Failure diagnostic method and failure diagnostic device of evaporative fuel processing system

The method diagnoses multiple leaks and failures in evaporative fuel processing systems by comparing actual and simulated pressure changes during depressurization, reducing the time required for diagnosis and minimizing emissions.

JP2024162877AInactive Publication Date: 2024-11-21NISSAN MOTOR CO LTD

Patent Information

Application Number
JP2023078834
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-11
Publication Date
2024-11-21
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing fault diagnosis methods for evaporative fuel processing systems in vehicles interrupt normal purge control for extended periods, leading to increased evaporative emissions and decreased drivability due to the need to diagnose multiple types of leaks and failures individually.

Method used

A method that simultaneously diagnoses gross leaks, purge failures, vent clogging, and vent valve failures by monitoring actual pressure changes and comparing them with simulated pressure changes during a single depressurization phase, allowing for rapid identification of these issues without prolonged disruption of normal purge control.

Benefits of technology

This approach enables efficient diagnosis of multiple leaks and failures while minimizing the impact on evaporative emissions and drivability by reducing the time spent in diagnostic mode, thus maintaining system functionality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024162877000001_ABST
    Figure 2024162877000001_ABST
Patent Text Reader

Abstract

To provide a method which may diagnose multiple leaks etc. while inhibiting influence on evaporative emission.SOLUTION: In a failure diagnostic method of an evaporative fuel processing system 1, a controller 20 causes a purge valve 7 interposed in a purge pipe 5 to open and starts monitoring of an actual pressure in the purge pipe 5, a gross leak simulation in which pressure change in the purge pipe 5 is estimated on the assumption that a gross leak has occurred, and a purge failure simulation in which pressure change in the purge pipe 5 is estimated on the assumption that a failure has occurred in a purge system at the start of the diagnosis. In a case where the pressure change in the gross leak simulation reaches a first reference pressure anticipated in the gross leak simulation earlier than change of the actual pressure and the change of the actual pressure reaches a second reference pressure anticipated in the purge failure simulation earlier than the pressure change in the purge failure simulation, it is determined that the gross leak has occurred.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a fault diagnosis method and a fault diagnosis device for an evaporated fuel processing system. [Background technology]

[0002] There is known an evaporated fuel processing system that adsorbs evaporated fuel generated in a vehicle fuel tank in a canister and purges fuel components from the canister to the intake system of the internal combustion engine while the internal combustion engine is running. Patent Document 1 discloses a leak diagnosis for such an evaporated fuel processing system that is performed while the vehicle is running, in which negative pressure is introduced into the evaporative system including the fuel tank, and the presence or absence of a leak is determined based on the pressure in the evaporative system after a predetermined time has elapsed since the start of the introduction and a leak determination value. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Patent Publication No. 2022-12676 Summary of the Invention [Problem to be solved by the invention]

[0004] Incidentally, the type of leak in the fuel vapor processing system may be, for example, when the fuel tank cap is removed or when the purge pipe is disconnected. In addition to leaks, malfunctions such as blockage of any of the pipes or valves may occur. The way in which the pressure changes when negative pressure is introduced into the evaporative system varies depending on the type of leak or malfunction. In this regard, the diagnostic method of the above document requires a diagnosis to be performed for each type of leak or malfunction to be diagnosed, which increases the time that diagnostic control interrupts normal purge control, and this may result in a decrease in evaporative emissions.

[0005] SUMMARY OF THE PRESENT DISCLOSURE An object of the present invention is to provide a method capable of diagnosing a plurality of leaks while suppressing the effect on evaporative emissions. [Means for solving the problem]

[0006] According to one aspect of the present invention, there is provided a fault diagnosis method for a vehicle evaporated fuel processing system, in which a controller opens a purge valve interposed in a purge pipe connecting a canister and an internal combustion engine when diagnosis is started, starts monitoring an actual pressure that is an actual pressure in the purge pipe, starts a gross leak simulation that estimates a pressure change in the purge pipe assuming that a gross leak is occurring, and starts a purge failure simulation that estimates a pressure change in the purge pipe assuming that a failure is occurring in the purge system, and determines that a gross leak is occurring when the pressure change by the gross leak simulation reaches a first reference pressure that is estimated to be reached by the gross leak simulation faster than the change in the actual pressure and when the change in the actual pressure reaches a second reference pressure that is estimated to be reached by the purge failure simulation faster than the pressure change by the purge failure simulation. Effect of the Invention

