Raising device of stacker crane and raising method of stacker crane
The stacker crane erecting device facilitates the safe and efficient erection of stacker cranes by using a truck section, mast, and hoisting parts to rotate and lift the crane, addressing the issue of high device height in conventional methods.
Patent Information
- Application Number
- JP2023073733
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-27
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2043-04-27
AI Technical Summary
Conventional methods for erecting rack steel frames require hooking a wire rope to a pulley at a height higher than the top, necessitating a high device height, which is inconvenient and potentially dangerous.
A stacker crane erecting device with a truck section, mast, elevating body, and hoisting parts that allow the stacker crane to be erected by lifting and rotating a horizontally elongated member, reducing the overall height of the device and enabling ground-level operation.
The device enables easy and safe erection of a stacker crane without increasing the device's height, allowing ground-level work and reducing the need for high-altitude operations.
Smart Images

Figure 2024158495000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a stacker crane erection device and a stacker crane erection method. [Background technology]
[0002] Conventionally, various methods have been proposed for erecting structures such as pillars. For example, Patent Document 1 discloses a method for erecting a rack steel frame by tying one end of a wire rope to the top of the rack steel frame, hooking the wire rope to pulleys supported on the top and bottom of an already erected steel frame, and pulling the wire rope with a winch. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Japanese Patent Application Publication No. 3-18502 Summary of the Invention [Problem to be solved by the invention]
[0004] However, the rack steel frame erection method of Patent Document 1 requires the wire rope to be hooked onto a pulley that is placed at a height equal to or higher than the top of the rack steel frame, which poses the problem that the height of the device for erecting the rack steel frame becomes high.
[0005] One aspect of the present invention aims to provide a stacker crane erection device and a stacker crane erection method that can easily erect a stacker crane without increasing the height of the device. [Means for solving the problem]
[0006] In order to solve the above problems, a stacker crane erection device according to one aspect of the present invention is a stacker crane erection device having a carriage section, a mast extending vertically from the carriage section, and a lifting body that rises and falls along the mast, and is equipped with a pair of first pillars extending vertically relative to a floor surface, first hoisting sections provided on the upper parts of the pair of first pillars, and lifting sections that are horizontally elongated members arranged under one side of the stacker crane in a laid-down state and have both ends connected to each of the first hoisting sections. The erection device is configured such that the stacker crane rotates and the stacker crane is erected by lifting the hoisting sections with each of the first hoisting sections.
[0007] A stacker crane erection device according to one aspect of the present invention is a stacker crane erection device having a carriage, a mast extending vertically from the carriage, and a lifting body that rises and falls along the mast, and is provided with a first support column extending vertically to a floor surface, a second support column arranged opposite the first support column, a pair of rails installed on the upper parts of the first support column and the second support column, a pair of trolleys arranged movably along each of the pair of rails, a pair of third hoisting units connected to each of the pair of trolleys and arranged movably along the pair of rails, and a lifting unit that is an elongated member arranged under one side of the stacker crane in a laid-down state and has both ends connected to each of the third hoisting units. The erection device is configured such that the stacker crane rotates and the stacker crane is erected by lifting the lifting units with each of the third hoisting units.
[0008] In order to solve the above problems, a method of erecting a stacker crane according to one embodiment of the present invention is a method of erecting a stacker crane using a stacker crane erection device having a carriage section, a mast extending vertically from the carriage section, and a lifting body that rises and falls along the mast, wherein the erection device comprises a pair of first pillars extending vertically relative to a floor surface, first hoisting sections respectively provided on the upper parts of the pair of first pillars, and a hoisting section which is an elongated member positioned under one side of the stacker crane when it is laid down on its side, and both ends of which are connected to each of the first hoisting sections.
[0009] The erection method includes a positioning step of positioning the lifting unit under the stacker crane in the laid-down position, a lifting step of lifting the lifting unit with each of the first hoisting units, and an adjustment step of adjusting the posture of the stacker crane to a vertical position by adjusting the rotation of the stacker crane with each of the first hoisting units.
[0010] A method of erecting a stacker crane according to one embodiment of the present invention is a method of erecting a stacker crane using a stacker crane erection device having a carriage section, a mast extending vertically from the carriage section, and a lifting body that rises and falls along the mast, wherein the erection device comprises a first pillar extending vertically relative to a floor surface, a second pillar arranged opposite the first pillar, a pair of rails installed on the upper parts of the first pillar and the second pillar, a pair of trolleys arranged movably along each of the pair of rails, a pair of third hoisting units connected to each of the pair of trolleys and arranged movably along the pair of rails, and a hoisting unit which is a horizontally elongated member arranged under one side of the stacker crane when it is laid down on its side, and both ends are connected to each of the third hoisting units.
