Ground information acquisition system and ground information acquisition method
The ground information acquisition system for excavators addresses the lack of subsurface information by using a striking part to measure vibrations, enhancing safety and efficiency through real-time data on underground conditions.
Patent Information
- Application Number
- JP2023072779
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-26
- Publication Date
- 2024-11-08
AI Technical Summary
Existing excavators primarily focus on acquiring information about the shape of the ground after work, neglecting the need for information about the ground below the working machine.
A ground information acquisition system for excavators that includes a measuring instrument capable of detecting vibrations transmitted to and progressing inside the ground using a striking part, such as a bucket, to gather information about the subsurface conditions.
Enables the acquisition of detailed information about the subsurface conditions, improving safety and efficiency by determining risk levels and optimizing operations based on the internal state of the ground.
Smart Images

Figure 2024158006000001_ABST
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a ground information acquisition system and a ground information acquisition method. [Background technology]
[0002] 2. Description of the Related Art There is known a shovel that has an attachment and acquires information about the shape of the ground surface as a work target based on a change in the posture of the attachment (see, for example, Patent Document 1). [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Patent Publication No. 2021-73401 Summary of the Invention [Problem to be solved by the invention]
[0004] It may become necessary not only to obtain information about the shape of the ground after work has been performed by a work machine, but also to obtain information about the ground below the work machine.
[0005] An object of the present disclosure is to provide a ground information acquisition system capable of acquiring information about the ground below a work machine. [Means for solving the problem]
[0006] A ground information acquisition system according to one embodiment of the present disclosure includes a work machine having an impact unit, and a measuring instrument capable of measuring vibrations transmitted to the ground by impact with the impact unit and traveling through the ground. Effect of the Invention
[0007] The present disclosure can provide a ground information acquisition system capable of acquiring information about the ground below a work machine. [Brief description of the drawings]
[0008] [Figure 1] FIG. 1 is a side view of a shovel to which a ground information acquisition system according to an embodiment is applied. [Diagram 2] FIG. 2 is a side view of the shovel, showing an example of information detected by a posture detection device mounted on the shovel. [Diagram 3] FIG. 1 is a block diagram showing a basic system mounted on an excavator. [Figure 4] FIG. 2 is a functional block diagram showing the ground information acquisition system. [Diagram 5] FIG. 1 is a schematic diagram showing a ground information acquisition system. [Figure 6] It is a schematic diagram showing a ground information acquisition system. It is a cross-sectional view showing the inside of the ground. [Figure 7] FIG. 13 is a diagram showing an example of a measurement result obtained by an elastic wave exploration device. [Figure 8] FIG. 11 is a diagram showing an example of display content displayed on a display device. [Figure 9] 1 is a flowchart showing the steps of a ground information acquisition method. [Figure 10] FIG. 1 is a schematic diagram showing a geotechnical information management system. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0009] (First embodiment) A ground information acquisition system and a ground information acquisition method according to an embodiment of the present disclosure will be described. First, a shovel 100 to which a ground information acquisition system 101 is applied will be described. In the ground information acquisition system 101, the shovel 100 is used to acquire information on the inside of the ground G1 below the shovel 100. FIG. 1 is a side view of the shovel 100 to which the ground information acquisition system 101 according to an embodiment is applied. The shovel 100 is an example of a work machine.
[0010] The excavator 100 shown in Fig. 1 includes a lower traveling body 1, an upper rotating body 3, and an attachment AT. The upper rotating body 3 is mounted on the lower traveling body 1 via a rotating mechanism 2. A boom 4 is attached to the upper rotating body 3. An arm 5 is attached to the tip of the boom 4, and a bucket 6 is attached to the tip of the arm 5. The boom 4, arm 5, and bucket 6 as working elements constitute an excavation attachment, which is an example of an attachment AT.
[0011] The attachment may be another attachment such as a bed excavation attachment, a leveling attachment, a dredging attachment, etc. The boom 4, the arm 5, and the bucket 6 are hydraulically driven by a boom cylinder 7, an arm cylinder 8, and a bucket cylinder 9, respectively. The upper rotating body 3 is provided with a cabin 10, and is equipped with a drive source such as an engine 11. The upper rotating body 3 is equipped with a communication device M1, a positioning device M2, an attitude detection device M3, and a cylinder pressure detection device M4.
[0012] The communication device M1 is a device that controls communication between the shovel 100 and the outside. The communication device M1 controls wireless communication between a GNSS (Global Navigation Satellite System) surveying system and the shovel 100. Specifically, the communication device M1 acquires topographical information of the work site when the shovel 100 starts work, for example, once a day. The GNSS surveying system employs, for example, a network-type RTK-GNSS positioning method.
[0013] The positioning device M2 is a device that measures the position and orientation of the shovel 100. The positioning device M2 is a GNSS receiver with an integrated electronic compass, and measures the latitude, longitude, and altitude of the location of the shovel 100, and also measures the orientation of the shovel 100.
[0014] The attitude detection device M3 is a device that detects the attitude of the attachment AT.
[0015] The cylinder pressure detection device M4 is a device that detects the pressure of the hydraulic oil in the hydraulic cylinder. The cylinder pressure detection device M4 includes a boom bottom pressure sensor that detects the pressure in the bottom side oil chamber of the boom cylinder 7 (hereinafter referred to as the "boom bottom pressure").
[0016] 2 is a side view of the shovel 100 and is a diagram showing an example of information detected by a posture detection device M3 mounted on the shovel 100. The posture detection device M3 includes a boom angle sensor M3a, an arm angle sensor M3b, a bucket angle sensor M3c, and a vehicle body inclination sensor M3d.
[0017] The boom angle sensor M3a is a sensor that acquires the boom angle θ1 and includes, for example, a rotation angle sensor that detects the rotation angle of the boom foot pin, a stroke sensor that detects the stroke amount of the boom cylinder 7, and an inclination (acceleration) sensor that detects the inclination angle of the boom 4. The boom angle θ1 is the angle of a line segment connecting the boom foot pin position P1 and the arm connecting pin position P2 with respect to a horizontal line on the XZ plane.
[0018] The arm angle sensor M3b is a sensor that acquires the arm angle θ2 and includes, for example, a rotation angle sensor that detects the rotation angle of the arm connecting pin, a stroke sensor that detects the stroke amount of the arm cylinder 8, and an inclination (acceleration) sensor that detects the inclination angle of the arm 5. The arm angle θ2 is the angle of a line segment connecting the arm connecting pin position P2 and the bucket connecting pin position P3 with respect to a horizontal line on the XZ plane.
[0019] The bucket angle sensor M3c is a sensor that acquires the bucket angle θ3 and includes, for example, a rotation angle sensor that detects the rotation angle of the bucket connecting pin, a stroke sensor that detects the stroke amount of the bucket cylinder 9, and an inclination (acceleration) sensor that detects the inclination angle of the bucket 6. The bucket angle θ3 is the angle of a line segment connecting the bucket connecting pin position P3 and the bucket toe position P4 with respect to a horizontal line on the XZ plane.
[0020] The vehicle body tilt sensor M3d is a sensor that acquires the tilt angle θ4 of the shovel about the Y axis and the tilt angle θ5 (not shown) of the shovel about the X axis, and includes, for example, a two-axis tilt (acceleration) sensor, etc. The XY plane in FIG. 2 is a horizontal plane.
[0021] Next, the basic system of the excavator will be described with reference to Fig. 3. The basic system of the excavator mainly includes an engine 11, a main pump 14, a pilot pump 15, a control valve 17, an operating device 26, a controller 30, and an engine control unit (ECU) 74.