[0007] According to the above aspect, it is possible to provide a method capable of diagnosing a plurality of leaks, etc. while suppressing the effect on evaporative emissions. [Brief description of the drawings]

[0008] [Figure 1] FIG. 1 is a schematic diagram of an evaporated fuel processing system. [Diagram 2] FIG. 2 is a flowchart showing a fault diagnosis routine. [Diagram 3] FIG. 3 is an example of a time chart when a fault diagnosis routine is executed. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] Hereinafter, an embodiment of the present invention will be described with reference to the drawings.

[0010] FIG. 1 is a schematic diagram of an evaporated fuel processing system 1 to which an embodiment of the present invention is applied.

[0011] The evaporated fuel treatment system 1 is mounted on a vehicle (not shown) together with an internal combustion engine 15 and a fuel tank 9, and is intended to treat gas (hereinafter referred to as gasoline vapor or vapor) produced by the evaporation of fuel in the fuel tank 9.

[0012] The fuel tank 9 is equipped with a fuel filler pipe 10 having a filler cap 12 removably attached to a fuel filler opening at the tip, and houses inside a pump unit 11 that supplies fuel to a fuel injection device 14 of an internal combustion engine 15 via a fuel piping 13, and a level sensor 18 that detects the liquid level according to the amount of remaining fuel. Based on the detection signal of this level sensor 18, a controller 20 (described later) calculates the amount of remaining fuel.

[0013] The evaporated fuel processing system 1 includes a canister 2 that adsorbs gasoline vapor, a breather pipe 3 that connects a fuel tank 9 and the canister 2, a purge pipe 5 that connects the canister 2 and an intake passage 16 of an internal combustion engine 15, and a drain pipe 4 that connects the canister 2 to the atmosphere. A purge valve 7 is disposed in the purge pipe 5, and a vent valve 6 is disposed in the drain pipe 4. The purge pipe 5 and the purge valve 7 are collectively referred to as a purge system. The evaporated fuel processing system 1 also includes a pressure sensor 8 that detects the pressure between the purge valve 7 of the purge pipe 5 and the canister 2.

[0014] The canister 2 is a case made of synthetic resin or the like with a flow path formed inside, and the flow path is filled with an adsorbent material made of activated carbon or the like. One end of the flow path is connected to a breather pipe 3 and a purge pipe 5, and the other end is connected to a drain pipe 4. Gasoline vapor generated in the fuel tank 9 flows into the canister 2 via the breather pipe 3 and is adsorbed by the adsorbent.

[0015] The vent valve 6 and the purge valve 7 are solenoid valves that open and close in response to a signal from a controller 20 serving as a valve control unit. For example, the vent valve 6 is a normally open valve that is in an open state when not energized, and the purge valve 7 is a normally closed valve that is in a closed state when not energized.

[0016] The detection signal of the pressure sensor 8 is read into a controller 20 serving as a monitoring unit.

[0017] The controller 20 performs various controls of the internal combustion engine 15, such as fuel injection amount control, injection timing control, ignition timing control, and throttle valve 17 opening control. The controller 20 also performs purge control to purge fuel components adsorbed in the adsorbent of the canister 2 (hereinafter also referred to as "adsorbed in the canister 2") to the intake passage 16 of the internal combustion engine 15 while the internal combustion engine 15 is in operation. The controller 20 is composed of a microcomputer equipped with a central processing unit (CPU), read only memory (ROM), random access memory (RAM), non-volatile memory, and an input / output interface (I / O interface). The controller 20 can also be composed of multiple microcomputers.

