When the water level in the water heating tank 45a drops to the lower limit water level yB, water is supplied up to the upper limit water level yA.
[0143] (1) Flow of Control 1 The flow of the above-mentioned control 1 will be described with reference to Fig. 18. The flow of the control 1 is repeatedly executed while the humidifier 45 is in operation. In S101, the control unit 60 determines whether the value of a counter that counts the total time that the humidifier heater 45c is on (i.e., the total time that the humidifier heater 45c is on) has reached a predetermined water supply time interval, and if so, proceeds to S102, and if not, ends the processing.
[0144] In S102, the control unit 60 determines whether the water level in the water heating tank 45a is below the upper limit water level yA, and if it is below the upper limit water level yA, proceeds to S103, and if it is not below the upper limit water level yA (i.e., if it is equal to or higher than the upper limit water level yA), proceeds to S104. In S103, the control unit 60 opens the water supply valve to supply water up to the upper limit water level yA. In S104, the control unit 60 resets the counter to zero.
[0145] (2) Flow of Control 2 The flow of the above-mentioned control 2 will be described with reference to Fig. 19. The flow of the control 2 is also repeatedly executed while the humidifier 45 is in operation. In S201, the control unit 60 determines whether the water level in the water heating tank 45a is below the lower limit water level yB. If it is below the lower limit water level yB, the process proceeds to S202, and if it is higher than the lower limit water level yB, the process ends.
[0146] In S202, the control unit 60 opens the water supply valve to supply water up to the upper limit water level yA. In S203, the control unit 60 resets the counter to 0. The counter is used in the above-mentioned control 1, and is not used in control 2, but the counter is also reset in control 2.
[0147] (3) Specific examples of Control 1 and Control 2 Specific examples of Control 1 and Control 2 will be described with reference to Fig. 20. First, a specific example of Control 2 will be described. In Fig. 20, time T1 is a time when a certain amount of time has elapsed since the operation of the humidifier 45 was started. At this time, the counter value is greater than 0. Time T2 is the time when the water level in the water boiling tank 45a drops to the lower limit water level yB. When the water level drops to the lower limit water level yB, in S201 of the above-mentioned control 2, it is determined that the water level is below the lower limit water level yB, and the water supply valve is opened. This starts the supply of water to the water boiling tank 45a. Then, at time T3, the water level reaches the upper limit water level yA, and the water supply valve is closed to stop the water supply (S202). Then, the counter is reset to 0 (S203).
[0148] Next, a specific example of Control 1 will be described. In the example shown in Fig. 20, it is determined that the counter value reaches a predetermined water supply time interval at time T4 (S101). Since the water level in the water boiling tank 45a is below the upper limit water level yA at time T4 (S102: Yes), the water supply valve is opened and water supply begins. In the example shown in Fig. 20, the water level in the water boiling tank 45a reaches the upper limit water level yA at time T5, and water supply stops (S103). Then, the counter is reset to 0 at time T5.
[0149] (4) Effects of the embodiment According to the reheating cart unit 10 of the fifth embodiment, water is supplied up to the upper limit water level yA every time the humidifying heater 45c is energized for a predetermined water supply time interval. Therefore, by appropriately setting the water supply time interval, the amount of water supplied each time can be reduced compared to the case where water is supplied from the lower limit water level yB to the upper limit water level yA. This makes it possible to maintain the water temperature in the water boiling tank 45a at a high temperature even if the size of the water boiling tank 45a is small. Therefore, the problems (the three problems mentioned above) caused by making the water boiling tank 45a larger can be suppressed.
[0150] According to the reheating cart unit 10, in addition to the water supply based on the power supply time, water is supplied up to the upper water level yA even when the water level in the water heating tank 45a drops to the lower water level yB, so that the water level in the water heating tank 45a can be prevented from falling below the lower water level yB.
[0151] <Embodiment 6> The sixth embodiment will be described with reference to FIGS. The control unit 60 according to the sixth embodiment drains all the water in the water boiling tank 45a when a predetermined condition is met. The predetermined condition can be determined as appropriate. For example, all the water in the water boiling tank 45a may be drained every time the steaming operation in the cold / hot storage compartment R1 ends (in other words, every time humidification by the humidifier 45 ends). In this case, the predetermined condition is "the steaming operation in the cold / hot storage compartment R1 has ended."
