Method for designing support structure for cut and expanded excavation face
The elastoplastic theory-based method for designing support structures for cut-and-expand excavation surfaces addresses the inefficiencies of three-dimensional analysis by quantifying stress and displacement, facilitating rapid and precise support structure design.
Patent Information
- Application Number
- JP2023075019
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-28
- Publication Date
- 2024-11-08
AI Technical Summary
Existing methods for designing support structures for cut-and-expand excavation surfaces require significant effort and time for three-dimensional excavation analysis, and lack a quantitative evaluation of the insulating effect.
A method using elastoplastic theory to create characteristic curves for shaft and cut-and-expand excavation surfaces, allowing for the quantification of stress and displacement, and enabling design of support structures without full three-dimensional analysis, utilizing spreadsheet-based calculations.
Enables efficient and precise design of support structures for cut-and-expand excavation surfaces by quantitatively evaluating the insulating effect, reducing displacement and stress, and allowing for rapid specification adjustments.
Smart Images

Figure 2024159184000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a method for designing a support structure for an excavation face. [Background technology]
[0002] Among the construction methods for mountain tunnels, the central pilot tunnel advancement method is a method in which a pilot tunnel with a small cross section is advanced, and then cutting and excavating at the normal cross section is performed. In the central pilot tunnel advancement method, the stress field in which the initial stress of the ground is reduced due to the stress release caused by pilot tunnel excavation is expanded, so it is expected to have the effect of reducing tunnel displacement and support stress during cutting and excavation (generally called the "damping effect") compared to general excavation methods in which the pilot tunnel is not advanced. In addition to the above-mentioned damping effect, the central pilot tunnel advancement method improves the stability of the face during excavation, and ventilation effects can be expected after the pilot tunnel is penetrated. It is possible to check the geological condition when advancing the pilot tunnel, and it is also possible to drain water as necessary. In addition, since the blasting method does not require core drilling, it leads to noise and vibration countermeasures.
[0003] Regarding the above-mentioned central pilot tunnel advance construction method, for example, Patent Document 1 describes a tunnel excavation method using an advance pilot tunnel, in which an advance pilot tunnel is formed within the design cross section of the main tunnel prior to the excavation of the face of the main tunnel, and a gunning machine is installed in the advance pilot tunnel, and after blasting excavation of the main tunnel, gunning work is carried out on the newly exposed tunnel wall surface using the gunning machine located in the advance pilot tunnel in parallel with the work of removing debris.
[0004] Incidentally, in the design of the support structure for the pilot tunnel and the expansion section, a three-dimensional excavation analysis is sometimes used to simulate the three-dimensional and complex excavation process of pilot tunnel excavation and expansion excavation. However, when carrying out a three-dimensional analysis, a lot of effort and time is required to create a model, perform the analysis, and organize the analysis results. In addition, there is currently no established design method for quantitatively evaluating the above-mentioned damping effect and reflecting it in the support structure design. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] JP 2001-323773 A Summary of the Invention [Problem to be solved by the invention]
[0006] The present invention aims to provide a method for designing a support structure for an expanded excavation surface, which can design the support structure for an expanded excavation surface relatively easily without performing three-dimensional excavation analysis, and furthermore, can quantitatively evaluate the cushioning effect. [Means for solving the problem]
[0007] In order to achieve the above object, one aspect of the design method for a support structure for an excavation face according to the present invention is to A method for designing the support structure of the excavation face of a cutting and expanding excavation, taking into account the stress release and anticipatory displacement of the ground caused by the excavation of a pilot tunnel, using a circular hole theoretical solution based on the elastic-plastic theory of tunnels, a pilot excavation surface ground characteristic curve creation step of creating a pilot excavation surface ground characteristic curve assuming the excavation of the pilot excavation; a pilot tunnel excavation surface support characteristic curve creation process for creating a pilot tunnel excavation surface support characteristic curve relating to a pilot tunnel excavation surface support structure according to the pilot tunnel excavation surface of the advance pilot tunnel; A first equilibrium point identification process for determining a first equilibrium point which is an intersection of the pilot excavation surface ground characteristic curve and the pilot excavation surface support characteristic curve; A process of creating an expansion excavation surface ground characteristic curve for creating an expansion excavation surface ground characteristic curve assuming expansion excavation around the advance pilot tunnel; A cutting and expanding excavation surface initial stress setting process for setting the ground stress on the cutting and expanding excavation surface at the first balance point as a cutting and expanding excavation surface initial stress on the cutting and expanding excavation surface; A process of creating a characteristic curve of a support for an excavation surface according to the excavation surface, the support for an excavation surface characteristic curve of the support for an excavation surface according to the excavation surface; A second equilibrium point identification process for determining a second equilibrium point which is an intersection of the ground characteristic curve of the cut-and-wide excavation surface and the support characteristic curve of the cut-and-wide excavation surface; The method is characterized by having an expansion excavation surface support structure inspection process, in which the stress and / or displacement of the expansion excavation surface support structure at the second equilibrium point is compared with the support strength and / or allowable displacement of the ground, and the expansion excavation surface support structure is designed so that the stress and / or displacement is equal to or less than the support strength and / or allowable displacement of the ground.
