Gas production apparatus and gas production method
By using multiple adsorption cylinders and a controlled gas flow system with atmospheric pressure and recovery processes, the device improves gas production efficiency by minimizing waste and optimizing gas utilization.
Patent Information
- Application Number
- JP2023076712
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-08
- Publication Date
- 2024-11-20
- Estimated Expiration
- Not applicable · inactive patent
Smart Images

Figure 2024161734000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a gas production apparatus and a gas production method. [Background technology]
[0002] In order to use a single gas such as hydrogen gas or oxygen gas as a dry gas, it is necessary to adsorb the moisture contained in the single gas to make it a dry gas. For example, as disclosed in Patent Document 1, a gas production apparatus equipped with an adsorption tube containing an adsorbent inside is known. In such a gas production apparatus, an adsorption process and a regeneration process are alternately and repeatedly performed in the adsorption tube. In the adsorption process, the moisture contained in the single gas supplied from a supply line to the adsorption tube is adsorbed by the adsorbent and discharged as a dry gas. In the regeneration process, the moisture contained in the adsorbent is removed after the adsorption process to regenerate the adsorbent. The gas production apparatus is equipped with a plurality of adsorption tubes so that the adsorption process can be performed in another adsorption tube until the adsorption process is performed again in the adsorption tube containing the adsorbent after the adsorption process by regenerating the adsorbent in the regeneration process.
[0003] In such a gas production apparatus, a part of the dry gas obtained in the adsorption process is decompressed to atmospheric pressure and supplied to the adsorption column in which the regeneration process is to be performed. In this way, the atmosphere in the adsorption column in which the regeneration process is to be performed approaches equilibrium with the dry gas, and the moisture contained in the adsorbent is efficiently desorbed into the dry gas. Then, the gas containing moisture in the regeneration process is discharged directly into the atmosphere. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2019-148001 A Summary of the Invention [Problem to be solved by the invention]
[0005] However, if the gas containing moisture in the regeneration process is discharged directly into the atmosphere in this manner, then as a result, part of the dry gas obtained in the adsorption process will be wasted and discharged into the atmosphere, thereby reducing the gas production efficiency. [Means for solving the problem]
[0006] Various aspects for solving the above problems will be described below. [Aspect 1] An adsorption cylinder that contains an adsorbent therein, an adsorption step in which moisture contained in a single gas supplied from a supply line into the adsorption cylinder is adsorbed by the adsorbent and discharged as a dry gas, and a regeneration step in which moisture contained in the adsorbent is removed after the adsorption step to regenerate the adsorbent are alternately and repeatedly performed in the adsorption cylinder; A gas production apparatus including a plurality of adsorption cylinders so that the adsorption step can be performed in another adsorption cylinder until the adsorption step is performed again in the adsorption cylinder that contains the adsorbent after the adsorption step by regenerating the adsorbent in the regeneration step, a regeneration dry gas supply unit that supplies a compressed regeneration dry gas, which is a gas other than the single gas, into an adsorption column that is the target for performing the regeneration process in a state where the compressed regeneration dry gas is reduced to atmospheric pressure; a gas vacuum pump that is driven to execute a gas evacuation step of evacuating the moisture-containing gas in the adsorption column after the regeneration step and discharging the gas into the atmosphere; a single gas recovery pump that is driven to perform a single gas recovery step of recovering the single gas in the adsorption column after the adsorption step and returning the single gas to the supply line, a gas generating apparatus comprising: a gas supply unit for supplying a single gas into the adsorption cylinder after the gas evacuation step; a gas supply unit for supplying a single gas to the adsorption cylinder;
[0007] [Aspect 2] The regenerating dry gas is dry air, The regenerating dry gas supply unit includes: an air dryer that adsorbs moisture contained in compressed air and discharges the dried air; an orifice for reducing the pressure of the dry air flowing out from the air dryer to atmospheric pressure; and a dry air switching valve that switches the flow of the dry air so that the dry air that has passed through the orifice is supplied to an adsorption column that is the target for carrying out the regeneration process.
[0008] [Aspect 3] The gas production apparatus according to [Aspect 1] or [Aspect 2] is characterized in that it includes a first switching valve that can be switched between a first switching state in which the gas containing moisture is discharged to the atmosphere in the regeneration process, and a second switching state in which the gas in the adsorption tube after the regeneration process is evacuated by driving the gas vacuum pump and discharged to the atmosphere in the gas vacuum pumping process.
[0009] [Aspect 4] The gas manufacturing apparatus according to [Aspect 3] is characterized in that it comprises a second switching valve that can be switched between a third switching state in which, when the first switching valve is in the first switching state, gas containing moisture is discharged to the atmosphere in the regeneration process, and when the first switching valve is in the second switching state, the gas in the adsorption tube after the regeneration process is evacuated by driving the gas vacuum pump and discharged to the atmosphere in the gas evacuation process, and a fourth switching state in which, in the single gas recovery process, the single gas in the adsorption tube after the adsorption process is recovered and returned to the supply line.
[0010] [Aspect 5] The single gas recovery pump comprises: a single gas vacuum pump for evacuating the single gas in the adsorption column after the adsorption step; A gas manufacturing apparatus according to any one of [Aspect 1] to [Aspect 4], characterized in including a compression pump that compresses and discharges the single gas evacuated by the single gas vacuum pump to return the single gas to the supply line.
[0011] [Aspect 6] The gas production apparatus according to [Aspect 5], wherein the compressor pump has a check valve that blocks the flow of a single gas from the supply line toward the inside of the compressor pump.
[0012] [Aspect 7] The gas manufacturing apparatus according to any one of [Aspect 1] to [Aspect 6], further comprising a check valve that blocks the flow of the single gas from the supply line toward the single gas recovery pump.