[0011] The erection method includes a positioning step of positioning the lifting section under the stacker crane in the laid-down position, a lifting step of lifting the lifting section using each of the third hoisting sections, and an adjustment step of adjusting the posture of the stacker crane to a vertical position by adjusting the rotation of the stacker crane using each of the third hoisting sections. Effect of the Invention
[0012] According to one aspect of the present invention, a stacker crane can be easily erected without increasing the height of the equipment. [Brief description of the drawings]
[0013] [Figure 1] FIG. 1 is a side view of a construction device according to a first embodiment of the present invention. [Diagram 2] FIG. 2 is a front view of the erection device according to the first embodiment. [Diagram 3] FIG. 2 is a side view showing the start of erecting a stacker crane by the erecting device according to the first embodiment. [Figure 4] FIG. 1 is a perspective view of a stacker crane according to a first embodiment. [Diagram 5] 4 is a flowchart showing an example of the flow of a stacker crane erection method using the erection device of the first embodiment. [Figure 6] FIG. 2 is a side view showing a state in the middle of erecting a stacker crane by the erection device of the first embodiment. [Figure 7] FIG. 2 is a side view showing a state in which a stacker crane is erected by the erecting device according to the first embodiment. [Figure 8] FIG. 11 is a schematic side view showing the start of erecting a stacker crane by the erecting device of the second embodiment. [Figure 9] FIG. 11 is a schematic front view showing the start of erecting a stacker crane by the erecting device of the second embodiment. [Figure 10]FIG. 11 is a schematic side view showing a state in the middle of erecting a stacker crane by the erection device of the second embodiment. [Figure 11] FIG. 11 is a schematic front view showing a state in the middle of erecting a stacker crane by the erection device of embodiment 2. [Figure 12] FIG. 11 is a schematic side view showing a state in which a stacker crane is erected by the erecting device according to the second embodiment. [Figure 13] FIG. 11 is a schematic side view showing the start of erecting a stacker crane by the erecting device of embodiment 3. [Figure 14] FIG. 11 is a schematic front view showing the start of erecting a stacker crane by the erecting device of embodiment 3. [Figure 15] FIG. 11 is a schematic side view showing a state in which a stacker crane is erected by the erection device according to the third embodiment. [Figure 16] FIG. 11 is a schematic side view showing a state in which a stacker crane is erected by the erection device according to the fourth embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0014] [Embodiment 1] Hereinafter, a construction device 1 according to a first embodiment of the present invention will be described with reference to Figs. 1 to 7.
[0015] [Erection device] Fig. 1 is a side view of the erection device 1 of embodiment 1. Fig. 2 is a front view of the erection device 1 of embodiment 1. For ease of explanation, the up-down direction, the front-rear direction, and the left-right direction of the erection device 1 are defined as shown by the arrows in Figs. 1 and 2.
[0016] As shown in Figures 1 and 2, the erection device 1 is a device for erecting a stacker crane 100 with its mast 20 laid down on its side. The erection device 1 includes a pair of first pillars 2, a first chain block 3 which is an example of a first hoisting section, a second chain block 4 which is an example of a second hoisting section, a connecting section 5, a lifting section 6, and a support section 7. The overall height dimension L1 of the erection device 1 is shorter than the overall height dimension L2 of the stacker crane 100 (see Figure 4).
[0017] The pair of first support columns 2 are made of, for example, metal blocks having a rectangular cross section. Each first support column 2 extends vertically, i.e., up and down, relative to the floor surface 200. Each first support column 2 has a main body portion 21, an extension portion 22, a base frame 23, a pair of first reinforcing members 24, a second reinforcing member 25, and a number of wheels 26.
[0018] The main body 21 extends from the base frame 23 in a direction perpendicular to the floor surface 200, i.e., in the up-down direction. The extension portion 22 extends horizontally from the main body 21 toward the front side. The front side of the main body 21 corresponds to the top side of the stacker crane 100 in a laid-down state (see FIG. 3).
[0019] 1, the base frame 23 is provided to extend in the front-rear direction below the main body portion 21. A pair of first reinforcing members 24 are disposed between the main body portion 21 and the base frame 23. The pair of first reinforcing members 24 are members for reinforcing the main body portion 21.
[0020] Further, a second reinforcing member 25 is disposed between the main body 21 and the front end of the extension portion 22. The second reinforcing member 25 is a member for reinforcing the extension portion 22. Further, a plurality of wheels 26 are provided on the lower portion of the base frame 23.
[0021] A first chain block 3 is provided on the upper part of each of the pair of first pillars 2. Specifically, the first chain block 3 is disposed at the front end of each extension section 22. Each first chain block 3 has a chain 31. A hook 32 is provided at the tip of each chain 31. Each hook 32 is connected to a shackle 61 provided at both ends of the lifting section 6 (see FIG. 3).
[0022] Here, Fig. 3 is a side view showing the start of erecting the stacker crane 100 by the erection device 1. As shown in Fig. 3, a lifting part 6 is attached to the tip of each chain 31 of each first chain block 3. Each chain 31 of each first chain block 3 lifts the mast 20 in the longitudinal direction, i.e., near the center in the front-rear direction, via the lifting part 6. It should be noted that the location of the lifting part 6 can be changed as appropriate.
[0023] A second chain block 4 is disposed at the rear end of each extension portion 22. Each second chain block 4 has a chain 41. Each chain 41 of each second chain block 4 pulls the bottom of the stacker crane 100.
[0024] As shown in FIG. 2, the connecting portion 5 is a member for connecting a pair of first pillars 2. The connecting portion 5 has a first connecting portion 51 and a second connecting portion 52. The first connecting portion 51 connects the upper ends of the main body portions 21 to each other. The second connecting portion 52 connects the central portions of the main body portions 21 to each other. The first connecting portion 51 and the second connecting portion 52 function to reinforce the pair of pillars 2. When erecting the stacker crane 100 by the erection device 1, the second connecting portion 52 is removed from the pair of pillars 2.