[0022] The engine 11 is a drive source of the excavator 100, and is, for example, a diesel engine. The engine 11 operates to maintain a predetermined rotation speed. An output shaft of the engine 11 is connected to input shafts of a main pump 14 and a pilot pump 15.
[0023] The main pump 14 is a hydraulic pump that supplies hydraulic oil to a control valve 17 via a high-pressure hydraulic line 16, and is, for example, a swash plate type variable displacement hydraulic pump. The pilot pump 15 is a hydraulic pump that supplies hydraulic oil to various hydraulic control devices via a pilot line 25, and is, for example, a fixed displacement hydraulic pump.
[0024] The control valve 17 is a hydraulic control valve that controls the hydraulic system in the excavator 100. The control valve 17 selectively supplies hydraulic oil supplied from the main pump 14 through the high-pressure hydraulic line 16 to, for example, one or more of the boom cylinder 7, the arm cylinder 8, the bucket cylinder 9, the traveling hydraulic motor 1A (for left), the traveling hydraulic motor 1B (for right), and the swing hydraulic motor 2A in response to pressure changes corresponding to the operation direction and operation amount of the levers or pedals 26A to 26C. In the following description, the boom cylinder 7, the arm cylinder 8, the bucket cylinder 9, the traveling hydraulic motor 1A (for left), the traveling hydraulic motor 1B (for right), and the swing hydraulic motor 2A are collectively referred to as "hydraulic actuators." The levers or pedals 26A to 26C are provided in the cabin 10 and are operated by an operator.
[0025] The operating device 26 is a device used by an operator to operate the hydraulic actuators. The operating device 26 supplies the hydraulic oil supplied from the pilot pump 15 via the pilot line 25 to the pilot port of the flow control valve. The operating device 26 supplies the hydraulic oil to the pilot port of the flow control valve corresponding to each of the hydraulic actuators. The pressure of the hydraulic oil supplied to each of the pilot ports is set to a pressure according to the operation direction and operation amount of the lever or pedal 26A to 26C corresponding to each of the hydraulic actuators.
[0026] The controller 30 is a control device for controlling the shovel, and is configured, for example, by a computer equipped with a CPU, RAM, ROM, etc. The CPU of the controller 30 reads out programs corresponding to the operations and functions of the shovel 100 from the ROM and loads them into the RAM while executing the programs, thereby executing processing corresponding to each of the programs.
[0027] The controller 30 controls the discharge flow rate of the main pump 14. For example, the controller 30 changes the control current in response to a negative control pressure of a negative control valve (not shown) to control the discharge flow rate of the main pump 14 via the regulator 14a.
[0028] The engine control unit (ECU) 74 is a device that controls the engine 11. For example, based on a command from the controller 30, the ECU 74 outputs to the engine 11 a fuel injection amount and the like for controlling the rotation speed of the engine 11 in accordance with the engine rotation speed (mode) set by an operator using an engine rotation speed adjustment dial 75, which will be described later.
[0029] The engine speed adjustment dial 75 is provided in the cabin 10. The engine speed adjustment dial 75 is a dial for adjusting the engine speed. An operator can switch the engine speed of the engine 11 between, for example, five stages by rotating the engine speed adjustment dial 75. By operating the engine speed adjustment dial 75, the engine speed of the engine 11 can be changed between, for example, five stages, "Rmax", "R4", "R3", "R2", and "R1". For example, the engine 11 speed increases in the order of "Rmax", "R4", "R3", "R2", and "R1".
[0030] Rmax is the maximum engine speed, and is selected when it is desired to prioritize the amount of work. R4 is the second highest engine speed, and is selected when it is desired to balance between the amount of work and fuel efficiency. R3 and R2 are the third and fourth highest engine speeds, and are selected when it is desired to operate the excavator with low noise while prioritizing fuel efficiency. R1 is the lowest engine speed (idling speed), and is the engine speed in idling mode, which is selected when it is desired to keep the engine 11 in an idling state.
[0031] For example, Rmax (maximum rotation speed) may be set to 2000 rpm, R1 (idling rotation speed) may be set to 1000 rpm, and multiple stages may be set therebetween in increments of 250 rpm, such as R4 (1750 rpm), R3 (1500 rpm), and R2 (1250 rpm).The engine 11 is then constantly controlled at the engine rotation speed set by the engine rotation speed adjustment dial 75. Note that, although an example of engine rotation speed adjustment in five stages by the engine rotation speed adjustment dial 75 has been shown here, any number of stages is possible and is not limited to five stages.
[0032] The shovel 100 includes a display device 40 disposed inside the cabin 10. For example, images for assisting the operator in driving are displayed on the display device 40. The operator can input information and commands to the controller 30 using an input unit 42 of the display device 40. In addition, the operating status and control information of the shovel 100 are displayed on the display device 40, thereby providing information to the operator. The display device 40 is, for example, a liquid crystal display device.
[0033] The display device 40 is connected to the controller 30 via a communication network such as CAN, LIN, etc. The display device 40 may be connected to the controller 30 via a dedicated line.
[0034] The display device 40 includes a processing unit 40a that generates an image to be displayed. The processing unit 40a generates a camera image to be displayed on the image display unit 41 based on the output of the imaging device M5. For this purpose, the imaging device M5 is connected to the display device 40 via, for example, a dedicated line. The processing unit 40a also generates an image to be displayed on the display device 40 based on the output of the controller 30.
[0035] The processing unit 40a may be realized as a function of the controller 30, rather than as a function of the display device 40. In this case, the imaging device M5 is connected to the controller 30, rather than to the display device 40.
[0036] The display device 40 may be, for example, a touch panel. The display device 40 functions as an input unit. The display device 40 can display an input screen that is operated by an operator.
[0037] The shovel 100 includes a storage battery 70. The display device 40 operates by receiving power from the storage battery 70. The storage battery 70 is charged with power generated by an alternator 11a (generator) of the engine 11. The power of the storage battery 70 is also supplied to electrical components 72 of the shovel 100 other than the controller 30 and the display device 40. The starter 11b of the engine 11 is driven by power from the storage battery 70 to start the engine 11.
[0038] As described above, the engine 11 is controlled by the engine control unit (ECU) 74. The ECU 74 constantly transmits various data indicating the state of the engine 11 (for example, data indicating the cooling water temperature (physical quantity) detected by the water temperature sensor 11c) to the controller 30. Therefore, the controller 30 can accumulate this data in a temporary storage unit (memory) 30a and transmit it to the display device 40 when necessary.
[0039] In addition, various data are supplied to the controller 30 as follows, and stored in the temporary storage unit 30a of the controller 30.
[0040] First, data indicating the tilt angle of the swash plate is supplied to the controller 30 from the regulator 14a of the main pump 14, which is a variable displacement hydraulic pump. Data indicating the discharge pressure of the main pump 14 is sent to the controller 30 from the discharge pressure sensor 14b. These data (data indicating physical quantities) are stored in the temporary storage unit 30a. An oil temperature sensor 14c is provided in the pipeline between the main pump 14 and a tank that stores the hydraulic oil to be sucked by the main pump 14, and data indicating the temperature of the hydraulic oil flowing through the pipeline is supplied from the oil temperature sensor 14c to the controller 30.
[0041] In addition, when the levers or pedals 26A to 26C are operated, the pilot pressure sent to the control valve 17 through the pilot line 25a is detected by the hydraulic sensors 15a, 15b, and data indicating the detected pilot pressure is supplied to the controller 30.
[0042] Furthermore, data indicating the setting state of the engine speed is constantly transmitted from the engine speed adjustment dial 75 to the controller 30 .