[0018] When performing purge control, the controller 20 opens the vent valve 6 and the purge valve 7. By opening the purge valve 7, the negative pressure in the intake passage 16 is introduced into the purge pipe 5, and one end of the flow path in the canister 2 becomes negative pressure. On the other hand, by opening the vent valve 6, the other end of the flow path becomes atmospheric pressure. Due to this pressure difference, air is introduced into the flow path in the canister 2, and the fuel components adsorbed on the canister 2 are released, and the released fuel components flow into the intake passage 16 via the purge pipe 5.

[0019] Next, diagnosis of the evaporated fuel processing system 1 configured as above will be described.

[0020] In this embodiment, the diagnosis targets are gross leaks, fine leaks, purge failures, vent clogging, and vent valve failures.

[0021] A gross leak is one in which the airtightness is significantly reduced, such as when the filler cap 12 is removed.

[0022] A fine leak is a leak that is finer than a gross leak, such as a 0.04 inch leak defined in the laws and regulations on volatile organic compounds (VOCs) in California, USA. A 0.04 inch leak is equivalent to a leak that occurs when a hole with a diameter of 0.04 inches is opened in the purge pipe 5.

[0023] The purge failure is a failure in which purging from the canister 2 to the intake passage 16 is not performed normally, for example, when the purge pipe 5 is disconnected.

[0024] The vent clogging is a malfunction such as a blockage occurring between the fuel tank 9 and the canister 2.

[0025] The vent valve failure is a failure in which the vent valve 6 is stuck closed or the like.

[0026] Leaks and malfunctions can be diagnosed by diagnostic control, which performs diagnosis based on pressure changes after the purge valve 7 is opened. However, the diagnostic control takes several to several tens of seconds, so if the above leaks and the like are diagnosed individually, the diagnostic control will interrupt the normal purge control for a long time. In other words, purging will be performed at a different timing from the normal purge control, which may result in a decrease in evaporative emissions.

[0027] Therefore, in this embodiment, diagnosis is performed by the method described below.

[0028] FIG. 2 is a flowchart showing a fault diagnosis routine executed by the controller 20.

[0029] In step S100, the controller 20 judges whether the diagnostic conditions are satisfied, and if satisfied, the process proceeds to step S101, and if not satisfied, the process repeats this judgment until the diagnostic conditions are satisfied. The diagnostic conditions are the same as those for general leak diagnosis, such as the coolant temperature of the internal combustion engine 15 being equal to or higher than a predetermined temperature, the vehicle being in motion, and the remaining fuel amount being within a predetermined range.

[0030] In step S101, the controller 20 switches from a normal purge control mode (hereinafter also referred to as the normal mode) to the diagnosis mode. Specifically, the purge valve 7 is closed. When purging is being performed in the normal mode, the valve is closed over a predetermined time (e.g., about several seconds). For example, when purging is being performed in the normal mode, if the purge valve 7 is suddenly closed upon switching to the diagnosis mode, the purge flow rate may suddenly fluctuate, which may affect drivability. Therefore, in this embodiment, the purge valve 7 is closed over a predetermined time, thereby gradually reducing the purge amount.

[0031] In step S102, the controller 20 performs a reference pressure check. Checking the reference pressure means acquiring a pressure (reference pressure) that is the starting point of a pressure change described later. Specifically, the vent valve 6 is opened and the purge valve 7 is closed to introduce atmospheric pressure into the canister 2 and the purge piping 5, and the detection signal of the pressure sensor 8 is read. If an atmospheric pressure sensor is provided in addition to the pressure sensor 8, the detection signal of the atmospheric pressure sensor may be read and used as the reference pressure.

[0032] In step S103, the controller 20 judges whether the amount of vapor generation is within a preset range. If it is within the range, the process proceeds to step S104. If it is not, the routine ends. The more the amount of vapor generation, the higher the pressure in the canister 2 becomes, and if it becomes excessively high, the simulation described later cannot be applied. Also, the less the amount of vapor generation, the harder the pressure in the canister 2 increases, and if it does not increase sufficiently, the simulation described later cannot be applied. Therefore, a range in which the simulation can be applied is set as a specified range, and if it is outside the specified range, the diagnosis is not performed. As described above, there is a correlation between the amount of vapor generation and the pressure in the canister 2, so the judgment is made based on the pressure detected by the pressure sensor 8. Specifically, the vent valve 6 is closed, and the pressure increase from the reference pressure thereafter is monitored to judge whether it is within a pressure range correlated with the specified range.