[0025] The lifting part 6 is a horizontally long plate-like member extending in the left-right direction. The lifting part 6 is disposed under one side of the mast 20 of the stacker crane 100 in a laid-down state. Specifically, the lifting part 6 is disposed under the vicinity of the longitudinal center of the mast 20. Both ends of the lifting part 6 are connected to each chain 31 of each first chain block 3. The lifting part 6 may be a metal pipe or the like.
[0026] The stacker crane 100 is transported to the location where the erecting device 1 is located while being supported by the support part 7. The support part 7 supports the stacker crane 100 at one side surface and the bottom surface that are on the underside of the stacker crane 100 when the mast 20 is laid down. The support part 7 has a plurality of wheels W that come into contact with the floor surface 200 when the stacker crane 100 is erected.
[0027] The erection device 1 is configured such that, by lifting the lifting section 6 with each first chain block 3, the support section 7 rotates together with the stacker crane 100, thereby erecting the stacker crane 100.
[0028] [Stacker crane] Next, the stacker crane 100 erected by the erection device 1 will be described with reference to Fig. 4. Fig. 4 is a perspective view of the stacker crane 100 of the embodiment 1. For ease of explanation, the up-down direction and the left-right direction of the stacker crane 100 are defined as shown by the arrows in Fig. 4.
[0029] As shown in FIG. 4, the stacker crane 100 includes four masts 20, an upper frame 30, a lifting body 40, a carriage unit 50, a crane control unit (not shown), a lifting motor M1, and a traveling motor M2.
[0030] The four masts 20 are provided extending vertically, i.e., upward, from the carriage section 50. Each mast 20 is formed of a vertically long hollow member. The upper frame 30 connects the upper ends of each mast 20 together. The lifting body 40 is supported by each mast 20 and moves along the masts 20.
[0031] The lifting body 40 is configured to be able to grip an article. The lifting body 40 moves up and down along the mast 20 as the chain C is wound up or unwound by the driving force of the lifting motor M1. Note that a belt may be used instead of the chain C.
[0032] The cart unit 50 runs along a traveling rail R. The cart unit 50 supports running wheels W1, W2 that roll on the traveling rail R. The running wheel W1 is provided at the left end of the cart unit 50 and is driven by a traveling motor M2. The running wheel W2 is provided at the right end of the cart unit 50 so as to be able to rotate freely.
[0033] The crane control unit drives the lifting motor M1 to control the lifting and lowering operation of the lifting body 40. The crane control unit also drives the traveling motor M2 to control the traveling operation of the cart unit 50.
[0034] [How to build] Next, a method for erecting the stacker crane 100 by the erecting device 1 will be described with reference to Fig. 5 to Fig. 7. Fig. 5 is a flow chart showing an example of the flow of the method for erecting the stacker crane 100 by the erecting device 1.
[0035] As shown in FIG. 5, in the method for erecting the stacker crane 100 by the erection device 1, a placement process (S1), a lifting process (S2), and an adjustment process (S3) are performed in this order.
[0036] In the placement step S1, first, the stacker crane 100 in a laid-down state is transported by a worker to an automated warehouse or the like in which the erection device 1 is installed, while being placed on the support part 7. Then, the stacker crane 100 in a laid-down state is placed between each main body part 21 of the pair of support pillars 2 of the erection device 1. Specifically, the vicinity of the center part in the longitudinal direction of the mast 20 is positioned directly below each first chain block 3.
[0037] Next, an operator places the lifting part 6 below the stacker crane 100 in the laid-over state. Specifically, the lifting part 6 is inserted into a plurality of eyebolts (not shown) provided near the center of the mast 20 in the longitudinal direction. The lifting part 6 is then placed below the center of the mast 20 in the longitudinal direction.
[0038] Next, in the lifting process S2, as shown in FIG. 3, the hooks 32 of each chain 31 of each first chain block 3 are connected to the shackles 61 provided at both ends of the lifting part 6. Then, by lifting the lifting part 6 with each first chain block 3, as shown in FIG. 6, the stacker crane 100 is gradually rotated clockwise in FIG. 6 around the wheel W provided at the front bottom of the support part 7, thereby erecting the stacker crane 100. The chains 31 are lifted manually by an operator. Also, the lifting part 6 is lifted with the second connecting part 52 detached from the pair of supports 2.
[0039] Next, in the adjustment step S3, the erection device 1 adjusts the rotation of the stacker crane 100 while gradually rotating the stacker crane 100 clockwise in Fig. 6 around the front bottom of the support part 7 by lifting the hoisting parts 6 with each first chain block 3. Then, as shown in Fig. 7, the posture of the stacker crane 100 is adjusted to a vertical state, thereby completing the erection of the stacker crane 100.
[0040] In this manner, when the stacker crane 100 is brought into a vertical position by the erection device 1, the wheels W provided on the support part 7 come into contact with the floor surface 200 and roll on the floor surface 200, so that the stacker crane 100 can be erected smoothly.
[0041] [Effects of the first embodiment] In the erection device 1 of embodiment 1 described above, the first chain blocks 3 provided on the upper parts of a pair of first pillars 2 lift the lifting section 6 located under the stacker crane 100 which is in a laid-down state, causing the stacker crane 100 to rotate, making it easy to erect the stacker crane 100.