[0008] According to this embodiment, the ground stress on the expansion excavation surface at the first balance point, which is the intersection of the ground characteristic curve of the pilot excavation surface and the support characteristic curve of the pilot excavation surface, is set as the initial stress of the expansion excavation surface on the expansion excavation surface, and then the stress and / or displacement of the support structure of the expansion excavation surface at the second balance point, which is the intersection of the ground characteristic curve of the expansion excavation surface and the support characteristic curve of the expansion excavation surface, is compared with the support strength and / or allowable displacement of the ground to design the support structure of the expansion excavation surface. This allows the ground stress and preliminary displacement of the surrounding ground after the pilot excavation to be quantitatively determined, and the damping effect to be quantitatively evaluated by taking into account the states of these stresses and displacements. The support structure of the expansion excavation surface can be designed relatively easily based on elastic-plastic theory without performing three-dimensional excavation analysis. Here, "relatively easy to design" means that it can be designed using a spreadsheet such as Excel. Also, "comparing stress and / or displacement with the bearing capacity of supports and / or the allowable displacement of the natural ground" means comparing only stress and bearing capacity, comparing displacement with the allowable displacement of the natural ground, and comparing both.
[0009] In addition, another aspect of the design method for a support structure for an excavation surface according to the present invention is as follows: The cut-and-spread excavation surface initial stress correction step is further provided, which corrects the cut-and-spread excavation surface initial stress by the stress release rate of the ground to obtain a corrected cut-and-spread excavation surface initial stress; The process of creating the expansion excavation surface support characteristic curve is characterized in that the displacement corresponding to the corrected expansion excavation surface initial stress is set as the starting point of the expansion excavation surface support characteristic curve.
[0010] According to this embodiment, the initial stress of the expansion excavation surface is corrected by the stress release rate of the ground, and the displacement corresponding to the corrected initial stress of the expansion excavation surface is set as the starting point of the expansion excavation surface support characteristic curve, thereby enabling the design of a more accurate support structure for the expansion excavation surface that reflects the stress release and anticipatory displacement associated with the expansion excavation.
[0011] In addition, another aspect of the design method for a support structure for an excavation surface according to the present invention is as follows: The method further comprises a pilot tunnel excavation surface support structure inspection process, which compares the stress and / or displacement of the pilot tunnel excavation surface support structure at the first equilibrium point with the support strength and / or allowable displacement of the ground, and designs the pilot tunnel excavation surface support structure so that the stress and / or displacement is equal to or less than the support strength and / or allowable displacement of the ground.
[0012] According to this aspect, by designing the pilot tunnel excavation surface support structure, which is installed prior to the design of the expansion excavation surface support structure, both the pilot tunnel excavation surface support structure and the expansion excavation surface support structure can be designed relatively easily without performing three-dimensional excavation analysis.
[0013] In addition, another aspect of the design method for a support structure for an excavation surface according to the present invention is as follows: The method further includes a step of correcting the initial stress of the ground by the stress release rate of the ground to obtain a corrected initial stress of the pilot excavation surface, The pilot excavation surface support characteristic curve creation process is characterized in that the displacement corresponding to the corrected pilot excavation surface initial stress is set as the starting point of the pilot excavation surface support characteristic curve.