[0033] In step S104, the controller 20 checks the reference pressure again after a predetermined time has elapsed since the vent valve 6 was opened. The predetermined time here is a time that is set in advance as the time it takes for the inside of the canister 2 to reach an equilibrium state after the vent valve 6 is opened.

[0034] In step S105, the controller 20 executes a depressurization phase for depressurizing the inside of the purge pipe 5. Specifically, the purge valve 7 is opened to introduce the negative pressure developed in the intake passage 16 into the purge pipe 5. At this time, the vent valve 6 is closed. Then, the controller 20 executes a gross leak diagnosis, a purge failure diagnosis, and a vent clogging diagnosis during the execution of the depressurization phase.

[0035] The gross leak diagnosis is a diagnosis of whether or not a gross leak that impairs airtightness occurs, for example, when the filler cap 12 is removed. Specifically, when the diagnosis condition is satisfied, the controller 20 as a simulation unit starts a simulation of the pressure change in the purge system (hereinafter also referred to as a gross leak simulation) assuming that a gross leak occurs, and compares the result with the actual pressure change in the purge system (hereinafter also referred to as an actual pressure change). The actual pressure in the purge system is the pressure detected by the pressure sensor 8. Since the decompression phase is being executed, both the gross leak simulation and the actual pressure change show a decreasing tendency, but due to the presence of a leak, the decreasing speed of the gross leak simulation is slower than that of the actual pressure change. For this reason, if the actual pressure change reaches the lower limit pressure (first reference pressure) that is estimated to be reached in the gross leak simulation before the gross leak simulation, it can be determined that a gross leak does not occur.

[0036] The purge failure diagnosis is to diagnose whether or not a purge failure has occurred, which prevents normal purging from the canister 2 due to, for example, a disconnected pipe. Specifically, when the diagnostic conditions are met, a simulation of the pressure change in the purge system assuming that a purge failure has occurred (hereinafter also referred to as a purge failure simulation) is started, and the result is compared with the actual pressure change. As with the gross leak diagnosis, this diagnosis can also be determined to have no purge failure if the actual pressure change reaches the lower limit pressure (second reference pressure) estimated to be reached in the purge failure simulation before the purge failure simulation.

[0037] The vent clogging diagnosis is to diagnose whether or not clogging (hereinafter also referred to as vent clogging) has occurred between the fuel tank 9 and the canister 2, such as, for example, clogging of the breather pipe 3 with some foreign matter. Specifically, when the diagnostic conditions are met, a simulation of the pressure change in the purge system (hereinafter also referred to as vent clogging simulation) is started assuming that the vent is clogged, and the result is compared with the actual pressure change. When the vent is clogged, the amount of vapor flowing in from the breather pipe 3 decreases, and the pressure drop rate in the purge pipe 5 becomes faster than in normal times. For this reason, when the actual pressure change reaches a lower limit pressure (third reference pressure) that is estimated to be reached in the vent clogging simulation before the vent clogging simulation, it can be determined that the vent is clogged.

[0038] The above simulations are performed by physically modeling the capacity of the fuel tank 9, the diameter and length of each pipe, and the specifications of the internal combustion engine 15, and further taking into consideration the remaining amount of fuel at the time of execution of the simulation.

[0039] Incidentally, each of the above diagnoses is performed by monitoring the actual pressure change during the decompression phase and comparing it with each simulation result. Therefore, if each diagnosis is performed individually and sequentially, the decompression phase will be performed for the number of diagnoses, and after one diagnosis is completed, a process of returning the pressure to atmospheric pressure for the next diagnosis is required, so the more diagnoses there are, the longer the time required for the diagnosis. Furthermore, since the diagnosis for leaks, etc. is performed by switching from the normal mode to the diagnosis mode, the longer the time in the diagnosis mode, i.e., the longer the time for which purge control different from the normal mode is performed, the higher the risk of the evaporative emission deteriorating.