[0042] In particular, since the overall height dimension L1 of the erection device 1 is shorter than the overall height dimension L2 of the stacker crane 100, the stacker crane 100 can be erected without increasing the height of the erection device 1, and the erection device 1 can be made compact.
[0043] Furthermore, in the past, when the top of the stacker crane 100 was hoisted up to erect it, a worker had to open the ceiling using a high-altitude work vehicle or the like, and hoist the top of the stacker crane 100 from a steel frame installed behind the ceiling using a chain block or the like. In contrast, with the erection device 1, the total height dimension L1 of the erection device 1 is shorter than the total height dimension L2 of the stacker crane 100, so there is no need to open the ceiling to work at high altitudes, and the stacker crane 100 can be erected only by work on the ground. In addition, the amount of winding of each chain 31 of each first chain block 3 can be reduced, and the lifting process S2 can be shortened.
[0044] Furthermore, since the pair of first support pillars 2 are connected by the first connecting portion 51 and the second connecting portion 52, it is possible to improve the durability of the erecting device 1. Furthermore, since the first chain block 3 is disposed at the front end portion of the extension portion 22, it is possible to prevent the first connecting portion 51 from interfering with the stacker crane 100 when erecting the stacker crane 100 with the first chain block 3.
[0045] In addition, by lifting the lifting section 6 with each first chain block 3, when erecting the stacker crane 100, the bottom of the stacker crane 100 is pulled by each second chain block 4, thereby preventing sudden rotation of the stacker crane 100 and allowing the stacker crane 100 to be erected gently.
[0046] [Embodiment 2] Next, a construction of a construction device 1A according to a second embodiment of the present invention will be described with reference to Fig. 8 to Fig. 12. For ease of explanation, the same reference numerals are given to members having the same functions as those described in the first embodiment, and the explanations thereof will not be repeated.
[0047] [Erection device] Fig. 8 is a schematic side view showing the start of erecting the stacker crane 100 by the erection device 1A. Fig. 9 is a schematic front view showing the start of erecting the stacker crane 100 by the erection device 1A. For ease of explanation, the up-down direction, front-rear direction, and left-right direction of the erection device 1A are defined as shown by the arrows in Figs. 8 and 9.
[0048] 8 and 9, the erection device 1A includes a pair of first pillars 2A, a first chain block 3A which is an example of a first hoisting section, a lifting section 6, a support section 7, a reinforcing section 8, a second chain block 4A which is an example of a second hoisting section, a first connecting section 51A, and a second connecting section 52A (see FIG. 11). The overall height dimension L1A of the erection device 1A is shorter than the overall height dimension L2 of the stacker crane 100 (see FIG. 4).
[0049] Each of the first support columns 2A has a front support column 21A, a rear support column 22A, a base frame 23A, and a connection portion 24A. Each support column 2A extends vertically, i.e., in the up-down direction, relative to the floor surface 200. As shown in Fig. 9, the pair of support columns 2A are disposed on both sides of the stacker crane 100 with a gap between them in the left-right direction.
[0050] The base frame 23A is placed on the upper surface of a base plate P placed in a recess 201 recessed into a floor surface 200. The depth of the recess 201, i.e., the length in the vertical direction, is, for example, about 600 mm. The thickness of the base plate P is, for example, about 20 mm. Note that the recess 201 does not have to be provided, and in this case, it is sufficient to place the base plate P on the floor surface 200.
[0051] The front support pillars 21A and the rear support pillars 22A extend vertically upward from the base frame 23A as shown in Fig. 8. The front support pillars 21A and the rear support pillars 22A are disposed with an interval therebetween in the front-rear direction.
[0052] The connection part 24A connects the front pillar 21A and the rear pillar 22A. A first chain block 3A is attached to the connection part 24A. Each first chain block 3A is provided on the upper part of each first pillar 2A. Each first chain block 3A has a chain 31A. A hook 32A is provided at the tip of each chain 31A. Each hook 32A is connected to a shackle 61 provided at both ends of the lifting part 6.
[0053] Further, a first coupling part 51A is attached to the connection part 24A. As shown in Fig. 9, the first coupling part 51A couples the upper parts of the pair of first pillars 2A to each other. The first coupling part 51A is configured to be detachable from the pair of first pillars 2A. The first coupling part 51A is removed in the middle of erecting the stacker crane 100 by the erection device 1A.
[0054] A reinforcing part 8 is disposed on the rear side of each of the pair of first support columns 2A. Each reinforcing part 8 is connected to each of the first support columns 2A to reinforce each of the first support columns 2A. Each reinforcing part 8 is disposed on the bottom side of the stacker crane 100 that is laid down on its side relative to each of the first support columns 2A.
[0055] The reinforcing portion 8 has a pillar portion 81 and a connection portion 82. The pillar portion 81 extends vertically upward from the base frame 23A. The connection portion 82 connects the pillar portion 81 to the rear support column 22A of the first support column 2A.
[0056] A second chain block 4A is provided at each connection portion 82 of each reinforcing portion 8. Each chain 41A of each second chain block 4A pulls the bottom portion of the stacker crane 100.