[0014] According to this embodiment, when creating the pilot tunnel excavation surface support characteristic curve, the initial stress of the ground is corrected by the stress release rate of the ground, and the displacement corresponding to the corrected initial stress of the pilot tunnel excavation surface is set as the starting point of the pilot tunnel excavation surface support characteristic curve, thereby making it possible to realize the design of a support structure for the expansion excavation surface with higher accuracy, which reflects the stress release and anticipatory displacement associated with the pilot tunnel excavation.
[0015] In addition, another aspect of the design method for a support structure for an excavation surface according to the present invention is as follows: In the expansion excavation surface support structure inspection process, if the stress and / or displacement are not below the support strength and / or the allowable displacement of the ground, and if the problem can be addressed by simply changing the support specifications of the expansion excavation surface support structure, the method further includes an expansion excavation surface support structure specification change process, in which the support specifications are changed.
[0016] According to this aspect, when the stress and / or displacement of the expansion excavation surface support structure does not fall below the support strength and / or the allowable displacement of the ground, and when the problem can be addressed by simply changing the support specifications of the expansion excavation surface support structure, the support specifications can be changed, and the design can be changed to an expansion excavation surface support structure with the desired strength in a relatively short period of time.
[0017] In addition, another aspect of the design method for a support structure for an excavation surface according to the present invention is as follows: In the expansion excavation surface support structure inspection process, if the stress and / or displacement is not below the support strength and / or the allowable displacement of the ground and it is not possible to address the issue by simply changing the support specifications of the expansion excavation surface support structure, the method further includes a pilot tunnel excavation surface support structure specification change process for changing the support specifications of the pilot tunnel excavation surface support structure.
[0018] According to this aspect, when the stress and / or displacement of the expansion excavation surface support structure does not fall below the support strength and / or the allowable displacement of the ground, and when it is not possible to address the issue by simply changing the support specifications of the expansion excavation surface support structure, the support specifications of the pilot excavation surface support structure can be changed, and the design can be changed to an expansion excavation surface support structure with the desired strength in a relatively short period of time. Effect of the Invention
[0019] According to the method for designing the support structure for an expanded excavation surface of the present invention, the support structure for an expanded excavation surface can be designed relatively easily without performing three-dimensional excavation analysis, and further, the support structure can be designed while quantitatively evaluating the cushioning effect. [Brief description of the drawings]
[0020] [Figure 1] This is a cross-sectional view explaining an overview of the central pilot tunnel advance construction method. [Diagram 2] 1 is a flowchart of an example of a method for designing a support structure for an excavation surface according to an embodiment. [Diagram 3] This is a stress model diagram of the ground around a tunnel based on elastic-plastic theory. [Figure 4] This figure shows a ground stress-displacement graph, including the ground characteristic curve for the pilot excavation surface and the support characteristic curve for the pilot excavation surface, used when designing the pilot excavation surface support structure, along with a stress model diagram of the ground around the pilot excavation surface. [Diagram 5] This figure shows a ground stress-displacement graph to explain the state of ground stress and displacement around the pilot tunnel, along with a stress model diagram of the ground around the tunnel. [Figure 6] 1 is a graph showing the state of rock mass stress and displacement at the surface of an excavation. [Figure 7] This is a ground stress-displacement graph including an expansion excavation surface ground characteristic curve and an expansion excavation surface support characteristic curve, which are used when designing an expansion excavation surface support structure. [Figure 8] This is a ground stress-displacement graph including the ground characteristic curve of the excavation face and the support characteristic curve of the excavation face when the pilot tunnel is not advanced. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0021] Hereinafter, a method for designing a support structure for an excavation surface according to an embodiment will be described with reference to the accompanying drawings. In this specification and the drawings, substantially identical components are designated by the same reference numerals to avoid redundant description.
[0022] [Method for designing support structure for excavation surface according to embodiment] An example of a design method for a support structure for an enlarged excavation surface according to an embodiment will be described with reference to Figures 1 to 8. Here, Figure 1 is a cross-sectional view for explaining an outline of the central pilot tunnel advancement method, Figure 2 is a flow chart of an example of a design method for a support structure for an enlarged excavation surface according to an embodiment, and Figure 3 is a stress model diagram of the ground around a tunnel based on the elastic-plastic theory.