[0152] The process in which the control unit 60 drains all the water in the water boiling tank 45a will be described with reference to Fig. 21. When draining all the water in the water boiling tank 45a, the control unit 60 determines whether the water level in the water boiling tank 45a is at the upper limit water level yA, and if it is below the upper limit water level yA, supplies water up to the upper limit water level yA. Then, when the water level in the water boiling tank 45a is at the upper limit water level yA, the control unit 60 opens the drain valve to start draining the water in the water boiling tank 45a (an example of a start process).
[0153] The control unit 60 then measures the time it takes for the water level in the water boiling tank 45a to drop from the upper limit water level yA to the lower limit water level yB (an example of a measurement process), and predicts the drainage time from when the drain valve is opened until all the water in the water boiling tank 45a is drained based on the measured time (an example of a prediction process). The prediction process will be described later. Then, when the drain time predicted by the prediction process has elapsed from the time the drain valve is opened, the control unit 60 assumes that all the water in the water heating tank 45a has been drained, and closes the drain valve to end the drainage (an example of an end process).
[0154] (1) Prediction processing The above-mentioned prediction process will be specifically described with reference to Fig. 21. For convenience, the description will be given assuming that drainage starts when the overflow water level is y0, which is higher than the upper limit water level yA. If the cross-sectional area of the internal space of the water heating tank 45a is defined as S0, the opening area of the drain outlet as μ, and the gravitational acceleration as g, the drainage time xA from the overflow water level y0 to the upper limit water level yA is expressed by the following equation 1.
number
[0155] Similarly, the drainage time xB from the overflow level y0 to the lower limit level yB is expressed by the following equation 2.
number
[0156] Therefore, the time (xB-xA) from the upper limit water level yA to the lower limit water level yB is expressed by the following equation 3.
number
[0157] The time x0 required for the water to be completely drained from the overflow water level y0 (in other words, until the water level reaches 0) is expressed by the following equation 4.
number
[0158] Here, Equation 3 can be transformed into Equation 5 below.
number
[0159] Therefore, by substituting Equation 5 into Equation 4, it can be transformed into the following Equation 6.
number
[0160] As described above, drainage of water in the water heater tank 45a starts when the water level is at the upper limit water level yA. Therefore, y0 = yA. Substituting yA for y0 in Equation 6, the time x0 until all the water is drained from the upper limit water level yA is expressed by the following Equation 7.
number
[0161] Since the upper limit water level yA and the lower limit water level yB are known, by measuring the time (xB-xA) required for water to be drained from the upper limit water level yA to the lower limit water level yB, the time x0 from when the drain valve is opened until all the water in the water heating tank 45a is drained can be predicted.
[0162] (2) Process flow for draining all the water in the water heater tank The flow of the process for draining all the water in the water heating tank 45a will be described with reference to Fig. 22. This process starts when the above-mentioned predetermined condition is met.
[0163] In S301, the control unit 60 determines whether the water level in the water heating tank 45a is at the upper limit water level yA (i.e., whether the float upper contact 88 is closed or not), and if it is below the upper limit water level yA, proceeds to S302, and if it is at the upper limit water level yA, proceeds to S303. In S302, the control unit 60 opens the water supply valve to supply water up to the upper limit water level yA. In S303, the control unit 60 opens the drain valve to start draining.
[0164] In S304, the control unit 60 starts a timer that counts the drainage time. In S305, the control unit 60 determines whether the water level in the water heating tank 45a has dropped to the lower limit water level yB (i.e., whether the float lower contact 89 is open or not), and if it has dropped to the lower limit water level yB, proceeds to S306. If the water level has not dropped to the lower limit water level yB, the control unit 60 executes S305 again after a predetermined time (e.g., 1 second) has elapsed.
[0165] In S306, the control unit 60 predicts the drainage time by substituting the time taken for the water level to drop from the upper limit water level yA to the lower limit water level yB (=xB-xA) into Equation 7. In S307, the control unit 60 determines whether the drainage time predicted in S306 has elapsed since drainage was started in S303, and if so, proceeds to S308. If not, the control unit 60 executes S307 again after a predetermined time (e.g., 1 second) has elapsed. In S308, the control unit 60 determines that all the water in the water heating tank 45a has been drained, and closes the drain valve to end the drainage.