[0040] Therefore, in this embodiment, the above three diagnoses are performed simultaneously during the depressurization phase in the manner described below.

[0041] If the cause of the purge failure is assumed to be the removal of the purge pipe 5 and the cause of the gross leak is assumed to be the removal of the filler cap 12, and the pressure change in the purge failure simulation is compared with the pressure change in the gross leak simulation, the pressure drop rate is greater in the gross leak. Therefore, if it is determined that there is no gross leak, there is also no purge failure. On the other hand, if it is determined that there is a gross leak, there is a case where a purge failure has occurred and a case where there is not, which can be distinguished by the above-mentioned purge failure diagnosis. In other words, by comparing the pressure changes in the gross leak simulation and the purge failure simulation with the actual pressure change, it is possible to distinguish three states: (1) no gross leak and no purge failure, (2) there is a gross leak and no purge failure, and (3) there is a gross leak and a purge failure.

[0042] Also, assuming that the cause of the vent clogging failure is blockage of the breather piping 3 by a foreign object, comparing the pressure change in the vent clogging simulation with the pressure change in the gross leak simulation, the rate of pressure drop is greater in the vent clogging failure. Therefore, when it is determined that no gross leak is occurring, there are cases where a vent clogging failure has occurred and cases where it has not, which can be determined by the above-mentioned vent clogging failure diagnosis. In other words, by comparing the pressure changes in the gross leak simulation, purge failure simulation, and vent clogging simulation with the actual pressure changes, it is possible to determine whether or not a vent clogging failure has occurred for each of the above states (1) to (3).

[0043] Therefore, in step S105, the controller 20 as a determination unit compares the pressure changes due to the gross leak simulation, the purge failure simulation, and the vent clogging simulation with the actual pressure change, and makes a determination as follows.

[0044] If the actual pressure change reaches the first reference pressure before the pressure change due to the gross leak simulation reaches the first reference pressure and the pressure change due to the vent clog simulation reaches the third reference pressure before the actual pressure change, it is determined that no failure has occurred.

[0045] If the pressure change resulting from the gross leak simulation reaches the first reference pressure earlier than the actual pressure change, and the actual pressure change reaches the second reference pressure earlier than the pressure change resulting from the purge failure simulation, it is determined that a gross leak has occurred.

[0046] If the pressure change resulting from the purge failure simulation reaches the second reference pressure earlier than the actual pressure change, it is determined that a purge failure has occurred.

[0047] If the third reference pressure is reached before the pressure change due to the vent failure simulation, which is greater than the actual pressure change, it is determined that a vent failure has not occurred, and if the opposite is true, it is determined that a vent failure has occurred.

[0048] Returning to the explanation of the flowchart.

[0049] When the depressurization phase of step S105 ends, the controller 20 checks in step S106 whether there is a gross leak, a purge failure, or a clogged vent failure (hereinafter also referred to as a leak, etc.), and if there is no leak, etc., the controller proceeds to the processing of step S107, and if there is, the controller ends this routine. The timing to end the depressurization phase is when a predetermined time has elapsed after all diagnoses have ended. The predetermined time here can be set arbitrarily. Furthermore, if there is a leak, etc., after the routine ends, the controller 20 performs processing to notify the driver of the occurrence of a leak, etc., such as turning on a warning light.

[0050] In step S107, the controller 20 executes a pressure adjustment phase. The pressure adjustment phase is a phase for stabilizing the state after pressure reduction. Here, the controller 20 waits for a pressure adjustment time, which can be set arbitrarily without performing any special control, to elapse from the timing of the end of the pressure reduction phase.