[0023] The tunnel to which the design method for the support structure of the expanded excavation surface according to the embodiment is applied is a mountain tunnel constructed by the central pilot tunnel advancement method, in which a pilot tunnel 10 with a small cross section is advanced in the natural ground G, and then a main tunnel 20 is constructed by expanding and excavating the normal cross section, as shown in Fig. 1. On the pilot tunnel excavation surface 12 when the advance pilot tunnel 10 is constructed, shotcrete, steel supports, etc. are applied. In addition, on the expanded excavation surface 22 when the main tunnel 20 is constructed by expanding and excavating the periphery of the advance pilot tunnel 10, shotcrete, steel supports, and, if necessary, rock bolts, etc. are also applied.
[0024] In the central pilot tunnel advancement method, the stress field in the ground, in which the initial stress has been reduced, is expanded due to the stress release caused by pilot tunnel excavation, and this is expected to reduce the tunnel displacement and support stress during expansion excavation (the so-called damping effect) compared to when the pilot tunnel is not advanced. Therefore, the tunnel elastic-plastic theory is used to quantitatively determine the ground stress and anticipatory displacement after pilot tunnel excavation, and a design method for the support structure at the expansion excavation surface is created based on the above-mentioned stress and displacement states.
[0025] Here, this design method is based on the following assumptions (1) to (4). (1) Assume an initial stress state of isotropic and isobaric nature. (2) The yield of the ground follows the Mohr-Coulomb yield condition. (3) The cross sections of the pilot tunnel and expansion cut shall be circular. (4) After the pilot tunnel has advanced a sufficient distance, expansion excavation shall commence, so that the faces shall not affect each other.
[0026] As shown in Figure 2, this design method involves the design of the pilot tunnel support structure (pilot tunnel support design, Phase 1) followed by the design of the support structure for the expansion cross section (expansion excavation surface) (expansion support design, Phase 2), and between Phases 1 and 2, the ground stress and displacement at the expansion surface position at the time of completion of pilot tunnel excavation are calculated (identified) (hence, there are three phases in total).
[0027] First, in the design of the pilot tunnel support in Phase 1, the following steps are sequentially carried out: creating a pilot tunnel excavation surface support characteristic curve (pilot tunnel excavation surface ground characteristic curve creation process, step S50), assuming the pilot tunnel cross-sectional dimensions and support specifications (step S52), creating a pilot tunnel excavation surface support characteristic curve (pilot tunnel excavation surface support characteristic curve creation process, step S54), and identifying the balance point of stress and displacement (the first balance point, which is the intersection of the pilot tunnel excavation surface ground characteristic curve and the pilot tunnel excavation surface support characteristic curve) (first balance point identification process, step S56).
[0028] The method of characteristics is applied in the design of the support structure of the pilot tunnel. Furthermore, the changes in ground stress and displacement caused by tunnel excavation can be calculated using formulas (1) to (9) in the following equation 1, based on the elastic-plastic theory of tunnels. These formulas are described in "Kastner, H (translated by Kanehara Hiroshi): Mechanics of Tunnels, pp.37-64, February 1974", and hereafter these formulas may be referred to as "theoretical formulas".
[0029]
number
[0030] For example, by substituting the radius of the pilot hole for the distance r from the center of the tunnel in each equation, and the internal pressure of the support P i With the variables, the ground stress P r and displacement U r By successively determining these values, it is possible to draw the so-called "ground characteristic curve."
[0031] In addition, when using shotcrete and steel supports, which are typical supports, the support pressure is calculated using the following formula (10).
[0032]
number
[0033] Stress generated in the support member (support internal pressure P i The relationship between the internal pressure of the support and the displacement is i =K × displacement, which can be called the support characteristic curve. Note that the "displacement" here refers to the displacement after the support is installed, and the above-mentioned displacement U r is different from.
[0034] Figure 4 shows a ground stress-displacement graph including the ground characteristic curve for the pilot excavation surface and the support characteristic curve for the pilot excavation surface, used when designing the pilot excavation surface support structure, along with a stress model diagram of the ground around the pilot excavation surface.