[0166] (3) Effects of the embodiment According to the reheating cart unit 10 of the sixth embodiment, the drain time is predicted based on the time taken for the water level to drop from the upper limit water level yA to the lower limit water level yB, so that the timing when all the water in the water heating tank 45a has been drained can be known with high accuracy without using a flow rate sensor. This provides the following effects.
[0167] -The increase in costs due to the use of a flow sensor can be suppressed. The drain path 81 is closed before all the water in the water boiling tank 45a is drained, thereby preventing water from remaining in the water boiling tank 45a. It is possible to prevent the time from being unnecessarily long after all the water in the water boiling tank 45a has been drained until the drain path 81 is closed. Therefore, it is possible to move on to the next operation promptly after all the water in the water boiling tank 45a has been drained. - Because the time it takes for the water level to drop from the upper limit yA to the lower limit yB is measured for each installation location, the designer does not need to consider the drainage environment of the installation location. This reduces the burden on the designer. If the drain time gradually increases after installation, it can be assumed that this is due to the buildup of scale (a substance formed when inorganic salts dissolved in the water precipitate) on the pipes, and the user can be encouraged to clean the pipes.
[0168] According to the reheating cart unit 10, even when the water level in the water heating tank 45a is below the upper limit water level yA, the draining time can be predicted by supplying water up to the upper limit water level yA and then starting draining.
[0169] <Related Technology 1> Related technique 1 will be described with reference to FIG. Steam generated in the water heating tank 45a is not only supplied to the hot / cold storage compartment R1, which is its original purpose, but there is also a possibility that the steam may flow into the drainage path 81 via the overflow drainage path 82. For this reason, in the past, a U-shaped trap section 82c was provided in the overflow drainage path 82, and water was stored in the trap section 82c to prevent the steam from flowing out from the overflow drainage path 82 via the drainage path 81.
[0170] However, in the past, when installing the reheating cart unit 10, the overflow drainage path 82 was disassembled and water was directly poured into the trap section 82c, or the trap section 82c was filled with water condensed from steam that had passed through the trap section 82c by operating the reheating cart unit 10 several times. This resulted in the following problems. Partial disassembly is required when installing the reheat cart unit 10. - High-temperature steam may flow from the drainage path 81 of the reheat cart unit 10 into the facility's drainage system, causing condensation and potentially causing mold to grow around the drainage system.
[0171] In order to solve the above problem, Related Art 1 adds water supply control to the water heating tank 45a before the heating operation.
[0172] (1) Controlling water supply to the water heater tank before heating operation The water supply control to the water boiling tank 45a before the heating operation is a control to overflow the water boiling tank 45a before the heating operation and store water in the trap portion 82c of the overflow drainage path 82. This control is started when the following two conditions are met. When humidification control is on and there are 30 minutes or less until the heating start time. - If the humidification settings (temperature, output) are not set, it will not start.
[0173] In controlling the water supply to the water heating tank 45a before the heating operation, the control unit 60 performs the following two operations. [1] Open the water supply path 80 to start water supply. [2] Water supply is terminated when 1.3 L of water has passed since the upper water level yA was detected by the water level sensor 45g. For example, the flow rate per unit time of the water supply path 80 is stored in the memory unit 60C, and the control unit 60 determines the time required to pass 1.3 L of water from the flow rate per unit time. When the relevant time has elapsed since the control unit 60 opened the water supply path 80, it is deemed that 1.3 L of water has passed, and the control unit 60 closes the water supply path 80.
[0174] The breakdown of the amount of water supplied from the time when the upper limit water level yA was detected will be explained. - Volume of water from upper limit water level yA to overflow water level y0 = 0.96L Capacity of trap part 82c = 30mL From the above breakdown, the required amount of water to be supplied is 0.99 L. However, in related art 1, more water is supplied to ensure that water is stored in the trap portion 82c. Specifically, the control portion 60 passes 1.3 L (= 0.99 L x 1.3) of water, with a safety factor of 1.3.
[0175] As described above, the control unit 60 supplies water to the water boiling tank 45a during the humidification operation. The water supply control to the water boiling tank 45a before the heating operation is a separate control from the water supply during the humidification operation, and is performed only before the heating operation (in other words, before the humidification operation).