[0043] The shovel 100 includes an external calculation device 30E. The external calculation device 30E is a control device that performs various calculations based on the outputs of the communication device M1, the positioning device M2, the attitude detection device M3, the cylinder pressure detection device M4, the imaging device M5, etc., and outputs the calculation results to the controller 30.
[0044] Next, the function of the external calculation device 30E will be described with reference to Fig. 4. Fig. 4 is a functional block diagram showing a configuration example of the external calculation device 30E. The external calculation device 30E receives outputs from the communication device M1, the positioning device M2, the attitude detection device M3, and the cylinder pressure detection device M4 and executes various calculations. The external calculation device 30E outputs the calculation results to the controller 30.
[0045] The external calculation device 30E has a CPU and a memory unit. The memory unit includes a ROM, a RAM, and a non-volatile memory. The memory unit stores a program for operating the CPU. The memory unit stores various data input by the external calculation device 30E. The memory unit stores a database of various data. The memory unit stores data related to boom bottom pressure. The data related to boom bottom pressure stored in the memory unit may be referred to as a boom pressure reference table. The memory unit stores data related to soil characteristics (density, viscosity, etc.), for example.
[0046] The controller 30 outputs, for example, a control command according to the calculation result to the control valve E1. The control valve E1 is a valve for controlling the movement of the attachment, and is, for example, a regeneration release valve 50, a pressure reducing valve for adjusting the pilot pressure, a relief valve, etc.
[0047] The external calculation device 30E includes a terrain database update unit 31, a position coordinate update unit 32, a ground shape information acquisition unit 33, and a ground contact determination unit .
[0048] The terrain database update unit 31 is a functional element that updates the terrain database. The terrain database systematically stores terrain information of the work site where the shovel 100 is located in a referable manner. The terrain database update unit 31 acquires the terrain information of the work site through the communication device M1, for example, when the shovel 100 is started, and updates the terrain database. The terrain information of the work site is described, for example, by a three-dimensional terrain model based on the global positioning system.
[0049] The position coordinate update unit 32 is a functional element that updates the coordinates and orientation indicating the current position of the shovel 100. The position coordinate update unit 32 acquires the position coordinates and orientation of the shovel 100 in the global positioning system based on the output of the positioning device M2. The position coordinate update unit updates data relating to the coordinates and orientation indicating the current position of the shovel 100 that are stored in the storage unit.
[0050] The ground shape information acquisition unit 33 is a functional element that acquires information about the current shape of the ground to be excavated. The ground shape information acquisition unit 33 acquires information about the current shape of the ground to be excavated based on the topographical information updated by the topographical database update unit 31, the coordinates and orientation representing the current position of the shovel 100 updated by the position coordinate update unit 32, the past transition of the attitude of the attachment AT detected by the attitude detection device M3, and the boom bottom pressure detected by the cylinder pressure detection device M4.
[0051] The ground shape information acquisition unit 33 acquires information related to the trajectory of the bucket 6. The ground shape information acquisition unit 33 calculates the trajectory of the bucket 6 based on the data input from the attitude detection device M3 and data on the shape of the bucket 6.
[0052] The ground shape information acquisition unit 33 derives the current shape of the ground to be excavated by removing a portion corresponding to the space through which the bucket 6 passed during the previous excavation operation from the shape of the ground to be excavated before the previous excavation operation. The ground shape information acquisition unit 33 can estimate the ground shape after the excavation operation. The ground shape information acquisition unit 33 can create a 3D terrain model represented by a 3D mesh model.
[0053] The ground shape information acquisition unit 33 can acquire information on the ground shape after the soil discharge operation. The ground shape information acquisition unit 33 executes a process to acquire the ground shape after soil discharge when the soil discharge operation is performed. The ground shape information acquisition unit 33 executes a process to acquire the ground shape after soil discharge when, for example, the bucket 6 is opened after the excavation operation.
[0054] The ground shape information acquisition unit 33 can estimate the amount of soil loaded. The ground shape information acquisition unit 33 can estimate the amount of soil loaded based on the attitude of the attachment AT detected by the attitude detection device M3 and the boom bottom pressure detected by the cylinder pressure detection device M4. The amount of soil loaded is the amount of soil loaded in the bucket 6 by the excavation operation. The amount of soil loaded may be, for example, the volume of soil loaded in the bucket 6. The amount of soil loaded is limited by a predetermined maximum loading amount.
[0055] The ground shape information acquisition unit 33 acquires the unloaded boom bottom pressure corresponding to the current posture of the excavation attachment by referring to the boom bottom pressure reference table. The unloaded boom bottom pressure means the boom bottom pressure when no soil is loaded in the bucket 6. The boom bottom pressure table is a reference table stored in advance in a ROM or the like, and is generated based on the analysis of actual measurement data. Specifically, the boom bottom pressure table stores the unloaded boom bottom pressure in association with the posture of the attachment detected by the posture detection device M3. Then, the weight of the soil loaded in the bucket 6 is estimated based on the difference between the current boom bottom pressure and the unloaded boom bottom pressure. Then, the volume of the soil loaded in the bucket 6 is estimated based on the estimated weight of the soil and the soil characteristics (density, viscosity, etc.) input in advance.
[0056] The ground shape information acquisition unit 33 can refer to a boom bottom pressure reference table stored in the memory unit. The ground shape information acquisition unit 33 can acquire the boom bottom pressure when unloaded that corresponds to the current attitude of the attachment AT. "Boom bottom pressure when unloaded" means the boom bottom pressure when no soil is loaded in the bucket 6.
[0057] The "boom bottom pressure table" is a reference table stored in advance in the memory unit, and is generated based on the analysis of actual measurement data. The memory unit stores the boom bottom pressure when unloaded as a boom bottom pressure table in association with the posture of the attachment AT detected by the posture detection device M3. The ground shape information acquisition unit 33 can estimate the weight of the soil loaded in the bucket 6 based on the difference between the current boom bottom pressure and the unloaded boom bottom pressure. The ground shape information acquisition unit 33 estimates the volume of the soil loaded in the bucket 6 based on the estimated weight of the soil and the soil properties (density, viscosity, etc.) input in advance.
[0058] The ground shape information acquisition unit 33 may estimate the amount of soil and sand loaded on the basis of changes in the ground shape.
[0059] The ground shape information acquisition unit 33 can calculate the amount of sediment discharged. The ground shape information acquisition unit 33 can calculate the amount of sediment discharged based on the amount of sediment loaded and the sediment discharge rate. The ground shape information acquisition unit 33 can calculate the amount of sediment discharged by multiplying the amount of sediment loaded by the sediment discharge rate.
[0060] The amount of soil discharged is the amount of soil discharged from the bucket 6 by the soil discharge operation, and is calculated by multiplying the soil load by the soil discharge rate. The amount of soil discharged is calculated, for example, as the volume of soil discharged by the bucket 6, similar to the soil load.
[0061] The soil discharge rate is the ratio of the soil discharge amount to the soil load amount, and is determined based on the change in the attachment posture during soil discharge, the change in the operating speed, the soil characteristics, etc. The ground shape information acquisition unit 33 determines the soil discharge rate by referring to a soil discharge rate table.
[0062] The "earthquake dumping rate table" is a reference table stored in advance in the storage unit, and is generated based on the analysis of actual measurement data. The storage unit stores the earthquake dumping rate in association with the bucket angle during the earthquake dumping operation detected by the attitude detection device M3 as the earthquake dumping rate table.