[0035] As shown in Figure 4, if the intersection point T1 (first equilibrium point) between the ground characteristic curve L1 on the pilot excavation surface and the support characteristic curve M1 on the pilot excavation surface is found, this intersection point T1 is the ground stress (= internal support pressure P ip ) and displacement U rp It becomes.
[0036] However, taking into consideration that as the face progresses, part of the initial stress P0 of the ground stress is released before the face is reached (before supports are installed), the starting point U1 of the support characteristic curve for the pilot excavation surface is set to the point at which the initial stress P0 is released by α% (the pilot excavation surface initial stress correction process, in which the initial stress of the ground is corrected using the stress release rate of the ground to obtain the corrected initial stress on the pilot excavation surface).
[0037] Here, α is generally called the stress release rate (or anticipatory displacement rate) and is considered to be about 40 to 60%.
[0038] To find the first equilibrium point T1, the displacement U rp is less than the allowable displacement of the ground, and / or the internal pressure of the support P ip is the bearing capacity P spThe pilot hole radius or the support member specifications are selected so that the pilot hole support structure is designed (step S58 in FIG. 2, pilot hole excavation surface support structure verification process). In the pilot hole excavation surface support structure verification process, it is preferable that the displacement Urp is equal to or less than the displacement amount allowed for the natural ground, and the support internal pressure P ip is the bearing capacity P sp The support structure of the pilot tunnel shall satisfy the following two conditions:
[0039] Returning to FIG. 2, after the pilot support is designed in Phase 1, the process moves to Phase 2, in which the stress and displacement of the excavation surface are calculated (Step S60).
[0040] Here, we will explain the method for calculating the ground stress and displacement of the ground around the pilot tunnel, i.e., the ground stress and displacement at the position that will become the future cut and enlargement excavation surface, for the situation at the time when the pilot tunnel excavation is completed, with reference to Fig. 5. Here, Fig. 5 shows a ground stress-displacement graph that explains the state of ground stress and displacement around the pilot tunnel, together with a stress model diagram of the ground around the tunnel.
[0041] The stress on the ground at the pilot tunnel excavation surface is the internal pressure P ip Therefore, P in each of the above theoretical formulas is i P ip By substituting the radius of the excavation surface for r, the ground stress P rm and displacement U rm Request.
[0042] Ground stress P at the excavation surface rm The initial stress P0 increases with pilot excavation, and the stress P rm To move to, this difference (P0-P rm ) was released by the pilot excavation. In addition, due to this stress release, the excavation surface was expanded by U rm Since the displacement is only 100%, this can be considered as a prior displacement caused by pilot excavation.
[0043] This method makes it possible to quantitatively calculate the ground stress and anticipatory displacement of the surrounding ground after pilot tunnel excavation.
[0044] In the design of the expansion excavation support in Phase 2, after calculating the stress and displacement of the expansion excavation surface as described above, the following steps are sequentially carried out: creating the expansion excavation surface ground characteristic curve (expansion excavation surface ground characteristic curve creation process, step S62), assuming the expansion support specifications (step S64), creating the expansion excavation surface support characteristic curve (expansion excavation surface support characteristic curve creation process, step S66), and identifying the balance point of stress and displacement (the second balance point, which is the intersection of the expansion excavation surface ground characteristic curve and the expansion excavation surface support characteristic curve) (second balance point identification process, step S68).
[0045] Here, Fig. 6 is a graph showing the state of the ground stress and displacement at the enlarged excavation face, and Fig. 7 is a graph showing the ground stress and displacement including the enlarged excavation face ground characteristic curve and the enlarged excavation face support characteristic curve, which are used when designing the support structure for the enlarged excavation face.
[0046] For the excavation of a cut-and-wide section, the ground stress and displacement at the completion of the cut-and-wide excavation are calculated from the intersection T1 (first equilibrium point) of the ground characteristic curve L1 of the pilot excavation surface and the support characteristic curve M1 of the pilot excavation surface, as shown in Figure 6. This is the same as Figure 4.
[0047] In this case, the ground stress P calculated from the theoretical formula rm and displacement U rm can theoretically be plotted as point T2 on the ground characteristic curve L2 of the flared excavation surface obtained for the flared excavation surface shown in Figure 6. The inventors have also confirmed in a separate three-dimensional excavation analysis simulating pilot excavation and flared excavation that the stress and displacement of the ground element corresponding to the flared excavation surface position at the time of pilot excavation completion coincide with the ground characteristic curve obtained from the theoretical solution.