[0176] (2) Effects of Related Technologies According to the reheating cart unit 10 relating to related technology 1, water is supplied to the overflow drainage path 82 until it flows before heating operation (in other words, before humidification operation), so that water can be stored in the trap section 82c of the overflow drainage path 82, thereby achieving the following effects. The steam generated by the humidifier 45 can be prevented from flowing into the drainage path 81. This prevents steam from leaking from the drainage path 81, reducing the risk of mold growth in the surrounding area. By providing a system for supplying steam only to the interior of the reheat cart unit 10, the humidity inside the cabinet can be kept stable.
[0177] <Other embodiments> The technology disclosed in this specification is not limited to the embodiments described above and in the drawings, and for example, the following embodiments are also included in the technical scope disclosed in this specification.
[0178] (1) In the above embodiment, the reheating cart unit 10 is exemplified as the storage, but the storage is not limited to the reheating cart unit 10 as long as it is equipped with a humidifier 45 that humidifies the inside of a storage compartment. For example, the reheating cart unit 10 is equipped with a refrigeration compartment and a cold / hot storage compartment R1, but the storage does not have to be equipped with a refrigeration compartment.
[0179] (2) In the above embodiment, the storage facility is provided with the heater 54 and a cooling device, but the storage facility does not have to be provided with a cooling device. In other words, the storage facility may heat the interior of the storage chamber but not cool it.
[0180] (3) In the above embodiment, the storage container is provided with the heater 54 and the humidifier 45, but the storage container does not have to be provided with the heater 54. In other words, the storage container may simply humidify the interior of the storage chamber.
[0181] (4) In the above embodiment 1, water is supplied to the water heating tank 45a 30 minutes before the humidification start time (in other words, the heating start time), and drainage starts after the water supply is completed. However, drainage may start without supplying water. In this case, drainage may start immediately 30 minutes before the humidification start time.
[0182] (5) In the above embodiment 1, water is not drained if the water temperature is higher than 60° C. when the supply of water to the water boiling tank 45a is completed. In contrast, water may be drained after the supply of water to the water boiling tank 45a is completed, regardless of the water temperature in the water boiling tank 45a.
[0183] (6) In the above embodiment 3, a case where both a change in temperature category and a change in heater output associated with at least two temperature categories are accepted is exemplified. However, only a change in temperature category may be accepted, or only a change in heater output associated with at least two temperature categories may be accepted. Similarly, in the above embodiment 3, a case where both a change in a time segment and a change in heater output associated with at least two time segments are accepted is exemplified. In contrast, only a change in a time segment may be accepted, or only a change in heater output associated with at least two time segments may be accepted.
[0184] (7) In the above-mentioned embodiment 5, the case where water is supplied up to the upper limit water level yA even when the water level in the water heating tank 45a drops to the lower limit water level yB is exemplified (control 2). In contrast, control 2 does not have to be performed. [Explanation of symbols]
[0185] 10: Reheat cart unit (an example of a storage facility) 45: Humidifier 45a: Water heating tank (example of a tank) 45c: Humidifier heater 45d: Water supply side opening and closing part 45e: Drainage side opening and closing part 45f: Water temperature sensor 45g: Water level sensor 47: Control section 54: Heater (an example of a heating device) 60: Control section 60C: Storage section 71A: Internal thermistor (an example of an internal temperature sensor) 80: Water supply route 81: Drainage route R1: Refrigerator / hot storage room (an example of a storage room) yA: Upper water level yB: Lower limit water level
Claims
1. A storage facility, A storage room; A humidifier for humidifying the storage chamber; A control unit; Equipped with The humidifier comprises: A tank for storing water, a humidification heater that heats the water in the tank to generate steam; A drainage side opening / closing unit that opens and closes a drainage path for draining water from within the tank; having The control unit opens the drainage path to drain the water in the tank after the humidification of the storage chamber by the humidification device is completed and a predetermined time before the next humidification start time for the storage chamber.
2. 2. The storage facility of claim 1 , The water supply system further includes a water supply side opening / closing unit that opens and closes a water supply path that supplies water to the tank, The control unit opens the water supply path to supply water to the tank before the predetermined time, and then opens the water drainage path to drain the water in the tank.