[0057] The erection device 1A lifts the lifting parts 6 with each of the first chain blocks 3A, gradually rotating the stacker crane 100 clockwise in Fig. 8 around the front bottom part of the support part 7. At this time, the wheels W attached to the support part 7 come into contact with the base plate P, making it easier for the stacker crane 100 to rotate.
[0058] [How to build] Next, a method for raising the stacker crane 100 by the raising device 1A will be described with reference to Fig. 5 and Figs. 8 to 12. Fig. 10 is a schematic side view showing the state in the middle of raising the stacker crane 100 by the raising device 1A. Fig. 11 is a schematic front view showing the state in the middle of raising the stacker crane 100 by the raising device 1A. Fig. 12 is a schematic side view showing the state in which the stacker crane 100 has been raised by the raising device 1A.
[0059] In the method for erecting the stacker crane 100 by the erection device 1A of the second embodiment, first, as in the first embodiment, the arrangement process (S1), the lifting process (S2), and the adjustment process (S3) are performed in this order as shown in FIG.
[0060] First, in the placement step S1, an operator drops the bottom side of stacker crane 100 in a laid-down state onto the upper surface of base plate P placed in recess 201 while the bottom side is placed on support 7 as shown in Fig. 8. At this time, the top side of stacker crane 100 is left on floor surface 200.
[0061] Next, an operator places the lifting unit 6 below the stacker crane 100 in the laid-over state. The lifting unit 6 is placed below the mast 20 near the center in the longitudinal direction (see FIG. 9).
[0062] Next, in the lifting process S2, the first chain blocks 3A lift the lifting parts 6 to gradually rotate the stacker crane 100. At this time, since there is a step between the floor surface 200 and the upper surface of the recess 201, the stacker crane 100 supported by the support parts 7 can easily rotate.
[0063] In the second embodiment, in the middle of erecting the stacker crane 100, as shown in FIG. 10, a second chain block 4A is attached to the front side of the recess 201, and the bottom of the stacker crane 100 is pulled by a chain 41A.
[0064] Furthermore, as shown in Fig. 11, second connecting parts 52A are attached to the pair of first pillars 2A. The second connecting parts 52A connect the central parts of the pair of first pillars 2A in the extension direction. The second connecting parts 52A are configured to be detachable from the pair of first pillars 2A. Note that the second connecting parts 52A are configured such that they cannot be detached from the pair of first pillars 2A when the first connecting parts 51A are detached from the pair of first pillars 2A.
[0065] Then, after the second connecting portions 52A are attached to the pair of first support pillars 2A, the first connecting portions 51A are removed from the pair of first support pillars 2A so that the first connecting portions 51A do not interfere with the rotation of the stacker crane 100.
[0066] Next, in the adjustment step S3, the erection device 1A lifts the hoisting section 6 with each of the first chain blocks 3A, gradually rotating the stacker crane 100 clockwise in Fig. 10 around the wheel W attached to the front bottom of the support section 7. Then, as shown in Fig. 12, the position of the stacker crane 100 is adjusted while lifting the hoisting section 6 with each of the first chain blocks 3A so that the posture of the stacker crane 100 is vertical.
[0067] [Effects of the second embodiment] The erection device 1A of the second embodiment described above can also provide the same effects as the erection device 1 of the first embodiment. In particular, since the pair of first pillars 2A is supported by each reinforcing part 8, the durability of the erection device 1A can be improved. Furthermore, when adjusting the posture of the stacker crane 100 to a vertical state, the bottom of the stacker crane 100 is pulled by the chain 41A of the second chain block 4A, so that sudden rotation of the stacker crane 100 can be suppressed.
[0068] In addition, when the erection device 1A starts erecting the stacker crane 100, the pair of first pillars 2A are connected by the first connecting parts 51A in a state in which the second connecting parts 52A are removed from the pair of first pillars 2A, as shown in Figures 8 and 9. This makes it possible to reinforce the erection device 1A while preventing the second connecting parts 52A from interfering with the rotation of the stacker crane 100.
[0069] On the other hand, when the erection of the stacker crane 100 by the erection device 1A has progressed, as shown in Figures 10 and 11, by removing the first connecting part 51A from the pair of first pillars 2A and connecting the pair of first pillars 2A by the second connecting part 52A, it is possible to reinforce the erection device 1A while preventing the first connecting part 51A from interfering with the rotation of the stacker crane 100.
[0070] [Embodiment 3] Next, a construction device 1B according to a third embodiment of the present invention will be described with reference to Figs. 13 to 15. For ease of explanation, the same reference numerals are used for members having the same functions as those described in the first embodiment, and the explanations thereof will not be repeated. The construction device 1B according to the third embodiment is mainly different from the first embodiment in that it does not include a connecting portion 5 and an extension portion 22 as in the construction device 1.
[0071] [Erection device] Fig. 13 is a schematic side view showing the start of erecting the stacker crane 100 by the erection device 1B of embodiment 3. Fig. 14 is a schematic front view showing the start of erecting the stacker crane 100 by the erection device 1B of embodiment 3. For convenience of explanation, the up-down direction, the front-rear direction, and the left-right direction of the erection device 1B are defined as shown by the arrows in Figs. 13 and 14.