[0048] Based on the above idea, when calculating the intersection of the ground characteristic curve and the support characteristic curve for the cutting and expanding excavation surface, the ground stress P rm and displacement U rm is set as the starting point of the expansion excavation (initial stress setting process for the expansion excavation surface).
[0049] And here too, the ground stress P rm The point T3 at which the stress is released by α% is plotted on the ground characteristic curve L2 of the cut-and-expanded excavation surface (the cut-and-expanded excavation surface initial stress correction process in which the cut-and-expanded excavation surface initial stress is corrected by the stress release rate of the ground to obtain the corrected cut-and-expanded excavation surface initial stress). .
[0050] Next, the displacement U2 corresponding to this point T3 is used as the starting point to draw the expansion excavation surface support characteristic curve M2, and the intersection T4 (second equilibrium point) between the expansion excavation surface ground characteristic curve L2 and the expansion excavation surface support characteristic curve M2 is obtained.
[0051] To find the second equilibrium point T4, the displacement U' rm is less than the allowable displacement of the ground, and / or the internal pressure of the support P im is the bearing capacity P sm The following expansion support specifications are selected, and the support structure of the expansion excavation surface is designed (step S70 in FIG. 2, expansion excavation surface support structure verification process). In the expansion excavation surface support structure verification process, it is preferable to select "displacement U' rm is less than the allowable displacement of the ground, and the internal pressure of the support P im is the bearing capacity P sm The support structure for the cut-and-expand excavation surface shall satisfy the following two conditions:
[0052] However, if the support structure of the excavation surface becomes too large, or if the internal pressure of the support P im is the bearing strength P sm If it exceeds this limit, it is examined whether it is possible to deal with the problem by simply changing the specifications for the expansion support in Figure 2 (step S72), and if it is determined that it is possible to deal with the problem, the specifications for the support of the expansion excavation surface are changed (process for changing the specifications of the support structure for the expansion excavation surface).
[0053] On the other hand, if it is judged that the problem cannot be solved by changing only the specifications of the cutting and expansion support, the pilot hole radius or the pilot hole support structure will be reviewed, and the ground stress P rm By reducing the internal pressure P imis the bearing strength P sm A series of design procedures are repeated as follows (process of changing specifications for the pilot excavation surface support structure). In other words, within the range where the support structure of the pilot excavation itself is established, the pilot excavation radius is increased or the pilot excavation support structure is changed to a softer specification, thereby adjusting so that the amount of advance release of the initial stress accompanying the pilot excavation is increased.
[0054] According to the design method for the support structure of the expanded excavation surface shown in the figure, the support structure of the expanded excavation surface can be designed relatively easily without performing three-dimensional excavation analysis, and further, the support structure can be designed while quantitatively evaluating the cushioning effect.
[0055] Here, for comparison with Figure 7, Figure 8 shows a ground stress-displacement graph including the ground characteristic curve of the excavation surface and the support characteristic curve of the excavation surface when the pilot tunnel is not advanced.
[0056] Compared with Fig. 7, which takes into account the effect of prior release of ground stress by the central pilot tunnel, Fig. 8 does not provide the above effect. rm Not P o The displacement U3 corresponding to the point T5 at the time when the load is released by α% is used as the starting point, and the support characteristic curve M2 for the expanded excavation surface is drawn. The intersection T6 (second equilibrium point) of the ground characteristic curve L2 for the expanded excavation surface and the support characteristic curve M2 for the expanded excavation surface is obtained. im is the bearing capacity P sm It is possible to exceed the limit.