3. 3. The storage facility of claim 2, A water temperature sensor is provided to detect the water temperature in the tank. The control unit detects the water temperature in the tank when water supply to the tank is completed using the water temperature sensor, and if the detected water temperature is below a predetermined temperature, opens the drainage path to drain the water in the tank.
4. A storage facility according to any one of claims 1 to 3, When the period from when humidification by the humidifier is started to when humidification is ended is defined as one operation of the humidifier, The control unit drains the water in the tank once every n (n≧2) times the humidifier is operated.
5. A storage facility, A storage room; A heating device for heating the inside of the storage chamber; A humidifier for humidifying the storage chamber; An internal temperature sensor that detects a temperature inside the storage chamber; a storage unit in which temperature categories in the storage chamber when the heating device and the humidifier are in operation are stored in association with output control information of the humidifier; An operation unit; A control unit; Equipped with The control unit is A control process for controlling the output of the humidifier based on the output control information associated with the temperature category to which the temperature detected by the internal temperature sensor belongs; a change acceptance process of accepting, via the operation unit, at least one of a change to the temperature category and a change to the output control information associated with the at least two temperature categories; Run the reservoir.
6. A storage facility, A storage room; A heating device for heating the inside of the storage chamber; A humidifier for humidifying the storage chamber; a storage unit in which time segments during which the heating device and the humidifier are operated are stored in association with output control information of the humidifier; An operation unit; A control unit; Equipped with The control unit is a control process for controlling an output of the humidifier based on the output control information associated with the time segment to which an elapsed time from when humidification by the humidifier is started belongs; and a change acceptance process for accepting, via the operation unit, at least one of a change to the time segment and a change to the output control information associated with the time segment for at least two of the time segments; Run the reservoir.
7. A storage facility, A storage room; A heating device for heating the inside of the storage chamber; A humidifier for humidifying the storage chamber; A control unit; Equipped with The operation mode of the storage facility includes a heat retention operation in which the heating device is operated until a predetermined stopping operation is performed, The control unit operates the humidifier during the heat retention operation.
8. 8. The repository of claim 7, a storage unit in which output control information of the humidifier during the heat retention operation is stored; An operation unit; Equipped with The control unit is a control process for controlling an output of the humidifier during the heat retention operation based on the output control information in the heat retention operation; A change acceptance process of accepting a change to the output control information in the heat retention operation via the operation unit; Run the reservoir.
9. A storage facility, A storage room; A humidifier for humidifying the storage chamber; A control unit; Equipped with The humidifier comprises: A tank for storing water, a humidification heater that heats the water in the tank to generate steam; a water supply side opening / closing unit that opens and closes a water supply path that supplies water to the tank; a water level sensor for detecting a water level in the tank; having The control unit opens the water supply path and supplies water up to a predetermined upper water level every time the humidification heater is energized for a predetermined period of time.
10. 10. The repository of claim 9, The control unit opens the water supply path when the water level in the tank drops to a predetermined lower water level, and supplies water up to the upper water level.
11. A storage facility, A storage room; A humidifier for humidifying the storage chamber; A control unit; Equipped with The humidifier comprises: A tank for storing water, a humidification heater that heats the water in the tank to generate steam; A drainage side opening / closing unit that opens and closes a drainage path for draining water from within the tank; a water level sensor for detecting a water level in the tank; having The control unit is an initiation process for opening the drainage path and starting drainage of water in the tank when the water level in the tank reaches a predetermined upper water level; a measurement process for measuring a time required for the water level in the tank to drop from the upper water level to a predetermined lower water level; a prediction process for predicting a drainage time from when the drainage path is opened in the start process until all the water in the tank is drained based on the time measured in the measurement process; a termination process for closing the drainage path and terminating drainage when a drainage time predicted by the prediction process has elapsed since the drainage path was opened by the start process; Run the reservoir.
12. 12. The repository of claim 11, The water supply system further includes a water supply side opening / closing unit that opens and closes a water supply path that supplies water to the tank, When the water level in the tank is below the upper water level, the control unit opens the water supply path to supply water up to the upper water level and then executes the start process.
Citation Information
Patent Citations
Food humidifier
JP1996154639A
Meal delivery using a food delivery cart
JP7197124B2