[0063] The storage unit stores data showing the relationship between the bucket angle θ3 and the soil discharge rate. For example, the soil discharge rate is set to 0% when the bucket angle θ3 is approximately 150 degrees or more. The ground shape information acquisition unit 33 can estimate that the soil in the bucket 6 has not yet been discharged if the bucket angle θ3 is approximately 150 degrees or more.
[0064] The soil discharge rate increases as the bucket angle θ3 falls below approximately 150 degrees, and reaches 100% when the bucket angle θ3 is approximately 50 degrees or less. If the bucket angle θ3 is approximately 50 degrees or less, the ground shape information acquisition unit 33 can estimate that all of the soil in the bucket 6 has been discharged.
[0065] The ground shape information acquisition unit 33 can estimate the ground shape after the soil discharge operation. The ground shape information acquisition unit 33 can estimate the ground shape after the soil discharge operation based on the amount of soil discharged, the ground shape before the most recent soil discharge operation, the height of the bucket 6 relative to the ground during the soil discharge operation, the transition of the attitude of the attachment AT during the soil discharge operation, the transition of the operating speed, and the soil characteristics.
[0066] The storage unit can store information regarding the shape of the ground after the earth-discharging operation. The storage unit can store data regarding the positional relationship between the discharged earth and the shovel 100.
[0067] The ground shape information acquisition unit 33 can calculate the reference point of the ground shape. The ground shape information acquisition unit 33 can calculate the reference point of the ground shape by projecting the center point of the bucket 6 onto the horizontal plane on which the shovel is located.
[0068] The ground shape information acquisition unit 33 can calculate the shape of the part of the ground shape after the soil dumping operation that has been updated by the most recent soil dumping operation (hereinafter referred to as the "updated part shape"). In addition, the conditions of the soil dumping operation that resulted in the updated part shape (including, for example, the amount of soil dumped) are referred to as the "reference soil dumping conditions".
[0069] The ground shape information acquisition unit 33 can determine the updated portion shape so that the updated portion shape becomes larger as the amount of soil discharged increases. The ground shape information acquisition unit 33 can determine the updated portion shape according to the size (depth) of the depression in the ground shape before the most recent soil discharge operation was performed.
[0070] The ground shape information acquisition unit 33 can calculate the updated portion shape when the height of the bucket 6 relative to the reference point during the most recent earth-discharging operation is higher than that under the reference earth-discharging condition. The ground shape information acquisition unit 33 can calculate the updated portion shape so that the higher the height of the bucket 6 during the most recent earth-discharging operation, the lower and more widespread it becomes.
[0071] The ground shape information acquisition unit 33 can calculate the shape of the updated portion based on the viscosity of the soil being discharged. The ground shape information acquisition unit 33 can calculate the shape of the updated portion so that the lower the viscosity of the soil discharged in the soil discharge operation, the lower the shape of the updated portion and the more it spreads around.
[0072] The ground shape information acquisition unit 33 can calculate the shape of the updated portion based on the motion speed (opening motion) of the bucket 6 during the soil unloading operation. The ground shape information acquisition unit 33 can calculate the shape of the updated portion so that the faster the opening speed of the bucket 6 during the soil unloading operation, the more biased the shape is in the opening direction of the bucket 6 with respect to the reference point.
[0073] The ground shape information acquisition unit 33 can determine the updated part shape by referring to the updated part shape table. The updated part shape table is a reference table stored in advance in the storage unit, and is generated based on the analysis of actual measurement data. The storage unit stores the updated part shape as the updated part shape table in association with the amount of soil discharged, the ground shape before the most recent soil discharge operation, the height of the bucket 6 during the soil discharge operation, the transition of the attachment's attitude during the soil discharge operation, the transition of the operating speed, soil characteristics, etc.
[0074] In this way, the ground shape information acquisition unit 33 can estimate the ground shape after the soil dumping operation. Therefore, the ground shape information acquisition unit 33 can acquire not only information on the ground shape after the excavation operation, but also information on the ground shape after the soil dumping operation. In other words, the ground shape information acquisition unit 33 can more accurately grasp the shape of the ground to be excavated before the excavation operation is performed.
[0075] The display device 40 can display images relating to the ground shape after an excavation operation and the ground shape after an earth removal operation. The communication device M1 can transmit various data to a management device that manages the operating status of multiple shovels 100.
[0076] The ground contact determination unit 34 is a functional element that determines whether the attachment AT is in contact with the ground and controls the attachment AT. The ground contact determination unit 34 determines whether the bucket 6 is in contact with the ground based on information regarding the current shape of the ground to be excavated acquired by the ground shape information acquisition unit 33, and controls the attachment AT.
[0077] The ground contact determination unit 34 can determine the excavation state based on the current attitude of the attachment AT detected by the attitude detection device M3 and information on the current shape of the ground to be excavated acquired by the ground shape information acquisition unit 33. The ground contact determination unit 34 determines whether the toe of the bucket 6 is in contact with the ground to be excavated. If it is determined that the toe of the bucket 6 is in contact with the ground to be excavated, the ground contact determination unit 34 outputs the determination result to the controller 30.
[0078] The controller 30 that has received the determination result outputs a control command to the regeneration release valve 50 serving as the control valve E1 to increase its opening area. The ground contact determination unit 34 may output a determination result that the tip of the bucket 6 will contact the ground surface to be excavated to the controller 30 immediately before the tip of the bucket 6 contacts the ground surface to be excavated. Furthermore, the excavation attachment may be controlled based on soil density information that has been input in advance.
[0079] Next, the ground information acquisition system 101 will be described with reference to Fig. 4 to Fig. 6. Fig. 5 and Fig. 6 are schematic diagrams showing the ground information acquisition system 101. In Fig. 5 and Fig. 6, the ground G1, G2 on which the shovel 100 is placed is different. In Fig. 5 and Fig. 6, cross sections of the ground G1, G2 are shown. The ground information acquisition system 101 includes the shovel 100 and an elastic wave exploration device 110.
[0080] As shown in Fig. 5 and Fig. 6, the ground information acquisition system 101 can apply vibrations to the grounds G1, G2 using a shovel 100 and measure the vibrations that have passed through the inside of the grounds G1, G2. The shovel 100 can strike the grounds G1, G2 using a bucket 6. The bucket 6 is an example of a striking unit. The shovel 100 can apply vibrations to the grounds G1, G2, for example, by hitting a bottom surface 6a of the bucket 6 against the surface of the grounds G1, G2.
[0081] Bucket 6 has a recessed shape for storing excavated soil and sand. This recessed shape is formed so as to bulge on the side opposite the opening of bucket 6. Bucket 6 has a recessed shape, so it can store soil and sand. A bottom surface 6a of bucket 6 forms a recessed shape. Bottom surface 6a forms the surface of bucket 6 opposite the opening.
[0082] The shovel 100 can detect the position of the bucket 6 by the position coordinate update unit 32 shown in Fig. 4. The external calculation device 30E can calculate the position of the bottom surface 6a of the bucket 6 based on data related to the shape of the bucket 6 and the transition of the trajectory of the bucket 6. The bottom surface 6a of the bucket 6 is the position where it comes into contact with the ground G1, G2.
[0083] The position coordinate update unit 32 can calculate the impact position, which is the position of the bottom surface 6a of the bucket 6, based on the bucket tip position P4 and the bucket angle θ3 shown in FIG. 2. The position coordinate update unit 32 may calculate the impact position of the bucket 6 based on other positions of the attachment AT. The impact position is not limited to the position of the bottom surface 6a of the bucket 6. For example, the ground G1, G2 may be impacted by hitting other parts of the shovel 100 against the ground G1, G2. In this case, the impact position is the position of the shovel 100 that hits the ground G1, G2. For example, the attachment AT may have other impact parts that hit the ground G1, G2. For example, the attachment AT may be equipped with a hammer for impact. The operator can apply vibration to the ground G1, G2 by operating the attachment AT and hitting the impact parts against the ground G1, G2.