[0057] In addition, the present invention is not limited to the configuration shown here, and may be implemented in other embodiments in which other components are combined with the configurations and the like of the above-mentioned embodiment. In this regard, the present invention may be modified within the scope of the gist of the present invention, and may be appropriately determined according to the application form. [Explanation of symbols]
[0058] 10:Advanced shaft (pilot) 12: Shaft excavation surface 20: Main pit 22: Expansion excavation surface G: Natural ground
Claims
1. A method for designing the support structure of the excavation face of a cutting and expanding excavation, taking into account the stress release and anticipatory displacement of the ground caused by the excavation of a pilot tunnel, using a circular hole theoretical solution based on the elastic-plastic theory of tunnels, a pilot excavation surface ground characteristic curve creation step of creating a pilot excavation surface ground characteristic curve assuming the excavation of the pilot excavation; a pilot tunnel excavation surface support characteristic curve creation process for creating a pilot tunnel excavation surface support characteristic curve relating to a pilot tunnel excavation surface support structure according to the pilot tunnel excavation surface of the advance pilot tunnel; A first equilibrium point identification process for determining a first equilibrium point which is an intersection of the pilot excavation surface ground characteristic curve and the pilot excavation surface support characteristic curve; A process of creating an expansion excavation surface ground characteristic curve for creating an expansion excavation surface ground characteristic curve assuming expansion excavation around the advance pilot tunnel; A cutting and expanding excavation surface initial stress setting process for setting the ground stress on the cutting and expanding excavation surface at the first balance point as a cutting and expanding excavation surface initial stress on the cutting and expanding excavation surface; A process of creating a characteristic curve of a support for an excavation surface according to the excavation surface, the support for an excavation surface characteristic curve of the support for an excavation surface according to the excavation surface; A second equilibrium point identification process for determining a second equilibrium point which is an intersection of the ground characteristic curve of the cut-and-wide excavation surface and the support characteristic curve of the cut-and-wide excavation surface; A design method for a support structure for an expansion excavation surface, comprising a process of inspecting the support structure for an expansion excavation surface, in which the stress and / or displacement of the support structure for an expansion excavation surface at the second equilibrium point is compared with the support strength and / or the allowable displacement of the ground, and the support structure for an expansion excavation surface is designed so that the stress and / or displacement is equal to or less than the support strength and / or the allowable displacement of the ground.
2. The cut-and-spread excavation surface initial stress correction step is further provided, which corrects the cut-and-spread excavation surface initial stress by the stress release rate of the ground to obtain a corrected cut-and-spread excavation surface initial stress; The design method for the support structure of an expansion excavation surface described in claim 1, characterized in that in the process of creating the support characteristic curve of the expansion excavation surface, the displacement corresponding to the corrected initial stress of the expansion excavation surface is set as the starting point of the support characteristic curve of the expansion excavation surface.
3. The design method for the support structure of the cutting and expansion excavation surface described in claim 1 or 2, further comprising a pilot tunnel excavation surface support structure inspection process for comparing the stress and / or displacement of the pilot tunnel excavation surface support structure at the first balance point with the support strength and / or allowable displacement of the ground, and designing the pilot tunnel excavation surface support structure so that the stress and / or displacement is equal to or less than the support strength and / or allowable displacement of the ground.
4. The method further includes a step of correcting the initial stress of the ground by the stress release rate of the ground to obtain a corrected initial stress of the pilot excavation surface, The design method for the support structure of a cut-and-expand excavation surface described in claim 3, characterized in that in the pilot excavation surface support characteristic curve creation process, the displacement corresponding to the corrected pilot excavation surface initial stress is set as the starting point of the pilot excavation surface support characteristic curve.
5. A design method for a support structure for an expanded excavation surface as described in claim 1 or 2, characterized in that, in the expansion excavation surface support structure inspection process, if the stress and / or displacement are not below the support strength and / or the allowable displacement of the ground and the problem can be addressed by simply changing the support specifications of the expansion excavation surface support structure, the support specifications are changed.
6. The design method for the support structure of an expansion excavation surface as described in claim 1 or 2, further comprising a pilot excavation surface support structure specification change process for changing the support specifications of the pilot excavation surface support structure when the stress and / or displacement are not below the support strength and / or the allowable displacement of the ground in the expansion excavation surface support structure inspection process and when the stress and / or displacement are not below the support strength and / or the allowable displacement of the ground and when the stress and / or displacement cannot be addressed by changing only the support specifications of the expansion excavation surface support structure, the design method for the support structure of an expansion excavation surface as described in claim 1 or 2, further comprising a pilot excavation surface support structure specification change process for changing the support specifications of the pilot excavation surface support structure.