[0013] [Aspect 8] an adsorption step in which moisture contained in a single gas supplied from a supply line into the adsorption cylinder is adsorbed by an adsorbent and discharged as a dry gas, and a regeneration step in which moisture contained in the adsorbent is removed after the adsorption step to regenerate the adsorbent, A gas production method, comprising: performing the adsorption step in another adsorption tube until the adsorbent is regenerated in the regeneration step after the adsorption step and the adsorption step is performed again in the adsorption tube containing the regenerated adsorbent, In the regeneration step, a compressed dry gas for regeneration, which is a gas different from the single gas, is decompressed to atmospheric pressure and supplied to an adsorption column which is the subject of the regeneration step; A gas evacuation step is carried out in which the gas containing moisture in the adsorption column after the regeneration step is evacuated and the gas is discharged to the atmosphere; carrying out a single gas recovery step of recovering the single gas in the adsorption column after the adsorption step and returning the single gas to the supply line; a regeneration step of the adsorption step after the single gas recovery step; and a regeneration step of the adsorption step after the single gas recovery step. Effect of the Invention
[0014] According to the present invention, the gas production efficiency can be improved. [Brief description of the drawings]
[0015] [Figure 1]FIG. 1 is a schematic diagram showing a gas production apparatus according to an embodiment. [Diagram 2] FIG. 2 is a diagram for explaining the adsorption step and the regeneration step. [Diagram 3] FIG. 3 is a diagram for explaining the adsorption step and the gas evacuation step. [Figure 4] FIG. 4 is a diagram for explaining the adsorption process and the single gas charging process. [Diagram 5] FIG. 5 is a diagram for explaining the single gas recovery process and the adsorption process. [Figure 6] FIG. 6 is a diagram for explaining the regeneration step and the adsorption step. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0016] Hereinafter, one embodiment of a gas production apparatus will be described with reference to Figures 1 to 6. The gas production apparatus of this embodiment adsorbs moisture contained in hydrogen gas, which is a single gas, to produce a dry gas.
[0017] <Outline of gas production equipment> As shown in FIG. 1, the gas production apparatus 10 includes a first adsorption column 11 and a second adsorption column 12. The first adsorption column 11 is an adsorption column that houses a first adsorbent 13 as an adsorbent therein. The second adsorption column 12 is an adsorption column that houses a second adsorbent 14 as an adsorbent therein. Thus, the gas production apparatus 10 includes a plurality of adsorption columns. The first adsorbent 13 and the second adsorbent 14 are configured to be capable of adsorbing moisture. Examples of the first adsorbent 13 and the second adsorbent 14 include activated alumina, silica gel, and synthetic zeolite.
[0018] The gas production apparatus 10 includes a supply line 15. The supply line 15 has a main supply pipe 16, a first branch supply pipe 17, and a second branch supply pipe 18. A first end of the main supply pipe 16 is connected to a hydrogen gas supply source 19. The hydrogen gas supplied from the hydrogen gas supply source 19 is wet hydrogen gas containing moisture produced by electrolysis.
[0019] A first end of the first supply branch pipe 17 and a first end of the second supply branch pipe 18 are each connected to a second end of the main supply pipe 16. Thus, the first supply branch pipe 17 and the second supply branch pipe 18 branch off from the second end of the main supply pipe 16. The second end of the first supply branch pipe 17 is connected to the first port 11a of the first adsorption column 11. The second end of the second supply branch pipe 18 is connected to the first port 12a of the second adsorption column 12.
[0020] The supply line 15 is equipped with a first supply switching valve 20 and a second supply switching valve 21. The first supply switching valve 20 is provided in a first supply branch pipe 17. The second supply switching valve 21 is provided in a second supply branch pipe 18. The first supply switching valve 20 and the second supply switching valve 21 are two-way valves. The first supply switching valve 20 and the second supply switching valve 21 are on-off valves.
[0021] The gas production device 10 includes a dry gas supply line 22. The dry gas supply line 22 includes a first dry gas supply pipe 23, a second dry gas supply pipe 24, and a dry gas junction pipe 25. A first end of the first dry gas supply pipe 23 is connected to the second port 11b of the first adsorption column 11. A first end of the second dry gas supply pipe 24 is connected to the second port 12b of the second adsorption column 12. A first end of the dry gas junction pipe 25 is connected to the second end of the first dry gas supply pipe 23 and the second end of the second dry gas supply pipe 24, respectively. Therefore, the first dry gas supply pipe 23 and the second dry gas supply pipe 24 are junctioned with the dry gas junction pipe 25. A second end of the dry gas junction pipe 25 is connected to a supply target (not shown) of the dry gas.
[0022] The dry gas supply line 22 is equipped with a first dry gas switching valve 26 and a second dry gas switching valve 27. The first dry gas switching valve 26 is provided in the first dry gas supply pipe 23. The second dry gas switching valve 27 is provided in the second dry gas supply pipe 24. The first dry gas switching valve 26 and the second dry gas switching valve 27 are two-way valves. The first dry gas switching valve 26 and the second dry gas switching valve 27 are on-off valves.
[0023] The gas production apparatus 10 includes a dry gas for regeneration supply unit 30. The dry gas for regeneration supply unit 30 includes an air dryer 31, an orifice 32, and a dry air switching valve 33. The air dryer 31 is a heatless desiccant type dryer having a well-known configuration. The air dryer 31 adsorbs moisture contained in compressed air and discharges dry air. The dry gas for regeneration in this embodiment is dry air. Therefore, the dry gas for regeneration is a gas different from hydrogen gas, which is a single gas.
[0024] The dry air switching valve 33 is a three-way valve. The dry air switching valve 33 has a first connection port 33a, a second connection port 33b, and a third connection port 33c. The dry air switching valve 33 is configured to be switchable between a first state in which the first connection port 33a and the second connection port 33b are connected, and a second state in which the first connection port 33a and the third connection port 33c are connected. The dry air switching valve 33 is an on-off valve.