[0084] Also, the operator may, for example, operate the bucket 6 to drop an object held by the bucket 6 from above, strike the grounds G1, G2, and apply vibrations to the grounds G1, G2. The shovel 100 can generate elastic waves in the grounds G1, G2 by striking them.
[0085] As shown in FIG. 4, the elastic wave exploration device 110 includes a measuring instrument 111 , an analysis unit 112 , and a communication unit 113 .
[0086] The measuring instrument 111 is, for example, a sensor that is inserted into the grounds G1 and G2 and can detect vibrations of the grounds G1 and G2. The measuring instrument 111 can detect elastic waves that travel through the grounds G1 and G2 and reach the measuring instrument 111.
[0087] The analysis unit 112 includes, for example, a CPU and a storage unit. The analysis unit 112 can receive and analyze signals related to elastic waves measured by the measuring instrument 111. The analysis unit 112 can amplify the received signals related to elastic waves. The elastic wave exploration device 110 can output data related to the elastic waves measured by the measuring instrument 111.
[0088] Fig. 7 is a diagram showing an example of a lateral result obtained by the elastic wave exploration device 110. In Fig. 7, the horizontal axis indicates the passage of time, and the vertical axis indicates position. The position indicated on the vertical axis indicates the position of the measuring instrument 111. The position of the measuring instrument 111 is, for example, the distance from a reference position for measurement. The reference position may be the position of the shovel 100, or may be another position.
[0089] As shown in Figs. 5 and 6, the elastic wave exploration device 110 may measure elastic waves using one measuring instrument 111, or may measure elastic waves using multiple measuring instruments 111. The position of the measuring instrument 111 may be any position. At the site where the shovel 100 is to work, information on the ground G1, G2 is acquired by conducting a boring survey in advance. The measurement position by the measuring instrument 111 may be a position different from the survey position by the boring survey, or may be the same position. For example, by placing the measuring instrument 111 at a position different from the survey position by the boring survey, information that complements the survey results by the boring survey can be acquired. For example, by placing the measuring instrument 111 at the same position as the survey position by the boring survey, the reliability of the survey results by the boring survey can be improved.
[0090] Elastic waves generated by the impact of the shovel 100 travel inside the grounds G1 and G2. For example, the elastic waves are reflected at the boundaries of strata inside the grounds G1 and G2. The elastic wave exploration device 110 can obtain information about the inside of the grounds G1 and G2 by measuring the elastic waves that have traveled inside the grounds G1 and G2.
[0091] The elastic wave exploration device 110 can obtain data on the hardness of the ground G1, G2 as information on the inside of the ground G1, G2. The elastic wave exploration device 110 can obtain data on the strata as information on the inside of the ground G1, G2. The strata include cut soil layers, fill soil layers, sand layers, silt layers, clay layers, bedrock layers, etc. The elastic wave exploration device 110 can obtain data on the depth of the strata and data on the thickness of the strata as information on the inside of the ground G1, G2. The information on the inside of the ground G1, G2 is an example of the "condition of the ground".
[0092] The external calculation device 30E of the excavator 100 shown in FIG. 4 includes a ground information acquisition unit 35, a ground database update unit 36, a risk level determination unit 37, a fuel consumption calculation unit 38, and a control unit 39.
[0093] The ground information acquisition unit 35 acquires information on the inside of the grounds G1, G2 that are the target of work. The information is acquired by inputting information transmitted from the elastic wave exploration device 110. The analysis results by the analysis unit 112 of the elastic wave exploration device 110 can be inputted. The ground information acquisition unit 35 can receive data transmitted from the elastic wave exploration device 110 via the communication device M1. The ground information acquisition unit 35 may acquire information measured by the measuring instrument 111 of the elastic wave exploration device 110 and analyze the acquired information to acquire information on the inside of the grounds G1, G2.
[0094] The ground database update unit 36 updates the ground database. The topography database systematically stores information on the inside of the grounds G1, G2 at the work site where the shovel 100 is located so that the information can be referenced. The ground database update unit 36 acquires information on the inside of the grounds G1, G2 at the work site through the communication device M1, for example, when the shovel 100 is started, and updates the ground database. The ground information of the work site may be described, for example, by a three-dimensional model based on the global positioning system.
[0095] The risk level determination unit 37 determines the risk level of the grounds G1, G2 based on the information on the inside of the grounds G1, G2 acquired by the ground information acquisition unit 35 and the information stored in the ground database. The risk level determination unit 37 can determine the risk level based on information on the hardness of the grounds G1, G2, for example.
[0096] When the ground G1, G2 is soft, the risk level determination unit 37 can determine that the risk level is higher than when the ground G1, G2 is hard. A high risk level indicates that the work by the shovel 100 is in a dangerous state compared to when the risk level is low.
[0097] When the ground G1, G2 is hard, the risk level determination unit 37 can determine that the risk level is lower than when the ground G1, G2 is soft. A low risk level indicates that work by the shovel 100 is safer than when the risk level is high.
[0098] The risk level determination unit 37 may determine the risk levels of the grounds G1, G2 based on the information received from the elastic wave exploration device 110 and the results of the boring survey. The risk level determination unit 37 may determine the risk level taking into consideration other information. Examples of other information include information about the weather and information about the surface shape of the terrain. For example, the risk level determination unit 37 may determine that the risk level is higher when there is a lot of rain compared to when there is a little rain. The risk level determination unit 37 may determine that the risk level is higher when there is a large change in the surface shape of the terrain compared to when there is a small change in the surface shape of the terrain.
[0099] The fuel efficiency calculation unit 38 can calculate the fuel efficiency of the engine 11 based on the information on the inside of the grounds G1, G2 acquired by the ground information acquisition unit 35 and the information stored in the ground database.
[0100] For example, when the ground G1, G2 is hard, the fuel efficiency calculation unit 38 can calculate the fuel efficiency so that the fuel efficiency is lower than when the ground G1, G2 is soft. When the ground G1, G2 is hard, the power of the excavation operation tends to increase, so the fuel efficiency calculation unit 38 can calculate the fuel efficiency so that the fuel efficiency is lower.
[0101] The fuel efficiency calculation unit 38 may calculate the fuel efficiency so that the fuel efficiency differs depending on, for example, the type of stratum of the ground G1, G2. For example, the fuel efficiency calculation unit 38 can calculate the fuel efficiency so that the fuel efficiency is lower when the density of the stratum is high compared to when the density of the stratum is low. When the density of the soil to be excavated is high, the weight of the soil excavated by the bucket 6 increases, and the power of the excavation operation tends to increase, so the fuel efficiency calculation unit 38 can calculate the fuel efficiency so that the fuel efficiency is lower.
[0102] The control unit 39 can control the operation of the shovel 100 based on the information on the inside of the grounds G1, G2 acquired by the ground information acquisition unit 35 and the information stored in the ground database. The control unit 39 can control the operation of the shovel 100 according to the risk level determined by the risk level determination unit 37. The control unit 39 can control the operation of the shovel 100 according to the fuel efficiency calculated by the fuel efficiency calculation unit 38. The control unit 39 can control the operation of the shovel 100 by outputting a command signal to the controller 30.