[0051] When the pressure adjustment phase is completed, the controller 20 executes a leak check phase in step S108 to diagnose the presence or absence of the above-mentioned micro leak. Specifically, the controller 20 starts a simulation of the pressure change in the purge system when the purge valve 7 is closed and a micro leak is generated (hereinafter, also referred to as a micro leak simulation), and compares the result with the actual pressure change. When the purge valve 7 is closed, the pressure in the purge pipe 5 gradually increases, but if a micro hole is opened in the purge pipe 5, air flows into the purge pipe 5 in a negative pressure state from the micro hole, so the pressure increases faster than when no micro leak occurs. Therefore, if the pressure fluctuation by the micro leak simulation reaches the reference pressure (fourth reference pressure) estimated to be reached by the micro leak simulation earlier than the actual pressure fluctuation, it is determined that a micro leak occurs, and if not, it is determined that no micro leak occurs.

[0052] If it is determined that no micro leaks are occurring, then a failure diagnosis of the vent valve 6 is performed. Specifically, after the diagnosis of micro leaks is completed, the vent valve 6 is opened and a simulation is performed in which the vent valve 6 is not in an open state (hereinafter, also referred to as a vent failure simulation), and the result is compared with the actual pressure change. If the vent valve 6 is opened while the purge valve 7 is closed, the pressure rises due to communication with the atmosphere of the drain pipe 4. However, if the vent valve 6 is not opened, the communication with the atmosphere is cut off, so the pressure rise rate is slower than when the vent valve 6 is in an open state. Therefore, if the actual pressure fluctuation reaches the reference pressure (fifth reference pressure) estimated to be reached in the vent failure simulation before the pressure fluctuation due to the vent failure simulation, it is determined that no failure has occurred in the vent valve 6, and if not, it is determined that a failure has occurred. When the failure diagnosis of the vent valve 6 is completed, the leak check phase is completed.

[0053] After the leak check phase is completed, the controller 20 performs a reference pressure check in step S109, similar to the processing in steps S102 and S103, and determines whether the amount of vapor generation is within a specified range in step S110. Since each of the above diagnoses takes several tens of seconds or more, even if the amount of vapor generation is within the specified range at the start of the diagnosis, there is a possibility that the amount of vapor generation may transition to a state outside the specified range during the diagnosis. Therefore, in this step, it is confirmed whether the amount of vapor generation has remained within the specified range while each diagnosis is being performed.

[0054] If it is determined in step S110 that the amount of generated vapor is within the specified range, the diagnosis result is confirmed in step S111, and if not, the diagnosis result is cancelled in step S112.

[0055] In step S113, the controller 20 waits for a delay time to elapse before returning from the diagnosis mode to the normal mode. When the vent failure diagnosis is completed, the vent valve 6 is opened again to return to the normal mode, but it takes time for the pressure inside the canister 2 to return to atmospheric pressure after the vent valve 6 is opened. Therefore, a delay time sufficient for the pressure inside the canister 2 to return to atmospheric pressure (for example, about several seconds) is preset, and the controller 20 waits for the delay time to elapse in step S113.

[0056] In step S114, the controller 20 initializes data relating to diagnosis, such as pressure changes by each simulation and actual pressure changes, in preparation for the next diagnosis, and ends this routine.

[0057] Figure 3 is an example of a time chart when the above control routine is executed. The solid line indicates the actual pressure change, the long dashed line indicates the pressure change in the gross leak simulation, the short dashed line indicates the pressure change in the purge failure simulation, the dashed line indicates the pressure change in the vent blockage simulation, the double dashed line indicates the pressure change in the micro leak simulation, and the dashed line indicates the pressure change in the vent valve failure simulation.

[0058] When the diagnostic condition is met at timing T1 and the depressurization phase starts, the actual pressure starts to decrease, and at the same time, a gross leak simulation, a purge failure simulation, and a vent clogging simulation are executed.

[0059] At time T2, the actual pressure change reaches the second reference pressure, but the pressure change due to the purge failure simulation has not yet reached the second reference pressure, and therefore the controller 20 determines that a purge failure has not occurred.

[0060] At time T3, the pressure change due to the vent clogging simulation reaches the third reference pressure, but the actual pressure change has not yet reached the third reference pressure, and therefore the controller 20 determines that the vent is not clogged.

[0061] At time T4, the actual pressure change reaches the first reference pressure, but the pressure change due to the gross leak simulation has not yet reached the first reference pressure, and therefore the controller 20 determines that no gross leak is occurring.