[0025] The gas production device 10 has a compressed air supply pipe 34, a dry air supply pipe 35, a first dry air branch pipe 36, and a second dry air branch pipe 37. A first end of the compressed air supply pipe 34 is connected to a compressed air supply source 38. A second end of the compressed air supply pipe 34 is connected to a first port 31a of the air dryer 31. A first end of the dry air supply pipe 35 is connected to a second port 31b of the air dryer 31. A second end of the dry air supply pipe 35 is connected to a first connection port 33a of the dry air switching valve 33. Dry air flowing out from the second port 31b of the air dryer 31 flows into the dry air supply pipe 35.
[0026] A first end of the first dry air branch pipe 36 is connected to the second connection port 33b of the dry air switch valve 33. A second end of the first dry air branch pipe 36 is connected to a portion of the first dry gas supply pipe 23 closer to the first adsorption column 11 than the first dry gas switch valve 26. A first end of the second dry air branch pipe 37 is connected to the third connection port 33c of the dry air switch valve 33. A second end of the second dry air branch pipe 37 is connected to a portion of the second dry gas supply pipe 24 closer to the second adsorption column 12 than the second dry gas switch valve 27.
[0027] The orifice 32 is provided in the dry air supply pipe 35. The orifice 32 is a fixed throttle. The orifice 32 is configured to be able to reduce the pressure of the dry air flowing through the dry air supply pipe 35 to atmospheric pressure. Thus, the orifice 32 reduces the pressure of the dry air flowing out of the air dryer 31 to atmospheric pressure.
[0028] The gas production apparatus 10 includes a gas vacuum pump 40, a single gas recovery pump 41, a first switching valve 42, a second switching valve 43, and a discharge switching valve 44. The single gas recovery pump 41 includes a single gas vacuum pump 60 and a compression pump 61.
[0029] The first switching valve 42 is a three-way valve. The first switching valve 42 has a first connection port 42a, a second connection port 42b, and a third connection port 42c. The first switching valve 42 is configured to be switchable between a first state in which the first connection port 42a and the second connection port 42b are connected, and a second state in which the first connection port 42a and the third connection port 42c are connected. The first switching valve 42 is an on-off valve.
[0030] The second switching valve 43 is a three-way valve. The second switching valve 43 has a first connection port 43a, a second connection port 43b, and a third connection port 43c. The second switching valve 43 is configured to be switchable between a first state in which the first connection port 43a and the second connection port 43b are connected, and a second state in which the first connection port 43a and the third connection port 43c are connected. The second switching valve 43 is a proportional valve.
[0031] The discharge switching valve 44 is a three-way valve. The discharge switching valve 44 has a first connection port 44a, a second connection port 44b, and a third connection port 44c. The discharge switching valve 44 is configured to be switchable between a first state in which the first connection port 44a and the second connection port 44b are connected, and a second state in which the first connection port 44a and the third connection port 44c are connected. The discharge switching valve 44 is an on-off valve.
[0032] The gas production apparatus 10 is equipped with an exhaust line 45. The exhaust line 45 has a first exhaust connection pipe 46, a second exhaust connection pipe 47, a joint exhaust pipe 48, a third exhaust connection pipe 49, an atmospheric exhaust pipe 50, and a fourth exhaust connection pipe 51.
[0033] A first end of the first exhaust connection pipe 46 is connected to a portion of the first supply branch pipe 17 closer to the first adsorption cylinder 11 than the first supply switchover valve 20. A second end of the first exhaust connection pipe 46 is connected to the second connection port 44b of the discharge switchover valve 44. A first end of the second exhaust connection pipe 47 is connected to a portion of the second supply branch pipe 18 closer to the second adsorption cylinder 12 than the second supply switchover valve 21. A second end of the second exhaust connection pipe 47 is connected to the third connection port 44c of the discharge switchover valve 44.
[0034] A first end of the junction discharge pipe 48 is connected to the first connection port 44a of the discharge switching valve 44. A second end of the junction discharge pipe 48 is connected to the first connection port 43a of the second switching valve 43. A first end of the third discharge connection pipe 49 is connected to the second connection port 43b of the second switching valve 43. A second end of the third discharge connection pipe 49 is connected to the first connection port 42a of the first switching valve 42. A first end of the atmosphere discharge pipe 50 is connected to the second connection port 42b of the first switching valve 42. A second end of the atmosphere discharge pipe 50 is open to the atmosphere. A first end of the fourth discharge connection pipe 51 is connected to the third connection port 42c of the first switching valve 42. A second end of the fourth discharge connection pipe 51 is connected to the suction port 40a of the gas vacuum pump 40. A discharge port 40b of the gas vacuum pump 40 is open to the atmosphere via a pipe not shown.
[0035] The gas production device 10 includes a recovery line 62. The recovery line 62 includes a first recovery pipe 63, a second recovery pipe 64, and a third recovery pipe 65. A first end of the first recovery pipe 63 is connected to the third connection port 43c of the second switching valve 43. A second end of the first recovery pipe 63 is connected to the intake port 60a of the single gas vacuum pump 60. A first end of the second recovery pipe 64 is connected to the discharge port 60b of the single gas vacuum pump 60. A second end of the second recovery pipe 64 is connected to the intake port 61a of the compression pump 61. A first end of the third recovery pipe 65 is connected to the discharge port 61b of the compression pump 61. A second end of the third recovery pipe 65 is connected to the supply main pipe 16.
[0036] The gas production apparatus 10 is equipped with a check valve 66. The check valve 66 is provided in the third recovery pipe 65. The check valve 66 allows the flow of hydrogen gas from the compression pump 61 toward the main supply pipe 16 via the third recovery pipe 65. The check valve 66 blocks the flow of hydrogen gas from the main supply pipe 16 toward the compression pump 61 via the third recovery pipe 65. Thus, the check valve 66 blocks the flow of hydrogen gas from the supply line 15 toward the single gas recovery pump 41.