[0072] 13 and 14, the erection device 1B includes a pair of first pillars 2B, a first chain block 3B which is an example of a first hoisting section, a second chain block 4B which is an example of a second hoisting section, a lifting section 6, a support section 7, and the second chain block 4B. The erection device 1B has an overall height L1B that is shorter than the overall height L2 (see FIG. 4) of the stacker crane 100.
[0073] Each of the first pillars 2B has a front pillar 21B, a rear pillar 22B, a base frame 23B, and a connection portion 24B. Each pillar 2B extends vertically, i.e., in the up-down direction, relative to the floor surface 200. As shown in FIG. 14, the pair of pillars 2B are disposed on both sides of the stacker crane 100 with a gap between them in the left-right direction.
[0074] The base frame 23B is disposed on the upper surface of the base plate P placed in the recess 201. As shown in Fig. 13, the front support pillar 21A and the rear support pillar 22A extend vertically upward from the base frame 23B. The front support pillar 21B and the rear support pillar 22B are disposed with an interval between them in the front-rear direction.
[0075] The connection part 24B connects the front pillar 21B and the rear pillar 22B. A first chain block 3B is attached to the connection part 24B. Each first chain block 3B is provided on the upper part of each first pillar 2B. Each first chain block 3B has a chain 31B. A hook 32B is provided at the tip of each chain 31B. Each hook 32B is connected to a shackle 61 provided at both ends of the lifting part 6.
[0076] In addition, a second chain block 4B is attached to the front side surface of the recessed portion 201. The second chain block 4B has a chain 41B. The chain 41B of the second chain block 4B pulls the bottom of the stacker crane 100.
[0077] [How to build] Next, a method for erecting the stacker crane 100 by the erecting device 1B will be described with reference to Figures 5 and 15. Figure 15 is a schematic side view showing how the stacker crane 100 is erected by the erecting device 1B.
[0078] In the method for erecting the stacker crane 100 by the erecting device 1B of the third embodiment, first, the arrangement step S1 shown in FIG. 5 is performed in the same manner as in the second embodiment.
[0079] Next, in the lifting process S2, as shown in the upper diagram of Fig. 15, the lifting section 6 is lifted by each first chain block 3B, and the stacker crane 100 is gradually rotated clockwise in Fig. 15 around the wheel W provided on the front bottom of the support section 7, thereby erecting the stacker crane 100. At this time, the wheel W comes into contact with the base plate P, making it easier for the stacker crane 100 to rotate.
[0080] Next, in the adjustment process S3, the erection device 1B adjusts the rotation of the stacker crane 100 by lifting the lifting section 6 with each first chain block 3B, and adjusts the posture of the stacker crane 100 to a vertical state as shown in the lower diagram of Figure 15.
[0081] In this way, when the stacker crane 100 is erected to a vertical position by the erection device 1B, the bottom of the stacker crane 100 is pulled by each chain 41B of each second chain block 4B, thereby preventing the stacker crane 100 from rotating suddenly.
[0082] [Effects of the third embodiment] In the erection device 1B of the above-described embodiment 3, as in the erection device 1 of embodiment 1, the stacker crane 100 in a laid-down state can be erected without increasing the overall height dimension L1B of the erection device 1B.
[0083] In particular, in the erection device 1B of embodiment 3, it is not necessary to provide an extension portion 22 on the support 2B as in the erection device 1 of embodiment 1, so the length of the erection device 1B in the front-to-rear direction can be shortened, and the erection device 1B can be made smaller.
[0084] [Embodiment 4] Next, a construction frame 1C according to a fourth embodiment of the present invention will be described with reference to Fig. 16. For ease of explanation, the same reference numerals are given to members having the same functions as those described in the first embodiment, and the explanations thereof will not be repeated.
[0085] [Erection device] Fig. 16 is a schematic side view showing how the stacker crane 100 is erected by the erection device 1C. For convenience of explanation, the up-down direction and the front-rear direction of the erection device 1C are defined as shown by the arrows in Fig. 16.
[0086] As shown in Fig. 16, the erection device 1C includes a first support pillar 2C, a second support pillar 3C, a pair of third chain blocks 4C, a pair of trolleys 5C, a lifting section 6, a support section 7, and a pair of rails 9C. The third chain block 4C is an example of a third hoisting section. The overall height dimension L1C of the erection device 1C is shorter than the overall height dimension L2 (see Fig. 4) of the stacker crane 100.
[0087] The erector 1C erects the stacker crane 100 on the upper surface of the base plate P placed in the recess 201. The recess 201 may not be present, and in this case, the erector 1C may erect the stacker crane 100 on the floor surface 200.
[0088] The first support pillar 2C extends in a direction perpendicular to the floor surface 200. The first support pillar 2C is formed, for example, from a rectangular column-shaped member. The second support pillar 3C extends in a direction perpendicular to the floor surface 200. The second support pillar 3C is formed, for example, from a rectangular column-shaped member.
[0089] The second support pillar 3C is disposed facing the first support pillar 2C in the front-rear direction. A stacker crane 100 in a laid-down state is disposed between the first support pillar 2C and the second support pillar 3C. Note that the first support pillar 2C and the second support pillar 3C may each be a pair of left and right support pillars.
[0090] A pair of rails 9C are installed on the tops of the first support pillar 2C and the second support pillar. The rails 9C are arranged at intervals in the left-right direction. Each rail 9C is made of an I-beam, an H-shaped steel material, or the like. Note that in FIG. 16, only one of the rails 9C (left or right) is shown, and the other rail 9C is omitted.