[0062] As described above, the diagnosis performed during the depressurization phase results in a diagnosis that no gross leak, purge failure, or vent clogging has occurred. Therefore, after the pressure adjustment phase (timing T5 to T6), the leak check phase is started, the actual pressure starts to rise, and a fine leak simulation and a vent valve failure simulation are performed.

[0063] At time T7, the pressure change due to the micro leak simulation reaches the fourth reference pressure, but the actual pressure change has not yet reached the fourth reference pressure. Therefore, the controller 20 determines that a micro leak is not occurring. The controller 20 then closes the vent valve 6, thereby increasing the rate at which the actual pressure rises.

[0064] At time T8, the actual pressure reaches the fifth reference pressure, but the pressure change due to the vent valve failure simulation has not yet reached the fifth reference pressure, and therefore the controller 20 determines that a vent valve failure has not occurred.

[0065] As described above, the diagnosis performed during the leakage phase results in a diagnosis that neither a micro-leak nor a vent valve failure has occurred.

[0066] As described above, in this embodiment, a fault diagnosis method for the evaporative fuel processing system 1 for a vehicle is provided. In this method, the controller 20 opens the purge valve 7 interposed in the purge pipe 5 connecting the canister 2 and the internal combustion engine 15 when the diagnosis starts, and starts monitoring the actual pressure in the purge pipe 5, a gross leak simulation for estimating the pressure change in the purge pipe 5 assuming that a gross leak has occurred, and a purge failure simulation for estimating the pressure change in the purge pipe 5 assuming that a failure has occurred in the purge system. Then, the controller 20 determines that a gross leak has occurred when the pressure change by the gross leak simulation reaches a first reference pressure that is estimated to be reached by the gross leak simulation earlier than the actual pressure change, and the actual pressure change reaches a second reference pressure that is estimated to be reached by the purge failure simulation earlier than the pressure change by the purge failure simulation. This allows both gross leak and purge failure to be diagnosed during one decompression phase, so that the time required for the diagnostic mode to switch to the normal mode can be shortened. In addition, it is possible to determine whether a gross leak or a purge failure has occurred. In other words, it is possible to diagnose a plurality of leaks while suppressing the effect on the evaporative emissions.

[0067] In this embodiment, the controller 20 determines that a fault has occurred in the purge system when the pressure change due to the purge fault simulation reaches the second reference pressure earlier than the change in the actual pressure, making it possible to determine whether a gross leak or a purge fault has occurred.

[0068] In this embodiment, the controller 20, when starting the diagnosis, also starts a vent clogging simulation to estimate a pressure change in the purge piping 5 assuming that a clogging has occurred between the fuel tank 9 and the canister 2, and determines that a clogging has occurred between the fuel tank 9 and the canister 2 if the change in actual pressure reaches a third reference pressure assumed in the vent clogging simulation faster than the pressure change due to the vent clogging simulation. This makes it possible to diagnose a gross leak and a purge failure as well as a vent clogging during one decompression phase.

[0069] In this embodiment, when the controller 20 determines that no gross leak, purge system failure (purge failure), or clogging between the fuel tank and the canister (vent clogging) has occurred, it closes the purge valve 7 and starts a fine leak simulation to estimate the pressure change in the purge pipe 5 assuming that a fine leak, which is less than a gross leak, has occurred. Then, when the pressure change due to the fine leak simulation reaches the fourth reference pressure assumed in the fine leak simulation before the change in the actual pressure, it is determined that a fine leak has occurred. This makes it possible to diagnose the presence or absence of a fine leak during the process of returning the pressure to atmospheric pressure for normal control from a state depressurized by the depressurization phase.