[0037] The compression pump 61 has a check valve 61v. The check valve 61v is provided, for example, at the discharge port 61b of the compression pump 61. The check valve 61v allows the flow of hydrogen gas discharged from the discharge port 61b to the third recovery pipe 65. The check valve 61v blocks the flow of hydrogen gas from the third recovery pipe 65 through the discharge port 61b toward the inside of the compression pump 61. Therefore, the check valve 61v blocks the flow of hydrogen gas from the supply line 15 toward the inside of the compression pump 61.
[0038] The gas production apparatus 10 includes a first tank 67 and a second tank 68. The first tank 67 is connected to the first recovery pipe 63. The second tank 68 is connected to the second recovery pipe 64. The first tank 67 stores a portion of the hydrogen gas flowing through the first recovery pipe 63. The second tank 68 stores a portion of the hydrogen gas flowing through the second recovery pipe 64.
[0039] <Electrical configuration of the gas production device 10> The gas production apparatus 10 includes a control device 70. The control device 70 includes a central processing unit (CPU). The control device 70 also includes a memory including a read-only memory (ROM) that stores various programs and maps in advance, and a random access memory (RAM) that temporarily stores the results of CPU calculations, etc. The control device 70 also includes a timer counter, an input interface, an output interface, etc.
[0040] The control device 70 is electrically connected to the first supply switching valve 20, the second supply switching valve 21, the first dry gas switching valve 26, the second dry gas switching valve 27, the dry air switching valve 33, the first switching valve 42, the second switching valve 43, and the discharge switching valve 44. The control device 70 controls the driving of each of the first supply switching valve 20, the second supply switching valve 21, the first dry gas switching valve 26, the second dry gas switching valve 27, the dry air switching valve 33, the first switching valve 42, the second switching valve 43, and the discharge switching valve 44.
[0041] The control device 70 is electrically connected to the air dryer 31, the gas vacuum pump 40, the single gas vacuum pump 60, and the compression pump 61. The control device 70 controls the operation of the air dryer 31, the gas vacuum pump 40, the single gas vacuum pump 60, and the compression pump 61.
[0042] <Each process> 2, a first program for executing an adsorption process in the first adsorption column 11 and a regeneration process in the second adsorption column 12 is stored in advance in the control device 70. In the adsorption process, moisture contained in the hydrogen gas supplied from the supply line 15 into the first adsorption column 11 is adsorbed by the first adsorbent 13 and discharged as a dry gas. In the regeneration process, moisture contained in the second adsorbent 14 is desorbed after the adsorption process to regenerate the second adsorbent 14.
[0043] In the first program, the first supply switching valve 20 is opened and the second supply switching valve 21 is closed. In the first program, the first dry gas switching valve 26 is opened and the second dry gas switching valve 27 is closed. In the first program, the dry air switching valve 33 is switched to the second state in which the first connection port 33a and the third connection port 33c are connected. In the first program, the first switching valve 42 is switched to the first state in which the first connection port 42a and the second connection port 42b are connected. In the first program, the second switching valve 43 is switched to the first state in which the first connection port 43a and the second connection port 43b are connected. In the first program, the discharge switching valve 44 is switched to the second state in which the first connection port 44a and the third connection port 44c are connected. In the first program, the air dryer 31 is driven. In the first program, the gas vacuum pump 40, the single gas vacuum pump 60, and the compression pump 61 are stopped.
[0044] As shown in FIG. 3, the control device 70 prestores a second program for executing an adsorption process in the first adsorption column 11 and a gas evacuation process in the second adsorption column 12. In the gas evacuation process, the air, which is a gas containing moisture, in the second adsorption column 12 after the regeneration process is evacuated and the air is discharged to the atmosphere. The second program is pre-set to be executed a certain time after the first program is started. The "certain time" refers to the time when it is estimated that the moisture contained in the second adsorbent 14 has been sufficiently removed by the regeneration process and the regeneration of the second adsorbent 14 has been completed. This "certain time" is determined in advance by an experiment or the like.
[0045] In the second program, the first switching valve 42 is switched to a second state in which the first connection port 42a and the third connection port 42c are connected. In the second program, the gas vacuum pump 40 is driven. The gas vacuum pump 40 is driven to perform a gas evacuation process. In the second program, the driving of the air dryer 31 is stopped.
[0046] As shown in FIG. 4, the control device 70 prestores a third program for executing an adsorption process in the first adsorption column 11 and a single gas filling process in the second adsorption column 12. In the single gas filling process, hydrogen gas is filled into the second adsorption column 12 after the gas evacuation process. The third program is preliminarily set to be executed a certain time after the second program is started. The "certain time" is the time when the dry air in the second adsorption column 12 is estimated to have been sufficiently evacuated by the gas evacuation process. This "certain time" is determined in advance by an experiment or the like. In the third program, the second supply switching valve 21 is opened. In the third program, the gas vacuum pump 40 is stopped.
[0047] As shown in FIG. 5, the control device 70 prestores a fourth program for executing a single gas recovery process in the first adsorption column 11 and an adsorption process in the second adsorption column 12. In the single gas recovery process, hydrogen gas in the first adsorption column 11 after the adsorption process is recovered and returned to the supply line 15. The fourth program is pre-set to be executed a certain time after the third program is started. The "certain time" is the time when it is estimated that hydrogen gas has been sufficiently filled in the second adsorption column 12 by the single gas filling process. This "certain time" is determined in advance by an experiment or the like. Therefore, the gas production device 10 fills hydrogen gas in the second adsorption column 12 after the gas evacuation process and then executes the adsorption process.
[0048] In the fourth program, the first supply switching valve 20 is closed. In the fourth program, the first drying gas switching valve 26 is closed and the second drying gas switching valve 27 is opened. In the fourth program, the second switching valve 43 is switched to the second state in which the first connection port 43a and the third connection port 43c are connected. In the fourth program, the discharge switching valve 44 is switched to the first state in which the first connection port 44a and the second connection port 44b are connected. In the fourth program, the single gas vacuum pump 60 and the compression pump 61 are driven. The single gas recovery pump 41 is driven to execute the single gas recovery process.