[0091] A trolley 5C is disposed on each of the pair of rails 9C. Each trolley 5C is disposed so as to be movable in the front-rear direction along each of the rails 9C. Note that in FIG. 16, only one of the left and right trolleys 5C is shown, and the other trolley 5C is omitted.
[0092] A third chain block 4C is connected to each trolley 5C. Each third chain block 4C has a chain 41C. Each third chain block 4C is disposed so as to be movable in the front-rear direction along each rail 9C. A hook 42C is provided at the tip of each chain 41C. Each hook 42C is connected to a shackle 61 provided at both ends of the lifting part 6.
[0093] [How to build] Next, a method for erecting the stacker crane 100 by the erection device 1C will be described with reference to Fig. 5 and Fig. 16. As shown in Fig. 5, in the method for erecting the stacker crane 100 by the erection device 1C, a placement process (S1), a lifting process (S2), and an adjustment process (S3) are performed in this order.
[0094] In the placement step S1, the lifting unit 6 is placed under the stacker crane 100 in a laid-down state. At this time, by moving the trolley 5C, it is possible to adjust the lifting position of the lifting unit 6 by the third chain block 4C in the longitudinal direction of the stacker crane 100.
[0095] Next, in the lifting process S2, as shown in the upper diagram of Fig. 16, the lifting parts 6 are lifted by the third chain blocks 4C, and the stacker crane 100 is gradually rotated clockwise in Fig. 16 around the front bottom part of the support part 7, thereby erecting the stacker crane 100. At this time, the wheels W attached to the support part 7 come into contact with the base plate P, making it easier for the stacker crane 100 to rotate.
[0096] Next, in the adjustment process S3, the erection device 1C adjusts the rotation of the stacker crane 100 by lifting the lifting section 6 with each third chain block 4C, and adjusts the posture of the stacker crane 100 to a vertical state as shown in the lower diagram of Figure 16.
[0097] [Effects of the fourth embodiment] The raising device 1C of the embodiment 4 described above can also provide the same effects as the raising device 1 of the embodiment 1. That is, the stacker crane 100 in a laid-down state can be raised by lifting the hoisting section 6C with each third chain block 4C without increasing the overall height dimension L1C of the raising device 1C.
[0098] In particular, according to the erection device 1C of embodiment 3, by moving the trolley 5C along the rail 9C, the position of the lifting part 6 in the longitudinal direction of the mast 20 is adjusted to adjust the lifting position, thereby enabling the stacker crane 100 to be erected satisfactorily.
[0099] Other embodiments In the above-mentioned first to third embodiments, the first chain blocks 3, 3A, 3B and the second chain blocks 4, 4A, 4B are used as an example of the first winding section and the second winding section, respectively, but the present invention is not limited thereto. For example, wires may be used instead of the chains 31, 31A, 31B of the first chain blocks 3, 3A, 3B. Also, wires may be used instead of the chains 41, 41A, 41B of the second chain blocks 4, 4A, 4B.
[0100] The erection device 1 of the above-mentioned embodiment 1 is provided with the support part 7, but is not limited thereto, and may not be provided with the support part 7. In this case, the stacker crane 100 can be erected satisfactorily by directly attaching the wheels W to the stacker crane 100. Also, the support part 7 may be configured separately from a member that supports one side of the stacker crane 100 and a member that supports the bottom surface of the stacker crane 100.
[0101] In addition, in each of the above-described embodiments, the stacker crane 100 is provided with four masts 20, but is not limited to this. The stacker crane 100 is required to be provided with at least one mast 20, and may be provided with only one mast 20.
[0102] In addition, in the erection device 1 of the above-mentioned embodiment 1, the chains 31 of each first chain block 3 are manually lifted by an operator, but this is not limiting. For example, a control unit for automatically lifting each chain 31 of each first chain block 3 may be provided. Then, the control unit may lift each chain 31 of each first chain block 3, thereby erecting the stacker crane 100 at a constant speed via the lifting unit 6. According to this configuration, the control unit can automatically erect the stacker crane 100 at a constant speed, thereby saving the worker's effort.
[0103] In the erection device 1C of the fourth embodiment, the first support 2C and the second support 3C are configured from rectangular column-shaped members, but are not limited thereto. For example, each of the first support 2C and each of the second support 3C may be configured by stacking a plurality of rectangular parallelepiped structures vertically and connecting them with bolts or the like. Each structure is formed from plate-shaped metal, hard ceramics, or the like. With this configuration, the height of the first support 2C and the second support 3C can be easily changed by adjusting the number of structures to be stacked.