[0103] The control unit 39 can control the shovel 100 to operate slower when the ground G1, G2 is hard than when the ground G1, G2 is soft. The control unit 39 can control the shovel 100 to operate faster when the ground G1, G2 is soft than when the ground G1, G2 is hard.
[0104] The control unit 39 can control the operation of the bucket 6 so that the amount of excavation in the excavation operation is smaller when the ground G1, G2 is hard, compared to when the ground G1, G2 is soft. The control unit 39 can control the operation of the bucket 6 so that the amount of excavation in the excavation operation is larger when the ground G1, G2 is soft, compared to when the ground G1, G2 is hard.
[0105] The control unit 39 can control the operation of the shovel 100 so as to change the attitude of the attachment AT depending on the hardness of the ground G1, G2. The control unit 39 may control the attitude of the attachment AT so as to make the bucket angle θ3 larger when the ground G1, G2 is hard, compared to when the ground G1, G2 is soft. The control unit 39 may control the attitude of the attachment AT so as to make the bucket angle θ3 smaller when the ground G1, G2 is soft, compared to when the ground G1, G2 is hard.
[0106] The control unit 39 can control the display device 40 to alert the operator when the risk level determined by the risk level determination unit 37 is high. The control unit 39 can control the display device 40 to notify the operator that excavation work can be performed safely when the risk level determined by the risk level determination unit 37 is low. The control unit 39 may, for example, control an audio output unit such as a speaker to notify the operator of the risk level. The display device 40 and the speaker are examples of a notification unit.
[0107] The control unit 39 may increase the operating speed of the shovel 100 when the fuel efficiency calculated by the fuel efficiency calculation unit 38 is high, compared to when the fuel efficiency is low. The control unit 39 may decrease the operating speed of the shovel 100 when the fuel efficiency calculated by the fuel efficiency calculation unit 38 is low, compared to when the fuel efficiency is high.
[0108] The control unit 39 can control the controller 30 to display information on the fuel efficiency calculated by the fuel efficiency calculation unit 38 on the display device 40. The control unit 39 can control the controller 30 to display information on the inside of the grounds G1, G2 acquired by the ground information acquisition unit 35 on the display device 40.
[0109] Next, the display contents displayed on the display device 40 will be described with reference to Fig. 8. Fig. 8 is a diagram showing an example of the display contents displayed on the display device 40. The display device 40 can display an image according to an instruction from the controller 30 shown in Fig. 3.
[0110] The display device 40 can display information about the inside of the grounds G1 and G2. The display device 40 can display information about the strata of the ground G1, the depth of the strata, and the thickness of the strata as images. The display device 40 may change the color or pattern depending on the type of strata. The display device 40 may change the image display depending on the hardness of the ground G1.
[0111] The display device 40 may display the position of the shovel 100 , the striking position of the bucket 6 , and the measurement position of the measuring instrument 111 .
[0112] The display device 40 may also display information related to changes in fuel efficiency depending on the condition of the ground G1. The display device 40 may also display information related to a risk level depending on the condition of the ground G1. The display device 40 may display text information as information related to a risk level depending on the condition of the ground G1. When the risk level of the ground G1 is high, the display device 40 may display the word "Danger", for example. The display device 40 may also change the size or color of the text depending on the risk level.
[0113] The display device 40 may also display guidance to change the posture of the attachment AT according to the state of the ground G1. The display device 40 may use a moving image, a still image, or text as a guidance display to encourage the user to change the posture of the attachment AT.
[0114] Next, the steps of the ground information acquisition method will be described with reference to Fig. 9. Fig. 9 is a flowchart showing the steps of the ground information acquisition method. The ground information acquisition method includes a step of striking the grounds G1, G2 using a shovel 100, and a step of measuring vibrations that are transmitted to the grounds G1, G2 by striking the grounds G1, G2 and that progress through the inside of the grounds G1, G2.
[0115] The ground information acquisition method is executed, for example, before excavation work is performed by the shovel 100. Note that the ground information acquisition method may be executed after excavation work is performed by the shovel 100. Furthermore, the ground information acquisition method may be executed during excavation work by the shovel 100.
[0116] First, the shovel 100 strikes the ground G1, G2 using the bucket 6 (step S11). The operator operates the attachment AT to move the bucket 6 downward, thereby striking the ground. The shovel 100 swings the bucket 6 to strike the bottom surface 6a against the ground.
[0117] By striking the ground with the bucket 6, vibrations are transmitted to the inside of the ground G1, G2. The vibrations transmitted to the ground G1, G2 travel through the ground G1, G2 as appropriate. The vibrations are reflected, for example, at the boundaries of the strata. Also, the transmission speed of the vibrations differs depending on the conditions inside the ground G1, G2.
[0118] Next, the measuring instrument 111 of the elastic wave exploration device 110 detects the vibrations that have traveled inside the grounds G1 and G2 (step S12). The analysis unit 112 of the elastic wave exploration device 110 analyzes the results of the measurement by the measuring instrument 111.
[0119] Next, the elastic wave exploration device 110 outputs the measurement results to the shovel 100 (step S13). Note that the measurement results here include analysis results. The communication unit 113 of the elastic wave exploration device 110 transmits a signal related to the measurement results. The communication device M1 of the shovel 100 receives the signal related to the measurement results transmitted from the elastic wave exploration device 110.
[0120] Next, the external computing device 30E of the shovel 100 evaluates the risk levels of the grounds G1, G2 based on the measurement results by the elastic wave exploration device 110 (step S14). The risk level determination unit 37 of the external computing device 30E grasps the internal state of the grounds G1, G2 and determines the risk levels of the grounds G1, G2. An example of the risk levels has been described above. Also, an example of the internal state of the grounds G1, G2 has been described above.
[0121] Next, the external calculation device 30E calculates the fuel efficiency of the shovel 100 according to the conditions of the grounds G1 and G2 (step S15). The fuel efficiency calculation unit 38 of the external calculation device 30E calculates the fuel efficiency of the shovel 100 according to the conditions of the grounds G1 and G2. An example of the calculation of the fuel efficiency is described above.
[0122] Next, the external calculation device 30E controls the posture of the attachment AT according to the conditions of the ground G1, G2 (step S16). The control unit 39 of the external calculation device 30E can control the operation of the attachment AT so as to change the posture of the attachment AT according to the internal conditions of the ground G1, G2. An example of controlling the posture of the attachment AT has been described above. The control unit 39 may change the posture of the bucket 6 according to the hardness of the ground G1, G2.
[0123] Next, the external calculation device 30E calculates the surface shape of the ground after the shovel 100 excavates the ground G1, G2 (step S17). The ground shape information acquisition unit 33 of the external calculation device 30E can calculate the surface shape of the ground. An example of the calculation of the surface shape of the ground has been described above. The shovel 100 may also calculate the surface shape of the ground by other methods. For example, the shovel 100 can measure the surface shape of the ground by irradiating a laser onto the ground.
[0124] Next, the external calculation device 30E associates and saves the information about the inside of the ground G1, G2 with the information about the surface shape of the ground (step S18). The external calculation device 30E can associate the information about the inside of the ground G1, G2 with the surface shape of the ground, for example, by associating the positions in a plan view. Note that the processing in steps S17 and S18 is performed after the excavation operation of the shovel 100. Steps S17 and S18 may be performed before the excavation operation.
[0125] In addition, the processes in the ground information acquisition method may be performed in a different order or simultaneously, as appropriate. In the ground information acquisition method, the risk levels of the grounds G1, G2 may be determined after the fuel consumption of the shovel 100 is calculated.