[0049] As shown in FIG. 6, the control device 70 prestores a fifth program for executing a regeneration process in the first adsorption column 11 and an adsorption process in the second adsorption column 12. The fifth program is pre-set to be executed a certain time after the fourth program is started. The "certain time" is the time when it is estimated that the hydrogen gas in the first adsorption column 11 has been sufficiently recovered by the single gas recovery process. This "certain time" is determined in advance by an experiment or the like. Therefore, the gas production device 10 executes the regeneration process after the single gas recovery process.
[0050] In the fifth program, the dry air switching valve 33 is switched to the first state in which the first connection port 33a and the second connection port 33b are connected. In the fifth program, the second switching valve 43 is switched to the first state in which the first connection port 43a and the second connection port 43b are connected. In the fifth program, the air dryer 31 is driven. In the fifth program, the drive of the single gas vacuum pump 60 and the compression pump 61 is stopped.
[0051] Thereafter, in the second to fourth programs, the processes in the first adsorption column 11 and the second adsorption column 12 are executed in reverse. Then, returning to the first program, the processes are executed again up to the fifth program. In this manner, in the gas production apparatus 10, the adsorption process and the regeneration process are alternately and repeatedly executed in the first adsorption column 11 and the second adsorption column 12. Therefore, the gas production apparatus 10 has a plurality of adsorption columns so that the adsorption process can be executed in another adsorption column until the adsorption process is executed again in the adsorption column that contains the adsorbent after the adsorption process by regenerating the adsorbent in the regeneration process.
[0052] [Operation of the embodiment] Next, the operation of this embodiment will be described while explaining the gas production method. Here, the operation from the adsorption process to the regeneration process in first adsorption column 11 and from the regeneration process to the adsorption process in second adsorption column 12 will be described. Note that the operation from the regeneration process to the adsorption process in first adsorption column 11 and from the adsorption process to the regeneration process in second adsorption column 12 is simply the reverse of the operation described below, so a detailed explanation of it will be omitted.
[0053] 2, the control device 70 first executes the first program. Then, hydrogen gas supplied from the hydrogen gas supply source 19 is supplied into the first adsorption column 11 via the main supply pipe 16 and the first branch supply pipe 17 of the supply line 15. At this time, the flow of hydrogen gas from the main supply pipe 16 toward the single gas recovery pump 41 is blocked by the check valve 66 and the check valve 61v.
[0054] Then, an adsorption process is carried out in the first adsorption column 11. In the adsorption process, moisture contained in the hydrogen gas supplied from the supply line 15 into the first adsorption column 11 is adsorbed by the first adsorbent 13 and discharged as dry gas. The dry gas discharged from the first adsorption column 11 is supplied to a supply target of the dry gas via the first dry gas supply pipe 23 and the dry gas junction pipe 25 of the dry gas supply line 22.
[0055] On the other hand, compressed air from a compressed air supply source 38 is supplied to the air dryer 31 via a compressed air supply pipe 34. The air dryer 31 adsorbs moisture contained in the compressed air supplied from the compressed air supply source 38 and discharges it as dry air. The dry air discharged from the air dryer 31 passes through a dry air supply pipe 35, a second dry air branch pipe 37, and a second dry gas supply pipe 24 and is supplied to the second adsorption column 12, which is the target for performing the regeneration process. The orifice 32 reduces the pressure of the dry air discharged from the air dryer 31 to atmospheric pressure. Therefore, the dry air supplied from the regeneration dry gas supply unit 30 to the second adsorption column 12 is supplied to the second adsorption column 12 in a state of being reduced in pressure to atmospheric pressure.
[0056] The atmosphere in the second adsorption column 12 tends to reach an equilibrium state with the dry air. This allows the moisture contained in the second adsorbent 14 to be efficiently desorbed into the dry air. In this manner, after the adsorption step, a regeneration step is performed in which the moisture contained in the second adsorbent 14 is desorbed to regenerate the second adsorbent 14.
[0057] During the regeneration process, the moist air in the second adsorption column 12 is discharged from the second adsorption column 12 to the atmosphere via the second supply branch pipe 18, the second exhaust connection pipe 47, the joint exhaust pipe 48, the third exhaust connection pipe 49, and the atmosphere exhaust pipe 50. Therefore, in the first program, the first switching valve 42 is switched to the first switching state in which the moist air is discharged to the atmosphere during the regeneration process.
[0058] As shown in FIG. 3, the control device 70 subsequently executes the second program after a certain time has elapsed since the first program was started. Then, the supply of dry air from the regeneration dry gas supply unit 30 to the second adsorption column 12 is stopped. Then, the gas vacuum pump 40 is driven to execute the gas evacuation process. Then, the air containing moisture in the second adsorption column 12 after the regeneration process is evacuated and discharged from the gas vacuum pump 40 to the atmosphere via the second supply branch pipe 18, the second exhaust connection pipe 47, the joint exhaust pipe 48, the third exhaust connection pipe 49, and the fourth exhaust connection pipe 51. Therefore, in the second program, the first switching valve 42 is switched to the second switching state in which the air in the second adsorption column 12 after the regeneration process is evacuated by driving the gas vacuum pump 40 and discharged to the atmosphere in the gas evacuation process. Therefore, the first switching valve 42 is switchable between the first switching state and the second switching state. Between the first program and the second program, when the first switching valve 42 is in the first switching state, the second switching valve 43 discharges moist air to the atmosphere in the regeneration process, and when the first switching valve 42 is in the second switching state, the second switching valve 43 is switched to a third switching state in which the air in the second adsorption column 12 after the regeneration process is evacuated by driving the gas vacuum pump 40 and discharged to the atmosphere in the gas vacuum pumping process.