[0070] Although the embodiments of the present invention have been described above, the above-mentioned embodiments merely show some of the application examples of the present invention, and it is not intended that the technical scope of the present invention be limited to the specific configurations of the above-mentioned embodiments. [Explanation of symbols]

[0071] 1 evaporative fuel treatment system, 2 canister, 3 breather piping, 4 drain piping, 5 purge piping, 6 vent valve, 7 purge valve, 8 pressure sensor, 9 fuel tank, 10 fuel supply pipe, 11 pump unit, 12 filler cap, 15 internal combustion engine, 16 intake passage, 20 controller

Claims

1. A method for diagnosing a fault in an evaporative fuel processing system for a vehicle, comprising: a controller, when starting the diagnosis, opens a purge valve provided in a purge pipe connecting the canister and the internal combustion engine, and starts monitoring an actual pressure that is an actual pressure in the purge pipe, a gross leak simulation that estimates a pressure change in the purge pipe assuming that a gross leak has occurred, and a purge failure simulation that estimates a pressure change in the purge pipe assuming that a failure has occurred in the purge system; A fault diagnosis method for an evaporated fuel processing system, characterized in that it is determined that a gross leak is occurring when the pressure change due to the gross leak simulation reaches a first reference pressure estimated to be reached in the gross leak simulation faster than the change in the actual pressure, and when the change in the actual pressure reaches a second reference pressure estimated to be reached in the purge failure simulation faster than the pressure change due to the purge failure simulation.

2. 2. The method for diagnosing a fault in an evaporated fuel processing system according to claim 1, A fault diagnosis method for an evaporated fuel processing system, wherein the controller determines that a fault has occurred in the purge system if the pressure change due to the purge fault simulation reaches the second reference pressure faster than the change in the actual pressure.

3. 3. The method for diagnosing a fault in an evaporated fuel processing system according to claim 2, The controller starts a vent clogging simulation to estimate a pressure change in the purge pipe assuming that clogging has occurred between the fuel tank and the canister, together with starting the diagnosis. A fault diagnosis method for an evaporated fuel processing system, which determines that a blockage has occurred between the fuel tank and the canister when the change in the actual pressure reaches a third reference pressure estimated to be reached in the vent clogging simulation faster than the pressure change in the vent clogging simulation.

4. 4. The method for diagnosing a fault in an evaporated fuel processing system according to claim 3, The controller: When it is determined that none of the gross leak, the failure of the purge system, and the clogging between the fuel tank and the canister has occurred, The purge valve is closed, and a micro-leak simulation is started to estimate a pressure change in the purge pipe assuming that a micro-leak, which is smaller than the gross leak, is occurring; A fault diagnosis method for an evaporated fuel processing system, which determines that a micro leak is occurring when the pressure change due to the micro leak simulation reaches a fourth reference pressure that is estimated to be reached in the micro leak simulation before the change in the actual pressure.

5. A fuel tank; a canister for absorbing gasoline vapor, which is gas generated by evaporation of fuel in the fuel tank; a breather pipe connecting the fuel tank and the canister; a purge pipe connecting the canister and an intake passage of an internal combustion engine; A drain pipe that connects the canister to the atmosphere; A purge valve installed in the purge pipe; A vent valve installed in the drain pipe; a pressure sensor that detects a pressure in the purge pipe between the purge valve and the canister; A fault diagnosis device for a vehicle vapor fuel processing system, comprising: a valve control unit that opens the purge valve when the diagnosis is started; a monitoring unit that monitors an actual pressure, which is an actual pressure in the purge pipe, when a diagnosis is started; a simulation unit that starts, when the diagnosis is started, a gross leak simulation for estimating a pressure change in the purge piping assuming that a gross leak has occurred, and a purge failure simulation for estimating a pressure change in the purge piping assuming that a failure has occurred in the purge system; a determination unit that determines that the gross leak is occurring when a pressure change due to the gross leak simulation reaches a first reference pressure that is estimated to be reached in the gross leak simulation faster than a change in the actual pressure, and when the change in the actual pressure reaches a second reference pressure that is estimated to be reached in the purge failure simulation faster than a pressure change due to the purge failure simulation; A fault diagnosis device for an evaporated fuel processing system, comprising:

Citation Information

Patent Citations

  • Leak diagnosis device for fuel evaporated gas purge system

    JP2022012676A

Cited By

  • Purging monitoring and early warning device and method of thermal power plant furnace tube leakage monitoring system

    CN121298140A