[0126] (Action and effect) The ground information acquisition system 101 according to this embodiment includes a shovel 100 having a bucket 6 which is an impact part, and a measuring instrument 111 capable of measuring vibrations transmitted to the ground G1, G2 by impact with the bucket 6 and propagating through the ground G1, G2.
[0127] According to this ground information acquisition system 101, elastic waves can be generated in the grounds G1, G2 by striking the grounds G1, G2 with a bucket 6. According to the ground information acquisition system 101, the internal state of the grounds G1, G2 can be grasped by using a measuring instrument 111 to measure the elastic waves that have passed through the grounds G1, G2.
[0128] Furthermore, the ground information acquisition system 101 determines the risk level of the grounds G1, G2 below the shovel 100 based on the measurement results obtained by the measuring instrument 111, and notifies the risk level of the grounds G1, G2. According to this ground information acquisition system 101, it is possible to determine the risk level based on information about the inside of the grounds G1, G2.
[0129] Furthermore, the ground information acquisition system 101 can notify the operator of the shovel 100 of the risk level, which is the result of the judgment. By looking at the display device 40 provided in the cabin 10, the operator can recognize the risk level based on information about the inside of the ground G1, G2 below the shovel 100. Based on the risk level, the operator can take various measures, such as suspending the excavation work by the shovel 100 or operating it carefully. As a result, the safety of the excavation work by the shovel 100 can be improved.
[0130] Furthermore, the ground information acquisition system 101 determines the state of the ground G1, G2 below the shovel 100 based on the measurement results obtained by the measuring instrument 111, and calculates the fuel consumption of the shovel 100 according to the state of the ground G1, G2. According to this ground information acquisition system 101, the fuel consumption of the shovel 100 can be calculated based on the internal state of the ground G1, G2 below the shovel 100, and the operation of the shovel 100 can be appropriately adjusted according to the calculated fuel consumption. The operator can change the operation taking into account the fuel consumption of the shovel 100 based on the internal state of the ground G1, G2. For example, the operator can concentrate on excavation work without worrying about fuel consumption. Furthermore, the operator can adjust the operation so that fuel consumption does not decrease.
[0131] In the ground information acquisition system 101, the shovel 100 includes a lower traveling body 1, an upper rotating body 3 rotatably mounted on the lower traveling body 1, an attachment AT attached to the upper rotating body 3 and having a bucket 6 as a striking part, and a positioning device M2 for measuring the position of the shovel 100, and calculates the actual striking position of the bucket 6 on the ground based on the position of the shovel 100 and changes in the attitude of the bucket 6. In the shovel 100, the ground contact determination unit 34 can detect the contact position between the bucket 6 and the ground G1, G2. In the shovel 100, the striking position can be measured automatically. As a result, in the ground information acquisition system 101, the measurement accuracy of the elastic wave exploration device 110 can be improved.
[0132] Furthermore, in the ground information acquisition system 101, measurements may be performed continuously by the elastic wave exploration device 110. As a result, the ground information acquisition system 101 can acquire information on the inside of the ground in real time. Since the ground information acquisition system 101 can acquire information on the inside of the ground in real time, it can quickly grasp, for example, changes in the hardness of the ground and changes in loosening of the ground due to prolonged rain. Therefore, risk information such as loosening of the ground can be notified to the operator of the shovel 100 in real time.
[0133] In addition, since the ground information acquisition system 101 can grasp the hardness of the interior of the ground, it is possible to predict the fuel consumption of the shovel 100 according to the hardness of the interior of the ground, and to control the operation of the shovel 100 based on this fuel consumption prediction.
[0134] Furthermore, the ground information acquisition system 101 can control the posture of the attachment AT according to the hardness of the interior of the ground.
[0135] Furthermore, in the ground information acquisition system 101, measurements may be performed by the elastic wave exploration device 110 according to the progress of excavation. This allows the state inside the ground to be grasped, and changes in the strata and the moisture content inside the ground, etc. may be grasped. Furthermore, in the ground information acquisition system 101, the acquired information can be notified to the operator in real time. For example, the display device 40 of the shovel 100 may display changes in the strata, changes in the moisture content, changes in hardness, etc., by using different colors. In the shovel 100, the operator of the shovel 100 can be alerted based on the information acquired by the elastic wave exploration device 110.
[0136] Furthermore, in the ground information acquisition system 101, information acquired by a boring survey is stored in advance in a storage unit, and the survey results by the boring survey can be compared with the measurement results by the elastic wave exploration device 110. In the shovel 100, the operation of the shovel 100 may be controlled based on the survey results by the boring survey and the measurement results by the elastic wave exploration device 110. In the shovel 100, the operation mode of the shovel 100 may be changed according to the measurement results by the elastic wave exploration device 110.
[0137] In addition, the ground information acquisition system 101 can generate elastic waves by striking the ground G1, G2 using the bucket 6 of the shovel 100, and can grasp the internal condition of the ground over a wide area, compared to the conventional practice of striking the ground by a person using a mallet, for example. In addition, the ground information acquisition system 101 can improve workability because it is not necessary for a person to strike the ground using a mallet.
[0138] Furthermore, the ground information acquisition system 101 can be implemented more easily than a conventional method of generating elastic waves in the ground using, for example, dynamite. The ground information acquisition system 101 can expand the measurement range of the elastic wave exploration device 110 without using dynamite, and can reduce dangerous work. When using dynamite, care must be taken in managing and transporting the dynamite, but this is not necessary with the ground information acquisition system 101.
[0139] According to the ground information acquisition system 101, the internal condition of the ground can be easily obtained before and after excavation work by using the shovel 100 present at the work site. In the ground information acquisition system 101, excavation work can be performed by the shovel 100, and the internal condition of the ground can be easily grasped by striking the ground using the shovel 100 and using the elastic wave exploration device 110.
[0140] Second embodiment Next, the geotechnical information management system 120 will be described with reference to Fig. 10. Fig. 10 is a schematic diagram showing the geotechnical information management system 120. The geotechnical information management system 120 is a system that acquires information from geotechnical information acquisition systems 101A-C arranged at multiple work sites, stores the acquired information, and manages it. The geotechnical information management system 120 includes multiple geotechnical information acquisition systems 101A-C and a management device 121.
[0141] The ground information acquisition systems 101A to C have the same configuration as the above-mentioned ground information acquisition system 101. The shovel 100A of the ground information acquisition system 101A is placed on ground G1, the shovel 100B of the ground information acquisition system 101B is placed on ground G2, and the shovel 100C of the ground information acquisition system 101C is placed on ground G3. The shovel 100 has the same configuration as the above-mentioned shovel 100. The shovels 100A to C are examples of a first work machine and a second work machine. The striking positions of the grounds G1 to G3 are examples of a first position and a second position.
[0142] The management device 121 includes a CPU 122 and a storage unit 130. The storage unit 130 includes a ROM, a RAM, and a non-volatile memory. The storage unit 130 stores a program for operating the CPU 122. The storage unit 130 stores various data input by the management device 121.
[0143] The storage unit 130 stores a ground shape database 131 and a ground information database 132. The ground shape database 131 stores data related to the ground shape transmitted from the ground information acquisition system 101. The ground shape database 131 stores information acquired by the ground shape information acquisition unit 33 described above.
[0144] The ground information database 132 stores data on the internal state of the ground transmitted from the ground information acquisition system 101. The ground information database 132 stores the information acquired by the ground information acquisition unit 35 described above.
[0145] The storage unit 130 stores the information stored in the ground shape database 131 and the information stored in the ground information database 132 in association with each other. The storage unit 130 can store data on the ground shape and data on the internal state of the ground based on the position information. The storage unit 130 stores information on the ground shape of the area Kn excavated by the shovel 100 and information on the inside of the ground below the area Kn in association with each other. The position information of the area Kn is position information measured by the positioning device M2 of the shovel 100.