[0104] The present invention is not limited to the above-described embodiments, and various modifications are possible within the scope of the claims. Embodiments obtained by appropriately combining the technical means disclosed in different embodiments are also included in the technical scope of the present disclosure. [Explanation of symbols]
[0105] 1, 1A, 1B, 1C Erection device 2, 2A, 2B, 2C 1st pillar 3, 3A, 3B No. 1 chain block 3C 2nd pillar 4, 4A, 4B No. 2 chain block 4C 3rd Chain Block 5 Connecting part 5C Trolley 7 Support part 8 Reinforcement 9C Rail 20 Mast 21 Main body 22 Extension section 31, 31A, 31B, 41, 41B, 41C Chain 40 Lifting body 50 Bogie section 51, 51A 1st connection part 52, 52A 2nd connection part 100 Stacker Crane 200 Floor S1 placement process S2 Lifting process S3 adjustment process
Claims
1. A stacker crane erection device having a carriage section, a mast extending vertically from the carriage section, and a lifting body that rises and falls along the mast, A pair of first support columns extending in a direction perpendicular to the floor surface; a first winding section provided on an upper portion of each of the pair of first pillars; A horizontally elongated member arranged under one side of the stacker crane in a horizontally laid state, the lifting section having both ends connected to each of the first hoisting sections; Equipped with A stacker crane erection device characterized in that the stacker crane is configured to rotate and erect by lifting the hoisting section with each of the first hoisting sections.
2. A connecting portion that connects the pair of first pillars is further provided, The pair of first pillars have a pair of main body portions extending vertically to the floor surface, and an extension portion extending horizontally from each of the pair of main body portions toward the top surface side of the stacker crane in a laid-down state, The erection device for a stacker crane according to claim 1, wherein each of the first hoisting sections is disposed at a front end of the extension section.
3. Further, a second roll-up portion is provided at a rear end of the extension portion, Each of the first hoisting sections hoists the vicinity of the longitudinal center of the mast via the hoisting section, The stacker crane erection device according to claim 2, wherein each of the second hoisting units pulls the bottom of the stacker crane.
4. Further comprising a first connecting portion and a second connecting portion connecting the pair of first pillars, The first connecting portion connects upper portions of the pair of first pillars to each other, The stacker crane erection device according to claim 1, characterized in that the second connecting portion is detachable from the pair of first pillars and connects the central portions of the pair of first pillars in the extension direction to each other.
5. A reinforcing portion disposed on the bottom side of the stacker crane in a state where the stacker crane is laid down on its side with respect to the pair of first columns; A pair of second roll-up portions provided on the reinforcing portion; Further comprising: The stacker crane erection device according to claim 1, wherein each of the second hoisting units pulls the bottom of the stacker crane.
6. A stacker crane erection device having a carriage section, a mast extending vertically from the carriage section, and a lifting body that rises and falls along the mast, A first support column extending in a direction perpendicular to the floor surface; A second support pillar disposed opposite the first support pillar; A pair of rails installed on the upper portions of the first support pillar and the second support pillar, A pair of trolleys movably disposed along each of the pair of rails; A pair of third hoisting units connected to the pair of trolleys, respectively, and arranged movably along the pair of rails; A horizontally elongated member arranged under one side of the stacker crane in a horizontally laid state, the lifting section having both ends connected to each of the third hoisting sections; Equipped with A stacker crane erection device characterized in that the stacker crane is configured to rotate and erect by lifting the hoisting section with each of the third hoisting sections.
7. The erection device for a stacker crane according to any one of claims 1 to 6, characterized in that the overall height dimension of the erection device is shorter than the overall height dimension of the stacker crane.
8. Further comprising a control unit for lifting each of the first hoist units, The control unit is 6. The stacker crane erecting device according to claim 1, wherein the stacker crane is erected at a constant speed via the hoisting parts by hoisting each of the first hoisting parts.
9. A method for erecting a stacker crane using an erection device for a stacker crane having a carriage section, a mast extending vertically from the carriage section, and a lifting body that rises and falls along the mast, comprising: The erection device is A pair of first support columns extending in a direction perpendicular to the floor surface; a first winding section provided on an upper portion of each of the pair of first pillars; A horizontally elongated member arranged under one side of the stacker crane in a horizontally laid state, the lifting section having both ends connected to each of the first hoisting sections; Equipped with A placement process of placing the lifting part under the stacker crane in the laid-down state; a lifting step of lifting the lifting section by each of the first hoists; an adjusting process of adjusting the posture of the stacker crane to a vertical state by adjusting the rotation of the stacker crane by each of the first hoisting units; A method for erecting a stacker crane, comprising:
10. A method for erecting a stacker crane using an erection device for a stacker crane having a carriage section, a mast extending vertically from the carriage section, and a lifting body that rises and falls along the mast, comprising: The erection device is A first support column extending in a direction perpendicular to the floor surface; A second support pillar disposed opposite the first support pillar; A pair of rails installed on the upper portions of the first support pillar and the second support pillar, A pair of trolleys movably disposed along each of the pair of rails; A pair of third hoisting units connected to the pair of trolleys, respectively, and arranged movably along the pair of rails; A horizontally elongated member arranged under one side of the stacker crane in a horizontally laid state, the lifting section having both ends connected to each of the third hoisting sections; Equipped with A placement process of placing the lifting part under the stacker crane in the laid-down state; a lifting step of lifting the lifting section by each of the third hoists; an adjusting process of adjusting the posture of the stacker crane to a vertical state by adjusting the rotation of the stacker crane by each of the third hoisting units; A method for erecting a stacker crane, comprising:
Citation Information
Patent Citations
JP1973078641A
JP1982158673U
Panel raising device
JP1991024553U
Conveying set up method of stacker crane for automatic warehouse, crane conveying set up implement, crane suspending jig, crane set up jig, and crane set up implement
JP1998291608A
Simple crane
JP2002187690A