[0059] 4, the control device 70 subsequently executes the third program a certain time after the start of the second program. Then, a portion of the hydrogen gas supplied from the hydrogen gas supply source 19 is supplied into the second adsorption column 12 via the main supply pipe 16 and the second branch supply pipe 18 of the supply line 15. In this manner, a single gas filling step is performed in which hydrogen gas is filled into the second adsorption column 12 after the gas evacuation step.
[0060] As shown in FIG. 5, the control device 70 subsequently executes the fourth program after a certain time has elapsed since the third program was started. Then, the supply of hydrogen gas from the hydrogen gas supply source 19 to the first adsorption column 11 through the supply line 15 is stopped. Meanwhile, the adsorption process is performed in the second adsorption column 12. Therefore, the gas production device 10 fills the second adsorption column 12 with hydrogen gas after the gas evacuation process and then executes the adsorption process. In the adsorption process, the moisture contained in the hydrogen gas supplied from the supply line 15 to the second adsorption column 12 is adsorbed by the second adsorbent 14 and discharged as dry gas. The dry gas discharged from the second adsorption column 12 is supplied to the supply target of the dry gas through the second dry gas supply pipe 24 and the dry gas junction pipe 25 of the dry gas supply line 22.
[0061] Furthermore, by driving the single gas vacuum pump 60 and the compression pump 61, the hydrogen gas in the first adsorption column 11 after the adsorption step is recovered and returned to the supply line 15. Specifically, by driving the single gas vacuum pump 60, the hydrogen gas in the first adsorption column 11 flows out to the single gas vacuum pump 60 via the first supply branch pipe 17, the first exhaust connection pipe 46, the joint exhaust pipe 48, and the first recovery pipe 63. In this way, the single gas vacuum pump 60 evacuates the hydrogen gas in the first adsorption column 11 after the adsorption step.
[0062] At this time, the pressure of the hydrogen gas flowing out from inside the first adsorption column 11 toward the single gas vacuum pump 60 is reduced by adjusting the aperture of the second switching valve 43. In addition, the pressure of the hydrogen gas flowing out from inside the first adsorption column 11 toward the single gas vacuum pump 60 is reduced by storing a portion of the hydrogen gas flowing through the first recovery pipe 63 in the first tank 67. This allows the single gas vacuum pump 60 to withstand the pressure of the hydrogen gas flowing in from inside the first adsorption column 11.
[0063] The hydrogen gas evacuated by the single gas vacuum pump 60 is sucked into the compression pump 61 through the second recovery pipe 64. The pressure of the hydrogen gas flowing through the second recovery pipe 64 is reduced by storing a part of the hydrogen gas flowing through the second recovery pipe 64 in the second tank 68. This allows the compression pump 61 to withstand the pressure of the hydrogen gas sucked into the compression pump 61 through the second recovery pipe 64. The compression pump 61 compresses and discharges the hydrogen gas in order to return the hydrogen gas evacuated by the single gas vacuum pump 60 to the supply line 15. The hydrogen gas discharged from the compression pump 61 returns to the main supply pipe 16 of the supply line 15 through the third recovery pipe 65. In this way, the single gas recovery process is performed by driving the single gas recovery pump 41.
[0064] In the fourth program, the second switching valve 43 is switched to a fourth switching state in which hydrogen gas in the first adsorption column 11 after the adsorption step in the single gas recovery step is recovered and returned to the supply line 15. Therefore, the second switching valve 43 is switchable between the third switching state and the fourth switching state.
[0065] As shown in FIG. 6, the control device 70 subsequently executes the fifth program after a certain time has elapsed since the fourth program was started. Then, compressed air from the compressed air supply source 38 is supplied to the air dryer 31 via the compressed air supply pipe 34. The air dryer 31 adsorbs moisture contained in the compressed air supplied from the compressed air supply source 38 and discharges it as dry air. The dry air discharged from the air dryer 31 passes through the dry air supply pipe 35, the first dry air branch pipe 36, and the first dry gas supply pipe 23 and is supplied to the first adsorption column 11, which is the target for performing the regeneration process. The orifice 32 reduces the pressure of the dry air discharged from the air dryer 31 to atmospheric pressure. Therefore, the dry air supplied from the regeneration dry gas supply unit 30 to the first adsorption column 11 is supplied to the first adsorption column 11 in a state where it is reduced in pressure to atmospheric pressure. In this way, the dry air switching valve 33 switches the flow of the dry air so that the dry air that has passed through the orifice 32 is supplied to the adsorption column, which is the target for performing the regeneration process.
[0066] The atmosphere in the first adsorption column 11 tends to reach an equilibrium state with the dry air. This allows the moisture contained in the first adsorbent 13 to be efficiently desorbed into the dry air. In this manner, a regeneration process is carried out after the adsorption process in which the moisture contained in the first adsorbent 13 is desorbed to regenerate the first adsorbent 13. Therefore, the regeneration dry gas supply unit 30 supplies the compressed dry air, in a state in which the pressure is reduced to atmospheric pressure, into the adsorption column in which the regeneration process is to be carried out.
[0067] During the regeneration process, the air containing moisture inside the first adsorption column 11 is discharged from inside the first adsorption column 11 to the atmosphere via the first supply branch pipe 17, the first exhaust connection pipe 46, the joint exhaust pipe 48, the third exhaust connection pipe 49, and the atmosphere exhaust pipe 50.
[0068] [Effects of the embodiment] The above embodiment can provide the following effects. (1) The compressed dry air from the regenerating dry gas supply unit 30 is supplied into the adsorption tube, which is the target for the regeneration process, in a state where the pressure is reduced to atmospheric pressure. As a result, the atmosphere in the adsorption tube tries to reach equilibrium with the dry air, and the moisture contained in the adsorbent is efficiently desorbed into the dry air. The gas vacuum pump 40 is driven to perform the gas evacuation process, so that the dry air in the adsorption tube after the regeneration process is evacuated and the dry air is discharged to the atmosphere. Then, after the gas evacuation process, the adsorption tube is filled with a single gas, and then the adsorption process is performed. On the other hand, the single gas recovery pump 41 is driven to perform the single gas recovery process, so that the single gas in the adsorption tube after the adsorption process is recovered and returned to the supply line 15. Then, the regeneration process is performed after the single gas recovery process. In this way, the adsorption process and the regeneration process can be repeatedly performed while avoiding the waste of a part of the dry gas obtained in the adsorption process, thereby improving the gas production efficiency.