[0146] The ground information management system 120 according to this embodiment includes a plurality of shovels 100A-B arranged at different positions, and includes a measuring instrument 111 capable of measuring an elastic wave transmitted to the ground G1 by the bucket 6 of the shovel 100A and traveling through the inside of the ground G1, a measuring instrument 111 capable of measuring an elastic wave transmitted to the ground G2 by the bucket 6 of the shovel 100B and traveling through the inside of the ground G2, and a measuring instrument 111 capable of measuring an elastic wave transmitted to the ground G3 by the bucket 6 of the shovel 100C and traveling through the inside of the ground G3. The ground information management system 120 includes a memory unit 130 that stores the measurement results measured by the measuring instrument 111 of the ground information acquisition system 101A, the measurement results measured by the measuring instrument 111 of the ground information acquisition system 101B, and the measurement results measured by the measuring instrument 111 of the ground information acquisition system 101C. The measuring instruments 111 of the ground information acquisition systems 101A to C are an example of a first measuring instrument and a second measuring instrument.
[0147] According to such a ground information management system 120, data on the internal conditions of the ground G1 to G3 at multiple sites can be integrated and managed. The ground information management system 120 can centrally manage information on the ground shape and information on the internal conditions of the ground for multiple sites. The ground information management system 120 can effectively utilize information on the internal conditions of the ground acquired by the ground information acquisition system 101, and can grasp information about the ground and take measures. By utilizing the data stored in the ground information management system 120 and taking disaster prevention measures in advance, effective land use can be promoted.
[0148] Although the preferred embodiments of the present invention have been described in detail above, the present invention is not limited to the above-described embodiments, and various modifications and substitutions can be made to the above-described embodiments without departing from the scope of the present invention.
[0149] The above-described shovel 100 may be operated by an operator riding in the cabin 10, or may be capable of remote operation or automatic excavation operation (unmanned operation), for example.
[0150] The imaging device M5 of the shovel 100 is a device that captures images of the periphery of the shovel. The imaging device M5 may be a camera attached to the upper rotating body 3 of the shovel, and can recognize the distance to the ground around the shovel based on the captured images to obtain topographical information of the work site. The imaging device M5 may be a stereo camera, a distance image camera, a three-dimensional laser scanner, or the like.
[0151] The imaging device M5 may also be attached to the outside of the shovel. In this case, the external computing device 30E may acquire the terrain information output by the imaging device M5 via the communication device M1. Specifically, the imaging device M5 may be attached to an aerial photography multicopter, a steel tower installed at a work site, or the like, and may acquire the terrain information of the work site based on an image of the work site viewed from above. When the imaging device M5 is attached to an aerial photography multicopter, it may acquire the terrain information of the work site by capturing an image of the work site viewed from above at a frequency of about once an hour or in real time. The terrain information acquired by the imaging device M5 is used to update the terrain database. When the acquisition interval of the terrain information is one hour or more, the update interval is longer than the update interval of the terrain database based on the signal from the attitude detection device M3.
[0152] In addition, in the above embodiment, the external computing device 30E is described as a separate computing device external to the controller 30, but it may be integrated into the controller 30 as an integral part.
[0153] In addition, in the above embodiment, the ground information acquisition system 101 including the shovel 100 having the bucket 6 as the impact part is illustrated, but the impact part is not limited to the bucket 6. The impact part may be another part that moves in the vertical direction and can impact the ground. For example, the shovel 100 may lower a hook (impact part) provided on the attachment AT to impact the ground.
[0154] In addition, in the above embodiment, the ground information acquisition system 101 including the shovel 100 as the work machine is exemplified, but the work machine is not limited to the shovel 100. The work machine may be, for example, a bulldozer. For example, the bulldozer may strike the ground by raising a bucket and then lowering the bucket.
[0155] Furthermore, the ground information acquisition system 101 may use multiple measuring instruments 111 to measure elastic waves that have traveled inside the ground, or may use one measuring instrument 111 to measure elastic waves. The measuring instrument 111 may be placed at any position as long as it is placed at a position where it can measure elastic waves. The measuring instrument 111 may be placed in front of the shovel 100, behind the shovel 100, or to the side of the shovel 100. The measuring instrument 111 may be placed above the shovel 100, or below the shovel 100.
[0156] In addition, in the above embodiment, the shovel 100 including the engine 11 as the driving source is exemplified, but the driving source is not limited to the engine 11. The shovel 100 may include a motor as the driving source, or may include an engine and a motor. The power supplied to the motor may be power generated by the engine, or may be power stored in a battery. [Explanation of symbols]
[0157] 101, 101A~C Ground information acquisition system 100, 100A~C Shovel (work machine, first work machine, second work machine) 1 Undercarriage 3. Upper rotating body 6 Bucket (impact part) 35 Ground information acquisition department 37 Risk Level Assessment Department 38 Fuel Efficiency Calculation Section 40 Display device (notification unit) 111 Measuring Instrument (1st Measuring Instrument, 2nd Measuring Instrument) 120 Soil Information Management System (Soil Information Acquisition System) AT Attachment G1~G3 Ground M2 positioning device
Claims
1. A work machine having a striking unit; A ground information acquisition system comprising: a measuring instrument capable of measuring vibrations transmitted to the ground by striking the striking part and traveling through the ground.
2. The ground information acquisition system according to claim 1 , which determines a risk level of the ground below the work machine based on the measurement results obtained by the measuring instrument, and notifies the risk level of the ground.
3. The ground information acquisition system according to claim 1 , further comprising: a determination of the condition of the ground below the work machine based on the results of measurements taken by the measuring device; and a fuel consumption rate of the work machine is calculated according to the condition of the ground.
4. The work machine includes: A lower running body; An upper rotating body rotatably mounted on the lower traveling body; an attachment attached to the upper rotating body and having the impact portion; Equipped with The ground information acquisition system according to claim 1 , wherein the ground condition around the work machine is determined based on the measurement results obtained by the measuring instrument, and the attitude of the attachment is changeable according to the ground condition.
5. The work machine includes: A lower running body; An upper rotating body rotatably mounted on the lower traveling body; An attachment attached to the upper rotating body and having a bucket as the impact part; A positioning device that measures the position of the work machine; Equipped with The ground information acquisition system according to claim 1 , further comprising: a calculating section for calculating an actual impact position of the bucket on the ground based on a position of the work machine and a change in attitude of the bucket.
6. The work machine includes: a first work machine disposed at a first location; a second work machine disposed at a second location; The measuring instrument is a first measuring device capable of measuring vibrations that are transmitted to the ground at the first position by the impact unit of the first work machine and that travel through the ground; a second measuring device capable of measuring vibrations transmitted to the ground at the second position by the impact unit of the second work machine and propagating through the ground, The ground information acquisition system according to claim 1 , further comprising a memory unit that stores the measurement results measured by the first measuring instrument and the measurement results measured by the second measuring instrument.
7. A step of striking the ground using a work machine; A ground information acquisition method comprising: a step of measuring vibrations that are transmitted to the ground by striking the ground and that propagate through the ground.
Citation Information
Patent Citations
Bucket excavation force display device for oil pressure shovel
JP1990030822A
Three-dimensional reflection survey data acquisition method using s-wave
JP2004279064A
Overturn preventing device and work machine
JP2019002242A
Excavator
JP2019163621A
Excavator management and support devices
JP2022010051A