[0069] (2) The regeneration dry gas supply unit 30, which includes the air dryer 31, the orifice 32, and the dry air switching valve 33, is suitable as a configuration for supplying compressed dry air, which is reduced in pressure to atmospheric pressure, into the adsorption column, which is the target for carrying out the regeneration process.
[0070] (3) The gas production apparatus 10 is provided with a first switching valve 42. This makes it possible to easily switch between the regeneration process and the gas evacuation process. (4) The gas production apparatus 10 is provided with a second switching valve 43. This makes it possible to easily switch between the regeneration process, the gas evacuation process, and the single gas recovery process.
[0071] (5) The single gas recovery pump 41, which includes the single gas vacuum pump 60 and the compression pump 61, is suitable as a configuration for performing a single gas recovery process in which hydrogen gas is recovered from the adsorption column after the adsorption process and returned to the supply line 15.
[0072] (6) The compression pump 61 has a check valve 61v. This makes it possible to prevent hydrogen gas from flowing into the compression pump 61 from the supply line 15.
[0073] (7) The gas production apparatus 10 is provided with a check valve 66. This makes it possible to prevent hydrogen gas from flowing from the supply line 15 toward the single gas recovery pump 41.
[0074] [Example of change] The above embodiment can be modified as follows: The above embodiment and the following modifications can be combined with each other to the extent that no technical contradiction occurs.
[0075] In the embodiment, the first switching valve 42 does not have to be a three-way valve. The gas production apparatus 10 may include a first switching valve including, for example, a two-way valve provided in the atmosphere exhaust pipe 50 and a two-way valve provided in the fourth exhaust connection pipe 51.
[0076] In the embodiment, the second switching valve 43 does not have to be a three-way valve. The gas production apparatus 10 may include a second switching valve including, for example, a two-way valve provided in the third exhaust connection pipe 49 and a two-way valve provided in the first recovery pipe 63.
[0077] In the embodiment, the dry air switching valve 33 does not have to be a three-way valve. The gas production apparatus 10 may include a dry air switching valve including, for example, a two-way valve provided in the first dry air branch pipe 36 and a two-way valve provided in the second dry air branch pipe 37.
[0078] In the embodiment, the discharge switching valve 44 does not have to be a three-way valve. The gas production apparatus 10 may include a discharge switching valve including, for example, a two-way valve provided in the first discharge connection pipe 46 and a two-way valve provided in the second discharge connection pipe 47.
[0079] In an embodiment, the single gas recovery pump 41 may be a single pump that combines the functions of both the single gas vacuum pump 60 and the compression pump 61 . In the embodiment, the compression pump 61 may be configured without including the check valve 61v.
[0080] In the embodiment, the gas production apparatus 10 may not include the check valve 66 . In the embodiment, the gas production apparatus 10 may not include the first tank 67.
[0081] In the embodiment, the gas production apparatus 10 may not include the second tank 68. In the embodiment, the second switching valve 43 may be an on-off valve instead of a proportional valve.
[0082] In the embodiment, the gas production apparatus 10 may include a plurality of first adsorption columns 11 and a plurality of second adsorption columns 12. For example, the plurality of first adsorption columns 11 may be connected in parallel to one another, or the plurality of first adsorption columns 11 may be connected in series to one another. Similarly, for example, the plurality of second adsorption columns 12 may be connected in parallel to one another, or the plurality of second adsorption columns 12 may be connected in series to one another.
[0083] In the embodiment, for example, a heater may be provided in each of the first dry air branch pipe 36 and the second dry air branch pipe 37. Then, the efficiency of the regeneration process may be improved by a thermal regeneration method in which the dry air flowing through each of the first dry air branch pipe 36 and the second dry air branch pipe 37 is heated by the heater.
[0084] In the embodiment, the dry gas for regeneration supply unit 30 may supply, for example, compressed dry nitrogen gas depressurized to atmospheric pressure as the dry gas for regeneration into the adsorption column in which the regeneration process is to be performed. In short, the dry gas for regeneration supply unit 30 may supply a gas other than a single gas, compressed dry gas for regeneration depressurized to atmospheric pressure, into the adsorption column in which the regeneration process is to be performed.
[0085] In the embodiment, for example, a humidity sensor may be provided in each of the first adsorption column 11 and the second adsorption column 12. Then, in the first program, the control device 70 may execute the second program when the control device 70 detects the completion of the regeneration process by detecting that the humidity detected by the humidity sensor reaches a humidity threshold value determined in advance by an experiment or the like.
[0086] In the embodiment, for example, a pressure sensor may be provided in the joint discharge pipe 48. Then, in the second program, the control device 70 may execute the third program when it detects that the dry air has been sufficiently evacuated by the gas evacuation process as a result of the pressure detected by the pressure sensor reaching a pressure previously determined by an experiment or the like.
[0087] In the embodiment, for example, a pressure sensor may be provided in each of the second port 11b of the first adsorption column 11 and the second port 12b of the second adsorption column 12. Then, the control device 70 may be configured to execute the fourth program when it detects in the third program that the pressure detected by the pressure sensor has reached a preset pressure, thereby indicating that sufficient hydrogen gas has been filled by the single gas filling step.
[0088] In the embodiment, for example, a pressure sensor may be provided in the joint discharge pipe 48. Then, in the fourth program, the control device 70 may be configured to execute the fifth program when it detects that the pressure detected by the pressure sensor reaches a pressure previously determined by an experiment or the like, thereby indicating that the hydrogen gas has been sufficiently recovered by the single gas recovery process.
[0089] In the embodiment, for example, an orifice may be provided in each of the first dry air branch pipe 36 and the second dry air branch pipe 37. This makes it possible to reduce the effective cross-sectional area required for the dry air switching valve 33, thereby making it possible to reduce the size of the dry air switching valve 33.
[0090] In the embodiment, the first supply switching valve 20, the second supply switching valve 21, the first dry gas switching valve 26, the second dry gas switching valve 27, the dry air switching valve 33, the first switching valve 42, the second switching valve 43, and the discharge switching valve 44 may be manually controlled rather than electrically controlled.
[0091] In the embodiment, the gas production device 10 may adsorb moisture contained in oxygen gas, which is a single gas, to produce a dry gas. In short, the single gas is not limited to hydrogen gas. [Explanation of symbols]
[0092] 10...gas production apparatus, 11...first adsorption column which is an adsorption column, 12...second adsorption column which is an adsorption column, 13...first adsorbent as an adsorbent, 14...second adsorbent as an adsorbent, 15...supply line, 30...dry gas supply section for regeneration, 31...air dryer, 32...orifice, 33...dry air switching valve, 40...gas vacuum pump, 41...single gas recovery pump, 42...first switching valve, 43...second switching valve, 60...single gas vacuum pump, 61...compression pump, 61v...check valve, 66...check valve.
Claims
1. An adsorption cylinder that contains an adsorbent therein, an adsorption step in which moisture contained in a single gas supplied from a supply line into the adsorption cylinder is adsorbed by the adsorbent and discharged as a dry gas, and a regeneration step in which moisture contained in the adsorbent is removed after the adsorption step to regenerate the adsorbent are alternately and repeatedly performed in the adsorption cylinder; A gas production apparatus including a plurality of adsorption cylinders so that the adsorption step can be performed in another adsorption cylinder until the adsorption step is performed again in the adsorption cylinder that contains the adsorbent after the adsorption step by regenerating the adsorbent in the regeneration step, a regeneration dry gas supply unit that supplies a compressed regeneration dry gas, which is a gas other than the single gas, into an adsorption column that is the target for performing the regeneration process in a state where the compressed regeneration dry gas is reduced to atmospheric pressure; a gas vacuum pump that is driven to execute a gas evacuation step of evacuating the moisture-containing gas in the adsorption column after the regeneration step and discharging the gas into the atmosphere; a single gas recovery pump that is driven to execute a single gas recovery step of recovering the single gas in the adsorption column after the adsorption step and returning the single gas to the supply line; a gas generating apparatus comprising: a gas supply unit for supplying a single gas into the adsorption cylinder after the gas evacuation step; a gas supply unit for supplying a single gas to the adsorption cylinder;
2. The regenerating dry gas is dry air, The regenerating dry gas supply unit includes: an air dryer that adsorbs moisture contained in compressed air and discharges the dried air; an orifice for reducing the pressure of the dry air flowing out from the air dryer to atmospheric pressure; 2. The gas production apparatus according to claim 1, further comprising: a dry air switching valve that switches the flow of the dry air so that the dry air that has passed through the orifice is supplied into an adsorption column that is the target for carrying out the regeneration process.
3. 3. The gas manufacturing apparatus according to claim 1, further comprising a first switching valve that can be switched between a first switching state in which the gas containing moisture is discharged to the atmosphere in the regeneration process and a second switching state in which the gas in the adsorption tube after the regeneration process is evacuated by driving the gas vacuum pump and discharged to the atmosphere in the gas evacuation process.
4. 4. The gas manufacturing apparatus according to claim 3, further comprising a second switching valve that can be switched between a third switching state in which, when the first switching valve is in the first switching state, gas containing moisture is discharged to the atmosphere in the regeneration process, and when the first switching valve is in the second switching state, the gas in the adsorption tube after the regeneration process is evacuated by driving the gas vacuum pump and discharged to the atmosphere in the gas evacuation process, and a fourth switching state in which, in the single gas recovery process, the single gas in the adsorption tube after the adsorption process is recovered and returned to the supply line.
5. The single gas recovery pump comprises: a single gas vacuum pump for evacuating the single gas in the adsorption column after the adsorption step; 2. The gas producing apparatus according to claim 1, further comprising: a compression pump that compresses and discharges the single gas evacuated by the single gas vacuum pump to return the single gas to the supply line.
6. 6. The gas production apparatus according to claim 5, wherein the compressor pump has a check valve for blocking the flow of a single gas from the supply line toward the inside of the compressor pump.
7. 2. The gas production apparatus according to claim 1, further comprising a check valve for blocking the flow of the single gas from the supply line toward the single gas recovery pump.
8. an adsorption step in which moisture contained in a single gas supplied from a supply line into the adsorption cylinder is adsorbed by an adsorbent and discharged as a dry gas, and a regeneration step in which moisture contained in the adsorbent is removed after the adsorption step to regenerate the adsorbent, A gas production method, comprising: performing the adsorption step in another adsorption tube until the adsorbent is regenerated in the regeneration step after the adsorption step and the adsorption step is performed again in the adsorption tube containing the regenerated adsorbent, In the regeneration step, a compressed dry gas for regeneration, which is a gas different from the single gas, is decompressed to atmospheric pressure and supplied to an adsorption column which is the subject of the regeneration step; A gas evacuation step is carried out in which the gas containing moisture in the adsorption column after the regeneration step is evacuated and the gas is discharged to the atmosphere; carrying out a single gas recovery step of recovering the single gas in the adsorption column after the adsorption step and returning the single gas to the supply line; a regeneration step of the adsorption step after the single gas recovery step; and a regeneration step of the adsorption step after the single gas recovery step.
Citation Information
Patent Citations
Hydrogen gas production method and hydrogen gas production facility
JP2019148001A